HomeMy WebLinkAboutSW6120802_Geotechnical Report_20120806May 3, 2012
Bojangles' Restaurants, Inc.
c/o The Issacs Group, P.C.
8720 Red Oalc Blvd., Suite 420
Charlotte, North Carolina 28217
Attention: Mr. Brian Upton, P.E.
Em
R@12916La
AUG -62012
Reference: Stormwater BVIP Soil Testing
Seasonal High Water Table Determination and
Hydraulic Conductivity Testing
Proposed Bojangles' Restaurant
Chicken foot Road at Corporation Drive
I -lope Mills, Cumberland County, North Carolina
S&ME, Inc. Project No. 1351-12-060
Dear Mr. Upton:
S&ME, Inc. (S&ME) has conducted Stormwater Best Management Practices (BMP) Soil
Testing in accordance with S&ME Proposal No. 1351-25206-12 dated April 4, 2012.
The Stormwater 13MP Soil "Testing was performed to provide information fora
Stormwater Management Permit Application to the North Carolina Department of
Environment and Natural Resources (NCDENR) — Division of plater Quality (DWQ)
and/or local regulatory agency. A soil scientist investigation was conducted to evaluate
the soil properties of one (1) proposec! Stormwater BMP area (Infiltration Devices) to
determine suitability for Stormwater management systems. The soil scientist
investigation was conducted to evaluate: seasonal high water table (SI-IWT) elevations
and in -situ soil infiltration rate (ill -situ saturated hydraulic conductivity testing).
PROJECT BACKGROUND
'['he subject property is located on the north side of Chicken Foot Road between
Corporation Drive and the I-95 Bypass northbound ramp in Hope Mills, North Carolina
(Figure 1). The area evaluated consisted of an open power line casement.
An S&ME soil scientist conducted an evaluation of the soils within area identified on a
site plan provided by The Issacs Group, P.C., which identified the proposed sormwater
management system area. The soil scientist evaluation was conducted to evaluate the
suitability of the soil properties relative to Stormwater Management permitted by the
S&ME, INC. / 3718 Old Battleground Road / Greensboro, NC 27410 / p 336.288.7180 f 336,288.8980 / www.smeinc.com
Stormwater BMP Soil Testing S&ME Project No. 1351-12-060
Hope Mills Bojangles May 3, 2012
NCDI?NR-DWQ. One stormwater BMP location was identified and consisted of a
proposed Infiltration Device.
Maps were prepared using Arcview 10.1 a Geographic Information System (GIS). Base
maps were generated using information from the following sources: I SRI, Inc., Bing
Map Web Site, and a site plan provided by The Issacs Group, P.C. (Figures 1-3).
FINDINGS
Seasonal High Water Table Determination
The SI-LWT evaluation was performed by advancing a hand auger boring to a depth of
approximately 6 feet below ground surface (bgs) at the proposed stormwater management
system area. The location of the SI-I WT evaluation was approximated in the field.
During the hand auger advancement, soils were evaluated by a Licensed Soil Scientist for
evidence of SHWT influence. This evaluation involved looking at the actual moisture
content in the soil and observing the matrix and mottle colors. Depending on the soil
texture, the soil color will indicate processes that are driven by seasonally high water
table fluctuations, such as iron reduction and oxidation and organic matter staining.
Please note that SHWT evaluations are based on secondary evidence and not on direct
groundwater level measurements. Groundwater levels fluctuate for numerous reasons
and these findings do not indicate that groundwater levels have not or will not rise above
the noted depths. The SHWT depth was determined to be approximately 52 inches bgs at
the location evaluated.
See Figure 2 and 3 for the approximate SHWT test location and Table I for the calculated
hydraulic conductivity rates and approximated SHWT depths.
Constant Head Permeameter Testing
S&ME performed the in -situ hydraulic conductivity (Ksat) testing by utilizing a compact
constant head permeameter. S&ME performed two (2) Ksat tests at the hand auger
boring location (Figure 2 and 3).
l,or the Ksat testing, a hand auger boring was advanced to depths of approximately 22
and 32 inches bgs with a 2 inch diameter auger bucket. A planer auger was used to clean
the bottom of the auger holes and give them a cylindrical shape. The water dissipating
unit was lowered to the bottom of the holes and water was dispensed from the
permeameter. The water was allowed to move through the unit until steady-state flow
was achieved and then flow rates were recorded. The last three measurements were
averaged to achieve the most representative value to express the saturated hydraulic
conductivity. The depth interval of the tests corresponded to a layer of material
approximately 5 to 6 inches thick at the selected testing depth. "Fite soils at the test
location depths were observed to consist of predominantly sandy loam and light sandy
clay loam textures. The hydraulic conductivity rates were calculated as 4.59 inches per
Stormwater BMP Soil Testing
Hope Mills Bojangles
5&ME Project No. 1351-12-060
May 3, 2012
hour (in/hr) at 22 inches bgs, and 1.26 in/hr at 32 inches bgs. Reference "Rabic l below
for the calculated hydraulic conductivity rates and the approximated SI-IWT depth.
Table 1: Calculated Hydraulic Conductivity Rates and Approximated SHWT Depths
Hope Mills Bojangles - Stormwater BMP Project
fTest LocationF
Horizon
te9ti
a���
lic9,'
At.
SeasonaliHigfiiWafer
��--s���•
Table {SFtW7 botow
,e«st
k( nctieslbgs) y H
Conductiviinlhr},
;• rn ,w �
I IA13 H I - 22"
E
17 to 22
4.59
52"
HAB # I - 32"
Bit
26 to 32
1.26
52"
CONCLUSIONS
Based on our findings associated with the location evaluated, along with regulatory
guidance on requirements for permitting of stornnvater BMP's as provided in the
NCDENR, DWQ — Stormwater Best Management Practices Manual (NCDIENR-SW-
13M11), dated July 2007 (revised 2009), BMP's that rely on infiltration for treatment
would be suitable within the top 40 inches bgs. However, based on identification of a
SHW"f at approximately 52 inches bgs, the bottom of an infiltration device shall be a
minimum of 2 feet above the seasonal high water table and should not be installed deeper
than 28 inches bgs.
3
Stormwater BMP Soil Testing
Hope Mills Bojangles
CLOSING
S&ME Project No. 1351-12-060
May 3, 2012
S&ME appreciates the opportunity to provide these services to YOU. If YOU have any
questions, please contact uS.
Sincerely,
S&ME, Inc.
4161,ow__a �/2/ l/�
Martin Mabe /e�� Rob Willcox, L.S.S.
Project Matlager/Agronomist Natural Resources Services Leacler
Tables: 'fable l: Calculated Hydraulic Conductivity Rates and Approximated
SI-IWT Depths
Attachments: Figure 1 — Vicinity Map
Figure 2 — Hand Auger Boring and Ksat Location Map
Figure 3 — Stormwater 13MP Location Map
In -Situ Constant Head Permeameter Calculations
Hand Auger Boring Profile Sheet
SA158811588 REPORTSIOther Branches1135 - Charlotte\1351 Reports - Charlotte11351-12-060 Hope Mills
Bojangles11351-12-060 Hope Mills Bojangles - Stormwater BMP Soil Report.doc
4
Date: 5l 1 /2012
Location: HAB 41
Horizon: P
Client: Bojangles' Restaurants, Inc.
Project Name: Stormwater Blv[P Project
Project #: 1351-12-060
S&ME
"TN -SITU" CONSTANT DEAD PERMEAMETER
Hole Depth-
1,83
Feet
Hole Radius (r):
0.08
Feet
Bubble Tube to Surface:
0.25
Feet
Reference Tube to Hole Bottom (D):
2.08
Feet
Water Depth in Hole (11):
0.50
Feet
CIIT Tube(s) Setting (h,):
1.58
Feet
Chamber Used:10.11 L Ft'-
Ksat = CQ/(2I iH2) Initial Water in Hole: 0.42 Feet
Final Water in Hole: 0.42 Feet
C = Binh-t (Il/r) - I(r/H)2 + 1]12 + r1H
sinh-t = inverse hyperbolic sin of a number
H = Height of water in hole (cm)
r = radius of hole (cm)
Q = Constant Flow Rate (Gal day)
= Cross Sectional Area of Resevior s Length of Drop in Water Column over Time
Time Drop in Water Column (ft)
r = 0.08 ft
(ft)
(cm)
H = 0.42 ft
0-5 min.
0.138
4.20
5-10 min.
0.151
4.60
C = 1.53
10-15 min.
0.246
7.50
Q= 49.00 Gallons/Day
15-20min.
0.210
6.40
20-25 min.
0.210
6.40
25-30 min.
0.210
6.40
30-35 min.
0.210
6.40
35-40 min.
0.210
6.40
Avg,
0.210
Cross Sectional Area = 0.11 ft2
Length of Drop in Water Column — 57.95 ft/day
Ksat— 68.59 Gallons/Day/ft2
Inches/flour= 4.585
Note: Ksat calculations are based on average drop in Water Column (ft) after equilibrium is reached.
Time (min) _
5
adjuitabtc
atr tube
=onsant-trod
bow meamrinf
�-7"Vdr
h2
mh:mwe level
H
DWERI.SHt,3 unx
SA1588\1588 REPORM01her Branches\135-Charloue11351 Reports - Charlottc11351-12-060 Hope Mills Bojanglesl1351-12-060 Hope Mills Bojangies - Storrnwater BMP Soil Report Ksat 5-3-12.As 5/3/2012
S&NIE
"IN -SITU" CONSTANT HEAD PERMEAMETER
Date: SY112012
Location: HAB 4I
Horizon: Btl
Client: Bojangles' Restaurants, Inc.
Project Name: Stormwater BM11 Project
Project#: 1351-12-060
Ksat=CQ!(2Pill )
C = Binh-1 (Hlr) - I(r/H)2 + 1 ]lr + HIR
Hole Depth:
2.67
Feet
Hole Radius (r):
0.08
Feet
Bubble Tube to Surface:
0.25
Feet
Reference Tube to hole Bottom (D):
2.92
Feet
Water Depth in Hole (11):
0.50
Feet
CI IT Tube(s) Setting (ht):
2.42
Feet
Chamber Used: 0-11 Ft2
Initial Water in Hole: 0.50 Feet
Final Water in Hole: 0.50 Feet
sinh-1 = inverse hyperbolic sin of a number
H = Height ofwater in hole (cm)
r = radius of hole (cm)
Q = Constant Flow Rate (Gal/day)
= Cross Sectional Area of Resevior
x Length of
Drop in Water
Column over Time
Time
Drop in Water Column (ft) Time (min) _
r= 0.08 ft
(ft)
(cm) 5
H = 0.50 ft
0-5 min.
0.129
3.90
5-10 min.
0.072
2.20
C =
1.68
10-15 min.
0.092
2.80
Q =
17.61 Gallons/Day
15 20 min.
0.072
2.20
20-25 min.
0.072
2.20
25-30 min.
0.072
2.20
30-35 min.
0.075
2.30
35-40 min.
0.075
2.30
4045 min.
0.075
2.30
45-50 min.
0.075
2.30
50-55 min.
0.075
2.30
55-60 min.
0.075
2.30
Avg.
0.075
Cross Sectional Area = 0.11 112
Length of Drop in Water Column = 20.83 ft/day
Ksat =
18.84 Gallons/W3,/ft2
IncheslHour=
1,259
Note: Ksat calculations are based on average drop in Water Column
(fi) after
equilibrium is reached.
mrsun:-tend -
rJ�
flow measarn@
ht - rextvtir
�x
ttfermte to*el
sscm /
d I
-01swt vie: level D
` N
DUIRr�E twrra
S:\1588\1598 REPORTS5Otber Brmches5135 - Charlone11351 Reports - Charlotte11351-12-060 Hope Mills Bojangles11351-1 ^--060 Hope Mills Bojangles - Stormvater BhIP Soil Report Ksat 5-3-12 xls 513L'01 ^—
S& M.E, INC.
SITEISOIL .EVALUATION
Project No.
�
1 35! - IZ -O(oD PhoneNo.
r
Date:
511 r2
Location
J{��E /y), S_ Pin
County-: C i/� r-e At-iD
Property size
363AAG LrS
Proposed Facility:
Water Supply: On -Site Well ❑ Evaluation:
Auger Boring
Community ❑
Pit ❑
Described By:
i2DO WILLC0 k,-
Public ❑
Cut ❑
Weather: �1,�/,�4T
T Antecedent Moisture
57- Surface Water: �'Ifit
FACTORS
PROFILE 77
PROFILE
PROFILE
PROFILE
Landscape Position'%
I
Horizon Depth I
Color Munsell
Id t ,e 418
Texture
15
Structure
r
Consistence
s Y>
Boundary
Horizon Depth II
Color— Munsell
fo -5
Texture
J
Mottles
Structure
l
lvs /[
Consistence
4S y
Boundary
Horizon Depth III
lQ -
5Z —G O
Color—Munsell
2, 5 vG
Texture
($C
Mottles
Structure
Consistence
c 2
Boundary
Horizon Depth IV�—
Color -- Munsell
Z S 6 (a
f
`Texture
S& 1 f
SC1 SOexw
Mottles
_
Structure
Pys bX
fi
VySbL 6-5 I vE
Consistence
r
SS S �r
r
Boundary
Soil Wetness
52
Restrictive Horizon
S W j— S 7 r
Saprolite
72 el
LIAR
Classification
LEGEND
LANDSCAPE POSITION
It
Itidge ]nterfluve
S
Shoulder
L
Lincar Slope
S
foot Slope
N
Nose Slope
If
Head Slope
Cc
Concave Slope
CV
Convex Slope
T
Terrace
1'
I-'lood Plain
TEXTUI(E
s
sand
Is
loamy sand
sl
sandy loam
1
loam
sl
silt
sil
sillloam
sicl
silty clay loam
cl
clay loam
scl
sandy clay loam
sc
sandy clay
sic
silty clay
c
clay
C0NSISr1;NC1;1Y1;1'
Ns non -sticky
Ss slightly sticky
S sticky
Vs Vcry sticky
Np
non -plastic
Sp
slightly plastic
1'
plastic
Vp
t very plastic
MOIST
Vfr
Very friable
ti
friable
fi
firm
vfi
Very firm
SI'RUChURI,
sg
single grain
in
massive
cr
crumb
gr
granular
Sall
subangular blocky
ab
" angular blocky
p]
platy
pr
prismatic
Oaka
Q ,yN
has H� •'
51)
31k 11A
4p tl25 SIR 1353
- ate" s'p
2320
C1
f
jL SITE
,�+=ram ..
cat. *Aft
(10%d
0 Ln
SCALE 1" = 0.5 Mile FIGURE
N0.
DATE
May 2012 #S&ME
VICINITY MAP
DRAWN BY MEM 1
PROJECT NO WWW.SMEINC.COM HOPE MILLS BOJANGLES
1351-12-060 1 1 HOPE MILLS, NC