HomeMy WebLinkAboutNCC232709_Site Plan or Location Map_20230914c1
FINAL APPROVAL 9/6/2023
PR03ECT NUMBER: SDRU-2022-00007
ENGINEERING
P
SO / DETENTION / DRAINAGE PLAN
qROSION
CONTROL
T
RBAN FORESTRY
EE ORDINANCE
DOT
N
AT
DISTURBING
FC
TE: SCHEDULE PRE -CONSTRUCTION MEETING
LEAST 48 HRS. PRIOR TO ANY LAND
ACTIVITY USING THE ONLINE
RM FOUND AT http://charlottenc.gov/ld
Jeu Moua
Jeff Bock
Stan Armstrong
Isaiah Washington
CHAPTER INDEX
LAND DEVELOPMENT SUBMITTAL 6
TRAILHEAD TOWNHOMES
SINGLE FAMILY ATTACHED TOWNHOMES
Sheet List Table
C6-10
BMP 4 DETAILS
Sheet Number
Sheet Title
C6-11
EXISTING CROSS SECTIONS
GENERAL CHAPTER
C6-12
PROPOSED HEC-RAS CROSS SECTIONS
CO-00
COVER
C6-13
CULVERT CROSS SECTIONS
CO-01
GENERAL NOTES
UTILITY CHAPTER
SITE LAYOUT CHAPTER
C7-01
WATER PLAN
C2-00
OVERALL SITE PLAN
C7-02
SANITARY SEWER PLAN
C2-01
OVERALL LAYOUT PLAN
C7-03
C2-10
SUBLOT PLAN
SITE MATERIALS CHAPTER
C2-20
FIRE ACCESS PLAN
C8-00
OVERALL MATERIALS PLAN
C2-30
WASTE COLLECTION ACCESS PLAN
SITE DETAILS CHAPTER
EROSION CONTROL CHAPTER
L1-00
SITE DETAILS
C3-01
EROSION CONTROL PLAN PHASE I
L1-01
SITE DETAILS
C3-02
EROSION CONTROL PLAN PHASE II
L1-02
SITE DETAILS
C3-10
EROSION CONTROL DETAILS (1 OF 2)
L1-03
SITE DETAILS
C3-11
EROSION CONTROL DETAILS (2 OF 2)
L1-04
ROADWAY CHAPTER
PLANTING CHAPTER
C4-00
DORTON ST PLAN AND PROFILE
1-2-00
OVERALL REQUIRED PLANTING PLAN
C4-01
MOUNTAIN VISTA PLAN AND PROFILE
C4-02
ISD FROM PRIVATE RD TO DORTON ST
PLANTING DETAILS CHAPTER
C4-03
ISD FROM ROAD C TO DORTON ST
L2-10
C4-04
ISD FROM PRIVATE RD TO ROAD C
GRADING CHAPTER
ARCHITECTURE ELEVATIONS
C5-00
OVERALL GRADING PLAN
A3.01
BUILDING Al & A2 EXTERIOR ELEVATION
C5-02
GRADING ENLARGEMENT II
C5-03
GRADING ENLARGEMENT III
A3.02
BUILDING B1 & B2 EXTERIOR ELEVATION
C5-01
GRADING ENLARGEMENT I
A3.03
BUILDING B3 & B4 EXTERIOR ELEVATION
C5-04
GRADING ENLARGEMENT IV
A3.04
BUILDING C1 EXTERIOR ELEVATION
STORM CHAPTER
C6-00
STORM DRAINAGE PLAN
A3.05
BUILDING D1 & D2 EXTERIOR
ELEVATION
STORMWATER MANAGMENT - 1978
C6-01
CONDITION
A3.06
BUILDING D3 EXTERIOR ELEVATION
STORMWATER MANAGMENT -
C6-02
PRE -DEVELOPMENT DA MAP
A3.09
BUILDING E1 & E2 EXTERIOR ELEVATION
STORMWATER MANAGMENT -
C6-03
POST -DEVELOPMENT DA MAP
A3.10
BUILDING F1 EXTERIOR ELEVATION
C6-04
OVERALL DRAINAGE AREA MAP
A3.11
BUILDING F2 & F3 EXTERIOR ELEVATION
C6-05
OFFSITE DRAINAGE AREA MAP
C6-06
STORM DETAILS
A3.12
BUILDING F4 & F5 EXTERIOR ELEVATION
C6-07
BMP 1 DETAILS
C6-08
BMP 2 DETAILS
C6-09
BMP 3 DETAILS
6/28/202310:58 AM ELIZABETH KELLEN\\CORP.LAN DDESIGN.COM\LDCORPDATA\PROJECTS\CLT\_2021\1021298\PHASE 1 (TOWN HOMES)\CAD\DOCUMENTATION\P1-1021298_PLN_COVR.DWG
CHARLOTTE, NORTH CAROLI NA 28213
VICINITY MAP
DATE: 06/23/2023
PROJECT TEAM
OWNER/DEVELOPER
CAPITAL CITY REAL ESTATE
3000 K STREET, SUITE 270
WASHINGTON, DC 20007
202.557.9865
LANDSCAPE ARCHITECT
LANDDESIGN
223 NORTH GRAHAM STREET
CHARLOTTE, NC 28202
704.333.0325
CONTACT NAME:
RICHARD PETERSHEIM, PLA
CIVIL ENGINEER
LANDDESIGN
223 NORTH GRAHAM STREET
CHARLOTTE, NC 28202
704.333.0325
CONTACT NAME:
DAN MELVIN, PE
ARCHITECT
ODELL, A LABELLA COMPANY
400 S. TRYON STREET SUITE 1300
CHARLOTTE, NC 28285
704.376.6423
CONTACT NAME:
CHRIS KOZUB
APPROVED FOR
CONSTRUCTION
CHARLOTTE-MECKLENBURG PLANNING DEPARTMENT
Josh Weaver
07/26/2023
#958 z:
/J
�. �N C A RO
=O �.• FESS/O •.• /L i
tiv� • ��
SEAL
046313
'�• ti�F� T . VA//0111111110
06/23/2023
TRAILHEAD TOWNHOMES
LD PN 1021298
COVER
CO-00