Loading...
HomeMy WebLinkAboutNCC232370_ESC Approval Submitted_20230809 ./13"..---,% ROY COOPER .t,.. t Gosernor (�` ,,.:4. 1 ) ELIZABETH S.BISER w Secretary (ibc,�`° " "�•' DOUGLAS R.ANSEL NORTH CAROLINA Intel m Director Environmental Quality July 27, 2023 LETTER OF APPROVAL WITH MODIFICATIONS Duke Energy Carolinas, LLC Attention: Kevin Mason, Sr. Transmission Permitting Manager 526 South Church Street Charlotte,North Carolina 28202-1006 RE: Project Name: Sweetwater Ret Tap Hickory B &W 100kV Relocation Project ID: CATAW-2024-002 Acres Approved: 10.13 County: Catawba City: Hickory Location: 11 th Avenue SE River Basin: Catawba Stream Classification: Other Submitted By: Duke Energy Carolinas, LLC Date Received by LQS: Jul 25, 2023 Plan Type: New Dear Mr. Mason: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3)years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNO1) form requesting a Certificate of Coverage (COC)under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNO1 form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: jNorth Dme of E Quality I D of Energy, and D '��� MooresvilleCarolina Regionalepart Officent 1610nvironmental East Center Avenueualit ,Suiteivision 301 1 MooresvilleMineral,North CarolinaLand 28115Resources NORTH CAROLINA oecaro�em of EnmronmenNI fl I7 704.663.1699 Letter of Approval with Modifications Duke Energy Carolinas, LLC July 27, 2023 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land- disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, A`tuk#P ?t ` i Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section ZSK/cys Enclosure: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c: Inspection Department ec: Duke Energy Carolinas, LLC Attention: Neal Cary Neal.cary@duke-energy.com Letter of Approval with Modifications Duke Energy Carolinas, LLC July 27, 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Sweetwater Ret Tap Hickory B &W 100KV Relocation Project ID: CATAW-2024-002 County: Catawba Reviewed by: Zahid S. Khan 1. Avoid temporary stream crossings when possible. Attempt to complete the proposed construction separately on each side and leave natural buffer zones along the streams. Employ appropriate measures to ensure protection of streams and other water bodies (see section 6.70 of the Erosion and Sediment Control Planning and Design Manual). 2. Before the initiation of any construction related activity, revise the Financial Responsibility/Ownership Form to include the deed book and page numbers of all properties in the project tract and submit copies of these property deeds. Provide a copy of the final utility easement agreement or the landowner's signed and dated written consent for the applicant to submit a draft erosion and sedimentation control plan and to conduct the anticipated land disturbing activity. 3. Local government and other agencies may have additional requirements apart from 404 permitting and 401 certifications. Before the initiation of any construction related activity, submit all copies to this office of any water quality certifications,buffer authorizations, or related permitting necessary to complete the proposed construction. 4. Additional measures may be required- The applicant is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115]