July 12, 2023
LETTER OF APPROVAL WITH MODIFICATIONS
Heritage, LLC
ATTN: Brad Mercer
PO Box 227
Kinston,NC 28501
RE: Project Name: Tarboro Road Extension
Acres Approved: 2.86 Acres
Project ID: EDGEC-2023-007
County: Edgecombe
City: Tarboro
Address: Hwy 258
River Basin: Tar-Pam
Stream Classification: C; NSW
Submitted By: Josh Russell, PM Engineering
Date Received by LQS: May 16, 2023
Plan Type: Revised
Dear Mr. Mercer,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall
expire three (3) years following the date of approval, if no land-disturbing activity has been
undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction General Permit. After the form is reviewed and found to be complete,
you will receive a link with payment instructions for the $100 annual permit fee. After the fee
is processed,you will receive the COC via email. As the Financially Responsible Party shown on
the FRO form submitted for this project, you MUST obtain the COC prior to commencement of
any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please
direct questions about the eNOl form to the Stormwater Program staff in the Raleigh central
Q vvv North Carolina Department of Environmental Quality 1 Division of Energy,Mineral and Land Resources
D_E
Raleigh Regional Office 11628 Mail Service Center 1 3800 Barrett Drive 1 Raleigh,North Carolina 27609
NORTH CAROLINA
oePanmem m En.�ronmenmi aaar� /� 919.791.4200
Letter of Approval
Heritage, LLC
July 12, 2023
Page 2 of 4
office. If the owner/operator of this project changes in the future, the new responsible party must
obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If,following the commencement
of this project, it is determined that the erosion and sedimentation control plan is inadequate to
meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General
Statute 113A-51 through 66), this office may require revisions to the plan and implementation of
the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws,regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land-disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form,which you provided. This permit allows for a land-disturbance, as
called for on the application plan, not to exceed the approved acres. Exceeding the acreage will
be a violation of this permit and would require a revised plan and additional application fee. You
are requested to file an amended form if there is any change in the information included on the
form. In addition, it would be helpful if you notify this office of the proposed starting date for this
project.
Your cooperation is appreciated.
Letter of Approval
Heritage, LLC
July 12, 2023
Page 3 of 4
Sincerely,
, k[6.4
Abdulrahman Fayad
ARPA Engineer II-RRO
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NPDES NCG01 Fact Sheet
cc: Regional Office file
Josh Russell, PM Engineering
Letter of Approval
Heritage, LLC
July 12, 2023
Page 4 of 4
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Tarboro Road Extension
Acres Approved: 2.68 Acres
Project ID: EDGEC-2023-007
1. To reduce the potential for loss of sediment offsite, please take note of the following:
While the storm drain is under construction,protection should be provided for the upstream
end of the open storm drainage pipe at the end of each workday. This is typically
accomplished by installing a piece of sturdy plywood flush with the upstream end of the
open pipe and anchoring it in place securely.
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities