Loading...
HomeMy WebLinkAboutNC0021636_Authorization to Construct_20230823DocuSign Envelope In BE8768CE-E74C-460A-A7AD-42A8C46D51E7 ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Mr. Steve Ward Director Harnett Regional Water PO Box 1119 Lillington, NC 27546 Dear Mr. Ward: NORTH CAROLINA Environmental Quality August 23, 2023 SUBJECT: Authorization to Construct A to C No. 021636A05 Harnett Regional Water North Harnett Regional WWTP NPDES Permit No. NCO021636 A letter of request for an Authorization to Construct was received February 13, 2023, by the Division of Water Resources (Division). With additional information received April 27, June 22 and August 17, 2023, final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 7.5 MGD North Harnett Regional Wastewater Treatment Plant, with discharge of treated wastewater into Cape Fear River in the of the Cape Fear River Basin. This authorization results in an increase in design and permitted capacity to 16.5 MGD, and is awarded for the construction of the following specific modifications: Installation of two (2) 18.75 MGD mechanical bar screens, one (1) 20.625 MGD vortex grit removal system with grit washer/classifier; construction of six (6) 2.75 MG sequencing batch reactors with twelve (12) 30 HP submersible propeller mixers, twelve (12) 387 GPM submersible non -clog waste sludge pumps, four (4) 7,125 GPM vertical turbine flow transfer pumps and two (2) 3,925 GPM vertical turbine flow transfer pumps and seven (7) 1,710 SCFM turbo centrifugal blowers; five (5) 283 square feet rotating disc tertiary filters; repurposing of existing clarifiers to two (2) 0.90 MG gravity thickening tanks with two (2) 450 GPM rotary lobe thickened sludge pumps, and three (3) 2,376 SCFM blowers; repurposing of existing oxidation ditches to two (2) 3.9 MG aerobic digestors with fine bubble aeration, ten (10) 8.4 HP mixers, five (5) 2,530 SCFM positive displacement blowers and two (2) 753 GPM submersible solids waste sludge pumps; installation of two (2) 1200 GPM submersible solids return backwash pumps; Installation of two (2) 10.31 MGD UV trains, and all necessary piping and controls; in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. North Carolina Department of Environmental Quality 1 Division of Water Resources D �n 512 North Salisbury Street 11611 Mail Service Center I Raleigh, North Carolina 27699-1611 NORTH CARCLINA ^ A_ 919.707.9000 DocuSign Envelope ID: BE8768CE-E74C-460A-A7AD-42A8C46D51E7 Mr. Steve Ward, Director August 23, 2023 Page 2 of 3 This ATC is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0021636 issued effective September 1, 2023 and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0021636. It is the Owner's responsibility to ensure that the as -constructed project meets the requirements of all applicable regulations and statutes, the ATC Permit Application package, and all of the requirements contained herein. Failure to comply may result in penalties in accordance with North Carolina General Statute § 143-215.6A through § 143-215.6C. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Fayetteville Regional Office, telephone number 910-433-3300, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on -site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a Professional Engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit and the ATC Permit Application package. Mail the Certification to: Division of Water Resources, WQ Permitting — NPDES, 1617 Mail Service Center, Raleigh, NC 27699-1617. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III, and IV facilities at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. DocuSign Envelope ID: BE8768CE-E74C-460A-A7AD-42A8C46D51E7 Mr. Steve Ward, Director August 23, 2023 Page 3 of 3 A copy of the project plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the Permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. The issuance of this ATC does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. If you have any questions or need additional information, please contact Amir Adaryani at telephone number (919) 707-3704 or by email at Amir.Adaryani@deq.nc.gov. Sincerely, IDocuSigned by: 064 V6 t. 57287E56MMOD... for Richard E. Rogers, Jr. Director, Division of Water Resources by Douglas Dowden Supervisor, Industrial NPDES Permitting Unit With Engineer's Certificate attached: cc: NPDES Files ecopy: Joseph W. McGougan, PE, MBD Consulting Engineers, P.A. Email: jmcgougan@mbd-eng.com DWR Fayetteville Regional Office, Water Quality Programs Without Engineer's Certificate attached: cc: Harnett County Health ecopy: DWI/Ali Ajami DocuSign Envelope ID: BE8768CE-E74C-460A-A7AD-42A8C46D51E7 Harnett Regional Water North Harnett Regional WWTP Authorization to Construct No. 021636A05 Issued August 23, 2023 NPDES Permit No. NCO021636 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the North Harnett Regional Wastewater Treatment Plant, located in North Harnett County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of two (2) 18.75 MGD mechanical bar screens, one (1) 20.625 MGD vortex grit removal system with grit washer/classifier; construction of six (6) 2.75 MG sequencing batch reactors with twelve (12) 30 HP submersible propeller mixers, twelve (12) 387 GPM submersible non -clog waste sludge pumps, four (4) 7,125 GPM vertical turbine flow transfer pumps and two (2) 3,925 GPM vertical turbine flow transfer pumps and seven (7) 1,710 SUM turbo centrifugal blowers; five (5) 283 square feet rotating disc tertiary filters; repurposing of existing clarifiers to two (2) 0.90 MG gravity thickening tanks with two (2) 450 GPM rotary lobe thickened sludge pumps, and three (3) 2,376 SUM blowers; repurposing of existing oxidation ditches to two (2) 3.9 MG aerobic digestors with fine bubble aeration, ten (10) 8.4 HP mixers, five (5) 2,530 SUM positive displacement blowers and two (2) 753 GPM submersible solids waste sludge pumps; installation of two (2) 1200 GPM submersible solids return backwash pumps; Installation of two (2) 10.31 MGD UV trains, and all necessary piping and controls; in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature Date Mail this Certification to: Attn: Min Xiao, PE Registration No. NPDES Industrial Permitting Unit DEQ/DWR/Water Quality Programs 1617 Mail Service Center Raleigh, NC 27699-1617 SEAL