Loading...
HomeMy WebLinkAboutNCC232837_Site Plan or Location Map_20230920 1', SCHEDULE \ �� / / __.- CONSTRUCTION \ , f ,y I. Obtain all necessary penults and plan approvals.Erosion and Sediment CeeflI — — - \ / f / \ ),„ (E&SC)permit and a Certificate of Coverage(CAC)moat be obtained before any laud dienubing activities �� / / / / y occur.A copy of the E&SC permit,the COC and a hard copy of the plan meet be kept on site,preferably in a \ �- / / // ` _ \ ' permits box,and accessible during inspection. - —� \ / I \ \ Id z. Install gravel construction entrances prat,men out fences,reinforced sot fence potters and wattle. SODDING \ \ — / / \ \ R• 2T 3. Finish clearing and grubbing any necessary areas on the lots m they are started. �- \ 1 4. Begin lot grading and excavation activities / / / ` \ ""IN \ 5. Begin or continue with house construction activities. �� o CP,f, 6 Finish II rough grading dh construction. �� oalo Las - _- \ — _ — ___/ / / // / \ 1 v ]. install driveways, elks d p - �— 'Co 8. Beg f togradingmulch t \ \ 9 Final grassing, Ichi g and b'f..of lot.In most case h will Iva the installation of sod on the lot JACRSpp SPRI '0 % The 1 f ill rem placelit the lots sodded or gran g stabilized and rakes hold. rSIIMIMIMIII axgsengrwMMxa Pscss. `� \ — — — / / / // \ ''''""IMPS j2 S ROgp 10. The h shall cod Ir spections of the erosion d sedimentation control measures and complete �� \ __ / // / / \\\ the following combined self-inspection form found es the DEMLR website MAE e _ \ \/ / / / \ //files self-inspection %form %found urces/StonnweterMPDES%20 EOxEIRE ROgp Gespration forms shallEMLR-CSW-Moni available for ReveAugustt all times f.Twelve months a complete MATCHED coaxscTJv. � \ / �_ / // / / / \ \\ 1122 inspection forms shall be kept on site end available for inspection at all times.ft is recommended a copy be \ kept m a permits box.(GS 113A-54.1(0,15A NCAC 04B.0131,NCGOI Pan Ili Sections A end B) TO%FIRE a0A0 11. Self-inspections for erosion and sedimentation control measures are to be performed at least once every seven -- ,•.,.., -i \ — — / \ SR 1122 calendar days and within 24 hours of every rain event of greater than 1 inch.Any needed repairs shall be \ \ \ / / / / / V/// / \\ made immediately to maintain measures as designed.All ESC measures shall be maintained specified in ---� \\ \ \\ \ / / \✓// / \ \ SITE he constructiond ails on this plan.Amngauge hell be installed the project site for monitoring. / eP q 12. Inspection final acceptance letters.When the project is complete,the per minees shall contact DEMLR to • \ J /� 0 2 close out the E&SC Plan.After DEMLR infomrs the Carmine of the project close out,via inspection report, 1// p.+� VALLEv ROgp c the permittee shall visit"deq.neJSovMCG01"to submit an electronic Notice of termination(e-NOT).A$100 ii i., 1 I� — ---- \ \ l ( L / // / / ?`�M$ annual general permit fee will be charged until the cNOT has been filled out dila ,rA,ll III K \ \ \ -- �_ \ \ \ \ ` \ / / / SUNSET GROUND STABILIZATION wlmmaapla .A�:ro ASSOOHAS" _" MOW WHEN THE SOD 15 aM''aR "T��— �� \ / \ ROSELAND VICINITY MAP SITE AREA STABILIZATION Lao. wcx iz al. \ \ 3 REITFENCED / -- PERIMETER — —� \ APPEARANCE OF GOOD SOD ) ) SR ZOAD DESCRIPTION TIME FRAME EXCEPTIONS / r �\\ I ouTN.T.S. DIKES, 7 DAYS NONE '11 \ \ \ / / \ /SWALES, DITCHES a AA INSTRUCTION MITS &SLOPES °r1MeXEG"`' AA6III / -- HIGH QUALITY 7 DAYS NONE no'' i N \ / A�J, x=1 WATER ZONES ro rXeAr ,gwn / / // /// �I� WATTLE I / / / HQW SLOPES STEEPER 7 DAYS IF SLOPES ARE " ".`k�'w;,;°a°om xwaaaa / / �^ / A"SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY THAN 3:1 10'OR LESS IN �- / Ve yam i 1 NCGS 113A-54.11IS AVAILABLE FOR USE IT CAN BE COMPLETED BY HAND OR LENGTH AND ARE \ / / / / / A 10 / / / / / COMPLETED AS AN EXCEL SPREADSHEET. NOT STEEPER General Erosion Control Notes \ / AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED THAN 2:1, 14 1.Only the areas shown shall be disturbed. \ / / 1 EROSION AND DAYS ARE // or,- -----____ / (\ SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A ALLOWED 2.All disturbed areas shall be grassed and 0 /7 / / NCAC 04B.0131 STATES THAT-...DOCUMENTATION SHALL BE ACCOMPLISHED BY mulched ass n as possible and maintained � d"+/' 1� INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE SLOPES 3:1 OR 14 DAYS 7 DAYS FOR until pemanent cover is established. b I I / / \ // !/ `+� CONTRUCTION I I \ APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, FLATTER SLOPES GREATER .0 p \ 1/ t / / ENTRANCE I \ DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, THAN 50'IN , \� " PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION LENGTH 2 ' / / "x�r" y/ \\ CONTROL PLAN." ALL OTHER AREAS 14 DAYS NONE(EXCEPT II I I / / // pj CONLMITS ION rD, `\ \ \ I WITH SLOPES FOR HPERIMETERS \ / /// y/ / 9 ro \ \ \ 1 1 FLATTER THAN 4:1 AND HQW ZONES) CC \ 'ter \ 1 I I DATE: PAGE: i 1 DATE. PAGE: 1 Silt Sock/wattle Silt Sock/Wattle N / / \ \ NOTE: 9' 'c' b C f n x \ a-�I FLO Area to be 1. omerm move vMearn9 eauwekm Pmtecaon 'A' \ Flow be 7I - .. .. I 1 \ 1 \ -s_ eb -1�i�r„tt � P...---ea era- n. ''''' reE rot �_ \I \ / / \ \ \ \ logs 11j�, g, ✓! ✓! Ito the desired \ \ \ 1 I ç77v / / \11 / / \ \ <0 <o ilt soland c k/waded)enowa gat areas shookl be n.tl men ceisN awl edge Of wweto "r AU it �� tl �� qY L� , L iJ 1 \ 1 1 /// / / / \ \ \\A.Me.. a•Maa. from 9 umr en o e II \ \ I / / \ \ \ \ , \ a_ tl0 HU V �HU NAY -HU WAY HU HU AY HU AV HU WAV RO AY prevent run going pro silt sock/waded) u )i) 11/ inch x 2 inch cross section should be dnven vertically plumb,through the center of the silt �Ctawatuna Notes \ s CURB INLET 1 If needed,Tree Protection fencing should be instal,along the buffer zone wetland of bounds and/or around protected trees d duo of at least 125 feet for each I 1 I I / , /// ,/ \ I Trencn n ^ Inch hound,an pro providing a radius Wood Much or Com at ground a"Mn. , LEGEND inch of trunk diameter. ) 1 \ \ \ \ To 1/2 height of log a. ^ks/wattl.are used o f' 2 Install Silt Fence on the low elevation sides of each lot Install Silt Fence outlets shown On I J 1 I I I I / / \ \ \ urvTRErveHED rvsintas ory min N schema0Cd agmm and field adjusted T necessary,for placement a[low points.If lots are I / V / I / 7 \ '"""°"""'°""'°'"°"""'°`"^"'°°"'«"""""""""" ea contiguous and have different land owners or builders each lot should have Individual Silt / / / / I I I / /// / / / / \ \ \ ISOMETRICvLHw Fences /I \ t.MAINTENANCE epee r ® 3 Install required B It Fence with n 10 feet of properly line to ensure there is no Conti ct with / each 1 MO or greater...all Remo. CONSTRUCTION septic system Its the responsibility of the budder to ensure the installation of sediment Mulch or comp COMPOSTSOCK x nu now RATES CURB INLET ENTRANCE control measures does not impact the septic y d p areals). / - bUmre�mneeso Area To Be Prote�coo otter« ^? 2 teak/Wane muste r 4 At least one ConstructionEntrance/Exit t binstalledp t. / / / / // / / / / ) / / / / \ \ \ \/ •\ nm)n (zw"'�")( 0"'M"1(600"M"') a(nmj 5 Waste b' and othera dedicated fmanaging building atedal waste shall be et / / / / / \ 1 least 50 f y f storm drain t drainage d h nlesst can be shown that / B It Sock/aL«s, ..., ne3Fm) .33F. ,r 1,Z1 i er rr r p t rn no other alternative - .If tH separation cannot be achieved,these areas must be BheetF wm� rwpttle ae m, (z,m, (ro m, Rew.11 if damaged or dislodged contained behind s,Fence / Y� / \ / \ \ \ Hydraulic 150 225 300 4 mau9h Rate /Pm/x sl// sPm/x sRmjx 5 B Inlets do t f d'ruot h old be protected streets should be swept when / / / / / / / / /6 --- -- \ \ \ 1 (w n., nee (ter !e4r0 a sediment from meconaw f actin ty is present. / \ \ 1 meaaxm naa green pemranesur akb ire. /m/m7 /m/m) M.A. /m/m) /m/m) .\NC En t I.jpeg ]Detailsed oS It Fence Silt Fence Outlets sedimlt EnroldeW and eother not drawntosere Nc-Fnwrox,mnxLIf5 SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION O,TE provided on additional sheets.Erosion LOTLAandsedlmenreoenudetensere not drawnm scale. / / //// / // / / / / / / /; \ \ \ rrrE^Tr= -!.cT TYPICAL LOT LAYOUT WITH CURB AND GUTTER DATE: PAGE: DATE: PAGE: 7 / / / / / / / // / / / / \ ` 1 \ \ I _ -,_ Filter Fabric BkeIP� Plastic 0 / // / / / /7 / L�/ 7 j //� / ) ) I I Strange6 Max Standard NM., a Wrye B ckf ll trench I I 9•Mex. new re kn Wire Fence / ' d Compact / / 4 / thoroughly �n / / / n A Steel Post J t 1 ts- , 1 uwlma �o`da .'(t �4 so / / / / / / / / / / / / \ / //J Wre ties '" n>id IT Qo��`a /._, ran r• F,wr / / / / / / / r 1 down aafm L , , l / \ w it ks'216.11.41ilks:CM-role-4 3111.....11.....Mk.OM k..11• .....11.....1*--,...,...,.... -4 ( (__. , .---- .—.... -.4.1' i Gorda...adimendomer of standard olnord.,�renpOo. w m.,�P°°row m..awwr V...- CROSSBEaTary VIEW �Filter Fob, � B Mn .-0A 00' I — — — — ______/. / / / / ( / / // / )) / / // // / / / / n.w"Sara .a"� na3 Constmei bd der fabric from a banduous roll cutto de imp of the tuner to Mots Oben nts ere a.m°d,n,necessary �mm• n«wnh,.w / ais� sin e Ne I / / ' 1 / / <i' s _ — / / / / / / / / / N ai.nwwa�J «di.wam.e'''''mU.m .ael.e ....e'eaa.rneene.bam� all \ ere,m,nth 9 m�rcei -- / / // // / \ / / / / / / /�/ / / / ade it make any recd.repairs n « e ex and cow Thorough companion d de meth a mavim so one wmardoce prop=v n.. p grade am dme^aonsmown on the pens and Nk prevent mud a sediment from leawng the roper, / - _ _ / / / / //---) /r /10[divided m m taro 3 Provide drainage to carry water to a sediment "w��ciao' "m torn roadways construct.si.This may objectiouire perlodlonable materials a p .w a e Nen do public / // / / / / / / / / \Ne-Envtriedt°ceneulelpe9nwe,.rranl.. ✓ / _- / / / / / / / / / / / / \NC-Envirwrmrierilul.Jycy 'r / I( / / \ SILT FENCE CONSTRUCTION ENTRANCE/EXIT , I I DATE PAGE: / / - / / \ \ I I I 1 // f/ // / .MIN _� FENCE PAGE 1 of 2 + 1. 11111111.11111111.111111111 MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION oTALLo\TE\o\ioN ACREAGE: P�ANACREs LOT 10 • General-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be THE wasHED j �v• relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover.TOP OF SILT FENCE 1 F OXFIRE EAST - Ili - Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all STEEL FENCE ST 17,7 objectionable materials spilled,washed,or tracked onto public roadways. PHASE IV,SECTION H EIRE FEN HARDWARE CL TH nrnsneEw Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure FOR Vi.cFILTER FABRIC,FtTTR IN TRENCH 15URY WIRE FENCE, that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. FILTER OF WASHED sToAND HARDWARE SET MAX APAARRCE Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth O N S I T E HOMES, L L C MIN 131 INTO 3'FILTER FABRIC ON GROUND GROUND sotD and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. MINERAL SPRINGS TOWNSHIP MOORE COUNTY ems_reth e.should he 2 Stone on low eiewecn ameamainknce one Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be k,overlay Mead fence at lead 12 incheS SCALE:1"=100' AUGUST 2023 00 0 on.conditions. repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. GRAPHIC SCALE 1.Per NOG.01.inspect outlet at led VICO a k anndainr h 1 inch Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed BURY WIRE FENCE AND vrRDW CLOTH HLTERFAORic iNTREUEOB`'"s napes. sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. I. - 5u CH 3 Keep mesh tree et debne M provide adequate flow 4 Rep...dime...half of Owe outlet is covered II a.Replace atone as needed to rewrote de-Watenng. Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout Remove and replace stone as necessary as it becomes clogged with sediment.Remove all NC q"" SECTION VIEW fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. ( IN FEET ) J.... fey SILT FENCE OUTLET MOORMAN,KIZER&REITZEL,INC.1115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 Enu in ,O.. PHONE(910)484-5191 FAX(910)484-0388 LICENSE BF-0106 LAST SAVED:0/3/2023 5:14 PM LAST CLOTTED:a/e/2023 7:55 AM PLOTTED BY.Dennis Gilbert FILENAME:a\CURRENT JOBS\ONSITE HOMES\21-2724-05 FOXRRE-EC\PLANS\FOXFIRE EC LOT IO.Des