Loading...
HomeMy WebLinkAboutNCC232451_ESC Approval Submitted_20230815 DocuSign Envelope ID:A7ED6541-4CE6-4264-9911-F9DDFA33A25A pa STATE q fl+ G ROY COOPER 1- •Governor 't%r ELIZABETH S.RISER .,4 ^* Secretory DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Quality January 31, 2023 LETTER OF APPROVAL WITH MODIFICATIONS True Homes Inc. Attention: Andrew McDonald, Market Partner 2649 Brekonridge Centre Drive Monroe,North Carolina 28110 RE: Project Name: Allentown Place Subdivision Project ID: STANL-2023-004 Acres Approved: 3.58 County: Stanly City: Norwood Location: Railroad St. River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: CESO Inc. Date Received by LQS: January 18, 2023 Plan Type: Revised Dear Mr. McDonald: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOl) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the$100 annual permit fee. After the fee is processed,you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO 1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. DE 1., North Carolina Department ofEnvironmental Quality IDivision ofEnergy,MineralandCarodliResources Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North na 28ll5 c.wa ,I L,..,,,:.1 W\ r 704.663.1699 DocuSign Envelope ID:A7ED6541-4CE6-4264-9911-F9DDFA33A25A Letter of Approval with Modifications True Homes Inc. January 31, 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Allentown Place Subdivision Project ID: STANL-2023-004 County: Stanly Reviewed by: Kenny S. Llywelyn 1. Silt fence needs to be extended along the southeast perimeter to separate the clean water bypass from the site construction. Construction flows are not to mix with the clean water bypass flows. This silt fence between the site and clean water bypass will need to be maintain throughout the duration of the site development. 2. Clean water bypass shall be permanently stabilized when it is completed. Permanent stabilization can be sod, lined rip rap channel, or pipe network. • North Carolina Department of Environmental Quality I Division of Energy,Mineral and Resources Mooresville Reginal Office I 610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 �eom�na ru vn,evm u.,ir� 704.663.1699