Loading...
HomeMy WebLinkAboutNCC232432_Site Plan or Location Map_20230818 PROJECT NARRATIVE THE PROPOSED CASTLE HAYNE SUB-FOLKSTONE 115KV LINE-REBUILD PROJECT IS LOCATED IN �Ipa ■„.��� ��� NEW HANOVER,PENDER,AND ONSLOW COUNTY,NORTH CAROLINA.THE PROJECT INCLUDES THE 1, REBUILD OF APPROXIMATELY 26 MILES OF THE EXISTING CASTLE HAYNE FOLKSTONE 115KV TRANSMISSION LINE FROM CASTLE HAYNE SUBSTATION TO STR 251.BASED ON STORMWATER AND ���� ��� Y CONSTRUCTION CONSTRAINTS,THE PROJECT IS SPLIT INTO TWO PHASES WITH STR 151 BEING RIGHT OF WAY.THE THE SPLIT POINT. HE PROJECT IS PRIOR USE OF THEASITDE SITHIN DUKE TRANSM TRANSMISSION INFRASTRUCTURERGY'S T AND AND THE �1� �� �� PROJECT WILL NOT CHANGE THE EXISTING LAND USE.PRIOR TO CONSTRUCTION,A DUKE ENERGY WAIL � ��NMan1 Al W� 41� CONSTRUCTION CONTRACTOR WILL INSTALL EROSION CONTROL MEASURES TO ENCOMPASS THE Kra � �� �� ' ANTICIPATEDR CONSTRUCTION PRITS.OR COMPLETION PREDEVELOPMENT OF CONDITIONS WILLN. AVOIDAEDNCE AND 40 �� THE AREA WILL BE DISTURBANCE STABILIZED PRIOR TO COH S BEEN CONSTRUCTION.AN DESIGN AND �� 1,101 MINIMIZATION OF DISTURBANCE APPROACH HAS BEEN INCORPORATED INTO THE DESIGN OF THE EROSIONIGHT-O-WAY CONTROL MEASURES , HEUTINIE E POEXISSIBGLE. .EROSION POINTS AND M STABILIZED GYO ���� � rIfi�.T RIGHT-OF-WAY ACCESS ROUTES,WHENEVER POSSIBLE.EROSION CONTROL MEASURES ARE ED U EKRE INDICATEDHEREINTO FOR IN PERMITTINGTOBEUSE ONLY BY NCDEQ.THE INITIAL PROJECT DURATION IS (111 R ���� � IACATION ANTICIPATED TO START IN OCTOBER 2024. PROGRESS CASTLE HAYNE 230 KV SUB - FOLKSTONE 115 KV LINE - 10 R E C O N D U CTO R PROJECT - PHASE 2 NORTH & SOUTH CAROLINA STATE MAP EROSION & SEDIMENT CONTROL & ACCESS PLAN PENDER AND ONSLOW COUNTY, NORTH CAROLINA LATITUDE: 34.435551° GENERAL NOTES LONGITUDE: -77.633533° 1. APPROXIMATE STRUCTURE LOCATIONS WERE PROVIDED BY DUKE ENERGY AND ARE FOR REFERENCE ONLY. THESE DRAWINGS SHALL NOT BE USED FOR LINE CONSTRUCTION. 2. BASE DRAWINGS WERE CREATED BY GIS DATA OBTAINED FROM VARIOUS SOURCES. AERIAL PHOTOGRAPHY I WAS OBTAINED FROM STATE AGENCIES. SHEET LIST: 3. THE LOCATION OF JURISDICTIONAL FEATURES ARE FROM THE NATURAL AND CULTURAL RESOURCES REPORT 'iF' TITLED CASTLE HAYNE-FOLKSTONE 115 KV LINE REBUILD,DATED NOVEMBER 2022. STR 252 l`5 COVER SHEET SHT 1 OF 24 4. NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE CONTRACTORS JUNIPER SWAMP '� OVERALL PROJECT LAYOUT SHT 2 OF 24 RESPONSIBILITY TO ACCURATELY LOCATE,BOTH VERTICAL AND HORIZONTAL,EXISTING UTILITIES PRIOR TO -- -___ EROSION CONTROL MEASURE QUANTITIES SHT 3 OF 24 THE START OF CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY NC 811 PRIOR TO EXCAVATION. 'Ill EROSION&SEDIMENT CONTROL PLAN(PENDER COUNTY) SHT 4 OF 24 CONTRACTOR SHALL NOTIFY DUKE ENERGY IMMEDIATELY IN THE EVENT OF ENCOUNTERING ANY PROJECT AREA EROSION&SEDIMENT CONTROL PLAN(PENDER COUNTY) SHT 5 OF 24 UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM THE PLAN. COST TO REPAIR DAMAGED UTILITIES EROSION&SEDIMENT CONTROL PLAN(PENDER COUNTY) SHT 6 OF 24 SHALL BE BORNE BY THE CONTRACTOR. EROSION&SEDIMENT CONTROL PLAN(PENDER COUNTY) SHT 7 OF 24 5. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR SHALL EROSION&SEDIMENT CONTROL PLAN(PENDER/ONSLOW COUNTY) SHT 8 OF 24 NOT DISTURB UTILITY POLES,GUYS WIRES,OR ANCHORS WITHOUT PERMISSION FROM DUKE ENERGY. BIG SHAKEY SWAMP EROSION&SEDIMENT CONTROL PLAN(ONSLOW COUNTY) SHT 9 OF 24 6. PROJECT IS LOCATED IN THE CAPE FEAR AND WHITE OAK RIVER BASINS.THERE ARE NO STATE-REGULATED EROSION&SEDIMENT CONTROL PLAN(ONSLOW COUNTY) SHT 10 OF 24 BUFFER REQUIREMENTS WITHIN THE BUFFER AREA. EROSION&SEDIMENT CONTROL PLAN(ONSLOW COUNTY) SHT 11 OF 24 EROSION&SEDIMENT CONTROL PLAN(ONSLOW COUNTY) SHT 12 OF 24 7. SEE SHEET 20 AND 21 FOR EROSION AND SEDIMENTATION CONTROL SEQUENCE AND SEEDING SCHEDULE. �1 EROSION&SEDIMENT CONTROL PLAN(ONSLOW COUNTY) SHT 13 OF 24 8. THE ACCESS PLAN DEPICTS BRIDGES ASSOCIATED WITH ACCESS OVER STREAMS,DITCHES AND DRAINAGE - �Ny EROSION&SEDIMENT CONTROL PLAN(ONSLOW COUNTY) SHT 14 OF 24 CHANNELS.ACCESS TO EACH STRUCTURE IS THE RESPONSIBILITY OF THE CONTRACTOR. ,S EROSION&SEDIMENT CONTROL PLAN(ONSLOW COUNTY) SHT 15 OF 24 9. STREAMS/WETLANDS EXTEND BEYOND THE RIGHT-OF-WAY.APPROPRIATE BRIDGING AND MATTING OF THESE r., f EROSION&SEDIMENT CONTROL PLAN INSET A SHT 16 OF 24 FEATURES IS REQUIRED SHOULD THE CONTRACTOR USE ANY ACCESS ROUTES LOCATED OUTSIDE OF THE EROSION&SEDIMENT CONTROL PLAN INSET B SHT 17 OF 24 RIGHT-OF-WAY. EROSION&SEDIMENT CONTROL PLAN INSET C SHT 18 OF 24 10. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DEP SITING,PERMITTING EROSION&SEDIMENT CONTROL PLAN INSET D SHT 19 OF 24 AND ENGAGEMENT(SPE)PRIOR TO USE. EROSION&SEDIMENT CONTROL DETAILS 1 SHT 20 OF 24 11. CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY. HEAVY MATS MAY BE USED IN LIEU OF ROCK EROSION&SEDIMENT CONTROL DETAILS 2 SHT 21 OF 24 CONSTRUCTION ENTRANCES IF DEEMED SUFFICIENT BY DEP REPRESENTATIVE. - ,N1 EROSION&SEDIMENT CONTROL DETAILS 3 SHT 22 OF 24 12. ACCESS LOCATIONS WITHIN THE TRANSMISSION LINE RIGHT-OF-WAY ARE APPROXIMATE. ACTUAL LOCATION STR 150 'q" J5�� NCGO 1 NCG1 DETAILS 2 DETAILS SHT 24 OF 24 N SHT 24 OF 24 2 MAY VARY BASED ON THE FEASIBILITY AND WEATHER CONDITIONS. WHEN MATS ARE REQUIRED,2 ROWS OF UJCO MATS MAY BE INSTALLED IN PARALLEL TO COVER THE 28-FT WIDE ACCESS ROAD WITHIN THE TRANSMISSION y Q LINE RIGHT-OF-WAY. ACCESS OUTSIDE OF THE TRANSMISSION LINE ROW IS LIMITED TO 14 FT UNLESS j - x OTHERWISE PERMITTED AND APPROVED BY DEP SPE AND NCDEQ. fit- 0- H- 13. WETLAND MATTING SHALL BE COMPOSITE AND/OR HEAVY DUTY TIMBER/"CRANE"MATS. NO LATTICE OR sO w TWO-PLY MATTING SHALL BE USED IN JURISDICTIONAL WETLANDS AND/OR STREAMS. - MIGRATORY BIRD HOTLINE -314. NO FILL IN WETLANDS MAY OCCUR.ALL EXCESS SOILS FROM STRUCTURE INSTALLATIONS IN WETLAND AREAS - ���� STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY Ce SHALL BE DISPOSED OF IN PERMITTED UPLAND AREAS AND STABILIZED. NO SLURRY MAY BE DISPOSED OF =.;,k SERVICE AREA.INTERACTIONS OF BIRDS WITH GENERATING FACILITIES,TRANSMISSION AND DISTRIBUTIONS, 0- WITHIN THE RIGHT-OF-WAY. SLURRY MUST BE DISPOSED OF IN A PERMITTED LANDFILL. I P SUBSTATIONS,OTHER STRUCTURES AND EQUIPMENT,AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO Ce 15. NO OIL/FUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 50 FEET OF WETLANDS OR SURFACE `--,t BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND 0 WATER WITHOUT CONTAINMENT. CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. 0 16. SITE SHOULD BE"STORM READY"AT THE END OF EACH WORK DAY/WEEK. - 17. SECURE WRITTEN ACCESS AGREEMENT IS REQUIRED FOR ALL 3RD PARTY ACCESS AND PRIVATE DRIVES NOT / "c, CAROLINAS:800.573.3853 FLORIDA:727.386.3084 MIDWEST:317.430.4497 Z •INCLUDED IN ROW DOCUMENTATION PRIOR TO BEGINNING CONSTRUCTION. 0 18. ALL DISTURBED AREAS SHALL BE RESTORED TO SAME OR BETTER CONDITION.PERMANENT GROUND COVER �'1 w SPILL REPORTING HOTLINEre SHALL BE USED FOR STABILIZATION. IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT,FEDERAL AND STATE LAWS REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER W Sources:Esri,HERE,Garvin,Intermap,increment P Corp.,GEBCO, Z - -- -- - - - REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION.IMMEDIATELY NOTIFY YOUR = SUPERVISOR AND THE FIELD ENVIRONMENTAUEHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS VICINITY MAP DISCOVERED.IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAUEHS PROFESSIONAL,CONTACT ONE OF THE DUKE ENERGY SPILL REPORTING HOTLINES AT: SCALE: 1:8,000 CAROLINAS&MIDWEST:800.527.3853 3 FLORIDA:866.769.1266 LU Z 0 I- ry CONTACTS OWNER: ENGINEER: u_ DUKE ENERGY PROGRESS,LLC DEWBERRY ENGINEERS INC. NUWAN WIJESURIYA ZACHARY EULO,PE m D CONTRACTOR SHALL NOTIFY"NORTH CAROLINA ONE CALL"(811)OR `11111016/p77 411 FAYETTEVILLE STREET 2610 WYCLIFF ROAD SUITE 410 CO (1-800-632-4949)AT LEAST 48 HOURS PRIOR TO BEGINNING `�oQ ASS d�1-i RALEIGH,)C 1-27601 RALEIGH,NC 2760761 PH: 919 931-6655 PH: 919 425-7610 CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. - .¢- ,.y:9 NUWAN.WIJESURIYA@DUKE-ENERGY.COM ZEULO@DEWBERRY.COM co CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDED SEAL r"' c N _ • 055132 THEIR OWN LOCATOR SERVICES INDEPENDENT OR"NORTH CAROLINA . e 6 Z ONE CALL".REPORT ANY DISCREPANCIES TO THE ENGINEER '2 fi4G ,�o, DUKE T"'E CASTLE HAYNE 230 KV SUB-FOLKSTONEz • IMMEDIATELY. x f 115 KV LINE-RECONDUCTOR PROJECT ._. . .. „ i• , i 9 5/3)/23 Dewberry® PHASE 2 F MI 0 Dewberry Engineers Inc. �, ENERGY® cn 2610 WYCLIFF ROAD C E20016101 06/16/2023 100%FOR PERMITTING DM JFA ZAE 100% FOR PERMITTING RAEEG410 H.NC27607 PROGRESS COVER SHEET 0 B E20016101 05/18/2023 90%DESIGN FOR DEP REVIEW DM JFA ZAE PHONE: 919.881.9939 60% DO NOT USE FOR CONSTRUCTION FAX: 919.881.9923 411 FAYETTEVILLE STREET A E20016101 01/20/2023 DESIGN FOR DEP REVIEW DM PAK ZAE NCBELS#F-0929 RALEIGH N.C.27601 512E D DRAM. E20016101 SHEET 1 OF 24 REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED Dewberry Project No.50130754 www.dewberry.com TELEPHONE NO.(919)546-2090