Loading...
HomeMy WebLinkAboutNCC232598_Site Plan or Location Map_20230829 PROJECT LOCATION '00.4111111111131MOV4160,.4. ideihm I \ f DUKE ummireirtak4s,•c ,, ofisigoralai ALVA Alv ierf • -' —40 litire6441401411.1vit ' 411110411*(11kVi NL, ENERGY® Y '*` CAROLI NAS 10 NORTH & SOUTH CAROLINA STATE MAP PIEDMONT EMC DEL10 BUCKHORN CONVERSION ORANGE COUNTY PROJECT NARRATIVE BUCKHORN , NC THE PROPOSED PIEDMONT EMC DELI BUCKHORN CONVERSION PROJECT IS LOCATED IN ORANGE COUNTY,NORTH CAROLINA.THE PROJECT INCLUDES INSTALLATION OF A NEW TRANSMISSION LINE(NORTH OF EFLAND RETAIL IS 4M1246 AND SOUTH OF EFLAND RETAIL IS 4P1252),RELOCATION OF A TOWER ALONG THE ENO 100KV TRANSMISSION LINE(1E226),AND REMOVAL OF THE EXISTING BUCKHORN TRANSMISSION LINE.THE NEW TRANSMISSION LINE WILL BE LOCATED ADJACENT TO THE EXISTING TRANSMISSION LINE AND WILL BE INSTALLED TWENTY FEET OFFSET FROM THE EXISTING TRANSMISSION CENTERLINE.THEREFORE,THIS PROJECT WILL EXTEND DUKE ENERGY'S MOWED AND MAINTAINED RIGHT-OF-WAY TWENTY FEET BEYOND THE EXISTING RIGHT-OF-WAY.THE NEW TRANSMISSION LINE SHEET LIST: WILL BEGIN NORTHWEST OF THE EFLAND RETAIL PARALLEL TO THE EXISTING ENO 100KV(1 E226)TRANSMISSION LINE,TURN SOUTH AT THE EFLAND RETAIL,AND RUN SOUTH ALONG THE EXISTING BUCKHORN TRANSMISSION LINE AND END NEAR THE BUCKHORN EMC DELI TAP.THE PROJECT WILL UTILIZE TEMPORARY POLES NEAR THE EFLAND RETAIL TO ALLOW FOR CONSTRUCTION BEFORE AN OUTAGE CAN TITLE SHEET SHEET PTL OCCUR.THE PROPOSED LIMITS OF DISTURBANCE IS 26.75 ACRES.IN ORDER TO ACCOUNT FOR ALTERNATIVE CONSTRUCTION METHODS, EROSION&SEDIMENT CONTROL NOTES SHEET PEN1 OR THE NEED FOR ACCESS TO OTHER TOWERS,AN ADDITIONAL 10%OF TOTAL PROPOSED WORK AREA HAS BEEN INCLUDED IN THE PERMITTING FEE.THE ADDITIONAL 10%OF ACREAGE IS EQUAL TO 2.68 ACRES AND RESULTS IN A TOTAL AREA OF 29.43 ACRES.A PORTION EROSION&SEDIMENT CONTROL NOTES SHEET PEN2 OF THE SITE IS EXISTING TRANSMISSION INFRASTRUCTURE AND WILL NOT CHANGE THE EXISTING LAND USE.THE PORTION OF THE START END EROSION&SEDIMENT CONTROL NOTES SHEET PEN3 PROJECT WITH NEW RIGHT-OF-WAY WILL REQUIRE CLEARING OF EXISTING LAND.PRIOR TO CONSTRUCTION,A DUKE ENERGY CONSTRUCTION CONTRACTOR WILL INSTALL EROSION CONTROL MEASURES TO ENCOMPASS THE ANTICIPATED CONSTRUCTION LIMITS. EROSION&SEDIMENT CONTROL OVERALL SHEET LAYOUT SHEET PLA1 PREDEVELOPMENT CONDITIONS WILL BE RESTORED AND THE AREA WILL BE STABILIZED PRIOR TO COMPLETION OF CONSTRUCTION.AN LATITUDE: 36°2'53.5" LATITUDE: 36°4'45" PROPERTY OWNER INFORMATION SHEET PLA2 AVOIDANCE AND MINIMIZATION OF DISTURBANCE APPROACH HAS BEEN INCORPORATED INTO THE DESIGN OF THE EROSION CONTROL PROPERTY OWNER INFORMATION SHEET PLA3 MEASURES BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED RIGHT-OF-WAY ACCESS ROUTES WHENEVER POSSIBLE.EROSION LONGITUDE: -790�I 1 2'46" LONGITUDE: -790.1 1 2'25" CONTROL MEASURES ARE INDICATED HEREIN FOR PERMITTING USE ONLY BY NCDEQ.THE INITIAL PROJECT DURATION IS ANTICIPATED TO EROSION&SEDIMENT CONTROL PLAN SHEET P1 START IN AUGUST 2023 AND BE COMPLETED IN DECEMBER 2024. EROSION&SEDIMENT CONTROL PLAN SHEET P2 EROSION&SEDIMENT CONTROL PLAN SHEET P3 EROSION&SEDIMENT CONTROL PLAN SHEET P4 EROSION&SEDIMENT CONTROL PLAN SHEET P5 EROSION&SEDIMENT CONTROL PLAN SHEET P6 GENERAL NOTES J EROSION&SEDIMENT CONTROL PLAN SHEET P7 1. APPROXIMATE STRUCTURE LOCATIONS WERE PROVIDED TO DUKE ENERGY LINE ENGINEER AND ARE FOR REFERENCE MT. WILLING ROAD (SR-1120)I n SQUIRES ROAD (SR-1145) EROSION&SEDIMENT CONTROL PLAN SHEET P8 ONLY. THESE DRAWINGS SHALL NOT BE USED FOR LINE CONSTRUCTION. 2. BASE DRAWINGS WERE CREATED BY GIS DATA OBTAINED FROM VARIOUS SOURCES.AERIAL PHOTOGRAPHY WAS I RAILROAD EROSION&SEDIMENT CONTROL DETAILS SHEET PED1 OBTAINED FROM STATE AGENCIES. END OF PROJECT a EROSION&SEDIMENT CONTROL DETAILS SHEET PED2 3. NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE CONTRACTOR'S BUCKHORN 44KV (4P1252) INTERSTATE 85 EROSION&SEDIMENT CONTROL DETAILS SHEET PED3 RESPONSIBILITY TO ACCURATELY LOCATE,BOTH VERTICAL AND HORIZONTAL,EXISTING UTILITIES PRIOR TO THE START OF CONSTRUCTION.THE CONTRACTOR SHALL NOTIFY NC 811 PRIOR TO EXCAVATION. CONTRACTOR SHALL NOTIFY DUKE __ _ ENERGY IMMEDIATELY IN THE EVENT OF ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM - _- - MIGRATORY BIRD HOTLINE THE PLAN. COST TO REPAIR DAMAGED UTILITIES SHALL BE BORNE BY THE CONTRACTOR. BEGINNING OF PROJECT 4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR SHALL NOT BUCKHORN 44KV (4M1246) STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY DISTURB UTILITY POLES,GUYS WIRES,OR ANCHORS WITHOUT PERMISSION FROM DUKE ENERGY. F SERVICE AREA.INTERACTIONS OF BIRDS WITH GENERATING FACILITIES,TRANSMISSION AND DISTRIBUTIONS, Z SUBSTATIONS,OTHER STRUCTURES AND EQUIPMENT,AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO O 5. PROJECT IS LOCATED IN THE NUESE RIVER BASIN. THE PROJECT IS SUBJECT TO STATE-REGULATED BUFFER 1 BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND REQUIREMENTS. EXISTING BUCKHORN LINE - Cl) 6. SEE SHEET PEN1 FOR EROSION AND SEDIMENTATION CONTROL SEQUENCE AND SEEDING SCHEDULE. I CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. lY 7. STREAMS EXTEND BEYOND THE RIGHT-OF-WAY. APPROPRIATE BRIDGING AND MATTING OF THESE FEATURES IS s' CAROLINAS:800.573.3853 FLORIDA:727.386.3084 MIDWEST:317.430.4497 ; REQUIRED SHOULD THE CONTRACTOR USE ANY ACCESS ROUTES LOCATED OUTSIDE OF THE RIGHT-OF-WAY. BUSHY COOK ROAD (SR-1137) Z 8. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DUKE ENERGY PERMITTING PRIOR TO USE. / SPILL REPORTING HOTLINE O 0 0 9. CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY. HEAVY MATS MAY BE USED IN LIEU OF ROCK ENO 1 OOKV (1 E226)J ®N IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT,FEDERAL AND STATE LAWS CONSTRUCTION ENTRANCES IF DEEMED SUFFICIENT BY A DUKE ENERGY REPRESENTATIVE. REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER Z 10. WETLAND MATTING SHALL BE COMPOSITE MATS. NO LATTICE OR TWO-PLY MATTING SHALL BE USED IN JURISDICTIONAL y REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION.IMMEDIATELY NOTIFY YOUR Ct WETLANDS AND/OR STREAMS. SUPERVISOR AND THE FIELD ENVIRONMENTAUEHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS 0 11. NO OIL/FUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 100 FEET OF WETLANDS OR SURFACE WATER DISCOVERED.IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAUEHS PROFESSIONAL CONTACT ONE OF I THE DUKE ENERGY SPILL REPORTING HOTLINES AT: WITHOUT CONTAINMENT. VICINITY MAP 12. SITE SHOULD BE"STORM READY"AT THE END OF EACH WORK DAY/WEEK. CAROLINAS&MIDWEST:800.527.3853 0 FLORIDA:866.769.1266 D 13. SECURE WRITTEN ACCESS AGREEMENT IS REQUIRED FOR ALL 3RD PARTY ACCESS AND PRIVATE DRIVES NOT INCLUDED SCALE:1"=1500' CO IN ROW DOCUMENTATION PRIOR TO BEGINNING CONSTRUCTION. 0 14. ALL DISTURBED AREAS SHALL BE RESTORED TO SAME OR BETTER CONDITION.PERMANENT GROUND COVER SHALL BE CONTACTS N— USED FOR STABILIZATION. J 15. CONTRACTOR TO FIELD ADJUST CRANE AND PULL PADS AS NEEDED FOR SAFE ACCESS UNDER EXISTING ENERGIZED PERMITTING SPECIALIST ENGINEER: RESPONSIBLE FOR MAINTENANCE: W ELECTRICAL OVERHEAR LINES. DUKE ENERGY CAROLINAS HDR ERIC SHOOK CI 16. TEMPORARY LINE IS 3 FEET WITHIN THE ROW AND SYMBOLOGY APPEARS LARGER.CONTACT DUKE EHS PRIOR TO ANY 526 SOUTH CHURCH ST. ANDREW CALTON,PE PH: (336)416-9468 U EXCAVATION FOR POTENTIAL ADJACENT PARCEL COORDINATION. CHARLOTTE,NC 28202 440 S.CHURCH STREET Eric.Shook@duke-energy.com 2 PH:(704)382-6383 SUITE 1200 W FAX:(704)382-6542 CHARLOTTE,NC CONTRACTOR SHALL NOTIFY "NORTH CAROLINA ONE CALL' (811) Jeff.Goto@duke-energy.com PH:(980)337-5084 H OR (1-800-632-4949) AT LEAST 48 HOURS PRIOR TO andrew.calton@hdrinc.com OZ BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING ' 8110 UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL 0 UTILITIES THAT PROVIDED THEIR OWN LOCATOR SERVICES W_ INDEPENDENT OR "NORTH CAROLINA ONE CALL'. REPORT ANY ZHCgI '. 0_ DISCREPANCIES TO THE ENGINEER IMMEDIATELY. ;` off. es .R e' DUKE E l .pf s..'.Z _ I�08�.���I ;Qp �y 3 :.- FD/ HDR Engineering Inc. �� PIEDMONT EMC DEL 10 BUCKHORN CONVERSION q7. of the Carolinas 440 S. Church St Suite 1000 le ENERGY® TITLE SHEET C 10336526 06/30/2023 ISSUE FOR PERMITTING AJS BTA ASC T �NpINEEP, Charlotte,NC 28202-2075 B 10336526 05/26/2023 60%CONCEPTUAL AJS BTA ASC 4,..:ys,,,14 04.338.6700 CAROLI NAS A 10336526 05/08/2023 10%CONCEPTUAL ASC BTA ASC "Munn,&.,, 013 N.C.B.EL.S.License Number F-0116 526 SOUTH CHURCH STREET CHARLOTTE N.C.28202 LINE PIOE., DRAWING SHEET REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED TELEPHONE NO.(704)382-2741 4P1252/4M1246 10368990 PTL