HomeMy WebLinkAboutNCC232504_Site Plan or Location Map_20230818 54.V1.3• 4, ® / , CONSTRUCTION SCHEDULE DATE: PAGE: I. Obtain all necessary permits and plan approvals.Erosion and Sediment Control hAh (E&SC)permit and a Certificate of Coverage(CDC)must be obtained before any land disturbing activities \ !� I occur.A copy of the ERSC permit,the COC and a hard copy of the plan must be kept on site,preferably in a e� S' CONSTRUCTION 'f¢ box,and accessible Burin LIMITS permits ginspection. 0 o I 2. Install gravel construction entrances first,then silt fences,reinforced silt fence outlets and wattles. Se 'vd / 3. Finish clearing and grabbing any necessary areas on the lots s they are started ¶-MI ! , R, p p ! �! ✓! �xpe c _ -_ d. Begin lot grading and excavation activities �. �y $• S4AA 6 �� 5. Begin or continue with house construction activities. :y { 4 P9 li. Finish all rough grading and house construction. ¶eoUS¶ J< JI HOU E R` RoustNOUSE b 1:1 1:11 '7. Install driveways,walks and Ipatios. bQ CONSTRUCTION 8. Begin r grading fl t I L • JJ QLIMITS CONSTRUCTION 9. Final grassing, I M1'g dstabilizing of lot.I h' ill' I M1 11 of sod on the lot L W L. IL•� ':u ��HO Y u ko �ROMP/AY R rev ,� The.-I f ill place -1 h I sodded mussing stabilized d k hold. O �Ro r AY 10. TheShall d l&inspe f thed d seta 1 s and Complete Ir 1r �ROADWAY q 35 / o- h f n g combined self-inspection f found h DEMLR website au L CURB AVLEOCE or tuna 'ate • 36 34 hops://files.nc.gov/n�dedEnergy°/20Mmeral/20and%20Lavd/20Resources/StororoeleNPDES%20 BINLEr Notes: ' 37 Lot Plan General%20Pennits/DEMLR-CSW-Monitoring-Forms-Rev-August-8-2019.pdf.Twelve months of complete 1.If needed.Tree Protection fencing should be installed along the buffer zone,wetland "E"&"F" inspection forms shall be k d available for ins inspection at all times.It is recommended a co be boundary and/or around protected trees,providing a radius of at leas[1.25 feet for each Lot Plan ins kept on site an P copy LEGEND inch of trunk diameter. .$ Lot Plan t• • CONSTRUCTION kept in a permits box.GS 113A-54.1 a ISA NCAC 04B.0131 NCGOI Part Ili Sections A and B "P' Lot•an OFFSITE LIMITS Il. Self-inspections for erosion and sedimevmtion control measures are to be performed at least once every seven 2.scheInstalmatic/diagram Fence onthe low elevation sides if necessary, lot.Install Silt Fence outlets shown re MON'(3y036 o C SEPTIC FOR I\l “lender days and within 24 hours of every rain event of greater than l inch.Any needed repairs shall be DIRECTION p Cotrg ticldegram end fold Adjusted.ftnecessary,for placement et low points.If lots are 1219 °"yao 31 LOT 66 1 the o s ur enured mils on this plan.A rain psi d.All ESC measures shall be maintained as specified in SILTFENCE Tlo 2ntPea. and have different land owners or buiMere,each lot should have individual Silt Ro ytomainthis plan.A measures as designed. p / \ qp 0gauge shell be installed et the project site for monitoring. SILT FENCE OUTLET La 3.Install required Silt Fence within 10 feet of property line to ensure there is no conflict with a'R.t2,4 V, Lot Pla Lot Plan 12. Inspection and final acceptance letters.When the project is complete,the pennittees shall contact DEMLR to F / C close out the E&SC Plan.After DEMLR informs the , of I p report, CONSTRUCTION ENTRANCE septic system.It is the responsibility of the builder to ensure the installation of sediment C•&F I pot an o Notices close out,via inspection CURD INLET control measures does not impact the septic system and repair area(s). _ the permittee shall visit,ileq.nc.gov/NCGOI"to submit an electronic Notice of termination(e-NOT).A MOO 4.At least one Construction Entrance/Exit is to be installed per lot. OFFSITE attest general scene fee will be charged until Nee-NOT has been rues pm. 66 / 5.Waste bins and other areas dedicated for managing building material waste shall be at _� least 50 feet away from stone drain inlets or drainage ditches unless it can be shown that i SITESEPTIC FOR no other alternative exists.If this sepamgon cannot be achieved these areas must be \ DnVe ASELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY contained behind Silt Fence. S \ nf LOT 65 N CGS 113A-54.11S AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR 6.Inlets downstream of disturbances should be protected:streets should be swept when COMPLETED AS AN EXCEL SPREADSHEET. yis preset 1in yw o W`A1teT % -� L AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED setlimentrromiencensWFence activity t. / EROSION AND ..\NC-Environmental.jpeg ].Oetailsfor Silt Fence,Silt Fence Outlets,Construction Entrances end other measures are 05� let .aly� -- _ - provided on additional sheets.Erosion and sediment control details are not drawn to scale. .�' _ 4, P 368 �yE3 SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A TYPICAL LOT LAYOUT WITH CURB AND GUTTER 7�- NCAC 046.0131 STATES THAT....DOCUMENTATION ORNTAPON SHALL BE ACCOMPLISHED BY a a. I" I61an INITIALING AND DATING EACH MEASURE PRACTICE SHOWN ON A COPY OF THE dOPEN APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, 40 \ DATE: PAGE: 2S y /MAIL SPACE DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION @r I EN KIOSK , C7 \ CONTROL PLAN." j SPP CE Lot Plan � plyf,xoAo sec"txa O IMITS /iON . -0 VICINITY MAP;' o / Lot 66 Plan gsb / 1 xG 1Y N.T.S. OHO �{� 1�� so. CON LIM/STION/ . 300 s \ / p M > 42 65 Q ,. ��.s 'woo Ill" / DATE. PAGE: / /'// ". dI S' S /Watt 51 Sock/wattle NOTE: / / / �nyS aW� a nto n r MI Area to be III d Other materials / // d �� get."s, �Ieteuu ` -11=Il ' ll-.IL. x. 'mmy win cumwst 1 ,' Consimc0on Maintenance, Stokes Stakes 3. e(I nsttaall.parallel ' '� 1.Clear the entrance and exit area of all vegetation,roots and other objectionable 1.Per NCGA1 inspect t k a after each 1 inch or SECTION e[oT oN a.a minimum of 10 feet bto the desired length such eyond toe of av Yj, r material and properly grades greater r rainfall; k requiredy p immediately. / Y 2.Placathe gravel to the specific grade and dimensions shown on the plans and 2Manteein Ne gmvelpatlinaondtontopreventmuaorsedment month it. from leaving the construction site.This may require periodic lO �O wwamel(l should be tuam>a slightly pslope to /' 45 �,/s• 3.Provide drainage to carry water to a sediment trap or other suitable outlet. topdressing with 2 inch stone. °.V,a+ gM,aw °metslm going around eerie Incsill / G 4.Use geotexfile fabrics in order to improve stability of the foundation in locations 3.Immediately remove all objectionable materials spilled washed or subject to seepage or high water table. tracked onto public roadways. IV 4. Oak or other durable hardwood stakes with a 2 inch x 2 inch cross section should be driven vertically plumb,through the center of the silt soolMvattle.Stakes should be placed at a 46.. CONSTRUCTION ENTRANCE/EXIT of 8 feetne>aIsoc leisplcedma4mN Wood or Com >t pl/2 height of log g ntl 4 Min. 5. Me(le.when UNTRENCHED ION avemetise M ISOMETRIC VIEW �w .LrLpwa 1.MAINTENANCE:ift ew W a)«>�weekly a .� LG 60\ SODDING ear, ch or greater rainfall.Remove , nummunuan sediment and any Paris as LAY 80P INA STAGGERED Mulch or COmpost for dndandied Socks I... d Camp.3.D>aFIn DMma,er =, ebn";",)(4«n„)1�nInch) '(nzs, 2. ante must n allow for qte d cloggedre if#111111" ��1` �� Shoat Rower �sinosockm�(�°n i�3 mi iarmi 3 I�o work Area I.f wattle /M (305 m) (398 m) (5`oo m) 4 M aMpa.RprarMn,Ino FIEpe>. Hrscak n„ zs ,L3 s.o zzs larger diameter n dour or diislodged. / m,reaghants 6 do noNmwames stealbe inspected until MA11011 Ili III *ING-.wmm�anns SILT SOCK/WATTLE FOR PERIMETER ANMp6 ceia T doe°retie one d�• „ram 4poi/f< 7374 s 3M .V0. rt„ nee rO ,./ measur..teen pern.ne Ma...' ECTLY m/m) imkm) imim) r/m/m) M f / 49 5aim MATO NE ORR AM • D INLET PROTECTION / CORP."! itif ',I DATE: Wire penceFilter Fabric PAGE: \ 5� • §] 8'Max.Standard Strength&b.with wire fence - • Steel Poe, 6Mex Edras g arc re ten Wre Fence Wire Bb<kpll trench \ \ \ ---II Y one Steel Post _ thoroughly Ups lope , wrry THE SOIL TACT a>,aca0p s aMowEa 56 as NEEDED.wsTsa war AA. Plastic or } 21 aLYr um. D HnH.a. Wire lies tn4 f . STABILIZATION opts 1 the ain GROUND STABILIZATION / APPEARANCE OF GOOD SOD r•,�r ( :curio • SITE AREA STABILIZATIONII x EXCEPTIONS (EN V � I' xa , 11 I DESCRIPTION TIME FRAME 55 PACE o� 1�� 4'I� ��1 1 �� LFBar Fob.o PERIMETER DIKES, 7 DAYS NONE aces Construction: n strength strength synthetic CROSS swALEs,DIrcHEs 10 53 20 ( ". T°TFAMI-OPPS""�1 e t harder ofextra &SLOPES \ 2 Ensure nature height of the sediment fence goes noteaceed ( s o>N.wmwr 1111111111' ;; amrmxs-SOIL uasoorssxwroes may Impound volumes of water suMcent to cause sure or ) r� ,n w,awwnx 3.construct the pmrfebdcfrom a continuous rollw4 to nee - - jointsHIGH QUALITY 7 DAYS NONE _ / '�"' r°°°°`"°r"' gonna.,securel...en the 11tercloth only m a ropy°n post with 4feet minimum the art. WATER ZONES o �" I 4 Support standard strength filter fabric by wire mesh fastened securer.the upspe de of the posts Estee. Maintenance: (HOW) the wire mesh support.the bottom of the trench Fasten the wire rin einforcement,then fabric on the upaope 1.Inspect sediment fences at least once week and aver each side of Me fence sip lies should strength -ne"or rester mere.make repairs lmmedet.r SLOPES STEEPER 7 DAYS IF SLOPES ARE a 62 \ / General Erosion Control Notes t. °used.space pstsammnmum8get 2.Should the of a teardeco p THAN 3,1 10'OR LESS INasou //11 119 0 aeeraE 3nerUbnc wan 6 foot po&sp�g does not require a wire mesh suppotfence.sem,dynyen nttdepoaits as necessary to LENGTH AND ARE N� 1.Only the areas shown shall be disturbed. a minimum or become ineffective, se decompose, a 3.Remove sediment provide areas hall be d and 6..tstenne 6nenabdc eimcnr.pos..wren,plastic tip nos should nonce minimum or so pound tensile storeg.volume ke care nenext re.and threduce fncpressure on rap NOT STEEPER 2.All disturbed s grasse atrengn. .rice.Take rrereto avodunderminingurng I qTq mulched as soon as possible d an maintained ] Excavate the CO 1 1 lnme>wlx aria a-genes Beep along the proposes-ne pine posts aria uea.wuta. THAN 2:1, 14 I ' 'yea i until pemanent cover's established. up>oue from to - 4.Remove all.neng ma.n.> ens deposits DAYS ARE \ q s Place 12 inches - bottom and due of the trench. and brng the area to grade. - - ecomdbutng I ALLOWED C2 P.am�ro.�ianceeadormance over negner.bdu and mete Tnomuenuomposdonofnenaskfi s drainage area has been eweoetersoteed. SLOPES 3:1 OR 14 DAYS 7 DAYS FOR (,�/ 12 m.Do wl ansre filter rabne.exIe5ss revs. FLATTER SLOPES GREATER ( - I M \ THAN 50•IN ( ANC-Envo-e„nm,ml.jpev SILT FENCE • LENGTH • • \ \ FFFFcrI,FL F, J.:U ALL OTHER AREAS 14 DAYS NONE(EXCEPT WITH SLOPES FOR PERIMETERS FLATTER THAN 4:1 AND HOW ZONES) 14 115 I116 DATE: PAGE: 7 /' \ ` \ 0M'N _� roses• re \ \ PAGE 1 of 2 / TOTAL DISTURBED ACREAGE: 4.25 ACRES LOT EROSION CONTROL PLAN TOP OF SILT FENCE s / LOTS 31 33, 36, 37, 39, 66 & 67 TABOVE THE HE MUST BE AT / WALTERS ST •• EEL BEN I / " MEADOW HARDWAREWIRE FENCE NOTH FRONT VIEW SPA(3 ,. BURY WIRE FENCE,FILTER FABRIC, MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION FOR AND WASHED STONE _ al~ CLOTH IN TRENCH DREAM FINDERS FILTER OF 3'FILTER FABRIC NOTES: INTO SOLID GROUNDGeneral-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be z67 ON GROUND 1.Hardware cloth andgreeelI hoPART muIdoverlaythesilttenve leastAi2E relocated on the lot to insure that the potential for sedimentatiommnoffis eliminated as much aspossible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained toinsure proper ground stabilizing cover. HOMES, LLC 88ro inches. Gravel Construction Entrance-The ravel ad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic to dressin with 2-inch stone.After each rainfall,inspect an structure used to trap sediment and clean it out as necessary. Immediate) remove all o e � g p p g y q ° top dressing p y p ry' y QUEWHIFFLE TOWNSHIP HOKE COUNTY a 2.Stone outlets should be placed on low elevation areas of silt fence objectionable materials spilled,washed,or tracked onto public roadways. and based en field conditions. Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure SCALE:1"=100' JULY 2023 MAINTENANCE: that the removed sediment does not wash back against the fence,Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. of 1.Per tCG-0i,inspect outlet atpla lestanyrarewrekpair afterimeachimmediately. or Sodding The sod should bemaintained to insure that the take holds in the areas beingd.The sod should be watered as necessary to maintain adequate moisturethe root zone and t dormant of the sod.The sod should not be mowed to close,since this could inhibit adequate growth GRAPHIC SCALE HARDWARE CLOTH FILTER FABRIC IN TRENCH greater rainfall event Complete any required repairs immediately. q- root properlyd, grassrecommendations ry quae in proven dormancyquae gro loci 0 50 100 200 400 2.Freshen stone when sediment accumulation exceeds 6 inches. and stabilization of the bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. 3.Keep mesh free of debris to provide adequate flow. Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be ill mi immi SECTION VIEW 4.Remove sediment when half of stone outlet is covered. repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. 5.Replace stone as needed to facilitate de-watering. ..\NC-Envo- en..Jpeg Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed ( IN FEET ) SILT FENCE OUTLET sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. t inch = 100 ft Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE BF-0106 LAST SAVED:8/8/2023 3:40 PM LAST PLOTTED:8/10/2023 12:15 PM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\H&H CONSTRUCTORS\23-1367-02 WALTERS MEADOW-EC\PLANS\WALTERS MEADOW EC-COTS 31-33.36.37.3g.66&67.0We