Loading...
HomeMy WebLinkAboutSW5230901_Supplemental Info Review_20230919 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 9/19/2023 10:30:18 AM (Supplemental Submittal) Accept by Kaitlin Peck 9/19/2023 10:43:40 AM (Supplemental Info Submittal) • The task was assigned to Kaitlin Peck 9/19/2023 10:30:20 AM =DEQ • Submittal from 9/19/2023 Permit Information: Please provide specific permit details below. ................................................................................................................................................................................................................................................................................................................................................................................................ What Type of Permit? Choose one: * NPDES Industrial or MS4 Permit State Stormwater(Post-Construction)Permit Other Permit Number* SW5230901 Begins with"SW","NCG",or"NCS" What DEQ Office is Reviewer:Please correct if misidentified,close this review form,and reassign task to the appropriate contact. the Primary Contact? Central Office * Washington Regional Office(Attn: Carl Dunn) Wilmington Regional Office(Attn:Christine Hall) ................................................................................................................................................................................................................................................................................................................................................................................................ Project Name* NCNG Camp Butner Training Center-BOM Yard Expansion Owner/Operator* North Carolina National Guard County: Granville Submitter Name:* Jacob Lewis Who is submitting this information? E-mail Address:* jacob.lewis@timmons.com Phone Number* 9195323236 Additional E-mail for (Optional) Submittal Confirmation: State Stormwater (Post-Construction) Information Uploads Choose file type and upload attachment(Reviewer may remove unnecessary submittals) File Type* Application Form File Upload Click the upload button,or drag and drop files to attach SSW-SWU-101-Application-DEMLR-SPU Oct 423.55KB 2013.pdf Only PDF files are accepted. File Type* Design Calculations File Upload Click the upload button,or drag and drop files to attach Stormwater Design Calculations.pdf 2.64MB Only PDF files are accepted. File Type* O&M Agreement/Plan File Upload Click the upload button,or drag and drop files to attach O&M Agreement-EZ 071414_1.1.pdf 86.29KB Only PDF files are accepted. File Type* Plansheet-Cover Sheet File Upload Click the upload button,or drag and drop files to attach Camp Butner BOM-C0.0 COVER SHEET.pdf 2.08MB Only PDF files are accepted. File Type* Plansheet-Existing Conditions/Survey File Upload Click the upload button,or drag and drop files to attach Camp Butner BOM-C1.0 EXISTING 2.16M6 CONDITIONS.pdf Camp Butner BOM-C1.1 EXISTING 2.16MB CONDITIONS.pdf Only PDF files are accepted. File Type* Plansheet-Proposed Conditions/Site Plan File Upload Click the upload button,or drag and drop files to attach Camp Butner BOM-C3.0 SITE PLAN-PHASE I.pdf 1.75MB Camp Butner BOM-C3.1 SITE PLAN-PHASE Il.pdf 1.94MB Only PDF files are accepted. File Type* Plansheet-Existing Drainage Area File Upload Click the upload button,or drag and drop files to attach Camp Butner BOM-C3.2 PRE-DEVELOPMENT 1.78M6 STORMWATER PLAN.pdf Only PDF files are accepted. File Type* Plansheet-Proposed Drainage Area File Upload Click the upload button,or drag and drop files to attach Camp Butner BOM-C3.3 POST-DEVELOPMENT 2.12M6 STORMWATER PLAN.pdf Camp Butner BOM-C3.4 POST-DEVELOPMENT 1.8MB STORMWATER MAP.pdf Only PDF files are accepted. File Type* Plansheet-Landscape/Planting Plan File Upload Click the upload button,or drag and drop files to attach Camp Butner BOM-C3.5 SCM PLANTING 1.36MB PLAN.pdf Only PDF files are accepted. File Type* Plansheet-Misc. Detail File Upload Click the upload button,or drag and drop files to attach Camp Butner BOM-C4.1 SITE DETAILS.pdf 3.63MB Camp Butner BOM-C4.6 SITE DETAILS.pdf 1.7MB Only PDF files are accepted. File Type* Plansheet-SCM Detail File Upload Click the upload button,or drag and drop files to attach Camp Butner BOM-C4.7 SITE DETAILS.pdf 3.15MB Only PDF files are accepted. File Type* Property Deed File Upload Click the upload button,or drag and drop files to attach Property Deed.pdf 778.82KB Only PDF files are accepted. File Type* Soils/Geotechnical Report File Upload Click the upload button,or drag and drop files to attach Soils Map.pdf 542.61KB Only PDF files are accepted. File Type* Stormwater Narrative File Upload Click the upload button,or drag and drop files to attach Stormwater Narrative.pdf 130.14KB Only PDF files are accepted. File Type* Stormwater Report File Upload Click the upload button,or drag and drop files to attach Stormwater Report.pdf 2.44MB Only PDF files are accepted. File Type* Supplement-EZ Form File Upload Click the upload button,or drag and drop files to attach Supplement-EZ Form.pdf 311.99KB Only PDF files are accepted. File Type* USGS Topographic Site Map File Upload Click the upload button,or drag and drop files to attach USGS Quad Map.pdf 7.56MB Only PDF files are accepted. Is this project funded No with ARPA grant Yes funds?* Uploads contain NO Confidential YES Information* NOTE:The following information cannot be claimed as confidential:the name and address of any permit applicant or permittee,permit applications,permits,effluent data,information required by NPDES application forms provided by the Director inclusive of all forms and attachments[Ref.40 CFR 122.7(b)and(c)]. Notes about the attachments: * By checking the box and signing box below, I certify that: d I have given true,accurate,and complete information on this form; o I agree that submission of this Supplemental Information form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act) d I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes (the"Uniform Electronic Transactions Act'); d I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND o I intend to electronically sign and submit the Supplemental Information Upload form. Full Name:* Jacob Lewis Signature: �T a6�rrJ Date Submitted: 09/19/2023 Initial Review Verify Permit No.* IMPORTANT:REVIEWER SHOULD VERIFY and revise here if necessary. SW5230901 Who needs a Copy?* Reviewer selections will only be required for offices checked here. Central Office Staff Regional Office Stormwater Contact State Stormwater RO Staff No Copy Needed Central Office Reviewer:* Notifies CO Staff with Email Jim Farkas Any Comments or Added Info for CO Staff Reviewer? Review Date* 09/19/2023