Loading...
HomeMy WebLinkAboutNCG140115 DMR SWSTORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 9) 1 L ��" FACILITY NAME: 'C4 , 6 CDM Fiw OX PERSON COLLECTING SAMPLES A4kY !off CERTIFIED LABORATORY IPC. Lab # Lab # OPTIONAL INFO: Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: Zo/�� SAMPLINGAERIOD: [:] July -December "P93 -June COUNTY t It - P NO. (ZSZ 1 7 3Z ADD TO LISTSERVE? ❑YES 2900 EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ❑Other, Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH (Standard Units) TSS Event Duration (mg/L) (minutes) In Tier 2 Total Rainfall ° Monthly Monitoring? (in) (Y/n) # of Months in Tier Z 2 Sampling - - 6-9 100 - - g— Olo 02 s g.S &0 c7#7 N A/Tf Pncll jON 18 2015 C WR S ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. "For each sampled measurable storm event the total precipitation must be recorded using data from an on-site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — avera¢ed over a calendar vear Outfall No. Date Sample Collected (mo/dd/yr)1 pH (Standard Units) 6-9 TPH using method 1664A SGT -HEM (mg/L) 15 Total Suspended Solids (mg/L) 100 ' Event Duration (minutes) - Total New Motor Oil Rainfalla Usage (in) (gal/month) Monthl In Tier 2 y Monitoring? (Y/n) # of Months in Tier 2 Sampling2 8-1 0� 02 .S so (0IL ou N ,- HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENC ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ N04�� HAVE YOU CONTACTED THE REGION? YES ❑ NQ REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitorine period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons ly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aw re th re are sign' ' t penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." -1&-ls (Si u o Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2