Loading...
HomeMy WebLinkAboutNCC232709_Site Plan or Location Map_20230914c1 FINAL APPROVAL 9/6/2023 PR03ECT NUMBER: SDRU-2022-00007 ENGINEERING P SO / DETENTION / DRAINAGE PLAN qROSION CONTROL T RBAN FORESTRY EE ORDINANCE DOT N AT DISTURBING FC TE: SCHEDULE PRE -CONSTRUCTION MEETING LEAST 48 HRS. PRIOR TO ANY LAND ACTIVITY USING THE ONLINE RM FOUND AT http://charlottenc.gov/ld Jeu Moua Jeff Bock Stan Armstrong Isaiah Washington CHAPTER INDEX LAND DEVELOPMENT SUBMITTAL 6 TRAILHEAD TOWNHOMES SINGLE FAMILY ATTACHED TOWNHOMES Sheet List Table C6-10 BMP 4 DETAILS Sheet Number Sheet Title C6-11 EXISTING CROSS SECTIONS GENERAL CHAPTER C6-12 PROPOSED HEC-RAS CROSS SECTIONS CO-00 COVER C6-13 CULVERT CROSS SECTIONS CO-01 GENERAL NOTES UTILITY CHAPTER SITE LAYOUT CHAPTER C7-01 WATER PLAN C2-00 OVERALL SITE PLAN C7-02 SANITARY SEWER PLAN C2-01 OVERALL LAYOUT PLAN C7-03 C2-10 SUBLOT PLAN SITE MATERIALS CHAPTER C2-20 FIRE ACCESS PLAN C8-00 OVERALL MATERIALS PLAN C2-30 WASTE COLLECTION ACCESS PLAN SITE DETAILS CHAPTER EROSION CONTROL CHAPTER L1-00 SITE DETAILS C3-01 EROSION CONTROL PLAN PHASE I L1-01 SITE DETAILS C3-02 EROSION CONTROL PLAN PHASE II L1-02 SITE DETAILS C3-10 EROSION CONTROL DETAILS (1 OF 2) L1-03 SITE DETAILS C3-11 EROSION CONTROL DETAILS (2 OF 2) L1-04 ROADWAY CHAPTER PLANTING CHAPTER C4-00 DORTON ST PLAN AND PROFILE 1-2-00 OVERALL REQUIRED PLANTING PLAN C4-01 MOUNTAIN VISTA PLAN AND PROFILE C4-02 ISD FROM PRIVATE RD TO DORTON ST PLANTING DETAILS CHAPTER C4-03 ISD FROM ROAD C TO DORTON ST L2-10 C4-04 ISD FROM PRIVATE RD TO ROAD C GRADING CHAPTER ARCHITECTURE ELEVATIONS C5-00 OVERALL GRADING PLAN A3.01 BUILDING Al & A2 EXTERIOR ELEVATION C5-02 GRADING ENLARGEMENT II C5-03 GRADING ENLARGEMENT III A3.02 BUILDING B1 & B2 EXTERIOR ELEVATION C5-01 GRADING ENLARGEMENT I A3.03 BUILDING B3 & B4 EXTERIOR ELEVATION C5-04 GRADING ENLARGEMENT IV A3.04 BUILDING C1 EXTERIOR ELEVATION STORM CHAPTER C6-00 STORM DRAINAGE PLAN A3.05 BUILDING D1 & D2 EXTERIOR ELEVATION STORMWATER MANAGMENT - 1978 C6-01 CONDITION A3.06 BUILDING D3 EXTERIOR ELEVATION STORMWATER MANAGMENT - C6-02 PRE -DEVELOPMENT DA MAP A3.09 BUILDING E1 & E2 EXTERIOR ELEVATION STORMWATER MANAGMENT - C6-03 POST -DEVELOPMENT DA MAP A3.10 BUILDING F1 EXTERIOR ELEVATION C6-04 OVERALL DRAINAGE AREA MAP A3.11 BUILDING F2 & F3 EXTERIOR ELEVATION C6-05 OFFSITE DRAINAGE AREA MAP C6-06 STORM DETAILS A3.12 BUILDING F4 & F5 EXTERIOR ELEVATION C6-07 BMP 1 DETAILS C6-08 BMP 2 DETAILS C6-09 BMP 3 DETAILS 6/28/202310:58 AM ELIZABETH KELLEN\\CORP.LAN DDESIGN.COM\LDCORPDATA\PROJECTS\CLT\_2021\1021298\PHASE 1 (TOWN HOMES)\CAD\DOCUMENTATION\P1-1021298_PLN_COVR.DWG CHARLOTTE, NORTH CAROLI NA 28213 VICINITY MAP DATE: 06/23/2023 PROJECT TEAM OWNER/DEVELOPER CAPITAL CITY REAL ESTATE 3000 K STREET, SUITE 270 WASHINGTON, DC 20007 202.557.9865 LANDSCAPE ARCHITECT LANDDESIGN 223 NORTH GRAHAM STREET CHARLOTTE, NC 28202 704.333.0325 CONTACT NAME: RICHARD PETERSHEIM, PLA CIVIL ENGINEER LANDDESIGN 223 NORTH GRAHAM STREET CHARLOTTE, NC 28202 704.333.0325 CONTACT NAME: DAN MELVIN, PE ARCHITECT ODELL, A LABELLA COMPANY 400 S. TRYON STREET SUITE 1300 CHARLOTTE, NC 28285 704.376.6423 CONTACT NAME: CHRIS KOZUB APPROVED FOR CONSTRUCTION CHARLOTTE-MECKLENBURG PLANNING DEPARTMENT Josh Weaver 07/26/2023 #958 z: /J �. �N C A RO =O �.• FESS/O •.• /L i tiv� • �� SEAL 046313 '�• ti�F� T . VA//0111111110 06/23/2023 TRAILHEAD TOWNHOMES LD PN 1021298 COVER CO-00