Loading...
HomeMy WebLinkAbout760060_Application Attachment-Sealed Drawings_20230831SRNG Liberty Pump Schedule Number Normal Flow (gpm) TDH (ft) Type Description P- 201 /202 500 140 Grundfos Lagoon 1 to AD-301 P-301/302 521 70 Shimaywa Tank-301 Pumps P-303/304 1,051 20 Magnatex Recycle Pump P-305 90 70 Magnatex Defoamer Pump P-306 Grundfos Hot Water Pump B-401 /402 Blower B-403 Blower DP301-302 1 30 22 Drain Pump Station /10 2" PIPE INV: 67100 CURRENT UNDERGOUND PIPING LENGTHS \ I / 2" - GLIO - SEE APEX DRAWINGS ID \ / 2" CONDENSATE LINE / // I I I I \01 01 \01 2" 450 BEND (ROTATE AS NECESSARY) / I \ \ \ \ 1 \ \ ° DPS-301 DRAIN PUMP WETWELL / \\ I If p� \ 1 \ \ \ \ FRAME: 662 00 I�p \ \ 1 \ 1 1 \ I INV IN (N): 656 50 co CUm / I \ I I I \ \ \ \ 1 \ \ / INV IN (W): 658 00 INV OUT (SE): 658 5 / (2) 2"XI" REDUCER \ ` I I I \ I 1 \ I I BOTTOM EL: 652 86 D y hti j (2) 2" 90° BENDS \ \ I ��� ah` ( \ 2" W C LOOP SEAL (SEE APEX DRAWINGS) I LWL EL: 653 86 /v �e % \ 2" TEE \ \ °. \ \ 1 '! 1 �s�O\®� \ / I HWL EL: 655 00 I P m LAG PUMP: 655 50 \ \ 1 1 \ \ 2 ALARM: 656 00 I / ® \\ \\\ - GLIO -SEE APEX DRAWINGS / FUTURE 2" VERTICAL 22 5° BEND o // \\\\\\ \ \ 2" CONDENSATE FLARE LINE 8" 900 DIRJ VERTICAL BEND (ROTATE AS NECESSARY) // \ \\\\ `�\\\ \ \ \ FUTURE I I / / 8" 45° D I R J BEND \ FUTURE 2" VERTICAL 22 50 BEND 1 / \N\� \\\ \ \ PL-303 HOT WATER I / I I I / / I I N: 767412 62 �a (ROTATE AS NECESSARY) // \ \\� \\\V \ PIPING - 350 LF I I I / E:1810733 81 luln ..j rr n i ,i I // A vvw AA\� \ O 6-INCH - - ° FUTURE ,, \ \ \ \ \\� (� \ 4 0 MANHOLE MH 301 I I 8 90 DIRJ VERTICAL BEND DL-305 - 2" PVC (SDR-26) DRAIN LINE I I 1 \ \ \ \� �\ \ \ FRAME: 670 5' I I I I l / _ N: 767410 04 130 LF FROM GENSET TO MH I I \ \\ \ INV IN - GENSET (N): 667 00' I I I / / E:1810732 95 INV IN - GLIO (NE): 665 00' J I I I I I I FUTURE I I \\ \ INV IN - FLARE (NE): 666 00 I I I I 3" GRADUAL BEND WITH I 1 I PL-304 HOT WATER — — �— \\ / INV IN - W C (NE): 664 I I I I _ _ — , MIN BEND RADIUS 7 3' (TYP) PIPING - 350 LF6-INCH INV OUT (SW): 663 90' ° 8" 450 D I R J BEND N: 767338 69 DL-304-4"PVC \\\\'\�\e� // I( I __� ---_� �E:181075643 / / m I (SDR-26) DRAIN LINE \\\�/ / o / — — 8" 450 D I R J BEND / /Q° / I I 143 LF • 5 2% FROM MH TO DIPS \� � / ° , N: 767339 25 E:1810751 10 1 ANK-301 / FRAME: 66500 / ' i� 8" 22 5° DIRJ BEND PL-307 - 8-INCH HDPE FROM TK-301 INV IN (AD): 659 50 �'� -75 LF ? 6z — N: 767323 II BOTTOM EL: 652 63 1_ (IPS, DR-17) \ \� —666 q E:1810741 39 / ---�-- LWL EL: 654453 \\�� �66 I I _ _ "00_ 8" 2250 DIRJ BEND HWL EL: 658 00 LAG PUMP: 658 50 4—N: 767319 52 ALARM 659 00 % \\\ \� _ 665— / J E:1810744 93 Size Type Material Approx. Lengths (LF) 2-inch drain PVC (SDR-26) 130 3-inch drain HDPE, DR-1 1 757 3-inch Pressure D.I. (CL 350) 165 4-inch drain PVC (SDR-26) 204 4-inch Pressure PVC (C-900, DR-18) 725 6-inch drain PVC (SDR-26) 96 6-inch HW Pressure Steel Pipe 700 8-inch Pressure HDPE (DR-17) 2180 8-inch or Per AD Header Gravity HDPE 82 15-inch Overflow PVC (SDR-26) 190 16-inch IPressure I D.I. (CL 350) 316 16-inch Pressure PVC(C-900, DR-18) 200 24inch sludge pipe PVC (SDR-26) 140 SRNG Uberty Pipe Schedule Number Size Type Material Normal Flow Normal Velocity Approx. Lengths Slope (Gravity Only) Description PL-101 NCS Gravity NCS NCS NCS 20 LF NCS NCS Screens to MRP-102 (SRNG EQ Tank) PL-103 16-inch Pressure PVC 2,600 gpm 4 ft/s 200 LF (total) N/A Lagoon Pump to Sand Lane PL-104 16-inch Pressure PVC 2,600 gpm 4 ft/s 200 LF (total) N/A Lagoon Pump to Sand Lane PL-105 16-inch Pressure PVC 2,600 gpm 4 ft/s 200 LF (total) N/A Lagoon Pump to Sand Lane PL-106 16-inch Pressure PVC 2,600 gpm 14 ft/s 200 LF (total) N/A Lagoon Pump to Sand Lane PL-107 15-inch Gravity PVC 521 gpm Overflow 120 LF 7.507. Sand Lane to Lagoon 3 PL-108 24-inch Gravity PVC 521 gpm Overflow 45 LF 0.507. MRP-102 to Lagoon 1 PL-201 -8-inch Gravity PVC 521 gpm 2.5 ft/s 5 LF N/A Screen-201 to Screen-202 PL-202 -8-inch Gravity PVC 521 gpm 2.5 ft/s 15 LF N/A Screen-202 to Lagoon 1 PL-204 6-inch Pressure PVC 521 gpm 5 ft/s 35 LF N/A Suction from Lagoon 1 PL-205 8-inch Pressure HDPE 521 gpm 3.7 ft/s 1055 LF N/A Lagoon 1 pump to HE-301 PL-301 6-inch Pressure Steel 521 gpm 5 ft/s 10 LF N/A HE-301 to HE-302 PL-302 6-inch Pressure Steel 521 gpm 5 ft/s 15 LF N/A HE-302 to P-303 PL-303 6-inch Pressure Steel 521 gpm 5 ft/s 350 LF N/A Loop to Genset PL-304 6-inch Pressure Steel 521 gpm 5 ft/s 350 LF N/A Loop from Genset PL-305 8-inch Gravity HDPE 1521 gpm 5 ft/s 72 LF N/A Inverted - U underground to TK-301 PL-306 8-inch Gravity HDPE Drain Drain 10 LF N/A from AD Wall Tank Drain to TK-301 PL-307 8-inch Pressure HDPE 521 gpm 3.7 ft/s 75 LF N/A TK-301 to HE-301 PL-308 8-inch Pressure HDPE 521 gpm 3.7 ft/s 1025 LF N/A HE-301 to Lagoon 3 PL-309 16-inch Pressure D.I. 1,900 gpm 3 ft/s M LF N/A Eff Header to P301 PL-3Iu 16-inch irressure D.I. 1,900 gpm 3 ft/s i6il 11F M Ly N/A P303 to AD Influent PL-311 3-inch Pressure D.I. 90 gpm 4 ft/s 3 LF N/A P305 (defoamer) to AD tank DL-301 6-inch Gravity PVC Drain 96 LF 9.45% Floor Drain to DPS-301 DL-302 4-inch Gravity PVC Drain 25 LF I % min Floor Drain to Wye DL-303 4-inch Gravity PVC Drain 36 LF I % min Floor Drain to Tee DL-304 4-inch Gravity PVC Drain 143 LF 5.20% from MH-301 DL-305 2-inch Gravity PVC Drain 130 LF N/A I Genset to MH-301 DL-306 3-inch IPressure HDPE 160 gpm 3 ft/s 757 LF N/A Ifrom MH-301 ID ID ID / / / IIV i / \ / / — _ �'�� 3" GRADUAL BEND WITH \ - / / / _ — _ _-- MIN BEND RADIUS 7 3 (TYP PL-306 8-INCH OR PER ISCO -g'1FM ) \ DRAIN LINE FROM AD-301 / / ZZ 15' WIDE, 6" CRUSHER RUN -10 LF / / — _ � — 667- / u \ � ` / ' / \\ / / i — / \ / 8 2250 DIRJ BEND \ PL-305 - 8-INCH OR PER — N: 767283 16 \ \ DRAIN LINE FROM AD-301 — —she u / / E:1810696 40 -72 LF A I 1 — — 668 — — 6- g" 22 50 D I R J BEND _ — 667 A _ 6 N: 767246 05 3" GRADUAL BEND WITH / / — — 66 ; s — \ — _ _ - E:1810685 67 MIN BEND RADIUS 7 3' (TYP) \sue''. s71 6?OI+OO6s9 ssa 66g ao/ /2 DO �— / ti \-sssa-� \� —_8"45° DIRJ BEND 0+00 I 1/ _ / \ \ � 6h D — — — N: 767162 20 E:181068890 3+0p V v SCALES I 1 \ \ \ �� ���� 8" 450 DIRJ BEND \ \ I \ \ \ 8" 2250 DIRJ BEND 00 ���� \ , N: 767163 96 APPROXIMATE WATER \ 4"X4" D I R J TEE I / — — — — \ — / / \ 1 \ N: 767286 16 ���� E:1810683 82 / 4-INCH PVC WATER MAIN WELL LOCATION I N: 767681 09 5+00 1 I I E:1810692 07 E:1810596 15 8" 22 50 D I R J BEND DL-306 - 3" HDPE N 6 — _ — — _ — — I I \ DRAIN PS PIPE : 767246 73 \ E:1810680 64 \ 757 LF (TOTAL) C) 677— 4-INCH PVC WATER MAIN 678 679----_------__ — --___ seo--_— �� �� �\ I 4"450 DIRJ BEND g� \ \ I I \ \ \ \ \ ✓ / // / // / / // // /� _�� / / / N: 767167 48 E:1810673 68 \\ \ \ PL-308- 1025 LF z 8 HDPE EFFLUENT PIPE N DL-303 - 4 PVC (SDR-26) DRAIN LINE I PL-205 - 1055 LF (TOTA 36 LF TOTAL FROM HE FLOOR 8 HDPE PROCESS PIPE TO HE-301 / / I \ ✓ / / \ \ Q (IPS, DR-17) I o / I I \ \ \ � DRAINS TO 4"X6" TEE m (IPS, DR-17) I 655 Wco DL-301 - 6" PVC (SDR-26) DRAIN LINE I I I \ 96 LF 0 9 45% SLOPE FROM FLOOR / 1 / I I \\ \ \ / / / / / / ' / / / / 65A� �� \ \ DRAIN TO DRAIN PS _ / / / I I I \V DL-302 - 4" PVC (SDR-26) DRAIN LINE / / I / 4" 45° D I R J BEND I \ \ \ \ 25 LF FROM FLOOR DRAIN TO 4"X6" WYE N: 767004 31 x�j E:1810534 39 / 00 MATCH LIN tE :\ E6 -GRAPHIC SCALE / 10' MIN TYP/ W I I I 40 0 20 i 40 _ 80 / / 160 / I / o \110I I 1 8" 45° DIRJ BEND I I I I N:76697610 E: 810480 58 I I II ) II I E:1810483 39 �( IN FEET 1 inch = 40 ft. \ \ 1 1 8" 2250 DIRJ BEND N N N N N N N N N W rn I� N V a \ N, o in Ln Ln ro O O O O O U U U U U m W cD Z a W 2 H cn U a Z 0 0 Z d 0 ~ w a z W o 2 X J o cr U _ p W � a d 3 o F- Ih N Z — 0 0 0 0 0 Z Z Z Z W 0 > > > > O W W W W In Ih N — O Z O O c'7 Z L0 ,� 0 O Q O >O N >N o, O O CD _ O o-- � U CY) LO < O � O � O O E LO 3 O cn J U Q z _O U a J z Z J � a w Z U)L /J L (D Ix Ja Z Z � �- Q Q Z W U) LJ D m U) a LLI Z LIJ LIJ M JOB NO: J-29722 0000 DATE: 02/08/21 DRAWN: FS DESIGNED: CDR REVIEWED: CDR APPROVED: FS SCALE: I" = 40' T-C-02-101 0 0 0 0 N r m N Z Z a 1) z m / m I I co 0 8 2250DIRJ BEND \ -- \ I I I I I I N +co I '� a N: 766971 54 W E:1810479 15 PL-308 - 1025 LF I I ILij I Q O I s �� V A 8" HDPE EFFLUENT PIPE \ I ? II I I W w II I II I (6s s\ \ \ UPS, DR-17) 9 \ `\ \ 1/� I \ I s v �v A \ �� / I 1 I QD � I I I ( 8" 22 5° DIRJ BEND ��� \ — ° \ \ \ / I � I � \ ,\ � — 8" 45 DIRJ BEND I I 0 I I N- 766972 26 �� �� \ N: 766774 51 l / o I I I i E:1810473 85 E:1810460 28 \ I u ID \ Q PL-205 - 1055 LF (TOTAL) — I - I B" HDPE PROCESS PIPE TO HE-301 DL-306 3" HDPE — \ \ \ (IPS, DR-17) DRAIN PS PIPE I I — — — \ —_ —- -_ \ \ 1 \ \ 757LF(TOTAL) I I /---------- — \ \ o—_----_--8"45°DIRJ BEND / I \ °--_---_---- N:76677694_\\\ \ \ \ \ or/ 4 45 DIRJ BEND \ / / \ — _ _ — _ — _ _ = E:1810455 49 1 8" 225' DIRJ BEND I / \ N: 766966 09—_ N: 766753 16 ° I I E:181037436 \ ---- --- ---- \ I I I I \ \� \ — — — — _ — — — - 1' \ E:1810435 97 (� \ 8"225°DIRJ BEND —6Ere, — ( — — — — N: 766757 52 1 I I I — — — _ — E:1810433 55 1 4" 450 D I R J BEND 1---- I N: 767037 47 \ 61.3\ E:1810291 52 CQ 8" 2250 DIRJ BEND- LLJ \ ssv \ 00 "' N 66\ - N: 766737 06 N ib m 0 0 OD Q Qw wo oZ Z �o \m o m Z m \ // // // / / —/ / I / 4"450 DIRJ BEND / I / N: 767004 31 0 / / E:1810534 39 / o / / / / i / / / / / / ,� —// — ^ CURRENT UNDERGOUND PIPING LENGTHSATCH LIN tE 0 102 \ \ �110' MIN TYP/` I 1 8" 450 D I R J BEND 8" 45° DIRJ BEND I N: 766980 55 0 I I I ) I / E:1810480 58 N: 766976 10 I I I I I ( I / E:1810483 39 Q j I I I II o I I / / �— �\ \ 1 1 1 \ A�� E:1810378 90 w w OUTFACE IE -662' Q --D I w I� I I I \ \ z Z I / ) o O 8" 22 50 DIRJ BEND N: 766742 20 Size Type IMateriial Approx. Lengths (LF) 2-inch drain PVC (SDR-26) 130 3-inch drain HDPE, DR-11 757 3-inch Pressure D.I. (CL 350) 165 4-inch drain PVC (SDR-26) 204 4-inch Pressure PVC (C-900, DR-18) 725 6-inch drain PVC (SDR-26) 96 6-inch HW Pressure Steel Pipe 700 8-inch Pressure HDPE (DR-17) 2180 8-inch or Per AD Header Gravity HDPE 82 15-inch Overflow PVC (SDR-26) 190 16-inch Pressure D.I. (CL 350) 316 16-inch Pressure PVC(C-900, DR-18) 200 24-inch Isludge pipe JPVC (SDR-26) 140 SRNG Liberty Pipe Schedule Number Size Type Material Normal Flow Normal Velocity Approx. Lengths Slope (Gravity Only) Description PL-101 NCS Gravity NCS NCS NCS 20 LF NCS NCS Screens to MRP-102 (SRNG EQ Tank) PL-103 16-inch Pressure PVC 2,600 gpm 4 ft/s 200 LF (total) N/A Lagoon Pump to Sand Lane PL-104 16-inch Pressure PVC 2,600 gpm 4 ft/s 200 LF (total) N/A Lagoon Pump to Sand Lane PL-105 16-inch Pressure PVC 2,600 gpm 4 ft/s 200 LF (total) N/A Lagoon Pump to Sand Lane PL-106 16-inch Pressure PVC 2,600 gpm 4 ft/s 200 LF (total) N/A Lagoon Pump to Sand Lane PL-107 15-inch Gravity PVC 521 gpm Overflow 120 LF 7.50% Sand Lane to Lagoon 3 PL-108 24-inch Gravity PVC 521 gpm Overflow 45 LF 0.50% MRP-102 to Lagoon 1 PL-201 -8-inch Gravity PVC 521 gpm 2.5 ft/s 5 LF N/A Screen-201 to Screen-202 PL-202 -8-inch Gravity PVC 521 gpm 2.5 ft/s 15 LF N/A Screen-202 to Lagoon 1 PL-204 6-inch Pressure PVC 521 gpm 5 ft/s 35 LF N/A Suction from Lagoon 1 PL-205 8-inch Pressure HDPE 521 gpm 3.7 ft/s 1055 LF N/A Lagoon 1 pump to HE-301 PL-301 6-inch Pressure Steel 521 gpm 5 ft/s 10 LF N/A HE-301 to HE-302 PL-302 6-inch Pressure Steel 521 gpm 15 ft/s 15 LF N/A HE-302 to P-303 PL-303 6-inch Pressure Steel 521 gpm 5 ft/s 350 LF N/A Loop to Genset PL-304 6-inch Pressure Steel 521 gpm 5 ft/s 350 LF N/A Loop from Genset PL-305 8-inch Gravity HDPE 521 gpm 5 ft/s 72 LF N/A Inverted - U underground to TK-301 PL-306 8-inch Gravity HDPE Drain Drain 10 LF N/A from AD Wall Tank Drain to TK-301 PL-307 8-inch Pressure HDPE 521 gpm 3.7 ft/s 75 LF N/A TK-301 to HE-301 PL-308 8-inch Pressure HDPE 521 gpm 3.7 ft/s 1025 LF N/A HE-301 to Lagoon 3 PL-309 16-inch Pressure D.I. 1,900 gpm 3 ft/s 155 LF N/A Eff Header to P301 PL-310 16-inch Pressure D.I. 1,900 gpm 3 ft/s 161 LF N/A P303 to AD Influent PL-311 3-inch Pressure D.I. 90 gpm 4 ft/s 165 LF N/A P305 (defoamer) to AD tank DL-301 6-inch Gravity PVC Drain 96 LF 9.45% Floor Drain to DPS-301 DL-302 4-inch Gravity PVC Drain 25 LF 1% min Floor Drain to Wye DL-303 flinch Gravity PVC 1 Drain 36 LF I% min Floor Drain to Tee 5L-304 flinch Gravity PVC I Drain 143 LF 5.20% from MH-301 DL-305 2-inch Gravity PVC I Drain 1 1130 LF N/A Genset to MH-301 DL-306 3-inch lPressure HDPE 160 gpm 1 3 ft/s 1757 LF N/A Ifrom MH-301 I c0 \ \ w w ° w z E:181031963 \ /) a a 257 LF (TOTAL) \ Iq 1 1 8" HDPE PROCESS PIPE TO HE-301 (IPS DR-171 Z O O C� Q J 8 225 DIRJ BEND I\ \ E:1810114 55 \ CONCRETE STRUCTURE AT APPROX IE: 679' \ \ 1 \ \ _ / / / N: 766701 16 i 6>o (2) 8" 900 DIRJ BEND _ \\ \� \ \ \\ / j E:1810268 61 N: 766872 ss E.181010505 0 `8"225°DIRJ BEND —cow I g N: 766886 22 f° 2 E'1810107 76 w III CONNECT TO 8-INCH HDPE MAIN a Z \ \ \ \ w� \ Of WITH (2) 450 BENDS � _674 — PL-108 - 45 LF OF i I \ \ N: 766819 45 w \ J ) \ O 24" PVC INFLUENT PIPE �I ) 1 \ E: 1810197 76 0 \ \ I \ z \ \ \ \ \ \ \ 675 \ O 0 5% MIN SLOPE CD :WITH OUTFACE IE: 670 5 / B" 2250 DIRJ BEND w z N \ \ \ N: 766817 68 Q - — — — a w a I 1 w E:181015063 r— o SC-201/202/203 s>6 — \� — / \ 8" 2250 DIRJ BEND w I 1 N: 766830 45 0 o02 E:181012354 ---,a0 8" 22 50 D I R J BEND I I / 1 \ \ \ \ \ \ I N: 766953 24 / ( \ \ 1 o 6a4 67 \ \ E:1810098 18 TEE \ I \\\ 6 45 DIRJ BEND , \ `6 6'— /l �A N: 766841 6830 6 '���', o �,9� (2) PLUG VALVES \ m„ m 0 Q,3. ee6, \ m m E:181010082 \ \\\ \ \\ \ a ° — \ o 8"225°DIRJ BEND �' ° \\ \ (2) 6 90 DIRJ BEND— / Be m A p?'a N: 766911 02 \ a ^ w \ — / / K \ N: 766856 98 \ a \ �\ \\ 9 o \ \ \ \ PL-107 - 120 LF g / / — sm e \ ( 1\ \ E:1810097 48 / E:1810106 68 \ \ — \ 6" 22 5° DIRJ BEND \ E \\ J\ 24" PVC SDR-26 OVERFLOW PIPE N: 766909 22 CONNECT TO EXISTING \\ \ w \ OUTFALL INV EL: -665 00 8 -5 8% SLOPE E:1810091 39 \ SAND LANE STRUCTURE \ \\ \\ \ \WITH VALVELLJ 225°BEND z INV EL: 6725' \\\\\ \ \ \\\\ i \ I I I \\ N:76684025 \ \\\ o/— \\_�\ /— \ I ✓ 14\\ \\\`\\\ E:181007534 GO IE: 672 5 CONNECT TO EXISTING �' \ \\\ \ \ \\\\ / / °' /�- \\ n �\ \\ \\ \ \\ \ ` /\� \ /�i �/ 6�R 664G� ! J �'�� --_-- — I \ \ \ n SAND LANE STRUCTURE \ \ \\ — — — — — — \\ wv EL: 6720' — I FUTURE P-101/102 N: 766865 29 \ \ \ \ \ \ / /\�/ �� / /// ///� / �o // CY / / / / / / / — — — — — — — — — \ \ % IN MRP PIT — — — J I I \ \ \ \ / / \ / g� / \// / / — �\ 0 / / — — — — — — — \ I I E:181009173 \ \\\ /\ \ \//�`\ / �// // / /�\ ,� 2 / / /� \ NCS PIT IE: 6715 1 \ I \ (2)6"900DIRJ BEND N: 766869 24 \ Z _ E:181009858 ° J \ \ \ \ \ PL-NCS -25 LF OF 15" _`\sse — — / /— = v/ W/ / /6�9 m PVC INFLUENT PIPE \ \ \ _ / / �/ ? / \ \ \ / — \ ---\— O 6" 2250 DIRJ BEND I \ I �— // \ \--6a3 N:76688266 / lu \ \— 4----- \ _^ I / / / 0/ 0 //-- m / E:1810104 05 ) 1\ I\ \ // \ \ \ ` — — �/ / // — _ / / /a m4 /co \ � \ / 1 \ \ I / Q \ 6�§— \\\ r_ I I / / /6�-2m /� /—ca —J/ }J/ // /Q) \ \ \ ( \ Q J ca 1 / // �/— // o — / \ / ~ o / W O w � � / -i ___/_— _ ° 0 m j ° � 0 �? 3 z ` ``� /// �� \ _— Z _D / l / � — —678-. — / / — — / ' � - \ \ \ \ — — — — — — — — - \ /- ` N 1 ,0 4/ � Q / \ // / / / / / \ \ _ / m J CO (DW - WQD O O W ? W O \ \ �\ \ \\ ��� \\ \ \\ \\ /— W c� 2 m \ \\ \\ \ \\ \ / 66/GRAPHIC SCALE tiw z z ° m m \\ ����� // / --6b9 \ \ / iu� 0 c m _o o \ \\\�\\\\ s5r9-- 88- _— \ \\ \\ \ \ \\ \ J / > \\\_� �\\J /� �Z o co \\\\\\ _/ / / J / \I 40 \ / 0 / / 20 / 40 80 160 owl m ro r_ 6n ° J o I/ \ o O IN FEET ) ° m I inch = 40 ft. o o / (Dm (D Q lU m J 4-INCH PVC WATER MAINssz �66s�-- PL-308-1150LF PL-204 - 35 LF / — — — ' / — j / / / / / '_ _ _ _ 8" PVC EFFLUENT PIPE / ^ 6 SUCTION FLOAT LINE '— — / / — / // ' _ / , a �� _ ���/// _ / (IPS, DR-17) 6F-9— — RR7— / o //�6$_=— sFPr --R\� \ \--��//�--- ii%// OUTLET TO LAGOON3� 666 / // / °— _ - (2) 8 90° DIRJ BEND _ � = sss- 4-INCH PURGE PIPING — \ / / — — — - N: 76685795 = =62_ \ `� \ \\ \ — — // / — �� / / / / IE - 664 N: 766674 34 E:1810111 78 \ INTO SOLIDS LAGOON /6>�— \ E:1810233 63 (2) 8" 450 DIRJ BEND 6" AND 8" PIPING TO BE INSTALLED AERIALLY N 766981 75 \ OVER THE EXISTING SAND LANE \ \ ° / SRNG Liberty Pump Schedule Number lNormal Flow (gpm) TDH (ft) Type Description P- 201 /202 500 140 Grund os Lagoon 1 to AD-301 P-301 /302 521 70 Shimaywa Tank-301 Pumps P-303/304 1,051 20 Magnatex Recycle Pump P-305 90 70 Magnatex Defoamer Pump P-306 Grundfos Hot Water Pump B-401 /402 Blower B-403 Blower DP301-302 301 22 IlDrain Pump Station rrrau a nur,� Q: 4. 1h N N N N N N w N, 1 \ \ \ N ro N M N V- Q ir ir ir Of X Of X o 0 0 0 o } U U U U U U m 0 Z a a Z O w U Z Q Q w U 2 H /n O U a Z J o O Z CL O O O Ln N Q Z W w O 2 o ir J Z O Cr Q U p LLJ Z O N Ld Cr Q w a 3 O (n F- rn N — w— 0 0 0 0 F- 0 Z Z Z Z 0 0 > > > > CL o w w w w 0 Z CD CD cY') Z L0 ,� 0 O Q>N O >O N C o. O O �CD _ o o7 � UM o °< O � � O o E LO 3 O J U Q L.L Z _O U a J Z Z J � a J w CL Z (D 1Z Ja Z Z a- Q Q Z W U) LLJ ~ m IU) U) a LLJ Z LLJ I— LLJ m J JOB NO: J-29722 0000 DATE: 02/08/21 DRAWN: FS DESIGNED: CDR REVIEWED: CDR APPROVED: FS SCALE: I" = 40' T-C-02-102 \ \' \ \ \ o O TOTAL LIMITS OF C �1 I I�I I I I \ \ \ DISTURBANCE: 7 67 AC o� O CONSTRUCTION SEQUENCE: \ \ o \\ \ \ II _ — — \ \ \ \ 1 EROSION CONTROL PERMIT HAS BEEN OBTAINED BY THE OWNER \ _ \ \ \ TEMPORARY SILT FENCE (TYP) _ — \\ \ 2 FIELD SURVEY AND STAKE PROPOSED DISTURBED LIMITS SEE DETAIL Cl/T-C-03-201 3 INSTALL ALL REQUIRED TREE PROTECTION SAFETY FENCING \ \ IN 4 PROVIDE STABILIZED CONSTRUCTION ENTRANCE(S) 1 5 INSTALL, LINE, AND STABILIZE CLEAN WATER DIVERSION DITCHES / TEMPORARY SKIMMER BASIN \ \ \ 6 PROVIDE ALL EROSION CONTROL MEASURES AS SHOWN, CLEARING ONLY \ �^ SEE DETAIL C3/T-C-03-201 \ \ AS REQUIRED TO INSTALL ANY OF THESE DEVICES SHOWN: O I I I ' / ' \ ss // / i� CONTRIBUTING AREA: 748 AC \ \ \ \ \ \ o CONSTRUCTION ENTRANCE / QIO: 19 35 CFS \ SILT FENCING TOP OF DAM ELEV = 660 50 \ \ \ ° INLET PROTECTION / TOP OF WEIR ELEV = 659 00 \ \ \ SEDIMENT TRAPS / BASIN BOTTOM ELEV = 655 00 \ \ \ \ \ ° DIVERSION DITCHES / DAM HEIGHT = 7'-0" \ \ \ \ ° SKIMMER BASINS .W-- / / ��• I ( /� G��y \ / I / // // i sse`_ _ DAM WIDTH = 7'-0" �- ��� �� \\ \\ \\ ° ALL OTHER ELEMENTS SHOWN SED STORAGE DEPTH = 2'-0" \ \ \ \ \ \ \ 7 NOTIFY DEMLR's EROSION AND SEDIMENT CONTROL REGIONAL OFFICE / ��• / / I �\ \\_ / / / -- _ WEIR LENGTH = 10 0 \ \ \ \ \ \ / STORAGE VOLUME AT 659 00 \ \ \ \ PRIOR TO GRADING / TEMPORARY POROUS BAFFLES \\ \\ \ \ \ \\ \\ 8 PERFORM CLEARING AND GRUBBING / / I / l / / / / ,/ / Ili /r l !\ i� / / �� TO BE PLACED WITHIN BASIN \ \ \ \ \ / 1 1 9 BEGIN CONSTRUCTION / PER DETAIL B2/T-C-03-201 ID/ HA / i SET SEDIMENT CLEAN OUT \ \ \ \ \ \ // /� STAKE WITH CLEANOUT LEVEL \ \ \ \ \ \ \ \ 1 I 10 CLEAN TRAPS, DITCHES, ETC WHEN HALF FULL SHOWN AT 657 00 11 FINE GRADE SITE / BASIN SHALL REMAIN IN PLACE \ 1 I I I 1 \ \ \ I I I I 12 SEED AND MULCH ALL EXPOSED AREAS WITHIN THE TIMEFRAME SHOWN IN UNTIL CONTRIBUTING DRAINAGE J 1 \ 1 \ I I I I THE STABILIZATION SCHEDULE SHOWN ON THIS SHEET / AREA IS STABILIZED 13 STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE MAINTAIN — SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS I / / ESTABLISHED / / TEMPORARY SILT FENCE (TYP) / / / / �— — /— / / / / 14 ONCE SITE AREAS ARE STABILIZED WITH PERMANENT GROUND COVER, � SEE DETAIL Cl/T-C-03-201 / / / _ / / / / / / _ / OBTAIN APPROVAL FROM DEMLR INSPECTOR TO REMOVE SOIL EROSION CONTROL MEASURES FINE GRADE AND STABILIZE THE AREAS WHERE EROSION CONTROL MEASURES ARE REMOVED / 16 NOTIFY DEMLR's EROSION AND SEDIMENT CONTROL REGIONAL OFFICE FOR —✓ / FINAL INSPECTION co°—________=_ \� � / // /' // // % // /�--�/ // ON -SITE SOILS: MaC MECKLENBURG LOAM, HYDROLOGIC GROUP C _ McB2 MECKLENBURG CLAY LOAM, HYDROLOGIC GROUP "C" TEMPORARY CONSTRUCTION ENTRANCE DRAINAGE BASIN: SEE DETAIL Cl/T-C-03-201 SITE DRAINS TO THE CAPE FEAR RIVER BASIN, THE RECEIVING WATER BODY IS \ \ SANDY CREEK (WS-III: STREAM INDEX 17-16-(1)) \� SEE SHEETS T-C-03-102 AND T-C-03-103 I I i I �\ j/j j o// / / j; i=/` \ \\ STABILIZATION TIME FRAMES: \ IN,/ / / / / / - - PERIMETER DIKES, SWALES, DITCHES, SLOPES: 7 DAYS / HIGH QUALITY WATER (HOW) ZONES: 7 DAYS SLOPES STEEPER THAN 3:1: 7 DAYS \ (EXCEPTION: IF SLOPES ARE 10 OR LESS IN LENGTH AND ARE NOT STEEPER \ THAN 2:1, 14 DAYS ARE ALLOWED \ SLOPES 3:1 OR FLATTER: 14 DAYS (EXCEPTION: 7 DAYS FOR SLOPES GREATER THAN 50 IN LENGTH) ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1: 14 DAYS \J I S // I I III \ / // // /' //// /�/ ��/%/--�I TEMPORARY SEEDING NOTES: 1✓ ( I �\ \I I /~\ I SEED IN ACCORDANCE WITH THE SEEDING SCHEDULE SHOWN IN DETAIL \\> I / I I o I 1 I I (/ / /6h J/�l / \ AI/T-C-03-201 2 REFER TO SPECIFICATIONS FOR ALL PERMANENT SEEDING REQUIREMENTS 3 MULCH WITH STRAW APPLIED AT THE RATE OF 100 LBS /1000 SF ALTERNATE SEEDING METHOD: HYDROSEED \ \ \ \ \ \ \✓ \ \ \ \ \ \ \ \ \ \ \ \ \l\\� \\ I \ �� \ \ \ \\ f� / / / \`_—_ I FIBER -MULCH AND TACKIFIER TO BE MIXED WITH THE HYDROSEED \ \ \ \ \ \ \ \ \ \ \M\ \ oo SLURRY ACCORDING TO FIBER -MULCH MANUFACTURER'S RECOMMENDATIONS \ \ \ \ \ \ \ \ \ \ \ \ \ 2 IF HYDROSEED METHOD IS UTILIZED, MATTING OF SLOPES AND INSTALLATION OF STRAW WATTLES WILL NOT BE REQUIRED UNLESS HYDROSEEDING METHOD FAILS TO STABILIZE SLOPES PROPERLY ALL _ DIVERSION DITCHES WILL STILL NEED TO BE LINED PER THE DETAIL o------- SEEDBED PREPARATION NOTES: ca- ////�/' I I AREAS TO BE SEEDED SHALL BE RIPPED AND SPREAD WITH AVAILABLE /i TOPSOIL I 2 REMOVE ALL LOOSE ROCKS, ROOTS, CONSTRUCTION DEBRIS, ETC FROM THE SURFACE PRIOR TO SEEDING \\ \ 3 IF NO SOIL TEST IS TAKEN, FERTILIZER AND LIME TO BE IN ACCORDANCE \ WITH RATES SHOWN IN THE SEEDING SCHEDULE IN ADDITION, PROVIDE I _-- — �jr�/� \ 15#/1000 SF OF SUPER -PHOSPHATE 4 IF SOIL TEST IS TAKEN, PROVIDE LIME AND FERTILIZER AS RECOMMENDED BY THE TEST REPORT 5 LIME AND FERTILIZER SHALL BE APPLIED UNIFORMLY AND MIXED WITH THE SOIL DURING SEEDBED PREPARATION \ \ \ \ \\ \ \ \ \ \, �'--_-- _—���_� — \\— \ \ \ \ \ \\ �\\\\\\��;—__ =,Js� III — ✓/�// -- �����\ \ \ ° �_%/� 65 �/ \ 1 6 MULCH TO BE TACKED OR MECHANICALLY TIED DOWN WITHIN TWO DAYS AFTER MULCH IS SPREAD \ \ \ \\ \ \ \ \\ --------------- /,� �/--�\ \\ \\ `\ 1 II I �> > > / � \`\� \\\� \ -' III \ 1 1,= � ��/ �I \►II\\ I goo_fe _—__—_—�'' \\/!/�\\\\ GRAPHIC SCALE �I �` `\' c -- s -- \III p ,, ` _ s ® / �p 60 \ 0 30 60 __- 12�O/ 240 IN FEET) / i inch = 60 ft. _— — \ n N N N w a Q N � M 0 } U 0 U m U) z V) cD o z cn a > a w 0 w Q 0 (L D Er w a _ 0 O w z U) w w it w N _ O z L0 O L0 Z Lq E O Q O O �o U 0 O > • Q� � U 00 `2 1 T� i D N w U O E N Z O � O � O � 3 v H J_ U Z Q O CL U � J O w z Cr J Ld F_ u) O Z CD v Ids Q Z Z Of O Q a O Z ir (n w J w D U) Co < J W Q Z Ld Cr O Of LLJ m_ J JOB NO: J-29722 0000 DATE: 02/08/21 DRAWN: FS DESIGNED: CDR REVIEWED: CDR APPROVED: FS SCALE: I" = 60' TmC-03-101 � J CONSTRUCTION SEQUENCE: 007 \ \ \ \ \ \ \ \ \ \ \ 1 I I I I I I 1 \ \ \ \ \ \ EROSION CONTROL PERMIT HAS BEEN OBTAINED BY THE OWNER \ \ \ \ s,, \ \ \ \ \ \ \ TOTAL LIMITS OF DISTURBANCE: 7 67 AC 2 FIELD SURVEY AND STAKE PROPOSED DISTURBED LIMITS _ \ \ 007 A \ p A \\ V A A\ \\ \ \ \ A V A V A v \ \ \ \ \ \ \\ \V A \ \\ _ / / / / / /� 3 INSTALL ALL REQUIRED TREE PROTECTION SAFETY FENCING \ \ \ V � A \ \ \ \ \ \ V TEMPORARY SILT FENCE (TYP) A \ \ \ \ \ \ V A \ / / / / // / a \ \ \ V A\ V A \ \ \ \ \ \ \ \ \ SEE DETAIL Cl/T-C-03-201 4 PROVIDE STABILIZED CONSTRUCTION ENTRANCE(S) o \ \ V A \ \ 00�A 5 INSTALL, LINE, AND STABILIZE CLEAN WATER DIVERSION DITCHES ROCK CHECK DAM (TYP) 6 PROVIDE ALL EROSION CONTROL MEASURES AS SHOWN, CLEARING ONLY \ V A I \I A V� i \\ \ \ \\ \I I I 1 SEE DETAIL BI/T-C-03-202 AS REQUIRED TO INSTALL ANY OF THESE DEVICES SHOWN: \ \ I I \ 0 \ \ I / ° CONSTRUCTION ENTRANCE \ \ \ \\ I I I I \ �7 \ o � I I I II TEMPORARY DIVERSION DITCH (TYP) ° ol SILT FENCING \ I m I I SEE DETAIL Cl/T C 03 20210 ° INLET PROTECTION \ \ I I I \ m o SEDIMENT TRAPS \ \ I I I I I I I ° DIVERSION DITCHES oo i \ \ I I I I Opel SKIMMER BASINS J \ \ol ° ALL OTHER ELEMENTS SHOWN I I \I I 7 NOTIFY DEMLR's EROSION AND SEDIMENT CONTROL REGIONAL OFFICE \ I I II PROVIDE TEMPORARY SEEDING IN AL I / DISTURBED AREAS IN I \ \ \ \ \ ACCORDANCE WITH THE STABILIZATION I I 0 PRIOR TO GRADING I I I 8 PERFORM CLEARING AND GRUBBING I TIME FRAMES LISTED ON THIS SHEET I / / PROVIDE PERMANENT SEEDING 9 BEGIN CONSTRUCTION AT CONCLUSION OF PROJECT I I I I I 10 00 ol 10 CLEAN TRAPS, DITCHES, ETC WHEN HALF FULL II FINE GRADE SITE 12 SEED AND MULCH ALL EXPOSED AREAS WITHIN THE TIMEFRAME SHOWN IN THE STABILIZATION SCHEDULE SHOWN ON THIS SHEET I o / / / I I I I o 13 STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS \ I / / \ / / PROVIDE EMBANKMENT MATTING ESTABLISHED O \ 0 ° / / FOR ALL SLOPES 4:1 AND GREATER J�\ \ � / / / / / / PER DETAIL BI/T-C-03-201 14 ONCE SITE AREAS ARE STABILIZED WITH PERMANENT GROUND COVER, OBTAIN APPROVAL FROM DEMLR INSPECTOR TO REMOVE SOIL EROSION \ I • \ I �\ / I I I I \ I 1 \ \ \ \ \ CONTROL MEASURES FINE GRADE AND STABILIZE THE AREAS WHERE EROSION \ \ �� \ !. �� / I I I \ \ \ CONTROL MEASURES ARE REMOVED \ \ I • /(0 I I _ \_ / / / I I I \ \ I I o \ \ \ \ \ \ 16 NOTIFY DEMLR's EROSION AND SEDIMENT CONTROL REGIONAL OFFICE FOR \ ° \ FINAL INSPECTION _ o � V ON -SITE SOILS: o� \ \ I I I I A I / / / \ \ \ I I 1 V I 1 I I V A I // / / / / / I 1 MoC MECKLENBURG LOAM, HYDROLOGIC GROUP "C" �� I -� I I II I \ \ \ 1 I I V I 00� McB2 MECKLENBURG CLAY LOAM, HYDROLOGIC GROUP "C" DRAINAGE BASIN: I / SITE DRAINS TO THE CAPE FEAR RIVER BASIN, THE RECEIVING WATER BODY IS o �e685 SANDY CREEK (WS-III: STREAM INDEX 17-16-(I)) 0 684T4 STABILIZATION TIME FRAMES: 682 0) o \ I I PERIMETER DIKES, SWALES, DITCHES, SLOPES: 7 DAYS 680 11ol HIGH QUALITY WATER (HOW) ZONES: 7 DAYS I SLOPES STEEPER THAN 3:1: 7 DAYS I I \ �� \ A A� \\�\V A \ \ I I I I f // / s�sssF� i �55 / TEMPORARY SILT FENCE (TYP) (EXCEPTION: IF SLOPES ARE 10 OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED o I SLOPES 3:1 OR FLATTER: 14 DAYS (EXCEPTION: 7 DAYS FOR SLOPES GREATER I I I � I I I II II �rn i -TYPE SKIMMER THAN 50 IN LENGTH) FAIRCLOTH SEE DETAIL -03-201 �ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1: 14 DAYS SKIMMER PIPE DIA: 2 511 \ SKIMMER ORIFICE DIA : 2 TEMPORARY SEEDING NOTES: I I I I,•. I I I I I y�v� -,1, \ I I I II II I 1 I � I I � ___— � � ��� �66g� ��� �� I SEED IN ACCORDANCE WITH THE SEEDING SCHEDULE SHOWN IN DETAIL I o Al/T-C-03-201I \\mil 2 REFER TO SPECIFICATIONS FOR ALL PERMANENT SEEDING i REQUIREMENTS Jo / / I � / � ' � � � � y y l / / l I I I / �658 - (/ 3 MULCH WITH STRAW APPLIED AT THE RATE OF 100 LBS /1000 SF / / / I /� \ I� I I �A / / - / - -� `_ �`� "66 TEMPORARY SKIMMER BASIN SEE DETAIL C3/T-C-03-201 1�Q / / / / I - / / i 2 CONTRIBUTING AREA: 7 48 AC / / \ \\\ a I L- — _ -- --,_, �i �� �i ALTERNATE SEEDING METHOD: HYDROSEED 0659010:1935 CFS � � _� i 66 \ ° I / I / o � i TOP OF DAM ELEV = 660 50 1 FIBER -MULCH AND TACKIFIER TO BE MIXED WITH THE HYDROSEED o - 63� TOP OF WEIR ELEV = 659 00 I / SLURRY ACCORDING TO FIBER -MULCH MANUFACTURER'S RECOMMENDATIONS l(o� h / - � r I I I / I I / / / / �v �v /� / � I - - _ 6 i BASIN BOTTOM ELEV = 655 00 / a M o / / �A ���66 i DAM HEIGHT = 7'-0" 2 IF HYDROSEED METHOD IS UTILIZED, MATTING OF SLOPES AND / o/ ti I / / 6�- DAM WIDTH = 7'-0" INSTALLATION OF STRAW WATTLES WILL NOT BE REQUIRED UNLESS / �' / I I / l / Y / y\ v I _ _ _ � � � ,6 � � � SED STORAGE DEPTH = 2'-0" HYDROSEEDING METHOD FAILS TO STABILIZE SLOPES PROPERLY ALL / / \ i , I I l l / l / / / l /� �� �A -�� - - i i / WEIR LENGTH = 10 0 DIVERSION DITCHES WILL STILL NEED TO BE LINED PER THE DETAIL / / \ i / / / / / / / / / / / / ) / / / / / �� ��� -PROVIDE EMBANKMENT MATTING _ 665' STORAGE VOLUME AT 659 00 - FOR ALL SLOPES 4:1 AND GREATER' •.,.r ,� n�� i � � � � � = 14079 CF / PER DETAIL BI/T-C-03-201 SEEDBED PREPARATION NOTES: i l / / v ' TOMBE PLACED WIITUHIN BASIN BAFFLES IDi / / _ _ - - O O • PER DETAIL B2/T-C-03-201 I AREAS TO BE SEEDED SHALL BE RIPPED AND SPREAD WITH AVAILABLE , _ _-- - TOPSOIL 1 SET SEDIMENT CLEAN OUT / / / / �� ��A \ / / o / �L _ - - STAKE WITH CLEANOUT LEVEL o SHOWN AT 657 00 2 REMOVE ALL LOOSE ROCKS, ROOTS, CONSTRUCTION DEBRIS, ETC FROM / 1� l / / \ / / / / / / / / / o / _ - - - -�� v� \ _ _ - - +0 THE SURFACE PRIOR TO SEEDING / / V A 0„- / - 0 00 BASIN SHALL REMAIN IN PLACE 3 IF NO SOIL TEST IS TAKEN, FERTILIZER AND LIME TO BE IN ACCORDANCE / i / i \, / / / 0 ` A _ - - - _ _ - OI�00 - _ - - ° UNTIL CONTRIBUTING DRAINAGE WITH RATES SHOWN IN THE SEEDING SCHEDULE IN ADDITION, PROVIDE / / / A , - A / / / / - _ - -- - - _ V A AREA IS STABILIZED 15#/1000 SF OF SUPER -PHOSPHATE / / / /667 \ _ _ kD 0 _ �I - _ ' V� / i ROCK CHECK DAM (TYP) 4 IF SOIL TEST IS TAKEN, PROVIDE LIME AND FERTILIZER AS / / / i / // - — - - _ - a A� / \ / SEE DETAIL BI/T-C-03-202 BY THE TEST REPORT / / / ° / / Aol m n - 0 7- RECOMMENDED - _ - - o A ao'� v --� _ _ ����1 - _ - O A TEMPORARY DIVERSION DITCH (TYP) 5 LIME AND FERTILIZER SHALL BE APPLIED UNIFORMLY AND MIXED WITH / / / / / �� v� i 2 �0" - - - _ A� 6 SEE DETAIL Cl/T-C-03-202 THE SOIL DURING SEEDBED PREPARATION / - / / i �� \ vv - - �� - �� 70- \ \ / 6 MULCH TO BE TACKED OR MECHANICALLY TIED DOWN WITHIN TWO DAYS AFTER MULCH IS SPREAD TEMPORARY SILT FENCE (TYP) 6676e>9, _ -SEE DETAIL Cl/T-C-03-201 - \ 6?0 - -SEE SHEET T-C-03-101 FOR CD - - - - 66_ - - - -669 -CONTINUATION /OpV-s6g- - 665 -_ >� vvvvv vvvvv ��_ 66 — \ 664 � 66 l n ' 6' 6' A / v _ -672-6? `Z V A s +00 o m m ol J9, 5+(- / LOD--_---=_LOD \__— / SOD `` _-- COD — LOQ �D-----LOR-- / LO I I I I�o 0'- TEMPORARY TEMPORARY CONSTRUCTION ENTRANCE SEE DETAIL Cl/T-C-03-201 GRAPHIC SCALE DI 30 0 15 30 60 120 Co IN FEET 1 inch = 30 ft. / I j "% u z.0L� — iZ ~ d5 zLLJ �J O o } U m U) z 0 Ln w Of 0 z w cy 0 z L0 O z O Q p N �00 U 0 O O L r , • Q c� � � 2 -9o v) 1 T i � w 0 0 04 Z O � O 3 3 U H Q �_ J U a_ LL O 0 � U < p J z c) J w " z r^ V Q _o Z5 z 0 o Q W z W Q Q Q F— Z V/ Ld a_ V/ Do a _O Ld w F_ U of ch w W z m p U JOB NO: J-29722 0000 DATE: 02/08/21 DRAWN: FS DESIGNED: CDR REVIEWED: CDR APPROVED: FS SCALE: I" = 30' T-C-03-103 PVC ENI PVC PERSPECTIVE VIEW FRONT VIEW 'C" ENCLOSURE -ER ENTRY UNIT _E 40 SCHEMATIC OF SKIMMER TAKEN FROM PENNSYLVANIA EROSION AND SEDIMENT POLLUTION CONTROL MANUAL, MARCH 2O00. SKIMME�RD ETAIL A2 NTS FOR LATE WINTER AND SOIL AMENDMENTS: EARLY SPRING: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER SEEDING MIXTURE: MULCH: RYE (GRAIN) - 120 LB/ACRE APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANNUAL LESPEDEZA (KOBE) - 50 LB/ACRE ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING (OMIT ANNUAL LESPEDEZA WHEN DURATION TOOL OF TEMPORARY COVER IS NOT TO EXTEND MAINTENANCE: BEYOND JUNE) REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE AND MULCH IMMEDIATELY FOLLOWING SEEDING DATES: EROSION OR OTHER DAMAGE JAN. 1 - MAY 1 FOR SUMMER: SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER SEEDING MIXTURE: GERMAN MILLET - 40 LB/ACRE (A SMALL -STEMMED SUDANGRASS MAY BE MULCH: APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH SUBSTITUTED AT A RATE OF 50 LB/ACRE) ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL SEEDING DATES: MAINTENANCE: MAY 1 -AUG. 15 REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE FOR FALL: SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB/ACRE 10-10-10 FERTILIZER SEEDING MIXTURE: MULCH: RYE (GRAIN) - 120 LB/ACRE APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH SEEDING DATES: ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING AUG. 15 - DEC 30 TOOL MAINTENANCE: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. FOR ADDITIONAL INFORMATION, REFER TO NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (ESCPDM), SECTION 6.10. FOR PERMANENT SEEDING SPECIFICATIONS, INCLUDING SEED BED PREP, SEASONAL LIMITATIONS FOR SEEDING OPERATIONS, THE KINDS OF GRADES OF FERTILIZERS, THE KINDS OF SEED, AND THE RATES OF APPLICATION OF LIMESTONE, FERTILIZER, AND SEED, REFER TO NCDENR ESCPDM SECTION 6.11. TEMPORARY SEEDING SCHEDULE Fo FLU SKIMMER SEDIMENT BASIN DESIGN CRITERIA DRAINAGE AREA < 10 AC. (ACRES) MIN. LENGTH TO 2:1 WIDTH RATIO MAX. LENGTH TO 6:1 WIDTH RATIO MIN. 1800 VOLUME (CU. FT. REQUIRED PER AC. DISTURBED) 325 SURFACE (SQ. FT, AREA PER CFS REQUIRED Q10) DATA BLOCK PLAN VIEW INFLOW STRUCTURE AVERAGE = AREA* 1 WIDTH LENGTH * AREA OF BASIN WATER SURFACE AT TOP OF PRIMARY SPILLWAY \4w-4m CROSS-SECTION VIEW INFLOW STRUCTURE DEWATERING ZONE FILTER FAB[ SEDIMENT STORAGE ZONE LENGTH 10' MIN. SKIMMER DEWATERING DEVICE 1' FREEBOARD 6" MAX. DEPTH OF FLOW EMBANKMENT NOTES: 1. REFER TO NCESCPDM SECTION #6.64 FOR ADDITIONAL DESIGN SPECIFICATIONS ■ REGARDING SKIMMER ■ SEDIMENT BASINS. 2. REFER TO DETAIL B2 FOR BAFFLE SPACING AND INSTALLATION. EMERGENCY III, F-SPILLWAY W=5' MIN. MBANKMENT VMERGENCY P I LLWAY ANTI -SEEP COLLAR BASIN DRAINAGE AREA (ACRES) DENUDED AREA (ACRES) Clio BASIN VOLUME BASIN SURFACE AREA CLEANOUT DEPTH (FT.) H/2 H (FEET) Z (FEET) L (FEET) T (FEET) W (FEET) SKIMMER PIPE DIAMETER SKIMMER ORIFICE DIAMETER REQUIRED (CUBIC FT.) PROVIDED (CUBIC FT.) REQUIRED (SQ FT.) PROVIDED (SQ FT.) 1 7.480 1.58 19.35 13464 1 14079 6289 6602 2' 4' 5.5' 60' 1.5' 7' 2.5" 2.1 " TEMPORARY SKIMMER BASIN N T S INLET ZONE 35% a OF SURFACE AREA INLET ZONE 25% OF SURFACE AREA INLET ZONE 25% OF SURFACE AREA a' MAX OUTLET ZONE 15% GENERAL NOTES: STEEL POST SQL POST OF SURFACE AREA 1. DRIVE 5' STEEL POST AT LEAST 24" INTO SOLID GROUND. 2. USE STAPLES 1' APART HORIZONTLLY p� F FILTER FABRIC / x AND VERTICALLY TO ATTACH THE WOVEN FILTER FABRICMENEM y� i+f / FILTER FABRIC TO THE WIRE FENCE. 0A FLON1 do 1 3. SPACE THE BAFFLES ACCORDING TO I � a \ x THE APPROVED PLAN. _ _ _ = _ III=III=11I =III=III=III=III III-11I-III-11I-III-11I-III-11I-III-III-11I-III-11I-III-11I III=III=III=III=III=III=III=III=III=III=III=III=III=III=III=1 I-11I-111- ii III=III=11 _ _ wo m Q I 4. THE FLOOR OF THE BASIN IN THE � III III - - - - - - - - - - - - - - -III -III -III -III -III -III -III -III -III -III -III -III - - - ;, I -III -II - = o OUTLET ZONE AND BERMS SHOULD -III -III "I-TII -III -III -III;, 1_,�IIIillllill�l I= 1 -I 11 11' 4 BE SEEDED IMMEDIATELLY AFTER =III-11lll�lll=1'',III�,IIllillllllllillllllll-II - - - - - - -I =I x THE BASIN IS CONSTRUCTED. / BERM X / \x-x� 4'-0" MAX. SPACING (TYPICAL) O UT�FT O/T Cy BAFFLE INSTALLATION N T S 36" MIN. SPACING TYP.* BAFFLE FABRIC SHALL BE A 700 GRAMS/SQUARE METER COIR EROSION CONTROL FABRIC. 5' STEEL POST FLOW 8" X 6" TRENCH BACKFILL AND COMPACT FENCE AND FABRIC BURIED IN TRENCH III=11 �_ III_II GENERAL NOTES 1. WOVEN FILTER FABRIC BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS. 2. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE. 3. TURN SILT FENCE UP SLOPE AT ENDS. 4. ORANGE SAFETY FENCE IS REQUIRED AT BACK OF SILT FENCE WHEN GRADING IS ADJACENT TO SWIM BUFFERS, STREAMS OR WETLANDS (REFER TO SWIM BUFFER GUIDELINES). THE COLOR ORANGE IS RESERVED FOR VISUAL IDENTIFICATION OF ENVIRONMENTALLY SENSITIVE AREAS. 5. DRAINAGE AREA CAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. 6. SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 7. DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW. TEMPORARY SILT FENCE N T S MAINTENANCE NOTES 1. FILTER BARRIERS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH APPROX. HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. 1 MIN. KEY/ANCHOR MATERIAL AT 1. NOTES: A STABILIZED ENTRANCE PAD OF 2"-3" RAIL ROAD BALLAST SHALL BE LOCATED WHERE PACING TYP.* TOP OF SLOPE. TRAFFIC WILL ENTER OR LEAVE THE CONSTRUC71ON SITE ONTO A PUBLIC STREET. 2. FILTER FABRIC OR COMPACTED CRUSHER RUN STONE SHALL BE USED AS A BASE FOR THE CONSTRUCTION ENTRANCE. GENERAL NOTES: 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL 1. LAY BLANKETS LOOSELY STONE AS CONDITIONS WARRANT AND REPAIR OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. i I 1 AND STAKE OR STAPLE TO ` MAINTAIN DIRECT CONTACT 4. ANY SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO ADJOINING STREETS MUST BE REMOVED IMMEDIATELY. WITH THE SOIL. DO NOT 5. WHEN APPROPRIATE, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN STRETCH. WASHING IS REQUIRED, IT SHALL BE DONE IN AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN * 2. DIMENSIONS SHOWN ARE APPROVED SEDIMENT BASIN. - MINIMUM, MANUFACTURED _ - - - - - PRODUCTS MAY HAVE ADDITIONAL REQUIREMENTS OVERLAP THAT MUST BE MET. IN SLICE 3. SLOPE SURFACE SHALL BE 50, MIN. PUBLIC STREET FREE OF ROCKS, SOIL CLODS, STICKS, GRASS. MAT/BLANKETS SHALL HAVE GOOD SOIL CONTACT. EXISTING GROUND '' ICI � �I - „ �L , vill O 11�11 V forilim-LillSOIL STABWZA71ON FABRIC 4. THE DETAIL SHOWN IS FOR -' UNDER RAILROAD BALLAST SLOPE MATTING. FOR TABLE OR OUTFALLL MATT NIGE SO' MIN. NjWATER j SPECIFICATIONS, PLEASE j REFER TO NCESCPDM STANDARD #6.17 AND MANUFACTURER'S GUIDELINES. vqmx Ll Lu N NON -WOVEN GEOTEXTILE FILTER CLOTH i FABRIC 4' ABOVE SOURCE WATER. m m KEY/ANCHOR MATERIAL TO TOE OF SLOPE. _ al_ D_ EMBANKMENT MATTING DETAIL N �O Z Ncy Ln 0 < � O w = N z = - 0 z Lo CD L0 (n Z Lq E 0U Q O O NO lz� GO N 0 O ', Q � C) 1 T i U 00 � N L U CD N 0 E N Z CD 0 3 O � � 3 U J_ U Q LL_ Z o U) J U � a j L H J W w (.D w Z CD J O Id: Q Z Z O Q a U) Z L Z -1 m O a (n L Z L w I-_ Of L m J JOB NO: DATE: J-29722 0000 02/08/21 DRAWN: DESIGNED: FS CDR REVIEWED: CDR APPROVED: FS SCALE: AS SHOWN T-C-03-201 N T S N T S N T S TOP OF MUST BE ABOVE T THE WAS STEEL FEN( WIRE I HARDWARE CLOTH FILTER OF 1" D WASHED STONE 3' FILTER FABRIC ON GROUND 4' MIN. E, JIttL rtN�t r��l U AND HARDWARE SET MAX 2' APART CLOTH IN TRENCH MIN. 18" INTO SOLID GROUND 1. 2. 3. GENERAL NOTES: RIPRAP SIZE TO BE DESIGNED BY ENGINEER. CHECK DAMS MAY BE USED IN SLOPING DITCHES OR CHANNELS TO SLOW VELOCITY OR TO CREATE SEDIMENT TRAPS. ENSURE THAT MAXIMUM SPACING BETWEEN DAMS PLACES THE TOE OF THE UPSTREAM DAM AT THE SAME ELEVATION AS THE DOWNSTREAM DAM (SEE DIAGRAM BELOW). CLASS B RIP a MAXIMUM SPACING B A AND B ARE AT EQUAL ELEVATIONS - - - - - - - - - - -- - - - - - - - - - r►K .. ��lJ _L u IN= - _ BURY WIRE FENCE AND m11 =l!!- III=11I= HARDWARE CLOTH _ _ _ _ _ � -1j1 111=i�� 111=111= i�lll=i 1=III='�- "_� 1=ill-111=_III=1il= BURY 6" OF Ill- I11-11,= 1j1_III_Ill Ill-Ili-I1�-111_Ill-Il UPPER EDGE - SECTION VIEW I OF ER FABRICINpl AAI TRENCH LVOLl 1'-6" MIN. 4' TO 6' L t W1CYC1\ C'�E NOTES: 1. REMOVE SEDIMENT FROM THE UPSLOPE SIDE OF THE WATTLE WHEN ACCUMULATION HAS REACHED 1/2 OF EFFECTIVE HEIGHT. 2. LOOSE FILTER MEDIA MAY BE BACKFILLED ON THE UPSLOPE SIDE OF THE WATTLE TO ENHANCE PERFORMANCE 3. JOINTS BETWEEN TWO WATTLES SHALL BE SLEEVED AND STAKED. -ALWAYS USE IN CONJUNCTION WITH ROLLED EROSION `CONTROL BLANKET. \DISTURBED AREA / PROTECTED AREA 2" X 2" WOODEN STAKES PLACED 4' O.C. PLAN NTS NATLRAL ftlE AND SLOPE GRADIENT VERTICAL SPACING > 1:1 5' 2:1 - 1:1 10' 4:1 - 2:1 20' 6:1 - 4:1 25' < 6:1 50' 1frL.F. PER END PLACED AT A 30' ANGLE TO PRE- VENT END -AROUND FLOW DISTURBED AREA ALWAYS INSTALL WATTLE PERPENDICULAR TO SLOPE WOOD \KE AA. STRAW TTLE ' OF EROSION JTROL MATTING 'E SURFACE SECTION AT STAKE NTS FIRST WATTLE SHALL BE PLACED AT TOP OF BANK. ALWAYS USE IN CONJUNCTION WITH ROLLED EROSION CONTROL BLANKET. 2" X 2" WOODEN STAKES PLACED 4' O.C. r'7 S4O AF SECTION NTS STRAW WATTLE INSTALLATION ON SLOPES NTS SLOPE 2' MI NOTE: _' u 1. DITCH SHOULD HAVE LONGITUDINAL SLOPE OF 1%. 2. SILT FENCE MAY BE REQUIRED BEHIND BERM COMPACTED BERM WIDTH AND DEPTH TO BE DESIGNED BY ENGINEER (1' MIN) 8" DIA. STRAW WATTLE PROTECTED AREA ILT FENCE SEE NOTE 2) \\\\\\`````��r F Q m Z O L W (Y 0 z In CD Z L CD O Q O N � O U c� oo (D O } Q c� 00 � Ln `2 1 T� i � N w U CD 0 E N Z CD O 3 O � _ 3 U J_ U Q L� z o J cU Q a j w H J w W (D w Z cl) 0 0 Q Z Of z O Q a U) z w Z J m O a (n 0 w z of w W H w 00 J O: : J-29722 0000 02/08/21 N: NED: FAROVED: FS CDR WED: CDR FS SCALE: AS SHOWN SILT FENCE OUTLET NTS TEMPORARY CHECK DAM NTS TEMPORARY DIVERSION DITCH NTS T-C-03-202