HomeMy WebLinkAboutSW1221002_Supplement-EZ Form_20230804 SUPPLEMENT-EZ COVER PAGE FORMS LOADED I PROJECT INFORMATION 1 Project Name Greater Asheville Regional Airport Terminal Modernization 2 Project Area(ac) 43.29 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 0 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 1 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Nathan Hudgens,PE 28 Organization: Gresham Smith 29 Street address: 222 2nd Ave S,STE 1400 30 City,State,Zip: Nashville,TN 37201 31 Phone number(s): 615-770-8155 32 Email: nathan.hudgens@greshamsith.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer 7-17‘ SEAL v•• = Signature of Designer •a 053149 EE • �,Nf►�liltt �\\\\\\\\ 08/02/2023 Seal Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 Dry Detention Pond 4 Type of SCM 1 5 Total drainage area (sq ft) 1885521 243790 6 Onsite drainage area (sq ft) 1885521 243790 7 Offsite drainage area (sq ft) 0 0 8 Total BUA in project (sq ft) 1493266 sf 215541 sf New BUA on subdivided lots (subject to permitting) 9 (sq ft) N/A N/A New BUA not on subdivided lots (subject to 10 permitting) (sf) 11 Offsite BUA (sq ft) N/A N/A 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) 66637 sf 15502 sf - Sidewalk (sq ft) 26625 sf 15899 sf I - Roof(sq ft) 175456 sf 126462 sf - Roadway(sq ft) 71727 sf 15645 sf - Future (sq ft) N/A N/A - Other, please specify in the comment box below (sq ft) 1152821 sf 42033 sf New infiltrating permeable pavement on 13 subdivided lots (sq ft) N/A N/A New infiltrating permeable pavement not on 14 subdivided lots (sq ft) N/A N/A Existing BUA that will remain (not subject to 15 permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 391479 sf 18 Percent BUA 79% 88% 19 Design storm (inches) 2.2 in _ 20 Design volume of SCM (cu ft) 19394 cf Simple Method for 21 Calculation method for design volume Runoff Volume ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): 1,152,821sf of impervious area includes airside general pavement for maintenance, access, and airplane taxiways. 42,033 sf of impervious area added on the airside of the airport is routed to the dry detention pond. DRY POND 1 Drainage area number 1-3& 1-4 2 Minimum required treatment volume (cu ft) 17597 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? No 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 3:1 Does the SCM have retaining walls, gabion walls or other 6 No engineered side slopes? 7 Are the inlets, outlets, and receiving stream protected from erosion Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? N/A 13 If the SCM is on a single family lot, does (will?)the plat comply with N/A General MDC (10)? 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes DRY POND MDC FROM 02H.1062 18 SHWT elevation (fmsl) 2095.35 19 Elevation of the bottom of the dry pond (fmsl) 2114.1 20 Distance from bottom to SHWT (feet) 13 ft 21 Elevation of the temporary pool during the design storm (feet) 2120 ft 22 Ponding depth of the design storm (feet) 6 ft 23 Will the dry pond be uniformly graded to flow toward the outlet? Yes 24 Is a low flow channel being provided? No 25 Are the inlet(s) and outlet located in a manner that avoids short- Yes circuiting? 26 Will berms or baffles be provided to increase the flow path? No 27 What method of pretreatment will be provided? Forebay 28 Design volume of SCM (cu ft) 19394 29 Diameter of drawdown orifice (in) _ 2 in 30 Drawdown time for the temporary pool (hours) 40 31 Does the pond minimize impacts to the receiving channel from the 1- Yes yr, 24-hr storm? 32 Is there a small permanent pool near the orifice to prevent clogging? No 33 Will the outlet be designed to prevent clogging? Yes 34 Are the dam and embankment planted in non-clumping turf grass? Yes 35 Species of turf that will be used on the dam and embankment KY Fescue at 5 Ibs/1,000sf 36 Will trees and shrubs be prevented from growing on the dam and Yes embankment? _ ADDITIONAL INFORMATION Please use this space to provide any additional information about the 37 dry pond(s): Dry Pond 1 6:13 PM 8/2/2023