HomeMy WebLinkAboutSW3171201_Stormwater Report_20230810 BOHLER / STORMWATER MANAGEMENT REPORT PREPARED FOR: LGI HOMES NC,LLC 3037 SHERMAN DRIVE LANCASTER,SC 39720 BEPC #NCC202055 March 28,2022 Revised:December 30,2022 Revised:June 12,2023 Revised:August 4,2023 PREPARED BY: BOHLER ENGINEERING,NC,PLLC 1927 S.TYRON ST.SUITE 310 CHARLOTTE,NC 28203 (980)272-3400 \`\`,,III,,„, \�� CARO,,"/; if S S AL 046878 _ J Z. o V EN°°tAc , ''r�,,,,,,,,'''' 8/4/23 NORTH CAROLINA LICENSE#046878 R.ALLEN MCDOWELL,P.E. PROFESSIONAL CERTIFICATION:I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME,AND THAT I AM A DULY LICENSED REGISTERED ENGINEER UNDER THE LAWS OF THE STATE OF NORTH CAROLINA CIVIL&CONSULTING ENGINEERS•SURVEYORS•TRAFFIC CONSULTANTS www.bohlereng.com Table of Contents General Project Description/Stormwater Management 3 Appendix 4 Rainfall Intensity Data Soil Map Design Spreadsheets HydroCAD Output Stormsewers Output Riprap Calculations Erosion Control Calculations 2 General Project Description/Stormwater Management GENERAL PROJECT OVERVIEW AND EXISTING CONDITIONS The subject site is located at 310 Limestone Terrace in Granite Quarry, NC. The project site consists of approximately 9.79 acres of mostly open fields. The site generally drains approximately equally to the east and west. Flow to the east drains toward an existing dry pond to the eastern property line while flow to the west drains to a previously approved wet pond (BMP3) associated with SW3171201. The project includes a modification to the existing dry pond that discharges to the NCDOT Right-of-Way. The site is majority grassland with type B/C soils, with average existing slopes of 2% to 8%. STORM WATER REQUIREMENTS AND DESIGN OVERVIEW This project is located in the Yadkin Pee-Dee river basin and is adjacent to Crane Creek. This project is classified as a high-density because the largest drainage area has greater than 24% built upon area. The proposed project will include 53 single family townhome units and associated development. For the western portion of the site, stormwater is directed to an existing inlet which ultimately drains to an existing wet pond (BMP3). Impervious calculations are attached to this report showing this townhome project stays below the previously permitted value for"future development". Therefore, no additional BMP is proposed for this drainage area. For the eastern portion of the site, the existing dry pond footprint will be expanded and the system will be converted to a wet pond to treat for water quality and quantity before discharging to the adjacent NCDOT stormwater network. Stormwater will be conveyed through pipe systems and sheet flow discharge to the proposed BMP and inlet in a non-erosive manner to maintain natural drainage patterns. Stormwater quality treatment systems shall treat the runoff generated from the first inch of rainfall. All structural stormwater treatment systems used to meet these requirements shall be designed to have a minimum of 85% average annual removal for total suspended solids. General engineering design criteria shall be accordance with 15 A NCAC 2H. 1008(c) in the design manual. The peak discharge is attenuated for both the 2-year, 24-hr storm and the 25-year, 24-hr storm events. The 100-year, 24-hr storm event has been analyzed to provide 1' of freeboard to the top of berm. Areas not controlled by systems due to topographic challenges are sheet flowing to roadside inlets along Limestone Terrace 3 Appendix 4 3 Hydrologic Soil Group—Rowan County, North Carolina 3 to (Granite Quarry Soil Map) § § 548150 548190 548230 548270 548310 548350 548393 548430 548470 548510 548550 35°36'30"N _ I I . , . , • 35°36'3Cf'N, 4 i4.04v 4iiiltriii401161Witil4k,APIP'w. —7-171 r..._ I . ":If.'• : • ,/l' ..i. 1 / all _,r, / / , _• .. NO" ill, ...- ' , , ;44,014n 1 • td, 41„1-t,..,, . , . 1 , • 1 / / . . .- • ce -...*? VnB2 VnB2. u- ': • .... • • . • _ •• „ , ••••.4' ' ' / .' -' . . _ / 4 A 1 'A1 t , ) an! WE1A. ii 7 1 ... -ii. 1 .• , - .. ...44 r milfainr, Nqiik.--.........t. , ) • - • . ,.... Wii •• ....,., o i I g--- ,- ., ,.,. o illillit: I -.— ii111114_ _ 1 e. . .. . . ... I Soil Map may not beovalid at his-scligan' . .kalk-_ , .111110iminmel,i .......- 1_,..r ,. a I ; 35°36'21"N 35°36'21"N 548150 548190 548220 548270 548310 548350 548390 548430 548470 548510 548550 Map Scale:1:1,970 if prinbad on A landscape(11"x 8.5")sheet. l-r. Meters N 0 25 50 100 150 Feet A 0 50 100 200 300 Map projection:Web Mercator Corner coordinates:WGS84 Edge tics:UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 3/23/2022 -101-1-1. Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Rowan County, North Carolina (Granite Quarry Soil Map) MAP LEGEND MAP INFORMATION Area of Interest(AOI) p c The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. 0 CID Soils • D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons 0 A p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil n A/D Water Features line placement.The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed n B scale. Transportation Q B/D r4-1. Rails Please rely on the bar scale on each map sheet for map n C measurements. ti Interstate Highways n CID US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: 0 D Major Roads Coordinate System: Web Mercator(EPSG:3857) n Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection,which preserves direction and shape but distorts • • A distance and area.A projection that preserves area,such as the 1111 Aerial Photography Albers equal-area conic projection,should be used if more • • A/D accurate calculations of distance or area are required. ^r B This product is generated from the USDA-NRCS certified data as , B/D of the version date(s)listed below. • r C Soil Survey Area: Rowan County,North Carolina Survey Area Data: Version 19,Jan 21,2022 • • CID Soil map units are labeled(as space allows)for map scales • • D 1:50,000 or larger. • w Not rated or not available Date(s)aerial images were photographed: Apr 6,2021—Apr 7, Soil Rating Points 2021 p A The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background O A/D imagery displayed on these maps.As a result,some minor • B shifting of map unit boundaries may be evident. • B/D USDA Natural Resources Web Soil Survey 3/23/2022 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Rowan County, North Carolina Granite Quarry Soil Map Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CeB2 Cecil sandy clay loam,2 B 7.6 81.9% to 8 percent slopes, moderately eroded VnB2 Vance sandy clay loam, C 1.7 18.1% 2 to 8 percent slopes, moderately eroded Totals for Area of Interest 9.3 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (ND, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. USDA Natural Resources Web Soil Survey 3/23/2022 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Rowan County,North Carolina Granite Quarry Soil Map Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey 3/23/2022 Conservation Service National Cooperative Soil Survey Page 4 of 4 3/23/22,3:01 PM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 so.�`c Location name:Salisbury, North Carolina, USA* ` , .„ Latitude:35.6067°,Longitude:-80.466° noon Elevation:765.37 ft** �� >+`� *source:ESRI Maps a **source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 5-min 0.388 0.458 0.535 0.588 0.647 0.686 0.721 I 0.750 0.782 0.802 (0.357-0.420) (0.423-0.499) (0.492-0.581) (0.539-0.637) (0.591-0.700) (0.624-0.743) (0.652-0.781) (0.675-0.815) (0.696-0.850) (0.709-0.874) 10-min 0.619 0.733 0.856 0.940 1.03 1.09 1.15 1.19 1.24 1.26 (0.571-0.672) (0.677-0.798) (0.788-0.930) (0.862-1.02) (0.942-1.12) (0.993-1.18) (1.04-1.24) (1.07-1.29) (1.10-1.35) (1.12-1.38) 15-min 0.774 0.921 1.08 1.19 1.31 1.38 1.45 1.50 1.56 I 1.59 (0.714-0.839) (0.850-1.00) (0.996-1.18) (1.09-1.29) (1.19-1.42) (1.26-1.50) (1.31-1.57) (1.35-1.63) (1.39-1.69) (1.40-1.73) 130-min 1.06 1.27 1.54 1.72 1.94 2.08 2.22 2.34 2.48 2.57 (0.978-1.15) (1.18-1.39) (1.42-1.67) (1.58-1.87) (1.77-2.10) (1.89-2.26) (2.01-2.40) (2.10-2.54) (2.21-2.69) (2.27-2.80) 60-min 1.32 1.60 1.97 2.24 2.58 I 2.82 3.06 3.28 3.55 3.75 I (1.22-1.44) I (1.47-1.74) (1.82-2.14) (2.06-2.43) (2.35-2.79) I (2.57-3.06) I (2.76-3.31) 1 (2.95-3.56) (3.17-3.87) I (3.31-4.09) 2-hr 1.53 1.85 2.30 2.63 3.06 3.39 3.70 4.00 4.40 I 4.68 (1.40-1.67) (1.70-2.02) (2.11-2.51) (2.41-2.87) (2.79-3.33) (3.06-3.68) (3.33-4.03) (3.57-4.37) (3.88-4.80) (4.09-5.13) 3-hr 1.63 1.96 2.45 2.82 3.31 3.69 4.06 4.43 4.92 5.29 (1.50-1.78) (1.81-2.15) (2.25-2.68) (2.58-3.07) (3.01-3.60) (3.33-4.00) (3.64-4.40) (3.94-4.81) (4.32-5.35) (4.59-5.77) 6-hr 1.97 2.37 2.96 3.42 4.03 4.51 4.99 5.47 6.12 6.62 (1.81-2.15) (2.18-2.59) (2.72-3.24) (3.13-3.72) _j (3.66-4.37) (4.07-4.89) (4.47-5.41) I (4.85-5.93) (5.35-6.65) (5.72-7.20) 12-hr 2.32 2.80 3.51 4.07 4.83 5.44 6.06 6.70 7.58 8.26 (2.14-2.53) (2.58-3.06) (3.23-3.83) (3.73-4.43) (4.39-5.24) (4.90-5.89) (5.41-6.55) (5.92-7.23) (6.58-8.17) (7.07-8.91) 24-hr 2.77 3.34 4.19 4.86 5.76 6.48 7.21 7.97 8.99 9.80 (2.58-2.97) (3.12-3.59) (3.91-4.50) (4.52-5.21) (5.35-6.18) (6.01-6.95) (6.67-7.73) (7.34-8.55) (8.25-9.66) (8.96-10.5) 2-day 3.21 3.87 4.82 5.56 6.56 7.35 8.16 8.98 10.1 11.0 (3.00-3.44) (3.62-4.14) (4.50-5.15) (5.19-5.94) (6.11-7.01) (6.83-7.86) (7.55-8.71) I (8.29-9.60) (9.28-10.8) (10.1-11.8) 3-day 3.42 4.11 5.09 5.86 6.90 7.73 8.57 9.43 10.6 11.5 (3.20-3.65) (3.85-4.39) (4.76-5.43) (5.47-6.25) (6.43-7.37)_ (7.18-8.25) (7.94-9.15) (8.72-10.1) (9.76-11.3) (10.6-12.3) 4-day 3.63 4.35 5.36 6.16 7.25 8.11 8.98 9.88 11.1 12.1 (3.40-3.86) (4.08-4.64) (5.02-5.71) (5.76-6.56) (6.75-7.73) (7.54-8.65) (8.33-9.59) (9.14-10.6) (10.2-11.9) 1 (11.1-12.9) 7-day 4.18 4.99 6.07 6.92 8.09 9.02 9.96 10.9 12.2 13.3 (3.95-4.45) (4.71-5.30) (5.72-6.44) (6.51-7.35) (7.59-8.59) (8.44-9.58) (9.29-10.6) (10.2-11.6) (11.3-13.1) (12.3-14.2) 10-day 4.77 5.67 6.81 7.70 8.90 9.84 10.8 11.7 13.0 14.0 (4.52-5.05) (5.37-6.00) (6.45-7.20) (7.28-8.14) (8.39-9.41) (9.26-10.4) (10.1-11.4) (11.0-12.4) (12.2-13.8) (13.0-14.9) 20-day I 6.42 7.57 8.94 10.0 11.5 12.6 13.7 14.9 16.5 17.7 (6.11-6.73) (7.21-7.95) (8.49-9.38) (9.51-10.5) (10.9-12.0) (11.9-13.2) (13.0-14.4) (14.0-15.7) (15.4-17.4) r(16.5-18.7) 30-day 7.93 9.33 10.8 12.0 13.5 14.7 15.9 17.0 18.5 19.7 (7.57-8.30) (8.90-9.75) (10.3-11.3) (11.4-12.5) (12.9-14.1) (14.0-15.4) (15.0-16.6) (16.1-17.8) (17.5-19.5) (18.5-20.7) 45-day 9.98 11.7 13.3 14.6 16.3 17.5 18.7 19.9 21.5 22.6 (9.58-10.4) (11.2-12.2) (12.8-13.9) (14.0-15.2) (15.6-16.9) (16.7-18.3) (17.8-19.5) (18.9-20.8) (20.3-22.4) (21.4-23.7) 60-day 11.9 13.9 15.6 17.0 18.8 20.1 21.4 22.6 24.2 - 25.4 (11.5-12.4) (13.3-14.4) (15.0-16.2) (16.4-17.7) (18.0-19.5) (19.3-20.9) (20.5-22.2) (21.6-23.5) (23.1-25.2) I (24.1-26.5) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6067&Ion=-80.4660&data=depth&units=english&series=pds 1/4 3/23/22,3:01 PM Precipitation Frequency Data Server PDS-based depth-duration-frequency (DDF) curves Latitude: 35.6067°, Longitude: -80.4660° 30 1 1 Average recurrence 25 interval (years) c — 1 _c 20 •-• - 2 a ai — 5 V c 15 -•- — 10 — 25 a • • •• • — 50 'D 10 -- • . .. . - -- — 100 v a — 200 5 - — 500 1 — 1000 0 mom . c c c c c 6- t 6- 6- 6- >, >,>. >. >, >, >, >,>, .F •- •- •-' •— -c -c -c -c -c r0 ro ro N r0 ro ro r0 r0 N r11 tb r V N A4 -D -0-D -0 -D -D -D -0-0 IA O -I rn lD r-1 f I� N O 0 I rfl UI ID Duration 30 r 1 25 - c r 20 Duration D>_ a) — 5-min — 2-day c15 _ — 10-min — 3-day .- 15-min — 4-day a — 30-min — 7-day 10 — 60-min — 10-day a — 2-hr — 20-day — 3-hr — 30-day — 6fir — 45-0ay • 12-hr — 60-day 0 ' I— i - i 1 1 i i — 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Wed Mar 23 19:01:18 2022 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6067&Ion=-80.4660&data=depth&units=english&series=pds 2/4 3/23/22,3:01 PM Precipitation Frequency Data Server OPORTO' 7.7 nd,, el S_ 5 i Granite —.-Wuarry 85 I Rd •F ai th • el 3km 2mi Lar a scale terrain p • t• Bristol v ty• 0 Ci ,^ Winston-Salem • • Durham Greensboro • itches Raleic • •Asheville i.... NC>RTHIC .ARC>LINA •Char Otte Fayetteville• •Greenville 10t. ,_.--. 60mi 4111L1/4.)LINA Wilmi Large scale map 43wt Brisfol 0 Johnson City . inston-S lem Q reensboro D fiam Relei9 Asheville © North ICarolina ...\s" , arlotte !' — + ill Greenvale 100km 60mi Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6067&Ion=-80.4660&data=depth&units=english&series=pds 3/4 3/23/22,3:01 PM Precipitation Frequency Data Server gsVort_.Bristol • Johnson Ci • Winston-Salem Greensboro Durham Ratei_ Asheville • North Carolina Charlotte Greenville l • III 100km 60mi • Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6067&Ion=-80.4660&data=depth&units=english&series=pds 4/4 3/23/22,3:01 PM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 so.�`N, Location name:Salisbury, North Carolina, USA* I noonemi Latitude:35.6067°,Longitude:-80.466° e Elevation:765.37 ft** i �I �s, .* *source:ESRI Maps � **source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval(years) Duration 1 I 2 5 10 25 50 100 200 500 1000 5-min 4.66 5.50 6.42 7.06 7.76 8.23 8.65 9.00 I 9.38 I 9.62 (4.28-5.04) (5.08-5.99) (5.90-6.97) (6.47-7.64) (7.09-8.40) (7.49-8.92) (7.82-9.37) (8.10-9.78) (8.35-10.2) (8.51-10.5) 10-min 3.71 4.40 5.14 5.64 6.18 6.56 6.88 7.14 7.42 7.58 (3.43-4.03) 1 (4.06-4.79) (4.73-5.58) (5.17-6.11) (5.65-6.70) (5.96-7.10) (6.22-7.45) (6.42-7.75) I (6.61-8.07) i (6.70-8.26) i 15-min 3.10 3.68 4.33 4.76 5.22 5.53 5.79 1 6.00 6.23 I 6.34 (2.86-3.36) (3.40-4.01) (3.98-4.71) (4.36-5.16) (4.77-5.66) (5.03-6.00) (5.24-6.28) (5.40-6.52) (5.54-6.77) (5.60-6.91) 130-min 2.12 2.55 3.08 3.45 3.87 4.17 4.44 4.67 4.95 5.13 (1.96-2.30) (2.35-2.77) (2.83-3.34) (3.16-3.74) (3.54-4.19) (3.79-4.52) (4.01-4.81) (4.20-5.07) (4.41-5.39) (4.54-5.60) 60-min 1.32 1.60 1.97 2.24 2.58 I 2.82 3.06 3.28 3.55 3.75 I (1.22-1.44) (1.47-1.74) (1.82-2.14) (2.06-2.43) (2.35-2.79) I (2.57-3.06) I (2.76-3.31) 1 (2.95-3.56) (3.17-3.87) I (3.31-4.09) 2-hr 0.764 0.924 1.15 1.32 1.53 1.69 1.85 1 2.00 2.20 I 2.34 (0.702-0.832) (0.849-1.01) (1.05-1.25) (1.20-1.43) (1.39-1.67) (1.53-1.84) (1.66-2.01) (1.79-2.18) (1.94-2.40) (2.05-2.56) 3-hr 0.541 0.654 0.817 0.939 1.10 1.23 1.35 1.47 1.64 1.76 (0.498-0.591) (0.602-0.715) (0.750-0.891) (0.859-1.02) (1.00-1.20) (1.11-1.33) (1.21-1.47) (1.31-1.60) (1.44-1.78) (1.53-1.92) 6-hr 0.329 0.396 0.495 0.571 0.673 ' 0.752 0.832 0.913 1.02 1.11 (0.303-0.359) (0.365-0.433) (0.454-0.540) (0.522-0.622) (0.611-0.730)1(0.679-0.816) (0.746-0.903)1(0.810-0.991) (0.894-1.11) (0.955-1.20) 12-hr 0.193 0.232 0.291 0.338 0.401 0.451 0.503 I 0.556 I 0.629 0.685 (0.178-0.210) (0.214-0.254) (0.268-0.318) (0.309-0.368) (0.364-0.435) (0.407-0.489) (0.449-0.544) (0.491-0.600) (0.546-0.678) (0.587-0.740) 24-hr 0.115 0.139 0.175 0.202 0.240 0.270 0.301 0.332 0.375 0.408 (0.108-0.124) (0.130-0.149) (0.163-0.187) (0.189-0.217) (0.223-0.258) (0.250-0.290) (0.278-0.322) (0.306-0.356) (0.344-0.403) (0.373-0.439) 2-day 0.067 0.081 0.100 0.116 0.137 0.153 0.170 0.187 0.210 0.228 (0.063-0.072) (0.075-0.086) (0.094-0.107) (0.108-0.124)1(0.127-0.146) (0.142-0.164)1(0.157-0.181)1(0.173-0.200)1(0.193-0.225) (0.209-0.245) 3-day 0.047 0.057 0.071 0.081 0.096 0.107 0.119 0.131 I 0.147 0.160 (0.044-0.051) (0.053-0.061) (0.066-0.075) (0.076-0.087) (0.089-0.102) (0.100-0.115) (0.110-0.127) (0.121-0.140) (0.136-0.158) (0.147-0.171) 4-day 0.038 0.045 0.056 0.064 0.075 0.084 0.094 0.103 0.116 0.126 (0.035-0.040) (0.043-0.048) (0.052-0.060) (0.060-0.068) (0.070-0.080) (0.079-0.090) (0.087-0.100) (0.095-0.110) (0.107-0.124) (0.115-0.135) 7-day 0.025 0.030 0.036 0.041 0.048 0.054 0.059 0.065 0.073 0.079 (0.023-0.026) (0.028-0.032) (0.034-0.038) (0.039-0.044) (0.045-0.051) (0.050-0.057) (0.055-0.063) (0.061-0.069)1(0.067-0.078) (0.073-0.084) 10-day 0.020 0.024 0.028 0.032 0.037 0.041 0.045 0.049 0.054 0.058 (0.019-0.021) (0.022-0.025) (0.027-0.030) (0.030-0.034) (0.035-0.039) (0.039-0.043) (0.042-0.048) (0.046-0.052) (0.051-0.058) (0.054-0.062) 20-day 0.013 0.016 0.019 0.021 0.024 0.026 0.029 0.031 0.034 0.037 (0.013-0.014) (0.015-0.017) (0.018-0.020) (0.020-0.022) (0.023-0.025) (0.025-0.028) (0.027-0.030) (0.029-0.033) (0.032-0.036) (0.034-0.039)) 30-day 0.011 0.013 0.015 0.017 0.019 0.020 0.022 0.024 0.026 0.027 (0.011-0.012) (0.012-0.014) (0.014-0.016) (0.016-0.017) (0.018-0.020) (0.019-0.021) (0.021-0.023) (0.022-0.025) (0.024-0.027) (0.026-0.029) 45-day 0.009 0.011 0.012 0.014 0.015 0.016 0.017 0.018 0.020 0.021 (0.009-0.010) (0.010-0.011) (0.012-0.013) (0.013-0.014) (0.014-0.016) (0.015-0.017) (0.017-0.018) (0.018-0.019) (0.019-0.021) (0.020-0.022) 60-day 0.008 0.010 0.011 0.012 0.013 0.014 0.015 0.016 0.017 0.018 (0.008-0.009) (0.009-0.010) (0.010-0.011) (0.011-0.012) (0.013-0.014) (0.013-0.015) (0.014-0.015) (0.015-0.016) (0.016-0.018) (0.017-0.018) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6067&Ion=-80.4660&data=intensity&units=english&series=pds 1/4 3/23/22,3:01 PM Precipitation Frequency Data Server PDS-based intensity-duration-frequency (IDF) curves Latitude: 35.6067°, Longitude: -80.4660° 10.000 , , I , 1 Average recurrence interval t \\`,` (years) :::: . \ - — 1 �` 2 c \ — 5 92 c -•-•-- \:-- _ — 10 c — 25 O ` — 50 ru 0.010 — 200 a 500 — 1000 0.001 — c c c c c L- I- i- i- k- >, >,>, >. >, >, >, >,>. 'F •- •- .1= •- L L L L L 2 2 /0 N 40 2 2 r0 00 O -I I rn 0D r-1 fV N Ar- o o f+o'1 Cr o ID Duration 10.000 I I _I - I I I • L 1.000 Duration '" — 5-min — 2-day c °J — 10-n1n — 3-day :::: — 2-hr — 20-day i — 3-hr — 30-day — 6-hr — 45-day — 12-hr — 60-day 0.001 — 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Wed Mar 23 19:01:48 2022 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6067&Ion=-80.4660&data=intensity&units=english&series=pds 2/4 3/23/22,3:01 PM Precipitation Frequency Data Server +PORT Ci'.7.7.4� nd,,61vd S_ 5 i Granite —.-Wuarry 85 I Rd •F ai th el 3km 2mi Lar a scale terrain p • • t Bristol v ty• 0 Ci ,^ Winston-Salem • • Durham Greensboro • 614k:hell R a l ei c • •Asheville wom'� NC>RTHIC .ARC>LINA Charlotte Fayetteville• •Greenville 10i ..,..— 60mi 4111LOLINA W ilmi Large scale map 43wt Brisfol 0 Johnson City . inston-S lem Q reensboro D fiam Ralei9 i Asheville © . North ...\s" , I Carolina !' — + ill Greenvale 100km 60mi Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6067&Ion=-80.4660&data=intensity&units=english&series=pds 3/4 3/23/22,3:01 PM Precipitation Frequency Data Server gsRort_.Bristol • Johnson Ci • Winston-Salem Greensboro Durham Ratei_ Asheville • North Carolina Charlotte Greenville l • III 100km 60mi • Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6067&Ion=-80.4660&data=intensity&units=english&series=pds 4/4 �.,- N/F P/N 5667-06-49-363 \ aK PO 404 002 '�/'V 5667 4p480p2 ALAN IV BEGS/E - SHgN?06-.3g,g _ OB 1289-319 \ c7 9c Oa r Rq'�ONFS 57v I I�"-- ZONED RL a lo ZONjNC,oU,9 2"121 a Z w w ,,l l ar c7 w � % ;�/N'Sss�0�B9r_,__ - �� __ _ -- __ - CD Di c lire:; l l E'OREY -1.9gg-_- 'r - SC— iD --_�am1NE__ - - .. W Z >z O w m s� >REE1i+ / I REA,/0 ,( ll � f� _- _� —�-1 �Wupi�SQZ¢ `i l l a6 3s NE _:- _ U O p a � e�o '��l+�m � " � � �/ i�1 ZgoN�EN �so // .�� ,� _ / ® f: , 589.52'59 E 69.7. 69.00' \R. I �pp ,I LAJ - a ap / e � N89°52'S9'1N \ I _15a. i -,5 W J N a €o , I LLI w / N F •., I' sp17 N ff 7411111111A dy/Y�'" ;: ;< �' 1009 'j� NA - �; l,' - I I y iier / (KA* �I so P/N 5667-06-39-847 / /' I \ II mER l / / "`' N MARCUS DIXON,,/� ,, -N �'- 1 - I N/F I ' ;'� OB 1359-B1d j l' /� : ■ ��I P/0 404 140 \ 7 (I ' -" ZON/NG PUD: / ,/A / 1 P/N 5667-06-49-4396 '/� // 1 8' `� // Nam`. _ I ROBERT✓DAMRON 4- // ,1 ° ' 7 V P .MIIIw OB 1045-835 I ( ''I REVISIONS �A ='�' w ZONED RL !� I� �sFo ti� \.' ,�/\ / / I A �'\�,''/ / ^ I , - I A-32 II REV DATE COMMENT O'''C� O�o \\ �u/'�;� / / I ■ I 11 / SW/BM G�6' 09 \� '``� _ • ), I / 1 12/30/22 NCDEQ COMMENTS �O�i� `?9 �y<' fry,,,,,, I / RAM /J` a I I Q I I o ' I/ 2 04/25/23 TOWN OF GRANITE PAB QUARRY COMMENTS 0.34ACRES Q s�l MM % I / , ATER SOM - 4 00234. / 9 _ __Raf LJI I_ g QO ��d26 / 042ACRES 042ACRES ®� — — — — - — — — — ��... pri,......a I g9 s�Ao j� j__ ✓=" �ma1l ��■�WI;t i,, l ;�. II, I ohs os o / // ■•, ��■mivii _� J � �o iP `�.9' ;'' / / �1 I `f I I \ \ j76i- f0'370R D 1 / �Gc 9���0 ;" j// -; h A .,�I i �� e I- -'� I PRE. N \ DRAIN 8 MAINTENANCE E-N�EMENi I �- Iii ' /� �� • ,�7/ftfr., /// -' \ ® — Mai him Iit �ll��� �� q � �s Fror �'\ ���� ``VI sy� /-- ® 0� I� ��■ A-31 II I'. `.� �/ K�owwn.lgbelDW. so�Pr'6� �',� �� // IYI �9���1�1 ( f ::,/, € Call9eroreyoumg. 06, j, ,� ( i imm�� III_ �IY ■ �� I ALWAYS CALL 811 •� // �W� di I - -; 1,‘,/ it's fast It's free.It's the law. 111 pi ' �� =� ���� �o f �� co k��a ISSUED FOR PERMIT o ,ti a a AND APPROVAL CONSTRUCTION 406839¢7054 - h� �; ,/ / � �, 11,- Iy $ ( ,HsowDOCUMENT�H.E�INDICATED OTHERAVANG IS INTENDED FOR MUNICIPAL AN0/013 WISE 29"SOE �✓ ,_ 111 �� �' e Kt � : PROJECT No: NCC202055 BIES NC LLC ('iJ� �' �. --�� ;l --- I Q I ��/297-258117'Z'f, } .-ALLEY -r - „� �� I DRAWN BY: Rsw V ALI / I• K $ CHECKED BY: RAM ONG RID I- - - -- r Y ,„..I. DATE: 04/26/23 1 SKr 'S9'E 54.00' 889.52'59.E 111.00' �N89.52'S9.'W'111.00' I r I N89.52'591W 1 A-11 / NI i/ '� (Q I Q J CAD I.D.: IDAM-0 ,I iE. � ',d�iiJt•���_�_ ��ii�f��.�_ ii�i♦fi , rp {= N F N F N F I ''" a v. U� II ll F 1� I v �,2 gl ' g PROJECT: / , �o �- I■■■■■ ', i�I �' WIC �Ii �'� "�1 _ IUD 4048003 I P/O 4048002 P/D 4048001 i�f���� �� �� ion ri 0.41 ACRES �, 1 r '11:: II ; � lP/N 5667-06-39-8024 4N 5667-06-39-8094�P 5667-06-39-906$ ICI '� \ �. LG/HOMES NC LLC♦ LG/HOMES NC LL LG/HOMES NC LLC iii / , - CONSTRUCTION pe 1297 25a DB 1297 25a DB 1297 25a o j I /r '- DOCUMENTS ZON/NG PLO ZONING PUD I ZONING PUO 25 25 27 25 29 o �- y //j i¢ C .4IxW�A' -,I _ ✓I FOR 1 J■ g :;. C/p- GN�X Ls`�� C\ IN CI_ _ - - .. �_I I,� �� -F� fID ¢0 \ ICI I I e POE wils- -���me ma. - �� _ p LGIHOME NC. ;�� - _L/MST O/V �� HOMES, � ETER�C.E—s I I I I I I I K� I I I I 13 '-11 \ w 8 VILLAGE AT GRANITE I on vgR/AB[E WO/Pu9ucR I r-sue-s s- J ®Ig f ,III - TOWNHOMES Aso _ I I 0.19 ACRES ,l _lye BOOK s99$PACE ED I I I I r'S rt° I I I 0.20 ACRES EX4 I I 310 LIMESTONE TERRACE _ C N�rJraNavNEB I ,-'ICI ICI ICI 131 I4I I A '- �5N� -- ___ I I (I � I I I )'I / ROWAN COUNTY ,a I_ _ __ •_� -22� III I _ �L�s o II F GRANITE QUARRY,NC 2814 , �' /`, s oR��i __ "ice i=wqa- r .1 �. 1 — ICI i t i�i I �1 o I�■� `��� OS ACRES II 0.06 ACRES PARCELS 404 144,404-145, .IB' P" 2 STORM _ _ .- - 0. — •, d I 404-142 AND 404-143 \Ir,O rwV1w�11A�A-22.11 5�' ,� --. - �R � ��� _"" - .—goo—_ 0.02ACRES _.'i NUMB P-1132 620ACRES igois��_ ®' — _` � BOH LER// N/F N/F III _ -_ -- -______ 4‘70 f 1 _� Iii JI� BOHLER ENGINEERING NC,PLLC 0.04 ACRES _ X ��II 19< P/O 404B087 P/O 404B086 y A-2� E'`� I •�'- 1927 S.TRYON STREET,SUITE 310 , mv ' PYN 5667-06-38-9816 iP/N 5667-06 38-988.• 1 - I ��__ a h LG/HOMES NC LLC LG/HOMES NC LLC ill - CHARLOTTE,NC 28203 a a 8 d OB 1297-258 OB 1297-25B / m - •� •� II -" l Phone: (980)272-3400g I: _�o s 0.33ACRES Fax 980)27z-gaolh ZONING PUD ZONING PUO I 0.10ACRES t g8 ■iI IA-23 I -- 1 NC((�ohlerEng.com = z v i°'- s:117 �. i ���I � EX6 o _ I ssa°15 I Ipp7� I A-21 I�I — - CR - I 2d ——cacn� �— - 0IN - _..��:,r°�!�Imo- . ��I .,.,P0 29 ACRES q A7/IglE90HNOFNNOCE _ T — 0.04 ACRES I 1, L.(� �DOTP /��SWJI�t � �' - - - -_ _=_ ,—� I EX8 , I 046878 r ` J .Fyc Ec , 2164,�� i !Aar - _. �,Ink,JwCe O: >zsGu. i ------_--- ------ - CfNI NMG���091023 I I , • j A t ���� 6 ACRES yl P/D 4048088 _, - �� -- - - -- --- / - __ - —p" �]____ SHEET TITLE: �' INLET ;IRO 5667-06-38-9724 / '--- L — — — — — ASPH.QL TPA�ED'- =1 - �- P� ELYZABETH McKENZ/E A l KIRK McKENZ/E f--� -- _ ACCESS SROA1� — — ,' -XJN/NG R-10 I __ 4....... E, - fr guar io kruNv - _I Q ��__ w DRAINAGE —= I AREA MA �h�/I VI- P/O 404 004 : P/D 404B089 P/N 5667-06-48-2665 SHEET NUMBER: / �'?%1I/,5667-06-38-9628 CURT/5 R KESLER& I FODAY DYER SR �I AMANOA KESLER SE/0/KENNEH I '•‘,I DB 1243-552 �' 3 / OB 1353-455 I ZONED RI 40 20 10 0 40 _- / ZONING R-10 1 Il 0�- i "�- 1``, __ _ L.,_ 1•=40' Q J REVISION 4-09/04/2023 I I • 700 /V'- P/N 5667 0 -49-3631 ---- p ALAN K BEGB/E //,4N]pA6-39,95� '-01-BY'8 OB 1289-319 ' 20 13802 3gS 7 �� ZONED RL , N/NG pU0 1o'wr _ \ O o , z /; l ,� -- -- "c_ saros�.1•E s72a4• w v C1a ego _ _ ! e- a z w l N BeELN TREEL/NE BR %FELINE_Igl - O / — JJJ` l/ l ( )) hen EA'L" UO \ l \ _ _ \ .j • � AREA UNDEFAINED IN APPROVED PLANS FOR � Z�O:f Q�N � NXfL LLI wa I- / my ah7atBs' 11 ;a. 'it / \\ �z 6-7 /IO , i1 i l ,M ^ A Z_ o Z c¢i y a a� 'mil 5 AO 4�'AS-BIA[IsJ �_„__ - \ 1 / 9"I killf'N' = Z g O O y Ri OAF71175• I \ / L9 re z m a z q�, �j�7a NNM7457/ N/F f ><,_ .'� �. - --7 I I '� Z a g 'R //� ;(BRrf22 RI'AS DRAINS TOIX.BMP 3A009 l , I I so O W ~ 5 G, `E' l 24`C4IK h / N I Ce U 1 �s PiN sss�os 3s 8 1/ �Rl V 1,1 k J � I� w_ //�,.'�' � MARCUS D/XON;,�� :..♦ / l — --/s6-- 7Bo=_'I — as 1359-81/% I I k R/0 404 1; 1yh / �ZON/NG PUD, �� �� V I \ P/N 5667-06, /' �� li U PI 8 / \ �, TA9Y R \ ► BYP" I I ROBERT✓ AREA DRAINS TO BMP S IN APPROVED PLANS FORM, m / /I �� \ is/ I /I :` 1) _' f I EVA "/ VILLAGE AT GRANITE QUARRY PHASE (SW3771201), ?aa/ uEn9 / ,/ \ \\ \\ I'I DB I, BASED ON SITE TOPOGRAPHY,AREA DRAINS AWAY / ,2 \� / ,� \ IT .D /� FROM SITE \ ��6,�23 s ,%(\,j•I/ 1.86ACRES ) 6 - �o�� ���oo P01-3 /. / A I ��� REVISIONS 0.14 s. S 9 '/ j0'1%'590 Oy�a y`\y�,. �'lX,$SNA,S7NB , I I I / / ^ REV DATE COMMENT CHEM.,' Gp %IXfWT Nt7 24Ji j ,.��j/J/:/ \ '�/I / 1 '' , 12/30/22 NCDEQ COMMENTS SRAM TOWN OF GRANITE PAB 4OM 56,O \ 1f'HCP/M; ���" ✓ 4/� ��' N/F '�-,y,1 / 1759 2 04/25/23 QUARRY COMMENTS SM/RAM -� _ PID 404 144 � 06�00 A NT • ,ry/ —/ PIN 5667-06-49-1233 �_ I I /N/ I I'' I 3 05/12/2023 SUB2 COMMENTS SRAM ti B ORAIAIAk ` 56- I LGI HOMES NC LLC I / 8 ��ti s-. ,„��� ���' _156� DEEDED ACRES 4.42 1 _ `� _ � h ,,-= a oeroa/2D23 REVIs oNsoRMwATER soM � ; �� DB 1297,PG 258 % I _ s oe SETBACK �..� ������..�������.� __ �py4. ..0 2\ O /� %/ , fi / / - 1 ZONED --_ IRE¢LNE a, —_- s x y I G 58 / NED PUD 9995,PG 89 _ u9rwT -__ 7 /—i\ m ��o ,� 0� 7 - 6 -'/ - 3 h1 N _ MB '� '� /, / ,. 1 16 \, 6 I / oP�1BrNTo4m= € sz S�G / 62 \ \ �o�'��' �'� .)(//,'; ' :/ /,� j58 / � E1 I / 1� ��% _ jell/^ '�I Igo BC REoE�iKEoI B �a ig < � / S P ;,, � N %� J / I - _ :_- / �I ,a;ROLE(APF6a,Y`) 1 j 1.95ACRES - I8�' �j�' .;y // ��1 I �s� Il �- PER APPROVED PERMIT algi171201J ','� /Z\ /'; ` ,,,„ , '7' s� / / �� / I I ORNN4CEAREA TO BMP 6=6 ACRES / 7I 'j' , � �' ��% ,� / I CN 73 I I Know what's below. / / N� V'./ I I TC5MN ;I A ' g� // ; ! $ Call before you dig. yA' f h ' / / / _ I t N/F / ;��'I ,, 1/ 6 ^0 I ALWAYS CALL 811 1' '�1 ! '° PID 404 145 I I f'-, Y f"� € �ti��y,,'/ _ / I I / ; ° / a $ h It's fast It's free.It's the law. ��\-4. Jr- % aslo sv I I PIN 5667-06-49d162/� / I I I,e� /// o� b� LGI HOMES NC LLC ) , � ! g j 9 — T g T, — _ — _ - _ DEEDED ACRES 1.78 / h 4 g �V' " --_ --------. x9'i1•W 140.00' �� PLAT PAGE 7805 I I '° IItil/ Q° ISSUED FOR PERMIT 04B004 / 3,�2n �uRI Z577o�, _ 8 Q o%I 06-39-7056-Ir' tsvJo-�. _ � o& 'tip _ I y I ZONED PUD I I�I'� I I'���7� /�� P0�-V ��V� I I:S NC LLC _ =�„6 -L�a�'1IsaEi _ '1 /I ;1 Id"HfP,ft1'L9F 41'- 161 _'_C': � c7PUo { r _ e�1 gyp, I I II �� �;w ' Il� g; _ B� I g DOCUMENT UNLESS ess rvo�,Eoo.xeawse.COAVANG IS INTENDED FOR MUNICIPAL AN0/013 NSTRUCTION \( arvo�PRo� corvs,R p.-7,-('- _ ^ �"o, 1. � �.„s rvo.�rvrervoeo asA ,AI 1 I W WJ PROJECT No.: NCC202065 kJ DRAWN BY: RSW h N F N F N/F H- // ' y ( 1' �� 4-'ii- =�/X/T/7</E`I DATE: 04/26/23 CHECKED BY: RAM 0 4048003 I P/0 4048002 I P/0 404B001 I ,L.''' R \ I • I I y 1' —'J I1/1/ h 1,"`1I CAD LD.: IDAM-0 P/N 5667-06-39-8054'FI/N 5667-06-39-6094i P/N 5667-06-39-90g I I'°�� \ / A ■ _p // �;�;�I -',� sue__ 154 LG/IHOMES NC LLe LC/HOMES NC LL' ILO/HOMES NC LLCo \ I I III'"'"" '%' �'" "'�A PROJECT: :X BM /;o; 4B 1297-258 , OS 1297-258 DB 1297-258, A \/' I 1 h i, ,'I(I /:;? -1--i '',... 1'r rv, ZONING PUD ZONING PUD ZONING PUD \ — J I 75� A /=�F / X B P B ^g -765 l �i _ Y f+ CONSTRUCTION �uB a�as �l =__---.7a5— I I 4.4ACRES q;L—. i% y o5/� 63 __ DOCUMENTS c/D = e -1 _s FRorvr SETBACK _---_ _ _ B'�`a OFF OW goo - �, I 0.04 ACRES -_ 7s/-eoo7s/ --- POI-BY - 7sa-- I', wA — _ I Z�"aaE �h l wM 1 t _ 9.28' �I wN ;"f0 _ , �€ FOR 1 I R / 5r—s=s�5—( 759 //IP//1'EASfNfi,� 11 W 16f80'iTIIFgLJU'V, 7EJ l- -75. (T-1-- -89°7/'S9'W 200819 TIAL7 _ 8A . o,y_-'Mi, a0\—N88�71•W 177./9'-ao -n___ a�• /'; I�` �52 \`,iI LGI HOMES, INC. 1 (TBA 37' BA II .at; .,., s�' • • 6o'ATER I �� ' d on / - -- ,. L„-9EST0/�ETER' I I ;I I, I I '+7s2/p l as�ENr(rBA/ �, I I I "�,o/a ma As \ ea7sso2 IA _ AY l 14 IT-,_ spa _ I :a1'Nrnmv7 N1SO16F V v I� uARueLE xlOrN Rueuc R gvado7 I /' •I 1 41"-.I Ci,Bv7614 I I A �-714'dY/I749f4' —'760 BOaK 9995 PAGE BBB9 FW/ %ZD ■ 51 tsgl� L -PROP.SA CUT LINE(TYP) L SOF T61/ I 1 II 1,1J',xP/,N'AI'75809"1� Id"FOP NY 15 CB Fm'SB1B' P`^'9fSSE��7/FB/1A/ � NNTr,W!/NTAINFO :/ I '/ &NT511 ■X BIYI • 1) I SS4H-7 •� 1o%P/N✓NJ 754$' q8 FOP M^✓10" 5� 1X4,,OW/ /aarm dV�as eNxrs/ / ncaFgiNq>ELctaTaN cr — I / i j V I caR810?J S I o667ar:y' I 1 II '., acP 1175s 1_`; Jr AN Xff75asa' ,ay 1. VILLAGE AT GRANITE 7so _ 1 I I - aB adpNT7 a�72 n!ur/na47n'raca as Lev ;E i,- ,,,,5 I I u I A , "_, .-11881911•3814i3z'...,e,1- I---- _ 18 4vArER UTErzA[( ,aw 7sf .-75B TOWNHOMES ��o � SEu� "- -"'`o "•_ _ c 1 I I I 1N7sa� 1 1 ;ii- f"eRiv � 7sa.� _..1,T-, , �i £� ,76',(p7f4�" —1723 9.18 -N8g 19"W 260.id' N' 'I,I Mgr N(1/ 5Y GBRN7519T; 10 /S"mrzv7se'71763 �T r 15'FRONT ssi9ncK --•I--- 1 KeA— --55.03'-__a a7 s5 r 388°19.11 1A1-97 / �. 310 LIMESTONE TERRACE e t p ^ IB° P" Si0F1 i✓9NiK.-...,J 1'� �� - - FF�T /N/J I I Ira?,eWkV 7m07-I tl�'� 0 79 ACRES -v:]:55 15 FCP al/J7d65/I E 17 ROWAN COUNTY\ . _ _ led 5 OeBeo- :� 1B'4WOUT75B7B' ,, —— -__,_ dr- _ - _ - - _�' ' _ a /NI / GRANITE QUARRY,NC 28146 ao75s� \ e\ III. ��. / s., --- _---_ __ �/e (e4E2 ones-says) .EATER any OFF UBRI Aso_ 75°^mr rrNa> v • • ANO 0TERAL p54) x ttnxsnea l_ — s m - ;I ,, / '�' N/ __ ��y-s> s/uee7y.7o — /5FRONT 404-142 AND 404-143 N/F / N/F' 81,,', e ��.-� .w'sAN/rARrsE!9ER -A64rNAse1/e1s/ .c�6,7"_J \ 06 \ ui F �� / FkSEMENF TH! -263 _ \ l `��W = P/D 404B087 ,' P/D 4048686;' n ;'�`o b = f --- ___ - A -�; 6<' wN •� PARCELS 404 144,404 145 IIll I, 6 �1', ,� _ �727E2IW OFF(TER) (p\� R / IlB P-1132 l oy n /mV 5667-06-38-9816,y'/N 5667-06H38798b� Y n 70� 1 3% 6A' IV 2� —\ -- __-________ ANo LATERAL(T&qJ \76�°NF ' '" \ • 1,� - "a'/ZSB.➢U' .+ mal I �La HOMES NC LLC LG/HOMES NC LC o g �- m ` 6,,. %1/ --------- - - -- - -.76J szNxrlN !\ 'mw4'7S7/70 BDNLER ENGINEERING �; Boa 25B _ ,, �� OHELBER// _ - ___ 310` o h ZONING ROD ZONING^'HUD, 404 142 - ID 40?3 s P ;- Q / m e eh R PIN 566-.. :-.821 -y-- -_�_ m P �s _--_-_ f WENT CHARLOTTE.NC 28203 T t PIN S8�7.c�18-1832 V '',1 Fax:ne (980)272-34001 LGI HOMES NC _ I a ; a. / DEEDED ACRES 5 768' e N - t4•'I DR 1297, '2 -- _ a O B! om o ',I-BY' 10'PRNA/ES7QN o,4wlr X BYP s PL.,.•PAGE 7, 5 ------- - - q ---- --- -------- _ D PLAT PAGE 7805 1 I `�>J' __ --I DB 1297,PG 258 a�� hl Eng.c d -asa• - _ �, 1, I,, -7551,rr PUM - - _ZONED PUD „C o7 ZONED - -- -- - �I \ a X B — 1 4 `/ 0.13 ACRES A 8 , 1, 6�� w YP� R h . ' -� Nam' • r J I� I \ = SEAL = y 2 r -, 'kWN767Q7 - _ _ _ - 046878 I Na72>ge•w \Bavaap 044ACRES o�NaN - ENT — — a ' P/O 4048088 rrs 3er-2B — - _ _ mixw�a.. y?y ,PIN 5667-06-38-972 /5'11'1112T0/ems ,� — — 2o'RSAx sm.e. _ _ ASPHAL TPA IILC �- 6� -7,,,,—:::::cLIH,_,,,, \ 4 N M �r5 EL/ZABETH MCKENZ/E(O�'AS-'.31(�V�" _j \' �— -,D , �L_ 20 REAR9E K i m / OZB1354134 765 4821'— -7sa4-�'" '//K/RK McKENzrE Na0'3f3(• ,6> ss _ ACCESS ROAb/ y ` SHEET TITLEON/NG R-1D - - - - ,r.- RELAGEAT GTRANITE QUARRV PHASEI SW91]012,71 11, -,'� 64,Yf5•W 55211' Osq�=, / -_ - ---------�-- -j 4- 765----FW 000H 10 AfuNN _765 - -- - - \ PRE DEV. �T, N F P/D 404 004 J \\ P/O 4046089 h, I 01-BY 5 w C/Mit. E DRAINAGE / / P/N 5667-06-48-2665 1 'Pl{V 5667-06-38-9628 CURT/S R KESLER& i p \ AREA MAP �,' TODAY DYER SR AMANDA KESLER :X BMP,B / SE/0/KENNEH OB 1243-552 - _ \_/ ZO/353 455 ', ZONED RL SHEET NUMBER: ZONING R-10 } �', 1 _- 1;•� 40 20 ,D S- 40 C-902 Q U 0 J I REVISION 4-08/04/2023 ---- 1 1 NSIO 10B -- P/ LAN K 5E05 1 - ----- ,' ;� N 56 363 'r/'AMTRg6 3-9,g7j ' '01-BY'8 05 1269-319 oa 73 `7<NES 11 ,- ZONED RL 5_. ZONE 6�-g,J9 AREA UNOETAINEO IN APPROVED PLANS FOR NC P(/� -'�.� VILLAGE AT GRANITE QUARRY PHASE (SW3171201) \ CD OG ., , / � Z 20 BY w3 , /__ /, J w fir ,6' r H�/ IX a z w � % l / Ey gs_,3y ' -_ H.a .— . 0.33 AC -- -- - z w w> e 9 9¢6¢_ RES 3®_ Z wc�10- o= 6 -CAR 11 06, ONES. H;; :`l �G— I '' -- -_- --- W CD z w a= w Z II= �E / / UO _ 35 / \ ( / / y r / J� , 389°52'59'E 69.0 N69.52'S9"W 89.00'• ,� I c O p d K p .-� o _ R. _ - W G / / ® /.:bq� _ _ __ L.6J?2\ -___�._r / Z U Z y y d Hg� - C9 O o w / O ; �, / T� 1AM Aiiilk _-! �2sx25'SIGHT DISTANCE \ f \f/ -I a ,,i r/ // , : N F / / __ _ ' � TRIANGLE(TVP.) 1 1If W go p� :l •009 '' if Ay' // _ � 11 i 0 6 P/N 5667-06-59 641 D L/ -1' _ I I w `< MARCUS D/XON,';�� '. � n. .� 1 N/1 —,1 I y -El ' PB 1359 a1a• , IIIgal 3 C]1 �� Pioal t' / / ' . D ZON/NG PUP // / l' / - --- ME •.= I P/N 56; /�,' II O Bo p CO 1 -1 / �� \ l p / ' /' \ � I I I ROB/ ARLA 40 3 GEAT DRAINS QUARRY 6 IN PHASE 1ROV31 PLANS FOR —'7�'Sd/✓/T'A'fY l� VILLAGE AT GRANITE QUARRY PHASE SW31]1201 sEurR raseurur Ball 'IN 14 I I. ESA ' I I. `� / / ' �I■ 1 OB BASED ON SITE TOPOGRAPHY,AREA DRAINS AWAY ' � / X 1 MI 4 I l§ ,FROM SITE o���� - �,/ // .'• �■�f I® 15 ®i>I! I jl �1 "D I il 1 REVISIONS _' P013 ®i E�� �y o $I� D��Na. S 9 I> I a_ev O� �Q '/ I _�� �� 16 ��Q jdI all I / REV DATE COMMENT NM,/1T OF WAY $ 1 12/30/22 NCDEO COMMENTS SW/SM W Ca✓/k OR TO KA/FYF _ I I TOWN OF GRANITE PAB � ss O �� j/ J _ M� �� 1] .I- l SdN/LARY!//�£/N MD/ T�96j p� N. ,'4' 1 7-7 ' ■1 - I. I I 1`'q TO LW✓SIALe7NAV A. ,/I/,,l l $� - ' 2 04/25/23 3 Ofi/11J2023 SUB2 COMMENTS TS • O�CT 06, /Q,. '� O SM/RAM • _E q p _� I. ^.[tF l_____. LGObW��/ \ I SOM IO��ti�98 ';6, /..;%� �' a �_�9�i E�: Y._ �! ��� 18 I I ___ - $ NCDEp STORMWATER SOM GP �, / ' �,�,� u �A 4 OS/04/2023 REVISIONS ��2 2 - , II, p``� I ^-�162 6'61DE 6ETBACK _ c o i �.� l� RAM � 1np w,:� I �� / ��5I I - I 7 - oo� `soOO ,� & / �i�� f118 19 3 �� .� I / II $ i 2 6 «, /: .. e i' ,/, - W • mini 1�V ,� P. \ RM:RgI�ygGE& 59' I / • c, 9e`>q0 ;2, /, /0'R'J- ® - ,�� mom 20 - R•. /V \ ` /" /, _.„jt EG„�ESMENT'\ I Ili I J O , r' kfr' 7DRAINAGE AREA TO BE En I oe,- -•P-awwWLv _ii66 I' i,EXPOLE(APPROX'`� ; // 77TREATED BY EXISTING MASTER �� z1 1 FMFNr� j� �„�-- TS',1V�,� 1/ LO�noNJ- '6 000 % 7r DEVELOPMENT BMP 3 ®��I�i�°t ��I I 'I / p y��T66 `', �/ yy ® gi�Im >��i I I p, 7 1 N,,' l/ Ir Io�i., , �— �n� I KooWWNoi§bBIDW.i // N� � 7 j5 Nat za 1 / • O $ Call Defare YOu tlig. � / �" IYF' I r. I I '/ O `/ Na I-��,_- I I 1 I ALWAYS CALL 811 - - - — Mi - 24 I yL�� I � I awl- eti IPs fast It's free.It's the law. �` ,/,�. "/ -/ ��_\. _-- _- - �`��K BMPV PROP.PERMAN TB FI ./ / :52::''1,, 0� ' _., :"T- 6_SIOESETBACK_ I,/ - /� III __ F yv _;-„ - — q v 1 i.�•R.P. TPON� I / l ( ISSUED FOR PERMIT 1 "I ! �l dEs NC LLC _ —— _.� ® _ P01-6� !II 1 a�Ew �oTo, 297 258 —— P��IT.f LLfY$ — I• 1 —— — '-VTAL-LE1`B-� I F j ' 1 $ ,Hsow°DOCUMENT N E66INDICATEDo.xEaaoE �o. /NO PUO I 589 2'S9"E 54.00' S89'S2'S9"E 111.00' ler N99°52'59•W'111.00' I I N89°52'59"W 110.00• y1' \ J PROJECT No:uE Asn NCC202055 �: DRAWN BY: RSW 1 N F N F I N F n - v I �.� e�l i .��. - �� I S;r I , JI A I J $ CHECKED BY: RAM - i'I] - , I. ( DATE: 04/26/23 TO 4045003 P/O 4045002 P/0 404800 R rill �s11.25xzs SIGHT DISTANC ?•:,i CAD I.D.: IDAM-o /i° P/N 5¢67 06 39-8024'F1/N 5667 06-39-8�94,P 5667 06 39 �1 — .1�®N� � TRANGLE(Tl'P.) ® � ®�� - - �i� - LG/HOMES NC LL/ LG/HOMES NC LL' �LG/HOMES NC, I J „., / PROJECT 45 1297-258 I OB 1297-25B OB 1297-25° �ZON/NG PL/D ZON/NG PUD 1 ZON/NG PUL' 32 33 34 35 36 37 ��'J BYP6 II III CONSTRUCTION ■E■■�1 - 11 $ DOCUMENTS L�0 . . _ - _- 15''MONT SETBACK ■,m e.m I„ ® Ii (! _ 15._0NT6ElBACK ].- /,e L 0-BY PROP.SIDEWALK EA3E'EN'� S X3 SIGHTDIST C .I�� f004 A�RE5 / ,\I FOR 1 BEIIINO 3IDENALK TVP ER- Ifir:I y •__i, a _ _ LGI f_• PROP.FENC` I / ' L_%MESTONET I-- T i i i i i %''- vARias/EwrorHaueucR/N' I I DRAINAGE AREA TO BE I I j j l I I j 1 aoI I WIC II. . o \ $ HOMES, INC.I CAUNTY J!4/NTGE 88 _- I ii— Q , •, �``, \. —14-_ 800/I 9995,PAGE 8889 BMP3 14)-F 1 1 1 1 1 I I ---- TN GFH7ESSfO C(/FB I/ _ — LT-- -Il TREATED BY EXISTING MASTER I ION/� 0/ VILLAGE Ar cRAN E APPMZIZMA1r gamy A I I I I p I I 1 1 0 $ T almr rkeau/Reaas .,� w _. _ EVE __� I__._ I _ I I I 'II ` I I I I I I I I — � TOWNHOMES / BM �' v , 065ACRES -... —DEVELOPMENT P Z — �� g j 11 11 11 I 310 LIMESTONE TERRACE OPME 3 s 1 k ',18 ," i-- - F rm - 'ho i0—_to-_ _ ROWAN COUNTY / \--:! -' ------ T W. 16 FRoursETBAcrc - s �. P� GRANITE QUARRY,NC 28146 o- o, 1 • - �� /s1x[crald2u/ PARCELS 404 144,404-145, 1 I� "• �.��PnoESMT. �.��! - 6 FROMSElB.4CK J � ' 404 142 AND 404 143 N/A- N/A- �� _S ���� ����� ®1.--L.—_-0,114 SM. �� � �, V �� �� ;1k 61111 -9 w x rn/vim/cr I- kW P/D 404B087 P/D 404B086 z �• � '}. a W a PIN 5667-06-38-9BJ6 P/N 5667-06-38-9886 x �■■ -- ` -__�ja' I LG/HOMES NC LCC I LG/HOMES NC LLC 44 I �� �������••Ro°j, OB MES N 5B OB 1297-258 Till ■■ I I" 46 4] 48 I / BOHLER ENGINEERING NC.PLLC � :I NCBE66 P 1132 o 1 - 50 51 i (�o w1 52 --1 / 1927 S.TRYON STREET,SUITE 310 h o ZON/NG PUD ZON/NG PUD PROP.'SIDEWALK I I _-1$ o \ 0 ¢III - ' EASEMENT(TYP.) I I S 4 O - J!, CHARLOTTE,NC 28203 N s-,! II n Iii A I I� Phone: (980)272-3400 ! �' 1�1 j�1 a - Fax: (980)272-3401 I� �II 599°19'1"E 94.98' RTg I I' i ` — ° I � �I I NC(�ohlerEng.com 6 ——-- 6 G PVT. -.. -] ° q S- IF>�!®III1 I_ - C s '01 BY' BYP1 79.00'7^ r _ N cARo;,;; �i�G o� 013 ACRES & I Z 1 --==_.-:t'LL__Lil j /1_,K,-' ''' AVF 4"iiiidAMMILAC_- - ----- BYP5 Wtsm z P/0 404B088 — - = _ _ 023 % �N 5667-06-38-9724 — — : 69A K _ ASPHALTPALIED�; -- - — to �FN M�� � --___,„_ PIEL ZABETH McKENZ/E — — _ _ 'Y" I PR SMACK ' K/RK McKENZ/E rht, `� ACRES — ACCESS ROAD — — — 0 30 i m OB 1354-134 29921'-- T _ - AREA DRAINS TO BMP 6 IN APPROVED PLANS FOR SHEET TITLE: '' -20(1//NG R-10 N // - =, _--- -- 252.90'— - - -- VILLAGE AT GRANITE QUARRY PHASE 1(SW3771201) _ I POST DEV w IN N F ''01-BY'S PO 4�04 004 —— — ��� / w E DRAINAGE �/ P/D 404B089 P/N RT/S R KESCER 665 /I \ �,P/{V,566706-389628 CURT/S R KESCER& FODAY DYER SR AMANDA KESCER BMP6 !Il AREA MAP SE/D/KENNEH OB 1243-552 '3 l OB 1353-455 ZONED RL / DB 135-455 �i.� S0 sNEFr NunnBER. QQ � - t t0.38ACRES -J�3 N = 40 20 10 0 40 e O i', 4 1,40' a g i REVISION 4-08/04/2023 Pervous and Impervious Lot Table Lot# Total Area (S.F.) IMP SW (S.F.) IMP DW (S.F.) IMP BLDG (S.F.) Pervious Area (S.F.) Total Impervious Area (S.F.) 1 1900 75 360 820 645 1255 2 3800 150 720 1640 1290 2510 3 4 3800 150 720 1640 1290 2510 5 6 1900 75 360 820 645 1255 7 1900 75 360 820 645 1255 8 3800 150 720 1640 1290 2510 9 10 3800 150 720 1640 1290 2510 11 12 1900 75 360 820 645 1255 13 1900 75 360 820 645 1255 14 3800 150 720 1640 1290 2510 15 16 3800 150 720 1640 1290 2510 17 18 _ 1900 _ 75 360 820 645 1255 19 1900 75 360 820 645 1255 20 3800 150 720 1640 1290 2510 21 22 3800 150 720 1640 1290 2510 23 24 1900 75 360 820 645 1255 25 1900 156.7 360 820 563.3 1336.7 26 3800 301.83 720 1640 1138.17 2661.83 27 28 3800 313.07 720 1640 1126.93 2673.07 29 30 1900 _ 170.49 360 820 549.51 1350.49 31 1900 167.5 360 820 552.5 1347.5 32 3800 327.85 720 1640 1112.15 2687.85 33 34 1900 170.2 360 1640 -270.2 2170.2 35 3800 314.4 720 1640 1125.6 2674.4 36 37 1900 174.73 360 820 545.27 1354.73 38 _ 1900 175.47 360 820 544.53 1355.47 39 3800 330.89 720 1640 1109.11 2690.89 40 41 3800 336.05 724.69 1640 1099.26 2700.74 42 43 1900 177.3 412.68 820 490.02 1409.98 44 1900 263.67 360 820 456.33 1443.67 45 3800 492.93 720 1640 947.07 2852.93 46 47 3800 465.04 720 1640 974.96 2825.04 48 49 1900 248.47 360 820 471.53 1428.47 50 1900 245.95 359.43 820 474.62 1425.38 51 3800 443.07 716.56 1640 1000.37 2799.63 52 53 1900 243.38 357.14 820 479.48 1420.52 Impervious Drainage Lot# BMP6 BMP3 BMP3 1 485 770 - 2 970 1540 - 3 4 970 1540 - 5 6 485 770 - 7 485 770 - 8 970 1540 - 9 10 970 1540 - 11 12 485 770 - 13 1255 - - 14 2510 - - 15 16 2510 - - 17 18 1255 - - 19 1255 - - 20 2510 - - 21 22 2510 - - 23 24 1255 - - 25 - 770 566.7 26 1540 1121.83 27 28 1540 1133.07 29 30 - 770 580.49 31 1347.5 - - 32 2687.85 - - 33 34 2170.2 - - 35 2674.4 - - 36 37 545.27 - - 38 770 - 585.47 39 1540 - 1150.89 40 41 1544.69 - 1156.05 42 43 822.68 - 587.3 44 1443.67 - - 45 2852.93 - - 46 47 2825.04 - - 48 49 1428.74 - - 50 1425.38 - - 51 2799.63 52 53 1420.52 - - Total 49179 13860 6882 Impervious Drainage Roads and SW ONSITE Road BMP 6 BMP 3 BMP 3 Public Road A 8206.71 381.83 - PVT. Alley A 9003.61 10494.62 - PVT. Alley B 5298.67 4517.23 - Public Road B 755.71 798.6 3385.8 PVT. Alley C 12205.4 - - Asphalt Paved Access Road 10960.82 - - Sidewalks (ONSITE) 5230 1620 2461.26 Parking Onsite 2400 2400 OFFSITE BMP6 BMP3 BMP3 Limestone Terrace (OFFSITE) 14755.49 - 8859.71 BMP 6 (OFFSITE ) 7315.11 - - SW (Offsite) 1199.82 1666.28 Basin Information B6 B3 Receiving Stream Name Crane Creek Crane Creek Stream Class C C Total Drainage Area (sf) 264409 123274 On-Site Drainage Area (sf) 229138 112143 Off-site Drainage Area (sf) 35271 11131 Proposed Impervious Area (sf) 124110 52466 % Impervious Area (total) 46.9 42.6 Impervious Surface Area On-Site Lots (sf) 49179 20742 On-Site Streets (sf) 44031 17178 On-Site Sidewalks (sf) 5230 1620 Off-Site (sf) 23270 10526 Existing BUA (sf) 23270 10526 On-Site Parking (sf) 2400 2400 Total (sf) 124110 52466 BMP 3 Allowable impervious area per SW3171201 calculations sheet 12 76,230 1.75 Note: Previously approved SW3171201 accounted for Limestone Terrace impervious area and gave an allowance for this"future multifamily site"of 50%of 3.5ac(1.75 ac of impervious). The proposed condition has a smaller drainage area and impervious area than allowed,therefore, no BMP is proposed with this development. BMP 6 Granite Quarry DESIGN: WATER QUALITY T• GIVEN: DRAINAGE AREA TO FACILITY= Ac. LAND USE= Townhomes ESTIMATED PERCENT IMPERVIOUS= 1)SA/DA RATIO AVERAGE POOL DEPTH= FEET = Vpp/SA MDC2 PERCENT IMPERVIOUS= 55% SA/DA= _64 %= 0.0164 MDC 1 SA REQUIRED= 6.07 Ac. X 0.0164 0.10 Ac. = 4,336 SF SA PROVIDED= 8,871 SF 2)TEMPORARY WATER QUALITY POOL REQU=NTS PROVIDE VOLUME TO DETAIN THE 1"STORM EVENT ABOVE THE ELEVATION ALLOCATED AS A PERMANENT POOL THE VOLUME FOR THE 1"STORM EVENT CAN BE CALCULATED AS: V�=(Design Rainfall)(Rv)(Drainage Area) Design Rainfall= 1 Inch Drainage Area= 6.07 Acres Rv=0.05+0.9(1) 1=Percent Impervious= 55% Rv= 0.55 in./in. V�= 0.276 acre-feet= 12,009 ff' 3)Pond Drawdown Time Pond Height above Orifice= 755.60 41Ifeet Orifice Invert Elevation=m54.00 feet Orifice Diameter(D)= inches= 0.13 feet Orifice Area(a)= 0.0123 square feet Gravitational Constant(g)= 32.2 ft/sec2 Head(H)= 1.60 feet Driving Head(Ho)= 0.800 feet Discharge Coefficient(CD)= 0.6 Drawdown rate(Q)= 0.053 cfs Time(t)= 227,218 seconds= 2.63 days 63.1161112 Note: The above calculation is based on the orifice equation where: Q=CDA 2g1 12/30/2022 10:20 AM Page 1 of 1 Project Name: Granite Quarry Phase 111 Ballast Pad Design for Wet Pond 759 ft. Top of Basin 0 ft. Spillway Heigh 759 ft. Spillway Elev. Box Width: 48.00 in • Box Length 48.00 in Barrel Size: 18.00 in • Kyyvyvyx.x48 in.BOX Top of Basin: 759.00 ft. WAN< Inv.Out of Pipe 754.00 ft. 5.00 x 5 ft. Spillway Height: 0.00 ft. Top of Riser Elev. 759.00 ft. 754 ft. Bottom of Basin v KKAAAW,n7 1J1J1J1J1J1J1J1J1J: J1J1J1J1J1J1J1J1J1J1J •1.1.1.1.1••1.1.1.1• Ballast Pad 18 in. RCP Uplift @ Peak Elevation: Peak Elevation=759 ft. Peak Elevation= 5 ft. Uplift Force=(62.4)(5 ft.)(4*4) Uplift Force=4992 lbs 48 in.BOX Volume of Concrete Required to Stabilize Riser: 4992 lbs X 1/150 Ibs/ft^3= 33.28 cubic feet Ballast Pad Ballast Pad Dimensions: 5ft. —f1.5ft. Try Volume of:5 ft.X 5 ft.X 1.5 ft. 5 ft. 37.5 cubic feet Ok 37.5 c.f.>or equal to 33.28 c.f. True Ballast Pad Dimensions: 5 ft.X 5 ft.X 1.5 ft. 5 <14> EX MP6 B P6 �7 16 17 EX BMP6 Dry Pond Prop Modified BMP 6- BMP 6 PP Wet Pond 8 9----N__ (18 19 EX BYP6 Pre-Dev P01-6 BYP6 Post-Dev P01-6 Subcat Reach 'on• Link Routing Diagram for Granite Quarry Prepared by Bohler Engineers, Printed 8/4/2023 HydroCAD®10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Granite Quarry Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 2 Rainfall Events Listing (selected events) Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 2-YR Type II 24-hr Default 24.00 1 3.34 2 2 25-YR Type II 24-hr Default 24.00 1 5.76 2 3 100-YR Type II 24-hr Default 24.00 1 7.21 2 Granite Quarry Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 3 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 3.300 61 >75% Grass cover, Good, HSG B (8, 14, 18) 2.850 98 Impervious Areas, HSG B (14) 6.000 73 PER APPROVED PLANS (5) 12.150 76 TOTAL AREA Granite Quarry Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 4 Soil Listing (all nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 6.150 HSG B 8, 14, 18 0.000 HSG C 0.000 HSG D 6.000 Other 5 12.150 TOTAL AREA Granite Quarry Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 5 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 3.300 0.000 0.000 0.000 3.300 >75% Grass cover, Good 8, 14, 18 0.000 2.850 0.000 0.000 0.000 2.850 Impervious Areas 14 0.000 0.000 0.000 0.000 6.000 6.000 PER APPROVED PLANS 5 0.000 6.150 0.000 0.000 6.000 12.150 TOTAL AREA Granite Quarry Type 11 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 6 Time span=0.00-120.00 hrs, dt=0.05 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment5: EX BMP6 Runoff Area=6.000 ac 0.00% Impervious Runoff Depth=1.07" Tc=5.0 min CN=73 Runoff=11.44 cfs 0.537 af Subcatchment8: EX BYP6 Runoff Area=0.040 ac 0.00% Impervious Runoff Depth=0.50" Tc=5.0 min CN=61 Runoff=0.03 cfs 0.002 af Subcatchment 14: BMP6 Runoff Area=6.070 ac 46.95% Impervious Runoff Depth=1.38" Tc=5.0 min CN=78 Runoff=15.06 cfs 0.696 af Subcatchment 18: BYP6 Runoff Area=0.040 ac 0.00% Impervious Runoff Depth=0.50" Tc=5.0 min CN=61 Runoff=0.03 cfs 0.002 af Pond 7: EX BMP6- Dry Pond Peak Elev=754.03' Storage=6,307 cf Inflow=11.44 cfs 0.537 af Outflow=4.32 cfs 0.536 af Pond 16: Prop Modified BMP 6 -Wet Pond Peak Elev=755.78' Storage=19,668 cf Inflow=15.06 cfs 0.696 af Outflow=0.43 cfs 0.662 af Pond 17: BMP 6 PP Peak Elev=0.00' Storage=0 cf Link 9: Pre-Dev P01-6 Inflow=4.33 cfs 0.538 af Primary=4.33 cfs 0.538 af Link 19: Post-Dev P01-6 Inflow=0.43 cfs 0.664 af Primary=0.43 cfs 0.664 af Total Runoff Area = 12.150 ac Runoff Volume = 1.237 af Average Runoff Depth = 1.22" 76.54% Pervious = 9.300 ac 23.46% Impervious = 2.850 ac Granite Quarry Type II 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 5: EX BMP6 Runoff = 11.44 cfs @ 11.96 hrs, Volume= 0.537 af, Depth= 1.07" Routed to Pond 7 : EX BMP6 - Dry Pond Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR Rainfall=3.34" Area (ac) CN Description * 6.000 73 PER APPROVED PLANS 6.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 5: EX BMP6 Hydrograph I — •Runoff 12/ 11.44 cfs �1 LlJ 11 1 I �Yp I I'Z4-h'r 10iz t 2 RtRlai1fa�II1M" 9 -/1 I I IRUnoffl AII-ea=6.000 at 81 _1_17Znctf _ 0 6�' I / � n�ff lD p�h ' - P� LL - Tc5.Q min _ 4 /1 I , 11 I L L I J — 31 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 8 Hydrograph for Subcatchment 5: EX BMP6 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.09 0.00 0.00 5.00 0.21 0.00 0.00 7.50 0.36 0.00 0.00 10.00 0.60 0.00 0.00 12.50 2.45 0.54 1.12 15.00 2.85 0.77 0.37 17.50 3.05 0.89 0.24 20.00 3.18 0.97 0.17 22.50 3.28 1.04 0.15 25.00 3.34 1.07 0.00 27.50 3.34 1.07 0.00 30.00 3.34 1.07 0.00 32.50 3.34 1.07 0.00 35.00 3.34 1.07 0.00 37.50 3.34 1.07 0.00 40.00 3.34 1.07 0.00 42.50 3.34 1.07 0.00 45.00 3.34 1.07 0.00 47.50 3.34 1.07 0.00 50.00 3.34 1.07 0.00 52.50 3.34 1.07 0.00 55.00 3.34 1.07 0.00 57.50 3.34 1.07 0.00 60.00 3.34 1.07 0.00 62.50 3.34 1.07 0.00 65.00 3.34 1.07 0.00 67.50 3.34 1.07 0.00 70.00 3.34 1.07 0.00 72.50 3.34 1.07 0.00 75.00 3.34 1.07 0.00 77.50 3.34 1.07 0.00 80.00 3.34 1.07 0.00 82.50 3.34 1.07 0.00 85.00 3.34 1.07 0.00 87.50 3.34 1.07 0.00 90.00 3.34 1.07 0.00 92.50 3.34 1.07 0.00 95.00 3.34 1.07 0.00 97.50 3.34 1.07 0.00 100.00 3.34 1.07 0.00 102.50 3.34 1.07 0.00 105.00 3.34 1.07 0.00 107.50 3.34 1.07 0.00 110.00 3.34 1.07 0.00 112.50 3.34 1.07 0.00 115.00 3.34 1.07 0.00 117.50 3.34 1.07 0.00 120.00 3.34 1.07 0.00 Granite Quarry Type II 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 8: EX BYP6 Runoff = 0.03 cfs @ 11.98 hrs, Volume= 0.002 af, Depth= 0.50" Routed to Link 9 : Pre-Dev P01-6 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR Rainfall=3.34" Area (ac) CN Description 0.040 61 >75% Grass cover, Good, HSG B 0.040 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8: EX BYP6 Hydrograph 0.0321/ 0.03 cfs ❑Runoff 0.03� T T T ype--I24-hr 0.028V0.026� r R I��ir fa1T�3 i4 0.024/ 1 H 1 1 4 ndff IAtet @.A401-at- 0.022 0.02V L i L H JFIPTYPIUrriP=P9G? c 0.016V fi t rt 1 1 rt r 1 - °I P rr�° °i 2 =5.O-min- LL 0.014/ H H H 1 + 1 4 I H H + 1 61 0.012 N- � 0.01V— 0- 1 _ H I_ I 1_ 1i L 1 H 1 H 1_ 0.008V 0.004 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 10 Hydrograph for Subcatchment 8: EX BYP6 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.09 0.00 0.00 5.00 0.21 0.00 0.00 7.50 0.36 0.00 0.00 10.00 0.60 0.00 0.00 12.50 2.45 0.18 0.00 15.00 2.85 0.31 0.00 17.50 3.05 0.38 0.00 20.00 3.18 0.44 0.00 22.50 3.28 0.48 0.00 25.00 3.34 0.50 0.00 27.50 3.34 0.50 0.00 30.00 3.34 0.50 0.00 32.50 3.34 0.50 0.00 35.00 3.34 0.50 0.00 37.50 3.34 0.50 0.00 40.00 3.34 0.50 0.00 42.50 3.34 0.50 0.00 45.00 3.34 0.50 0.00 47.50 3.34 0.50 0.00 50.00 3.34 0.50 0.00 52.50 3.34 0.50 0.00 55.00 3.34 0.50 0.00 57.50 3.34 0.50 0.00 60.00 3.34 0.50 0.00 62.50 3.34 0.50 0.00 65.00 3.34 0.50 0.00 67.50 3.34 0.50 0.00 70.00 3.34 0.50 0.00 72.50 3.34 0.50 0.00 75.00 3.34 0.50 0.00 77.50 3.34 0.50 0.00 80.00 3.34 0.50 0.00 82.50 3.34 0.50 0.00 85.00 3.34 0.50 0.00 87.50 3.34 0.50 0.00 90.00 3.34 0.50 0.00 92.50 3.34 0.50 0.00 95.00 3.34 0.50 0.00 97.50 3.34 0.50 0.00 100.00 3.34 0.50 0.00 102.50 3.34 0.50 0.00 105.00 3.34 0.50 0.00 107.50 3.34 0.50 0.00 110.00 3.34 0.50 0.00 112.50 3.34 0.50 0.00 115.00 3.34 0.50 0.00 117.50 3.34 0.50 0.00 120.00 3.34 0.50 0.00 Granite Quarry Type II 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 14: BMP6 Runoff = 15.06 cfs @ 11.96 hrs, Volume= 0.696 af, Depth= 1.38" Routed to Pond 16 : Prop Modified BMP 6 - Wet Pond Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR Rainfall=3.34" Area (ac) CN Description * 2.850 98 Impervious Areas, HSG B 3.220 61 >75% Grass cover, Good, HSG B 6.070 78 Weighted Average 3.220 53.05% Pervious Area 2.850 46.95% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 14: BMP6 Hydrograph /( — _ 1 11 1_ 1 _ ■Runoff 16/. 15.06 cfs 15� I r rt 1 �_Yp�e II -�h- r 14� H 2='iR-R1ai4 13. 13/ 12/b -H -H RRUn-bfLAhea 6.O7Q a( - 104/1 1 1 1 1 ilrni? V 1 rne .�9¢ f c-5$ in 1/ m '/ H 1 4 I— 1 1 1 GVNL78 - 64 5V — 4/ —� T o= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 12 Hydrograph for Subcatchment 14: BMP6 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.09 0.00 0.00 5.00 0.21 0.00 0.00 7.50 0.36 0.00 0.00 10.00 0.60 0.00 0.02 12.50 2.45 0.76 1.36 15.00 2.85 1.02 0.43 17.50 3.05 1.16 0.28 20.00 3.18 1.26 0.20 22.50 3.28 1.33 0.18 25.00 3.34 1.38 0.00 27.50 3.34 1.38 0.00 30.00 3.34 1.38 0.00 32.50 3.34 1.38 0.00 35.00 3.34 1.38 0.00 37.50 3.34 1.38 0.00 40.00 3.34 1.38 0.00 42.50 3.34 1.38 0.00 45.00 3.34 1.38 0.00 47.50 3.34 1.38 0.00 50.00 3.34 1.38 0.00 52.50 3.34 1.38 0.00 55.00 3.34 1.38 0.00 57.50 3.34 1.38 0.00 60.00 3.34 1.38 0.00 62.50 3.34 1.38 0.00 65.00 3.34 1.38 0.00 67.50 3.34 1.38 0.00 70.00 3.34 1.38 0.00 72.50 3.34 1.38 0.00 75.00 3.34 1.38 0.00 77.50 3.34 1.38 0.00 80.00 3.34 1.38 0.00 82.50 3.34 1.38 0.00 85.00 3.34 1.38 0.00 87.50 3.34 1.38 0.00 90.00 3.34 1.38 0.00 92.50 3.34 1.38 0.00 95.00 3.34 1.38 0.00 97.50 3.34 1.38 0.00 100.00 3.34 1.38 0.00 102.50 3.34 1.38 0.00 105.00 3.34 1.38 0.00 107.50 3.34 1.38 0.00 110.00 3.34 1.38 0.00 112.50 3.34 1.38 0.00 115.00 3.34 1.38 0.00 117.50 3.34 1.38 0.00 120.00 3.34 1.38 0.00 Granite Quarry Type II 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 18: BYP6 Runoff = 0.03 cfs @ 11.98 hrs, Volume= 0.002 af, Depth= 0.50" Routed to Link 19 : Post-Dev P01-6 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR Rainfall=3.34" Area (ac) CN Description 0.040 61 >75% Grass cover, Good, HSG B 0.040 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 18: BYP6 Hydrograph 0.0321/ 0.03 cfs ❑Runoff 0.03� T T T ype--I24-hr 0.028V0.026� r R I��ir fa1T�3 i4 0.024/ 1 H 1 1 4 ndff IAtet @.A401-at- 0.022 0.02V L i L H JFIPTYPIUrriP=P9G? c 0.016V fi t rt 1 1 rt r 1 - °I P rr�° °i 2 =5.O-min- LL 0.014/ H H H 1 + 1 4 I H H + 1 61 0.012 N- � 0.01V— 0- 1 _ H I_ I 1_ 1i L 1 H 1 H 1_ 0.008V 0.004 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 14 Hydrograph for Subcatchment 18: BYP6 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.09 0.00 0.00 5.00 0.21 0.00 0.00 7.50 0.36 0.00 0.00 10.00 0.60 0.00 0.00 12.50 2.45 0.18 0.00 15.00 2.85 0.31 0.00 17.50 3.05 0.38 0.00 20.00 3.18 0.44 0.00 22.50 3.28 0.48 0.00 25.00 3.34 0.50 0.00 27.50 3.34 0.50 0.00 30.00 3.34 0.50 0.00 32.50 3.34 0.50 0.00 35.00 3.34 0.50 0.00 37.50 3.34 0.50 0.00 40.00 3.34 0.50 0.00 42.50 3.34 0.50 0.00 45.00 3.34 0.50 0.00 47.50 3.34 0.50 0.00 50.00 3.34 0.50 0.00 52.50 3.34 0.50 0.00 55.00 3.34 0.50 0.00 57.50 3.34 0.50 0.00 60.00 3.34 0.50 0.00 62.50 3.34 0.50 0.00 65.00 3.34 0.50 0.00 67.50 3.34 0.50 0.00 70.00 3.34 0.50 0.00 72.50 3.34 0.50 0.00 75.00 3.34 0.50 0.00 77.50 3.34 0.50 0.00 80.00 3.34 0.50 0.00 82.50 3.34 0.50 0.00 85.00 3.34 0.50 0.00 87.50 3.34 0.50 0.00 90.00 3.34 0.50 0.00 92.50 3.34 0.50 0.00 95.00 3.34 0.50 0.00 97.50 3.34 0.50 0.00 100.00 3.34 0.50 0.00 102.50 3.34 0.50 0.00 105.00 3.34 0.50 0.00 107.50 3.34 0.50 0.00 110.00 3.34 0.50 0.00 112.50 3.34 0.50 0.00 115.00 3.34 0.50 0.00 117.50 3.34 0.50 0.00 120.00 3.34 0.50 0.00 Granite Quarry Type 11 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 15 Summary for Pond 7: EX BMP6 - Dry Pond Inflow Area = 6.000 ac, 0.00% Impervious, Inflow Depth = 1.07" for 2-YR event Inflow = 11.44 cfs @ 11.96 hrs, Volume= 0.537 af Outflow = 4.32 cfs @ 12.08 hrs, Volume= 0.536 af, Atten= 62%, Lag= 6.8 min Primary = 4.32 cfs @ 12.08 hrs, Volume= 0.536 af Routed to Link 9 : Pre-Dev P01-6 Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 754.03' @ 12.08 hrs Surf.Area= 9,638 sf Storage= 6,307 cf Plug-Flow detention time= 43.8 min calculated for 0.536 of(100% of inflow) Center-of-Mass det. time= 45.0 min ( 903.4 - 858.3 ) Volume Invert Avail.Storage Storage Description _ #1 753.00' 65,286 cf Ex Volume - Design (Pyramidal)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area _ (feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft) 753.00 3,100 0 0 3,100 754.00 9,600 6,052 6,052 9,607 756.00 12,700 22,228 28,280 12,820 758.00 16,100 28,733 57,012 16,352 758.50 17,000 8,274 65,286 17,288 Device Routing Invert Outlet Devices #1 Primary 753.00' 24.0" Round RCP_Round 24" L= 53.0' RCP, square edge headwall, Ke= 0.500 Inlet/Outlet Invert= 753.00' / 752.71' S= 0.0055 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Primary 754.00' 1.8" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Primary 755.20' 13.3' long Sharp-Crested Rectangular Weir 2 End Contraction(s) lrimary OutFlow Max=4.29 cfs @ 12.08 hrs HW=754.02' TW=0.00' (Dynamic Tailwater) -1=RCP_Round 24" (Barrel Controls 4.29 cfs @ 3.87 fps) -2=Orifice/Grate (Orifice Controls 0.00 cfs @ 0.51 fps) -3=Sharp-Crested Rectangular Weir( Controls 0.00 cfs) Granite Quarry Type II 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 16 Pond 7: EX BMP6 - Dry Pond Hydrograph ❑ Inflow 111.44 cfs I I ❑Primary 11 / ± + InflowjAi-ela=[6.060 ad 10 I 1 H 17 Piak El�el.;=i54.b31, 9 1t‘re4171 c 8 • 1— H — H —1 H — I H HI —[ H —1 ± 1 IIIIIII II II II II c 6 i LL 5 4.32 cfs -H 4 4 - 1 3 // fi H t H 2 jd 1 I 1 `/ 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 17 Hydrograph for Pond 7: EX BMP6 - Dry Pond Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 753.00 0.00 2.50 0.00 0 753.00 0.00 5.00 0.00 0 753.00 0.00 7.50 0.00 0 753.00 0.00 10.00 0.00 0 753.00 0.00 12.50 1.12 3,870 753.75 2.43 15.00 0.37 1,144 753.30 0.41 17.50 0.24 873 753.24 0.26 20.00 0.17 726 753.20 0.19 22.50 0.15 662 753.19 0.16 25.00 0.00 356 753.11 0.05 27.50 0.00 160 753.05 0.01 30.00 0.00 104 753.03 0.00 32.50 0.00 78 753.02 0.00 35.00 0.00 63 753.02 0.00 37.50 0.00 53 753.02 0.00 40.00 0.00 46 753.01 0.00 42.50 0.00 40 753.01 0.00 45.00 0.00 36 753.01 0.00 47.50 0.00 33 753.01 0.00 50.00 0.00 30 753.01 0.00 52.50 0.00 28 753.01 0.00 55.00 0.00 26 753.01 0.00 57.50 0.00 24 753.01 0.00 60.00 0.00 23 753.01 0.00 62.50 0.00 21 753.01 0.00 65.00 0.00 20 753.01 0.00 67.50 0.00 19 753.01 0.00 70.00 0.00 18 753.01 0.00 72.50 0.00 17 753.01 0.00 75.00 0.00 17 753.01 0.00 77.50 0.00 16 753.01 0.00 80.00 0.00 15 753.00 0.00 82.50 0.00 15 753.00 0.00 85.00 0.00 14 753.00 0.00 87.50 0.00 14 753.00 0.00 90.00 0.00 13 753.00 0.00 92.50 0.00 13 753.00 0.00 95.00 0.00 13 753.00 0.00 97.50 0.00 12 753.00 0.00 100.00 0.00 12 753.00 0.00 102.50 0.00 12 753.00 0.00 105.00 0.00 11 753.00 0.00 107.50 0.00 11 753.00 0.00 110.00 0.00 11 753.00 0.00 112.50 0.00 10 753.00 0.00 115.00 0.00 10 753.00 0.00 117.50 0.00 10 753.00 0.00 120.00 0.00 10 753.00 0.00 Granite Quarry Type 11 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 18 Stage-Area-Storage for Pond 7: EX BMP6 - Dry Pond Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 753.00 3,100 0 758.30 16,637 61,923 753.10 3,589 334 758.40 16,818 63,596 753.20 4,114 719 758.50 17,000 65,286 753.30 4,674 1,158 753.40 5,271 1,655 753.50 5,903 2,213 753.60 6,571 2,837 753.70 7,274 3,529 753.80 8,014 4,293 753.90 8,789 5,133 754.00 9,600 6,052 754.10 9,745 7,019 754.20 9,891 8,001 754.30 10,037 8,997 754.40 10,185 10,008 754.50 10,334 11,034 754.60 10,485 12,075 754.70 10,636 13,131 754.80 10,788 14,202 754.90 10,941 15,289 755.00 11,096 16,391 755.10 11,251 17,508 755.20 11,408 18,641 755.30 11,566 19,790 755.40 11,725 20,954 755.50 11,884 22,135 755.60 12,045 23,331 755.70 12,207 24,544 755.80 12,371 25,773 755.90 12,535 27,018 756.00 12,700 28,280 756.10 12,860 29,558 756.20 13,022 30,852 756.30 13,184 32,162 756.40 13,348 33,489 756.50 13,512 34,832 756.60 13,678 36,191 756.70 13,844 37,567 756.80 14,012 38,960 756.90 14,180 40,370 757.00 14,350 41,796 757.10 14,520 43,239 757.20 14,692 44,700 757.30 14,864 46,178 757.40 15,038 47,673 757.50 15,212 49,185 757.60 15,388 50,715 757.70 15,564 52,263 757.80 15,742 53,828 757.90 15,920 55,411 758.00 16,100 57,012 758.10 16,278 58,631 758.20 16,457 60,268 Granite Quarry Type 11 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 19 Summary for Pond 16: Prop Modified BMP 6 - Wet Pond Inflow Area = 6.070 ac, 46.95% Impervious, Inflow Depth = 1.38" for 2-YR event Inflow = 15.06 cfs @ 11.96 hrs, Volume= 0.696 af Outflow = 0.43 cfs @ 15.01 hrs, Volume= 0.662 af, Atten= 97%, Lag= 183.0 min Primary = 0.43 cfs @ 15.01 hrs, Volume= 0.662 af Routed to Link 19 : Post-Dev P01-6 Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 755.78' @ 15.01 hrs Surf.Area= 12,732 sf Storage= 19,668 cf Plug-Flow detention time= 1,810.8 min calculated for 0.662 af(95% of inflow) Center-of-Mass det. time= 1,785.2 min ( 2,627.8 - 842.6 ) Volume Invert Avail.Storage Storage Description #1 754.00' 68,712 cf Temporary Pool (Pyramidal)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area _ (feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft) 754.00 8,870 0 0 8,870 755.00 11,632 10,220 10,220 11,661 759.00 17,834 58,492 68,712 18,157 Device Routing Invert Outlet Devices #1 Primary 754.00' 18.0" Round RCP Round 18" L= 27.2' RCP, sq.cut end projecting, Ke= 0.500 Inlet/Outlet Invert= 754.00' / 753.68' S= 0.0118 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.77 sf #2 Device 1 754.00' 1.5" Veil. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 755.60' 18.0" W x 27.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 757.85' 16.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) Primary OutFlow Max=0.43 cfs @ 15.01 hrs HW=755.78' TW=0.00' (Dynamic Tailwater) 4-1=RCP_Round 18" (Passes 0.43 cfs of 8.46 cfs potential flow) -2=Orifice/Grate (Orifice Controls 0.08 cfs @ 6.30 fps) -3=Orifice/Grate (Orifice Controls 0.36 cfs @ 1.35 fps) -4=Sharp-Crested Rectangular Weir( Controls 0.00 cfs) Granite Quarry Type II 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 20 Pond 16: Prop Modified BMP 6 - Wet Pond Hydrograph L I I 1 T 1e Inflow j 15.06 cfs D Primary 16 1 I 1 I 1141 —A i 6.1O O—a — 15= / p ,,� , C 14V T IPI�T E` � I8' 13V z 12V — 1StO a64= 1 9I V Ci 1 � 100V — — T — I 4 T I - T I I T I 9- / 1 _1 _L 1-1 T - 1 1 _L T 1 _L T 1 -1 T I gi 8/ " 71/ I ITTI 1T IT IT IT 1 I 6/ 5/ / TT fit I T T 17 IT 4V -H 1-1 T 1 - T // i 1 0.43 cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 21 Hydrograph for Pond 16: Prop Modified BMP 6 -Wet Pond Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 754.00 0.00 2.50 0.00 0 754.00 0.00 5.00 0.00 0 754.00 0.00 7.50 0.00 0 754.00 0.00 10.00 0.02 7 754.00 0.00 12.50 1.36 16,180 755.50 0.07 15.00 0.43 19,668 755.78 0.43 17.50 0.28 19,237 755.74 0.33 20.00 0.20 18,806 755.71 0.25 22.50 0.18 18,532 755.69 0.20 25.00 0.00 17,964 755.64 0.11 27.50 0.00 17,219 755.58 0.07 30.00 0.00 16,569 755.53 0.07 32.50 0.00 15,931 755.48 0.07 35.00 0.00 15,304 755.43 0.07 37.50 0.00 14,689 755.38 0.07 40.00 0.00 14,085 755.33 0.07 42.50 0.00 13,493 755.28 0.07 45.00 0.00 12,913 755.23 0.06 47.50 0.00 12,345 755.18 0.06 50.00 0.00 11,789 755.13 0.06 52.50 0.00 11,244 755.09 0.06 55.00 0.00 10,712 755.04 0.06 57.50 0.00 10,191 755.00 0.06 60.00 0.00 9,683 754.95 0.06 62.50 0.00 9,187 754.91 0.05 65.00 0.00 8,704 754.87 0.05 67.50 0.00 8,233 754.83 0.05 70.00 0.00 7,775 754.78 0.05 72.50 0.00 7,330 754.74 0.05 75.00 0.00 6,898 754.70 0.05 77.50 0.00 6,478 754.66 0.05 80.00 0.00 6,073 754.63 0.04 82.50 0.00 5,680 754.59 0.04 85.00 0.00 5,301 754.55 0.04 87.50 0.00 4,936 754.52 0.04 90.00 0.00 4,584 754.48 0.04 92.50 0.00 4,247 754.45 0.04 95.00 0.00 3,923 754.42 0.04 97.50 0.00 3,614 754.39 0.03 100.00 0.00 3,319 754.36 0.03 102.50 0.00 3,038 754.33 0.03 105.00 0.00 2,772 754.30 0.03 107.50 0.00 2,521 754.27 0.03 110.00 0.00 2,284 754.25 0.03 112.50 0.00 2,062 754.23 0.02 115.00 0.00 1,855 754.20 0.02 117.50 0.00 1,663 754.18 0.02 120.00 0.00 1,487 754.16 0.02 Granite Quarry Type 11 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 22 Stage-Area-Storage for Pond 16: Prop Modified BMP 6 -Wet Pond Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 754.00 8,870 0 756.65 14,030 31,360 754.05 8,999 447 756.70 14,107 32,064 754.10 9,129 900 756.75 14,183 32,771 754.15 9,260 1,360 756.80 14,260 33,482 754.20 9,392 1,826 756.85 14,336 34,197 754.25 9,525 2,299 756.90 14,413 34,916 754.30 9,659 2,779 756.95 14,491 35,638 754.35 9,794 3,265 757.00 14,568 36,365 754.40 9,930 3,758 757.05 14,646 37,095 754.45 10,067 4,258 757.10 14,723 37,829 754.50 10,204 4,765 757.15 14,801 38,568 754.55 10,343 5,278 757.20 14,880 39,310 754.60 10,482 5,799 757.25 14,958 40,055 754.65 10,623 6,327 757.30 15,037 40,805 754.70 10,764 6,861 757.35 15,116 41,559 754.75 10,906 7,403 757.40 15,195 42,317 754.80 11,050 7,952 757.45 15,274 43,079 754.85 11,194 8,508 757.50 15,354 43,844 754.90 11,339 9,071 757.55 15,433 44,614 754.95 11,485 9,642 757.60 15,513 45,388 755.00 11,632 10,220 757.65 15,593 46,165 755.05 11,701 10,803 757.70 15,674 46,947 755.10 11,771 11,390 757.75 15,754 47,733 755.15 11,841 11,980 757.80 15,835 48,522 755.20 11,911 12,574 757.85 15,916 49,316 755.25 11,981 13,171 757.90 15,997 50,114 755.30 12,051 13,772 757.95 16,078 50,916 755.35 12,122 14,377 758.00 16,160 51,722 755.40 12,193 14,984 758.05 16,241 52,532 755.45 12,264 15,596 758.10 16,323 53,346 755.50 12,335 16,211 758.15 16,406 54,164 755.55 12,406 16,829 758.20 16,488 54,987 755.60 12,478 17,451 758.25 16,571 55,813 755.65 12,550 18,077 758.30 16,653 56,644 755.70 12,622 18,706 758.35 16,736 57,478 755.75 12,694 19,339 758.40 16,820 58,317 755.80 12,767 19,976 758.45 16,903 59,160 755.85 12,839 20,616 758.50 16,987 60,008 755.90 12,912 21,260 758.55 17,070 60,859 755.95 12,985 21,907 758.60 17,154 61,715 756.00 13,059 22,558 758.65 17,239 62,574 756.05 13,132 23,213 758.70 17,323 63,438 756.10 13,206 23,872 758.75 17,408 64,307 756.15 13,280 24,534 758.80 17,493 65,179 756.20 13,354 25,200 758.85 17,578 66,056 756.25 13,428 25,869 758.90 17,663 66,937 756.30 13,503 26,542 758.95 17,748 67,822 756.35 13,578 27,219 759.00 17,834 68,712 756.40 13,653 27,900 756.45 13,728 28,585 756.50 13,803 29,273 756.55 13,879 29,965 756.60 13,954 30,661 Granite Quarry Type 11 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 23 Summary for Pond 17: BMP 6 PP Volume Invert Avail.Storage Storage Description #1 748.00' 24,668 cf Permanent Pool (Prismatic)Listed below (Recalc) #2 752.00' 3,859 cf Forebay (Prismatic)Listed below (Recalc) 28,527 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 748.00 2,152 0 0 749.00 2,734 2,443 2,443 754.00 6,156 22,225 24,668 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 752.00 1,145 0 0 754.00 2,714 3,859 3,859 Granite Quarry Type 11 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 24 Stage-Area-Storage for Pond 17: BMP 6 PP Elevation Storage Elevation Storage Elevation Storage (feet) (cubic-feet) (feet) (cubic-feet) (feet) (cubic-feet) 748.00 0 750.65 7,886 753.30 22,678 748.05 108 750.70 8,080 753.35 23,072 748.10 218 750.75 8,275 753.40 23,469 748.15 329 750.80 8,473 753.45 23,871 748.20 442 750.85 8,672 753.50 24,276 748.25 556 750.90 8,873 753.55 24,684 748.30 672 750.95 9,076 753.60 25,097 748.35 789 751.00 9,280 753.65 25,512 748.40 907 751.05 9,486 753.70 25,932 748.45 1,027 751.10 9,694 753.75 26,355 748.50 1,149 751.15 9,903 753.80 26,782 748.55 1,272 751.20 10,114 753.85 27,213 748.60 1,396 751.25 10,327 753.90 27,647 748.65 1,522 751.30 10,541 753.95 28,085 748.70 1,649 751.35 10,758 754.00 28,527 748.75 1,778 751.40 10,976 748.80 1,908 751.45 11,195 748.85 2,039 751.50 11,417 748.90 2,173 751.55 11,640 748.95 2,307 751.60 11,865 749.00 2,443 751.65 12,091 749.05 2,581 751.70 12,319 749.10 2,720 751.75 12,549 749.15 2,861 751.80 12,781 749.20 3,003 751.85 13,014 749.25 3,148 751.90 13,250 749.30 3,294 751.95 13,486 749.35 3,442 752.00 13,725 749.40 3,591 752.05 14,023 749.45 3,743 752.10 14,325 749.50 3,896 752.15 14,631 749.55 4,050 752.20 14,941 749.60 4,207 752.25 15,254 749.65 4,365 752.30 15,571 749.70 4,524 752.35 15,891 749.75 4,686 752.40 16,215 749.80 4,849 752.45 16,543 749.85 5,014 752.50 16,875 749.90 5,181 752.55 17,210 749.95 5,349 752.60 17,549 750.00 5,519 752.65 17,891 750.05 5,691 752.70 18,237 750.10 5,864 752.75 18,587 750.15 6,040 752.80 18,941 750.20 6,217 752.85 19,298 750.25 6,395 752.90 19,659 750.30 6,576 752.95 20,023 750.35 6,758 753.00 20,391 750.40 6,941 753.05 20,763 750.45 7,127 753.10 21,139 750.50 7,314 753.15 21,518 750.55 7,503 753.20 21,901 750.60 7,693 753.25 22,288 Granite Quarry Type 11 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 25 Summary for Link 9: Pre-Dev P01-6 Inflow Area = 6.040 ac, 0.00% Impervious, Inflow Depth = 1.07" for 2-YR event Inflow = 4.33 cfs @ 12.08 hrs, Volume= 0.538 af Primary = 4.33 cfs @ 12.08 hrs, Volume= 0.538 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 9: Pre-Dev P01-6 Hydrograph 7 1 I d rf ❑Inflow ` ❑Primary 4.33 cfs Inflow Area=6.040 ac 4 / 3 1 I I N o LL 2 I I 1 I 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 26 Hydrograph for Link 9: Pre-Dev P01-6 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.00 0.00 0.00 10.00 0.00 0.00 0.00 12.50 2.43 0.00 2.43 15.00 0.41 0.00 0.41 17.50 0.26 0.00 0.26 20.00 0.19 0.00 0.19 22.50 0.16 0.00 0.16 25.00 0.05 0.00 0.05 27.50 0.01 0.00 0.01 30.00 0.00 0.00 0.00 32.50 0.00 0.00 0.00 35.00 0.00 0.00 0.00 37.50 0.00 0.00 0.00 40.00 0.00 0.00 0.00 42.50 0.00 0.00 0.00 45.00 0.00 0.00 0.00 47.50 0.00 0.00 0.00 50.00 0.00 0.00 0.00 52.50 0.00 0.00 0.00 55.00 0.00 0.00 0.00 57.50 0.00 0.00 0.00 60.00 0.00 0.00 0.00 62.50 0.00 0.00 0.00 65.00 0.00 0.00 0.00 67.50 0.00 0.00 0.00 70.00 0.00 0.00 0.00 72.50 0.00 0.00 0.00 75.00 0.00 0.00 0.00 77.50 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 Granite Quarry Type II 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 27 Summary for Link 19: Post-Dev P01-6 Inflow Area = 6.110 ac, 46.64% Impervious, Inflow Depth > 1.30" for 2-YR event Inflow = 0.43 cfs @ 15.01 hrs, Volume= 0.664 af Primary = 0.43 cfs @ 15.01 hrs, Volume= 0.664 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 19: Post-Dev P01-6 Hydrograph 0.48/ n dA rf — 0 Inflow ` - - 0 Primary I 0.46Y/ / 0.43 cfs 4 ]— —[ I 1 - li'1oi %ok1" —6'I �C 0.44 °0 4 % I I I 0.34� 0.324 / I 0.33 o 0.26 / / Linimilismil L0.24� i 0.22 , " 0.2V -HIH IH —H I + ± 0.18 0.16 T 01 i 4 0.081/ o.oz= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 11 24-hr 2-YR Rainfall=3.34" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 28 Hydrograph for Link 19: Post-Dev P01-6 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.00 0.00 0.00 10.00 0.00 0.00 0.00 12.50 0.07 0.00 0.07 15.00 0.43 0.00 0.43 17.50 0.34 0.00 0.34 20.00 0.25 0.00 0.25 22.50 0.20 0.00 0.20 25.00 0.11 0.00 0.11 27.50 0.07 0.00 0.07 30.00 0.07 0.00 0.07 32.50 0.07 0.00 0.07 35.00 0.07 0.00 0.07 37.50 0.07 0.00 0.07 40.00 0.07 0.00 0.07 42.50 0.07 0.00 0.07 45.00 0.06 0.00 0.06 47.50 0.06 0.00 0.06 50.00 0.06 0.00 0.06 52.50 0.06 0.00 0.06 55.00 0.06 0.00 0.06 57.50 0.06 0.00 0.06 60.00 0.06 0.00 0.06 62.50 0.05 0.00 0.05 65.00 0.05 0.00 0.05 67.50 0.05 0.00 0.05 70.00 0.05 0.00 0.05 72.50 0.05 0.00 0.05 75.00 0.05 0.00 0.05 77.50 0.05 0.00 0.05 80.00 0.04 0.00 0.04 82.50 0.04 0.00 0.04 85.00 0.04 0.00 0.04 87.50 0.04 0.00 0.04 90.00 0.04 0.00 0.04 92.50 0.04 0.00 0.04 95.00 0.04 0.00 0.04 97.50 0.03 0.00 0.03 100.00 0.03 0.00 0.03 102.50 0.03 0.00 0.03 105.00 0.03 0.00 0.03 107.50 0.03 0.00 0.03 110.00 0.03 0.00 0.03 112.50 0.02 0.00 0.02 115.00 0.02 0.00 0.02 117.50 0.02 0.00 0.02 120.00 0.02 0.00 0.02 Granite Quarry Type 1124-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 29 Time span=0.00-120.00 hrs, dt=0.05 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment5: EX BMP6 Runoff Area=6.000 ac 0.00% Impervious Runoff Depth=2.89" Tc=5.0 min CN=73 Runoff=31.18 cfs 1.445 af Subcatchment8: EX BYP6 Runoff Area=0.040 ac 0.00% Impervious Runoff Depth=1.85" Tc=5.0 min CN=61 Runoff=0.13 cfs 0.006 af Subcatchment 14: BMP6 Runoff Area=6.070 ac 46.95% Impervious Runoff Depth=3.37" Tc=5.0 min CN=78 Runoff=36.35 cfs 1.704 af Subcatchment 18: BYP6 Runoff Area=0.040 ac 0.00% Impervious Runoff Depth=1.85" Tc=5.0 min CN=61 Runoff=0.13 cfs 0.006 af Pond 7: EX BMP6- Dry Pond Peak Elev=755.11' Storage=17,586 cf Inflow=31.18 cfs 1.445 af Outflow=13.71 cfs 1.445 af Pond 16: Prop Modified BMP 6 -Wet Pond Peak Elev=756.91' Storage=35,076 cf Inflow=36.35 cfs 1.704 af Outflow=7.33 cfs 1.668 af Pond 17: BMP 6 PP Peak Elev=0.00' Storage=0 cf Link 9: Pre-Dev POI-6 Inflow=13.77 cfs 1.451 af Primary=13.77 cfs 1.451 af Link 19: Post-Dev POI-6 Inflow=7.35 cfs 1.674 af Primary=7.35 cfs 1.674 af Total Runoff Area = 12.150 ac Runoff Volume = 3.161 af Average Runoff Depth = 3.12" 76.54% Pervious = 9.300 ac 23.46% Impervious = 2.850 ac Granite Quarry Type II 24-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 30 Summary for Subcatchment 5: EX BMP6 Runoff = 31.18 cfs @ 11.96 hrs, Volume= 1.445 af, Depth= 2.89" Routed to Pond 7 : EX BMP6 - Dry Pond Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR Rainfall=5.76" Area (ac) CN Description * 6.000 73 PER APPROVED PLANS 6.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 5: EX BMP6 �1 Hydrograph 34�J ~ + H t— H + 4 # 14 •Runoff 3230;/ 1.18 cfs 1 4 1— 1 4 L _yp�e IIt24-�ir 30 284/1_ L L L 1-215414-Rla+ilfc411-5.F7 " - 26/ �p.I.�� q /� ry� 24V I 7 7 IRW � ) �I Ales 6.O O AIv 20/ L L 7 L V14m1e -1.144W - 18< 4-1 4 _ ncr IrjT p '1 8-17 0 16/ �/ c=5-O- rnm - LL14 / L L L LI L 1 1 64L - 12V 101_ I ILL L 1_ IL L 1 1 L 1_ 4 8V / 6/T / _ 17 4 7 T T 1 —1 4_ 2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 31 Hydrograph for Subcatchment 5: EX BMP6 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.16 0.00 0.00 5.00 0.36 0.00 0.00 7.50 0.63 0.00 0.00 10.00 1.04 0.02 0.19 12.50 4.23 1.70 2.67 15.00 4.92 2.21 0.83 17.50 5.25 2.48 0.54 20.00 5.48 2.67 0.37 22.50 5.66 2.81 0.34 25.00 5.76 2.89 0.00 27.50 5.76 2.89 0.00 30.00 5.76 2.89 0.00 32.50 5.76 2.89 0.00 35.00 5.76 2.89 0.00 37.50 5.76 2.89 0.00 40.00 5.76 2.89 0.00 42.50 5.76 2.89 0.00 45.00 5.76 2.89 0.00 47.50 5.76 2.89 0.00 50.00 5.76 2.89 0.00 52.50 5.76 2.89 0.00 55.00 5.76 2.89 0.00 57.50 5.76 2.89 0.00 60.00 5.76 2.89 0.00 62.50 5.76 2.89 0.00 65.00 5.76 2.89 0.00 67.50 5.76 2.89 0.00 70.00 5.76 2.89 0.00 72.50 5.76 2.89 0.00 75.00 5.76 2.89 0.00 77.50 5.76 2.89 0.00 80.00 5.76 2.89 0.00 82.50 5.76 2.89 0.00 85.00 5.76 2.89 0.00 87.50 5.76 2.89 0.00 90.00 5.76 2.89 0.00 92.50 5.76 2.89 0.00 95.00 5.76 2.89 0.00 97.50 5.76 2.89 0.00 100.00 5.76 2.89 0.00 102.50 5.76 2.89 0.00 105.00 5.76 2.89 0.00 107.50 5.76 2.89 0.00 110.00 5.76 2.89 0.00 112.50 5.76 2.89 0.00 115.00 5.76 2.89 0.00 117.50 5.76 2.89 0.00 120.00 5.76 2.89 0.00 Granite Quarry Type II 24-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 32 Summary for Subcatchment 8: EX BYP6 Runoff = 0.13 cfs @ 11.96 hrs, Volume= 0.006 af, Depth= 1.85" Routed to Link 9 : Pre-Dev P01-6 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR Rainfall=5.76" Area (ac) CN Description 0.040 61 >75% Grass cover, Good, HSG B 0.040 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8: EX BYP6 Hydrograph 0 Runoff 0.14 j 0.13 cfs V'0.13 — ypIil24-hr CL12iZ0.11 /L 0.1i/ RUnOffQAte =0A14-06aaf 0.09 �J-1ncpff_LV T I- mI #•T 0 0.08. -R ��f I�thr1`I"57 1 � — �C� Own� o.os 0.05i/ 0.04/ 0.03� I/ - 0.02: 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 33 Hydrograph for Subcatchment 8: EX BYP6 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.16 0.00 0.00 5.00 0.36 0.00 0.00 7.50 0.63 0.00 0.00 10.00 1.04 0.00 0.00 12.50 4.23 0.93 0.01 15.00 4.92 1.32 0.00 17.50 5.25 1.52 0.00 20.00 5.48 1.67 0.00 22.50 5.66 1.78 0.00 25.00 5.76 1.85 0.00 27.50 5.76 1.85 0.00 30.00 5.76 1.85 0.00 32.50 5.76 1.85 0.00 35.00 5.76 1.85 0.00 37.50 5.76 1.85 0.00 40.00 5.76 1.85 0.00 42.50 5.76 1.85 0.00 45.00 5.76 1.85 0.00 47.50 5.76 1.85 0.00 50.00 5.76 1.85 0.00 52.50 5.76 1.85 0.00 55.00 5.76 1.85 0.00 57.50 5.76 1.85 0.00 60.00 5.76 1.85 0.00 62.50 5.76 1.85 0.00 65.00 5.76 1.85 0.00 67.50 5.76 1.85 0.00 70.00 5.76 1.85 0.00 72.50 5.76 1.85 0.00 75.00 5.76 1.85 0.00 77.50 5.76 1.85 0.00 80.00 5.76 1.85 0.00 82.50 5.76 1.85 0.00 85.00 5.76 1.85 0.00 87.50 5.76 1.85 0.00 90.00 5.76 1.85 0.00 92.50 5.76 1.85 0.00 95.00 5.76 1.85 0.00 97.50 5.76 1.85 0.00 100.00 5.76 1.85 0.00 102.50 5.76 1.85 0.00 105.00 5.76 1.85 0.00 107.50 5.76 1.85 0.00 110.00 5.76 1.85 0.00 112.50 5.76 1.85 0.00 115.00 5.76 1.85 0.00 117.50 5.76 1.85 0.00 120.00 5.76 1.85 0.00 Granite Quarry Type II 24-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 34 Summary for Subcatchment 14: BMP6 Runoff = 36.35 cfs @ 11.96 hrs, Volume= 1.704 af, Depth= 3.37" Routed to Pond 16 : Prop Modified BMP 6 - Wet Pond Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR Rainfall=5.76" Area (ac) CN Description 2.850 98 Impervious Areas, HSG B 3.220 61 >75% Grass cover, Good, HSG B 6.070 78 Weighted Average 3.220 53.05% Pervious Area 2.850 46.95% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 14: BMP6 Hydrograph 40/ f- t t l t - .Runoff 38V 36.35 cfs 34 I � I � -r 11 1 -r -r � -rpe 1 1 Mr 32 -r 1- 1 1 t —Irt 1-215=1n RI1f 11 .F141" 30 28 _ LRU nlftAI ei I6.O1O �c I = 26 / _ lume f — ° 18=� ! nrFrhV' ZI nun — LL16 1 � —L 61 5.Q L 12V I4 1- I - I I4 ]- I - 10 6V 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 35 Hydrograph for Subcatchment 14: BMP6 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.16 0.00 0.00 5.00 0.36 0.00 0.00 7.50 0.63 0.00 0.03 10.00 1.04 0.07 0.36 12.50 4.23 2.07 2.98 15.00 4.92 2.64 0.91 17.50 5.25 2.93 0.59 20.00 5.48 3.13 0.40 22.50 5.66 3.28 0.36 25.00 5.76 3.37 0.00 27.50 5.76 3.37 0.00 30.00 5.76 3.37 0.00 32.50 5.76 3.37 0.00 35.00 5.76 3.37 0.00 37.50 5.76 3.37 0.00 40.00 5.76 3.37 0.00 42.50 5.76 3.37 0.00 45.00 5.76 3.37 0.00 47.50 5.76 3.37 0.00 50.00 5.76 3.37 0.00 52.50 5.76 3.37 0.00 55.00 5.76 3.37 0.00 57.50 5.76 3.37 0.00 60.00 5.76 3.37 0.00 62.50 5.76 3.37 0.00 65.00 5.76 3.37 0.00 67.50 5.76 3.37 0.00 70.00 5.76 3.37 0.00 72.50 5.76 3.37 0.00 75.00 5.76 3.37 0.00 77.50 5.76 3.37 0.00 80.00 5.76 3.37 0.00 82.50 5.76 3.37 0.00 85.00 5.76 3.37 0.00 87.50 5.76 3.37 0.00 90.00 5.76 3.37 0.00 92.50 5.76 3.37 0.00 95.00 5.76 3.37 0.00 97.50 5.76 3.37 0.00 100.00 5.76 3.37 0.00 102.50 5.76 3.37 0.00 105.00 5.76 3.37 0.00 107.50 5.76 3.37 0.00 110.00 5.76 3.37 0.00 112.50 5.76 3.37 0.00 115.00 5.76 3.37 0.00 117.50 5.76 3.37 0.00 120.00 5.76 3.37 0.00 Granite Quarry Type II 24-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 36 Summary for Subcatchment 18: BYP6 Runoff = 0.13 cfs @ 11.96 hrs, Volume= 0.006 af, Depth= 1.85" Routed to Link 19 : Post-Dev P01-6 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR Rainfall=5.76" Area (ac) CN Description 0.040 61 >75% Grass cover, Good, HSG B 0.040 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 18: BYP6 Hydrograph 0 Runoff 0.14 j 0.13 cfs V'0.13 — ypIil24-hr CL12iZ0.11 /L 0.1i/ Ft nOffQAte =0A14-06aaf 0.09 �J-1ncpff_LV T I- mI #•T 0 0.08. -R ��f I�thr1`I"57 1 � — �C� Own� o.os 0.05i/ 0.04/ 0.03� I/ - 0.02: 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 37 Hydrograph for Subcatchment 18: BYP6 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.16 0.00 0.00 5.00 0.36 0.00 0.00 7.50 0.63 0.00 0.00 10.00 1.04 0.00 0.00 12.50 4.23 0.93 0.01 15.00 4.92 1.32 0.00 17.50 5.25 1.52 0.00 20.00 5.48 1.67 0.00 22.50 5.66 1.78 0.00 25.00 5.76 1.85 0.00 27.50 5.76 1.85 0.00 30.00 5.76 1.85 0.00 32.50 5.76 1.85 0.00 35.00 5.76 1.85 0.00 37.50 5.76 1.85 0.00 40.00 5.76 1.85 0.00 42.50 5.76 1.85 0.00 45.00 5.76 1.85 0.00 47.50 5.76 1.85 0.00 50.00 5.76 1.85 0.00 52.50 5.76 1.85 0.00 55.00 5.76 1.85 0.00 57.50 5.76 1.85 0.00 60.00 5.76 1.85 0.00 62.50 5.76 1.85 0.00 65.00 5.76 1.85 0.00 67.50 5.76 1.85 0.00 70.00 5.76 1.85 0.00 72.50 5.76 1.85 0.00 75.00 5.76 1.85 0.00 77.50 5.76 1.85 0.00 80.00 5.76 1.85 0.00 82.50 5.76 1.85 0.00 85.00 5.76 1.85 0.00 87.50 5.76 1.85 0.00 90.00 5.76 1.85 0.00 92.50 5.76 1.85 0.00 95.00 5.76 1.85 0.00 97.50 5.76 1.85 0.00 100.00 5.76 1.85 0.00 102.50 5.76 1.85 0.00 105.00 5.76 1.85 0.00 107.50 5.76 1.85 0.00 110.00 5.76 1.85 0.00 112.50 5.76 1.85 0.00 115.00 5.76 1.85 0.00 117.50 5.76 1.85 0.00 120.00 5.76 1.85 0.00 Granite Quarry Type 1124-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 38 Summary for Pond 7: EX BMP6 - Dry Pond Inflow Area = 6.000 ac, 0.00% Impervious, Inflow Depth = 2.89" for 25-YR event Inflow = 31.18 cfs @ 11.96 hrs, Volume= 1.445 af Outflow = 13.71 cfs @ 12.06 hrs, Volume= 1.445 af, Atten= 56%, Lag= 6.4 min Primary = 13.71 cfs @ 12.06 hrs, Volume= 1.445 af Routed to Link 9 : Pre-Dev P01-6 Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 755.11' @ 12.06 hrs Surf.Area= 11,262 sf Storage= 17,586 cf Plug-Flow detention time= 32.8 min calculated for 1.445 af(100% of inflow) Center-of-Mass det. time= 32.3 min ( 861.3 - 829.0 ) Volume Invert Avail.Storage Storage Description _ #1 753.00' 65,286 cf Ex Volume - Design (Pyramidal)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area _ (feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft) 753.00 3,100 0 0 3,100 754.00 9,600 6,052 6,052 9,607 756.00 12,700 22,228 28,280 12,820 758.00 16,100 28,733 57,012 16,352 758.50 17,000 8,274 65,286 17,288 Device Routing Invert Outlet Devices #1 Primary 753.00' 24.0" Round RCP Round 24" L= 53.0' RCP, square edge headwall, Ke= 0.500 Inlet/Outlet Invert= 753.00' / 752.71' S= 0.0055 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Primary 754.00' 1.8" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Primary 755.20' 13.3' long Sharp-Crested Rectangular Weir 2 End Contraction(s) primary OutFlow Max=13.56 cfs @ 12.06 hrs HW=755.09' TW=0.00' (Dynamic Tailwater) -1=RCP_Round 24" (Barrel Controls 13.48 cfs @ 5.10 fps) -2=Orifice/Grate (Orifice Controls 0.09 cfs @ 4.85 fps) -3=Sharp-Crested Rectangular Weir( Controls 0.00 cfs) Granite Quarry Type II 24-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 39 Pond 7: EX BMP6 - Dry Pond Hydrograph 4 1 -[ -H 1 0 Inflow 343/ '31.18 cfsl } ❑Primary l 32� Inikil r66=46.VVO ad 28V �z- 28� 1 -H — -H — -L — I P-aic E =i7SI5. 111— 26 / L _1 L 11 1 IStOia6- =i-7115t6HCjf- 247- / 22 / / 1 1 1 1 1 1 201/ ) _ � 18 _ IT IT IJ I � I- lz 14 13.71cfs LL - t 1 1 t t 1 —[ 11 1 12V / 10V '_ fi I ± 1 1 '7 I - I —I ± I 6V jp 1-1 + ' - 1 4 i 1 - - 1 o may/ !.,. //(. <�/ <�// / 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 40 Hydrograph for Pond 7: EX BMP6 - Dry Pond Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 753.00 0.00 2.50 0.00 0 753.00 0.00 5.00 0.00 0 753.00 0.00 7.50 0.00 0 753.00 0.00 10.00 0.19 381 753.11 0.06 12.50 2.67 9,002 754.30 6.53 15.00 0.83 1,896 753.44 0.91 17.50 0.54 1,396 753.35 0.57 20.00 0.37 1,130 753.29 0.40 22.50 0.34 1,024 753.27 0.34 25.00 0.00 452 753.13 0.08 27.50 0.00 177 753.05 0.01 30.00 0.00 111 753.03 0.00 32.50 0.00 82 753.03 0.00 35.00 0.00 65 753.02 0.00 37.50 0.00 54 753.02 0.00 40.00 0.00 47 753.01 0.00 42.50 0.00 41 753.01 0.00 45.00 0.00 37 753.01 0.00 47.50 0.00 33 753.01 0.00 50.00 0.00 30 753.01 0.00 52.50 0.00 28 753.01 0.00 55.00 0.00 26 753.01 0.00 57.50 0.00 24 753.01 0.00 60.00 0.00 23 753.01 0.00 62.50 0.00 22 753.01 0.00 65.00 0.00 20 753.01 0.00 67.50 0.00 19 753.01 0.00 70.00 0.00 18 753.01 0.00 72.50 0.00 18 753.01 0.00 75.00 0.00 17 753.01 0.00 77.50 0.00 16 753.01 0.00 80.00 0.00 16 753.00 0.00 82.50 0.00 15 753.00 0.00 85.00 0.00 14 753.00 0.00 87.50 0.00 14 753.00 0.00 90.00 0.00 13 753.00 0.00 92.50 0.00 13 753.00 0.00 95.00 0.00 13 753.00 0.00 97.50 0.00 12 753.00 0.00 100.00 0.00 12 753.00 0.00 102.50 0.00 12 753.00 0.00 105.00 0.00 11 753.00 0.00 107.50 0.00 11 753.00 0.00 110.00 0.00 11 753.00 0.00 112.50 0.00 10 753.00 0.00 115.00 0.00 10 753.00 0.00 117.50 0.00 10 753.00 0.00 120.00 0.00 10 753.00 0.00 Granite Quarry Type 1124-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 41 Stage-Area-Storage for Pond 7: EX BMP6 - Dry Pond Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 753.00 3,100 0 758.30 16,637 61,923 753.10 3,589 334 758.40 16,818 63,596 753.20 4,114 719 758.50 17,000 65,286 753.30 4,674 1,158 753.40 5,271 1,655 753.50 5,903 2,213 753.60 6,571 2,837 753.70 7,274 3,529 753.80 8,014 4,293 753.90 8,789 5,133 754.00 9,600 6,052 754.10 9,745 7,019 754.20 9,891 8,001 754.30 10,037 8,997 754.40 10,185 10,008 754.50 10,334 11,034 754.60 10,485 12,075 754.70 10,636 13,131 754.80 10,788 14,202 754.90 10,941 15,289 755.00 11,096 16,391 755.10 11,251 17,508 755.20 11,408 18,641 755.30 11,566 19,790 755.40 11,725 20,954 755.50 11,884 22,135 755.60 12,045 23,331 755.70 12,207 24,544 755.80 12,371 25,773 755.90 12,535 27,018 756.00 12,700 28,280 756.10 12,860 29,558 756.20 13,022 30,852 756.30 13,184 32,162 756.40 13,348 33,489 756.50 13,512 34,832 756.60 13,678 36,191 756.70 13,844 37,567 756.80 14,012 38,960 756.90 14,180 40,370 757.00 14,350 41,796 757.10 14,520 43,239 757.20 14,692 44,700 757.30 14,864 46,178 757.40 15,038 47,673 757.50 15,212 49,185 757.60 15,388 50,715 757.70 15,564 52,263 757.80 15,742 53,828 757.90 15,920 55,411 758.00 16,100 57,012 758.10 16,278 58,631 758.20 16,457 60,268 Granite Quarry Type 1124-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 42 Summary for Pond 16: Prop Modified BMP 6 - Wet Pond Inflow Area = 6.070 ac, 46.95% Impervious, Inflow Depth = 3.37" for 25-YR event Inflow = 36.35 cfs @ 11.96 hrs, Volume= 1.704 af Outflow = 7.33 cfs @ 12.12 hrs, Volume= 1.668 af, Atten= 80%, Lag= 10.0 min Primary = 7.33 cfs @ 12.12 hrs, Volume= 1.668 af Routed to Link 19 : Post-Dev P01-6 Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 756.91' @ 12.12 hrs Surf.Area= 14,430 sf Storage= 35,076 cf Plug-Flow detention time= 768.9 min calculated for 1.668 af(98% of inflow) Center-of-Mass det. time= 756.3 min ( 1,573.1 - 816.9 ) Volume Invert Avail.Storage Storage Description _ #1 754.00' 68,712 cf Temporary Pool (Pyramidal)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area _ (feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft) 754.00 8,870 0 0 8,870 755.00 11,632 10,220 10,220 11,661 759.00 17,834 58,492 68,712 18,157 Device Routing Invert Outlet Devices #1 Primary 754.00' 18.0" Round RCP_Round 18" L= 27.2' RCP, sq.cut end projecting, Ke= 0.500 Inlet/Outlet Invert= 754.00' / 753.68' S= 0.0118 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.77 sf #2 Device 1 754.00' 1.5" Veil. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 755.60' 18.0" W x 27.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 757.85' 16.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) Primary OutFlow Max=7.25 cfs @ 12.12 hrs HW=756.90' TW=0.00' (Dynamic Tailwater) 4-1=RCP_Round 18" (Passes 7.25 cfs of 12.48 cfs potential flow) -2=Orifice/Grate (Orifice Controls 0.10 cfs @ 8.11 fps) -3=Orifice/Grate (Orifice Controls 7.15 cfs @ 3.66 fps) -4=Sharp-Crested Rectangular Weir( Controls 0.00 cfs) Granite Quarry Type II 24-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 43 Pond 16: Prop Modified BMP 6 - Wet Pond Hydrograph I I I T T T 40- II Inflow 36.35 cfs _ /� ElPrimary 36" ' I I _ t _ t I-�I ��L . ���+++.IV//_�V - 34V z 11: ai El-56. 111 32v 30V 1 1 1 4 — I V toi-a i=-5!0- 61-C 28_„ 26V z 1— I - I I + 4 4 -[ 24v F 22 / c201/ z I— I —[ fi 1 �t ± fi " 16V z I— t 1 I t 4 - —[ 14V / _ _ _ 12 — — — — 10-V 7.33 cfs 8Y l TI —[ -H - 4 - —[ 1 6I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 44 Hydrograph for Pond 16: Prop Modified BMP 6 -Wet Pond Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 754.00 0.00 2.50 0.00 0 754.00 0.00 5.00 0.00 0 754.00 0.00 7.50 0.03 24 754.00 0.00 10.00 0.36 1,382 754.15 0.02 12.50 2.98 31,989 756.69 5.61 15.00 0.91 22,330 755.98 1.22 17.50 0.59 20,643 755.85 0.69 20.00 0.40 19,880 755.79 0.48 22.50 0.36 19,478 755.76 0.39 25.00 0.00 18,486 755.68 0.19 27.50 0.00 17,479 755.60 0.07 30.00 0.00 16,825 755.55 0.07 32.50 0.00 16,182 755.50 0.07 35.00 0.00 15,551 755.45 0.07 37.50 0.00 14,931 755.40 0.07 40.00 0.00 14,323 755.35 0.07 42.50 0.00 13,726 755.30 0.07 45.00 0.00 13,141 755.25 0.06 47.50 0.00 12,568 755.20 0.06 50.00 0.00 12,007 755.15 0.06 52.50 0.00 11,458 755.11 0.06 55.00 0.00 10,921 755.06 0.06 57.50 0.00 10,396 755.02 0.06 60.00 0.00 9,883 754.97 0.06 62.50 0.00 9,382 754.93 0.05 65.00 0.00 8,894 754.88 0.05 67.50 0.00 8,418 754.84 0.05 70.00 0.00 7,955 754.80 0.05 72.50 0.00 7,505 754.76 0.05 75.00 0.00 7,067 754.72 0.05 77.50 0.00 6,643 754.68 0.05 80.00 0.00 6,232 754.64 0.04 82.50 0.00 5,834 754.60 0.04 85.00 0.00 5,449 754.57 0.04 87.50 0.00 5,079 754.53 0.04 90.00 0.00 4,722 754.50 0.04 92.50 0.00 4,379 754.46 0.04 95.00 0.00 4,050 754.43 0.04 97.50 0.00 3,735 754.40 0.03 100.00 0.00 3,434 754.37 0.03 102.50 0.00 3,148 754.34 0.03 105.00 0.00 2,876 754.31 0.03 107.50 0.00 2,618 754.28 0.03 110.00 0.00 2,376 754.26 0.03 112.50 0.00 2,148 754.23 0.02 115.00 0.00 1,935 754.21 0.02 117.50 0.00 1,737 754.19 0.02 120.00 0.00 1,555 754.17 0.02 Granite Quarry Type 1124-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 45 Stage-Area-Storage for Pond 16: Prop Modified BMP 6 -Wet Pond Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 754.00 8,870 0 756.65 14,030 31,360 754.05 8,999 447 756.70 14,107 32,064 754.10 9,129 900 756.75 14,183 32,771 754.15 9,260 1,360 756.80 14,260 33,482 754.20 9,392 1,826 756.85 14,336 34,197 754.25 9,525 2,299 756.90 14,413 34,916 754.30 9,659 2,779 756.95 14,491 35,638 754.35 9,794 3,265 757.00 14,568 36,365 754.40 9,930 3,758 757.05 14,646 37,095 754.45 10,067 4,258 757.10 14,723 37,829 754.50 10,204 4,765 757.15 14,801 38,568 754.55 10,343 5,278 757.20 14,880 39,310 754.60 10,482 5,799 757.25 14,958 40,055 754.65 10,623 6,327 757.30 15,037 40,805 754.70 10,764 6,861 757.35 15,116 41,559 754.75 10,906 7,403 757.40 15,195 42,317 754.80 11,050 7,952 757.45 15,274 43,079 754.85 11,194 8,508 757.50 15,354 43,844 754.90 11,339 9,071 757.55 15,433 44,614 754.95 11,485 9,642 757.60 15,513 45,388 755.00 11,632 10,220 757.65 15,593 46,165 755.05 11,701 10,803 757.70 15,674 46,947 755.10 11,771 11,390 757.75 15,754 47,733 755.15 11,841 11,980 757.80 15,835 48,522 755.20 11,911 12,574 757.85 15,916 49,316 755.25 11,981 13,171 757.90 15,997 50,114 755.30 12,051 13,772 757.95 16,078 50,916 755.35 12,122 14,377 758.00 16,160 51,722 755.40 12,193 14,984 758.05 16,241 52,532 755.45 12,264 15,596 758.10 16,323 53,346 755.50 12,335 16,211 758.15 16,406 54,164 755.55 12,406 16,829 758.20 16,488 54,987 755.60 12,478 17,451 758.25 16,571 55,813 755.65 12,550 18,077 758.30 16,653 56,644 755.70 12,622 18,706 758.35 16,736 57,478 755.75 12,694 19,339 758.40 16,820 58,317 755.80 12,767 19,976 758.45 16,903 59,160 755.85 12,839 20,616 758.50 16,987 60,008 755.90 12,912 21,260 758.55 17,070 60,859 755.95 12,985 21,907 758.60 17,154 61,715 756.00 13,059 22,558 758.65 17,239 62,574 756.05 13,132 23,213 758.70 17,323 63,438 756.10 13,206 23,872 758.75 17,408 64,307 756.15 13,280 24,534 758.80 17,493 65,179 756.20 13,354 25,200 758.85 17,578 66,056 756.25 13,428 25,869 758.90 17,663 66,937 756.30 13,503 26,542 758.95 17,748 67,822 756.35 13,578 27,219 759.00 17,834 68,712 756.40 13,653 27,900 756.45 13,728 28,585 756.50 13,803 29,273 756.55 13,879 29,965 756.60 13,954 30,661 Granite Quarry Type 1124-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 46 Summary for Pond 17: BMP 6 PP Volume Invert Avail.Storage Storage Description #1 748.00' 24,668 cf Permanent Pool (Prismatic)Listed below (Recalc) #2 752.00' 3,859 cf Forebay (Prismatic)Listed below (Recalc) 28,527 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 748.00 2,152 0 0 749.00 2,734 2,443 2,443 754.00 6,156 22,225 24,668 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 752.00 1,145 0 0 754.00 2,714 3,859 3,859 Granite Quarry Type 1124-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 47 Stage-Area-Storage for Pond 17: BMP 6 PP Elevation Storage Elevation Storage Elevation Storage (feet) (cubic-feet) (feet) (cubic-feet) (feet) (cubic-feet) 748.00 0 750.65 7,886 753.30 22,678 748.05 108 750.70 8,080 753.35 23,072 748.10 218 750.75 8,275 753.40 23,469 748.15 329 750.80 8,473 753.45 23,871 748.20 442 750.85 8,672 753.50 24,276 748.25 556 750.90 8,873 753.55 24,684 748.30 672 750.95 9,076 753.60 25,097 748.35 789 751.00 9,280 753.65 25,512 748.40 907 751.05 9,486 753.70 25,932 748.45 1,027 751.10 9,694 753.75 26,355 748.50 1,149 751.15 9,903 753.80 26,782 748.55 1,272 751.20 10,114 753.85 27,213 748.60 1,396 751.25 10,327 753.90 27,647 748.65 1,522 751.30 10,541 753.95 28,085 748.70 1,649 751.35 10,758 754.00 28,527 748.75 1,778 751.40 10,976 748.80 1,908 751.45 11,195 748.85 2,039 751.50 11,417 748.90 2,173 751.55 11,640 748.95 2,307 751.60 11,865 749.00 2,443 751.65 12,091 749.05 2,581 751.70 12,319 749.10 2,720 751.75 12,549 749.15 2,861 751.80 12,781 749.20 3,003 751.85 13,014 749.25 3,148 751.90 13,250 749.30 3,294 751.95 13,486 749.35 3,442 752.00 13,725 749.40 3,591 752.05 14,023 749.45 3,743 752.10 14,325 749.50 3,896 752.15 14,631 749.55 4,050 752.20 14,941 749.60 4,207 752.25 15,254 749.65 4,365 752.30 15,571 749.70 4,524 752.35 15,891 749.75 4,686 752.40 16,215 749.80 4,849 752.45 16,543 749.85 5,014 752.50 16,875 749.90 5,181 752.55 17,210 749.95 5,349 752.60 17,549 750.00 5,519 752.65 17,891 750.05 5,691 752.70 18,237 750.10 5,864 752.75 18,587 750.15 6,040 752.80 18,941 750.20 6,217 752.85 19,298 750.25 6,395 752.90 19,659 750.30 6,576 752.95 20,023 750.35 6,758 753.00 20,391 750.40 6,941 753.05 20,763 750.45 7,127 753.10 21,139 750.50 7,314 753.15 21,518 750.55 7,503 753.20 21,901 750.60 7,693 753.25 22,288 Granite Quarry Type II 24-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 48 Summary for Link 9: Pre-Dev P01-6 Inflow Area = 6.040 ac, 0.00% Impervious, Inflow Depth = 2.88" for 25-YR event Inflow = 13.77 cfs @ 12.06 hrs, Volume= 1.451 af Primary = 13.77 cfs @ 12.06 hrs, Volume= 1.451 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 9: Pre-Dev P01-6 Hydrographl —I T I —[ -H I —I + ❑ Inflow 11'A 77 rfri 1a� 13.77 cfs � �ov�i4 - a .1O4O-Lac ❑Primary 12/ 11V I-1 —I 4 — 14 I - I —I C I 10Y ' 9V - _I $ / r I I rt 7 / ' 5/ I I 3/ 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 49 Hydrograph for Link 9: Pre-Dev P01-6 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.00 0.00 0.00 10.00 0.06 0.00 0.06 12.50 6.55 0.00 6.55 15.00 0.92 0.00 0.92 17.50 0.57 0.00 0.57 20.00 0.40 0.00 0.40 22.50 0.34 0.00 0.34 25.00 0.08 0.00 0.08 27.50 0.01 0.00 0.01 30.00 0.00 0.00 0.00 32.50 0.00 0.00 0.00 35.00 0.00 0.00 0.00 37.50 0.00 0.00 0.00 40.00 0.00 0.00 0.00 42.50 0.00 0.00 0.00 45.00 0.00 0.00 0.00 47.50 0.00 0.00 0.00 50.00 0.00 0.00 0.00 52.50 0.00 0.00 0.00 55.00 0.00 0.00 0.00 57.50 0.00 0.00 0.00 60.00 0.00 0.00 0.00 62.50 0.00 0.00 0.00 65.00 0.00 0.00 0.00 67.50 0.00 0.00 0.00 70.00 0.00 0.00 0.00 72.50 0.00 0.00 0.00 75.00 0.00 0.00 0.00 77.50 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 Granite Quarry Type 1124-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 50 Summary for Link 19: Post-Dev P01-6 Inflow Area = 6.110 ac, 46.64% Impervious, Inflow Depth > 3.29" for 25-YR event Inflow = 7.35 cfs @ 12.12 hrs, Volume= 1.674 af Primary = 7.35 cfs @ 12.12 hrs, Volume= 1.674 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 19: Post-Dev P01-6 Hydrograph ti 7 'lq rf ❑Inflow 7.35 cfs �— ❑Primary Inflow Area=6.110 ac 5- 0 4- LL = I I 2 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 25-YR Rainfall=5.76" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 51 Hydrograph for Link 19: Post-Dev P01-6 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.00 0.00 0.00 10.00 0.02 0.00 0.02 12.50 5.62 0.00 5.62 15.00 1.22 0.00 1.22 17.50 0.69 0.00 0.69 20.00 0.49 0.00 0.49 22.50 0.39 0.00 0.39 25.00 0.19 0.00 0.19 27.50 0.07 0.00 0.07 30.00 0.07 0.00 0.07 32.50 0.07 0.00 0.07 35.00 0.07 0.00 0.07 37.50 0.07 0.00 0.07 40.00 0.07 0.00 0.07 42.50 0.07 0.00 0.07 45.00 0.06 0.00 0.06 47.50 0.06 0.00 0.06 50.00 0.06 0.00 0.06 52.50 0.06 0.00 0.06 55.00 0.06 0.00 0.06 57.50 0.06 0.00 0.06 60.00 0.06 0.00 0.06 62.50 0.05 0.00 0.05 65.00 0.05 0.00 0.05 67.50 0.05 0.00 0.05 70.00 0.05 0.00 0.05 72.50 0.05 0.00 0.05 75.00 0.05 0.00 0.05 77.50 0.05 0.00 0.05 80.00 0.04 0.00 0.04 82.50 0.04 0.00 0.04 85.00 0.04 0.00 0.04 87.50 0.04 0.00 0.04 90.00 0.04 0.00 0.04 92.50 0.04 0.00 0.04 95.00 0.04 0.00 0.04 97.50 0.03 0.00 0.03 100.00 0.03 0.00 0.03 102.50 0.03 0.00 0.03 105.00 0.03 0.00 0.03 107.50 0.03 0.00 0.03 110.00 0.03 0.00 0.03 112.50 0.02 0.00 0.02 115.00 0.02 0.00 0.02 117.50 0.02 0.00 0.02 120.00 0.02 0.00 0.02 Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 52 Time span=0.00-120.00 hrs, dt=0.05 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment5: EX BMP6 Runoff Area=6.000 ac 0.00% Impervious Runoff Depth=4.12" Tc=5.0 min CN=73 Runoff=44.03 cfs 2.058 af Subcatchment8: EX BYP6 Runoff Area=0.040 ac 0.00% Impervious Runoff Depth=2.85" Tc=5.0 min CN=61 Runoff=0.21 cfs 0.010 af Subcatchment 14: BMP6 Runoff Area=6.070 ac 46.95% Impervious Runoff Depth=4.67" Tc=5.0 min CN=78 Runoff=49.69 cfs 2.360 af Subcatchment 18: BYP6 Runoff Area=0.040 ac 0.00% Impervious Runoff Depth=2.85" Tc=5.0 min CN=61 Runoff=0.21 cfs 0.010 af Pond 7: EX BMP6- Dry Pond Peak Elev=755.58' Storage=23,109 cf Inflow=44.03 cfs 2.058 af Outflow=27.07 cfs 2.058 af Pond 16: Prop Modified BMP 6 -Wet Pond Peak Elev=757.68' Storage=46,696 cf Inflow=49.69 cfs 2.360 af Outflow=14.58 cfs 2.324 af Pond 17: BMP 6 PP Peak Elev=0.00' Storage=0 cf Link 9: Pre-Dev P0I-6 Inflow=27.18 cfs 2.068 af Primary=27.18 cfs 2.068 af Link 19: Post-Dev P01-6 Inflow=14.64 cfs 2.333 af Primary=14.64 cfs 2.333 af Total Runoff Area = 12.150 ac Runoff Volume = 4.438 af Average Runoff Depth = 4.38" 76.54% Pervious = 9.300 ac 23.46% Impervious = 2.850 ac Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 53 Summary for Subcatchment 5: EX BMP6 Runoff = 44.03 cfs @ 11.96 hrs, Volume= 2.058 af, Depth= 4.12" Routed to Pond 7 : EX BMP6 - Dry Pond Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR Rainfall=7.21" Area (ac) CN Description * 6.000 73 PER APPROVED PLANS 6.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 5: EX BMP6 Hydrograph 48 ■Runoff 46=/. 44.03 cfs 44 � IIp r 42 I 38 � / / H 1H- H -HH- 1 iOI YFRai�fll7. �� 34 IRua ffAI a I6.QIIQ is - 32 30W I ± V$I Ie • � �f = w 28V :/ !1-L!nr11:7Ph7&17' 3 24i , n LL 22 — — c�5$ min — 20 fi H fi t641j=113 14 � � 1 4 I— I - I 4 � I - — �14= � � 12 " 4 (� 20 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 54 Hydrograph for Subcatchment 5: EX BMP6 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.20 0.00 0.00 5.00 0.45 0.00 0.00 7.50 0.79 0.00 0.02 10.00 1.31 0.07 0.41 12.50 5.30 2.52 3.64 15.00 6.15 3.22 1.11 17.50 6.57 3.57 0.72 20.00 6.86 3.82 0.49 22.50 7.09 4.01 0.44 25.00 7.21 4.12 0.00 27.50 7.21 4.12 0.00 30.00 7.21 4.12 0.00 32.50 7.21 4.12 0.00 35.00 7.21 4.12 0.00 37.50 7.21 4.12 0.00 40.00 7.21 4.12 0.00 42.50 7.21 4.12 0.00 45.00 7.21 4.12 0.00 47.50 7.21 4.12 0.00 50.00 7.21 4.12 0.00 52.50 7.21 4.12 0.00 55.00 7.21 4.12 0.00 57.50 7.21 4.12 0.00 60.00 7.21 4.12 0.00 62.50 7.21 4.12 0.00 65.00 7.21 4.12 0.00 67.50 7.21 4.12 0.00 70.00 7.21 4.12 0.00 72.50 7.21 4.12 0.00 75.00 7.21 4.12 0.00 77.50 7.21 4.12 0.00 80.00 7.21 4.12 0.00 82.50 7.21 4.12 0.00 85.00 7.21 4.12 0.00 87.50 7.21 4.12 0.00 90.00 7.21 4.12 0.00 92.50 7.21 4.12 0.00 95.00 7.21 4.12 0.00 97.50 7.21 4.12 0.00 100.00 7.21 4.12 0.00 102.50 7.21 4.12 0.00 105.00 7.21 4.12 0.00 107.50 7.21 4.12 0.00 110.00 7.21 4.12 0.00 112.50 7.21 4.12 0.00 115.00 7.21 4.12 0.00 117.50 7.21 4.12 0.00 120.00 7.21 4.12 0.00 Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 55 Summary for Subcatchment 8: EX BYP6 Runoff = 0.21 cfs @ 11.96 hrs, Volume= 0.010 af, Depth= 2.85" Routed to Link 9 : Pre-Dev P01-6 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR Rainfall=7.21" Area (ac) CN Description 0.040 61 >75% Grass cover, Good, HSG B 0.040 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8: EX BYP6 / Hydrograph o.23J 0 Runoff 0.225v 0.21 cfs 0.21L I4I4114 � pe��I24-hr 0:;$Y/C fi l rt rt '7 11 fi i-ab 4RItbmfall�7 .0 0.17 — — 0.16K- — 1 1 -J Rtinoff-Ate =0- 01401 arc 0.14 — 0.14� H IRLI •9 w 0.13 0.12 — lAuprID-;Pth=p7 LL o09 — in - -1 H I—I 4 — 1 -4 CLn 0.07 — fiI o.os 0.05 -r 0.04 V 0.02 I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 56 Hydrograph for Subcatchment 8: EX BYP6 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.20 0.00 0.00 5.00 0.45 0.00 0.00 7.50 0.79 0.00 0.00 10.00 1.31 0.00 0.00 12.50 5.30 1.55 0.02 15.00 6.15 2.11 0.01 17.50 6.57 2.40 0.00 20.00 6.86 2.60 0.00 22.50 7.09 2.76 0.00 25.00 7.21 2.85 0.00 27.50 7.21 2.85 0.00 30.00 7.21 2.85 0.00 32.50 7.21 2.85 0.00 35.00 7.21 2.85 0.00 37.50 7.21 2.85 0.00 40.00 7.21 2.85 0.00 42.50 7.21 2.85 0.00 45.00 7.21 2.85 0.00 47.50 7.21 2.85 0.00 50.00 7.21 2.85 0.00 52.50 7.21 2.85 0.00 55.00 7.21 2.85 0.00 57.50 7.21 2.85 0.00 60.00 7.21 2.85 0.00 62.50 7.21 2.85 0.00 65.00 7.21 2.85 0.00 67.50 7.21 2.85 0.00 70.00 7.21 2.85 0.00 72.50 7.21 2.85 0.00 75.00 7.21 2.85 0.00 77.50 7.21 2.85 0.00 80.00 7.21 2.85 0.00 82.50 7.21 2.85 0.00 85.00 7.21 2.85 0.00 87.50 7.21 2.85 0.00 90.00 7.21 2.85 0.00 92.50 7.21 2.85 0.00 95.00 7.21 2.85 0.00 97.50 7.21 2.85 0.00 100.00 7.21 2.85 0.00 102.50 7.21 2.85 0.00 105.00 7.21 2.85 0.00 107.50 7.21 2.85 0.00 110.00 7.21 2.85 0.00 112.50 7.21 2.85 0.00 115.00 7.21 2.85 0.00 117.50 7.21 2.85 0.00 120.00 7.21 2.85 0.00 Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 57 Summary for Subcatchment 14: BMP6 Runoff = 49.69 cfs @ 11.95 hrs, Volume= 2.360 af, Depth= 4.67" Routed to Pond 16 : Prop Modified BMP 6 - Wet Pond Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR Rainfall=7.21" Area (ac) CN Description * 2.850 98 Impervious Areas, HSG B 3.220 61 >75% Grass cover, Good, HSG B 6.070 78 Weighted Average 3.220 53.05% Pervious Area 2.850 46.95% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 14: BMP6 Hydrograph 55�/ fi Irt 1 rt 1— 11 •Runoff 5017 49.69 cfs T T 1 T T T �Typ�e II 24-hr I Y I 11010-'(I Rai�f�ll�7.�11" 40 -/ IRUnbffl Area=6.070 ad 351/ L L j_Rigurvfl Nf lume2. 60f 30 / 1 4 i_ ! nr11) p h '167' - 3 LL 251/ , c=5.0 m i n 201 T T GIN 7s 151/ 1- 11 fi rt SIT 1- 1 Irt ]— i 10-- ✓ T T T T F1 T 1 5-L/ I o 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 58 Hydrograph for Subcatchment 14: BMP6 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.20 0.00 0.00 5.00 0.45 0.00 0.00 7.50 0.79 0.02 0.12 10.00 1.31 0.15 0.62 12.50 5.30 2.97 3.96 15.00 6.15 3.72 1.20 17.50 6.57 4.09 0.77 20.00 6.86 4.35 0.53 22.50 7.09 4.55 0.47 25.00 7.21 4.67 0.00 27.50 7.21 4.67 0.00 30.00 7.21 4.67 0.00 32.50 7.21 4.67 0.00 35.00 7.21 4.67 0.00 37.50 7.21 4.67 0.00 40.00 7.21 4.67 0.00 42.50 7.21 4.67 0.00 45.00 7.21 4.67 0.00 47.50 7.21 4.67 0.00 50.00 7.21 4.67 0.00 52.50 7.21 4.67 0.00 55.00 7.21 4.67 0.00 57.50 7.21 4.67 0.00 60.00 7.21 4.67 0.00 62.50 7.21 4.67 0.00 65.00 7.21 4.67 0.00 67.50 7.21 4.67 0.00 70.00 7.21 4.67 0.00 72.50 7.21 4.67 0.00 75.00 7.21 4.67 0.00 77.50 7.21 4.67 0.00 80.00 7.21 4.67 0.00 82.50 7.21 4.67 0.00 85.00 7.21 4.67 0.00 87.50 7.21 4.67 0.00 90.00 7.21 4.67 0.00 92.50 7.21 4.67 0.00 95.00 7.21 4.67 0.00 97.50 7.21 4.67 0.00 100.00 7.21 4.67 0.00 102.50 7.21 4.67 0.00 105.00 7.21 4.67 0.00 107.50 7.21 4.67 0.00 110.00 7.21 4.67 0.00 112.50 7.21 4.67 0.00 115.00 7.21 4.67 0.00 117.50 7.21 4.67 0.00 120.00 7.21 4.67 0.00 Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 59 Summary for Subcatchment 18: BYP6 Runoff = 0.21 cfs @ 11.96 hrs, Volume= 0.010 af, Depth= 2.85" Routed to Link 19 : Post-Dev P01-6 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR Rainfall=7.21" Area (ac) CN Description 0.040 61 >75% Grass cover, Good, HSG B 0.040 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 18: BYP6 / Hydrograph o.23J 0 Runoff 0.225v 0.21 cfs 0.21L I4I4114 � pe24-hr 0:;$Y/C fi l rt rt '7 11 fi i-ab 4RItbmfall�7 .0 0.17 — — 0.16K- — 1 1 -J Rtinoff-Ate =0- 01401 arc 0.14 — 0.14� H IRLI •9 w 0.13 0.12 — lAuprID-;Pth=p7 LL o09 — in - -1 H I—I 4 — 1 -4 CLn 0.07 — fiI o.os 0.05 -r 0.04 V 0.02 I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 60 Hydrograph for Subcatchment 18: BYP6 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.20 0.00 0.00 5.00 0.45 0.00 0.00 7.50 0.79 0.00 0.00 10.00 1.31 0.00 0.00 12.50 5.30 1.55 0.02 15.00 6.15 2.11 0.01 17.50 6.57 2.40 0.00 20.00 6.86 2.60 0.00 22.50 7.09 2.76 0.00 25.00 7.21 2.85 0.00 27.50 7.21 2.85 0.00 30.00 7.21 2.85 0.00 32.50 7.21 2.85 0.00 35.00 7.21 2.85 0.00 37.50 7.21 2.85 0.00 40.00 7.21 2.85 0.00 42.50 7.21 2.85 0.00 45.00 7.21 2.85 0.00 47.50 7.21 2.85 0.00 50.00 7.21 2.85 0.00 52.50 7.21 2.85 0.00 55.00 7.21 2.85 0.00 57.50 7.21 2.85 0.00 60.00 7.21 2.85 0.00 62.50 7.21 2.85 0.00 65.00 7.21 2.85 0.00 67.50 7.21 2.85 0.00 70.00 7.21 2.85 0.00 72.50 7.21 2.85 0.00 75.00 7.21 2.85 0.00 77.50 7.21 2.85 0.00 80.00 7.21 2.85 0.00 82.50 7.21 2.85 0.00 85.00 7.21 2.85 0.00 87.50 7.21 2.85 0.00 90.00 7.21 2.85 0.00 92.50 7.21 2.85 0.00 95.00 7.21 2.85 0.00 97.50 7.21 2.85 0.00 100.00 7.21 2.85 0.00 102.50 7.21 2.85 0.00 105.00 7.21 2.85 0.00 107.50 7.21 2.85 0.00 110.00 7.21 2.85 0.00 112.50 7.21 2.85 0.00 115.00 7.21 2.85 0.00 117.50 7.21 2.85 0.00 120.00 7.21 2.85 0.00 Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 61 Summary for Pond 7: EX BMP6 - Dry Pond Inflow Area = 6.000 ac, 0.00% Impervious, Inflow Depth = 4.12" for 100-YR event Inflow = 44.03 cfs @ 11.96 hrs, Volume= 2.058 af Outflow = 27.07 cfs @ 12.04 hrs, Volume= 2.058 af, Atten= 39%, Lag= 5.0 min Primary = 27.07 cfs @ 12.04 hrs, Volume= 2.058 af Routed to Link 9 : Pre-Dev P01-6 Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 755.58' @ 12.04 hrs Surf.Area= 12,016 sf Storage= 23,109 cf Plug-Flow detention time= 28.0 min calculated for 2.057 af(100% of inflow) Center-of-Mass det. time= 28.8 min ( 847.6 - 818.9 ) Volume Invert Avail.Storage Storage Description _ #1 753.00' 65,286 cf Ex Volume - Design (Pyramidal)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area _ (feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft) 753.00 3,100 0 0 3,100 754.00 9,600 6,052 6,052 9,607 756.00 12,700 22,228 28,280 12,820 758.00 16,100 28,733 57,012 16,352 758.50 17,000 8,274 65,286 17,288 Device Routing Invert Outlet Devices #1 Primary 753.00' 24.0" Round RCP Round 24" L= 53.0' RCP, square edge headwall, Ke= 0.500 Inlet/Outlet Invert= 753.00' / 752.71' S= 0.0055 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Primary 754.00' 1.8" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Primary 755.20' 13.3' long Sharp-Crested Rectangular Weir 2 End Contraction(s) primary OutFlow Max=26.45 cfs @ 12.04 hrs HW=755.57' TW=0.00' (Dynamic Tailwater) -1=RCP_Round 24" (Barrel Controls 16.74 cfs @ 5.39 fps) -2=Orifice/Grate (Orifice Controls 0.10 cfs @ 5.88 fps) -3=Sharp-Crested Rectangular Weir(Weir Controls 9.61 cfs @ 1.98 fps) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 62 Pond 7: EX BMP6 - Dry Pond Hydrograph — 1 4 1 e Inflow 484v 1 44.03 cfs 1 D Primary 44 �r�f10- v ►�-e .00a 42� , Pa tFe ��5. 8 �40 / FI 38 _ 36 F 1 F F 1-1 + — 4 Sioi-age= 3,lib cJL �/ � 34= /- 3227 30 27.07 cfs F I F I - 1 1 r 28 - 24V �—°° 22'_ / 20 18= / 1 / 1 14 / . 12 10 f 1 —h 1 1_ 8� + 6 4= 2= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 63 Hydrograph for Pond 7: EX BMP6 - Dry Pond Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 753.00 0.00 2.50 0.00 0 753.00 0.00 5.00 0.00 0 753.00 0.00 7.50 0.02 8 753.00 0.00 10.00 0.41 876 753.24 0.26 12.50 3.64 11,261 754.52 8.47 15.00 1.11 2,313 753.52 1.22 17.50 0.72 1,675 753.40 0.76 20.00 0.49 1,340 753.34 0.53 22.50 0.44 1,212 753.31 0.45 25.00 0.00 493 753.14 0.09 27.50 0.00 182 753.06 0.01 30.00 0.00 113 753.04 0.00 32.50 0.00 83 753.03 0.00 35.00 0.00 66 753.02 0.00 37.50 0.00 55 753.02 0.00 40.00 0.00 47 753.01 0.00 42.50 0.00 41 753.01 0.00 45.00 0.00 37 753.01 0.00 47.50 0.00 33 753.01 0.00 50.00 0.00 31 753.01 0.00 52.50 0.00 28 753.01 0.00 55.00 0.00 26 753.01 0.00 57.50 0.00 24 753.01 0.00 60.00 0.00 23 753.01 0.00 62.50 0.00 22 753.01 0.00 65.00 0.00 20 753.01 0.00 67.50 0.00 19 753.01 0.00 70.00 0.00 19 753.01 0.00 72.50 0.00 18 753.01 0.00 75.00 0.00 17 753.01 0.00 77.50 0.00 16 753.01 0.00 80.00 0.00 16 753.01 0.00 82.50 0.00 15 753.00 0.00 85.00 0.00 14 753.00 0.00 87.50 0.00 14 753.00 0.00 90.00 0.00 13 753.00 0.00 92.50 0.00 13 753.00 0.00 95.00 0.00 13 753.00 0.00 97.50 0.00 12 753.00 0.00 100.00 0.00 12 753.00 0.00 102.50 0.00 12 753.00 0.00 105.00 0.00 11 753.00 0.00 107.50 0.00 11 753.00 0.00 110.00 0.00 11 753.00 0.00 112.50 0.00 10 753.00 0.00 115.00 0.00 10 753.00 0.00 117.50 0.00 10 753.00 0.00 120.00 0.00 10 753.00 0.00 Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 64 Stage-Area-Storage for Pond 7: EX BMP6 - Dry Pond Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 753.00 3,100 0 758.30 16,637 61,923 753.10 3,589 334 758.40 16,818 63,596 753.20 4,114 719 758.50 17,000 65,286 753.30 4,674 1,158 753.40 5,271 1,655 753.50 5,903 2,213 753.60 6,571 2,837 753.70 7,274 3,529 753.80 8,014 4,293 753.90 8,789 5,133 754.00 9,600 6,052 754.10 9,745 7,019 754.20 9,891 8,001 754.30 10,037 8,997 754.40 10,185 10,008 754.50 10,334 11,034 754.60 10,485 12,075 754.70 10,636 13,131 754.80 10,788 14,202 754.90 10,941 15,289 755.00 11,096 16,391 755.10 11,251 17,508 755.20 11,408 18,641 755.30 11,566 19,790 755.40 11,725 20,954 755.50 11,884 22,135 755.60 12,045 23,331 755.70 12,207 24,544 755.80 12,371 25,773 755.90 12,535 27,018 756.00 12,700 28,280 756.10 12,860 29,558 756.20 13,022 30,852 756.30 13,184 32,162 756.40 13,348 33,489 756.50 13,512 34,832 756.60 13,678 36,191 756.70 13,844 37,567 756.80 14,012 38,960 756.90 14,180 40,370 757.00 14,350 41,796 757.10 14,520 43,239 757.20 14,692 44,700 757.30 14,864 46,178 757.40 15,038 47,673 757.50 15,212 49,185 757.60 15,388 50,715 757.70 15,564 52,263 757.80 15,742 53,828 757.90 15,920 55,411 758.00 16,100 57,012 758.10 16,278 58,631 758.20 16,457 60,268 Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 65 Summary for Pond 16: Prop Modified BMP 6 - Wet Pond Inflow Area = 6.070 ac, 46.95% Impervious, Inflow Depth = 4.67" for 100-YR event Inflow = 49.69 cfs @ 11.95 hrs, Volume= 2.360 af Outflow = 14.58 cfs @ 12.09 hrs, Volume= 2.324 af, Atten= 71%, Lag= 8.3 min Primary = 14.58 cfs @ 12.09 hrs, Volume= 2.324 af Routed to Link 19 : Post-Dev P01-6 Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 757.68' @ 12.09 hrs Surf.Area= 15,648 sf Storage= 46,696 cf Plug-Flow detention time= 569.1 min calculated for 2.324 af(98% of inflow) Center-of-Mass det. time= 559.7 min ( 1,367.3 - 807.6 ) Volume Invert Avail.Storage Storage Description _ #1 754.00' 68,712 cf Temporary Pool (Pyramidal)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area _ (feet) (sq-ft) (cubic-feet) (cubic-feet) (sq-ft) 754.00 8,870 0 0 8,870 755.00 11,632 10,220 10,220 11,661 759.00 17,834 58,492 68,712 18,157 Device Routing Invert Outlet Devices #1 Primary 754.00' 18.0" Round RCP_Round 18" L= 27.2' RCP, sq.cut end projecting, Ke= 0.500 Inlet/Outlet Invert= 754.00' / 753.68' S= 0.0118 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.77 sf #2 Device 1 754.00' 1.5" Veil. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 755.60' 18.0" W x 27.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 757.85' 16.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) Primary OutFlow Max=14.54 cfs @ 12.09 hrs HW=757.68' TW=0.00' (Dynamic Tailwater) 4-1=RCP_Round 18" (Passes 14.54 cfs of 14.56 cfs potential flow) -2=Orifice/Grate (Orifice Controls 0.11 cfs @ 9.16 fps) -3=Orifice/Grate (Orifice Controls 14.43 cfs @ 4.63 fps) -4=Sharp-Crested Rectangular Weir( Controls 0.00 cfs) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 66 Pond 16: Prop Modified BMP 6 - Wet Pond Hydrograph + ❑ Inflow 55� 49.69 cfs - _❑Primary 50L/ 1 InlIovAi-e 16.0O0�d 451/ , I I I _ I _ 1 Ptak E-I = '&7- 8' 40 j 1S oka6e=46,696-c 351/ - 1- 4 I - I o 30� 1— —F fi fi fi 1 7 1 ° 25� LL 20/ 14.58 cfs ' 1 1 1 I 15-r i / 101 I I I J 51/ 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 67 Hydrograph for Pond 16: Prop Modified BMP 6 - Wet Pond Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 754.00 0.00 2.50 0.00 0 754.00 0.00 5.00 0.00 0 754.00 0.00 7.50 0.12 325 754.04 0.00 10.00 0.62 3,079 754.33 0.03 12.50 3.96 38,285 757.13 9.22 15.00 1.20 23,312 756.06 1.57 17.50 0.77 21,308 755.90 0.89 20.00 0.53 20,410 755.83 0.62 22.50 0.47 19,947 755.80 0.50 25.00 0.00 18,716 755.70 0.23 27.50 0.00 17,562 755.61 0.08 30.00 0.00 16,904 755.56 0.07 32.50 0.00 16,260 755.50 0.07 35.00 0.00 15,627 755.45 0.07 37.50 0.00 15,006 755.40 0.07 40.00 0.00 14,396 755.35 0.07 42.50 0.00 13,799 755.30 0.07 45.00 0.00 13,212 755.25 0.06 47.50 0.00 12,638 755.21 0.06 50.00 0.00 12,075 755.16 0.06 52.50 0.00 11,525 755.11 0.06 55.00 0.00 10,986 755.07 0.06 57.50 0.00 10,459 755.02 0.06 60.00 0.00 9,945 754.98 0.06 62.50 0.00 9,443 754.93 0.06 65.00 0.00 8,953 754.89 0.05 67.50 0.00 8,476 754.85 0.05 70.00 0.00 8,011 754.81 0.05 72.50 0.00 7,559 754.76 0.05 75.00 0.00 7,120 754.72 0.05 77.50 0.00 6,694 754.68 0.05 80.00 0.00 6,281 754.65 0.05 82.50 0.00 5,882 754.61 0.04 85.00 0.00 5,496 754.57 0.04 87.50 0.00 5,123 754.53 0.04 90.00 0.00 4,765 754.50 0.04 92.50 0.00 4,420 754.47 0.04 95.00 0.00 4,089 754.43 0.04 97.50 0.00 3,772 754.40 0.03 100.00 0.00 3,470 754.37 0.03 102.50 0.00 3,182 754.34 0.03 105.00 0.00 2,908 754.31 0.03 107.50 0.00 2,649 754.29 0.03 110.00 0.00 2,405 754.26 0.03 112.50 0.00 2,175 754.24 0.02 115.00 0.00 1,960 754.21 0.02 117.50 0.00 1,761 754.19 0.02 120.00 0.00 1,576 754.17 0.02 Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 68 Stage-Area-Storage for Pond 16: Prop Modified BMP 6 -Wet Pond Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 754.00 8,870 0 756.65 14,030 31,360 754.05 8,999 447 756.70 14,107 32,064 754.10 9,129 900 756.75 14,183 32,771 754.15 9,260 1,360 756.80 14,260 33,482 754.20 9,392 1,826 756.85 14,336 34,197 754.25 9,525 2,299 756.90 14,413 34,916 754.30 9,659 2,779 756.95 14,491 35,638 754.35 9,794 3,265 757.00 14,568 36,365 754.40 9,930 3,758 757.05 14,646 37,095 754.45 10,067 4,258 757.10 14,723 37,829 754.50 10,204 4,765 757.15 14,801 38,568 754.55 10,343 5,278 757.20 14,880 39,310 754.60 10,482 5,799 757.25 14,958 40,055 754.65 10,623 6,327 757.30 15,037 40,805 754.70 10,764 6,861 757.35 15,116 41,559 754.75 10,906 7,403 757.40 15,195 42,317 754.80 11,050 7,952 757.45 15,274 43,079 754.85 11,194 8,508 757.50 15,354 43,844 754.90 11,339 9,071 757.55 15,433 44,614 754.95 11,485 9,642 757.60 15,513 45,388 755.00 11,632 10,220 757.65 15,593 46,165 755.05 11,701 10,803 757.70 15,674 46,947 755.10 11,771 11,390 757.75 15,754 47,733 755.15 11,841 11,980 757.80 15,835 48,522 755.20 11,911 12,574 757.85 15,916 49,316 755.25 11,981 13,171 757.90 15,997 50,114 755.30 12,051 13,772 757.95 16,078 50,916 755.35 12,122 14,377 758.00 16,160 51,722 755.40 12,193 14,984 758.05 16,241 52,532 755.45 12,264 15,596 758.10 16,323 53,346 755.50 12,335 16,211 758.15 16,406 54,164 755.55 12,406 16,829 758.20 16,488 54,987 755.60 12,478 17,451 758.25 16,571 55,813 755.65 12,550 18,077 758.30 16,653 56,644 755.70 12,622 18,706 758.35 16,736 57,478 755.75 12,694 19,339 758.40 16,820 58,317 755.80 12,767 19,976 758.45 16,903 59,160 755.85 12,839 20,616 758.50 16,987 60,008 755.90 12,912 21,260 758.55 17,070 60,859 755.95 12,985 21,907 758.60 17,154 61,715 756.00 13,059 22,558 758.65 17,239 62,574 756.05 13,132 23,213 758.70 17,323 63,438 756.10 13,206 23,872 758.75 17,408 64,307 756.15 13,280 24,534 758.80 17,493 65,179 756.20 13,354 25,200 758.85 17,578 66,056 756.25 13,428 25,869 758.90 17,663 66,937 756.30 13,503 26,542 758.95 17,748 67,822 756.35 13,578 27,219 759.00 17,834 68,712 756.40 13,653 27,900 756.45 13,728 28,585 756.50 13,803 29,273 756.55 13,879 29,965 756.60 13,954 30,661 Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 69 Summary for Pond 17: BMP 6 PP Volume Invert Avail.Storage Storage Description #1 748.00' 24,668 cf Permanent Pool (Prismatic)Listed below (Recalc) #2 752.00' 3,859 cf Forebay (Prismatic)Listed below (Recalc) 28,527 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 748.00 2,152 0 0 749.00 2,734 2,443 2,443 754.00 6,156 22,225 24,668 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 752.00 1,145 0 0 754.00 2,714 3,859 3,859 Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 70 Stage-Area-Storage for Pond 17: BMP 6 PP Elevation Storage Elevation Storage Elevation Storage (feet) (cubic-feet) (feet) (cubic-feet) (feet) (cubic-feet) 748.00 0 750.65 7,886 753.30 22,678 748.05 108 750.70 8,080 753.35 23,072 748.10 218 750.75 8,275 753.40 23,469 748.15 329 750.80 8,473 753.45 23,871 748.20 442 750.85 8,672 753.50 24,276 748.25 556 750.90 8,873 753.55 24,684 748.30 672 750.95 9,076 753.60 25,097 748.35 789 751.00 9,280 753.65 25,512 748.40 907 751.05 9,486 753.70 25,932 748.45 1,027 751.10 9,694 753.75 26,355 748.50 1,149 751.15 9,903 753.80 26,782 748.55 1,272 751.20 10,114 753.85 27,213 748.60 1,396 751.25 10,327 753.90 27,647 748.65 1,522 751.30 10,541 753.95 28,085 748.70 1,649 751.35 10,758 754.00 28,527 748.75 1,778 751.40 10,976 748.80 1,908 751.45 11,195 748.85 2,039 751.50 11,417 748.90 2,173 751.55 11,640 748.95 2,307 751.60 11,865 749.00 2,443 751.65 12,091 749.05 2,581 751.70 12,319 749.10 2,720 751.75 12,549 749.15 2,861 751.80 12,781 749.20 3,003 751.85 13,014 749.25 3,148 751.90 13,250 749.30 3,294 751.95 13,486 749.35 3,442 752.00 13,725 749.40 3,591 752.05 14,023 749.45 3,743 752.10 14,325 749.50 3,896 752.15 14,631 749.55 4,050 752.20 14,941 749.60 4,207 752.25 15,254 749.65 4,365 752.30 15,571 749.70 4,524 752.35 15,891 749.75 4,686 752.40 16,215 749.80 4,849 752.45 16,543 749.85 5,014 752.50 16,875 749.90 5,181 752.55 17,210 749.95 5,349 752.60 17,549 750.00 5,519 752.65 17,891 750.05 5,691 752.70 18,237 750.10 5,864 752.75 18,587 750.15 6,040 752.80 18,941 750.20 6,217 752.85 19,298 750.25 6,395 752.90 19,659 750.30 6,576 752.95 20,023 750.35 6,758 753.00 20,391 750.40 6,941 753.05 20,763 750.45 7,127 753.10 21,139 750.50 7,314 753.15 21,518 750.55 7,503 753.20 21,901 750.60 7,693 753.25 22,288 Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 71 Summary for Link 9: Pre-Dev P01-6 Inflow Area = 6.040 ac, 0.00% Impervious, Inflow Depth = 4.11" for 100-YR event Inflow = 27.18 cfs @ 12.04 hrs, Volume= 2.068 af Primary = 27.18 cfs @ 12.04 hrs, Volume= 2.068 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 9: Pre-Dev P01-6 Hydrograph 177 1 R rf ❑Inflow 30 27.18 cfs r ❑Primary 28= Inflow Area=6.040 ac 26= 24= 22- 20 18' —[ - I rn / 0 14 LL 12- 10- I 8= 4 2-/ / 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 72 Hydrograph for Link 9: Pre-Dev P01-6 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.00 0.00 0.00 10.00 0.26 0.00 0.26 12.50 8.49 0.00 8.49 15.00 1.23 0.00 1.23 17.50 0.76 0.00 0.76 20.00 0.54 0.00 0.54 22.50 0.45 0.00 0.45 25.00 0.09 0.00 0.09 27.50 0.01 0.00 0.01 30.00 0.00 0.00 0.00 32.50 0.00 0.00 0.00 35.00 0.00 0.00 0.00 37.50 0.00 0.00 0.00 40.00 0.00 0.00 0.00 42.50 0.00 0.00 0.00 45.00 0.00 0.00 0.00 47.50 0.00 0.00 0.00 50.00 0.00 0.00 0.00 52.50 0.00 0.00 0.00 55.00 0.00 0.00 0.00 57.50 0.00 0.00 0.00 60.00 0.00 0.00 0.00 62.50 0.00 0.00 0.00 65.00 0.00 0.00 0.00 67.50 0.00 0.00 0.00 70.00 0.00 0.00 0.00 72.50 0.00 0.00 0.00 75.00 0.00 0.00 0.00 77.50 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.50 0.00 0.00 0.00 85.00 0.00 0.00 0.00 87.50 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.50 0.00 0.00 0.00 95.00 0.00 0.00 0.00 97.50 0.00 0.00 0.00 100.00 0.00 0.00 0.00 102.50 0.00 0.00 0.00 105.00 0.00 0.00 0.00 107.50 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.50 0.00 0.00 0.00 115.00 0.00 0.00 0.00 117.50 0.00 0.00 0.00 120.00 0.00 0.00 0.00 Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 73 Summary for Link 19: Post-Dev P01-6 Inflow Area = 6.110 ac, 46.64% Impervious, Inflow Depth > 4.58" for 100-YR event Inflow = 14.64 cfs @ 12.09 hrs, Volume= 2.333 af Primary = 14.64 cfs @ 12.09 hrs, Volume= 2.333 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 19: Post-Dev P01-6 Hydrograph 1 d Rd rf ❑Inflow 16= D Primary 15_ 14.64 cfs IInflow Area=6.110 ac 14 1 L I I I I LIL L I — L 1 13= 12= I -r I T I -r I � 11= 10- ]- 1 -[ fi 11 fi t i71 - 71/ FA L II L I L L LIL L II L 1 -z 5= r I TTI IT IT ITT1T71 ITT 4- 3 —[ t1 I ± t 0 .............. 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Granite Quarry Type 1124-hr 100-YR Rainfall=7.21" Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC Page 74 Hydrograph for Link 19: Post-Dev P01-6 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.00 0.00 0.00 10.00 0.03 0.00 0.03 12.50 9.24 0.00 9.24 15.00 1.58 0.00 1.58 17.50 0.89 0.00 0.89 20.00 0.63 0.00 0.63 22.50 0.50 0.00 0.50 25.00 0.23 0.00 0.23 27.50 0.08 0.00 0.08 30.00 0.07 0.00 0.07 32.50 0.07 0.00 0.07 35.00 0.07 0.00 0.07 37.50 0.07 0.00 0.07 40.00 0.07 0.00 0.07 42.50 0.07 0.00 0.07 45.00 0.06 0.00 0.06 47.50 0.06 0.00 0.06 50.00 0.06 0.00 0.06 52.50 0.06 0.00 0.06 55.00 0.06 0.00 0.06 57.50 0.06 0.00 0.06 60.00 0.06 0.00 0.06 62.50 0.06 0.00 0.06 65.00 0.05 0.00 0.05 67.50 0.05 0.00 0.05 70.00 0.05 0.00 0.05 72.50 0.05 0.00 0.05 75.00 0.05 0.00 0.05 77.50 0.05 0.00 0.05 80.00 0.05 0.00 0.05 82.50 0.04 0.00 0.04 85.00 0.04 0.00 0.04 87.50 0.04 0.00 0.04 90.00 0.04 0.00 0.04 92.50 0.04 0.00 0.04 95.00 0.04 0.00 0.04 97.50 0.03 0.00 0.03 100.00 0.03 0.00 0.03 102.50 0.03 0.00 0.03 105.00 0.03 0.00 0.03 107.50 0.03 0.00 0.03 110.00 0.03 0.00 0.03 112.50 0.02 0.00 0.02 115.00 0.02 0.00 0.02 117.50 0.02 0.00 0.02 120.00 0.02 0.00 0.02 Granite Quarry Table of Contents Prepared by Bohler Engineers Printed 8/4/2023 HydroCAD® 10.20-2g s/n 03478 ©2022 HydroCAD Software Solutions LLC TABLE OF CONTENTS Project Reports 1 Routing Diagram 2 Rainfall Events Listing (selected events) 3 Area Listing (all nodes) 4 Soil Listing (all nodes) 5 Ground Covers (all nodes) 2-YR Event 6 Node Listing 7 Subcat 5: EX BMP6 9 Subcat 8: EX BYP6 11 Subcat 14: BMP6 13 Subcat 18: BYP6 15 Pond 7: EX BMP6 - Dry Pond 19 Pond 16: Prop Modified BMP 6 - Wet Pond 23 Pond 17: BMP 6 PP 25 Link 9: Pre-Dev P01-6 27 Link 19: Post-Dev P01-6 25-YR Event 29 Node Listing 30 Subcat 5: EX BMP6 32 Subcat 8: EX BYP6 34 Subcat 14: BMP6 36 Subcat 18: BYP6 38 Pond 7: EX BMP6 - Dry Pond 42 Pond 16: Prop Modified BMP 6 - Wet Pond 46 Pond 17: BMP 6 PP 48 Link 9: Pre-Dev P01-6 50 Link 19: Post-Dev P01-6 100-YR Event 52 Node Listing 53 Subcat 5: EX BMP6 55 Subcat 8: EX BYP6 57 Subcat 14: BMP6 59 Subcat 18: BYP6 61 Pond 7: EX BMP6 - Dry Pond 65 Pond 16: Prop Modified BMP 6 - Wet Pond 69 Pond 17: BMP 6 PP 71 Link 9: Pre-Dev P01-6 73 Link 19: Post-Dev P01-6 Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan 18 1• 16 15 Outfall 19 Outfall Outfall 1 • 2 8 ■ 3 11 13 �� 4 14 12 9 5 7 6 Project File: 230611_Granite Quarry.stm Number of lines: 19 Date:6/12/2023 Storm Sewers v2022.00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 53.500 0.20 2.98 0.90 0.18 2.68 5.0 5.0 4.0 10.73 24.20 2.52 36 0.11 753.94 754.00 755.70 755.73 756.94 759.02 SD-EX1 2 1 66.100 0.20 1.37 0.90 0.18 1.23 5.0 5.0 4.0 4.93 11.80 4.62 15 2.84 754.08 755.96 755.95 756.86 759.02 761.32 SD-EX2 3 2 51.900 0.20 1.17 0.90 0.18 1.05 5.0 5.0 4.0 4.21 6.51 5.09 15 0.87 756.09 756.54 756.86 757.37 761.32 761.54 SD-EX3 4 3 31.820 0.10 0.97 0.90 0.09 0.87 5.0 5.0 4.0 3.49 11.53 6.37 15 1.89 757.00 757.60 757.47 758.35 761.54 763.04 SD-A 20 5 4 78.000 0.50 0.87 0.90 0.45 0.78 5.0 5.0 4.0 3.13 5.94 4.20 15 0.50 757.60 757.99 758.35 758.70 763.04 763.08 SD-A21 6 5 166.327 0.00 0.37 0.00 0.00 0.33 5.0 5.0 4.0 1.33 5.97 2.57 15 0.51 757.99 758.83 758.70 759.29 763.08 764.67 SD-A22 7 6 106.000 0.28 0.28 0.90 0.25 0.25 5.0 5.0 4.0 1.01 5.94 2.76 15 0.50 758.83 759.36 759.29 759.75 764.67 763.66 SD-A23 8 1 50.000 0.06 1.41 0.90 0.05 1.27 5.0 5.0 4.0 5.08 0.00 1.62 24 -0.24 754.69 754.57 756.69 756.71 759.02 758.28 SD-EX4 9 6 89.000 0.04 0.09 0.90 0.04 0.08 5.0 5.0 4.0 0.32 4.92 2.24 15 0.49 759.20 759.64 759.42 759.86 764.67 763.50 SD-A22.1 10 9 21.660 0.05 0.05 0.90 0.05 0.05 5.0 5.0 4.0 0.18 4.98 1.91 15 0.51 759.74 759.85 759.90 760.01 763.50 763.55 SD-A22.2 11 8 55.000 0.33 1.35 0.90 0.30 1.22 5.0 5.0 4.0 4.86 30.82 1.58 24 1.58 754.10 754.97 756.77 756.79 758.28 758.50 SD-EX5 12 11 55.000 0.04 0.04 0.90 0.04 0.04 5.0 5.0 4.0 0.14 5.81 0.12 15 0.69 754.90 755.28 756.85 756.85 758.50 759.53 SD-EX6 13 11 15.000 0.02 0.98 0.90 0.02 0.88 5.0 5.0 4.0 3.53 8.81 2.00 18 0.60 754.98 755.07 756.85 756.86 758.50 757.97 SD-EX7 14 13 40.000 0.96 0.96 0.90 0.86 0.86 5.0 5.0 4.0 3.46 0.00 1.96 18 -3.93 755.07 753.50 756.94 756.98 757.97 758.50 SD-EX8 15 End 158.000 0.18 1.36 0.90 0.16 1.22 5.0 5.0 4.0 4.90 9.65 2.86 18 0.50 753.75 754.54 755.70 755.88 755.06 761.19 SD-A31 16 15 113.399 0.42 0.84 0.90 0.38 0.76 5.0 5.0 4.0 3.02 7.38 2.18 18 0.49 754.65 755.21 756.07 756.14 761.19 759.77 SD-A33 17 16 21.000 0.42 0.42 0.90 0.38 0.38 5.0 5.0 4.0 1.51 7.94 3.37 18 0.57 756.78 756.90 757.22 757.36 759.77 759.77 SD-A34 18 15 119.263 0.34 0.34 0.90 0.31 0.31 5.0 5.0 4.0 1.22 4.58 3.16 15 0.50 755.79 756.39 756.23 756.83 761.19 759.32 SD-A32 19 End 49.799 0.40 0.40 0.90 0.36 0.36 5.0 5.0 4.0 1.44 9.67 2.51 18 0.50 755.00 755.25 755.70 755.70 756.56 760.66 SD-All Project File: 230611_Granite Quarry.stm Number of lines: 19 Run Date: 6/13/2023 NOTES:Intensity=4.04/(Inlet time+5.50)^0.00; Return period=Yrs. 1 ; Pipe travel time suppressed. ; c=cir e=ellip b=box Storm Sewers v2022 00 Inlet Report Pagel Line Inlet ID Q= Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt Byp Type Line Ht L Area L W So W Sw Sx n Depth Spread Depth Spread Depr No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sqft) (ft) (ft) (ft/ft) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) 1 EX1 0.72 0.22 0.94 0.00 Comb 6.0 3.00 3.66 3.00 2.00 Sag 2.00 0.015 0.020 0.000 0.06 3.38 0.22 3.38 2.0 Off 2 EX2 0.72 0.00 0.62 0.10 Comb 6.0 3.00 0.00 3.00 2.00 0.030 2.00 0.031 0.020 0.013 0.11 4.43 0.22 1.73 2.0 1 3 EX3 0.72 0.00 0.60 0.12 Comb 6.0 3.00 0.00 3.00 2.00 0.030 2.00 0.025 0.020 0.013 0.10 4.64 0.22 2.17 2.0 1 4 A-20 0.36 0.00 0.36 0.00 DrCrb 6.0 12.00 0.00 0.00 0.00 Sag 0.00 0.180 0.180 0.000 0.05 0.26 0.05 0.26 0.0 Off 5 A-21 1.80 0.00 1.80 0.00 DrGrt 0.0 0.00 7.32 6.00 2.00 Sag 2.00 0.020 0.020 0.000 0.11 13.19 0.11 13.19 0.0 Off 6 A-22 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.0 Off 7 A-23 1.01 0.00 1.01 0.00 DrGrt 0.0 0.00 3.66 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.10 12.40 0.10 12.40 0.0 Off 8 EX4 0.22 0.00 0.22 0.00 Comb 6.0 3.00 3.66 3.00 2.00 Sag 2.00 0.015 0.020 0.000 -0.04 1.33 0.13 1.33 2.0 Off 9 A-22.1 0.14 0.00 0.14 0.00 Comb 6.0 3.00 3.66 3.00 2.00 Sag 2.00 0.011 0.020 0.000 -0.06 1.10 0.10 1.10 2.0 Off 10 A-22.2 0.18 0.00 0.18 0.00 Comb 6.0 3.00 3.66 3.00 2.00 Sag 2.00 0.011 0.020 0.000 -0.05 1.24 0.12 1.24 2.0 Off 11 EX5 1.19 0.00 1.19 0.00 Comb 6.0 2.00 2.00 2.00 2.00 Sag 2.00 0.030 0.020 0.000 0.11 4.50 0.28 4.50 2.0 Off 12 EX6 0.14 0.00 0.14 0.00 Comb 6.0 4.00 2.00 2.00 2.00 Sag 2.00 0.210 0.020 0.000 -0.02 0.49 0.14 0.49 2.0 Off 13 EX7 0.07 0.00 0.07 0.00 Comb 6.0 4.00 2.00 2.00 2.00 Sag 2.00 0.046 0.020 0.000 -0.08 0.67 0.09 0.67 2.0 Off 14 EX8 3.46 0.00 3.46 0.00 Comb 6.0 4.00 2.00 2.00 2.00 Sag 2.00 0.070 0.020 0.000 0.26 8.14 0.43 8.14 2.0 Off 15 A-31 0.65 0.00 0.65 0.00 DrCrb 6.0 12.00 0.00 0.00 0.00 Sag 0.00 0.023 0.023 0.000 0.07 2.98 0.07 2.98 0.0 Off 16 A-33 1.51 0.00 1.51 0.00 Comb 6.0 6.00 7.32 6.00 2.00 Sag 2.00 0.014 0.020 0.000 0.07 3.96 0.23 3.96 2.0 Off 17 A-34 1.51 0.00 1.51 0.00 Comb 6.0 6.00 7.32 6.00 2.00 Sag 2.00 0.014 0.020 0.000 0.07 3.96 0.23 3.96 2.0 Off 18 A-32 1.22 0.00 1.22 0.00 DrCrb 6.0 12.00 0.00 0.00 0.00 Sag 0.00 0.330 0.330 0.000 0.10 0.32 0.10 0.32 0.0 Off 19 A-11 1.44 0.00 1.44 0.00 DrGrt 0.0 0.00 3.66 3.00 2.00 Sag 2.00 0.030 0.030 0.000 0.13 10.80 0.13 10.80 0.0 Off Project File: 230611_Granite Quarry.stm Number of lines: 19 Run Date: 6/13/2023 NOTES: Inlet N-Values=0.016; Intensity=4.04/(Inlet time+5.50)^0.00; Return period= 1 Yrs. ; *Indicates Known Q added.All curb inlets are Horiz throat. Storm Sewers v2022 00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 53.500 0.20 2.98 0.90 0.18 2.68 5.0 5.0 7.1 18.92 24.20 2.86 36 0.11 753.94 754.00 756.61 756.64 756.94 759.02 SD-EX1 2 1 66.100 0.20 1.37 0.90 0.18 1.23 5.0 5.0 7.1 8.70 11.80 7.09 15 2.84 754.08 755.96 756.93 757.95 759.02 761.32 SD-EX2 3 2 51.900 0.20 1.17 0.90 0.18 1.05 5.0 5.0 7.1 7.43 6.51 6.06 15 0.87 756.09 756.54 759.12 759.71 761.32 761.54 SD-EX3 4 3 31.820 0.10 0.97 0.90 0.09 0.87 5.0 5.0 7.1 6.16 11.53 5.02 15 1.89 757.00 757.60 759.99 760.17 761.54 763.04 SD-A 20 5 4 78.000 0.50 0.87 0.90 0.45 0.78 5.0 5.0 7.1 5.52 5.94 4.50 15 0.50 757.60 757.99 760.36 760.70 763.04 763.08 SD-A21 6 5 166.327 0.00 0.37 0.00 0.00 0.33 5.0 5.0 7.1 2.35 5.97 1.91 15 0.51 757.99 758.83 761.17 761.30 763.08 764.67 SD-A22 7 6 106.000 0.28 0.28 0.90 0.25 0.25 5.0 5.0 7.1 1.78 5.94 1.45 15 0.50 758.83 759.36 761.36 761.41 764.67 763.66 SD-A23 8 1 50.000 0.06 1.41 0.90 0.05 1.27 5.0 5.0 7.1 8.95 0.00 2.85 24 -0.24 754.69 754.57 756.93 757.00 759.02 758.28 SD-EX4 9 6 89.000 0.04 0.09 0.90 0.04 0.08 5.0 5.0 7.1 0.57 4.92 0.47 15 0.49 759.20 759.64 761.36 761.37 764.67 763.50 SD-A22.1 10 9 21.660 0.05 0.05 0.90 0.05 0.05 5.0 5.0 7.1 0.32 4.98 0.26 15 0.51 759.74 759.85 761.37 761.37 763.50 763.55 SD-A22.2 11 8 55.000 0.33 1.35 0.90 0.30 1.22 5.0 5.0 7.1 8.57 30.82 2.73 24 1.58 754.10 754.97 757.19 757.25 758.28 758.50 SD-EX5 12 11 55.000 0.04 0.04 0.90 0.04 0.04 5.0 5.0 7.1 0.25 5.81 0.21 15 0.69 754.90 755.28 757.43 757.43 758.50 759.53 SD-EX6 13 11 15.000 0.02 0.98 0.90 0.02 0.88 5.0 5.0 7.1 6.22 8.81 3.52 18 0.60 754.98 755.07 757.43 757.47 758.50 757.97 SD-EX7 14 13 40.000 0.96 0.96 0.90 0.86 0.86 5.0 5.0 7.1 6.10 0.00 3.45 18 -3.93 755.07 753.50 757.70 757.82 757.97 758.50 SD-EX8 15 End 158.000 0.18 1.36 0.90 0.16 1.22 5.0 5.0 7.1 8.64 9.65 4.89 18 0.50 753.75 754.54 756.61 757.24 755.06 761.19 SD-A31 16 15 113.399 0.42 0.84 0.90 0.38 0.76 5.0 5.0 7.1 5.33 7.38 3.02 18 0.49 754.65 755.21 757.77 758.06 761.19 759.77 SD-A33 17 16 21.000 0.42 0.42 0.90 0.38 0.38 5.0 5.0 7.1 2.67 7.94 2.73 18 0.57 756.78 756.90 758.13 757.52 759.77 759.77 SD-A34 18 15 119.263 0.34 0.34 0.90 0.31 0.31 5.0 5.0 7.1 2.16 4.58 1.76 15 0.50 755.79 756.39 757.77 757.90 761.19 759.32 SD-A32 19 End 49.799 0.40 0.40 0.90 0.36 0.36 5.0 5.0 7.1 2.54 9.67 1.47 18 0.50 755.00 755.25 756.61 756.62 756.56 760.66 SD-All Project File: 230611_Granite Quarry.stm Number of lines: 19 Run Date: 6/12/2023 NOTES:Intensity=105.57/(Inlet time+ 18.00)A 0.86; Return period=Yrs. 10 ; Pipe travel time suppressed. ; c=cir e=ellip b=box Storm Sewers v2022 00 Inlet Report Pagel Line Inlet ID Q= Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt Byp Type Line Ht L Area L W So W Sw Sx n Depth Spread Depth Spread Depr No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sqft) (ft) (ft) (ft/ft) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) 1 EX1 1.27 0.63 1.90 0.00 Comb 6.0 3.00 3.66 3.00 2.00 Sag 2.00 0.015 0.020 0.000 0.13 7.16 0.30 7.16 2.0 Off 2 EX2 1.27 0.00 0.97 0.30 Comb 6.0 3.00 0.00 3.00 2.00 0.030 2.00 0.031 0.020 0.013 0.13 5.64 0.25 2.94 2.0 1 3 EX3 1.27 0.00 0.94 0.33 Comb 6.0 3.00 0.00 3.00 2.00 0.030 2.00 0.025 0.020 0.013 0.13 5.81 0.24 3.39 2.0 1 4 A-20 0.64 0.00 0.64 0.00 DrCrb 6.0 12.00 0.00 0.00 0.00 Sag 0.00 0.180 0.180 0.000 0.07 0.38 0.07 0.38 0.0 Off 5 A-21 3.18 0.00 3.18 0.00 DrGrt 0.0 0.00 7.32 6.00 2.00 Sag 2.00 0.020 0.020 0.000 0.16 18.34 0.16 18.34 0.0 Off 6 A-22 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.0 Off 7 A-23 1.78 0.00 1.78 0.00 DrGrt 0.0 0.00 3.66 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.15 17.19 0.15 17.19 0.0 Off 8 EX4 0.38 0.00 0.38 0.00 Comb 6.0 3.00 3.66 3.00 2.00 Sag 2.00 0.015 0.020 0.000 0.01 1.81 0.18 1.81 2.0 Off 9 A-22.1 0.25 0.00 0.25 0.00 Comb 6.0 3.00 3.66 3.00 2.00 Sag 2.00 0.011 0.020 0.000 -0.03 1.50 0.14 1.50 2.0 Off 10 A-22.2 0.32 0.00 0.32 0.00 Comb 6.0 3.00 3.66 3.00 2.00 Sag 2.00 0.011 0.020 0.000 -0.01 1.69 0.16 1.69 2.0 Off 11 EX5 2.10 0.00 2.10 0.00 Comb 6.0 2.00 2.00 2.00 2.00 Sag 2.00 0.030 0.020 0.000 0.19 8.26 0.35 8.26 2.0 Off 12 EX6 0.25 0.00 0.25 0.00 Comb 6.0 4.00 2.00 2.00 2.00 Sag 2.00 0.210 0.020 0.000 0.03 0.68 0.20 0.68 2.0 Off 13 EX7 0.13 0.00 0.13 0.00 Comb 6.0 4.00 2.00 2.00 2.00 Sag 2.00 0.046 0.020 0.000 -0.05 0.92 0.12 0.92 2.0 Off 14 EX8 6.10 0.00 6.10 0.00 Comb 6.0 4.00 2.00 2.00 2.00 Sag 2.00 0.070 0.020 0.000 0.37 13.53 0.54 13.53 2.0 Off 15 A-31 1.14 0.00 1.14 0.00 DrCrb 6.0 12.00 0.00 0.00 0.00 Sag 0.00 0.023 0.023 0.000 0.10 4.35 0.10 4.35 0.0 Off 16 A-33 2.67 0.00 2.67 0.00 Comb 6.0 6.00 7.32 6.00 2.00 Sag 2.00 0.014 0.020 0.000 0.13 7.09 0.30 7.09 2.0 Off 17 A-34 2.67 0.00 2.67 0.00 Comb 6.0 6.00 7.32 6.00 2.00 Sag 2.00 0.014 0.020 0.000 0.13 7.09 0.30 7.09 2.0 Off 18 A-32 2.16 0.00 2.16 0.00 DrCrb 6.0 12.00 0.00 0.00 0.00 Sag 0.00 0.330 0.330 0.000 0.15 0.46 0.15 0.46 0.0 Off 19 A-11 2.54 0.00 2.54 0.00 DrGrt 0.0 0.00 3.66 3.00 2.00 Sag 2.00 0.030 0.030 0.000 0.19 14.84 0.19 14.84 0.0 Off Project File: 230611_Granite Quarry.stm Number of lines: 19 Run Date: 6/12/2023 NOTES: Inlet N-Values=0.016;Intensity=105.57/(Inlet time+18.00)^0.86; Return period= 10 Yrs. ; *Indicates Known Q added.All curb inlets are Horiz throat. Storm Sewers v2022 00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 53.500 0.20 2.98 0.90 0.18 2.68 5.0 5.0 8.2 22.11 24.20 3.13 36 0.11 753.94 754.00 757.14 757.19 756.94 759.02 SD-EX1 2 1 66.100 0.20 1.37 0.90 0.18 1.23 5.0 5.0 8.2 10.17 11.80 8.29 15 2.84 754.08 755.96 757.53 758.93 759.02 761.32 SD-EX2 3 2 51.900 0.20 1.17 0.90 0.18 1.05 5.0 5.0 8.2 8.68 6.51 7.08 15 0.87 756.09 756.54 760.53 761.33 761.32 761.54 SD-EX3 4 3 31.820 0.10 0.97 0.90 0.09 0.87 5.0 5.0 8.2 7.20 11.53 5.87 15 1.89 757.00 757.60 761.72 761.95 761.54 763.04 SD-A 20 5 4 78.000 0.50 0.87 0.90 0.45 0.78 5.0 5.0 8.2 6.46 5.94 5.26 15 0.50 757.60 757.99 762.22 762.68 763.04 763.08 SD-A21 6 5 166.327 0.00 0.37 0.00 0.00 0.33 5.0 5.0 8.2 2.75 5.97 2.24 15 0.51 757.99 758.83 763.33 763.51 763.08 764.67 SD-A22 7 6 106.000 0.28 0.28 0.90 0.25 0.25 5.0 5.0 8.2 2.08 5.94 1.69 15 0.50 758.83 759.36 763.58 763.65 764.67 763.66 SD-A23 8 1 50.000 0.06 1.41 0.90 0.05 1.27 5.0 5.0 8.2 10.46 0.00 3.33 24 -0.24 754.69 754.57 757.53 757.62 759.02 758.28 SD-EX4 9 6 89.000 0.04 0.09 0.90 0.04 0.08 5.0 5.0 8.2 0.67 4.92 0.54 15 0.49 759.20 759.64 763.58 763.59 764.67 763.50 SD-A22.1 10 9 21.660 0.05 0.05 0.90 0.05 0.05 5.0 5.0 8.2 0.37 4.98 0.30 15 0.51 759.74 759.85 763.60 763.60 763.50 763.55 SD-A22.2 11 8 55.000 0.33 1.35 0.90 0.30 1.22 5.0 5.0 8.2 10.02 30.82 3.19 24 1.58 754.10 754.97 757.88 757.97 758.28 758.50 SD-EX5 12 11 55.000 0.04 0.04 0.90 0.04 0.04 5.0 5.0 8.2 0.30 5.81 0.24 15 0.69 754.90 755.28 758.21 758.21 758.50 759.53 SD-EX6 13 11 15.000 0.02 0.98 0.90 0.02 0.88 5.0 5.0 8.2 7.27 8.81 4.12 18 0.60 754.98 755.07 758.21 758.27 758.50 757.97 SD-EX7 14 13 40.000 0.96 0.96 0.90 0.86 0.86 5.0 5.0 8.2 7.12 0.00 4.03 18 -3.93 755.07 753.50 758.59 758.75 757.97 758.50 SD-EX8 15 End 158.000 0.18 1.36 0.90 0.16 1.22 5.0 5.0 8.2 10.09 9.65 5.71 18 0.50 753.75 754.54 757.14 758.00 755.06 761.19 SD-A31 16 15 113.399 0.42 0.84 0.90 0.38 0.76 5.0 5.0 8.2 6.23 7.38 3.53 18 0.49 754.65 755.21 758.72 759.12 761.19 759.77 SD-A33 17 16 21.000 0.42 0.42 0.90 0.38 0.38 5.0 5.0 8.2 3.12 7.94 1.76 18 0.57 756.78 756.90 759.22 759.24 759.77 759.77 SD-A34 18 15 119.263 0.34 0.34 0.90 0.31 0.31 5.0 5.0 8.2 2.52 4.58 2.06 15 0.50 755.79 756.39 758.72 758.91 761.19 759.32 SD-A32 19 End 49.799 0.40 0.40 0.90 0.36 0.36 5.0 5.0 8.2 2.97 9.67 1.68 18 0.50 755.00 755.25 757.14 757.16 756.56 760.66 SD-All Project File: 230611_Granite Quarry.stm Number of lines: 19 Run Date: 6/12/2023 NOTES:Intensity=103.30/(Inlet time+ 16.60)^0.82; Return period=Yrs.25 ; Pipe travel time suppressed. ; c=cir e=ellip b=box Storm Sewers v2022 00 Inlet Report Pagel Line Inlet ID Q= Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt Byp Type Line Ht L Area L W So W Sw Sx n Depth Spread Depth Spread Depr No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sqft) (ft) (ft) (ft/ft) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) 1 EX1 1.48 0.82 2.30 0.00 Comb 6.0 3.00 3.66 3.00 2.00 Sag 2.00 0.015 0.020 0.000 0.16 8.54 0.33 8.54 2.0 Off 2 EX2 1.48 0.00 1.09 0.39 Comb 6.0 3.00 0.00 3.00 2.00 0.030 2.00 0.031 0.020 0.013 0.14 6.01 0.26 3.36 2.0 1 3 EX3 1.48 0.00 1.06 0.43 Comb 6.0 3.00 0.00 3.00 2.00 0.030 2.00 0.025 0.020 0.013 0.13 6.17 0.25 3.76 2.0 1 4 A-20 0.74 0.00 0.74 0.00 DrCrb 6.0 12.00 0.00 0.00 0.00 Sag 0.00 0.180 0.180 0.000 0.08 0.42 0.08 0.42 0.0 Off 5 A-21 3.71 0.00 3.71 0.00 DrGrt 0.0 0.00 7.32 6.00 2.00 Sag 2.00 0.020 0.020 0.000 0.18 20.13 0.18 20.13 0.0 Off 6 A-22 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.0 Off 7 A-23 2.08 0.00 2.08 0.00 DrGrt 0.0 0.00 3.66 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.17 18.85 0.17 18.85 0.0 Off 8 EX4 0.45 0.00 0.45 0.00 Comb 6.0 3.00 3.66 3.00 2.00 Sag 2.00 0.015 0.020 0.000 0.03 1.96 0.19 1.96 2.0 Off 9 A-22.1 0.30 0.00 0.30 0.00 Comb 6.0 3.00 3.66 3.00 2.00 Sag 2.00 0.011 0.020 0.000 -0.01 1.63 0.15 1.63 2.0 Off 10 A-22.2 0.37 0.00 0.37 0.00 Comb 6.0 3.00 3.66 3.00 2.00 Sag 2.00 0.011 0.020 0.000 0.01 1.84 0.17 1.84 2.0 Off 11 EX5 2.45 0.00 2.45 0.00 Comb 6.0 2.00 2.00 2.00 2.00 Sag 2.00 0.030 0.020 0.000 0.21 9.56 0.38 9.56 2.0 Off 12 EX6 0.30 0.00 0.30 0.00 Comb 6.0 4.00 2.00 2.00 2.00 Sag 2.00 0.210 0.020 0.000 0.05 0.74 0.22 0.74 2.0 Off 13 EX7 0.15 0.00 0.15 0.00 Comb 6.0 4.00 2.00 2.00 2.00 Sag 2.00 0.046 0.020 0.000 -0.04 1.00 0.13 1.00 2.0 Off 14 EX8 7.12 0.00 7.12 0.00 Comb 6.0 4.00 2.00 2.00 2.00 Sag 2.00 0.070 0.020 0.000 0.41 15.40 0.57 15.40 2.0 Off 15 A-31 1.34 0.00 1.34 0.00 DrCrb 6.0 12.00 0.00 0.00 0.00 Sag 0.00 0.023 0.023 0.000 0.11 4.83 0.11 4.83 0.0 Off 16 A-33 3.12 0.00 3.12 0.00 Comb 6.0 6.00 7.32 6.00 2.00 Sag 2.00 0.014 0.020 0.000 0.15 8.18 0.32 8.18 2.0 Off 17 A-34 3.12 0.00 3.12 0.00 Comb 6.0 6.00 7.32 6.00 2.00 Sag 2.00 0.014 0.020 0.000 0.15 8.18 0.32 8.18 2.0 Off 18 A-32 2.52 0.00 2.52 0.00 DrCrb 6.0 12.00 0.00 0.00 0.00 Sag 0.00 0.330 0.330 0.000 0.17 0.51 0.17 0.51 0.0 Off 19 A-11 2.97 0.00 2.97 0.00 DrGrt 0.0 0.00 3.66 3.00 2.00 Sag 2.00 0.030 0.030 0.000 0.21 16.25 0.21 16.25 0.0 Off Project File: 230611_Granite Quarry.stm Number of lines: 19 Run Date: 6/12/2023 NOTES: Inlet N-Values=0.016;Intensity=103.30/(Inlet time+16.60)A 0.82; Return period=25 Yrs. ; *Indicates Known Q added.All curb inlets are Horiz throat. Storm Sewers v2022 00 Storm Sewer Profile EX OUTFALL - A23 Proj. file: 230611_Granite Quarry.stm co N CO 7 u--) O• a C J O C J Q C J O c J Q c J O C J Q C J Q O N 61 O 000 O Mm0cLo O .LAO N O(o(o N OQ)O) V CD coop V mop O r._ Co O V Ni (0 �)(0 LU (O N- o M N r co M r--N- (0 V co W (0 M o) o w c6 nor` 6 rV2� ti nor` o Ir�� Nr` - v -. , N +O -a W O W W W v- W W W ,- W W W N W WW N W W W . W W W u) W W as E > co E » m E » m E » m E » co E » co E 5 5 co E > (/) 0 E c.0 a .E (i) EEE cn EE E v) E E E u) E E E c -CZ c c S E E 775.00 - • - 775.00 770.00 770.00 765.00 - 765.00 . 760.00 ( ti__— —--- � —760.00 755.00 — 78.000Lf-'5"(a)0.50% 755.00 31R2fllf-1$i"©1RA% — ins 0001f-1fi"Q0.0% 51.000Lf 16"@ 0.87%, — 60.100Lf- 13"@ 2.847o b1.bUOLt-36"e 0.11% 750.00 750.00 0 50 100 150 200 250 300 350 400 450 500 550 600 HGL - EGL Reach (ft) Storm Sewers Storm Sewer Profile A-22 - A22.2 Proj. file: 230611_Granite Quarry.stm 0 0 E J 0E -1 0E J 0 00 c) O)0r)) r (o co Ncs, Lc) N- U� p CO M �co� M co 0) a co Ma) p W W W W W W co Lo N W W W N W W yo E > > c E >; >: yq E > ; c0 E > E E c co E E E co ii.E E Cl) E E 775.00 - - 775.00 771.00 771.00 767.00 767.00 / ----------- ------ _ �L 763.00 - • 763.00 7 759.00 9• �9A6f 16"@ C�19% — • 759.00 1GG.32'Lf 15"C051% 21.660Lf 16"@ 0.51% 755.00 755.00 0 25 50 75 100 125 150 175 200 225 250 275 300 HGL - EGL Reach (ft) Storm Sewers Storm Sewer Profile Al 0 - Al 1 Proj. file: 230611_Granite Quarry.stm cn G m J 0 O O• m cr) ON Elev. (ft) o it o -o w o w ul co E > co E 768.00 — 768.00 765.00 - 765.00 762.00 • 762.00 759.00 • 759.00 756.00 756.00 49.799Lt-lb"(cU u bU% 753.00 753.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile A30-A34 Proj. file: 230611_Granite Quarry.stm as r O 8 D C . O E J O C J Q rn ' n . r-- O ,— Co •N- O Co CO ma' r N- 0,0) N- O N. co O of co• a'cn c0 M �c0 Elev. (ft) g w r N co 17 N- ( �r C pW WWW N WWW N L.T. CO E > c0 Ej j as Ej j ca Ej u c co ricc co iEcc co Ec 771.00 771.00 767.00 767.00 763.00 763.00 759.00 759.00 i — 755.00 — ` 755.00 — MI 113.300Lf 18"Ei n acr% 158.000L -18"L 0.50% — 21.000Lf-18"@ 0.57% 751.00 751.00 0 25 50 75 100 125 150 175 200 225 250 275 300 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile A31 -A32 Proj. file: 230611_Granite Quarry.stm co of J 0 a) d-m M M NM O (7' 2 N (D Elev. (ft) a -. teV'r- a) N.' o W w w Ww mE > ; ca E >: 768.00 768.00 765.00 - 765.00 762.00 / 762.00 759.cu 759.00 r 756.00 — �� I ' 756.00 119.215"@ u.b0% 753.00 753.00 0 10 20 30 40 50 60 70 80 90 100 110 120 - HGL - EGL Reach (ft) Storm Sewers A-10 Appendices Q = 2.54 CFS 12' D50 = 0.5 DMAX = 0.75 4.5' 12' THICKNESS = 1.0 3 o It 1 1,': Outlet W = Do + La 90 'm fill 1 I•II II • I, IIII 11111 I pipeIIIIIIIIIIII �, 4 diameter (Do) ' � 1liiii ILI I % 1;,, La _� nnuunn 80I I- . - uulum �r!o* I _ 11111111111 rf,!d!11 T ilwa_ < 0.5Do ,..- _ -_- - I .. ' 1uuu1 i.lrrnlr P i--- ---- - --- i- mum '�trioiri'. ��1 1 III ,, d Pir'li!111' \� IlEll1 IS111d1 Ir • a ! _ I___ d7goi I/I' ' p(\ _ 411111i►,11� .a rIII, '<1\\' 60 1� — I ._ i or IP;r:il; ''I OHM 111117 —1 //,III!iP111 1 III gar _ 1�I1 r _ - h. 'nlrlra •. . , uuu Ven - - =-bill _ -- - y ri:lrn ,, iimm ut<` 5 -I 1 11�■ • ■ 6 •�1 it muumuu' u \� I_ ��%���' III�I111111111111111111� `n `h —_ iIIIh111111111111111111■ \v` I - 3 r • 111111111■IIIIII:1111111•ll 1 11111111111111 IU!:,1 4 40 • + 1 '"ate ,�4�;�1� 111111 l 0 ,,mnl �!■, I�IIIIIIII ilPJIII1■F . - of I�Iuuuu AMA MI I 4 � � �■ Ilrluulnl IfinU,iludw ��nn .% I 1 . 11�1111111111111111JV.111it _9. 1 - 1-_` r ' 1 AN■gi IIr1111111 Imp:warp I _ +--_-- -I a} - iU - 4■■■ III ICI 4.•nJIII III!d t 1 _, I 1 ■■ 1 1 i111JIP':iIp I �� }d '--,-. il__I ■■ .!Illlllp'r rt1111,1114 20 �111 � I m� s 1.5 /; .�r..1III� I 1 ■■ ICI hIIIII111Oli�ill, 111JI11/ 3 ���ll _ , -/� I I- ■ 1 I�IIIIIl dl 11 I,' �■ri ' :i- ° T 11111111 I-- 'Paa'li'siim . ��,�' Mil ■ a7. �-v nlili ..1 --'� I an d11;111i1Vi��� rt ■ / i 1�illlll!i111/11:Ilill�i' ' N0 ��� l_ �lr_► III;IIIII,IIIilitif. •�O 2 I —�� /,- r/ IIIIIiI/vIGV�IIIi _I LL ,,' � 1111Iv:";A:11:11!:]IIIII�I E■l � — I �� I: r=��'�41iii;i•l!11G11111 iiimi V. IRi/I:dII S 114111111111I11110 IZ — -} v= I'' rp i�►I' 1�/illl:dlllllllllllllllllll■ .I III_ In, ,O.j/ '-II; •JiiIr;v i�lunnulnuumuuu oC 11E, .—,__ -- - V=V ```a Ar ,; ,I4digir !Du immunium111i11111 ui 1/' ._ 1 nmluuul unuuuu 18 �/l��"• +, �1 1 IDOIIi1OIOiHOP" I 11 1 t v o 15 /t'� -t- I 5 I I1. • 1 , I I • . I III .I. ! ; i ii_: • I.. !ll •Ill;i 0 3 5 10 20 50 100 200 500 1000 Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). Rev.12/93 8.06.3 A-30 Appendices Q = 8.41 CFS 10' D50 = 0.4 DMAX = 0.6 4.5' 12' THCKNESS = 1.0 3o . , . I11 l I,!: 1 l I .1I. Outlet W = Do + La 90 `im iin I I III i,pipe ;uulluul'1 diameter (Do) I. . " iliil1iri111I 1 I 80 uu111111 l • or,r I L —+1 no m r;!dsii La I I T mom ,f�!irnM►I T ilwater < 0.5Do I-_ '-- min Nfrrn'1r i-------- - --- �- 1111111 'aaii°11i11r, I �� _ — rilllll�►.11! .a II 't Ppt 60 _. _ . -�_ I• iiril1111II1 iiir ?:r :YI - O /.i111!in rl 4,l • II■ egg - r_ y 4 argil i 11111■ �� ,i MI nm1■ J� 1 Mil -- - 6 •//i� r rnil�auuum■ • \(� 54 -+ I ,, ',� IIIIi1111111I111111 �� _ . -I--` '_% Ld' I!rl�l�IIIIIIIIIIIIIIIIIIC - —h" - I yliedAia W dun,un■ ul uuu■ . IIIIIIIIIIIIIlIIllIm111Ri 111111111111111 IU!;/ 4 40 + 1 1 I iisr—rs�uuuullu DA.,,lulr uualu , el,uurl I .1 V. ` i uuuull iiius nu4 • k_ - � :�■ I 1 111111111 I f 11111',1111Pnl l �n I -- , ,%'i /1� �■■ IIIIII IIIIII lllt'iIP'i I �.11 MI I_ --- ' 1- ,� Sri mmll 16 Irnnam�IIIE 74 .• III ■I �- - 1� .��'' 'd ill WIUrr is IIIIIII ■:I �� }d .,.�/ il_ rl!II.0/111rauI:111,■ 20 IIIIIII mum ■.I �� s 15 /-:/ 1 mu 1 pliilllrOr'illlr IIId1I, IIIIIII r�llltt■■"111� - , �,/�' I •-- — IIIIIII'l 11! $.4i 3 mini rr ■ 2 / ' %W5,,1111' ° e''1 IIIIIII■■� ■ r �/_�" l� I-I -- - �1111111M id � � _ — / Ij;l�ll�''ItiJ ,Dli,�� 10 IIIIIII N�•Snr!.i ► r ^ IIIIII.�■� co1r _ I '.. %�'/i';�r�' IIIrOr'.n: I '.' �S,iitllll �� I'. %�•'�II?III! P. mem IIIIIII ��' Mil = -_ i% ii!:;, II;IIIi1Vd IIIIIII��� _ / i r lllll!111r/11:I1',11, , N 0 �11111111�M�� 1■ 1-- �! IIII;rlllrllri1�511! 2 immi IIIIIII a = _�, -4� I�� IV;IIIII:II:IRIV, r. Nom IIIIIII mini. OM --- 1 /111111;,Iriri;,iI.�11■ MEM IIIIIII um _ _ / •r� iiiii5lin: /1!:a11111■ a ME IIIIIII�0 i �' �P lII'drit!IIIIIIIII III■ CZ r IIIIIIIEll i // /_� I; I• I IIIIIII 1 �1 T _ 25,— �" ��II dl.Ilillllllllll III■ Q } V= %iI /'rlIl:,IIII1111III1111I111■ E 111111 - .f I11 jjir< �/ J.ilr�i irinunuunuunnum■ ii �■mill v— . .r _ III . - - 'c ik,... +. ni l I 1 1 11111 IIII■ 1 a r c1.15 - �i'� III 1 1 IIII II II■ lv=u ai/i � / 0 3 5 10 20 50 100 200 500 1000 Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). Rev.12/93 8.06.3 EX-FES Appendices Q = 16.73 CFS 20' D50 = 0.6 DMAX = 0.9 9' 23' THCKNESS = 1.5 3 o . , I I it I 1,': I l 1 .�I. Outlet W = Do + La 90� `iiil m I ' III I. 1111111111 1 pipe mull, ! nmlllll� 11 diameter (Do) 80 1 i. iiiiiiiii`i=1i I :n%itil,l La —s1 1 1- . -- ,. nuuuut �r!dsin1 I _ uunuull �f,!�rn�lll�l T ilwa__ < 0.5D0 - -,..- - --- --. _. 1 ' 111111111 Ni1rPlril r�1 1_ I 1111111 'I:11Ar7i 11 a\` - I1111 IAPIsn ffur a ;al ilra!dI , .a 11 plot — -_� _ - - -, '5ii:111tIdr'. !III 111 P osk 60 I — '. _ _ 1 •r:vsnn r.oi '1 •v1111, mum eng ; _- r- y r i;ua1 s um�1 � ',1 roi, • nnu�11 51 6 •Ai Aril aiiimu l \\(�J - -- _- _11111M1 + ', I Illtlllllllllllllll II�� , I '% Ld' I!li i'11111111111111t111111—�-- - -- I Q a M e1UIru1111t11111IIt111■Ir - _I 74i 11111111111111t111:111111.n, f / 111111111111111 1r!i11/ 40 ` _+— - 1 - A i=►�.��r/I�mmullu or.,,U11ra 4 F uumu ', el,uurul 4 ..��' mmilu J A:Uenu7lr 111111111 11111115111111/111 ��nn '�% 1 �� 111111111111r1111Nr!,d�1/ 3Y. 'I - L AlliIi 11111111 1r11r'e11I11l111P �� ill 1 1r"irr�Ir, I - _ il_ lli/111!M u1111,1■rA III•■•• -I }di:id l :� 1 1,1i111ua��,nlr Iue1r,11 20---- 11 — �r�' • .7. .!�� _ ��IIIIIII,I,11�"b�Y 13 Mill li 10 11■�UI... .� — — _ i-- / ,r"'d11S1Uilr1 AI a) 0 -111111•111:1111111111111111 _ -1---- ''',[ MI 4'r-Oraro- • ,ev.aellE * I!, — ��� r / • .rllirilln1911i11.i • 11 2 N ��� I �! IIII;IIIII,IIIiI!ll! 11 /.i11111,1Ir/i.;;.] IIImI IMI MO —=EN -'--- _I - A.....- �tllur:,^,;A.11.11.: IIIIAt11 i %rllVidr�t!IIIIIIIII IIIr11 ' P7 : 1V1111i1ri1111111111�IIIm11 I .} Vai = Xiirfir �—il /'d1ISd11111111111111IIIIm11 - - — —_-- `` 111_ i�'. ��r1r—� �Iimnnulnumuuuum }-- L. • �� 1111111IIIIIIIIIIIIIIIIIIIIII cc '-` - ------- V_V , /I j•0 l 11111111111111111111111111■II O � IIIIIIIIIIIIII Iluuuumll � 1�./ �.1i %� Inul 11 1 ul1u ■II 1 — I- j V o�15 - Joe III 1 111111111111111101II�II v = 5sll�� 11 -II 1, .'�l1II- 0 3 5 10 20 50 100 200 500 1000 Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). Rev.12/93 8.06.3 Phase I - Sediment Basin A 4.400 Disturbed Area (Acres) 10.692 Peak Flow from 10-year Storm (cfs) 7920 Required Volume ft3 4651 Required Surface Area ft2 48.2 Suggested Width ft 96.4 Suggested Length ft 42300 Actual Volume ft3 Okay 14610 Actual Surface Area ft2 Okay 30 Trial Weir Length ft 1 Trial Depth of Flow ft 90.0 Spillway Capacity cfs Okay 2 Skimmer Size (inches) 0.167 Head on Skimmer(feet) 1.25 Orifice Size (1/4 inch increments) 2.68 Dewatering Time (days) Suggest about 3 days Stage Storage Yoe-me Table Cortege Bev Contour Ana... Ynaemetal OWN w) Avg.bid A±w haemeAal Vol (alit) Avg End Asa CumAilve Vol.bu_R) Corte ksemaaal Vol.OLIO Corte Qamiabve Vol.b a.R) 755 000 427153 N/A N/A 0 00 WA 0.00 755 000 9.301.90 0-000 0 00 0 00 000 0 CO 756 000 1277.40 1.000 5289 65 5289 65 4675,45 4675 45 756 000 10.567.86 0_000 0 00 5289 65 0.00 4675.45 757 000 11.846.94 1000 1120740 16497 05 11201.31 15876 77 758 CO3 13.174,37 1.000 12510 65 29007 71 12504.78 2838155 759.000 14.610.53 1000 13892 45 4290015 13886.26 42267 81 Phase I - Sediment Basin B 1 2.400 Disturbed Area (Acres) 5.832 Peak Flow from 10-year Storm (cfs) 4320 Required Volume ft3 2537 Required Surface Area ft2 35.6 Suggested Width ft 71.2 Suggested Length ft 38609 Actual Volume ft3 Okay 7580 Actual Surface Area ft2 Okay 30 Trial Weir Length ft 1 Trial Depth of Flow ft 90.0 Spillway Capacity cfs Okay 2 Skimmer Size (inches) 0.167 Head on Skimmer(feet) 1 Orifice Size (1/4 inch increments) 2.29 Dewatering Time (days) Suggest about 3 days stage storage Mc-.rt x, Costa,Bev Cmfar hea. Inavndd Dew ft l Avg End kea fwemerfd Vol la+.ft) Avg End lima Cunleeve Vol lou ft) Conc h+aemertal Vol lou ft) Cars Cunletne Vol.leu.*) 751 000 3297 52 WA WA 0 00 WA 0 00 752 000 4.148 71 1 000 372311 372311 3714 98 3714 98 753 000 5.056 45 1000 4602 58 8325 69 459510 8310 08 754 000 6.020 75 1 000 5538 60 13864 29 5531 59 1384167 755 000 7,04160 1000 6531 18 20395 47 6524 52 2036619 756 000 8,11900 1000 7580 30 27975 77 7573 91 2744010 757 000 13,44121 1 000 1078010 38755.87 10668 90 38609 00 757 000 9252.95 0 000 0 CO 38755 87 0 CO 38609 00 Phase I - Sediment Basin C 2.000 Disturbed Area (Acres) 4.860 Peak Flow from 10-year Storm (cfs) 3600 Required Volume ft3 2114 Required Surface Area ft2 32.5 Suggested Width ft 65.0 Suggested Length ft 4667 Actual Volume ft3 Okay 2413 Actual Surface Area ft2 Okay 20 Trial Weir Length ft 1 Trial Depth of Flow ft 60.0 Spillway Capacity cfs Okay 2 Skimmer Size (inches) 0.167 Head on Skimmer(feet) 1 Orifice Size (1/4 inch increments) 1.91 Dewatering Time (days) Suggest about 3 days Stage Storage Volume Table Contour Elev... Contour Area... hcremetal Depth fft) Avg.End Area Incremental Vol.(cu.ft) Avg.End Area Cumulative Vol.(cu.ft) Conic Incremental Vol.(cu.ft) Conic Cumulative Vol.(cu.ft) 754.500 825.00 N/A N/A 0.00 N/A 0.00 755.000 1.044.00 0.500 467.25 467.25 466.18 466.18 756.000 1.532.57 1.000 1288.28 1755.53 1280.49 1746.67 757.000 2.078.54 1.000 1805.55 3561.09 1798.63 3545.30 757.500 2.413.03 0.500 1122.89 4683.98 1121.85 4667.16 757.500 4.748.16 0.000 0.00 4683.98 0.00 4667.16