Loading...
HomeMy WebLinkAboutSW6230705_Design Calculations_20230831 (28) 4D Site Solutions, Inc. DESIGN REQUIREMENTS: A. Pass the storm event SCM 15 Pre-Development Runoff-100-yr Drainage Area,(DA)= 16.13 acres Intensity,(I)= 7.57 inches/hr Composite Runoff Coefficient,(C)=> 0.30 Maximum Release Rate,(Qloo)=> 36.63 cfs SCM 15 Post-Development Runoff-100-yr Drainage Area,(DA)= 16.13 acres Intensity,(I)= 9.52 inches/hr Composite Runoff Coefficient,(C)=> 0.59 Peak Release Rate,(Qloo)=> 90.60 cfs Detention Pond Stage-Storage Function Contour Contour Incr. Accum. Stage Elev. Area Storage Storage(S) (Z) (ft) (sf) (cf) (cf) (ft) ln(S) ln(Z) Z est 295.5 20,647 - - - 296.0 22,448 10,774 10,774 0.50 9.28 -0.69 0.55 297.0 24,344 23,396 34,170 1.50 10.44 0.41 1.52 298.0 26,317 25,331 59,500 2.50 10.99 0.92 2.48 299.0 28,367 27,342 86,842 3.50 11.37 1.25 3.45 300.0 30,493 29,430 116,272 4.50 11.66 1.50 4.46 300.5 31,585 15,520 131,792 5.00 11.79 1.61 4.98 301.0 32,696 16,070 147,862 5.50 11.90 1.70 5.50 301.5 33,825 16,630 164,492 6.00 12.01 1.79 6.04 302.0 34,975 17,200 181,692 6.50 12.11 1.87 6.60 Regression Output: b= 1.14 (X Variable Coeff) Ks= 21,166 (eY-b`te`Cept) Stage-Storage Equation is of the form:S=(Ks)(Z)b printed: 7/7/2023 1.25 PM Page 1 of 3 4D Site Solutions, Inc. Primary Spillway Barrel Number of Barrels= 1 Dia.of Barrel= 24 inches Area of Barrel,(Ab)= 3.14 sf Pipe Length,(L)= 80 feet Friction Coeff.,(Kp)= 0.01058 Inv.of Barrel= 295.50 feet Riser Elev.of Riser Crest= 299.00 feet Rectangular Length Weir= 36 inches Width Weir= 48 inches Total Weir Length= 14.00 feet Area of Riser= 12.00 sq.ft. Orifice in Riser Dia.of Orifice= 3.00 inches Number of Orifices= 1 Area of Orifice,(Ab)= 0.05 sf Orifice Coefficient(CO= 0.60 Inv.of Orifice= 295.50 feet Length of weir 3.00 feet Top of weir= 296.79 feet Weir Coefficient(Cw)= 3.00 Emergency Spillway Width of Spillway(Approx.)= 25 feet Weir Coefficient= 3.3 Crest Elevation= 310.00 feet Summary of Results Maximum Release Rate,(Qloo)= 36.63 cfs Release Rate,(Q1oo)= 74.53 cfs Normal Water Surface Elev.= 295.50 feet Water Surface Elev.@ Outlet(Q100)= 299.73 feet printed: 7/7/2023 1.25 PM Page 2 of 3 4D Site Solutions, Inc. Inflow Hydrograph-100-yr Peak Inflow,(Qp)_> 90.60 cfs Time to Peak Calculation: CN= 71 P= 7.91 in. S= 4.08 in. Q*= 4.50 in. (depth of runoff) Vol= 263,551 cf (vol.of runoff) Time to Peak,(Tp)=> 34.9 minutes (SCS TR-55) printed: 7/7/2023 1:25 PM Page 3 of 3