Loading...
HomeMy WebLinkAboutNCC232544_ESC Approval Submitted_20230825 r 'a- f K ROY COOPER Governor : I l i F J.)ELIZABETH S.BISER `« n,-, St Secretary Qum. DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Quality July 28, 2023 LETTER OF APPROVAL Sloane Realty of Ocean Isle Beach, Inc. ATTN: - George A Sloane, President 16 Causeway Rd. Ocean Isle Beach,NC 28469 RE: Project Name: Appletree Street Storage Yard Project ID: BRUNS-2024-003 County: Brunswick City: Ocean Isle Beach Address: Appletree St Acres Approved: 1.76 River Basin: Lumber Stream Classification: HQW Submitted By: J. Phillip Norris,Norris& Tunstall Consulting Date Receive by LQS: July 3, 2023 Plan Type: Commercial Dear Mr. Sloane: This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications and Performance Reservations. A list of the modifications and reservations is attached if required. This plan approval shall expire three(3)years following the date of approval.If no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B.0129. Should the plan not perform adequately, a revised plan will be required(G.S. 113A-54.1)(b). As of April 1,2019, all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI)form requesting a Certificate of Coverage(COC)under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed,you will receive the COC via email. As the Financially Responsible Party shown on the FRF from submitted for this project you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGOI. Please direct questions about the eNOI changes to the Stormwater Program Staff in the Raleigh central office. If the owner/operator of the project changes in the future,the new responsible party MUST obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: l. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. — North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Wilmington Regional Office 127 Cardinal Drive Extension I Wilmington,North Carolina 28405 P4✓RTH CAROLINA ➢epmlment m Environmental sail.:: 910.796.7215 Letter of Approval Sloane Realty of Ocean Isle Beach, Inc. July 28,2023 Page 2 of 4 Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance-oriented,requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided. This permit allows for a land-disturbance,as called for on the application plan,not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the infoi ination included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated_ 7_ r :sue Sincerely, Mike Cook Assistant Regional Engineer Land Quality Section Enclosures: Modifications Required for Approval NPDES NCG01 Fact Sheet cc: J. Phillip Norris,Norris & Tunstall Consulting North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources Wilmington Regional Office 127 Cardinal Drive Extension I Wilmington,North Carolina 28405 NORTH C R,ONA toena b Rsiy 910.796.7215 Letter of Approval Sloane Realty of Ocean Isle Beach, Inc. July 28, 2023 Page 3 of 4 Approval Letter and Conditions Project Name: Appletree Street Storage Yard Project ID: BRUNS-2024-003 County: Brunswick e 1. This plan approval shall expire three(3)years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. 2. The developer is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site(NCGS 113A-57(3)). Each sediment storage device must be inspected after each storm event(NCGS 113A-54.1(e)). Maintenance and/or clean out is necessary anytime the device is at 50%capacity. All sediment storage measures will remain on site and functional until all grading and final landscaping of the project is complete(15A NCAC 04B .0113). 3. Any and all existing ditches on this project site are assumed to be left undisturbed by the proposed development unless otherwise noted. The removal of vegetation within any existing ditch or channel is prohibited unless the ditch or channel is to be regarded with side slopes of 2 horizontal to 1 vertical or less steep (15A NCAC 04B .0124 (d)). Bank slopes may be mowed but stripping of vegetation is considered new earth work and is subject to the same erosion control requirements as new ditches(NCGS 113A52(6)). 4. The developer is responsible for obtaining any and all peituits and approvals necessary for the development of this project prior to the commencement of this land disturbing activity. This could include our agency's Stormwater regulations and the Division of Water Resources' enforcement requirements within Section 401 of the Clean Water Act, the U.S. Army Corps of Engineers'jurisdiction of Section 404 of the Clean Water Act, the Division of Coastal Management's CAMA requirements,the Division of Solid Waste Management's landfill regulations, the Environmental Protection Agency and/or The U.S. Army Corps of Engineers jurisdiction of the Clean Water Act, local County or Municipalities' ordinances, or others that may be required. This approval cannot supersede any other penuit or approval; however, in the case of a Cease- and-Desist Order from the Corps of Engineers, that Order would only apply to wetland areas. All highlands would still have to be in compliance with the N.C. Sedimentation Pollution Control Act. 5. If any area on site falls within the jurisdiction of Section 401 or 404 of the Clean Water Act,the developer is responsible for compliance with the requirements of the Division of Water Resources (DWR), the Corps of Engineers and the Environmental Protection Agency (EPA) respectively. Any erosion control measures that fall within jurisdictional wetland areas must be approved by the aforementioned agencies prior to installation. The Land Quality Section must be notified of a relocation of the measures in question to the transition point between the wetlands and the uplands to assure that the migration of sediment will not occur. If that relocation presents a problem or contradicts any requirements of either DWR,the Corps,or the EPA,it is the responsibility of the developer to inform the Land Quality Section regional office so that an adequate contingency plan can be made to assure sufficient erosion control remains on site. Failure to do so will be considered a violation of this approval (NCGS 113A-54.1(b)). 6. Any borrow material brought onto this site must be from a legally operated mine or other approved source. Any soil waste that leaves this site can be transported to a permitted mine or separately permitted construction North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources Wilmington Regional Office ( 127 Cardinal Drive Extension I Wilmington.North Carolina 28405 NORTH CAROLINA aeaa,ant alEmPWm,alQualitym 910.796.7215 Letter of Approval Sloane Realty of Ocean Isle Beach, Inc. July 28, 2023 Page 2 of 4 Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance-oriented,requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is detkmined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided. This pei>_nit allows for a land-disturbance,as called for on the application plan,not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended foiiu if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. 7; -a, e4 Sincerely, Mike Cook Assistant Regional Engineer Land Quality Section Enclosures: Modifications Required for Approval NPDES NCGO 1 Fact Sheet cc: J. Phillip Norris,Norris& Tunstall Consulting North Carolina Department of Environmental Quality ( Division of Energy.Mineral and Land Resources i) Wilmington Regional Office 127 Cardinal Drive Extension I Wilmington,North Carolina 28405 NOPTH CAROLINA Deportment a€nsa mhneunml Guar!`9 910.7967215