Loading...
HomeMy WebLinkAboutSW8220519_Historical File_20220630Burd, Tina J From: Burd, Tina J Sent: Thursday, June 30, 2022 2:26 PM To: swarmuth@nhcgov.com; kcaison@nhcgov.com; ramoore@mckimcreed.com Subject: SW8 220519 - Blue Clay Road Business Park Attachments: SW8 220519 - Blue Clay Road Business Park.pdf The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) completed their review of the Express Stormwater Permit Application for the subject project. Attached is the cover letter and permit issued on June 30, 2022 that will be mailed separately, along with any other supporting documents. Please direct any questions to your reviewer. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance & Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from INS address is subject to Me North Carolina Public F?GCOFds Law and may be disclosed to lb rd pailies. Website: http:/Ydeg.nc.jzov/about/divisions/enerev-mineral-land-resources/stormwater Based on the current guidance to minimize the spread of COVID-ig, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public.. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. Edmonds, Jessica From: Edmonds, Jessica Sent: Monday, June 27, 2022 3:08 PM To: kcaison@nhcgov.com; swarmuth@nhcgov.com;jboyd@withersravenel.com Cc: Hall, Christine; Sams, Dan Subject: New Hanover County Emergency Logistic Center - Blue Clay Road Business Park Al I, An offsite permit application package was received for New Hanover County Emergency Logistic Center as an offsite to Blue Clay Road Business Park. New Hanover County is listed as the applicant for Blue Clay Road Business Park as well as the subject project. This would suggest that the project should be submitted as a modification to Blue Clay Road rather than as an offsite. However, if there is a reason to have an offsite permit, it should be noted that Blue Clay Road Business Park is not currently proposing subdivided and deed restricted lots, so it is not currently set up for an offsite permit application to be submitted without a modification to Blue Clay Road. Additionally, Blue Clay Road Business Park is currently in review and the permit has not been issued at this time. Thanks, Jessica Edmonds, El Environmental Engineer Division of Energy, Mineral, and Land Resources — State Stormwater Program North Carolina Department of Environmental Quality Office: 910 796 7215 Direct: 910 796 7344 Email: iessica.edmonds(ZDncdenr.aov Address: 127 Cardinal Drive Ext. • Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disa'osed to third parties. Edmonds, Jessica From: Edmonds, Jessica Sent: Monday, June 27, 2022 2:59 PM To: swarmuth@nhcgov.com; kcaison@nhcgov.com; Richard (Rick) A. Moore Cc: Weaver, Cameron Subject: Second request for additional info - Blue Clay Road Business Park - SW8 220519 All, Thank you for the submittal. Everything looks good, there is just one minor item that needs to be address: 1. The supplement appears to have been updated in Rows 2 and 4 on the cover page as well as the following columns on the drainage area supplement: entire site, wet pond 4, and untreated; however, sections IV.4, IV.7, and IV.10 of the application were not updated. Please ensure this information is presented consistently across all application documents. The above item can be submitted via email and I will print it for the file. I will begin drafting this permit so it will be able to be issued ASAP upon receipt of these items. Please let me know if you have any questions or concerns. Thanks! Jessica Edmonds, El Environmental Engineer Division of Energy, Mineral, and Land Resources — State Stormwater Program North Carolina Department of Environmental Quality Office: 910 796 7215 Direct: 910 796 7344 Email: iessica.edmondsCcDncdenr.aov Address: 127 Cardinal Drive Ext. Wilmington, NC 28405 DEQ �s Email correspondence to and fro;n this address is subject to thF North Carolina Public Rr eords Law and may be disclos E d to third parties. vM"KIM&cREEv DELIVERED TO: NCDEQ — Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 ATTENTION: Jessica Edmonds WE ARE SENDING: ® Originals ® Prints ❑ Specifications ® Calculations LETTER OF TRANSMITTAL DATE: June 21, 2022 PROJECT NO: 00494-0039 TASK NO: 19 RE: Blue Clay Road Business Park Express Stormwater ReSubmittal TRANSMITTAL NO: 1 of 1 -7 PAGE 1 OF 1 ❑ Shop Drawings ❑ Samples ❑ Other — Quantity Drawing No. Rev. Description Status EXPRESS STORMWATER RESUBMITTAL 2 Revised Supplement, Revised O&M Agreement (Page 4) G 2 Revised Blue Clay Road Business Park Permit Drawings G 2 Revised Drainage Area Map 2 Revised Calculations G issue Status erode: A. Preliminary B. Fabrication Only C. For Information D. Bid E. Construction F. For Review & Comments G. For Approval H. See Remarks Action Status Code: 1. No Exceptions Taken 2. Make Corrections Noted 3.Other 4. Amend & Resubmit 5. Rejected - See Remarks REMARKS: PDF of the Supplement EZ emailed to Tessica.edmonds@ncdenr.gov 243 NORTH FRONT STREET, WILMNGTON. NC 28401 (910) 343-1048 FAX (910) 251-8282 cc File, McKim & Creed, Inc. w/enc McKIM & CREED, Inc. ,FIFE Signe*Richard A. Moore, PE Regional Manager v MgOW&CREED ENGINEERS SURVEYORS PLANNERS June 21, 2022 M&C 00494-0039 (40) Jessie Edmonds, Environmental Engineer North Carolina Department of Environmental Quality 127 Cardinal Drive Ext. Wilmington, North Carolina 28405 RE: Request for Additional Information — Stormwater Project No. SW8 220519 Blue Clay Road Business Park New Hanover County Dear Ms. Edmonds: 9 EC� 212022 This submittal. is in response to comments received on June 14, 2022 regarding the application and submittal packages for the above referenced project. Most of the comments pertaining to the calculations were unfortunately errors in our spreadsheet. Thank you for catching them so that they don't get copied'saved in any future projects. They have been corrected and the revised information is included herein. The comments below have not been edited and were retyped or cut and pasted to the extent practical to ensure they accurately reflect the letter provided. 1. 15A NCAC 02H.1042(2)(g)(iv): A. Curb and gutter appears to be proposed along the road crossings over the surface water. Please ensure this curb and gutter extends at least the full length of the vegetated setback to support that the BUA is collected and treated (ex: Logistics Way) and please ensure all the curb and gutter has the label shown on the plans (ex: plan sheet 26). Response: Curb and Gutter has been revised to extend the full length of 243 North Front Street the vegetated setback. Curb and Gutter has been labeled on the plans. Wilmington, NC 28401 B. Please confirm that the bypassing BUA has been minimized to the extent possible and will not negatively impact the adjacent property. Response: The only bypassing BUA is located on Logistics Road heading towards Juvenile Center Road. The proposed BUA runoff is directed 910, 343.1 048 towards a low wet depressional area in the powerline easement. All other BUA is to be captured and directed to a proposed SCM. Fax 9 i 0.251 .�282 g¢ �p,�+�, r�..w.:rckimrr<ed com { Ms. Jessie Edmonds June 21, 2022 2. 15A NCAC 02H.1053(1): A. SCM 2 and SCM 3 grading shows the elevation of the permanent pool extends into the inlet swales. Please clarify whether the surface area for the permanent pool elevation in the calculations includes the surface area in the swale at this elevation. Response: The permanent pool calcualtions for SCM 2 and SCM 3 did not include the swale surface area. B. For SCM 1, the first page of the calculations lists the provided permanent pool surface area as 74,122 sf, however, this value is reported as 78,973 sf in the stage storage table. This discrepancy is noted in all four SCM calculations. Please confirm the permanent pool surface area is reported consistently in the calculations as well as Row 26 of the wet pond supplement for all SCMs. Response: The calculations for each SCM have been revised and the correct permanent pool surface areas are reported in the calculations as well as Row 26 of the wet pond supplement for each SCM. - --'15A NCAC 02H.1053(3): The volume of the main permanent pool for SCM 1 is reported as 212,896 cubic feet in the calculations and supplement, however, this appears to be consistent with a pond that has a sediment storage elevation of 25 instead of the proposed sediment storage elevation of 24. This discrepancy is noted for all main pools of the four SCMs. Please confirm the sediment storage elevation for the main pool is reported consistently across the application documents including the calculations, supplement, 0&M, and plans. Response: The calculations for each SCM have been revised and the correct sediment storage elevations are reported in the calculations, supplement, O&M and plans for each SCM. 4. 15A NCAC 02H.1053(5): A. Row 32 for SCM 4 of the wet pond supplement lists the forebay volume as 11,616 cubic feet, however, the calculations report 11,799 cubic feet. Please confirm and ensure this value is reported consistently cross the application documents. Response: The calculations for each SCM have been revised and the correct forebay volumes are reported in the calculations and supplement for each SCM. B. With the information provided in the calculations, the multiple forebay calculation for forebay 1 of SCM 3 appears to be at 14.1%. Please confirm the multiple forebay calculations are correct given the provided drainage areas and main pool volume and ensure that the forebays are designed to be between 15-20% for their respective drainage areas. MCIQM&CREED Ms. Jessie Edmonds June 21, 2022 Response: The calculations for each SCM forebay have been revised and the correct forebay volumes are reported in the calculations and supplement for each SCM. 5. 15A NCAC 02H.1003(3)(a): A. For SCM 3, the temporary pool elevation is considered to be the next available outlet. The calculations list this elevation as either 32.5 ft, however, the overflow structure detail lists this elevation as 32.25 and the cross section detail lists this elevation as 32. Please confirm the elevation of the temporary pool and the resulting provided storage volume and ensure it is represented consistently across all application documents. Response: The temporary pool elevation for SCM 3 is 32.50 ft. There is a weir that was left off of the outlet structure detail. This has been updated in the calculations, the overflow structure detail, and the cross section. B. For SCM 3, the orifice is reported as 6 inches in the supplement and 8 inches on the pond overflow structure detail on the plans (labeled pond 1 overflow structure). Please ensure the orifice size is reported consistently across all application documents. Response: The orifice size for SCM 3 is 6 inches and has been updated on the overflow structure detail, the supplement and in the calculations. C. For SCM 4, the supplement reports the permanent pool is set at 28 ft with a 2 inch drawdown orifice, however, the Pond Overflow Structure detail (which appears to accidentally be labeled Pond 1 Overflow Structure), shows a weir at elevation 28.75. Please ensure the permanent pool drawdown orifice is represented consistently across the application documents. Response: The permanent pool elevation for SCM 4 is 28.0'. The temporary pool elevation is 28.75' and the drawdown orifice is 2.5". These value have been updated and reflected in the application documents. 6. 15A NCAC 02H.1050(4): Row 45 of the supplement reports that water does not flow out of the forebay in a non -erosive manner. It appears that the forebays are all set to be 0.5 feet below the permanent pool elevation according to the cross- section details, however, the grading shows the forebay berms at the permanent pool elevations. Please ensure the grading and the cross section detail for all SCMs are consistent. If the berms are set at or below the permanent pool elevation, please confirm if the response to Row 45 of the wet pond supplement should be Yes. 4: MCKIM&CREED Ms. Jessie Edmonds June 21, 2022 Response: The grading has been revised to reflect the 0.5' difference between top of forebay and permanent pool elevation. Forebay Weir Calculations for each SCM Forebay have been provided with this resubmittal showing non -erosive velocities across the forebays. Response to Row 45 of the wet pond supplement changed to "yes". 7. 15A NCAC 02H.1053(11)(b): The vegetated shelf shall be planted with a minimum of three diverse species of herbaceous, native vegetation at a minimum density of 50 plants per 200 square feet of shelf area. Please provide a citation of where the density supported on the plans to ensure that the minimum density will be met. Response: The detail provided represents 63 plants per 240 square feet of shelf area. The minimum density required (50 plants per 200 square feet) equals 60 plants per 240 square feet. Therefore, the minimum planting requirements have been meet / exceeded. 8. 15A NCAC 02H.1050(4): Please provide engineering calculations demonstrating that the inlets of the SCMs will be designed to protect the SCM from erosion resulting from stormwater flow into the SCM during the peak flow from the 10- year storm event or a citation of where this can be located. Response: Engineering Calculations are provided with this resubmittal. 9. 15A NCAC 02.1042(2)(a)(iv), .1003, and 1050(1): Please ensure the drainage area information is consistent across section IV.10 of the application and the drainage area map. Response: Drainage Area Map has been revised and included with this resubmittal. 10. 15A NCAC 02H.1042(h)(ii): Please provide a cross section of the proposed swale(s) in the plan set. Response: Cross Section of the proposed swales provided on Sheet CE502/ Detail 1 and Sheet CE503/ Detail 4 which are included in this resubmittal. 11. Recommendation 1, Chapter C-3. Wet Pond: Row 48 of the wet pond supplement notes that the pond does not drawdown below the permanent pool surface. However, in looking at the pond details and outlet structures, they both proposed a turned -down elbow to allow the water to drawdown from below the permanent pool surface. Based on the proposed design, please re -consider the response to Row 48 of the wet pond supplement. Response: Response to Row 48 of the wet pond supplement revised to 'YES" due to turned -down elbow. v� M&CREED Ms. Jessie Edmonds June 21, 2022 12. 15A NCAC 02H.1042(2): In addition to mailing a hard copy of the revised Supplement-EZ, please email a pdf of the supplement form to the email address provided below so that it can be preserved electronically per the regulatory requirements. Response: A pdf of the Supplement-EZ form will be emailed to the addressed provided. 13. N.C.G.S.143-214(c3): If the project is within 5 statute miles of a public airport, the Division cannot require the use of a BMP with a permanent pool of water. A copy of the permit will be forwarded to the airport's director who may elect to adjudicate the permit if the applicant has chosen to use a BMP with a permanent pool of water. Response: Understood. 14. Due to the potentially minor nature of these comments, the express additional information review fee has been waived. Response: Noted. Thank you. If you have any questions, please do not hesitate to contact me at our office 910- 343-1048. Sincerely, c Creed, Inc. Ri and A. Moore, PE Regional Manager Cc: File, 00494-0039(40) A r r 2550 a� b �'��y, 7di,t AV4f�Ti `v MCKIM&CREED ROY COOPER Gevmw 1 Z M S.'NSM nw-tay BRIAN WRENN Mvctor June 14, 2022 Via email only: swarmuth Alec-em.com New Hanover County Attn: Sara Warmuth, Chief Facilities Officer 230 Government Center Drive, Suite 190 Wilmington, NC 29403 NORTH CAROL04A Subject: Request for AddWonal Information Stormwater Project No. SWS 220519 Blue Clay Read Business Park New Hanover Cuamty Dear Ms. Warmuth. The Wilmington Regional Office received and accepted a Express State Stonmwater Management Permit Application for the subject project on May 26, 2022. A preliminary to -depth review of that information has deteimmned that the apphc ation is not complete and that addib almfonnadonisneededL To continue the review, please provide the following additional information in a dude, bard cony submittal package. 15A NCAC 02H.1042(2)(gxiv): a. Curb and gutty appear to be proposed along the road crossings over the surface ureter. Please ensure this curb and gutter extends at least the full length of the vegetated setback to support that the BUA is collected and treated (sic: Logistics Way) and please ensure all the curt and gutter has the label shown on the ply (ex: plan sheet 26). li. Please confirm that the bypassing BUA has been minimized to the extent possible and will not negatively impact the adjacent property. 15A NCAC 02H.1053(1). SCM 2 and SCM 3 grading shows the elevation of the permanent pool extends mto the inlet swales. Please clarify whether the surface area for the permanent pool elevation m the calculations includes the surface area m the Swale at this elevation. XFor SCM 1, the first page of the calculations lists the provided permanent pool surface area an 74,122 sf, however, tins value is reported as 78,973 sf in the stage storage table. This discrepancy is noted in all four SCM calculations. Please confirm the permanent pool surface area is reported consistently in the calculations as well as Row 26 of the wet pond supplement for all SCMs. 15A NCAC 02H.1053(3). The volatne of the mean permanent pool for SCM 1 is reported as 212,896 cubic feet in the calculations and supplement, however, this appears to be consistent with a pond that has a sediment storage elevation of 25 instead of the proposed sedimeW storage elevation of 24. This discrepancy is noted for all main pools of the four SCMs. Please confirm the sediment storage elevation for the main pool is reported consistently across the application documents including the calculations, supplement. O&M, and plans. 15A NCAC 02H.1053(5): �. d. Row 32 for SCM 4 of the wet pond supplement lists the forebay volume as 11,616 cubic feet, however, the calculations report.11,799 cubic feet. Please confirm and ensure this value is reported consistently cross the application documents. With the uifm=tion provided in the calculations, the multiple forebay calculation for forebay 1 of SCM 3 appears to be at 14 1 %. Please confrm the multiple forebay calculations are correct given the provided drainage areas and main pool volume and ensure that the forebays are designed to be between 15-20% for their respective drainage areas. .� Ai@rFi1 'OgRB t�t[�. Qf 1=A11R0f�i!'�1 Chi � .ZiIYiSK�l7 Of �JgN*�4. t'8� end �4H'>±t"Y WIMPWO" ona i Offlrr IV (Zi7dtrtW Drive Extension ., WflmbWm North Canift 2a4o5 State Stormwater Permit No. SW8 220519 Page 2 of 3 I5A NCAC 02H. 1003 (3)(a): For SCM 3, the temporary pool elevation is considered to be the next available outlet The calculations list this elevation as either 32.5 ft, however, the overflow structure detail lists this elevation as 32.25 and the cross section detail lists this elevation as 32.. Please confirm the elevation of the temporary pool and the resulting provided storage volume and ensure it is represented consistently across all application documents. b. '. For SCM 3, the orifice is reported as 6 inches in the supplement and 8 inches on the pond overflow structure detail on the plans (labeled pond 1 overflow structure). Please ensure the orifice size is reported consistently across all application documents. c- For SCM 4, the supplement reports the permanent pool is set at 28 ft with a 2 inch drawdown orifice, however, the Pond Overflow Structure detail (which appears to accidentally be labeled Pond 1 Overflow Structure), shows a weir at elevation 28.75. Please ensure the permanent pool drawdown orifice is represented consistently across the application documents. ,if • . 15A NCAC 02H.1050(4). Row 45 of the supplement reports that water does not flow out of the forebay a� in a non -erosive manner. It appears that the forebays are all set to be 0.5 feet below the permanent pool elevation according to the cross-section details, however, the grading shows the forebay berms at the permanent pool elevations. Please ensure the grading and the cross section detail for all SCMs are consistent. If the berms are set at or below the permanent pool elevation, please confirm if the response to Row 45 of the wet pond supplement should be Yes. y�.T 15A NCAC 02H.1053(11)(b) The vegetated shelf shall be planted with a minimum of three diverse species of herbaceous, native vegetation at a minimum density of50 plants per 200 square feet of shelf area. Please provide a citation of where the density supported on the plans to ensure that the minimum density will be met. i 15A NCAC 02H.1050(4): Please provide engineering calculations demonstrating that the inlets of the SCMs will be designed to protect the SCM from erosion resulting from stormwater flow into the SCM during the peak flow from the 10 year storm event or a citation of where this can be located. 9. 15ANCAC 02.1042(2)(a)(w), .1003, and 1050(1): Please ensure the drainage area information is consistent across section IV.10 of the application and the drainage area map. 15A NCAC 02111042(h)(ii): Please provide a cross section of the proposed swale(s) in the plan set. Recommendation 1, Chapter C-3. Wet Pon.: Row 48 of the wet pond supplement notes that the pond does not drawdown below the permanent pool surface. However, in looking at the pond details and outlet structures, they both proposed a turned -down elbow to allow the water to drawdown from below the permanent pool surface. Based on the proposed design, please re -consider the response to Row 48 of the wet pond supplement. 11. 15A NCAC 02H.1042(2).- In addition to mailing a hard copy of the revised Supplement-EZ, please email a pdf of the supplement form to the email address provided below so that it can be preserved electronically per the regulatory requirements- N. C.G. S. 143-214(c3). If the project is within 5 statute miles of a public airport, the Division cannot f require the use of a BW with a permanent pool of water. A copy of the permit will be forwarded to the airport's director who may elect to adjudicate the permit if the applicant has chosen to use a BUT with a permanent pool of water. 4. Due to the potentially minor nature of these comments, the mMms additional information review fee has been waived. Please remember to confirm that any revised information is presented consistently throughout the application documents including calculations, supplements, narrative, and plans. Please also remember to provide two hard copies of any updated documents per 15A NCAC 02H.1042(2). Nw7�'di Garv>�a r;�artrr�nt of �++rnearal �t�� '. Ditr�n rjf �c+ergp: and tar5d N� JwW W u*Vton Rtgignal Cerise 1 127 Cardinal Drupe Extension I W l ningYon, Nurth COok a a~r ,""� Sto,746 7215 State Stormwater Permit No. SW8 220519 Page 3 of 3 All of the requested information listed alcove should be received in this Office by Jime 21, 2022, or the application will be returned as incomplete. If additional time is heeded to submit the requested information, please email your extension request prior to this clue date to the email address provided below with a justification and a date of when the requested information will be submitted, which shall be no later than 5 business days past the original due date. Please remember that extension requests delay the issuance of the final permit. Also, please note that only two letters requesting addaawnal information is allowed in the State Stormwater Program. If the information is not satisfactorily provided der the second request, the project will be returned If the project is returned and you wish to re -submit to the Express Program, you will need to reschedule the project through the Express Coordinator for the next available review date and will need to resubmit all required items at that time, including the application fee. The construction of any impervious surfaces. other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "Express" and reference the State assigned project number on all correspondence. If you have any qm. tions eonc ng this matter, please feel free to call me at (910) 796-7215 or email me at jessica.edmonds@ncdenr.gov. Sincerely, f 44a a Jessie Edmonds Environmental Engineer DES/jme: \\\5tormwaterTermits & Projects\2022\220519 HD\2022 06 addmfo 220519 ce: Richard Moore, PE; McKim & Creed Inc.; via email ramoore a cbmereed. Eom W mmgtm Regional Office Stoanwates File ,t � `forth Carolina Dtpwtmeor of Envhwuwrktal Quplity ; taMWon oP£nergy,'vlinf --al and land Aesourc" Wfimington 900maiflPfice 127 Ordinal Drive FxctenOon I Wtimingtom North Garo6na 2W5 i d am', 910.7%.7215 Edmonds, Jessica From: Edmonds, Jessica Sent: Tuesday, June 14, 2022 4:42 PM To: swarmuth@nhcgov.com; kcaison@nhcgov.com; Richard (Rick) A. Moore Cc: Weaver, Cameron Subject: Request for additional info - Blue Clay Road Business Park SW8 220519 Attachments: 2022 06 addinfo 220519.pdf All, Attached is a pdf of the request for additional information for the subject project. Please let me know if you have any questions or concerns. Please also remember to label any packages submitted with "EXPRESS". Thanks! Jessica Edmonds, El Environmental Engineer Division of Energy, Mineral, and Land Resources State Stormwater Program North Carolina Department of Environmental Quality Office: 910 796 7215 Direct: 910 796 7344 Email: !essica.edmonds@ncdenr.gov Address: 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 6/2/22, 2:01 PM Facilities Management - the model of good governance - New Hanover County - North Carolina NEW. HANOVER COUNTY Staff NHCGov.com > Staff ) Facilities Management FACILITIES MANAGEMENT 1 wantto: i��3��t W Preserving the past maintaining the present and building the future of New Hanover County Facilities Management is a people, customer -oriented department with several disdnct functions. The department's core objective is to provide a safe and hygienic environment for fellow employees, citizens of New Hanover County, and visitors. The department accomplishes this through: 1. An efficient use of cost and energy 2. A computer generated work request system for routine, preventive and emergency maintenance Facilities Management also oversees the construction, renovation and repair of county buildings and facilities. Sara Warmuth Chief Facilities Officer Phone: (910) 798-4336 Fax: (910) 798-7830 Contact Biography Julia Laeombard Deputy Chief Facilities Officer Phone: (910) 798-4333 Contact Kevin Caison Facilities Project Manager Phone: (910) 798-4338 Contact Scott Gordon Administrative Supervisor Phone: (910) 798-4334 Contact Cesar Moya Equipment Shop Supervisor Vehicle Management Phone: (910) 798-4323 Contact Ryan Kondor Facilities Maintenance Superintendent Phone: (910) 798-4342 Contact Jyll Gartin Equipment Shop Administrative Technician Phone: (910) 798-4320 Contact Chris Clayton Detention Center Trades Supervisor Phone: (910) 798-4349 Contact Tina Lovingood Inventory Control Specialist Phone: (910) 798-4337 Contact Paul Prince Fiscal Support Technician Phone: (910) 798-4335 Contact Adele Doty Administrative Technician Phone: (910) 798-4395 Contact -A-4 y' .J <iLr VY, hftps://www.nhcgov.com/staff/facilities-management/ 1 /2 6/2/22, 2:01 PM Facilities Management - the model of good governance - New Hanover County - North Carolina Facilities Management: 200 Division Drive • Wilmington, NC 28401 • Phone 910-798-4330 • Fax 910-798-7830 ARIII the model of good governance HUMAN SERVICES SAFETY CHILDREN FIRST QUALITY OF PLACE LIBRARY CAREERS EDATA & RECORDS ADMINISTRATION ECONOMIC VITALITY COUNTY CALENDAR LAND USE NEWS BUSINESS WITH NHC CONTACT US FORMS & APPLICATIONS EMPLOYEE PORTAL DEPARTMENTS Privacy Statement - Accessibility https:/twww.nhcgov.com/staff/facilities-management/ 2/2 6/2/22, 1:43 PM Administration & County Manager - the model of good governance - New Hanover County North Carolina NEW HANOVER COUNTY Administration & County Manager the model of good governance NHCGov.com > Administration & County Manager T. _ _-----_ Am Alligh I want to: OC)IV QD ,, ,C Here in New Hanover County, the community, elected officials and county staff cooperate to balance a high quality of life with a progressive business and economic climate. Our Vision At less than 200 square miles, New Hanover County is the second smallest - geographically - ofthe 100 North Carolina counties; however, it is home to more than 225,702 people. Board of Commissioners New Hanover County is not just a great place In which to live or visit. New Hanover County is also a great place to do business. Tourism, film production, the service and retail sectors are the engines that power our economy. Our Mission: New Hanover County is committed to providing equitable opportunities and exceptional public services through good governance to ensure a safe, healthy, secure and thriving community for all. The government of New Hanover County is committed to ensuring that you are safe, healthy and secure; that is our promise to you. County Manager Chris Coudriet New Hanover County Manager Chris Coudriet serves as chief administrator of county government and maintains responsibility for administering all departments under the general control of the five -member Board of Commissioners. The county managers work includes the development of the countys annual County Manager Staff 2018-2023 Strategic Plan Government Center Redevelopment Healing Place of New Hanover County Free County Wi-Fi Initiative County News budget. The budget is the policy document, financial plan, and operations guide and communications device of county government. It reflects the countys NACo Prescription response to the needs of the community and residents' requests for services. New Discount Program Hanover Countys government is operating on a $458 million multi -fund budget for the fiscal year beginning July 1, 2021 and ending June 30, 2022, serving more than 225,000 residents. In addition, the manager and his executive leadership team are responsible for aligning the operations of the county to the adopted strategic plan and advancing the county's mission and vision through five key focus areas: superior education and workforce, superior public health and safety, intelligent growth and economic development, strong financial performance, and effective county management. Mr. Coudriet has served as the county manager since July 2012. Prior to his appointment, he served as assistant county managerfor New Hanover County for four years and as county manager in Franklin and Washington counties, N.C. He has more than twenty-five years of public administration experience, with fifteen years as a county manager or assistant county manager in North Carolina. He holds a Bachelor of Science Degree in Urban and Regional Planning from East Carolina University and a Master's Degree in Public Administration from the University of North Carolina at Pembroke. Mr. Coudriet currently serves in several leadership positions with the National Association of Counties (NACo), including vice -chair ofthe Public Health and Healthy Communities Subcommittee and vice -chair of the Resilient Counties Advisory Board. He is also a member of NACo's Information Technology Standing Committee and the International Economic NACo Health and Dental Discount Program 141A. Y L G L 22 i BY: hftps://www.nhcgov.com/administration/ 1/5 NEW HANOVER COUNTY OFFICE OF THE COUNTY MANAGER 230 GOVERNMENT CENTER DR STE 195 WILMINGTON, NORTH CAROLINA 28403-1732 TELEPHONE (910) 798-7I84 FAX (910) 798-7277 August 31, 2015 Mr. Dean Hunkele Senior Environmental Specialist NC DENR — Division of Water Resources Water Quality Regional Operations Section 127 Cardinal Drive Extension Wilmington, NC 28405 Email: dean.hunkelg@gcdenr.gov Dear Mr. Hunkele: CHRIS COUDRIET, ICMA-CM County Manager AVRM M. PMER, CPA Dgmty County Manager TIM BURGESS Assistant County Manager I understand that New Hanover County has pending permits with the Department of Envh mnent and Natn vl Resources and would like our Facilities Project Manager to sign the applications on the County's behalf. The following is his contact information: Kevin Caison Facilities Project Manager New Hanover County Property Management 200 Division Drive Wilmington, NC 29401 Phone: 910-798-4338 Fax:910-798-7830 Email: kcaisonLa nhcgov.com I hereby delegate signatory authority to Kevin Caison to sign for water and sewer and stormwater permits on behalf of New Hanover County. Sincerely, maw Chris Coudriet County Manager BLUE CLAY ROAD BUSINESS PARK NEW HANOVER COUNTY, NC STORMWATER NARRATIVE Prepared for: COUNTY OF NEW HANOVER 230 Government Center Drive, Suite 195 Wilmington, NC 28403 Prepared by: V 243 North Front Street Wilmington, NC 28401 (910)343-1048 �`�� Project #00494-0039 (40) 1;* May 2022 - 025503y I A..�+�'a� ECEIV MAY 2 6 2 22 8Y� BLUE CLAY ROAD BUSINESS PARK STORMWATER NARRATIVE Table of Contents DESIGN NARRATIVE I. EXISTING SITE II. PROPOSED IMPROVEMENTS III. STORMWATER CONTROL MEASURE (SCM) IV. CONCEPTUAL MASTER PLAN ATTACHMENTS - SUPPORTING INFORMATION A. USGS QUAD MAP B. SCS SOIL SURVEY MAP C. CALCULATIONS D. HYDRAFLOW MODEL RESULTS E. ECS SOILS REPORT F. WETLANDS JURISDICTIONAL DETERMINATION G. PROPERTY DEED H. COPY OF APPROVED PERMITS Design Narrative - I. Existing Site The proposed 120.0-acre development, known as Blue Clay Road Business Park, is in New Hanover County, 2.0 miles northeast of the intersection of N. Kerr Avenue (SR 1322) and Blue Clay Road (SR 1318). This development will consist of commercial properties, open space, and public streets. This development consists of approximately 95 acres of commercial development. The remaining 25 acres consisting of wetlands and will remain undeveloped. The existing site is undeveloped farmland and woods with vegetation that is primarily row crops with crop residue, woods, wetlands, and understory growth. A copy of the USGS quadrangle map is attached indicating project vicinity and general drainage patterns in the area. The New Hanover County SCS Soil Survey (copy attached) indicates the underlying soils within the project area predominantly, Leon Sand (Le), Murville Fine Sand (Mu), Pantego loam (Pn), Stallings fine sand (St), Torhunta loamy fine sand (To), and Wrightsboro fine sandy loam (Wr). The Hydraulic Soil Group Classifications are B/D, A/D, B/D, C, C, and C respectively. The project site is in the Cape Fear River Basin and drains to Prince George Creek. According to the latest surface water classifications published by NCDEQ Prince George Creek is classified as C;Sw. Prince George Creek Drains to the North East Cape Fear River (B; Sw, Index -No. 18-74- (47.5)) as illustrated on the attached USGS Topo Map. Wetlands do exist within the site boundary with approximately 0.5 acres to be disturbed. Wetland impact permitting is being performed by Land Management Group. These efforts are currently underway. The wetlands have been delineated and are represented on the attached drawings. The site does not drain to ORW designated waters; is not within 1h - mile of and draining to SA classified waters; and is not within 1-mile and draining to HWQ designated waters. II. Proposed Improvements The proposed improvements are consistent with most business park developments. The basic improvements proposed at this time consist of the construction of roadways with shoulder and ditch cross section, water and sewer utilities, and treatment systems (consisting of four wet detention ponds) to allow for the construction of future buildings and parking lots. The systems ultimately drain to the North East Cape Fear River via wetlands and Prince George Creek. III. Stormwater Control Measure (SCM) The proposed project will be permitted as high density utilizing four (4) wet detention ponds. The proposed water quality SCM's are sized to treat, at a minimum, the first 1.5-inch of runoff from the contributing drainage areas in accordance with the MDCs for SCMs and specifically, C-3 Wet Pond. Post development peak discharge is less than pre -development peak discharge for the analyzed storm events (See Tables Attached). A water surface elevation table s�a�t�ta+ �hei as well. A a SEAL 025503 ��rah Q aaaa ayroail� H i iisaa�a Post -construction a small section of Logistics Road will have untreated stormwater runoff. Approximately 4,840 square feet of road will sheet flow north of Logistics Road, through vegetated areas in the CFPUA utility and Duke Power easements towards existing wetland/ponds. While their purpose is unknown, they do appear to be manmade since they do not show up on the USGS Topographic Map. The section of road that will remain untreated is only the northern half (inbound travel lane). Reasons this area can't be collected/treated include: • NCDOT is going to take over ownership of the roads, they do not want to superelevate this road section to collect the runoff on the southern side. They prefer not to superelevate any roads however they did allow us to do this on Triumph Drive to avoid untreated water on that section. This also helped us avoid RPW impacts and grading outside of an existing right of way. • The natural ground on the northern side of Logistics Road falls away from the road therefore grading in a ditch is not feasible. We would be chasing grade and getting too deep to allow the runoff to flow to an onsite SCM. Also, excavation would be required through the CFPUA utility easement which contains a 16" water main. Any excavation in this easement would require relocating that water main deeper in the ground. Table 1- Rooting Summga Ppak Ylkirharaa (43/cl a+ Pmiurf niv#4.11. SCMS RETURN EVENT 2-YR 10-YR 25-YR SCM 1 PRE -DEVELOPMENT 44.96 95.12 133.52 POST -DEVELOPMENT 45.95 103.05 121.68 SCM 2 PRE -DEVELOPMENT 21.29 44.29 61.83 POST -DEVELOPMENT 12.34 46.23 57.45 SCM 3 PRE -DEVELOPMENT 53.68 122.61 176.55 POST -DEVELOPMENT 23.43 100.77 177.39 SCM 4 PRE -DEVELOPMENT 15.27 33.51 47.59 POST -DEVELOPMENT 8.44 32.35 41.68 UNTREATED PRE -DEVELOPMENT 0.77 1.694 2.41 POST -DEVELOPMENT 1.85 3.009 3.83 TOTALS PRE -DEVELOPMENT 135.89 297.00 421.38 POST -DEVELOPMENT 85.83 278.95 399.40 ATTACHMENT A - USGS QUAD MAP Q y ATy�Hgv '�w i� r' ` 2y--�- � �p, f �C \ 132 4 cc 'j1n1� L p / " 46 _ 3 Skippers / Cairner.; !,, •L MADE �'; Su gyp; BLUE CLAY ROADy % 51DB�RY (tD` BUSINESS PARK `,. ��J 02 . g ^' • A HERMITAGE RD W ♦ � CFO n s 01 oZ �• .ai[. . ' � 1tP m 0 _ - - — -u6- _ QP0 l-P TIt to 132 �0 TL Norch se 1 0.o / 1 -ae ice,. slue Clay Farms 0 , i 99 BLUE CLAY ROAD BUSINESS PARK 2�3 NorM Front Street Phone (910)343-1048 . Fa. (at0)=-8M2 U/S�G�S��ENL_ARGEiyM/yE/�N/�T 11 /15/2021 No "M Ile. F-Im I WALL- 1 sw 2000' ATTACHMENT B - SCS SOIL SURVEY MAP 3 S O a 0 Z CL C Z w 0 W J CL m OL O. E 12 Q 0, N w CL E m L T 7 w o O w cq m LO O L l�py U1 >O Z C0_7 ` U) N 1U 0 0 L U) 0 0 O I co c O Em o m- E a ,F O c N N c E 'E E $7 0 wa 12 O �Y p h U) m N a) 7 0 0 O E N •O m E W L UOj O O (1 :E U) CO U7 a C 0 N 0 12 CO U L •: O > Z f0/1 ) Y C Nl 0 a L LP) it 0 Z +: U7 'O0 U) O N 3 U E y L� U) E 0 L1J w N p 00`7 W. ❑ C 3N m U) L i`coo N C n w U) om U 0 0• Ud) i; O. O Q L T U) m 16 w o_ y0y Y 3 C yU a o ma aE C 0 U) 0 C C AL > N N) p E >. U) w N CD a 0 L) w -0 m o :° 0 Cn .0 0 0 a) cn 0) CL u— a r = 'y a m a w -pZ2w ac VC Z y� oCd0 EL UZ .O NY O.O OOU) 7 T 0 N N 3 C 0 U7 0 O 7` T O 0 C L C M E O. E 0 0 C E N 0 E 0 Q� U) 8 O U) 0 2 Q 7 0 O.O U) W O U) t a a O U) 3 CO y CO y. H C > 0' U) 7 T fA U) 0 O E O v O � 01 p 'Q U) C m m U) N �a p p U) p a�:o m U) O w Q L yL-. •O 0 •O � N N _ 10f0 U) � E w 9 U 2 a� Q U) H O to w to— ❑ N pE H U 9 w w N w O C T L m m o. G. U- U L N w w a o m w w o, cU m C >` c 2 w a N n CO J N UI .d. O O L Q a y m E 'o a m w L $ m m In w :R i O w > w AO w S m •o Q c at aoo$a LL wtm 3 m w 0 O Orn w w G. Q N = C :� o c o w a Y a w c CL aw w g CL CL �CL'm a aO oCL CL LLJ m wc)oii L N � C -Ad r- 'a Lu O O O m C:2 d Q w w w •Q m m U U (7 U' J J '2 d C✓ w w w to fq w d c w "c t>j sae,' ' a0 07 � 2 N 00 N N Of N oa m 'o ZU � m w .Z _ CO 0 01 U a USa� 0 D O U rC O m Z Soil Map —New Hanover County, North Carolina Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI Le Leon sand 0.4 0.3% Mu Murville fine sand 10.3 8.0% Pn Pantego loam 22.0 17.2% St Stallings fine sand 33.0 25.8% To Torhunta loamy fine sand 55.0 43.1 % Wr Wrightsboro fine sandy loam, 0 to 2 percent slopes 7.0 5.5% Totals for Area of Interest 127.7 100.0% USDA Natural Resources Web Soil Survey 10/19/2021 e1iiiiiii Conservation Service National Cooperative Soil Survey Page 3 of 3 ATTACHMENT C - CALCULATIONS ATTACHMENT C - CALCULATIONS SEAL 02550 A `,4`boe ECEIVElft ��y 8 2 i ✓ BY: Blue Clay Road Commercial Park NCDEQ Retention Requirements Wet Pond - I Site Data Total DA ;e •. G �'1F Value from CAD On -Site Drainage Area A,", R, E Value from CAD Off -Site Drainage Area �'a - ACRE Value from CAD Impervious iL.fs ACRE Value from CAD Buildings s SF Value from CAD Sidewalks : s 16 Value from CAD Streets .-> s, • SF Value from CAD Parking •..qe SF Value from CAD Curb and Gutter m;: •; Value from CAD Future.: Value from CAD Offsite SF Impervious Cover 70.00% Impervious Lover -(Impervious Drainage Area)/(Total Drainage Area)*100% Treatment Volume Runoff Coefficient,Rv 0.680 IN/IN Rv=0.05+0.009*(%Impervious) Required 1.5" Runoff Volume 98,424 CF 1.5 inch*Rv*lftt/12 in*(Total DA) Provided Treatment Volume E-17 CF Volume between permanent pool & next -highest orifice Stormwater Pond Bottom of Pond Elevation - Main Bay JiF T Value selected by designer Bottom of Pond Elevation - Forebay Sediment Storage Elevation - Main Bay F I Fr Value selected by designer Sediment Storage Elevation - Forebay Sediment Storage Volume CF Pond volume below sediment storage elev. Permanent Pool Elevation F T Value selected by designer Temporary Pool Elevation FT Elevation of the next -highest outlet Submerged Vegetated Shelf Width FT Max Depth of Vegetated Shelf FT Perimeter of Permanent Pool FT Main Bay only Average Depth Provided FT See formula below Required SA/DA Ratio for 90%TSS Removal 'A Value from 90% TSS removal chart Required Permanent Pool Surface Area G.9„4.�2 SF (Req'd SA/DA Ratio) *(Total Drainage Area) Provided Permanent Pool Surface Area SF Value from stage -storage calculations Forebav Permanent Pool Volume s •� _ j Total pond volume between permanent pool elevation & sediment storage elevation Total Required Forebay Volume S,54A F 20% of permanent pool volume Provided Volume - Forebay 51,520 CF Provided volume between permanent pool elev. & sediment storage elevation Total Forebay % of Permanent Pool 18.55% Total between 15 - 20% - OK Drawdown Diameter of Low Flow Orifice v,;? 4A Value selected by designer Weir Elevation of Outlet Structure FT JrT Elevation of the next -highest weir Total Elevation Head Above Weir Invert Total elevation head above renter of orifice Average Elevation Head Above Weir Invert S FT 1/3 of total elevation head Cd, Coefficient of Discharge .;' i Value selected by designer Q Flowrate Through Low -flow Orifice lA7 CFS Q=Cd*Weir Area *sgrt(2*32.2*Avg Head) Drawdown Time 2.41 DAYS 1.5" Runoff Volume/Flowrate through Wler/86400 1:100494\0039\PDNR120-Tech124-Discipline Design DocumentabonlStormwater%SCM-11Wet Detention Pond- 1 _00494-0039 Sizing_2022.01.05.xis Blue Clay Road Commercial Park Stage -Storage Calculations for the Proposed Wet Detention Pond Wet Pond 1 Stage/Storage Above Permanent Pool Cumulative Contour Incremental Volume, S Contour. Area (SF) Volume (CF) (CF) 28.00 101,025 0 0 Permanent Pool 28.50 107,011 52,009 52,009 29.00 110,026 54,259 106,268 •-Temporary Pool 30.00 116,098 113,062 219,330 31.00 122,226 119,162 338,492 32.00 128,411 125,319 463,811 32.25 129,966 32,297 496,108 Top of Pond Capaity Stage/Storage Below Permanent Pool Main Bay Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 23.00 60,558 0 0 Pond Bottom 24.00 63,358 61,958 61,958 �Sed. Storage 25.00 66,187 64,773 126,731 26.00 69,046 67,617 194,347 27.00 71,936 70,491 264,838 27.50 74,122 36,515 301,353 •1opotrorebay 28.00 78,973 38,274 339.626 -vermanent Noo) Forebay - Total Forebay 1 Forebay 2 Contour Area (SF) Volume (CF) Volume, S (all units are SF) 23.50 1,671 0 0 739 932 24.00 12,928 3,650 3,650 4orebay Bottom 5,802 7,126 25.00 14,453 13,691 17,340 +Sed. Storage 6,613 7,840 26.00 16,039 15,246 32,586 7,452 8,587 27.00 17,678 16,859 49,445 8,320 9,358 27.50 18,966 9,161 58,606 +Top of Forebay 8,990 9,976 28.00 22,050 10,254 68,860 Permanent Pool 10,490 11,560 Contributing DA (SF) 578,967 578,967 Ratio of Pond Volume (CF) 138,834 138,834 Required Forebay Volume (CF) 27,767 27,767 Provided Forebay Volume (CF) 24,116 27,404 Total Forebay % of Permanent Pool 17.37% 19.74% Stage/Storage Below Permanent Pool Total (Main Bay+Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 23.00 60,558 0 0 +Pond Bottom 23.60 1,671 15,557 15,557 24.00 76,286 19,489 35,047 25.00 80,640 78,463 113.510 26.00 85,085 82,863 196,372 27.00 89,614 87,350 283,722 27.50 93,088 45,676 329,391 -Top of Forebay 28.00 101,023 48,528 377,925 -Top of Perm Pool I:\00494\0039\PDNR\20-Tech\24-Discipline Design Documentation\Stormwater\SCM-1\Wet Detention Pond-1_00494-0039 Sizing 2022.01.05.xls Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Pond 1 - Forebay 1 (10-yr) Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 50.00 Total Depth (ft) = 0.50 Side Slope (z:1) = 3.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 51.52 Depth (ft) 1.00 0.50 -0.50 - Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (fUs) Top Width (ft) Pond 1 - Forebay 1 (10-yr) Thursday, Jun 16 2022 = 0.48 = 51.52 = 24.69 = 2.09 = 52.88 I I 0 5 10 15 20 25 30 35 40 45 50 55 sn Rr, Depth (ft) WHIR 0.50 -0.50 Weir — W.S. Length (ft) Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Pond 1 - Forebay 2 (10-yr) Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 146.00 Total Depth (ft) = 0.50 Side Slope (z:1) = 3.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 51.52 Depth (ft) 1.00 0.50 e �� -0.50 - Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (fUs) Top Width (ft) Pond 1 - Forebay 2 (10-yr) Thursday, Jun 16 2022 = 0.24 = 51.52 = 35.21 = 1.46 = 147.44 0 10 20 30 60 70 80 100 110 120 130 150 15n 17n 40 50 90 140 Depth (ft) 1.00 0.50 M -0.50 Weir W.S. Length (ft) Blue Clay Road Commercial Park NCDEQ Retention Requirements 1Net Pond - 7 Site Data Total DA ERE Value from CAD On -Site Drainage Area. �:FE Value from CAD Off -Site Drainage Area a1E Value from CAD Impervious a. F 'A ;11' b'F , Value from CAD Buildings 4.NfF ValuefromCAD Sidewalks SF Value from CAD Streets "c Value from CAD ParkingSF Value from CAD Curb and Gutter Valuefrom CAD Future aF' Value from CAD Offsite SF Impervious Cover 70.00% Impervious Cover -(Impervious Drainage Area)/(Total Drainage Area)*100% Treatment Volume Runoff Coefficient, Rv 0.680 IN/IN Rv=0.05+0.009*(%Impervious) Required 1.5" Runoff Volume ) i,F 1.5 inch*Rv*lftt112 in*(Total DA) Provided Treatment Volume Yi ` ,, Volume between permanent pool & next -highest orifice Stormwater Pond Bottom of Pond Elevation - Main Bay FT Value selected by designer Bottom of Pand Elevation - Forebay FT Sediment Storage Elevation - Main Bay FT Value selected by designer Sediment Storage Elevation - Forebay FT Sediment Storage Volume CF Pond volume below sediment storage elev. Permanent Pool Elevation FT Value selected by designer Temporary Pool Elevation FT Elevation ofthe next -highest outlet Submerged Vegetated Shelf Width a•, FT Max Depth of Vegetated Shelf i •t• - FT Perimeter of Permanent Pool FT Main Bay only Average Depth Provided FT See formula below Required SA/DARatio for 90% TSS Removal `-=:"-c .;:,' Value from 90% 73S removal chart Required Permanent Pool Surface Area 22,473 Sr (RLOSA/DA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area o'---'4 -. SF Value from stage -storage calculations Forebay Permanent Pool Volume TK; =Icr Total pond volume between permanent pool i elevation & sediment storage elevation Total Required Forebay Volume Z7,&E� TF 20% of permanent pool volume Provided Volume - Forebay 25,216 CF Provided volume between permanent pool elev. & sediment storage elevation Total Forebay % of Permanent Pool 18.12% Total between 15 - 20%- OK Drawdown Diameter of Low Flow Orifice Value selected by designer Weir Elevation of Outlet Structure -' FT Elevation of the next -highest weir Total Elevation Head Above Weir Invert 1" Total elevation head above center of orifice Average Elevation Head Above Weir Invert FT 113 of total elevation head Cd, Coefficient of Discharge Value selected by designer QFlowrateThrough Low -flow Orifice 0A7 CFS Q=Cd*Weir Area *sgrt(2*32.1*Avg Head) Drawdown Time 2.98 DAYS 1.5" Runoff Volume/Flowrate through Wier/86400 1:100494100391PDNRt20-Tech124-Discipline Design DocumentationXStormwater%SCM-21Wet Detention Pond-7_00494-0039 5izing_2022.01.05.xis Blue Clay Road Commercial Park Stage -Storage Calculations for the Proposed Wet Detention Pond Wet Pond 2 Stage/Storage Above Permanent Pool Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) C8.00 52,820 0 0 Permanent Pool 28.50 56,220 27,260 27,260 29.00 57,941 28,540 55,800Temporary Pool 30.00 61,420 59,681 115,481 31.00 64,953 63,187 178,667 32.00 68,538 66,746 245,413 32.25 69,442 17,248 262,660 Top of Pond Capaity Stage/Storage Below Permanent Pool Main Bay Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 23.00 29,631 0 0 Pond Bottom 24.00 31,237 30,434 30,434 Sed. Storage 25.00 32,873 32,055 62,489 26.00 34,537 33,705 96,194 27.00 36,230 35,384 131,578 27.50 37,519 18,437 150,015 *1 op or roreoay 28.00 40,832 19,588 169,603 -rermanent rooi Forebay - Total Forebay 1 Forebay 2 Contour Area (SF) Volume (CF) Volume, S (all units are SF) 23.50 458 0 0 227 231 24.00 5,453 1,478 1,478 Forebay Bottom 1492 3961 25.00 6,492 5,973 7,450 -Sed. Storage 1852 4640 26.00 7,590 7,041 14,491 2242 5348 27.00 8,745 8,168 22,659 2660 6085 27.50 9,649 4,599 27,257 Top of Forebay 2992 6657 28.00 11,986 5,409 32,666 Permanent Pool 3792 8194 Contributing DA (SF) 156022 364051 Ratio of Pond Volume (CF) 48,709 90,460 Required Forebay Volume (CF) 9,742 18,092 Provided Forebay Volume (CF) 7,607 17,609 Total Forebay % of Permanent Pool 15.62% 19.47% Stage/Storage Below Permanent Pool Total (Main Bay+ Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 23.00 29,631 0 0 Pond Bottom 23.50 458 7,522 7,522 24.00 36,690 9,287 16,809 25.00 39,365 38,028 54,837 26.00 42,127 40,746 95,583 27.00 44,975 43,551 139,134 27.50 47,168 23,036 162,170 --Top of Forebay 28.00 52,818 24,997 187,166 -Top of Perm Pool 1:100494100391PDNR120-Tech124-Discipline Design DocumentationlStormwaterlSCM-21Wet Detention Pond-2_00494-0039 Sizing_2022.01.05.x!s Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Pond 2 - Forebay 1 (10-yr) Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 37.00 Total Depth (ft) = 0.50 Side Slope (z:1) = 3.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 16.18 Depth (ft) 1.00 0.50 MM -0.50 Highlighted Depth (ft) Q (cfs) Area (sgft) Velocity (ft/s) Top Width (ft) Pond 2 - Forebay 1 (10-yr) Thursday, Jun 16 2022 = 0.27 = 16.18 = 10.21 = 1.58 = 38.62 Depth (ft) 1.00 0.50 iM -0.50 Weir W.S. Length (ft) Weir Report Hydraflow Express Extension for AutodesM Civil 3D® by Autodesk, Inc. Pond 2 - Forebay 2 (10-yr) Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 166.00 Total Depth (ft) = 0.50 Side Slope (z:1) = 3.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 30.05 Depth (ft) 1.00 0.50 e �� -0.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Top Width (ft) Pond 2 - Forebay 2 (10-yr) ZU ZfU bU tsU 1UU 120 140 160 180 Weir W.S_ Thursday, Jun 16 2022 = 0.16 = 30.05 = 26.64 = 1.13 = 166.96 Depth (ft) 1.00 0.50 W1 -0.50 200 220 Length (ft) Blue Clay Road Commercial Park NCDEQ Retention Requirements Wet Pond - 3 Site Data Total DAx C R E Value from CAD On -Site Drainage Area _ ', , - ACHE Value from CAD Off -Site Drainage Area ; q.���a J�CF Value from CAD Impervious 2714 ACRE Value from CAD Buildings SF Value from CAD Sidewalks Value from CAD Streets r` rz4. 'F Value from CAD Parking '.ra .. Value from CAD Curb and Gutter Value from CAD Future �. • S-F Valuefrom CAD Offsite.. IMF Impervious Cover 70.00% Impervious Cover -(Impervious Drainage Area)/(Total Drainage Area) *100% Treatment Volume Runoff Coefficient,Rv 0.680 IN/IN Rv=0.05+0.009*(%Impervious) Required 1.5" Runoff Volume i�4,d � 'F 1.5 inch*Rv*lftt/12 in*(Total DA) Provided Treatment Volume �� f_`s7, CF Volume between permanent pool & next -highest orifice Stormwater Pond Bottom of Pond Elevation - Main Bay ` I FT Value selected by designer Bottom of Pond Elevation - Forebay F I Sediment Storage Elevation - Main Bay FT Value selected by designer Sediment Storage Elevation - Forebay J PT Sediment Storage Volume 1C> Pond volume below sediment storage elev. Permanent Pool Elevation ;JF i Value selected by designer Temporary Pool Elevation _ •.rF �_� Elevation of the next -highest outlet Submerged Vegetated Shelf Width ! FT Max Depth of Vegetated Shelf Perimeter of Permanent Pool I FT Main Boy only Avpraep npnth Prnvidpd - FT See formula below Required SA/DA Ratio for 90%TSS Removal % Value from 90% 755 removal chart Required Permanent Pool Surface Area 70,40e SF (Req'd SAIDA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area"'t `: F Value from stage -storage calculations Forebay Permanent Pool Volume Ti,•` ' CF Total pond volume between permanent pool elevation & sediment storage elevation Total Required Forebay Volume iC',6,d! Cif 20% of permanent pool volume Provided Volume - Forebay 66,947 CF Provided volume between permanent pool elev. & sediment storage elevation Total Forebay % of Permanent Pool 17.47% Total between 15 - 20%- OK Drawdown Diameter of Low Flow Orifice IN Value selected by designer Weir Elevation of Outlet Structure E�a Elevation of the next -highest weir Total Elevation Head Above Weir Invert rJ I-T Total elevation head above center of orifice Average Elevation Head Above Weir Invert FT 113 of total elevation head Cd, Coefficient of Discharge71177.7 ' Value selected by designer a Flowrate Through Low -flow Orifice 0-GAI CFS Q=Cd*Weir Area*sgrt(2*32.2*Avg Head) Drawdown Time 2.73 DAYS 1.5" Runoff Volume/Flowrate through Wier/86400 1:10049410039%PDNR120-Tech124-Discipline Design DocumentationXStormwater%SCM-31Wet Detention Pond-3_00494-0039 Sizing_2022.01.06.xls Blue Clay Road Commercial Park Stage -Storage Calculations for the Proposed Wet Detention Pond Wet Pond 3 Stage/Storage Above Permanent Pool Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 31.00 132,482 0 0 Permanent Pool 32.00 139,559 136,021 136,021 32.50 141,946 70,376 206,397 •-Temporary Pool 33.00 144,347 71,573 277,970 34.00 149,192 146,770 424,740 35.00 154,094 151,643 576,383 36.00 159,052 156,573 732,956 *-Top of Pond Capaity Stage/Storage Below Permanent Pool Main Bay Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 26.00 87,751 0 0 Pond Bottom 27.00 90,285 89,018 89,018 +-Sed. Storage 28.00 92,849 91,567 180,585 29.00 95,442 94,146 274,731 30.00 98,065 96,754 371,484 30.50 100,051 49,529 421,013 -•iop of rorebay 31.00 104,828 51,220 472,233 -rermanent vooi Forebay - Total Forebay 1 Forebay 2 Contour Area (SF) Volume (CF) Volume, S (all units are SF) 26.50 2,141 0 0 1345 796 27.00 17,868 5,002 5,002 -Forebay Bottom 10481 7387 23.00 19,459 18,664 23,666 •-Sed. Storage 11338 8121 29.00 21,110 20,285 43,950 12223 8887 30.00 22,825 21,968 65,918 13139 9686 30.50 24,150 11,744 77,662 -Top of Forebay 13844 10306 31.00 27,654 12,951 90,613 -Permanent Pool 15670 11984 Contributing DA (SF) 1101626 593182 Ratio of Pond Volume (CF) 210,768 172,447 Required Forebay Volume (CF) 42,154 249,090 Provided Forebay Volume (CF) 38,586 28,361 Total Forebay % of Permanent Pool 18.31 % 16.45% Stage/Storage Below Permanent Pool Total (Main Bay + Farebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 26.00 87,751 0 0 -Pond Bottom 27.00 108,153 97,952 97,952 28.00 112,308 110,231 208,183 29.00 116,552 114,430 322,613 30.00 120,890 118,721 441,334 30.50 124,2D1 61,273 502,606 -Top of Forebay 31.00 132,482 64,171 566,777 -Top of Perm Pool I:\00494\0039\PDNR\20-Tech\24-Discipline Design Documentation\Stormwater\SCM-3\Wet Detention Pond-3 00494-0039 Sizing 2022.01.06.xls Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc Pond 3 - Forebay 1 (10-yr) Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 175.00 Total Depth (ft) = 0.50 Side Slope (z:1) = 3.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 56.22 Depth (ft) 1.00 W IX -0.50 Highlighted Depth (ft) Q (cfs) Area (sgft) Velocity (ft/s) Top Width (ft) Pond 3 - Forebay 1 (10-yr) u ZU 4U OU OU 1UU 120 140 160 180 Weir W.S. Thursday, Jun 16 2022 = 0.23 = 56.22 = 40.41 = 1.39 = 176.38 Depth (ft) 1.00 0.50 M -0.50 200 220 Length (ft) Weir Report Hydraflow Express Extension for Autodesk® Civil 3138 by Autodesk, Inc. Pond 3 - Forebay 2 (10-yr) Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 180.00 Total Depth (ft) = 0.50 Side Slope (z:1) = 3.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 46.00 Depth (ft) 1.00 0.50 E "1 -0.50 Highlighted Depth (ft) Q (cfs) Area (sgft) Velocity (ft/s) Top Width (ft) Pond 3 - Forebay 2 (10-yr) Thursday, Jun 16 2022 = 0.19 = 46.00 = 34.31 = 1.34 = 181.14 0 20 i I 22n 120 140 160 180 200 40 60 80 100 ?An Depth (ft) 1.00 0.50 ME -0.50 Weir W_S. Length (ft) Blue Clay Road Commercial Park NCDEQ Retention Requirements Wet Pond - 4 Site Data Total DA a s ACRE Value from CAD On -Site Drainage Area AICRE Value from CAD Off -Site Drainage Area Al -RE Value from CAD Impervious .1151 CRE Value from CAD Buildings r'S,F ValuefromCAD Sidewalks Value from CAD Streets .::+F Value from CAD Parking $ Value from CAD Curb and Gutter F,.. Value from CAD Future SF Value from CAD Offsite JF Impervious Cover 40.00% Impervious Cover -(Impervious Drainage Area)/(Total Drainage Area)*100% Treatment Volume Runoff Coefficient,Rv 0.410 IN/IN Rv=0.05+0.009*(%Impervious) Required 1.5" Runoff Volume IE, FI CF 1.5 inch*Rv*lftt/12 in*(Total DA) Provided Treatment Volume ya CF Volume between permanent pool & next -highest orifice Stormwater Pond Bottom of Pond Elevation - Main Bay FT Value selected by designer Bottom of Pond Elevation - Forebay©� FT Sediment Storage Elevation - Main Bay F I Value selected by designer Sediment Storage Elevation - Forebay FT Sediment Storage Volume CF Pond volume below sediment storage elev. Permanent Pool Elevation FT Value selected by designer Temporary Pool Elevation FT Elevation of the next -highest outlet Submerged Vegetated Shelf Width FT Max Depth of Vegetated Shelf FT Perimeter of Permanent Pool FT Main Bay only Average Depth Provided FT See formula below Required SA/DA Ratio for 90%TSS Removal % Value from 90%T.SS removal chart Required Permanent Pool Surface Area 13,067 SF (Req'd SAIDA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area �,'-' , F Value from stage -storage calculations Forebay Permanent Pool Volume =`7i-I CF Total pond volume between permanent pool elevation & sediment storage elevation Total Required Forebay Volume v&1, 52? CF 20% ofpermonent pool volume Provided Volume - Forebay 16,197 CF Provided volume between permanent pool elev. & sediment storage elevation Total Forebay % of Permanent Pool 17.39% Total between 15 - 20% -OK Drawdown Diameter of Low Flow Orifice r I Value seeded by designer Weir Elevation of Outlet Structure FT Elevation of the next -highest weir Total Elevation Head Above Weir Invert ' "' .' Ff Total elevation head above center of orifice Average Elevation Head Above Weir Invert z T 1,13 of total elevation head Cd, Coefficient of Discharge Value selected by designer Q, Flowrate Through Low -flow Orifice h.FS, CFS Q=Cd*Weir Area *sgrt(2*32.2*Avg Head) Drawdown Time 3.39 DAYS 1.5" Runoff Volume/Flowrate through WierIS6400 1:100494100391PDNR120-Techl24-Discipline Design DocumentationlStorrnwaterlSCM-41WPt Detention Pond-400494-0039 Sizing_2022.05.20-adj .xis Blue Clay Road Commercial Park Stage -Storage Calculations for the Proposed Wet Detention Pond Wet Pond 4 Stage/Storage Above Permanent Pool Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 35,513 0 0 Permanent Pool 72,962 27,119 27,119 73,783 18,343 45,462 -Temporary Pool 74,604 18,548 64,010 77,931 76,268 140,278 81,314 79,622 219,900 84,753 83,033 309 ass «Toe of Pond Capaity Stage/Storage Below Permanent Pool Main Bay Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 23.00 19,590 0 0 Pond Bottom 24.00 20,750 20,170 20,170 +Sed. Storage 25.00 21,936 21,343 41,513 26.00 23,150 22,543 64,056 27.00 24,391 23,770 87,826 27.50 25,021 12,353 100,179 `1 op of rorebay 'R.00 27,402 13,106 113,285 •-rermanent Fooi Forebay - Total Forebay 1 Forebay 2 Contour Area (SF) Volume (CF) Volume, S (all units are SF) 23.50 448 0 0 247 201 24.00 3,235 921 921 Forebay Bottom 1115 2120 25.00 3,987 3,611 4,532 Sed. Storage 1418 2569 26.00 4,809 4,398 8,929 1755 3054 27.00 5,704 5,256 14,186 2127 3577 27.50 6,178 2,970 17,156 +Top of Forebay 2325 3852 28.00 8,111 3,572 20,728 --Permanent Pool 3116 4995 Contributing DA (SF) 174221 261332 Ratio of Pond Volume (CF) 37,246 55,869 Required Forebay Volume (CF) 7,449 11,174 Provided Forebay Volume (CF) 6,001 10,196 Total Forebay % of Permanent Pool 16.11 % 18.25% Stage/Storage Below Permanent Pool Total (Main Bay+Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 23.00 19,590 0 0 Pond Bottom 23.50 448 5,010 5,010 24.00 23,985 6,108 11,118 25.00 25,923 24,954 36,071 26.00 27,959 26,941 63,012 27.00 30,094 29,027 92,039 Top of Forebay 28.00 35,513 32,804 124,843 -Top of Penn Pool I:%00494100391PDNR120-Tech124-Discipline Design Documentation\StormwaterlSCM-41Wet Detention Pond-4_00494-0039 Sizing_2022.05.20-adj As Weir Report Hydraflow Express Extension forAutodesk® Civil 3D® by Autodesk, Inc. Pond 4 - Forebay 1 (10-yr) Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 62.00 Total Depth (ft) = 0.50 Side Slope (z:1) = 3.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 12.46 Depth (ft) 1.00 0.50 M E L Highlighted Depth (ft) Q (cfs) Area (sgft) Velocity (ft/s) Top Width (ft) Pond 4 - Forebay 1 (10-yr) Thursday, Jun 16 2022 = 0.17 = 12.46 = 10.63 = 1.17 = 63.02 Depth (ft) 1.00 0.50 WE -0.50 u b lu 1b 2u 2b 30 35 40 45 50 55 60 65 70 75 80 Weir W.S. Length (ft) Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Pond 4 - Forebay 2 (10-yr) Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 119.00 Total Depth (ft) = 0.50 Side Slope (z:1) = 3.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 18.71 Depth (ft) 1.00 M .,. -0.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Top Width (ft) Pond 4 - Forebay 2 (10-yr) Thursday, Jun 16 2022 = 0.14 = 18.71 = 16.72 = 1.12 = 119.84 I 40 f I 50 I 60 v I 100 I 110 fl I 120 I 130 I 14n isn I 70 I 0 10 I 20 I 30 I 80 I 90 Depth (ft) 1.00 0.50 no 1 -0.50 Weir W.S. Length (ft) u W O O v a 0 Cl a z .a a E a E z 5 d m ❑ n. ID Tr N W ` T is M OD M to n co O V. Y T M O M O A ..cr w N Q w V j C CtCmL C Ol LL 0 2 d d CL CL. ❑ W C c rn rn o)o o v - t mm(D > a❑❑❑o00000 1�i7 2 W H U 7 0 t0 M e � N O W m U o U +K OD - tb CV 2 � .o W r O to W c C Ol CD UNv I t Oc Mo, oi z L � � d a c o 0 0 c c T lL ,o o U N N a co fn fn f- ❑ 2 2 It 0 Q .® z�Zz� OOOOO ry N { U U J J J H HWP W J J 47e U C N _p CD to ul� -UO In O O G J Q' m Iu; r O � CAD N O 7I Mvtt)�st y II �' 0 OaDOaD aO o. c o . o 0 0 0 0 v _ 0 W O t n M O. O 00 ao r N a OD n to N N C r tV r C IU C N Co O N L ML N M M M M ci Co , OOiO-:Nr N M CO M th v co m N N N N N N N N N ry -- oo.=oo v o rs �OOoDoCD M I- m E U Q �- p CL sieAciaitti z x � io c W MaoOoao� � JIM w_ z �- a Q u '6 r .- dd CL w � v ` v c a a 7 0 U a m Z d CO l0 ❑ C 7 d W c 0 .a U 2 a O z E 0 w Y Otry OO W N t0 0 U a LO EEtt a o �.99S 0 wMMta t„g to o to aa,, O I, v Lo LO Q c M —:% E II w ° n v ._ d o V E u z��UUU� gl II� rl fffffim N Y O 0 cn U ry cn L Co cn a c rn M O 4 O O O O Z ff n w arnaoIn� nw ��mc?v �coOR N N M M� M V 0 n w C u o w o w 0• C) L • • 01 0) 0) O LL !] = h G1 O. O. OQ r 0 c c c W 0 0 0 C C �%m 01OO •C �19 Id •{p w w w C, 0 N N N KAMOO-05000 ,r = w WH c N 0 <O M O O Q d w J 0 J U G co m a w c a y m co w c c old U m rn 0 Of dl L O I of m a� °D c LY z to C O L;- iD o gw LL a c 0 m o O O U CL C c w .0 o U cncnco o =_ J J J J 0000 Z Z Z Z 0000 co m UUUU w w w w F- » » 0000 >° I m Ir C O O O M st OR a v Lo coM () m m J � n naovrn Q C -4;± O N N N N o 0 0 0 0 CD N o 0 0 0 oloo go c cc go 9 oo m 11 U •M L W O r 0 nOoO O O O r N N N N C] c O O N m O n Ur n r LO O�4 Ind � � Orrr E 0 CS 3 O c CC; ti 4 O d o C 0 0 0 0 2: v'u� uj"tea. r;v A!ri 10 I OI I!J III w M��ao a N r r r L►j [( w , U C 7 P U m 0 0 C W N Z 0 cn a co N O cr LD U- r 0 'a Qa Q 0 z E 0 N Cl In O O Y �0 N LO O O q o M L L i �0 0 N O f M N nmva 0 ('J II NCOM C. M Q N E II 11 • 00•- dyooVEli �IIx —Im al YUG� O a) L U Ilr l 7 O C m Z m c 0 0 U O a a GO N c y N :1 m N tb Q CD m tll tt OCDM TaDM wNf00 cn CND GM'I O aNO co OR GV N ram+ c0 93 E y .,tw LL []w m E Q N AA V j C C C O a) LL 0 = MO al C C C 0 wp 0 0 C C Ol 0 0 r 'Gp Gil G7 Ga 0 0 ao04M00061,8 = w WH C a) 7 0 ONE GNLUO � s7l r N W J U OJ az O f ' GM ry 2 J v w r 'o i d (Ln W C C vl rnI U W m c � �aIL mil CV a1 � Z � O (p c w o O W O U C c �' W o U -s N ._ N O_ N 'O co cn Y T �_ T J J J J I0000 M C%I: ZZZZ o'E 0000 0000 wwww J J J J Z Z Z Z a� m CL O O Cn co O O a). Q) cn iz coMGNhMM J m , GV cri G+i ri CQ O O I I U Ic" m -4 toi 0 M 'fit M O. ci] v �Nnn W o - — — W O C N N N go L '. V m N Oi O1 �t a .`, OONN 4 N M M M ti N n ti N N N N cv sN ca00CD v N _ M M 11 6 V G CCa7 N CL rLo m 2 A ^ N F M M co M Z i toi�cfaclfcof f f f f 1 M 00 Go aD W �..: Lo T� Z Lt., W V � L C O U a 0 c co N Z 0 a� m Cl) tr O C a) LD LL O ans IL O Z E w T � C aGOoo Y W N GO r Cl O 0 ` CJ G7 C C C C w O N n O st M O GON N CJi II lO G0 a7ti w Q U c � - ri ._ = E II y11 C Q N ._ w?�oUEn Z S C3 Cs7 �a) [— I!� I T Im o ac''i U O IL` E a E Z L N. oa W NCO N r CO TInW CC N M M n M lL r0 M N V_ o � N OO A {Q > t C .. d N L N N w O LL Q w O' U L •• M Ol M E Q N lq O C C C O! lL ❑ = W O Q 'a 'Q C C C w C c rn or Mo o r r 10 'm m '� '� o o voiooi aoo❑❑v ht I2 W I —I ' C m 7 C= 0 th CO CV CM Cc, O C) W J U N M j n! N a w m L C C co w — ol M a al `� c iil c �p a10i .Scm L � M o x Z c A IJx.J ii o s 3 m m Q-DiOLgw a. C m O U C c W O c U N N rL Y N O .— > cnfn(nF- 22 J 0000 J J J Z Z Z Z "'CNUUUOU 11 J J J F-ter•-� J 1 0 0 0 0 a q C) Q) [1 O O O CCD CN CNOco CORM co CNN �Cn U U co p LO CO OO_ C... (, CCi CCi MM O co 9999 v C a:x7 M o N N - V^ f� r r cM In c m ,c L W ci °0 rn N o (n cn v M .� cn � O CI �v Cy C7 M CM M M vN V7 C8M CA N NN C7 O C] 0 0 o i � v `ry E u�' a cq 0I-r 't i`6 o E H U Q N II (] 'MC IQ chc`a ui ui to uY x X 7 C W v Ci LO LO ao a Lu Lu a V Wd co N N N N j a rn .a .Q `7 a O Z 0 C o x C71000 N LO r M CD O LLq r Q N o_ M 0 c 2 2 c o O C%j O LO N dCJ a uiCDuiN w E u II * 0 Ln C7 tll O U a N O E II II Z r-0CYcl L Q O c m 2 3 `^ � v Z O a m m u U U = N O 'a u u O F- u m L 2 0J L C ii 13 H m H (U H = C N N m O O 'O "O °CO O1 m aJ Ln m o U Q 'cf O _= m z Qo m L a1 � E LA m = Z 3 _O E > m d LL. s = Z O m C Q N d m w > F' O U O a O CO N O L —64 um O u N Lo -itN Do + O I, .-i M r-1 L o � o u IA }, -0 LA M 'to occ_5u._acl n N + L M aJ L O m u a'' l0 -T M N r-I l0 t0 M + O I�z M m O p O aJ "a u .m j.+ -0 N M 00 aC u L L a) N o C u w m uj r+-i m m .� m N th N t0 ri o O ^ O N O O) N 00 u ai 'L 0 0 O L Q JA E m = 0�u._¢cl Q 01 000 ri L L 0J u O m u 4' v TC m N m o 00 Q 01 ry O r� u 'L Q o m s O. a E m = I cc H u ._ Q cf t J O 0 Ln l{ C L U 41 O m U '~ r, N t0 m N 00 00 m t0 + O r, o . q 00 E, 4. m p O at d, d u 13 N M OO IOC JO u ._ Q c1 J d N L = L 0 m u ri m Ln ri O O I,: n � t m p O 0C OJ 6 u N ++ m 'on o0c -i u ._ Q cf F- L CC N C LLi m u + N 00 M qt tD m Ln N O m O 41 r4 LO t0 + t0 Ol t � 4 p O m aJ ,3 u m OO cc u ._ Q cf t0 tD 0+1 L aJ {" 4 C L U 4 O u m u 4' to In NFOr-: Ln NPJ+ 4 O Ln N r� 1 a ca O � aJ - a u � H M 'pO z -iu._ <c1 N ri ci � L O \ ` N O� m u + l0 M' r-1 00 Q Kr N N 01 O I.. tC u o � a, -a .0 = L M M O CL w0u._aU a F- w O Q1 N m L al u O C m u 0) ri Ln M N � a% 00 r1 + O 1-: N O ri N N L 4- N > 'C 0 O � s CO. E m = w uLn L aJ 5 u m + N CM LnN � N o O r4 O O tD + r-I N u aJ > N '2 L CO. E m = oc u J i\ CN + m rl L a) 0 m u Ln N N O) M + O I, O O Ol O r-I O � or ai U v +� M 'OO iY -j u ._ Q cr t J lD + m r� L Q ` u C m u + 00 m Ln 00 ri M (14 -T 0) A ri T m s 3 u a-' T o vC L (A O m i1 O. a O u ._ Q cr H J m N 00 � L O ` \ m t0 u m qr N 00 O `"i O I.: r-I t0 r� m 3 u u t! T M cu C _ O M M a n wou._pc7 I -- at rn N L 00 C u ,q m u lD O N M N N M ri u3 u O ai 'O C = M O M O- O cc O u ._ Q cl + m L o Ql u m u Ol 00 ri Ln N ri I� m ? O f� 66 � m ai •y L O m a Q wou._¢c! G a N LL N O ri u Ol lD l0 tD 00 ri r-I n Ol M I� n O OD ui qr a Ln Ln d' to Ln w t0 00 Ln to r M ` � O O c;O O O O O O O c;O O c;O O LA Q d 2 0 u a LU w) W Ln Ln m Ln Ln Ln Ln Ln m Ln Ln Ln M M M m Cn M M M Pn rn frl M Ln in Ln M V1 M L/1 M 0 0 0 0 0 0 0 0 0 0 coo 0 a � LL Q Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Cl Cl Cl of Cl Ql Gl Ol of Ol al cl al al LT m a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d u W MNOCDM CF Ol M m e N -I .--I 00 a M 'cr �' M ri tO N O e-I ri O ri N tD M Z N O O O O O N O 0 0 0 0 0 0 r-1 c1 3 W in C � ]c W � m a m � u L to � L,0 al r` as O to 1- w v m m N Ln wN cc G ri O O OI� N O O N L'n N 0 ri N O 0 ; O O O O O O O O O 00 O O O O O Oc Q W U. a u 2 LY H a Q OJ m ri 01 n In -I;r -0 to to N cr Ol m to Ol Ln 0 J GLi 00 tD M N O Ln ri N 00 N ri Cn 00 I:t u N 0 0 0 0 r 1 N 0 0 0 0 0 0 0 .-1 ri F- F- � 00 O N I� N LD N O 1� O N t0 M M to c Ol + O N O t0 M N t O N N I� Ol 'C Ll0 t a-i t m t Ln t Ql t N to t Ln t ch t + -* N + vi t m + 00 t 00 + M 0 r-I N r-I ri ei M N ri r-I N M r-I r-I r-I r-I ri 'a 0 0 0 0 0 0 0 0 O 0 0 0 0 0 O 0 � N O O n O t0 O I� n Cl ID W W N 00 0) M N O w O N rntO N r-I n n ri t O t 00 t O t MN + + Cl t n t rn + O t t ri W O + ri + M t rn t ei ri ri r-I ri ri ai c1 r-I ri N N ri ri r-I r-I r-I > > > ! N f6 N mN m .. >_>m(atomfu m?�33333 d L L cc = w oc W L L 0 0 E c i a .0 a of u w u H Ci of u Ln U bl u of u L L t! c c c c c E E L A Q cl E E _m QL� LAn Ln� Da DO_ 1- 0 J 0 J 0 J 0 J 0 J 0 J '- Q, a Q CL a L1 DO_ a 0 0 0 0 0 LU 0 � H xo.-1Nm�Lnw pa ri N m � LA to NOD Ol � ei a -I ei ri .-1 r-f ri O o C Hydraulic Analysis Report Project Data Project Title: Blue Clay Road Business Park Designer: RAS Project Date: Tuesday, January 11, 2022 Project Units: U.S. Customary Units Notes: Channel Analysis: Roadside Ditch 1 (Triumph Drive 10+87 to 18+90 RT) Notes: Input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 ft/ft Side Slope 2 (Z2): 3.0000 ft/ft Longitudinal Slope: 0.0050 ft/ft Manning's n: 0.0350 Flow: 9.0000 cfs Result Parameters Depth: 1.2046 ft Area of Flow: 4.3535 ft^2 Wetted Perimeter: 7.6188 ft Hydraulic Radius: 0.5714 ft Average Velocity: 2.0673 ft/s Top Width: 7.2279 ft Froude Number: 0.4694 Critical Depth: 0.8902 ft Critical Velocity: 3.7858 ft/s Critical Slope: 0.0251 ft/ft Critical Top Width: 5.34 ft Calculated Max Shear Stress: 0.3758 Ib/ft^2 Calculated Avg Shear Stress: 0.1783 Ib/ft^2 Channel Analysis: Roadside Ditch 2 (Trriumph Drive 18+90 to 21+02 RT) Notes: Input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 f`Jft Side Slope 2 (Z2): 3.0000 ft/ft Longitudinal Slope: 0.0050 ft/ft Manning's n: 0.0350 Flow: 2.1600 cfs Result Parameters Depth: 0.7054 ft Area of Flow: 1.4928 ft"2 Wetted Perimeter: 4.4614 ft Hydraulic Radius: 0.3346 ft Average Velocity: 1.4470 ft/s Top Width: 4.2324 ft Froude Number: 0.4294 Critical Depth: 0.5030 ft Critical Velocity: 2.8458 ft/s Critical Slope: 0.0304 ft/ft Critical Top Width: 3.02 ft Calculated Max Shear Stress: 0.2201 Ib/ft^2 Calculated Avg Shear Stress: 0.1044 Ib/ft"2 Channel Analysis: Roadside Ditch 3 (Logistics Road 10+30 to 13+27 RT) Notes: Input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 ft/ft Side Slope 2 (Z2): 3.0000 ft/ft Longitudinal Slope: 0.0050 ft/ft Manning's n: 0.0350 Flow: 3.6600 cfs Result Parameters Depth: 0.8597 ft Area of Flow: 2.2170 ft"2 Wetted Perimeter: 5.4369 ft Hydraulic Radius: 0.4078 ft Average Velocity: 1.6509 ft/s Top Width: 5.1579 ft Froude Number: 0.4437 Critical Depth: 0.6211 ft Critical Velocity: 3.1623 ft/s Critical Slope: 0.0283 ft/ft Critical Top Width: 3.73 ft Calculated Max Shear Stress: 0.2682 Ib/ft"2 Calculated Avg Shear Stress: 0.1272 Ib/ft"2 Channel Analysis: Roadside Ditch 4 (Logistics Road 13+27 to 15+02 RT) Notes: Input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 ft/ft Side Slope 2 (Z2): 3.0000 fi/fr Longitudinal Slope: 0.0145 ft/ft Manning's n: 0.0350 Flow: 4.8900 cfs Result Parameters Depth: 0.7849 ft Area of Flow: 1.8482 ft^2 Wetted Perimeter: 4.9641 ft Hydraulic Radius: 0.3723 ft Average Velocity: 2.6459 ft/s Top Width: 4.7093 ft Froude Number: 0.7443 Critical Depth: 0.6974 ft Critical Velocity: 3.3509 ft/s Critical Slope: 0.0272 ft/ft Critical Top Width: 4.18 ft Calculated Max Shear Stress: 0.7102 Ib/ft^2 Calculated Avg Shear Stress: 0.3369 Ib/ft^2 Channel Analysis: Roadside Ditch 5 (Logistics Road 17+00 to 19+66 RT) Notes: Input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 ft/ft Side Slope 2 (Z2): 3.0000 ft/ft Longitudinal Slope: 0.0050 ft/ft Manning's n: 0.0350 Flow: 5.1400 cfs Result Parameters Depth: 0.9764 ft Area of Flow: 2.8601 ft^2 Wetted Perimeter: 6.1753 ft Hydraulic Radius: 0.4631 ft Average Velocity: 1.7971 ft/s Top Width: 5.8584 ft Froude Number: 0.4533 Critical Depth: 0.7115 ft Critical Velocity: 3.3845 ft/s Critical Slope: 0.0270 ft/ft Critical Top Width: 4.27 ft Calculated Max Shear Stress: 0.3046 Ib/ft^2 Calculated Avg Shear Stress: 0.1445 Ib/ft"2 Channel Analysis: Roadside Ditch 6 (Logistics Road 19+66 to 32+32 RT) Notes: Input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 ft/ft Side Slope 2 (Z2): 3.0000 ft/ft Longitudinal Slope: 0.0030 ft/ft Manning's n: 0.0350 Flow: 4.3600 cfs Result Parameters Depth: 1.0102 ft Area of Flow: 3.0617 ft^2 Wetted Perimeter: 6.3893 ft Hydraulic Radius: 0.4792 ft Average Velocity: 1.4240 ft/s Top Width: 6.0614 ft Froude Number: 0.3531 Critical Depth: 0.6662 ft Critical Velocity: 3.2749 ft/s Critical Slope: 0.0276 ft/ft Critical Top Width: 4.00 ft Calculated Max Shear Stress: 0.1891 Ib/ft^2 Calculated Avg Shear Stress: 0.0897 Ib/ft^2 Channel Analysis: Roadside Ditch 7 (Logistics Road 17+00 to 26+24 LT) Notes: Input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 ft/ft Side Slope 2 (Z2): 3.0000 ft/ft Longitudinal Slope: 0.0050 ft/ft Manning's n: 0.0350 Flow: 7.4100 cfs Result Parameters Depth: 1.1200 ft Area of Flow: 3.7629 ft^2 Wetted Perimeter: 7.0832 ft Hydraulic Radius: 0.5312 ft Average Velocity: 1.9692 ft/s Top Width: 6.7197 ft Froude Number: 0.4637 Critical Depth: 0.8236 ft Critical Velocity: 3.6414 ft/s Critical Slope: 0.0258 ft/ft Critical Top Width: 4.94 ft Calculated Max Shear Stress: 0.3494 Ib/ft^2 Calculated Avg Shear Stress: 0.1657 Ib/ft"2 Channel Analysis: Roadside Ditch 8 (Logistics Road 13+27 to 15+00 LT) Notes: Input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 ft/ft Side Slope 2 (Z2): 3.0000 ft/ft Longitudinal Slope: 0.0145 ft/ft Manning's n: 0.0350 Flow: 1.6800 cfs Result Parameters Depth: 0.5258 ft Area of Flow: 0.8294 ft"2 Wetted Perimeter: 3.3254 ft Hydraulic Radius: 0.2494 ft Average Velocity: 2.0257 ft/s Top Width: 3.1547 ft Froude Number: 0.6962 Critical Depth: 0.4549 ft Critical Velocity: 2.7063 ft/s Critical Slope: 0.0314 ft/ft Critical Top Width: 2.73 ft Calculated Max Shear Stress: 0.4757 Ib/ft^2 Calculated Avg Shear Stress: 0.2257 Ib/ft^2 Channel Analysis: Roadside Ditch 9 (Logistics Road 10+37 to 13+27 LT) Notes: Input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 ft/ft Side Slope 2 (Z2): 3.0000 ft/ft Longitudinal Slope: 0.0050 ft/ft Manning's n: 0.0350 Flow: 0.9100 cfs Result Parameters Depth: 0.5101 ft Area of Flow: 0.7806 ft^2 Wetted Perimeter: 3.2262 ft Hydraulic Radius: 0.2420 ft Average Velocity: 1.1657 ft/s Top Width: 3.0606 ft Froude Number: 0.4068 Critical Depth: 0.3560 ft Critical Velocity: 2.3939 ft/s Critical Slope: 0.0341 ft/ft Critical Top Width: 2.14 ft Calculated Max Shear Stress: 0.1592 Ib/ft"2 Calculated Avg Shear Stress: 0.0755 Ib/ft^2 Channel Analysis: Roadside Ditch 10 (Triumph Drive 21+60 to 24+75 RT) Notes: Input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 ft/ft Side Slope 2 (Z2): 3.0000 ft/ft Longitudinal Slope: 0.0110 ft/ft Manning's n: 0.0350 Flow: 1.7900 cfs Result Parameters Depth: 0.5671 ft Area of Flow: 0.9647 ft"2 Wetted Perimeter: 3.5864 ft Hydraulic Radius: 0.2690 ft Average Velocity: 1.8555 ft/s Top Width: 3.4024 ft Froude Number: 0.6141 Critical Depth: 0.4666 ft Critical Velocity: 2.7408 ft/s Critical Slope: 0.0311 ft/ft Critical Top Width: 2.80 ft Calculated Max Shear Stress: 0.3892 Ib/ft^2 Calculated Avg Shear Stress: 0.1846 Ib/ft^2 Channel Analysis: Roadside Ditch 11 (Triumph Drive 26+29 to 32+90 RT) Notes: Input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 ft/ft Side Slope 2 (Z2): 3.0000 ft/ft Longitudinal Slope: 0.0050 ft/ft Manning's n: 0.0350 Flow: 10.8400 cfs Result Parameters Depth: 1.2917 ft Area of Flow: 5.0053 ft12 Wetted Perimeter: 8.1693 ft Hydraulic Radius: 0.6127 ft Average Velocity: 2.1657 ft/s Top Width: 7.7501 ft Froude Number: 0.4749 Critical Depth: 0.9590 ft Critical Velocity: 3.9293 ft/s Critical Slope: 0.0245 ft/ft Critical Top Width: 5.75 ft Calculated Max Shear Stress: 0.4030 Ib/ft^2 Calculated Avg Shear Stress: 0.1912 Ib/ft"2 Channel Analysis: Roadside Ditch 12 (Opportunity Way 10+40 to 11+12 RT) Notes: Input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 ft/ft Side Slope 2 (Z2): 3.0000 ft/ft Longitudinal Slope: 0.0086 ft/ft Manning's n: 0.0350 Flow: 6.9800 cfs Result Parameters Depth: 0.9892 ft Area of Flow: 2.9358 ft^2 Wetted Perimeter: 6.2565 ft Hydraulic Radius: 0.4692 ft Average Velocity: 2.3775 ft/s Top Width: 5.9355 ft Froude Number: 0.5958 Critical Depth: 0.8041 ft Critical Velocity: 3.5981 ft/s Critical Slope: 0.0260 ft/ft Critical Top Width: 4.82 ft Calculated Max Shear Stress: 0.5309 Ib/ft"2 Calculated Avg Shear Stress: 0.2518 Ib/ft^2 Channel Analysis: Roadside Ditch 13 (Opportunity Way 11+12 to 13+76 RT) Notes: Input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 ft/ft Side Slope 2 (Z2): 3.0000 ft/ft Longitudinal Slope: 0.0050 ft/ft Manning's n: 0.0350 Flow: 0.7800 cfs Result Parameters Depth: 0.4815 ft Area of Flow: 0.6954 ft^2 Wetted Perimeter: 3.0450 ft Hydraulic Radius: 0.2284 ft Average Velocity: 1.1217 ft/s Top Width: 2.8887 ft Froude Number: 0.4029 Critical Depth: 0.3347 ft Critical Velocity: 2.3213 ft/s Critical Slope: 0.0348 ft/ft Critical Top Width: 2.01 ft Calculated Max Shear Stress: 0.1502 Ib/ft"2 Calculated Avg Shear Stress: 0.0713 Ib/ft"2 Channel Analysis: Roadside Ditch 14 (Opportunity Way 13+76 to 18+23 RT) Notes: input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 ft/ft Side Slope 2 (Z2): 3.0000 ft/ft Longitudinal Slope: 0.0050 ft/ft Manning's n: 0.0350 Flow: 1.5600 cfs Result Parameters Depth: 0.6244 ft Area of Flow: 1.1695 ft^2 Wetted Perimeter: 3.9488 ft Hydraulic Radius: 0.2962 ft Average Velocity: 1.3339 ft/s Top Width: 3.7462 ft Froude Number: 0.4207 Critical Depth: 0.4416 ft Critical Velocity: 2.6664 ft/s Critical Slope: 0.0317 ft/ft Critical Top Width: 2.65 ft Calculated Max Shear Stress: 0.1948 Ib/ft^2 Calculated Avg Shear Stress: 0.0924 Ib/ft^2 Channel Analysis: Roadside Ditch 15 (Opportunity Way 13+76 to 18+23 LT) Notes: Input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 ft/ft Side Slope 2 (Z2): 3.0000 ft/ft Longitudinal Slope: 0.0040 ft/ft Manning's n: 0.0350 Flow: 6.0100 cfs Result Parameters Depth: 1.0796 ft Area of Flow: 3.4967 ft^2 Wetted Perimeter: 6.8281 ft Hydraulic Radius: 0.5121 ft Average Velocity: 1.7188 ft/s Top Width: 6.4777 ft Froude Number: 0.4123 Critical Depth: 0.7574 ft Critical Velocity: 3.4921 ft/s Critical Slope: 0.0265 ft/ft Critical Top Width: 4.54 ft Calculated Max Shear Stress: 0.2695 Ib/ft"2 Calculated Avg Shear Stress: 0.1278 Ib/ft^2 Channel Analysis: Roadside Ditch 16 (Opportunity Way 11+12 to 13+76 LT) Notes: input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 ft/ft Side Slope 2 (Z2): 3.0000 ft/ft Longitudinal Slope: 0.0050 ft/ft Manning's n: 0.0350 Flow: 3.9800 cfs Result Parameters Depth: 0.8871 ft Area of Flow: 2.3609 ft^2 Wetted Perimeter: 5.6105 ft Hydraulic Radius: 0.4208 ft Average Velocity: 1.6858 ft/s Top Width: 5.3226 ft Froude Number: 0.4461 Critical Depth: 0.6423 ft Critical Velocity: 3.2158 ft/s Critical Slope: 0.0280 ft/ft Critical Top Width: 3.85 ft Calculated Max Shear Stress: 0.2768 Ib/ft"2 Calculated Avg Shear Stress: 0.1313 Ib/ft^2 ATTACHMENT D - HYDRAFLOW MODEL RESULTS Hydraflow Tablq46#Discipline Design Documentation%Starmwaterl2022.05.20_Pre-Post 004940039.gpw Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Friday, 05 / 2012022 WatershedModel Schematic...................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 I -Year SummaryReport......................................................................................................................... 3 HydrographReports ................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, Pond No.1 Pre -development ................................................. 4 Hydrograph No. 2, SCS Runoff, Pond No.1 Post -Development .............................................. 5 Hydrograph No. 3, Reservoir, Pond No. 1 Routed................................................................... 6 PondReport - Pond No.1.................................................................................................... 7 Hydrograph No. 5, SCS Runoff, Pond No.2 Pre -Development ................................................ 9 Hydrograph No. 6, SCS Runoff, Pond No.2 Post -Development ............................................ 10 Hydrograph No. 7, Reservoir, Pond No.2 Routed.................................................................. 11 PondReport - Pond No.2.................................................................................................. 12 Hydrograph No. 9, SCS Runoff, Pond No. 3 Pre -Development.. ............................................ 14 Hydrograph No. 10, SCS Runoff, Pond No.3 Post -Development .......................................... 15 Hydrograph No. 11, Reservoir, Pond No.3 Routed............................................................... 16 PondReport - Pond No.3.................................................................................................. 17 Hydrograph No. 13, SCS Runoff, Pond No.4 Pre -Development ............................................ 19 Hydrograph No. 14, SCS Runoff, Pond No.4 Post -Development .......................................... 20 Hydrograph No. 15, Reservoir, Pond No.4 Routed................................................................ 21 PondReport - Pond No.4.................................................................................................. 22 Hydrograph No. 17, SCS Runoff, Untreated Pre -Development ............................................. 24 Hydrograph No. 18, SCS Runoff, Untreated Post -Development ............................................ 25 Hydrograph No. 20, Combine, TOTAL SITE PRE -DEVELOPMENT ...................................... 26 Hydrograph No. 21, Combine, TOTAL SITE POST -DEVELOPMENT .................................... 27 Hydrograph No. 22, Combine, TOTAL SITE ROUTED. ......................................................... 28 2 - Year SummaryReport ....................................................................................................................... HydrographReports 29 ................................................................................................................. Hydrograph No. 1, SCS Runoff, Pond No.1 Pre -development ............................................... 30 30 Hydrograph No. 2, SCS Runoff, Pond No.1 Post -Development ............................................ 31 Hydrograph No. 3, Reservoir, Pond No. 1 Routed................................................................. 32 Hydrograph No. 5, SCS Runoff, Pond No.2 Pre -Development .............................................. 33 Hydrograph No. 6, SCS Runoff, Pond No.2 Post -Development ............................................ 34 Hydrograph No. 7, Reservoir, Pond No.2 Routed.................................................................. 35 Hydrograph No. 9, SCS Runoff, Pond No. 3 Pre -Development ............................................. 36 Hydrograph No. 10, SCS Runoff, Pond No.3 Post -Development .......................................... 37 Hydrograph No. 11, Reservoir, Pond No.3 Routed............................................................... 38 Hydrograph No. 13, SCS Runoff, Pond No.4 Pre -Development ............................................ 39 Hydrograph No. 14, SCS Runoff, Pond No.4 Post -Development .......................................... 40 Hydrograph No. 15, Reservoir, Pond No.4 Routed .......................................... Hydrograph No. 17, SCS Runoff, Untreated Pre -Development ............................................. 42 Hydrograph No. 18, SCS Runoff, Untreated Post -Development ............................................ 43 Hydrograph No. 20, Combine, TOTAL SITE PRE -DEVELOPMENT ...................................... 44 Hydrograph No. 21, Combine, TOTAL SITE POST -DEVELOPMENT ................................... 45 Contents continued.LW0494100391PDNR120-Tech124-Discipline Design Documentationlstormwater12022.05.20_Pre-Post_004940039.gpw Hydrograph No. 22, Combine, TOTAL SITE ROUTED......................................................... 46 3 - Year SummaryReport ....................................................................................................................... HydrographReports 47 ................................................................................................................. Hydrograph No. 1, SCS Runoff, Pond No.1 Pre -development ............................................... 48 48 Hydrograph No. 2, SCS Runoff, Pond No.1 Post -Development ............................................ 49 Hydrograph No. 3, Reservoir, Pond No. 1 Routed................................................................. 50 Hydrograph No. 5, SCS Runoff, Pond No.2 Pre -Development .............................................. 51 Hydrograph No. 6, SCS Runoff, Pond No.2 Post -Development ............................................ 52 Hydrograph No. 7, Reservoir, Pond No.2 Routed.................................................................. 53 Hydrograph No. 9, SCS Runoff, Pond No. 3 Pre -Development ............................................. 54 Hydrograph No. 10, SCS Runoff, Pond No.3 Post -Development .......................................... 55 Hydrograph No. 11, Reservoir, Pond No.3 Routed............................................................... 56 Hydrograph No. 13, SCS Runoff, Pond No.4 Pre -Development ............................................ 57 Hydrograph No. 14, SCS Runoff, Pond No.4 Post -Development .......................................... 58 Hydrograph No. 15, Reservoir, Pond No.4 Routed................................................................ 59 Hydrograph No. 17, SCS Runoff, Untreated Pre -Development ............................................. 60 Hydrograph No. 18, SCS Runoff, Untreated Post -Development ............................................ 61 Hydrograph No. 20, Combine, TOTAL SITE PRE -DEVELOPMENT ...................................... 62 Hydrograph No. 21, Combine, TOTAL SITE POST -DEVELOPMENT .................................... 63 Hydrograph No. 22, Combine, TOTAL SITE ROUTED 64 ......................................................... 5 - Year SummaryReport ....................................................................................................................... HydrographReports 65 ................................................................................................................. Hydrograph No. 1, SCS Runoff, Pond No.1 Pre -development ............................................... 66 66 Hydrograph No. 2, SCS Runoff, Pond No.1 Post -Development ............................................ 67 Hydrograph No. 3, Reservoir, Pond No. 1 Routed................................................................. 68 Hydrograph No. 5, SCS Runoff, Pond No.2 Pre -Development .............................................. 69 Hydrograph No. 6, SCS Runoff, Pond No.2 Post -Development ............................................ 70 Hydrograph No. 7, Reservoir, Pond No.2 Routed.................................................................. 71 Hydrograph No. 9, SCS Runoff, Pond No. 3 Pre -Development ............................................. 72 Hydrograph No. 10, SCS Runoff, Pond No.3 Post -Development .......................................... 73 Hydrograph No. 11, Reservoir, Pond No.3 Routed............................................................... 74 Hydrograph No. 13, SCS Runoff, Pond No.4 Pre -Development ............................................ 75 Hydrograph No. 14, SCS Runoff, Pond No.4 Post -Development .......................................... 76 Hydrograph No. 15, Reservoir, Pond No.4 Routed................................................................ 77 Hydrograph No. 17, SCS Runoff, Untreated Pre -Development ............................................. 78 Hydrograph No. 18, SCS Runoff, Untreated Post -Development ............................................ 79 Hydrograph No. 20, Combine, TOTAL SITE PRE -DEVELOPMENT ...................................... 80 Hydrograph No. 21, Combine, TOTAL SITE POST -DEVELOPMENT .................................... 81 Hydrograph No. 22, Combine, TOTAL SITE ROUTED......................................................... 82 10 - Year SummaryReport ....................................................................................................................... 83 HydrographReports................................................................................................................. 84 Hydrograph No. 1, SCS Runoff, Pond No.1 Pre -development ............................................... 84 Hydrograph No. 2, SCS Runoff, Pond No.1 Post -Development ............................................ 85 Hydrograph No. 3, Reservoir, Pond No. 1 Routed .............................. ........... ...... a................. 86 Contents continued.k100494100391PDNR120-Tech124-Discipline Design Documentationlstormwater12022.05.20_Pre-Post 004940039.gpw Hydrograph No. 5, SCS Runoff, Pond No.2 Pre -Development .............................................. 87 Hydrograph No. 6, SCS Runoff, Pond No.2 Post -Development ............................................ 88 Hydrograph No. 7, Reservoir, Pond No.2 Routed.................................................................. 89 Hydrograph No. 9, SCS Runoff, Pond No. 3 Pre-Developm.ent............................................. 90 Hydrograph No. 10, SCS Runoff, Pond No.3 Post -Development. ......................................... 91 Hydrograph No. 11, Reservoir, Pond No.3 Routed............................................................... 92 Hydrograph No. 13, SCS Runoff, Pond No.4 Pre -Development ............................................ 93 Hydrograph No. 14, SCS Runoff, Pond No.4 Post -Development .......................................... 94 Hydrograph No. 15, Reservoir, Pond No.4 Routed................................................................ 95 Hydrograph No. 17, SCS Runoff, Untreated Pre -Development ............................................. 96 Hydrograph No. 18, SCS Runoff, Untreated Post -Development ............................................ 97 Hydrograph No. 20, Combine, TOTAL SITE PRE -DEVELOPMENT ...................................... 98 Hydrograph No. 21, Combine, TOTAL SITE POST -DEVELOPMENT .................................... 99 Hydrograph No. 22, Combine, TOTAL SITE ROUTED ....................................................... 100 25 - Year SummaryReport ..................................................................................................................... HydrographReports 101 ............................................................................................................... Hydrograph No. 1, SCS Runoff, Pond No.1 Pre -development ............................................. 102 102 Hydrograph No. 2, SCS Runoff, Pond No.1 Post -Development .......................................... 103 Hydrograph No. 3, Reservoir, Pond No. 1 Routed............................................................... 104 Hydrograph No. 5, SCS Runoff, Pond No.2 Pre -Development ............................................ 105 Hydrograph No. 6, SCS Runoff, Pond No.2 Post --Development .......................................... 106 Hydrograph No. 7, Reservoir, Pond No.2 Routed................................................................ 107 Hydrograph No. 9, SCS Runoff, Pond No. 3 Pre -Development ........................................... 108 Hydrograph No. 10, SCS Runoff, Pond No.3 Post -Development ........................................ 109 Hydrograph No. 11, Reservoir, Pond No.3 Routed............................................................. 110 Hydrograph No. 13, SCS Runoff, Pond No.4 Pre -Development .......................................... 111 Hydrograph No. 14, SCS Runoff, Pond No.4 Post -Development ........................................ 112 Hydrograph No. 15, Reservoir, Pond No.4 Routed.............................................................. 113 Hydrograph No. 17, SCS Runoff, Untreated Pre -Development ........................................... 114 Hydrograph No. 18, SCS Runoff, Untreated Post -Development .......................................... 115 Hydrograph No. 20, Combine, TOTAL SITE PRE -DEVELOPMENT ................................... 116 Hydrograph No. 21, Combine, TOTAL SITE POST -DEVELOPMENT .................................. 117 Hydrograph No. 22, Combine, TOTAL SITE ROUTED ....................................................... 118 50 - Year SummaryReport ..................................................................................................................... HydrographReports 119 ............................................................................................................... Hydrograph No. 1, SCS Runoff, Pond No.1 Pre -development ............................................. 120 120 Hydrograph No. 2, SCS Runoff, Pond No.1 Post -Development .......................................... 121 Hydrograph No. 3, Reservoir, Pond No. 1 Routed............................................................... 122 Hydrograph No. 5, SCS Runoff, Pond No.2 Pre -Development ............................................ 123 Hydrograph No. 6, SCS Runoff, Pond No.2 Post -Development .......................................... 124 Hydrograph No. 7, Reservoir, Pond No.2 Routed................................................................ 125 Hydrograph No. 9, SCS Runoff, Pond No. 3 Pre -Development ........................................... 126 Hydrograph No. 10, SCS Runoff, Pond No.3 Post -Development ........................................ 127 Hydrograph No. 11, Reservoir, Pond No.3 Routed............................................................. 128 Hydrograph No. 13, SCS Runoff, Pond No.4 Pre -Development .......................................... 129 Hydrograph No. 14, SCS Runoff, Pond No.4 Post -Development ........................................ 130 Contents continued.k100494100391PDNR120-Tech124-Discipline Design DocumentationlStormwater12022.05.20_Pre-Post_004940039.gpw Hydrograph No. 15, Reservoir, Pond No.4 Routed.............................................................. 131 Hydrograph No. 17, SCS Runoff, Untreated Pre -Development ........................................... 132 Hydrograph No. 18, SCS Runoff, Untreated Post -Development .......................................... 133 Hydrograph No. 20, Combine, TOTAL SITE PRE -DEVELOPMENT .................................... 134 Hydrograph No. 21, Combine, TOTAL SITE POST -DEVELOPMENT ................................. 135 Hydrograph No. 22, Combine, TOTAL SITE ROUTED. ....................................................... 136 100 - Year SummaryReport..................................................................................................................... HydrographReports 137 ............................................................................................................... Hydrograph No. 1, SCS Runoff, Pond No.1 Pre -development ............................................. 138 138 Hydrograph No. 2, SCS Runoff, Pond No.1 Post -Development .......................................... 139 Hydrograph No. 3, Reservoir, Pond No. 1 Routed............................................................... 140 Hydrograph No. 5, SCS Runoff, Pond No.2 Pre -Development ............................................ 141 Hydrograph No. 6, SCS Runoff, Pond No.2 Post -Development .......................................... 142 Hydrograph No. 7, Reservoir, Pond No.2 Routed................................................................ 143 Hydrograph No. 9, SCS Runoff, Pond No. 3 Pre -Development ........................................... 144 Hydrograph No. 10, SCS Runoff, Pond No.3 Post -Development ........................................ 145 Hydrograph No. 11, Reservoir, Pond No.3 Routed............................................................. 146 Hydrograph No. 13, SCS Runoff, Pond No.4 Pre -Development .......................................... 147 Hydrograph No. 14, SCS Runoff, Pond No.4 Post -Development ........................................ 148 Hydrograph No. 15, Reservoir, Pond No.4 Routed.............................................................. 149 Hydrograph No. 17, SCS Runoff, Untreated Pre -Development ........................................... 150 Hydrograph No. 18, SCS Runoff, Untreated Post -Development .......................................... 151 Hydrograph No. 20, Combine, TOTAL SITE PRE -DEVELOPMENT .................................... 152 Hydrograph No. 21, Combine, TOTAL SITE POST -DEVELOPMENT .................................. 153 Hydrograph No. 22, Combine, TOTAL SITE ROUTED........................................................ 154 IDFReport................................................................................................................ 155 Watershed Model Schematic Legend Hvd. Origin Descri 1 SCS Runoff Pond No.1 Pre -development 2 SCS Runoff Pond No.1 Post -Development 3 Reservoir Pond No. 1 Routed 5 SCS Runoff Pond No.2 Pre -Development 6 SCS Runoff Pond No.2 Post -Development 7 Reservoir Pond No.2 Routed 9 SCS Runoff Pond No. 3 Pre -Development 10 SCS Runoff Pond No.3 Post -Development 11 Reservoir Pond No.3 Routed 13 SCS Runoff Pond No.4 Pre -Development 14 SCS Runoff Pond No.4 Post -Development 15 Reservoir Pond No.4 Routed 17 SCS Runoff Untreated Pre -Development 18 SCS Runoff Untreated Post -Development 20 Combine TOTAL SITE PRE -DEVELOPMENT 21 Combine TOTAL SITE POST -DEVELOPMENT 22 Combine TOTAL SITE ROUTED Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 22 Project: I:\00494\0039\PDNR\20-Tech\24-Discipline Design Documentation\StormwateoO2Mr &9, )Pf@P6itD2E4940039.gpw Hydrograph Return Period Recp raflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr T-Yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff -- 30.56 44.96 1.185 71.00 95.12 133.52 168.77 209.36 Pond No.1 Pre -development 2 SCS Runoff -- 78.85 99.29 20.85 133.36 163.17 208.80 249.47 295.82 Pond No.1 Post -Development 3 Reservoir 2 26.91 45.95 0.541 80.38 103.05 121.68 134.03 144.82 Pond No. 1 Routed 5 SCS Runoff 14.64 21.29 0.692 33.26 44.29 61.83 77.85 96.27 Pond No.2 Pre -Development 6 SCS Runoff --- 35.75 45.02 9.454 60.47 73.99 94.68 113.12 134.14 Pond No.2 Post -Development 7 Reservoir 6 4.394 12.34 0.198 30.99 46.23 57.45 63.17 67.77 Pond No.2 Routed 9 SCS Runoff ---- 34.61 53.68 0.390 89.12 122.61 176.55 226.42 284.71 Pond No. 3 Pre -Development 10 SCS Runoff --- 110.87 140.51 27.66 189.99 233.31 299.58 358.64 425.89 Pond No.3 Post -Development 11 Reservoir 10.47 23.43 0.834 53.67 100.77 177.39 211.75 230.21 Pond No.3 Routed 13 SCS Runoff - 10.12 15.27 0.239 24.69 33.51 47.59 60.62 75.69 Pond No.4 Pre -Development 14 SCS Runoff --- 19.03 26.20 2.048 38.68 49.92 67.36 83.00 100.84 Pond No.4 Post -Development 15 Reservoir 14 4.625 8.443 0.212 22.27 32.35 41.68 47.88 53.87 Pond No.4 Routed 17 SCS Runoff ---- 0.513 0.771 0.012 1.244 1.694 2.412 3.071 3.832 Untreated Pre -Development 18 SCS Runoff -- 1.483 1.853 0.420 2.470 3.009 3.835 4.572 5.413 Untreated Post -Development 20 Combine 1, 5, 9, 90.37 135.89 2.377 219.17 297.00 421.38 536.52 669.57 TOTAL SITE PRE -DEVELOPMENT 13, 17, 21 Combine 2, 6, 10, 245.55 312.33 60.13 424.24 522.50 673.10 807.43 960.46 TOTAL SITE POST -DEVELOPMENT 14, 18, 22 Combine 3, 7, 11, 41.61 85.83 1.777 180.41 278.95 399.40 458.30 498.16 TOTAL SITE ROUTED 15, 18, Proj. file: 1s\00494\0039\PDNR\20--I'ech\24-Discipline Design Documentation\St r ftrM)22f bZM2're-Post 004940039.gp Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 30.56 2 734 140,567 ---- --- Pond No.1 Pre -development 2 SCS Runoff 78.86 728 308,886 --- --- Pond No.1 Post -Development 3 Reservoir 25.91 750 292,601 2 29.43 1 Pond No. 1 Routed 5 SCS Runoff 14.64 734 66,812 ---- ------ ---- Pond No.2 Pre -Development 6 SCS Runoff 35.75 2 728 140,064 -- -- ---- Pond No.2 Post -Development 7 Reservoir 4.394 2 778 129,777 6 29.d 82,581 Pond No.2 Routed 9 SCS Runoff 34.61 2 736 166,390 -- - ---- Pond No. 3 Pre -Development 10 SCS Runoff 110.87 2 728 431,671 ---- -- ------ Pond No.3 Post -Development 11 Reservoir 10.47 2 800 406,794 10 32.90 263,354 Pond No.3 Routed 13 SCS Runoff 10.12 2 734 47,479 --- — Pond No.4 Pre -Development 14 SCS Runoff 19.03 2 728 73,516 -- - Pond No.4 Post -Development 15 Reservoir 4.625 2 758 73,492 14 28.79 29,489 Pond No.4 Routed 17 SCS Runoff 0.513 2 730 2,085 --- Untreated Pre -Development 18 SCS Runoff 1.483 2 724 4,609 ---- — Untreated Post -Development 20 Combine 90.37 2 734 423,333 1, 5, 9, -- TOTAL SITE PRE -DEVELOPMENT 13, 17, 21 Combine 245.55 2 728 958,746 2, 6, 10, -- ---- TOTAL SITE POST -DEVELOPMENT 14, 18, 22 Combine 41.61 2 756 907,273 3, 7, 11, ------ TOTAL SITE ROUTED 15, 18, i:\00494\0039\PDNR\20-Tech\24-Discipline dtigorBdbmrindnt'htiftdStormwatee2 .28IPd 4=2004940039.gpw Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk. Inc. v2020.4 Hyd. No. 1 Pond No.1 Pre -development Hydrograph type = SCS runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 29.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.82 in Storm duration = 24 hrs Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.1 Pre -development Hyd. No. 1 —1 Year 4 Friday, 05 / 20 / 2022 = 30.56 cfs = 734 min = 140,567 cult = 72 = Oft = 20.00 min = Type III = 484 Q (cfs) 35.00 30.00 25.00 KO I1 15.00 10.00 5.00 0.00 -' ' ' I I I I 1 I_ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3108 by Autodesk, Inc. v2020.4 Hyd. No. 2 Pond No.1 Post -Development Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 29.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.82 in Storm duration = 24 hrs 70.00 �4 50.00 E1111117 30.00 20.00 10.00 r Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.1 Post -Development Hyd. No. 2 --1 Year 5 Friday, 05 / 20 / 2022 = 78.85 cfs = 728 min = 308,886 cuff = 91 = 0 ft = 10.00 min = Type III = 484 Q (cfs) 80.00 70.00 - �l 50.00 40.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report s Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Friday, 05 / 20 / 2022 Hyd. No. 3 Pond No. 1 Routed Hydrograph type = Reservoir Peak discharge = 25.91 cfs Storm frequency = 1 yrs Time to peak = 750 min Time interval = 2 min Hyd. volume = 292,601 cuft Inflow hyd. No. = 2 - Pond No.1 Post-Developmaifix. Elevation = 29.43 ft Reservoir name = Pond No.1 Max. Storage = 155,331 cuft Storage Indication method used. Pond No. 1 Routed Hyd. No. 3 --1 Year 70.00 50.00 40.00 20.00 10.00 Q (cfs) 80.00 70.00 -1 11 - 40.00 30.00 20.00 10.00 0.00 -' ' - - I . -! - I i i - - 0.00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 3960 Hyd No. 3 Hyd No. 2 Time (min) y � Total storage used = 155,331 cuff Pond Report 7 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Friday, 05 120 12022 Pond No.1 - Pond No.1 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation 28.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cult) 0.00 28.00 101,025 0 0 0.50 28.50 107,012 51,997 51,997 1.00 29.00 110,026 54,252 106,249 2.00 30.00 116,098 113,037 219,286 3.00 31.00 122,226 119,137 338,423 4.00 32.00 128,411 125,293 463,717 32.25 129,966 32,294 496,010 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 36.00 6.00 Inactive 0.00 Crest Len (ft) = 26.00 Inactive 65.00 0.00 Span (in) = 36.00 6.00 0.00 0.00 Crest El. (ft) = 29.00 0.00 31.00 0.00 No. Barrels = 2 1 0 0 Weir Coeff. = 3.33 3.33 2.60 3.33 Invert El. (ft) = 25.00 28.00 0.00 0.00 Weir Type = 1 Rect Broad -- Length (ft) = 76.00 1.00 0.00 0.00 Multi -Stage = Yes Yes Yes No Slope (%) = 0.56 0.50 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: CulverVOrfice outflows are analyzed under inlet (ic) and outlet (cc) control. Weir r isers checked for orifice conditions (ic) and submergence (s). Stage / Storage I Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfl User Total ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs efs 0.00 0 28.00 0.00 0.00 - - 0.00 - 0.00 -- -- -- 0.000 0.05 5,200 28.05 51.73 cc 0.01 is -- -- 0.00 -- 0.00 -- -- --- 0.008 0.10 10,399 28.10 51.73 cc 0.03 is --- 0.00 --- 0.00 - 0.031 0.15 15,599 28.15 51.73 cc 0.07 is --- 0.00 -- 0.00 -- --- 0.066 0.20 20,799 28.20 51.73 cc 0.11 is 0.00 -- 0.00 -- - -- 0.114 0.25 25,998 28.25 51.73 cc 0.17 is --- - 0.00 -- 0.00 -- - -- 0.167 0.30 31,198 28.30 51.73 cc 0.23 is -- 0.00 --- 0.00 -- - -- 0.230 0.35 36,398 28.35 51.73 cc 0.30 is --- 0.00 -- 0.00 -- - --- 0.298 0.40 41,598 28.40 51.73 cc 0.36 is - 0.00 -- 0.00 -- --- -- 0.363 0.45 46,797 28.45 51.73 cc 0.43 is --- -- 0.00 - 0.00 - -- -- 0.427 0.50 51,997 28.50 51.73 cc 0.47 is --- 0.00 - 0.00 - -- 0.473 0.55 5%,422 28.55 51.73 cc 0.52 is - -- 0.00 -- 0.00 -- - --- 0.518 0.60 62,847 28.60 51.73 cc 0.56 is -- --- 0.00 - 0.00 - -- --- 0.559 0.65 68,273 28.65 51.73 cc 0.60 is -- - 0.00 -- 0.00 --- --- --- 0.598 0.70 73,698 28.70 51.73 cc 0.63 is --- - 0.00 -- 0.00 - -- --- 0.634 0.75 79,123 28.75 51.73 cc 0.67 is --- -- 0.00 -- 0.00 -- - -- 0.668 0.80 84,548 28.80 51.73 cc 0.70 is -- - 0.00 --- 0.00 --- -- --- 0.701 0.85 89,974 28.85 51.73 cc 0.73 is - --- 0.00 -- 0.00 --- - --- 0.732 0.90 95,399 28.90 51.73 cc 0.76 is --- - 0.00 --- 0.00 -- -- --- 0.762 0.95 100,824 28.95 51.73 cc 0.79 is -- -- 0.00 --- 0.00 -- - --- 0.791 1.00 106,249 29.00 51.73 cc 0.82 is -- -- 0.00 --- 0.00 -- --- 0.819 1.10 117,553 29.10 51.73 cc 0.87 is - -- 2.74 -- 0.00 -- -- -- 3.609 1.20 128,857 29.20 51.73 cc 0.92 is - -- 7.74 -- 0.00 --- -- -- 8.665 1.30 140,160 29.30 51.73 cc 0.97 is - -- 14.23 - 0.00 - -- -- 15.20 1.40 151,464 29.40 51.73 cc 1.01 is - - 21.90 -- 0.00 --- - --- 22.92 1.50 162,768 29.50 51.73 cc 1.06 is - - 30.61 -- 0.00 -- - --- 31.67 1.60 174,072 29.60 51.73 cc 1.10 is - - 40.24 -- 0.00 -- - -- 41.34 1.70 185,375 29.70 51.85 cc 1.14 is -- - 50.71 --- 0.00 - - - 51.84 1.80 196,679 29.80 63.13 cc 1.18 is -- --- 61.95 - 0.00 --- -- - 63.13 1.90 207,983 29.90 75.06 cc 1.13 is -- --- 73.92 - 0.00 - - - 75.05 2.00 219,286 30.00 87.62 cc 1.04 is -- -- 86.58 - 0.00 --- --- -- 87.62 2.10 231,200 30.10 99.11 cc 0.93 is -- -- 98.18 s - 0.00 - -- -- 99.11 2.20 243,114 30.20 106.48 cc 0.86 is -- -- 105.62 s - 0.00 - --- - 106.48 2.30 255,027 30.30 112.48 cc 0.80 is -- --- 111.68 s - 0.00 -- --- -- 112.48 2.40 266,941 30.40 117.65 cc 0.75 is -- -- 116.89 s - 0.00 - --- -- 117.64 2.50 278,855 30.50 122.20 cc 0.70 is -- -- 121.49 s - 0.00 - --- -- 122.19 Continues on next page... 8 Pond No.1 Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft Cuft ft Cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs 2.60 290,768 30.60 126.30 oc 0.66 iC -- 125.63 s -- 0.00 - - - 126.29 2.70 302,682 30.70 130.04 oc 0.62 is - 129.41 s - 0.00 -- - - 130.03 2.80 314,596 30.80 133.49 oc 0.59 is - - 132.90 s - 0.00 -- -- - 133.49 2.90 326,510 30.90 136.71 oc 0.56 is -- 136.15 s --- 0.00 --- -- --- 136.71 3.00 338,423 31.00 139.20 is 0.53 is -- --- 138.65 s -- 0.00 -- -- 139.18 3.10 350,953 31.10 141.80 is 0.48 is --- - 135.97 s - 5.34 - --- --- 141.80 3.20 363,482 31.20 144.45 is 0.42 is - --- 128.91 s --- 15.10 s --- -- -- 144.43 3.30 376,011 31.30 146.75 is 0.37 is -- -- 122.87 s --- 23.52 s - -- --- 146.75 3.40 388,541 31.40 148.81 is 0.33 is -- --- 118.02 s -- 30.42 s --- - --- 148.77 3.50 401,070 31.50 150.71 is 0.29 is - - 113.98 s -- 36.39 s --- - -- 150.67 3.60 413,699 31.60 152.50 is 0.27 is - -- 110.58 s - 41.65 s -- --- --- 152.50 3.70 426,128 31.70 154.21 is 0.24 is --- --- 107.63 s - 46.31 s --- -- -- 154.19 3.80 438,658 31.80 155.86 is 0.22 is -- - 105.10 s - 50.50 s --- --- 155.82 3.90 451,187 31.90 157.46 is 0.21 is -- -- 102.89 s -- 54.29 s -- - - 157.38 4.00 463,717 32.00 159.02 is 0.19 is -- 100.97 s -- 57.74 s - 158.90 4.03 466,946 32.03 159.40 is 0.19 is -- 100.57 s -- 58.59 s -- -- 159.35 4.05 470,175 32.05 159.78 is 0.19 is -- --- 100.12 s --- 59.37 s -- --- 159.68 4.07 473,405 32.08 160.16 is 0.18 is -- -- 99.72 s --- 60.17 s --- - -- 160.07 4.10 476,634 32.10 160.54 is 0.18 is --- --- 99.38 s --- 60.97 s -- --- 160.53 4.13 479,863 32.13 160.92 is 0.18 is --- 98.98 s --- 61.72 s - -- 160.88 4.15 483,093 32.15 161.30 is 0.17 is --- --- 98.53 s --- 62.42 s -- 161.12 4.18 486,322 32.18 161.67 is 0.17 is 98.26 s 63.20 s - - 161.63 4.20 489,552 32.20 162.04 is 0.17 is 97.82 s 63.87 s --- - -- 161.86 4.23 492,781 32.23 162.41 is 0.17 is --- 97.59 s --- 64.64 s --- -- 162.39 4.25 496,010 32.25 162.78 is 0.16 is --- --- 97.18 s --- 65.27 s -- 162.61 ..End Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 5 Pond No-2 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 13.150 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.82 in Storm duration = 24 hrs 12.00 • /, 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.2 Pre -Development Hyd. No. 5 —1 Year 120 240 360 480 600 720 Hyd No. 5 9 Friday, 05 / 20 / 2022 = 14.64 cfs = 734 min = 66,812 cult = 73 = Oft = 20.00 min = Type III = 484 Q (cfs) 15.00 12.00 • /, 3.00 0.00 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 6 Pond No.2 Post -Development Hydrograph type = SCS Runoff' Storm frequency = 1 yrs Time interval = 2 min Drainage area = 13.150 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.82 in Storm duration = 24 hrs Q (cfs) 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.2 Post -Development Hyd. No. 6 —1 Year 120 240 360 480 600 720 840 960 Hyd No. 6 10 Friday, 05 / 20 / 2022 = 35.75 cfs = 728 min = 140,064 cuft = 91 = Oft = 10.00 min = Type III = 484 Q (cfs) 40.00 30.00 20.00 10.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 11 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 7 Pond No.2 Routed I lydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 6 - Pond No.2 Post-Developmd ilax. Elevation Reservoir name = Pond No.2 Max. Storage Storage Indication method used. Q (cfs) 30.00 r� 10.00 Pond No.2 Routed Hyd. No. 7 --1 Year Friday, 05 / 20 / 2022 = 4.394 cfs = 778 min = 129,777 cuft = 29.45 ft = 82,581 tuft 600 1200 1800 2400 3000 3600 4200 4800 5400 Hyd No. 7 Hyd No. 6 ® Total storage used = 82,581 cuft Q (cfs) 40.00 30.00 20.00 10.00 0.00 6000 Time (min) Pond Report 12 Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2020.4 Friday, 05 / 20 / 2022 Pond No. 2 - Pond No.2 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 28.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 28.00 52,820 0 0 0.50 28.50 56,220 27,253 27,253 1.00 29.00 57,941 28,536 55,789 2.00 30.00 61,420 59,666 115,455 3.00 31.00 64,953 63,172 178,627 4.00 32.00 68,538 66,731 245,358 4.25 32.25 69,442 17,246 262,604 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 36.00 3.50 0.00 0.00 Crest Len (ft) = 18.00 4.00 25.00 0.00 Span (in) = 36.00 3.50 0.00 0.00 Crest El. (ft) = 29.50 29.00 31.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 2.60 3.33 Invert El. (ft) = 25.50 28.00 0.00 0.00 Weir Type = 1 Rect Broad -- Length (ft) = 67.00 1.00 0.00 0.00 Multi -Stage = Yes Yes Yes No Slope (%) = 0.63 0.50 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 28.00 0.00 0.00 - 0.00 0.00 0.00 0.05 2,725 28.05 24.07 oc 0.01 is 0.00 0.00 0.00 0.10 5,451 28.10 24.07 oc 0.02 is --- 0.00 0.00 0.00 0.15 8,176 28.15 24.07 oc 0.05 is --- 0.00 0.00 0.00 0.20 10,901 28.20 24.07 oc 0.08 is 0.00 0.00 0.00 0.25 13,626 28.25 24.07 oc 0.10 is 0.00 0.00 0.00 0.30 16,352 28.30 24.07 oc 0.13 is -- 0.00 0.00 0.00 0.35 19,077 28.35 24.07 oc 0.15 is -- - 0.00 0.00 0.00 0.40 21,802 28.40 24.07 oc 0.16 is 0.00 0.00 0.00 0.45 24,528 28.45 24.07 oc 0.18 is 0.00 0.00 0.00 0.50 27,253 28.50 24.07 oc 0.19 is - 0.00 0.00 0.00 0.55 30,106 28.55 24.07 oc 0.20 is --- --- 0.00 0.00 0.00 0.60 32,960 28.60 24.07 oc 0.22 is --- 0.00 0.00 0.00 0.65 35,814 28.65 24.07 oc 0.23 is - 0.00 0.00 0.00 0.70 38,667 28.70 24.07 oc 0.24 is - 0.00 0.00 0.00 0.75 41,521 28.75 24.07 oc 0.25 is -- 0.00 0.00 0.00 0.80 44,375 28.80 24.07 oc 0.26 is --- --- 0.00 0.00 0.00 0.85 47,228 28.85 24.07 oc 0.27 is - - 0.00 0.00 0.00 0.90 50,082 28.90 24.07 oc 0.28 is -- -- 0.00 0.00 0.00 0.95 52,936 28.95 24.07 oc 0.29 is -- -- 0.00 0.00 0.00 1.00 55,789 29.00 24.07 oc 0.30 is -- 0.00 0.00 0.00 1.10 61,756 29.10 24.07 oc 0.31 is -- - 0.00 0.42 0.00 1.20 67,722 29.20 24.07 oc 0.33 is -- - 0.00 1.19 0.00 1.30 73,689 29.30 24.07 oc 0.35 is -- - 0.00 2.19 0.00 1.40 79,656 29.40 24.07 oc 0.36 is -- --- 0.00 3.37 0.00 1.50 85,622 29.50 24.07 oc 0.37 is -- --- 0.00 4.71 0.00 1.60 91,589 29.60 24.07 oc 0.39 is -- --- 1.90 6.19 0.00 1.70 97,555 29.70 24.07 oc 0.40 is -- - 5.36 7.80 0.00 1.80 103,522 29.80 24.07 oc 0.41 is -- --- 9.85 9.53 0.00 1.90 109,489 29.90 26.91 oc 0.38 is -- 15.16 11.37 0.00 2.00 115,455 30.00 34.86 oc 0.35 is -- - 21.19 13.32 0.00 2.10 121,772 30.10 43.00 oc 0.30 is -- 27.86 14.84 s 0.00 2.20 128,090 30.20 49.57 oc 0.25 is -- -- 34.45 s 14.87 s 0.00 2.30 134,407 30.30 53.33 oc 0.22 is -- -- 38.10 s 15.00 s 0.00 2.40 140,724 30.40 56.19 oc 0.20 is -- --- 40.86 s 15.13 s 0.00 2.50 147,041 30.50 58.57 oc 0.18 is -- 43.15 s 15.25 s 0.00 0.000 0.006 0.022 --- 0.046 0.075 - 0.104 0.126 -- 0.145 - 0.162 -- --- 0.177 -- -- 0.191 - -- 0.204 0.217 0.228 -- -- --- 0.239 -- - - 0.250 -- - 0.260 -- -- - 0.270 -- -- --- 0.279 -- --- --- 0.288 --- -- - 0.297 -- -- 0.735 --- - -- 1.522 --- -- --- 2.534 -- - --- 3.730 -- --- 5.064 - -- -- 8.474 13.56 -- -- -- 19.79 -- -- 26.91 - -- - 34.86 - -- - 43.00 --- -- --- 49.57 -- -- -- 53.33 --- -- -- 56.19 -- -- -- 58.57 Continues on next page 13 Pond No.2 Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrFRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs Cfs cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs cfs 2.60 153,358 30.60 60.63 oc 0.16 is -- - 45.12 s 15.35 s 0.00 - - --- 60.63 2.70 159,676 30.70 62.48 oc 0.15 is --- --- 46.87 s 15.45 s 0.00 -- -- --- 62.47 2.80 165,993 30.80 64.16 oc 0.14 is -- -- 48.46 s 15.54 s 0.00 -- -- -- 64.15 2.90 172,310 30.90 65.72 oc 0.13 is -- -- 49.93 s 15.65 s 0.00 -- - - 65.71 3.00 178,627 31.00 66.87 is 0.12 is --- -- 51.06 s 15.67 s 0.00 -- --- -- 66.85 3.10 185,300 31.10 67.96 is 0.11 is --- - 50.56 s 15.24 s 2.06 - --- -- 67.96 3.20 191,973 31.20 69.01 is 0.10 is --- 49.48 s 14.68 s 4.72 s -- - -- 68.98 3.30 198,646 31.30 69.98 is 0.09 is -- 48.66 s 14.22 s 7.01 s -- --- -- 69.97 3.40 205,320 31.40 70.91 is 0.08 is -- -- 47.94 s 13.83 s 9.04 s -- - 70.89 3.50 211,993 31.50 71.80 is 0.07 is --- -- 47.33 s 13.50 s 10.86 s -- --- - 71.76 3.60 218,666 31.60 72.66 is 0.07 is -- 46.85 s 13.21 s 12.51 s -- --- -- 72.63 3.70 225,339 31.70 73.50 is 0.06 is -- 46.46 s 12.98 s 14.00 s -- - 73.50 3.80 232,012 31.80 74.32 is 0.06 is --- -- 46.09 s 12.76 s 15.36 s -- -- -- 74.26 3.90 238,685 31.90 75.13 is 0.05 is - -- 45.84 s 12.58 s 16.62 s - -- - 75.10 4.00 245,358 32.00 75.92 is 0.05 is --- 45.58 s 12.41 s 17.77 s - - - -- 75.82 4.03 247,083 32.03 76.12 is 0.05 is --- --- 45.55 s 12.38 s 18.05 s - -- -- 76.04 4.05 248,807 32.05 76.31 is 0.05 is -- -- 45.49 s 12.35 s 18.32 s -- -- - 76.21 4.07 250,532 32.08 76.50 is 0.05 is -- -- 45.50 s 12.32 s 18.61 s - - - 76.48 4.10 252,256 32.10 76.70 is 0.05 is --- --- 45.41 s 12.28 s 18.85 s - -- - 76.58 4.13 253,981 32.13 76.89 is 0.05 is 45.37 s 12.25 s 19.11 s -- -- -- 76.77 4.15 255,705 32.15 77.08 is 0.04 is -- 45.40 s 12.24 s 19.39 s - --- -- 77.07 4.18 257,430 32.18 77.28 is 0.04 is -- 45.33 s 12.19 s 19.62 s - - -- 77.19 4.20 259,155 32.20 77.47 is 0.04 is 45.32 s 12,17 s 19.88 s --- --- --- 77.42 4.23 260,879 32.23 77.66 is 0.04 is --- 45.30 s 12.15 s 20.13 s -- --- -- 77.62 4.25 262,604 32.25 77.85 is 0.04 is --- 45.25 s 12.12 s 20.36 s --- -- 77.77 ...End Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 9 Pond No. 3 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 41.950 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.82 in Storm duration = 24 hrs Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No. 3 Pre -Development Hyd. No. 9 --1 Year 14 Friday, 05/20 / 2022 = 34.61 cfs = 736 min = 166,390 cult = 68 = Oft = 20.00 min = Type III = 484 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 F 11 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 10 Pond No.3 Post -Development Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 41.950 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.82 in Storm duration = 24 hrs 100.00 80.00 40.00 9MX I so Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.3 Post -Development Hyd. No. 10 — 1 Year 120 240 360 480 600 720 840 Hyd No. 10 15 Friday, 05 / 20 / 2022 = 110.87 cfs = 728 min = 431,671 cuft = 90 = Oft = 10.00 min = Type III = 484 Q (cfs) 120.00 100.00 0111I11 MCI 40.00 20.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 16 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 11 Pond No.3 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 10 - Pond No.3 Post-DeveloprMak. Elevation Reservoir name = Pond No.3 Max. Storage Storage Indication method used U 1 1I8] 3 9 40.00 20.00 Pond No.3 Routed Hyd. No. 11 -- 1 Year 600 1200 1800 2400 Hyd No. 11 Hyd No. 10 Friday, 05 / 20 / 2022 = 10.47 cfs = 800 min = 406,794 cuft = 32.90 ft = 263,354 tuft 3000 3600 4200 4800 5400 ® Total storage used = 263,354 cuft 100.0c 40.00 20.00 0.00 6000 Time (min) Pond Report 1' Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020A Friday, 05 / 20 / 2022 Pond No. 3 - Pond No.3 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 31.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (tuft) 0.00 31.00 132,482 0 0 1.00 32.00 139,559 135,992 135,992 1.50 32.50 141,946 70,368 206,360 2.00 33.00 144,347 71,565 277,925 3.00 34.00 149,192 146,748 424,673 4.00 35.00 154,094 151,621 576,295 5.00 36.00 159,052 156,551 732,845 5.50 36.50 161,552 80,142 812,988 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrFRSr] [A] [B] [C] [D] Rise (in) = 48.00 8.00 0.00 0.00 Crest Len (ft) = 30.00 10.00 70.00 0.00 Span (in) = 48.00 8.00 0.00 0.00 Crest El. (ft) = 33.75 32.50 35.00 0.00 No. Barrels = 2 1 0 0 Weir Coeff. = 3.33 3.33 2.60 3.33 Invert El. (ft) = 28.25 31.00 0.00 0.00 Weir Type = 1 Rect Broad - Length (ft) = 700.00 1.00 0.00 0.00 Multi -Stage = Yes Yes Yes No Slope (%) = 0.50 0.50 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 EAL(inlhr) = 0.000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 31.00 0.00 0.00 --- --- 0.00 0.00 0.00 - - --- 0.000 0.10 13,599 31.10 104.66 is 0.04 is --- --- 0.00 0.00 0.00 --- --- -- 0.036 0.20 27,198 31.20 104.66 is 0.13 is -- - 0.00 0.00 0.00 - --- -- 0.135 0.30 40,797 31.30 104.66 is 0.29 is --- 0.00 0.00 0.00 - - --- 0.287 0.40 54,397 31.40 104.66 is 0.47 is --- 0.00 0.00 0.00 -- -- - 0.472 0.50 67,996 31.50 104.66 is 0.68 is --- --- 0.00 0.00 0.00 -- -- --- 0.680 0.60 81,595 31.60 104.66 is 0.88 is -- --- 0.00 0.00 0.00 -- -- - 0.876 0.70 95,194 31.70 104.66 is 1.02 is -- --- 0.00 0.00 0.00 -- -- -- 1.018 0.80 108,793 31.80 104.66 is 1.15 is --- --- 0.00 0.00 0.00 --- -- --- 1.148 0.90 122,392 31.90 104.66 is 1.27 is 0.00 0.00 0.00 -- -- -- 1.265 1.00 135,992 32.00 104.66 is 1.37 is --- 0.00 0.00 0.00 --- -- -- 1.372 1.05 143,028 32.05 104.66 is 1.42 is - --- 0.00 0.00 0.00 -- -- - 1.423 1.10 150,065 32.10 104.66 is 1.47 is - 0.00 0.00 0.00 --- -- - 1.471 1.15 157,102 32.15 104.66 is 1.52 is -- 0.00 0.00 0.00 -- - - 1.519 1.20 164,139 32.20 104.66 is 1.56 is -- - 0.00 0.00 0.00 -- -- --- 1.564 1.25 171,176 32.25 104.66 is 1.61 is - - 0.00 0.00 0.00 --- - -- 1.609 1.30 178,213 32.30 104.66 is 1.65 is - --- 0.00 0.00 0.00 -- -- --- 1.652 1.35 185,250 32.35 104.66 is 1.69 is - 0.00 0.00 0.00 --- -- - 1.694 1.40 192,286 32.40 104.66 is 1.74 is -- 0.00 0.00 0.00 -- -- - 1.736 1.45 199,323 32.45 104.66 is 1.78 is --- - 0.00 0.00 0.00 -- --- -- 1.776 1.50 206,360 32.50 104.66 is 1.82 is --- 0.00 0.00 0.00 --- --- -- 1.815 1.55 213,517 32.55 104.66 is 1.85 is -- --- 0.00 0.37 0.00 --- -- - 2.226 1.60 220,673 32.60 104.66 is 1.89 is --- 0.00 1.05 0.00 -- -- - 2.944 1.65 227,830 32.65 104.66 is 1.93 is -- - 0.00 1.93 0.00 --- -- -- 3.863 1.70 234,986 32.70 104.66 is 1.96 is --- - 0.00 2.98 0.00 -- --- -- 4.943 1.75 242,143 32.75 104.66 is 2.00 is -- --- 0.00 4.16 0.00 -- --- - 6.163 1.80 249,299 32.80 104.66 is 2.04 is --- -- 0.00 5.47 0.00 -- --- - 7.507 1.85 256,456 32.85 104.66 is 2.07 is -- - 0.00 6.89 0.00 - -- - 8.965 1.90 263,612 32.90 104.66 is 2.10 is -- - 0.00 8.42 0.00 --- -- --- 10.53 1.95 270,769 32.95 104.66 is 2.14 is - -- 0.00 10.05 0.00 -- -- --- 12.19 2.00 277,925 33.00 104.66 is 2.17 is - --- 0.00 11.77 0.00 -- -- -- 13.94 2.10 292,600 33.10 104.66 is 2.23 is -- --- 0.00 15.48 0.00 --- -- -- 17.71 2.20 307,275 33.20 104.66 is 2.30 is --- -- 0.00 19.50 0.00 --- -- --- 21.80 2.30 321,950 33.30 104.66 is 2.36 is -- 0.00 23.83 0.00 --- -- --- 26.18 2.40 336,624 33.40 104.66 is 2.42 is --- 0.00 28.43 0.00 -- -- -- 30.85 Continues on next page... 18 Pond No.3 Stage / Storage / Discharge Table Stage Storage Elevation Civ A Civ B It cuft ft cfs cfs 2.50 351,299 33.50 104.66 is 2.47 is 2.60 365,974 33.60 104.66 is 2.53 is 2.70 380,649 33.70 104.66 1s 2.59 is 2.80 395,324 33.80 104.66 is 2.64 is 2.90 409,999 33.90 104.66 is 2.69 is 3.00 424,673 34.00 104.66 is 2.74 is 3.10 439,836 34.10 104.66 is 2.80 is 3.20 454,998 34.20 107.91 is 2.85 is 3.30 470,160 34.30 124.64 is 2.89 is 3.40 485,322 34.40 142.36 is 2.79 is 3.50 500,484 34.50 161.89 is 2.66 is 3.60 515,646 34.60 180.70 oc 2.31 is 3.70 530,808 34.70 193.49 oc 2.00 is 3.80 545,970 34.80 203.60 oc 1.70 is 3.90 561,132 34.90 209.59 oc 1.53 is 4.00 576,295 35_o0 214.14 oc 1.40 is 4.10 591,950 35.10 218.71 oc 1.25 is 4.20 607,605 35.20 223.02 oc 1.09 is 4.30 623,260 35.30 226.86 oc 0.93 is 4.40 638,915 35.40 229.98 oc 0.82 is 4.50 654,570 35.50 232.64 oc 0.73 is 4.60 670,225 35.60 235.03 oc 0.66 is 4.70 685,880 35.70 237.24 oc 0.59 is 4.80 701,535 35.80 239.33 oc 0.54 is 4.90 717,190 35.90 241.32 oc 0.50 is 5.00 732,845 36.00 243.24 oc 0.46 is 5.05 740,860 36.05 244.18 oc 0.45 is 5.10 748,874 36.10 245.11 oc 0.43 is 5.15 756,888 36.15 246.02 oc 0.41 is 5.20 764,902 36.20 246.92 oc 0.40 is 5.25 772,917 36.25 247.82 oc 0.39 is 5.30 780,931 36.30 248.70 oc 0.38 is 5.35 788,945 36.35 249.58 oc 0.36 is 5.40 796,959 36.40 250.45 oc 0.35 is 5.45 804,974 36.45 251.32 oc 0.34 is 5.50 812,988 36.50 252.17 oc 0.33 is ...End Civ C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total cfs cfs cfs cfs cfs cfs cfs cfs cfs -- - 0.00 33.30 0.00 -- -- - 35.77 - - 0.00 38.42 0.00 -- -- - 40.95 -- - 0.00 43.77 0.00 -- -- -- 46.36 -- -- 1.12 49.36 0.00 --- -- --- 53.11 - -- 5.80 55.16 0.00 -- - -- 63.66 - 12.49 61.18 0.00 --- - --- 76.41 --- - 20.69 67.39 0.00 --- --- --- 90.88 --- - 30.16 73.81 0.00 --- --- --- 106.81 --- --- 40.75 80.42 0.00 -- --- --- 124.06 -- -- 52.35 87.21 0.00 -- -- - 142.36 --- - 64.89 94.19 0.00 --- -- -- 161.73 -- -- 78.29 100.10 s 0.00 -- --- --- 180.70 - --- 92.50 98.99 s 0.00 --- - -- 193.49 -- -- 107.32 s 94.58 s 0.00 -- - 203.60 -- -- 115.66 s 92.40 s 0.00 -- -- --- 209.58 -- - 121.69 s 91.04 s 0.00 - --- -- 214.13 --- --- 123.92 s 87.79 s 5.76 --- - -- 218.71 --- - 122.65 s 82.99 s 16.28 -- --- -- 223.01 - -- 118.74 s 77.26 s 29.91 -- --- -- 226.84 - --- 115.50 s 72.66 s 40.98 s -- - --- 229.96 - -- 113.22 s 69.14 s 49.51 s - - 232.59 - - - 111.36 s 66.23 s 56.76 s --- - 235.00 - - - 109.79 s 63.74 s 63.07 s -- -- --- 237.19 - 108.47 s 61.60 s 68.65 s -- -- 239.26 --- 107.36 s 59.74 s 73.65 s - 241.25 106.44 s 58.13 s 78.18 s - -- 243.21 105.99 s 57.38 s 80.26 s - 244.07 105.60 s 56.69 s 82.27 s 244.99 105.27 s 56.05 s 84.21 s 245.95 104.96 s 55.45 s 86.07 s -- - --- 246.88 104.63 s 54.85 s 87.82 s -- - --- 247.69 104.38 s 54.32 s 89.55 s - -- 248.62 104.16 s 53.82 s 91.22 s --- 249.56 - 103.92 s 53.32 s 92.80 s 250.39 --- 103.66 s 52.84 s 94.30 s --- 251.15 103.53 s 52.43 s 95.85 s - -- --- 252.15 Hydrograph Report 19 Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Hyd. No. 13 Pond No.4 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 10.800 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.82 in Storm duration = 24 hrs 10.00 M . 1I 4.00 2.00 120 240 360 480 Hyd No. 13 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.4 Pre -Development Hyd. No. 13 — 1 Year Friday, 05 / 20 / 2022 = 10.12 cfs = 734 min = 47,479 tuft = 70 = Oft = 20.00 min = Type III = 484 Q (cfs) 12.00 10.00 A MY] 4.00 2.00 0.00 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 20 Hydraflow Hydrographs Extension for Autodesk® Civil 31® by Autodesk, Inc. v2020.4 Hyd. No. 14 Pond No.4 Post -Development Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 10.800 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.82 in Storm duration = 24 hrs 18.00 15.00 12.00 • IX .M 3.00 Friday, 05 / 20 / 2022 19.03 cfs = 728 min = 73,516 cuft = 79 = Oft = 10.00 min = Type III = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of cons. (Tc) Distribution Shape factor Pond No.4 Post -Development Hyd. No. 14 --1 Year Q (cfs) 21.00 18.00 15.00 12.00 • W Mle] 3.00 0.00 -j I I I I I I i I --7 �M 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 -- Hyd No. 14 Time (min) Hydrograph Report 21 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Friday, 05 / 20 / 2022 Hyd. No. 15 Pond No.4 Routed Hydrograph type = Reservoir Peak discharge = 4.625 cfs Storm frequency = 1 yrs Time to peak = 758 min Time interval = 2 min Hyd. volume = 73,492 cuft Inflow hyd. No. = 14 - Pond No.4 Post- Devel oprTMak. Elevation = 28.79 ft Reservoir name = Pond No.4 Max. Storage = 29,489 cuft Storage Indication method used. 18.00 15.00 12.00 • c . To MO 240 480 Hyd No. 15 Pond No.4 Routed Hyd. No. 15 —1 Year Q (cfs) 21.00 18.00 15.00 12.00 . 11 3.00 0.00 720 960 1200 1440 1680 1920 2160 2400 Time (min) Hyd No. 14 ® Total storage used = 29,489 cuff Pond Report 22 Hydraflow Hydrographs Extension forAutodesk® Civil 3D® by Autodesk, Inc. v2020.4 Friday, 05 / 20 / 2022 Pond No. 4 - Pond No.4 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 28.00 ft Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 28.00 35,513 0 0 0.50 28.50 37,910 18,351 18,351 1.00 29.00 39,130 19,257 37,608 2.00 30.00 41,618 40,364 77,971 3.00 31.00 44,165 42,881 120,852 4.00 32.00 46,773 45,458 166,310 Culvert I Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 24.00 4.00 0.00 0.00 Crest Len (ft) = 24.00 3.00 30.00 0.00 Span (in) = 24.00 43.00 0.00 0.00 Crest El. (ft) = 29.00 28.75 31.00 0.00 No. Barrels = 2 1 0 0 Weir Coeff. = 3.33 3.33 2.60 3.33 Invert El. (ft) = 27.00 28.00 0.00 0.00 Weir Type = 1 Red Broad -- Length (ft) = 74.00 1.00 0.00 0.00 Multistage = Yes Yes Yes No Slope (%) = 0.55 0.50 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(In/hr) = 0.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage I Storage / Discharge Table Stage Storage Elevation Clv A Clv, B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 28.00 0.00 0.00 - 0.00 0.00 0.00 --- 0.000 0.05 1,835 28.05 10.36 cc 0.08 cc - 0.00 0.00 0.00 0.076 0.10 3,670 28.10 10.36 cc 0.16 cc --- - 0.00 0.00 0.00 0.160 0.15 5,505 28.15 10.36 cc 0.24 cc - 0.00 0.00 0.00 --- 0.244 0.20 7,340 28.20 10.36 cc 0.33 cc -- -- 0.00 0.00 0.00 --- - 0.327 0.25 9,175 28.25 10.36 cc 0.41 cc --- - 0.00 0.00 0.00 0.410 0.30 11,010 28.30 10.36 cc 0.49 cc --- - 0.00 0.00 0.00 0.493 0-35 12,845 28.35 10.36 cc 1.13 cc -- -- 0.00 0.00 0.00 --- --- 1.129 0.40 14,680 28.40 10.36 cc 2.05 cc -- --- 0.00 0.00 0.00 -- -- 2.054 0.45 16,515 28.45 10.36 cc 2.68 cc - --- 0.00 0.00 0.00 --- 2.677 0.50 18,351 28.50 10.36 cc 3.18 cc - -- 0.00 0.00 0.00 -- 3.180 0.55 20,276 28.55 10.36 cc 3.56 is - -- 0.00 0.00 0.00 --- 3.561 0.60 22,202 28.60 10.36 cc 3.79 is --- -- 0.00 0.00 0.00 --- --- 3.786 0.65 24,128 28.65 10.36 cc 4.00 is --- -- 0.00 0.00 0.00 -- -- 3.998 0.70 26,053 28.70 10.36 cc 4.20 is -- -- 0.00 0.00 0.00 - --- --- 4.200 0.75 27,979 28.75 10.36 cc 4.39 is -- -- 0.00 0.00 0.00 --- --- --- 4.393 0.80 29,905 28.80 10.36 cc 4.58 is -- -- 0.00 0.11 0.00 -- -- --- 4.689 0.85 31,831 28.85 10.36 cc 4.75 is -- - 0.00 0.32 0.00 --- -- -- 5.070 0.90 33,756 28.90 10.36 cc 4.93 is --- - 0.00 0.58 0.00 - -- - 5.505 0.95 35,682 28.95 10.36 cc 5.09 is -- -- 0.00 0.89 0.00 - --- - 5.984 1.00 37,608 29.00 10.36 cc 5.25 is --- -- 0.00 1.25 0.00 -- -- - 6.499 1.10 41,644 29.10 10.36 cc 5.56 is -- --- 2.53 2.07 0.00 --- -- -- 10.15 1.20 45,680 29.20 10.36 cc 5.85 is -- - - 7.15 3.02 0.00 -- --- --- 16.01 1.30 49,717 29.30 17.35 cc 6.12 is -- -- 13.13 4.07 0.00 -- -- -- 23.33 1.40 53,753 29.40 23.33 cc 6.39 is -- - 19.05 s 4.27 s 0.00 -- -- - 29.71 1.50 57,789 29.50 27.10 cc 6.64 is - - 22.58 s 4.51 s 0.00 - - -- 33.74 1.60 61,826 29.60 29.92 cc 6.89 is - - 25.23 s 4.69 s 0.00 - -- - 36.81 1.70 65,862 29.70 32.23 cc 7.12 is -- - 27.39 s 4.84 s 0.00 - -- -- 39.34 1.80 69,899 29.80 34.21 cc 7.35 is - --- 29.24 s 4.96s. 0.00 -- -- - 41.56 1.90 73,935 29.90 35.98 cc 7.57 is - -- 30.89 s 5.08 s 0.00 --- -- - 43.54 2.00 77,971 30.00 37.61 cc 7.79 is - --- 32.39 s 5.20 s 0.00 -- - - 45.38 2.10 82,259 30.10 39.12 cc 8.00 is - -- 33.80 s 5.31 s 0.00 -- -- - 47.11 2.20 86,547 30.20 40.55 cc 8.20 is -- -- 35.11 s 5.42 s 0.00 - --- - 48.74 2.30 90,836 30.30 41.91 cc 8.40 is -- -- 36.35 s 5.53 s 0.00 - -- 50.28 2.40 95,124 30.40 43.21 cc 8.59 is -- --- 37.55 s 5.64 s 0.00 -- --- -- 51.79 2.50 99,412 30.50 44.46 cc 8.79 is -- --- 38.70 s 5.75 s 0.00 -- --- - 53.24 2.60 103,700 30.60 45.67 cc 8.97 is --- --- 39.76 s 5.84 s 0.00 -- -- -- 54.58 Continues on next page... 23 Pond No.4 Stage / Storage / Discharge Table Stage Storage Elevation Clv A ft Cuft ft Cfs 2.70 107,988 30.70 46.84 oc 2.80 112,276 30.80 47.98 oc 2.90 116,564 30.90 49.09 OC 3.00 120,852 31.00 50.17 oc 3.10 125,398 31.10 51.23 oc 3.20 129,944 31.20 52.28 oc 3.30 134,490 31.30 53.29 oc 3.40 139,036 31.40 54.29 oc 3.50 143,581 31.50 55.26 oc 3.60 148,127 31.60 56.22 oc 3.70 152,673 31.70 57.16 oc 3.80 157,219 31.80 58.08 oc 3.90 161,765 31.90 58.98 oc 4.00 166,310 32.00 59.87 oc ...End Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total Cfs cfs Cfs Cfs Cis Cfs Cfs Cfs efs Cfs 9.15 is --- --- 40.86 s 5.95 s 0.00 - -- - 55.97 9.33 is --- -- 41.91 s 6.06 s 0.00 -- -- - 57.30 9.51 iC - -- 42.90 s 6.16 s 0.00 --- - - 58.56 9.68 is --- 43.86 s 6.25 s 0.00 - - -- 59.80 9.85 is -- 43.55 s 6.17 s 1.40 s -- - --- 60.97 10.02 is --- -- 43.23 s 6.09 s 2.89 s - -- -- 62.23 10.18 is -- - 42.91 s 6.02 s 4.31 s - --- --- 63.41 10.34 is -- - 42.56 s 5.94 s 5.62 s --- -- - 64.47 10.50 is -- --- 42.47 s 5.90 s 6.88 s - -- 65.76 10.66 is - -- 42.22 s 5.85 s 8.03 s --- -- -- 66.75 10.81 is --- - 42.06 s 5.80 s 9.11 s -- --- -_ 67.78 10.96 is -- --- 42.08 s 5.79 s 10.15 s - -- --- 68.99 11.11 is --- - 41.85 s 5.74 s 11.08 s --- - -- 69.78 11.26 is --- --- 41.96 s 5.73 s 12.03 s - -- - 70.98 Hydrograph Report 24 nyoranow nyarograpns txtension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Hyd. No. 17 Untreated Pre -Development Hydrograph type = SCS Runoff: Storm frequency = 1 yrs Time interval = 2 min Drainage area = 0.460 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.82 in Storm duration = 24 hrs 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 a Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Untreated Pre -Development Hyd. No. 17 --1 Year Friday, 05 / 20 / 2022 = 0.513 cis = 730 min = 2,085 cuft = 70 = Oft = 10.00 min = Type III = 484 Q (cfs) 1.00 IX 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 o.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Time (min) Hydrograph Report 25 Mydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 18 Untreated Post -Development Hydrograph type SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area _ 0.460 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.82 in Storm duration = 24 hrs 1.00 Friday, 05 / 20 / 2022 = 1.483 cfs = 724 min = 4,609 cuft = 92 = Oft = 5.00 min = Type III = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Untreated Post -Development Hyd. No. 18 —1 Year 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 18 Q (cfs) 2.00 1.00 0.00 1440 Time (min) Hydrograph Report zs Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 20 TOTAL SITE PRE -DEVELOPMENT Hydrograph type = Combine Storm frequency = 1 yrs Time interval = 2 min Inflow hyds. = 1, 5, 9, 13, 17 Q (cfs 100.00 . O 91 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 Friday, 05 / 20 / 2022 Peak discharge = 90.37 cfs Time to peak = 734 min Hyd. volume = 423,333 cuft Contrib. drain. area = 95.360 ac TOTAL SITE PRE -DEVELOPMENT Hyd. No. 20 - 1 Year Q (Cfs) 100.00 90.00 80.00 ' 70.00 - 60.00 50.00 40.00 30.00 20.00 - ... - 10.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 20 Hyd No. 1 Hyd No. 5 - Hyd No. 9 Time (min) Hyd No. 13 Hyd No. 17 Hydrograph Report 27 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 21 TOTAL SITE POST -DEVELOPMENT Hydrograph type = Combing: Storm frequency = 1 yrs Time interval = 2 min Inflows hyds. = 2, 6, 10, 14, 18 240.00 200.00 160.00 120.00 :1 11 40.00 a Friday, 05 / 20 / 2022 Peak discharge = 245.55 cfs Time to peak = 728 min Hyd. volume = 958,746 cuff Contrib. drain. area = 95.360 ac TOTAL SITE POST -DEVELOPMENT Hyd. No. 21 --1 Year 120 240 360 480 600 720 Hyd No. 21 Hyd No. 2 Hyd No. 14 Q (cfs) 280.00 240.00 200.00 160.00 120.00 80.00 40.00 JW 840 960 1080 1200 1320 1440 1560 -- Hyd No. 6 Hyd No. 10 Time (min) Hyd No. 18 Hydrograph Report 28 Hydraflow Hydrographs Extension forAutodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 22 TOTAL SITE ROUTED Hydrograph type = Combine Storm frequency = 1 yrs Time interval = 2 min Inflow hyds. = 3, 7, 11, 15, 18 U811111 KI1 TS 1, 20.00 10.00 480 960 Hyd No. 22 Friday, 05 / 20 / 2022 Peak discharge = 41.61 cfs Time to peak = 756 min Hyd. volume = 907,273 cuft Contrib. drain. area = 0.460 ac TOTAL SITE ROUTED Hyd. No. 22 -- 1 Year Q (cfs) 50.00 40.00 KOW 20.00 10.00 1440 1920 2400 2880 3360 3840 4320 4800 5280 Hyd No. 3 Hyd No. 7 Hyd No. 11 Time (min) Hyd No. 15 Hyd No. 18 29 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak now (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 44.96 2 734 201,801 ---- --- ---- Pond No.1 Pie -development 2 SCS Runoff 99.29 2 728 393,379 --- --- Pond No.1 Post -Development 3 Reservoir 45.95 2 744 377,034 2 29.64 179,032 Pond No. 1 Routed 5 SCS Runoff 21.29 2 734 95,195 --- --- --- Pond No.2 Pre -Development 6 SCS Runoff 45.02 ? 728 178,377 ---- --- ---- Pond No.2 Post -Development 7 Reservoir 12.34 2 754 167,969 6 29.68 Pond No.2 Routed 9 SCS Runoff 53.68 2 734 246,836 ---- ------ Pond No. 3 Pre -Development 10 SCS Runoff 140.51 2 728 552,829 -- - ---- Pond No.3 Post -Development 11 Reservoir 23.43 2 762 527,726 10 3-4- 312,721 Pond No.3 Routed 13 SCS Runoff 15.27 2 734 69,249 ----- ---- Pond No.4 Pre -Development 14 SCS Runoff 26.20 2 728 100,505 -- Pond No.4 Post -Development 15 Reservoir 8.443 2 752 100,481 14 29.05 Pond No.4 Routed 17 SCS Runoff 0.771 2 730 3,042 ---- ---- Untreated Pre -Development 18 SCS Runoff 1.853 2 724 5,837 --- -- ---- Untreated Post -Development 20 Combine 135.89 734 616,123 1, 5, 9, -- TOTAL SITE PRE -DEVELOPMENT 13, 17, 21 Combine 312.33 2 728 1,230,925 2, 6, 10, --- TOTAL SITE POST -DEVELOPMENT 14, 18, 22 Combine 85.83 2 750 1,179,045 3, 7, 11, — ---- TOTAL SITE ROUTED 15, 18, I:\00494\0039\PDNR\20- i ech\24-Discipline d3a,3rlii6bukie ithfibMIStormwate 0 .H8 /IR@dP2M2004940039.gpw Hydrograph Report 30 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 1 Pond No.1 Pre -development Hydrograph type = SCS !runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 29.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.63 in Storm duration = 24 hrs 40.00 30.00 20.00 fi[ I6, 0.00 0 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.1 Pre -development Hyd. No. 1 — 2 Year 120 240 360 480 600 720 Hyd No. 1 Friday, 05 / 20 / 2022 = 44.96 cfs = 734 min = 201,801 cuf[ = 72 = 0 ft = 20.00 min = Type III = 484 Q (cfs) 50.00 01111 30.00 r� 10.00 0.00 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 31 nyaranow nyarograpns tmenslon Tor Autwesm uvu 3D® by Autodesk, Inc. v202O.4 Hyd. No. 2 Pond No.1 Post -Development Hydrograph type = SCS runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 29.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.63 in Storm duration = 24 hrs 40.00 1 �� 0.00 0 120 240 360 Hyd No. 2 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.1 Post -Development Hyd. No. 2 — 2 Year 480 600 720 Friday, 05 / 20 / 2022 = 99.29 cfs = 728 min = 393,379 cuft = 91 = Oft = 10.00 min = Type III = 484 Q (cfs) 100.00 :� 40.00 20.00 0.00 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 32 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 3 Pond No. 1 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Pond No.1 Post-DevelopmM;6x. Elevation Reservoir name = Pond No.1 Max. Storage Storage Indication method used. �1 40.00 20.00 0.00 0 240 480 Hyd No. 3 72 Pond No. 1 Routed Hyd. No. 3 — 2 Year Friday, 05 / 20 / 2022 = 45.95 cfs = 744 min = 377,034 cult = 29.64 ft = 179,032 cult Q (cfs) 100.00 :1 �� TOO, 141 40.00 20.00 0.00 0 960 1200 1440 1680 'i920 2160 2400 2640 2880 3120 Time (min) Hyd No. 2 ® Total storage used = 179,032 cuff Hydrograph Report 33 nyaranow nyorograpns tx[ension Tor Au[oaesK® GIVII 3D® by Autodesk, Inc. v202O.4 Hyd. No. 5 Pond No.2 Pre -Development Hydrograph type = SDS runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 13.150 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.63 in Storm duration = 24 hrs Q (cfs) 24.00 20.00 16.00 12.00 4.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.2 Pre -Development Hyd. No. 5 — 2 Year 120 240 360 480 600 720 840 Hyd No. 5 Friday, 05 / 20 / 2022 = 21.29 cfs = 734 min = 95,195 cult = 73 = Oft = 20.00 min = Type III = 484 Q (cfs) 24.00 20.00 16.00 WA1I17 4.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 6 Pond No.2 Post -Development Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 13.150 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.63 in Storm duration = 24 hrs F� 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.2 Post -Development Hyd. No. 6 -- 2 Year 120 240 360 480 600 720 840 Hyd No. 6 34 Friday, 05 / 20 / 2022 = 45.02 cfs = 728 min = 178,377 cult = 91 = Oft = 10.00 min = Type III = 484 Q (cfs) 50.00 40.00 30.00 NMI] 10.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 35 nyoranow nyorograpns tmension Tor AutoaesKQD civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 7 Pond No.2 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 6 - Pond No.2 Post-DevelopmMhx. Elevation Reservoir name = Pond No.2 Max. Storage Storage Indication method used. 40.00 20.00 10.00 0.00 0 480 -- Hyd No. 7 Pond No.2 Routed Hyd. No. 7 -- 2 Year Friday, 05 120 / 2022 = 12.34 cfs = 754 min = 167,969 cuft = 29.68 ft = 96,127 cuft 960 1440 1920 2400 2880 3360 3840 4320 • Hyd No. 6 Total storage used = 96,127 cuft Q (cfs) 50.00 40.00 30.00 20.00 10.00 -- 0.00 4800 Time (min) Hydrograph Report 36 nyaratiow nyarograpns tMenslon for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 9 Pond No. 3 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 41.950 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.63 in Storm duration = 24 hrs 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No. 3 Pre -Development Hyd. No. 9 -- 2 Year 120 240 360 480 600 720 Hyd No. 9 Friday, 05 120 12022 = 53.68 cfs = 734 min = 246,836 tuft = 68 = Oft = 20.00 min = Type III = 484 Q (cfs) 60.00 50.00 40.00 9119111 MCI 10.00 0.00 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 37 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 10 Pond No.3 Post -Development Hydrograph type = SCS runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 41.950 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.63 in Storm duration = 24 hrs 140.00 120.00 100.00 01161f 40.00 20.00 Friday, 05 / 20 / 2022 = 140.51 cfs = 728 min = 552,829 cuff = 90 = 0 ft = 10.00 min = Type III = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.3 Post -Development Hyd. No. 10 -- 2 Year Q (cfs) 160.00 140.00 120.00 100.00 - $I 40.00 1 1r: 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) Hydrograph Report 38 Hydraflow Hydrographs Extension for Autodesk® Civil 31® by Autodesk, Inc. v2020.4 Hyd. No. 11 Pond No.3 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 10 - Pond No.3 Post-®evelopnMak. Elevation Reservoir name = Pond No.3 Max. Storage Storage Indication method used Pond No.3 Routed Hyd. No. 11 -- 2 Year 140.00 120.00 100.00 E Ii 1 40.00 20.00 Friday, 05 / 20 / 2022 = 23.43 cfs = 762 min = 527,726 cuft = 33.24 ft = 312,721 cuft Q (cfs) 160.00 140.00 120.00 100.00 :� 40.00 Ki 6 S, 0.00 1 —s - , I , _ I L 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 — Hyd No. 11 Hyd No. 10 ® Total storage used = 312,721 cuft Time (min) Hydrograph Report Hydraflow Hydrographs Extension forAutodesk® Civil 3D® byAutodesk, Inc. v2020.4 Hyd. No. 13 Pond No.4 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 10.800 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.63 in Storm duration = 24 hrs 15.00 12.00 M We] MY 120 240 360 480 Hyd No. 13 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.4 Pre -Development Hyd. No. 13 -- 2 Year 39 Friday, 05 / 20 / 2022 = 15.27 cfs = 734 min = 69,249 cult = 70 = Oft = 20.00 min = Type III = 484 Q (cfs) 18.00 15.00 12.00 MM M 3.00 0.00 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 40 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 14 Pond No-4 Post -Development Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 10.800 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.63 in Storm duration = 24 hrs Q (cfs) 28.00 24.00 61 �� 16.00 12.00 M 4.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.4 Post -Development Hyd. No. 14 -- 2 Year Friday, 05 / 20 / 2022 = 26.20 cfs = 728 min = 100,505 cult = 79 = Oft = 10.00 min = Type III = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 M 4.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 14 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil MOD by Autodesk, Inc. v2020.4 Hyd. No. 15 Pond No.4 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 14 - Pond No.4 Post- Develop rrMak. Elevation Reservoir name = Pond No.4 Max. Storage Storage Indication method used. Q (cfs) 28.00 24.00 20.00 fi. III 12.00 W6 WC Pond No.4 Routed Hyd. No. 15 — 2 Year 41 Friday, 05 / 20 / 2022 = 8.443 cfs = 752 min = 100,481 cuft = 29.05 ft = 39,756 cult Q (cfs) 28.00 24.00 tI II 16.00 12.00 I I' 4.00 0.00 240 480 720 960 1200 1440 1680 1920 2160 Hyd No. 15 Hyd No. 14 ® Total storage used = 39,756 CA Time (min) Hydrograph Report 42 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Friday, 05 / 20 / 2022 Hyd. No. 17 Untreated Pre -Development Hydrograph type = SCS Runoff Peak discharge = 0.771 cfs Storm frequency = 2 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 3,042 cult Drainage area = 0.460 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 4.63 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 )MO ;� c 0.40 0.30 0.20 0.10 0.00 0 Untreated Pre -Development Hyd. No. 17 -- 2 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 111W 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Time (min) Hydrograph Report 43 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 18 Untreated Post -Development Hydrograph type = SDS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 0.460 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.63 in Storm duration = 24 hrs Q (Cfs) 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Untreated Post -Development Hyd. No. 18 -- 2 Year Friday, 05 / 20 / 2022 = 1.853 cis = 724 m i n = 5,837 cult = 92 = Oft = 5.00 min = Type III = 484 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 18 Q (cfs) 2.00 1.00 0.00 1440 Time (min) Hydrograph Report 44 Hydraflow Hydrographs Extension forAutodesk® Civil 3138 by Autodesk, Inc. v2020.4 Hyd. No. 20 TOTAL SITE PRE -DEVELOPMENT Hydrograph type = Combine Storm frequency = 2 yrs Time interval = 2 min Inflow hyds. = 1, 5, 9, 13, 17 120.00 100.00 80.00 40.00 O 1I7 Friday, 05 / 20 / 2022 Peak discharge = 135.99 cfs Time to peak = 734 min Hyd. volume = 616,123 cuft Contrib. drain. area = 95.360 ac TOTAL SITE PRE -DEVELOPMENT Hyd. No. 20 -- 2 Year Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 20 Hyd No. 1 Hyd No. 5 Hyd No. 9 Time (min) Hyd No. 13 Hyd No. 17 Hydrograph Report 45 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk. Inc. v2020.4 Hyd. No. 21 TOTAL SITE POST -DEVELOPMENT Hydrograph type = Combine Storm frequency = 2 yrs Time interval = 2 min Inflow hyds. = 2, 6, 10, 14, 18 280.00 240.00 200.00 160.00 120.00 n- li e 40.00 Friday, 05 / 20 / 2022 Peak discharge = 312.33 cfs Time to peak = 728 min Hyd. volume = 1,230,925 cuft Contrib. drain. area = 95.360 ac TOTAL SITE POST -DEVELOPMENT Hyd. No. 21 -- 2 Year Q (cfs) 320.00 240.00 200.00 160.00 120.00 80.00 MIX X 0 120 240 360 480 600 720 840 860 1080 1200 1320 1440 1560 Hyd No. 21 Hyd No. 2 Hyd No. 6 - Hyd No. 10 Time (min) Hyd No. 14 Hyd No. 18 Hydrograph Report 46 nyuranow nyurograpns r-mension Tor AutooesK® civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 22 TOTAL SITE ROUTED Hydrograph type = Combine Storm frequency = 2 yrs Time interval = 2 min Inflow hyds. = 3, 7, 11, 15, 18 Q (cfs 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 Friday, 05 / 20 / 2022 Peak discharge = 85.83 cfs Time to peak = 750 min Hyd. volume = 1,179,045 cuft Contrib. drain. area = 0.460 ac TOTAL SITE ROUTED Hyd. No. 22 - 2 Year Q (Cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 IMMMM Ban - 0.00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 3960 Hyd No. 22 Hyd No. 3 Hyd No. 7 - Hyd No. 11 Time (min) — Hyd No. 15 Hyd No. 18 47 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 1.185 2 750 11,889 ---- - - Pond No.1 Pre -development 2 SCS Runoff 20.85 728 80,345 -- Pond No.1 Post -Development 3 Reservoir 0.541 1130 68,119 2 28.58 60,451 Pond No. 1 Routed 5 SCS Runoff 0.692 2 748 6,187 ---- -- Pond No.2 Pre -Development 6 SCS Runoff 9.454 2 728 36,432 --- --- Pond No.2 Post -Development 7 Reservoir 0.198 2 1250 30,988 6 28.52 28,590 Pond No.2 Routed 9 SCS Runoff 0.390 2 764 9,033 -- - --- Pond No. 3 Pre -Development 10 SCS Runoff 27.66 2 728 107,329 ---- ------ -- Pond No.3 Post -Development 11 Reservoir 0.834 2 1080 91,048 0 31.58 78,689 Pond No.3 Routed 13 SCS Runoff 0.239 2 754 3,286 --- Pond No.4 Pre -Development 14 SCS Runoff 2.048 2 732 10,453 Pond No.4 Post -Development 15 Reservoir 0.212 2 940 10,429 14 1 Pond No.4 Routed 17 SCS Runoff 0.012 t 748 144 - — --- --- Untreated Pre -Development 18 SCS Runoff 0.420 2 724 1,254 ---- ----- Untreated Post -Development 20 Combine 2.377 2 752 30,539 1, 5, 9, TOTAL SITE PRE -DEVELOPMENT 13, 17, 21 Combine 60.13 2 728 235,813 2, 6, 10, TOTAL SITE POST -DEVELOPMENT 14, 18, 22 Combine 1.777 2 1048 201,838 3, 7, 11, TOTAL SITE ROUTED 15, 18, I:\00494\0039\PDNR\20-Tech\24-Discipline d&nr5dhmnak1%hbffdBtormwate OWN /FBQA�Rffl2004940039.gpw Hydrograph Report 48 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 1 Pond No-1 Pre -development Hydrograph type = SCS runoff Storm frequency = 3 yrs Time interval = 2 min Drainage area = 29.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 1.50 in Storm duration = 24 hrs 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.1 Pre -development Hyd. No. 1 — 3 Year 120 240 360 480 600 720 840 960 Hyd No. 1 Friday, 05 / 20 / 2022 = 1.185 cfs = 750 min = 11,889 cuft = 72 = Oft = 20.00 min = Type III = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 49 Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Hyd. No. 2 Pond No.1 Post -Development Hydrograph type = SCS Runoff Storm frequency = 3 yrs Time interval = 2 min Drainage area = 29.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 1.50 in Storm duration = 24 hrs 18.00 15.00 12.00 •M M 3.00 Friday, 05 / 20 / 2022 = 20.85 cfs = 728 min = 80,345 cuft = 91 = 0 ft = 10.00 min = Type III = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.1 Post -Development Hyd. No. 2 — 3 Year Q (cfs) 21.00 18.00 15.00 12.00 WE M 3.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report 50 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 3 Pond No. 1 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 3 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Pond No.1 Post-DevelopmMbx. Elevation Reservoir name = Pond No.1 Max. Storage Storage Indication method used. 18.00 15.00 12.00 M . 11 Km 600 Hyd No. 3 Pond No. 1 Routed Hyd. No. 3 — 3 Year Friday, 05 / 20 / 2022 = 0.541 cfs = 1130 min = 68,119 cuft = 28.58 ft = 60,451 cuff Q (cfs) 21.00 18.00 15.00 12.00 n1WIIIIIIIIIII 90111111111111 3.00 0.00 1200 1800 2400 3000 3600 4200 4800 5400 6000 Hyd No. 2 ® Total storage used = 60,451 cuff Time (min) Hydrograph Report 51 Hydraflow Hydrographs Extension for Autodesk® Civil MOD by Autodesk, Inc. v2020.4 Hyd. No. 5 Pond No.2 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 3 yrs Time interval = 2 min Drainage area = 13.150 ac Basin Slope = 0.0 % Tc method = User Total precip. = 1.50 in Storm duration = 24 hrs Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.2 Pre -Development Hyd. No. 5 — 3 Year Friday, 05 / 20 / 2022 = 0.592 cfs = 748 min = 6,187 cuft = 73 = Oft = 20.00 min = Type III = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) Hydrograph Report 52 Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Hyd. No. 6 Pond No.2 Post -Development Hydrograph type = SCS runoff Storm frequency = 3 yrs Time interval = 2 min Drainage area = 13.150 ac Basin Slope = 0.0 % Tc method = User Total precip. = 1.50 in Storm duration = 24 hrs NOR . IX 4.00 2.00 120 240 360 480 Hyd No. 6 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.2 Post -Development Hyd. No. 6 — 3 Year Friday, 05 / 20 / 2022 = 9.454 cfs = 728 min = 36,432 cuft = 91 = Oft = 10.00 min = Type III = 484 Q (cfs) 10.00 WX MM 4.00 r M 0.00 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 53 Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Hyd. No. 7 Pond No.2 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 3 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 6 - Pond No.2 Post-DevelopmM;bx. Elevation Reservoir name = Pond No.2 Max. Storage Storage Indication method used. Mal M 4.00 2.00 II • 600 1200 Hyd No. 7 Pond No.2 Routed Hyd. No. 7 -- 3 Year Friday, 05 / 20 / 2022 = 0.198 cfs = 1250 min = 30,988 cult = 28.52 ft = 28,590 cult Q (cfs) 10.00 N. 141 4.00 2.00 0.00 1800 2400 3000 3600 4200 4800 5400 6000 Hyd No. 6 Total storage used = 28,590 cuff Time (min) Hydrograph Report 54 Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Friday, 05 120 12022 Hyd. No. 9 Pond No. 3 Pre -Development Hydrograph type = SDS Runoff Peak discharge = 0.390 cfs Storm frequency = 3 yrs Time to peak = 764 min Time interval = 2 min Hyd. volume = 9,033 cuft Drainage area = 41.950 ac Curve number = 68 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 20.00 min Total precip. = 1.50 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 C��F7 Pond No. 3 Pre -Development Hyd. No. 9 -- 3 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd Na. 9 Time (min) Hydrograph Report 55 Hydraflow Hydrographs Extension for Autodesk® Civil 31® by Autodesk, Inc. v2020.4 Hyd. No. 10 Pond No-3 Post -Development Hydrograph type = SCS Runoff Storm frequency = 3 yrs Time interval = 2 min Drainage area = 41.950 ac Basin Slope = 0.0 % Tc method = User Total precip. = 1.50 in Storm duration = 24 hrs 24.00 20.00 16.00 12.00 WE 4.00 Friday, 05 / 20 / 2022 = 27.56 cfs = 728 min = 107,329 cuft = 90 = Oft = 10.00 min = Type III = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.3 Post -Development Hyd. No. 10 -- 3 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 W mile' 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) Hydrograph Report 56 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Friday, 05 / 20 / 2022 Hyd. No. 11 Pond No.3 Routed Hydrograph type = Reservoir Peak discharge = 0.834 cfs Storm frequency = 3 yrs Time to peak = 1080 min Time interval = 2 min Hyd. volume = 91,048 cuft Inflow hyd. No. = 10 -Pond No.3 Post-DeveioprrMak. Elevation = 31.58 ft Reservoir name = Pond No.3 Max. Storage = 78,689 cuft Storage Indication method used. 24.00 Ki 1 6 16.00 12.00 M 4.00 I of 600 Hyd No. 11 Pond No.3 Routed Hyd. No. 11 — 3 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 10 ® Total storage used = 78,689 cuff Hydrograph Report 57 Hydraflow Hydrographs Extension for Autodesk® Civil 3139 by Autodesk, Inc. v2020.4 Friday, 05 / 20 / 2022 Hyd. No. 13 Pond No.4 Pre -Development Hydrograph type = SCS runoff Peak discharge = 0.239 cfs Storm frequency = 3 yrs Time to peak = 754 min Time interval = 2 min Hyd. volume = 3,286 cuff Drainage area = 10.800 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 20.00 min Total precip. = 1.50 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0 25 Pond No.4 Pre -Development Hyd. No. 13 — 3 Year Q (cfs) 0.50 0.45 0.40 0.35 WX 0.25 0.20 0.20 0.15 _ 0.15 0.10 0.10 0.05 - 0.05 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 13 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 14 Pond No.4 Post -Development Hydrograph type = SDS Runoff Storm frequency = 3 yrs Time interval = 2 min Drainage area = 10.800 ac Basin Slope = 0.0 % Tc method = User Total precip. = 1.50 in Storm duration = 24 hrs Q (ds) 3.00 2.00 1.00 M Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.4 Post -Development Hyd. No. 14 — 3 Year 120 240 360 480 600 720 840 960 Hyd No. 14 58 Friday, 05 / 20 / 2022 = 2.048 c%i = 732 min = 10,453 cult = 79 = Oft = 10.00 min = Type III = 484 Q (cfs) 3.00 2.00 1.00 - 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 59 Hydraflow Hydrographs Extension for Autodesk® Civil 300 by Autodesk, Inc. v2020.4 Hyd. No. 15 Pond No.4 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 3 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 14 - Pond No.4 Post- ®eveloprMak. Elevation Reservoir name = Pond No.4 Max. Storage Storage Indication method used. Q (cfs) 3.00 I� OX1I17 1.00 0.00 0 240 480 720 960 Hyd No. 15 Pond No.4 Routed Hyd. No. 15 -- 3 Year Friday, 05 / 20 / 2022 = 0.212 cfs = 940 min = 10,429 cult = 28.13 ft = 4,821 cult Q (cfs) 3.00 Mors, 1.00 — 0.00 1200 1440 1680 1920 2160 2400 2640 2880 3120 Time (min) Hyd No. 14 1 Total storage used = 4,821 cult Hydrograph Report 60 Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Hyd. No. 17 Untreated Pre -Development Hydrograph type = SCS Runoff Storm frequency = 3 yrs Time interval = 2 min Drainage area = 0.460 ac Basin Slope = 0.0 % Tc method = User Total precip. = 1.50 in Storm duration = 24 hrs all!] 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 0 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Untreated Pre -Development Hyd. No. 17 — 3 Year Friday, 05 / 20 / 2022 = 0.012 cfs = 748 min = 144 cult = 70 = Oft = 10.00 min = Type III = 484 Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Time (min) Hydrograph Report 61 Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Friday, 05 / 20 / 2022 Hyd. No. 18 Untreated Post -Development Hydrograph type = SCS runoff Peak discharge = 0.420 cfs Storm frequency = 3 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 1,254 cuft Drainage area = 0.460 ac Curve number = 92 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 1.50 in Storm duration = 24 hrs Distribution Shape factor = Type III = 484 Q (CfS) Untreated Post -Development Hyd. No. 18 — 3 Year Q (cfs) 0.50 -- 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 ---- 0.05 0.00 - 0 120 240 360 480 60v^ 720 840 6601080 1200 1320 1440 1560 0.00 Hyd No. 18 Time (min) Hydrograph Report 62 Hydraflow Hydrographs Extension for Autodesk® Civil 31® by Autodesk, Inc. v2020.4 Hyd. No. 20 TOTAL SITE PRE -DEVELOPMENT Hydrograph type = Combine Storm frequency = 3 yrs Time interval = 2 min Inflow hyds. = 1, 5, 9, 13, 17 Q (cfs) 3.00 2 nn 1.00 Peak discharge Time to peak Hyd. volume Contrib. drain. area TOTAL SITE PRE -DEVELOPMENT Hyd. No. 20 -- 3 Year 120 240 3E0 480 800 720 840 960 Hyd No. 20 Hyd No. 1 Hyd No. 5 Hyd No. 13 Hyd No. 17 Friday, 05 / 20 / 2022 = 2.377 cfs = 752 min = 30,539 cult = 95.360 ac Q (cfs) 3.00 fifflr] 0.00 10€0 1200 1320 1440 1560 Hyd No. 9 Time (min) Hydrograph Report 63 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 21 TOTAL SITE POST -DEVELOPMENT Hydrograph type = Combine Storm frequency = 3 yrs Time interval = 2 min Inflow hyds. = 2, 6, 10, 14, 18 50.00 40.00 30.00 N m 10.00 0.00 n Friday, 05 / 20 / 2022 Peak discharge = 60.13 cfs Time to peak = 728 min Hyd. volume = 235,813 cuff Contrib. drain. area = 95.360 ac TOTAL SITE POST -DEVELOPMENT Hyd. No. 21 — 3 Year Q (cfs) 70.00 �1 50.00 40.00 30.00 20.00 10.00 0.00 120 240 360 480 �00 720 840 96C i08C 1200 i,^520 1440 1560 Hyd No. 21 Hyd No. 2 Hyd No. 6 Hyd No. 10 Time (min) Hyd No. 14 Hyd No. 18 Hydrograph Report 64 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 22 TOTAL SITE ROUTED Hydrograph type = Combine Storm frequency = 3 yrs Time interval = 2 min Inflow hyds. = 3, 7, 11, 15, 18 1.00 0.00 60 12VU Hyd No. 22 Peak discharge Time to peak Hyd. volume Contrib. drain. area TOTAL SITE ROUTED Hyd. No. 22 -- 3 Year 1800 2400 Hyd No. 3 Hyd No. 15 3000 Friday, 05120 12022 = 1.777 cfs = 1048 min = 201,838 cult = 0.460 ac 3600 4200 4800 5400 Hyd No. 7 — Hyd No. 11 Hyd No. 18 Q (cfs) 2.00 1.00 0.00 6000 Time (min) Hydrograph Summary Report 65 Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 71.00 2 734 314,236 --- -- — Pond No.1 Pre -development 2 SCS Runoff 133.36 2 728 537,092 --- -- — Pond No.1 Post -Development 3 Reservoir 80.38 2 740 520,666 2 29.94 � , , _ Pond No. 1 Routed 5 SCS Runoff 33.26 2 734 147,037 ---- -- — Pond No.2 Pre -Development 6 SCS Runoff 60.47 2 728 243,543 -- ----- --- Pond No.2 Post -Development 7 Reservoir 30.99 232,997 6 29.95 112,546 Pond No.2 Routed 9 SCS Runoff 89.12 734 397,928 ---- ------ Pond No. 3 Pre -Development 10 SCS Runoff 189.99 2 728 759,454 --- ---- Pond No.3 Post -Development 11 Reservoir 53.67 2 752 734,091 10 33.81 396,094 Pond No.3 Routed 13 SCS Runoff 24.69 2 734 109,664 --- -- Pond No.4 Pre -Development 14 SCS Runoff 38.68 728 148,404 --- --- Pond No.4 Post -Development 15 Reservoir 22.27 2 740 148,380 14 29.29 Pond NoA Routed 17 SCS Runoff 1.244 2 728 4,817 --- --- Untreated Pre -Development 18 SCS Runoff 2.470 2 724 7,921 --- Untreated Post -Development 20 Combine 219.17 2 734 973,681 1, 5, 9, ---- TOTAL SITE PRE -DEVELOPMENT 13, 17, 21 Combine 424.24 2 728 1,696,413 2, 6, 10, -- ------ TOTAL SITE POST -DEVELOPMENT 14, 18, 22 Combine 180.41 2 742 1,644,054 3, 7, 11, --- TOTAL SITE ROUTED 15, 18, 1A00494100391PDNR120- T ech\24-Discipline ai#ur3dbvrinen zMff9Btormwater M*215 /F2Q 2004940039.gpw Hydrograph Report 66 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 1 Pond No.1 Pre -development Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 29.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.99 in Storm duration = 24 hrs Q (cfs) 80.00 r- 14 40.00 20.00 10.00 Friday, 05 / 20 / 2022 Peak discharge = 71.00 cfs Time to peak = 734 min Hyd. volume = 314,236 cuft Curve number = 72 Hydraulic length = 0 ft Time of conc. (Tc) = 20.00 min Distribution = Type III Shape factor = 484 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 -1 1 1 1 1 1 _1r i i i 1 i - ' 0.00 0 120 240 360 480 600 720 840 9C0 1000 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 67 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 2 Pond No.1 Post -Development Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 29.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.99 in Storm duration = 24 hrs 120.00 100.00 80.00 40.00 20.00 0.00 0 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (TO Distribution Shape factor Pond No.1 Post -Development Hyd. No. 2 -- 5 Year Friday, 05 / 20 / 2022 = 133.36 cfs = 728 min = 537,092 cuft = 91 = Oft = 10.00 min = Type III = 484 Q (cfs) 140.00 120.00 100.00 .9 A 40.00 all W - 0.00 120 240 360 480 800 720 840 �80 10�0 1200 1320 144U 1560 Hyd No. 2 Time (min) Hydrograph Report ss Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 3 Pond No. 1 Routed Hydrograph type = Resenloir Peak discharge Storm frequency = 5 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Pond No.1 Post-Deveiopm&ihx. Elevation Reservoir name = Pond No.1 Max. Storage Storage Indication method used. Q (cfs) 140.00 120.00 100.00 80.00 .M 40.00 20.00 Pond No. 1 Routed Hyd. No. 3 — 5 Year Friday, 05 / 20 / 2022 = 60.36 cfs = 740 min = 520,666 cuft = 29.94 ft = 212,772 cuft Q (cfs) 140.00 120.00 100.00 - M 40.00 20.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Hyd No. 2 ® Total storage used = 212,772 cuff Time (min) Hydrograph Report 69 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 5 Pond No.2 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 13.150 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.99 in Storm duration = 24 hrs 30.00 25.00 20.00 15.00 i[W 11, .wl Friday, 05 / 20 / 2022 = 33.26 cfs = 734 min = 147,037 cult = 73 = Oft = 20.00 min = Type III = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.2 Pre -Development Hyd. No. 5 — 5 Year Q (cfs) 35.00 30.00 25.00 15.00 10.00 5.00 0.00 1 ' ' ' J--1r_ I I I I I 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) Hydrograph Report 70 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 6 Pond No.2 Post -Development Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 13.150 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.99 in Storm duration = 24 hrs [1-1i I 1 [I$X 40.00 30.00 10.00 Friday, 05 / 20 / 2022 = 60.47 cfs = 728 min = 243,543 cuft = 91 = Oft = 10.00 min = Type III = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.2 Post -Development Hyd. No. 6 -- 5 Year Q (cfs) 70.00 -M -M 40.00 30.00 NM 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) Hydrograph Report 71 Hydraflow Hydrographs Extension forAutodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 7 Pond No.2 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 5 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 6 - Pond No.2 Post-Developm&Abx. Elevation Reservoir name = Pond No.2 Max. Storage Storage Indication method used. 50.00 40.00 30.00 20.00 10.00 Friday, 05 / 20 / 2022 = 36.99 cfs = 742 min = 232,997 cuff = 29.95 ft = 112,546 tuft Pond No.2 Routed Hyd. No. 7 — 5 Year Q (cfs) 70.00 50.00 40.00 30.00 10i 1 O 90816 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Hyd No. 7 Hyd No. 6 ® Total storage used = 112,546 cult Time (min) Hydrograph Report 72 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 9 Pond No. 3 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 41.950 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.99 in Storm duration = 24 hrs Friday, 05 / 20 / 2022 Peak discharge = 89.12 cfs Time to peak = 734 min Hyd. volume = 397,928 cuft Curve number = 68 Hydraulic length = 0 ft Time of conc. (Tc) = 20.00 min Distribution = Type III Shape factor = 484 Pond No. 3 Pre -Development Hyd. No. 9 — 5 Year Q (cfs) 90.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 . I f 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) Hydrograph Report 73 Hydraflow Hydrographs Extension forAutodesk® Civil 3D® byAutodesk, Inc. v2020.4 Hyd. No. 10 Pond No.3 Post -Development Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 41.950 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.99 in Storm duration = 24 hrs 180.00 150.00 120.00 �*Il f l 30.00 Friday, 05 / 20 / 2022 = 189.99 cf-. = 728 min = 759,454 cuft = 90 = Oft = 10.00 min = Type III = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.3 Post -Development Hyd. No. 10 -- 5 Year Q (cfs) 210.00 180.00 150.00 120.00 .AIKI 30.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) Hydrograph Report 74 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 11 Pond No.3 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 5 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 10 - Pond No.3 Post-DevelopnMet. Elevation Reservoir name = Pond No.3 Max. Storage Storage Indication method used. 180.00 150.00 120.00 NMI] MI 30.00 360 720 Hyd No. 11 Pond No.3 Routed Hyd. No. 11 — 5 Year Friday, 05 / 20 / 2022 = 53.67 cf-. = 752 min = 734,091 cuft = 33.81 ft = 396,094 cuft Q (cfs) 210.00 180.00 150.00 120.00 a� �� 30.00 0.00 1080 1440 1800 2160 2520 2880 3240 3600 3960 Hyd No. 10 ® Total storage used = 396,094 cuff Time (min) Hydrograph Report 75 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 13 Pond No.4 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 10.800 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.99 in Storm duration = 24 hrs Friday, 05 / 20 / 2022 Peak discharge = 24.69 cfs Time to peak = 734 min Hyd. volume = 109,664 cuft Curve number = 70 Hydraulic length = 0 ft Time of conc. (Tc) = 20.00 min Distribution = Type III Shape factor = 484 Pond No.4 Pre -Development Q (cfs) Hyd. No. 13 -- 5 Year Q (c) 28.00 — 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 - 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 13 Time (min) Hydrograph Report 76 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 14 Pond No.4 Post -Development Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 10.800 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.99 in Storm duration = 24 hrs 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.4 Post -Development Hyd. No. 14 — 5 Year 'n 240 360 480 600 720 840 14 Friday, 05 / 20 / 2022 = 38.68 cfs = 728 min = 148,404 cuft = 79 = Oft = 10.00 min Type III = 484 Q (cfs) 40.00 cM 20.00 10.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 77 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 15 Pond No.4 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 5 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 14 - Pond No.4 Post-DevelopryMet. Elevation Reservoir name = Pond No.4 Max. Storage Storage Indication method used. 30.00 20.00 �] Friday, 05 / 20 / 2022 = 22.27 cfs = 740 min = 148,380 cult 29.29 ft = 49,131 tuft Pond No.4 Routed Hyd. No. 15 — 5 Year 240 480 720 960 1200 1440 1680 Hyd No. 15 Hyd No. 14 ® Total storage used = 49,131 cuft Q (cfs) 40.00 30.00 F01I6I17 10.00 0.00 1920 Time (min) Hydrograph Report 78 Hydraflow Hydrographs Extension for Autodesk® Civil 31® by Autodesk, Inc. v2020.4 Hyd. No. 17 Untreated Pre -Development Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 0.460 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.99 in Storm duration = 24 hrs 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Untreated Pre -Development Hyd, No. 17 — 5 Year 120 240 360 480 600 720 840 960 Hyd No. 17 Friday, 05 / 20 / 2022 = 1.244 cfs = 728 min = 4,817 cuft = 70 = Oft = 10.00 min = Type III = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 79 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 18 Untreated Post -Development Hydrograph type = SCS Runoff Peak discharge Storm frequency = 5 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.460 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.99 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 3.00 2.00 1.00 0.00 0 120 240 Hyd No. 18 Untreated Post -Development Hyd. No. 18 — 5 Year Friday, 05 120 / 2022 2.470 cfs = 724 min = 7,921 tuft = 92 = Oft = 5.00 min = Type III = 484 r------- 7 360 480 600 720 840 860 1080 1200 1320 Q (cfs) 3.00 2.00 1.00 0.00 1440 Time (min) Hydrograph Report 80 Hydraflow Hydrographs Extension forAutodesk® Civil 3D® byAutodesk, Inc. v2020.4 Hyd. No. 20 TOTAL SITE PRE -DEVELOPMENT Hydrograph type = Combine Storm frequency = 5 yrs Time interval = 2 min Inflow hyds. = 1, 5, 9, 13, 17 Q (cfs) 240.00 210.00 180.00 150.00 120.00 91111111 Friday, 05 / 20 / 2022 Peak discharge = 219.17 cf.- Time to peak = 734 min Hyd. volume = 973,681 cuft Contrib. drain. area = 95.360 ac TOTAL SITE PRE -DEVELOPMENT Hyd. No. 20 -- 5 Year Q (cfs) 240.00 210.00 H:I1 1 I, 150.00 120.00 MITI] 30.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 20 Hyd No. 1 Hyd No. 5 Hyd No. 9 Time (min) Hyd No. 13 Hyd No. 17 Hydrograph Report 81 Hydraflow Hydrographs Extension for Autodesk® Civil 3D0 by Autodesk, Inc. v2020.4 Hyd. No. 21 TOTAL SITE POST -DEVELOPMENT Hydrograph type = Combine Storm frequency = 5 yrs Time interval = 2 min Inflow hyds. = 2, 6, 10, 14, 18 420.00 300.00 240.00 180.00 120.00 .01I, Friday, 05 / 20 / 2022 Peak discharge = 424.24 cfs Time to peak = 728 min Hyd. volume = 1,696,413 cuft Contrib. drain. area = 95.360 ac TOTAL SITE POST -DEVELOPMENT Hyd. No. 21 -- 5 Year Q (cfs) 480.00 420.00 300.00 240.00 180.00 120.00 Al Me J wl' 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 21 — Hyd No. 2 Hyd No. 6 Hyd No. 10 Time (min) Hyd No. 14 Hyd No. 18 Hydrograph Report 82 Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Hyd. No. 22 TOTAL SITE ROUTED Hydrograph type = Combine Storm frequency = 5 yrs Time interval = 2 min Inflow hyds. = 3, 7, 11, 15, 18 Friday, 05120 / 2022 Peak discharge = 180.41 cfs Time to peak = 742 min Hyd. volume = 1,644,054 cuff Contrib. drain. area = 0.460 ac TOTAL SITE ROUTED Q (cfs) cfs Hyd. No. 22 — 5 Year Q ( ) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 ,i, 30.00 0.00 -- _ 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 2880 Hyd No. 22 — Hyd No. 3 Hyd No. 7 — Hyd No. 11 Time (min) — Hyd No. 15 Hyd No. 18 Hydrograph Summary Report 83 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (tuft) Hydrograph Description 1 SCS Runoff 95.12 2 734 420,182 -• Pond No.4 Pre -development 2 SCS Runoff 163.17 2 728 665,009 --• Pond No.1 Post -Development 3 Reservoir 103.05 2 738 648,527 2 237,570 Pond No. 1 Routed 5 SCS Runoff 44.29 2 734 195,690 -- --- Pond No.2 Pre -Development 6 SCS Runoff 73.99 2 728 301,547 --- ----- ------ Pond No.2 Post -Development 7 Reservoir 46.23 2 738 290,905 6 30.15 124,878 Pond No.2 Routed 9 SCS Runoff 122.61 2 734 542,793 ----- ------ ------ Pond No. 3 Pre -Development 10 SCS Runoff 233.31 2 728 943,712 --- ---- -- Pond No.3 Post -Development 11 Reservoir 100.77 2 744 918,187 10 34.16 449,251 Pond No.3 Routed 13 SCS Runoff 33.51 2 734 148,069 - — - —• ---- Pond No.4 Pre -Development 14 SCS Runoff 49.92 2 728 192,385 -• -- Pond No.4 Post -Development 15 Reservoir 32.35 2 738 192,361 14 29.47 56,398 Pond No.4 Routed 17 SCS Runoff 1.694 2 728 6,504 ---- ---- --- Untreated Pre -Development 18 SCS Runoff 3.009 2 724 9,772 --- -- --- Untreated Post -Development 20 Combine 297.00 2 734 1,313,238 1, 5, 9, - TOTAL SITE PRE -DEVELOPMENT 13, 17, 21 Combine 522.50 2 728 2,112,425 2, 6, 10, ------ TOTAL SITE POST -DEVELOPMENT 14, 18, 22 Combine 278.95 2 742 2,059,754 3, 7, 11, ----- -- TOTAL SITE ROUTED 15, 18, f:10049410039\PDNR`,2C-Tech124-Discipiine?d%i#orBd'bvin&tkffi&d&ormwate'1622W.M /1% 2004940039.gpw Hydrograph Report 84 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 1 Pond No.1 Pre -development Hydrograph type = SCS runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 29.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.19 in Storm duration = 24 hrs Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 E1i 6 I, 30.00 20.00 10.00 0.00 0 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Friday, 05 / 20 / 2022 95.12 cfy = 734 min = 420,182 cuff = 72 = Oft = 20.00 min = Type III = 484 Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Pond No.1 Pre -development Hyd. No. 1 —10 Year Hydrograph Report 85 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 2 Pond No.1 Post -Development Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 29.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.19 in Storm duration = 24 hrs Q (Cfs 180.00 180.00 160.00 160.00 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - _ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Friday, 05 120 / 2022 Peak discharge = 163.17 cfs Time to peak = 728 min Hyd. volume = 665,009 cuft Curve number = 91 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type III Shape factor = 484 Pond No.1 Post -Development Hyd. No. 2 --10 Year Hydrograph Report 86 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 3 Pond No. 1 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Pond No.1 Post-Developm&ftx. (Elevation Reservoir name = Pond No.1 Max. Storage Storage Indication method used. Pond No. 1 Routed Friday, 05 / 20 / 2022 = 103.05 cfs = 738 min = 648,527 cult = 30.15 ft = 237,570 cult Q (cfs) Hyd. No. 3 --10 Year Q (cfs) 180.00 180.00 160.00 160.00 140.00 140.00 120.00 120.00 100.00 100.00 1j, 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 - - L f. 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 — Hyd No. 2 ® Total storage used = 237,570 cuff Hydrograph Report 87 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 5 Pond No.2 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 13.150 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.19 in Storm duration = 24 hrs 40.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 5 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.2 Pre -Development Hyd. No. 5 --10 Year 360 480 600 720 840 Friday, 05 / 20 / 2022 = 44.29 cfs = 734 min = 195,690 cuft = 73 = Oft = 20.00 min = Type III = 484 Q (cfs) 50.00 40.00 30.00 06 � 10.00 0.00 560 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 88 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 6 Pond No.2 Post -Development Hydrograph type = SCS runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 13.150 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.19 in Storm duration = 24 hrs 70.00 60.00 50.00 40.00 30.00 20.00 10.00 Friday, 05 / 20 / 2022 Peak discharge = 73.99 cfs Time to peak = 728 min Hyd. volume = 301,547 cuft Curve number = 91 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type III Shape factor = 484 Pond No.2 Post -Development Hyd. No. 6 -- 10 Year Q (cfs) 80.00 W 1* 50.00 40.00 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) Hydrograph Report 89 Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Hyd. No. 7 Pond No.2 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 6 - Pond No.2 Post-Developm&Ahx. Elevation Reservoir name = Pond No.2 Max. Storage Storage Indication method used. Q (cfs; 80.00 r 1 1* 50.00 40.00 30.00 20.00 10.00 Friday, 05 / 20 / 2022 = 46.23 cfs = 738 min = 290,905 cuft = 30.15 ft = 124,878 cult Q (cfs) 80.00 70.00 191 I 1 50.00 40.00 11411 1 20.00 10.00 0.00 -1 1 1 11r, ' I i I I 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) Hyd No. 7 Hyd No. 6 ® Total storage used = 124,878 cuff Hydrograph Report 90 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 9 Pond No. 3 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 41.950 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.19 in Storm duration = 24 hrs Q (cfs) 140.00 120.00 100.00 �1 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No. 3 Pre -Development Hyd. No. 9 —10 Year = 122.61 cfs = 734 min = 542,793 cuff 68 = 0 ft = 20.00 min = Type III = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 10 Pond No.3 Post -Development Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 41.950 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.19 in Storm duration = 24 hrs 91 Friday, 05 / 20 / 2022 Peak discharge = 233.31 cfs Time to peak = 728 min Hyd. volume = 943,712 cuft Curve number = 90 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type III Shape factor = 484 Q (cfs) Pond No.3 Post -Development cfs Q Hyd. No. 10 —10 Year ( ) 240.00 210.00 180.00 150.00 120.00 90.00 60.00 30.00 0.00 240.00 210.00 180.00 150.00 120.00 90.00 60.00 30.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) Hydrograph Report 92 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 11 Pond No.3 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 10 -Pond No.3 Post-QeveloprvMet. Elevation Reservoir name = Pond No.3 Max. Storage Storage Indication method used. Q (Cfs 240.00 210.00 180.00 150.00 120.00 Friday, 05 / 20 / 2022 100.77 cfs = 744 min = 918,187 cult = 34.16 ft = 449,251 cuft Q (cfs) 240.00 210.00 180.00 150.00 120.00 30.00 0.00 -' 1 L ' I �- 0.00 0 240 480 720 960 1200 1440 1680 1920 21A60 2400 2640 2880 3120 Time (min) Hyd No. 11 Hyd No. 10 ® Total storage used = 449,251 CA Hydrograph Report 93 Hydraflow Hydrographs Extension for Autodesk® Civil 31® by Autodesk, Inc. v2020.4 Hyd. No. 13 Pond No.4 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 10.800 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.19 in Storm duration = 24 hrs 30.00 25.00 KO I4 15.00 10.00 M1111 Friday, 05 / 20 / 2022 = 33.51 cfs = 734 min = 148,069 cult = 70 = Oft = 20.00 min = Type III = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.4 Pre -Development Hyd. No. 13 —10 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 M 0.00 1 1 I I I I �� I_ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 13 Time (min) Hydrograph Report 94 Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Hyd. No. 14 Pond No.4 Post -Development Hydrograph type = SDS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 10.800 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.19 in Storm duration = 24 hrs 40.00 KI 11 K111r/, 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.4 Post -Development Hyd. No. 14 --10 Year 120 240 360 480 600 720 840 Hyd No. 14 Friday, 05 / 20 / 2022 = 49.92 cfs = 728 min = 192,385 cult = 79 = Oft = 10.00 min = Type III = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 95 Hydraflow Hydrographs Extension for Autodesk® Civil 31D® by Autodesk, Inc. v2020.4 Hyd. No. 15 Pond No.4 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 14 - Pond No.4 Post-Developnftak. Elevation Reservoir name = Pond No.4 Max. Storage Storage Indication method used. 40.00 30.00 20.00 10.00 Friday, 05 / 20 / 2022 = 32.35 cfs = 738 min = 192,361 cult = 29.47 ft = 56,398 tuft Pond No.4 Routed Hyd. No. 15 — 10 Year Q (cfs) 50.00 40.00 30.00 20.00 i[l f f 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Hyd No. 15 Hyd No. 14 Total storage used = 56,398 cuff Time (min) Hydrograph Report 96 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 17 Untreated Pre -Development Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.460 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 7.19 in Distribution Storm duration = 24 hrs Shape factor II$ Untreated Pre -Development Hyd. No. 17 -- 10 Year 120 240 360 480 600 720 840 960 Hyd No. 17 Friday, 05 / 20 / 2022 = 1.694 cfs = 728 min = 6,504 cult = 70 = 0 ft = 10.00 min = Type III = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 97 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 18 Untreated Post -Development Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 0.460 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.19 in Storm duration = 24 hrs Q (cfs) 4.00 3.00 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Untreated Post -Development Hyd. No. 18 -- 10 Year 120 240 360 480 600 720 840 960 Hyd No. 18 3.009 cfs = 724 min = 9,772 cuft = 92 = Oft = 5.00 min = Type III = 484 Q (cfs) 4.00 3.00 2.00 1.00 0.00 1080 1200 1320 1440 Time (min) Hydrograph Report 98 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 20 TOTAL SITE PRE -DEVELOPMENT Hydrograph type = Combine Storm frequency = 10 yrs Time interval = 2 min Inflow hyds. = 1, 5, 9, 13, 17 Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 Friday, 05 / 20 / 2022 Peak discharge = 297.00 cfs Time to peak = 734 min Hyd. volume = 1,313,238 cuft Contrib. drain. area = 95.360 ac TOTAL SITE PRE -DEVELOPMENT Hyd. No. 20 -- 10 Year Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 20 Hyd No. 1 Hyd No. 5 Hyd No. 9 Time (min) Hyd No. 13 Hyd No. 17 Hydrograph Report 99 Hydraflow Hydrographs Extension for Autodesk® Civil 31® by Autodesk, Inc. v2020.4 Hyd. No. 21 TOTAL SITE POST -DEVELOPMENT Hydrograph type = Combine Storm frequency = 10 yrs Time interval = 2 min Inflow hyds. = 2, 6, 10, 14, 18 Q (cis 560.00 480.00 U81911I7 320.00 240.00 160.00 80.00 Friday, 05 / 20 / 2022 Peak discharge - 522.50 cfs Time to peak = 728 min Hyd. volume = 2,112,425 cult Contrib. drain. area = 95.360 ac TOTAL SITE POST -DEVELOPMENT Hyd. No. 21 -- 10 Year 0.00 Q (cfs) 560.00 480.00 400.00 320.00 240.00 160.00 rrrm 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 21 - Hyd No. 2 Hyd No. 6 Hyd No. 10 Time (min) Hyd No. 14 Hyd No. 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 22 TOTAL SITE ROUTED Hydrograph type = Combine Storm frequency = 10 yrs Time interval = 2 min Inflow hyds. = 3, 7, 11, 15, 18 240.00 K111 10 160.00 120.00 40.00 0.00 0 240 — Hyd No. 22 100 Friday, 05 / 20 / 2022 Pcak discharge = 278.95 cfs Time to peak = 742 min Hyd. volume = 2,059,754 cuft Contrib. drain. area = 0.460 ac TOTAL SITE ROUTED Hyd. No. 22 --10 Year 480 720 — Hyd No. 3 — Hyd No. 15 1200 Hyd No. 7 Hyd No. 18 Q (cfs) 280.00 240.00 200.00 160.00 120.00 5 4 I, 40.00 0.00 1440 1680 1920 Hyd No. 11 Time (min) 101 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (tuft) Hydrograph Description 1 SCS Runoff 133.52 2 732 591,401 ---- --- Pond No.1 Pre -development 2 SCS Runoff 208.80 2 728 863,341 -- -- -- Pond No.1 Post -Development 3 Reservoir 121.68 2 740 846,789 2 Su., 277,523 Pond No. 1 Routed 5 SCS Runoff 61.83 2 732 274,079 - -- — Pond No.2 Pre -Development 6 SCS Runoff 94.68 2 728 391,480 ---- ------ Pond No.2 Post -Development 7 Reservoir 57.45 2 738 380,723 6 30.45 144,070 Pond No.2 Routed 9 SCS Runoff 176.55 2 734 780,032 -- ------ --- Pond No. 3 Pre -Development 10 SCS Runoff 299.58 2 728 1,229,758 --- ----- Pond No.3 Post -Development 11 Reservoir 177.39 2 740 1,204,049 10 34.58 513,006 Pond No.3 Routed 13 SCS Runoff 47.59 - 734 210,535 ---- -- Pond No.4 Pre -Development 14 SCS Runoff 67.36 2 728 262,099 --- -- Pond No.4 Post -Development 15 Reservoir 41.68 2 740 262,075 14 29.81 70,135 Pond No-4 Routed 17 SCS Runoff 2.412 2 728 9,247 -- -- Untreated Pre -Development 18 SCS Runoff 3.835 2 724 12,640 ---- Untreated Post -Development 20 Combine 421.38 2 732 1,865,295 1, 5, 9, --- -- TOTAL SITE PRE -DEVELOPMENT 13, 17, 21 Combine 673.10 2 728 2,759,319 2, 6, 10, ------ TOTAL SITE POST -DEVELOPMENT 14, 18, 22 Combine 399.40 2 740 2,706,272 3, 7, 11, TOTAL SITE ROUTED 15, 18, 1s\00454\0039\PDNR\20- i ech\24-Discipiine d§03roo-buio&g i6tlr3&ormwater 63 .H6 4 4'RW2004940039.gpw Hydrograph Report 102 Hydraflow Hydrographs Extension for Autodesk® Civil 31® by Autodesk, Inc. v2020.4 Hyd. No. 1 Pond No.1 Pre -development Hydrograph type = SDS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 29.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 9.04 in Storm duration = 24 hrs 120.00 100.00 80.00 40.00 20.00 Friday, 05 120 / 2022 133.52 cfs = 732 min = 591,401 cuff = 72 = Oft = 20.00 min = Type III = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.1 Pre -development Hyd. No. 1 — 25 Year Q (cfs) 140.00 120.00 100.00 :M - M 40.00 20.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 103 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 2 Pond No.1 Post -Development Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 29.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 9.04 in Storm duration = 24 hrs Friday, 05 / 20 12022 Peak discharge = 208.80 cfs Time to peak = 728 min Hyd. volume = 863,341 cuft Curve number = 91 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type III Shape factor = 484 Q (cfs) Pond No.1 Post -Development cfs Q Hyd. No. 2 -- 25 Year ( ) 210.00 210.00 180.00 - — -- 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 -- 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report 104 Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Friday, 05 / 20 / 2022 Hyd. No. 3 Pond No. 1 Routed Hydrograph type = Reservoir Peak discharge = 121.68 cfs Storm frequency = 25 yrs Time to peak = 740 min Time interval = 2 min Hyd. volume = 846,789 cuft Inflow hyd. No. = 2 - Pond No.1 Post-®evelopmdMhx. Elevation = 30.49 ft Reservoir name = Pond No.1 Max. Storage = 277,523 cuft Storage Indication method used. Q (cfs; 210.00 180.00 150.00 120.00 30.00 0.00 1 -- _ .y i i i -- , I_ 0 Q (cfs) 210.00 180.00 150.00 120.00 30.00 r.T." 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 �- Hyd No. 3 — Hyd No. 2 ® Total storage used = 277,523 cuff Time (min) Hydrograph Report 105 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 5 Pond No.2 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 13.150 ac Basin Slope = 0.0 % Tc method = User Total precip. = 9.04 in Storm duration = 24 hrs .o M1 .7i 1 1, 40.00 30.00 20.00 10.00 Friday, 05I20 12022 = 51.83 cfs = 732 min = 274,079 cult = 73 = Oft = 20.00 min = Type III = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.2 Pre -Development Hyd. No. 5 -- 25 Year Q (cfs) 70.00 50.00 40.00 30.00 rO I1 Mi a k 0.00 i i i I T I_ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 5 Time (min) Hydrograph Report 106 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 6 Pond No.2 Post -Development Hydrograph type = SCS runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 13.150 ac Basin Slope = 0.0 % Tc method = User Total precip. = 9.04 in Storm duration = 24 hrs Q (cfs; 100.00 90.00 80.00 70.00 60.00 50.00 Ui 4 I 30.00 20.00 10.00 0.00 V Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Friday, 05 / 20 / 2022 = 94.68 efts = 728 min = 391,480 cult = 91 = Oft = 10.00 min = Type III = 484 Q (Cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 1KINIr: 20.00 10.00 n nn 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560v vv Hyd No. 6 Time (min) Hydrograph Report 107 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Friday, 05 / 20 / 2022 Hyd. No. 7 Pond No.2 Routed Hydrograph type = Reservoir Peak discharge = 57.45 cfs Storm frequency = 25 yrs Time to peak = 738 min Time interval = 2 min Hyd. volume = 380,723 cuft Inflow hyd. No. = 6 - Pond No.2 Post-®evelopmddbx. Elevation = 30.45 ft Reservoir name = Pond No.2 Max. Storage = 144,070 cuft Storage Indication method used Pond No.2 Routed Q (cfs) Hyd. No. 7.— 25 Year Q (off) 100.00 - 100.00 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 _ 20.00 10.00 10.00 i 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) — Hyd No. 7 Hyd No. 6 ® Total storage used = 144,070 cult Hydrograph Report 108 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 9 Pond No. 3 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 41.950 ac Basin Slope = 0.0 % Tc method = User Total precip. = 9.04 in Storm duration = 24 hrs Friday, 05 / 20 / 2022 Peak discharge = 176.55 cfs Time to peak = 734 min Hyd. volume = 780,032 cuft Curve number = 68 Hydraulic length = 0 ft Time of conc. (Tc) = 20.00 min Distribution = Type III Shape factor = 484 Pond No. 3 Pre -Development Q (cfs) Hyd. No. 9 -- 25 Year Q (c) 180.00 180.00 150.00 150.00 120.00 120.00 90.00 1 1 1 190.00 60.00 60.00 30.00 30.00 I 0.00 - 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) Hydrograph Report 109 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 10 Pond No.3 Post -Development Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 41.950 ac Basin Slope = 0.0 % Tc method = User Total precip. = 9.04 in Storm duration = 24 hrs Q (cfs; 320.00 240.00 200.00 if-.14yorom 120.00 - Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Friday, 05 / 20 / 2022 = 299.58 cfs = 728 min = 1,229,758 cuft = 90 = Oft = 10.00 min = Type III = 484 Q (cfs) 320.00 W. 240.00 200.00 160.00 120.00 :8 1I 40.00 0.00 1 i 1 i i i i i i- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) Hydrograph Report 110 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc, v2020.4 Hyd. No. 11 Pond No.3 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 10 -Pond No.3 Post-Developnttak. Elevation Reservoir name = Pond No.3 Max. Storage Storage Indication method used. Q (cfs) 320.00 280.00 240.00 200.00 t.1 ee 120.00 80.00 40.00 Friday, 05 / 20 / 2022 = 177.39 cfs = 740 min = 1,204,049 tuft = 34.58 ft = 513,006 cuft Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 :R II 40.00 0.00 -'.� . _ , - - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) Hyd No. 11 Hyd No. 10 Total storage used = 513,006 cuff Hydrograph Report III Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 13 Pond No.4 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 10.800 ac Basin Slope = 0.0 % Tc method = User Total precip. = 9.04 in Storm duration = 24 hrs D11811] 01111i 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.4 Pre -Development Hyd. No. 13 — 25 Year 120 240 360 480 600 720 840 Hyd No. 13 Friday, 05 / 20 / 2022 = 47.59 cfs = 734 min = 210,535 cuft = 70 = Oft = 20.00 min = Type III = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 112 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 14 Pond No.4 Post -Development Hydrograph type = SDS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 10.800 ac Basin Slope = 0.0 % Tc method = User Total precip. = 9.04 in Storm duration = 24 hrs Q (cfs) 70.00 KOV117 50.00 40.00 30.00 20.00 10.00 0.00 0 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.4 Post -Development Hyd. No. 14 -- 25 Year Friday, 05 / 20 / 2022 = 67.36 cfs = 728 min = 262,099 cuft = 79 = Oft = 10.00 min = Type III = 484 Q (cfs) 70.00 :1 11 50.00 40.00 30.00 r� 10.00 0.00 120 240 360 480 600 720 840 060 1080 1200 1320 1440 1560 Hyd No. 14 Time (min) Hydrograph Report 113 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 15 Pond No.4 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 14 - Pond No.4 Post- QeveloprMek. Elevation Reservoir name = Pond No.4 Max. Storage Storage Indication method used. 50.00 40.00 911 1 20.00 10.00 Friday, 05 / 20 / 2022 = 41.68 cfs = 740 min = 262,075 cuff = 29.81 fl: = 70,135 cuff Pond No.4 Routed Hyd. No. 15 -- 25 Year Q (cfs) 70.00 40.00 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 15 Hyd No. 14 ® Total storage used = 70,135 CA Time (min) Hydrograph Report 114 Hydraflow Hydrographs Extension forAutodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 17 Untreated Pre -Development Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.460 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 9.04 in Distribution Storm duration = 24 hrs Shape factor r OX 1.00 Untreated Pre -Development Hyd. No. 17 -- 25 Year 120 240 360 480 600 720 840 960 Hyd No. 17 Friday, 05 / 20 12022 = 2.412 cfs = 728 min = 9,247 cuft = 70 = Oft = 10.00 min = Type III = 484 Q (cfs) 3.00 2.00 1.00 0.00 1080 1200 1320 4440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 18 Untreated Post -Development Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 0.460 ac Basin Slope = 0.0 % Tc method = User Total precip. = 9.04 in Storm duration = 24 hrs Q (cfs) 4.00 MM mix 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Untreated Post -Development Hyd. No. 18 -- 25 Year 120 240 360 480 600 720 840 960 Hyd No. 18 115 Friday, 05 / 20 / 2022 = 3.835 cfs = 724 min = 12,640 cuft = 92 = 0 ft = 5.00 min = Type III = 484 Q (cfs) 4.00 3.00 2.00 1.00 0.00 1080 1200 1320 1440 Time (min) Hydrograph Report 11s Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 20 TOTAL SITE PRE -DEVELOPMENT Hydrograph type = Combine Storm frequency = 25 yrs Time interval = 2 min Inflow hyds. = 1, 5, 9, 13, 17 420.00 360.00 300.00 240.00 180.00 120.00 Friday, 05 / 2012022 Peak discharge = 421.38 cfs Time to peak = 732 min Hyd. volume = 1,865,295 cuft Contrib. drain. area = 95.360 ac TOTAL SITE PRE -DEVELOPMENT Hyd. No. 20 -- 25 Year Q (cfs) 480.00 420.00 360.00 1111 16 240.00 180.00 120.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 15600.00 Hyd No. 20 Hyd No. 1 Hyd No. 5 — Hyd No. 9 Time (min) Hyd No. 13 Hyd No. 17 Hydrograph Report 117 Hydraflow Hyd rographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 21 TOTAL SITE POST -DEVELOPMENT Hydrograph type = Combine Storm frequency = 25 yrs Time interval = 2 min Inflow hyds. = 2, 6, 10, 14, 18 Q (cfs 700.00 �$ 500.00 400.00 KIi 1 6 I %II II] 100.00 Friday, 05 / 20 / 2022 Peak discharge = 673.10 cfs Time to peak = 728 min Hyd. volume = 2,759,319 tuft Contrib. drain. area = 95.360 ac TOTAL SITE POST -DEVELOPMENT Hyd. No. 21 -- 25 Year ,I FTa .. - - --__: - x 0 Q (cfs) 700.00 500.00 400.00 300.00 200.00 100.00 f&LLI 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 21 Hyd No. 2 — Hyd No. 6 Hyd No. 10 Time (min) Hyd No. 14 Hyd No. 18 Hydrograph Report 118 Hydraflow Hydragraphs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 22 TOTAL SITE ROUTED Hydrograph type = Combine Storm frequency = 25 yrs Time interval = 2 min Inflow hyds. = 3, 7, 11, 15, 18 Q (cfs 420.00 360.00 300.00 240.00 180.00 120.00 Friday, 05 / 20 / 2022 Peak discharge = 399.40 cfs Time to peak = 740 min Hyd. volume = 2,706,272 cuft Contrib. drain. area = 0.460 ac Q (cfs) 420.00 11411* 300.00 240.00 180.00 120.00 r.T." 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560v.Vv Hyd No. 22 Hyd No. 3 Hyd No. 7 Hyd No. 11 Time (min) — Hyd No. 15 - Hyd No. 18 Hydrograph Summary Report 119 Hydraflow Hydrographs Extension forAutodesk® Civil 3D@ byAutodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 168.77 2 732 750,402 ----- ---- -- Pond No.1 Pre -development 2 SCS Runoff 249.47 2 728 1,041,989 ---- --- --- Pond No.1 Post -Development 3 Reservoir 134.03 2 740 1,025,391 2 30.82 316,606 Pond No. 1 Routed 5 SCS Runoff 77.85 732 346,704 ---- ----- -- Pond No.2 Pre -Development 6 SCS Runoff 113.12 2 728 472,488 -- -- -- Pond No.2 Post -Development 7 Reservoir 63.17 2 740 461.653 6 30.74 162,32 Pond No.2 Routed 9 SCS Runoff 226.42 2 732 1,002,592 -- ----- --- Pond No. 3 Pre -Development 10 SCS Runoff 358.64 2 728 1,487,645 - -- ---- Pond No.3 Post -Development 11 Reservoir 211.75 2 740 1,461,807 10 34.95 568,372 Pond No.3 Routed 13 SCS Runoff 60.62 2 732 268,828 ---- -- Pond No.4 Pre -Development 14 SCS Runoff 83.00 2 728 325,900 --- --- --- Pond No.4 Post -Development 15 Reservoir 47.88 2 740 325,877 14 30.15 84,278 Pond No.4 Routed 17 SCS Runoff 3.071 2 728 11,808 --- -- Untreated Pre -Development 18 SCS Runoff 4.572 2 724 15,221 --- --- Untreated Post -Development 20 Combine 536.52 2 732 2.380,333 1, 5, 9, - ---- TOTAL SITE PRE -DEVELOPMENT 13, 17, 21 Combine 807.43 2 728 3,343,244 2, 6, 10, — -- TOTAL SITE POST -DEVELOPMENT 14, 18, 22 Combine 458.30 2 740 3,289,952 3, 7, 11, TOTAL SITE ROUTED 15, 18, I:\00494\0039\PDNR\20-Tech\24-Discipline L- E3eprBdZsmodnffl6fd&ormwate 6M.fj.261PA FM2004940039.gpw Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Hyd. No. 1 Pond No.1 Pre -development Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 29.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 10.70 in Storm duration = 24 hrs 160.00 140.00 120.00 100.00 40.00 641111 120 Friday, 05 / 20 12022 Peak discharge = 168.77 cfs Time to peak = 732 min Hyd. volume = 750,402 cuft Curve number = 72 Hydraulic length = 0 ft Time of conc. (Tc) = 20.00 min Distribution = Type III Shape factor = 484 Pond No.1 Pre -development Hyd. No. 1 — 50 Year Q (cfs) 180.00 160.00 140.00 120.00 100.00 :1 9I . O In 40.00 20.00 0.00 -' I I I _ i— i I I I I i 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 2 Pond No.1 Post -Development Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 29.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 10.70 in Storm duration = 24 hrs 121 Friday, 05 / 20 / 2022 Peak discharge = 249.47 cfs Time to peak = 728 min Hyd. volume = 1,041,989 cuft Curve number = 91 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type III Shape factor = 484 Q (cfs) Pond No.1 Post -Development Hyd. No. 2 -- 50 Year Q (cfs) 280.00 280.00 240.00 - 240.00 200.00 200.00 160.00 160.00 120.00 120.00 80.00 80.00 40.00 40.00 0.00 f - o 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report 122 Hydraflow Hydrographs Extension forAutodesk® Civil 3D® byAutodesk, Inc. v2020.4 Hyd. No. 3 Pond No. 1 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Pond No.1 Post- Developm dMbx. Elevation Reservoir name = Pond No.1 Max. Storage Storage Indication method used Q (cfs 280.00 240.00 200.00 160.00 120.00 40.00 Friday, 05 120 / 2022 = 134.03 cfs = 740 min = 1,025,391 tuft = 30.82 ft = 316,606 tuft Q (cfs) 280.00 Fz, 1811EI 1I11 160.00 120.00 80.00 40.00 r WE"s 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 -- Hyd No. 3 Hyd No. 2 ® Total storage used = 316,606 cuff Time (min) Hydrograph Report 123 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 5 Pond No.2 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 13.150 ac Basin Slope = 0.0 % Tc method = User Total precip. = 10.70 in Storm duration = 24 hrs 70.00 .1 11 50.00 40.00 K1 11 20.00 10.00 Friday, 05 / 20 / 2022 = 77.85 cfs = 732 min = 346,704 cuft = 73 = Oft = 20.00 min = Type III = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.2 Pre -Development Hyd. No. 5 -- 50 Year Q (cfs) 80.00 70.00 ./ 11 50.00 40.00 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) Hydrograph Report 124 Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020.4 Hyd. No. 6 Pond No.2 Post -Development Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 13.150 ac Basin Slope = 0.0 % Tc method = User Total precip. = 10.70 in Storm duration = 24 hrs Friday, 05 / 20 12022 Peak discharge = 113.12 cfs Time to peak = 728 min Hyd. volume = 472,488 cuft Curve number = 91 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type III Shape factor = 484 Q (cfs) Pond No.2 Post -Development Hyd. No. 6 -- 50 Year Q (off) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 6 Time (min) Hydrograph Report 125 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 7 Pond No.2 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 6 - Pond No.2 Post-DevelopmMhx. Elevation Reservoir name = Pond No.2 Max. Storage Storage Indication method used. Q (cfs; 120.00 100.00 40.00 Friday, 05 / 20 / 2022 = 63.17 cfs = 740 min = 461,653 cuft = 30.74 ft = 162,322 cuft Q (cfs) 120.00 100.00 40.00 20.00 Few, A" 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Hyd No. 7 Hyd No. 6 ® Total storage used = 162,322 cult Time (min) Hydrograph Report 126 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 9 Pond No. 3 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 41.950 ac Basin Slope = 0.0 % Tc method = User Total precip. = 10.70 in Storm duration = 24 hrs Friday, 05 / 20 / 2022 Peak discharge = 226.42 cfs Time to peak = 732 min Hyd. volume = 1,002,592 cuft Curve number = 68 Hydraulic length = 0 ft Time of conc. (Tc) = 20.00 min Distribution = Type III Shape factor = 484 Q (cfs) Pond No. 3 Pre -Development Hyd. No. 9 — 50 Year Q (off) 240.00 240.00 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 f 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 9 Time (min) Hydrograph Report 127 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 10 Pond No.3 Post -Development Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 41.950 ac Basin Slope = 0.0 % Tc method = User Total precip. = 10.70 in Storm duration = 24 hrs Q (cfs 400.00 350.00 300.00 250.00 200.00 150.00 i(iI OI 50.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Friday, 05/20 / 2022 = 358.64 cfs = 728 min = 1,487,645 cuft = 90 = Oft = 10.00 min = Type III = 484 Pond No.3 Post -Development Hyd. No. 10 -- 50 Year 1 .. 0.00 0 Q (cfs) 400.00 350.00 300.00 250.00 200.00 150.00 100.00 50.00 r.T.Tu 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 10 Time (min) Hydrograph Report 128 Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Hyd. No. 11 Pond No.3 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 10 - Pond No.3 Post-DeveloprrMat. Elevation Reservoir name = Pond No.3 Max. Storage Storage Indication method used. Q (Cfs; 400.00 350.00 300.00 250.00 �1111z 150.00 100.00 Friday, 05 / 20 / 2022 = 211.75 cfs = 740 min = 1,461,807 cuft = 34.95 ft = 568,372 cult Q (cfs) 400.00 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0.00 Aa°® i I i I i - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Hyd No. 11 — Hyd No. 10 ® Total storage used = 568,372 cuft Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Hyd. No. 13 Pond No.4 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 10.800 ac Basin Slope = 0.0 % Tc method = User Total precip. = 10.70 in Storm duration = 24 hrs 129 Friday, 05120 12022 Peak discharge = 60.62 cfs Time to peak = 732 min Hyd. volume = 268,828 cuft Curve number = 70 Hydraulic length = 0 ft Time of conc. (Tc) = 20.00 min Distribution = Type III Shape factor = 484 Pond No.4 Pre -Development Q (cfs) Hyd. No. 13 -- 50 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 13 Time (min) Hydrograph Report 130 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 14 Pond No.4 Post -Development Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 10.800 ac Basin Slope = 0.0 % Tc method = User Total precip. = 10.70 in Storm duration = 24 hrs Q (cfs 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20 00 Friday, 05 / 20 / 2022 Peak discharge = 83.00 cfs Time to peak = 728 min Hyd. volume = 325,900 cuft Curve number = 79 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type III Shape factor = 484 Pond No.4 Post -Development Hyd. No. 14 -- 50 Year Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 10.00 f 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 14 Time (min) Hydrograph Report 131 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 15 Pond No.4 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 14 - Pond No.4 Post- Develop nMak. Elevation Reservoir name = Pond No.4 Max. Storage Storage Indication method used Pond No.4 Routed Friday, 05 120 / 2022 = 47.88 cfs = 740 min = 325,877 cult = 30.15 ft = 84,278 cuft Q (cfs) -- Q (cfs) Hyd. No. 15 50 Year 90.00 90.00 80.00 . 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 i 20.00 10.00 - 10.00 00 0.00 -- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1AA0 1560 Time (min) Hyd No. 15 Hyd No. 14 ® Total storage used = 84,278 cuff Hydrograph Report 132 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 17 Untreated Pre -Development Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 0.460 ac Basin Slope = 0.0 % Tc method = User Total precip. = 10.70 in Storm duration = 24 hrs Q (cfs) 4.00 Km 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Untreated Pre -Development Hyd. No. 17 -- 50 Year 120 240 360 480 600 720 840 Hyd No. 17 Friday, 05 / 20 / 2022 = 3.071 cfs = 728 min = 11,808 cult = 70 = Oft = 10.00 min = Type III = 484 Q (cfs) 4.00 { IM 2.00 1.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 133 Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Hyd. No. 18 Untreated Post -Development Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 0.460 ac Basin Slope = 0.0 % Tc method = User Total precip. = 10.70 in Storm duration = 24 hrs Friday, 05 / 20 / 2022 Peak discharge = 4.572 cfs Time to peak = 724 min Hyd. volume = 15,221 cuft Curve number = 92 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type III Shape factor = 484 Untreated Post -Development Q (cfs) Hyd. No. 18 -- 50 Year 5.00 4.00 3.00 1.00 MM Q (cfs) 5.00 4.00 3.00 2.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 18 Time (min) Hydrograph Report 134 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc, v2020.4 Hyd. No. 20 TOTAL SITE PRE -DEVELOPMENT Hydrograph type = Combine Storm frequency = 50 yrs Time interval = 2 min Inflow hyds. = 1, 5, 9, 13, 17 Q (cfs 560.00 480.00 400.00 320.00 240.00 160.00 Friday, 05 / 20 / 2022 Peak discharge = 536.52 cfs Time to peak = 732 min Hyd. volume = 2,380,333 cuft Contrib. drain. area = 95.360 ac TOTAL SITE PRE -DEVELOPMENT Hyd. No. 20 -- 50 Year Q (cfs) 560.00 480.00 400.00 320.00 240.00 160.00 0.00 __ - - .-xmv- iwR 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 20 — Hyd No. 1 Hyd No. 5 Hyd No. 9 Time (min) — Hyd No. 13 Hyd No. 17 Hydrograph Report 135 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 21 TOTAL SITE POST -DEVELOPMENT Hydrograph type = Combine Storm frequency = 50 yrs Time interval = 2 min Inflow hyds. = 2, 6, 10, 14, 18 Q (cfs 812.00 .•. 11 580.00 464.00 KW if 232.00 116.00 Friday, 05 / 20 / 2022 Peak discharge = 807.43 cfs Time to peak = 728 min Hyd. volume = 3,343,244 cuff Contrib. drain. area = 95.360 ac TOTAL SITE POST -DEVELOPMENT Hyd. No. 21 -- 50 Year �I 1.- 0 Q (cfs) 812.00 580.00 464.00 348.00 232.00 116.00 rm 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 21 Hyd No. 2 Hyd No. 6 Hyd No. 10 Time (min) Hyd No. 14 Hyd No. 18 Hydrograph Report 136 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 22 TOTAL SITE ROUTED Hydrograph type = Combine Storm frequency = 50 yrs Time interval = 2 min Inflow hyds. = 3, 7, 11, 15, 18 Q (cfs 490.00 420.00 350.00 280.00 210.00 140.00 MIX111I Friday, 05 / 20 / 2022 Peak discharge = 458.30 cfs Time to peak = 740 min Hyd. volume = 3,289,952 cuft Contrib. drain. area = 0.460 ac TOTAL SITE ROUTED Hyd. No. 22 — 50 Year Q (cfs) 490.00 420.00 350.00 280.00 210.00 140.00 70.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 22 — Hyd No. 3 — Hyd No. 7 Hyd No. 11 Time (min) Hyd No. 15 Hyd No. 18 137 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 209.36 2 732 936,475 ---- ----- --- Pond No.1 Pre -development 2 SCS Runoff 295.82 2 728 1,246,942 -- -- --- Pond No.1 Post -Development 3 Reservoir 144.82 2 742 1,230,303 i 31.22 365,602 Pond No. 1 Routed 5 SCS Runoff 96.27 2 732 431,562 •- --- ---- Pond No.2 Pre -Development 6 SCS Runoff 134.14 2 728 565,423 -- ------ ---- Pond No.2 Post -Development 7 Reservoir 67.77 2 742 554,518 6 31.08 184,177 Pond No.2 Routed 9 SCS Runoff 284.71 2 732 1,264,852 ---- ----- ------ Pond No. 3 Pre -Development 10 SCS Runoff 425.89 2 728 1,783,659 ---- --- -- Pond No.3 Post -Development 11 Reservoir 230.21 2 740 1,757,708 10 35.41 640,388 Pond No.3 Routed 13 SCS Runoff 75.69 2 732 337,274 ---- ------ Pond No.4 Pre -Development 14 SCS Runoff 100.84 2 728 399,842 --- --- ------ Pond No.4 Post -Development 15 Reservoir 53.87 2 740 399,818 14 30.55 101,434 Pond No.4 Routed 17 SCS Runoff 3.832 2 728 14,814 --- ------ Untreated Pre -Development 18 SCS Runoff 5.413 2 724 18,180 ----- --- Untreated Post -Development 20 Combine 669.57 2 732 2,984,975 1, 5, 9, -- ---- TOTAL SITE PRE -DEVELOPMENT 13, 17, 21 Combine 960.46 2 728 4,014,047 2, 6, 10, ------ --- - TOTAL SITE POST -DEVELOPMENT 14, 18, 22 Combine 498.16 2 740 3,960,528 3, 7, 11, --- ---- TOTAL SITE ROUTED 15, 18, 1:100494100391PDNR120-TechL4-Discipline E9iPrB&mib lnt 6M8br•mwate FAW.26 IFM•I W2004940039.9pw Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 1 Pond No.1 Pre -development Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 29.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 12.60 in Storm duration = 94 hrc 138 Friday, 05 / 20 / 2022 Peak discharge = 209.36 cfs Time to peak = 732 min Hyd. volume = 936,475 cuft Curve number = 72 Hydraulic length = 0 ft Time of conc. (Tc) = 20.00 min Distribution = Type III Shane factor = 484 Q (cfs) Pond No.1 Pre -development Hyd. No. 1 --100 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 139 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 2 Pond No.1 Post -Development Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 29.000 ac Basin Slope = 0.0 % Tc method = User Total precip. = 12.60 in Storm duration = 24 hrs Friday, 05 / 20 / 2022 Peak discharge = 295.82 cfs Time to peak = 728 min Hyd. volume = 1,246,942 cuft Currie number = 91 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type III Shape factor = 484 Q (cfs) Pond No.1 Post -Development Hyd. No. 2 --100 Year Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 80.00 40.00 0.00 320.00 280.00 240.00 200.00 160.00 120.00 80.00 40.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report 140 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 3 Pond No. 1 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - Pond No.1 Post-®evelopmM;hx. Elevation Reservoir name = Pond No.1 Max. Storage Storage Indication method used. Q (cfs, 320.00 280.00 240.00 200.00 160.00 120.00 80.00 40.00 Friday, 05 / 20 / 2022 = 144.62 cfs = 742 min = 1,230,303 cuft = 31.22 ft = 365,602 tuft Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 E 11 O 4 40.00 0.00 -� - i i i i „ . �- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 2 ® Total storage used = 365,602 cult Hydrograph Report 141 Hydraflow Hydrographs Extension for Autodesk® Civil MOD by Autodesk, Inc. v2020.4 Hyd. No. 5 Pond No.2 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 13.150 ac Basin Slope = 0.0 % Tc method = User Total precip. = 12.60 in Storm duration = 24 hrs Q (cfs 100.00 90.00 80.00 70.00 60.00 50.00 40.00 KIi 1 O Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.2 Pre -Development Hyd. No. 5 --100 Year Friday, 05 / 20 / 2022 = 96.27 cfs = 732 min = 431,562 cuff = 73 = Oft = 20.00 min = Type III = 484 Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 El 1911EI 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1550 Hyd No. 5 Time (min) Hydrograph Report 142 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 6 Pond No.2 Post -Development Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 13.150 ac Basin Slope = 0.0 % Tc method = User Total precip. = 12.60 in Storm duration = 24 hrs 120.00 100.00 80.00 40.00 ►1 16 Friday, 05 / 20 / 2022 = 134.14 cfs = 728 min = 565,423 tuft 91 = Oft = 10.00 min = Type III = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.2 Post -Development Hyd. No. 6 --100 Year Q (cfs) 140.00 120.00 100.00 1:9 A J� 40.00 20.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) Hydrograph Report 143 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Friday, 05 / 20 / 2022 Hyd. No. 7 Pond No.2 Routed Hydrograph type = Reservoir Peak discharge = 67.77 cfs Storm frequency = 100 yrs Time to peak = 742 min Time interval = 2 min Hyd. volume = 554,518 cuff Inflow hyd. No. = 6 - Pond No.2 Post-DevelopmMhx. Elevation = 31.08 ft Reservoir name = Pond No.2 Max. Storage = 184,177 cuft Storage Indication method used. Pond No.2 Routed Q (cfs) Hyd. No. 7 —100 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 1 1 1 20.00 0.00 0.00 - 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) Hyd No. 7 Hyd No. 6 ® Total storage used = 184,177 cult Hydrograph Report I" Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 9 Pond No. 3 Pre -Development Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 41.950 ac Basin Slope = 0.0 % Tc method = User Total precip. = 12.60 in Storm duration = 24 hrs Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 Friday, 05 / 20 / 2022 Peak discharge = 284.71 cfs Time to peak = 732 min Hyd. volume = 1,264,852 cuft Curve number = 68 Hydraulic length = 0 ft Time of conc. (Tc) = 20.00 min Distribution = Type III Shape factor = 484 Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 0.00 ' 11 1 _A--- I I I i i 1— 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) Hydrograph Report 145 Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Hyd. No. 10 Pond No.3 Post -Development Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 41.950 ac Basin Slope = 0.0 % Tc method = User Total precip. = 12.60 in Storm duration = 24 hrs Friday, 05 / 20 / 2022 Peak discharge = 425.89 cfs Time to peak = 728 min Hyd. volume = 1,783,659 cuft Curve number = 90 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type III Shape factor = 484 Pond No.3 Post -Development Q (cfs) Hyd. No. 10 --100 Year Q MS) 480.00 420.00 360.00 300.00 240.00 180.00 120.00 60.00 0.00 480.00 420.00 360.00 300.00 240.00 180.00 120.00 60.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 10 Time (min) Hydrograph Report 146 Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Hyd. No. 11 Pond No.3 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 10 - Pond No.3 Post-®eveloprMat. Elevation Reservoir name = Pond No.3 Max. Storage Storage Indication method used. Q (Cfs; 480.00 420.00 360.00 300.00 240.00 180.00 120.00 ni 1 6 Friday, 05 / 20 / 2022 = 230.21 cfs = 740 min = 1,757,708 tuft = 35.41 ft = 640,388 tuft Q (Cfs) 480.00 420.00 360.00 300.00 Wz'KIM 180.00 120.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) Hyd No. 11 Hyd No. 10 ® Total storage used = 640,388 Cuft Hydrograph Report 147 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 13 Pond No.4 Pre -Development Hydrocgraph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 10.800 ac Basin Slope = 0.0 % Tc method = User Total precip. = 12.60 in Storm duration = 24 hrs 70.00 .gm 50.00 40.00 30.00 K111111 10.00 Friday, 05 / 20 12022 = 75.68 cfs = 732 min = 337,274 cuft = 70 = Oft = 20.00 min = Type III = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.4 Pre -Development Hyd. No. 13 --100 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 1 1 1 1 1 1 1 1 1 1 1 — 1- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 13 Time (min) Hydrograph Report 148 Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020.4 Hyd. No. 14 Pond No.4 Post -Development Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 10.800 ac Basin Slope = 0.0 % Tc method = User Total precip. = 12.60 in Storm duration = 24 hrs Q (Cf5 120.00 100.00 40.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pond No.4 Post -Development Hyd. No. 14 —100 Year 0.00 0 120 240 360 480 600 Hyd No. 14 Friday, 05 / 20 / 2022 = 100.84 cfs = 728 min = 399,842 cult = 79 = Oft = 10.00 min = Type III = 484 Q (Cfs) 120.00 100.00 [:I110I1] -TOI1 40.00 20.00 IlfWMI 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 149 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 15 Pond No.4 Routed Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 14 - Pond No.4 Post-DeveloprMak. Elevation Reservoir name = Pond No.4 Max. Storage Storage Indication method used. Q (cfs) 120.00 TI111I11 80.00 - M 40.00 20.00 Pond No.4 Routed Hyd. No. 15 --100 Year Friday, 05 / 20 / 2022 = 53.87 cfs = 740 min = 399,818 cult = 30.55 ft = 101,434 cuft Q (cfs) 120.00 100.00 80.00 .O I1, 40.00 20.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 15 Hyd No. 14 ® Total storage used = 101,434 cuff Time (min) Hydrograph Report 150 Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Hyd. No. 17 Untreated Pre -Development Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 0.460 ac Basin Slope = 0.0 % Tc method = User Total precip. = 12.60 in Storm duration = 24 hrs Q (cfs) 4.00 3.00 2.00 1.00 0.00 0 120 240 360 480 600 720 — Hyd No. 17 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Untreated Pre -Development Hyd. No. 17 -- 100 Year 840 Friday, 05 120 / 2022 = 3.832 cfs = 728 min = 14,814 cult 70 = 0 ft = 10.00 min = Type III = 484 Q (cfs) 4.00 3.00 O �M H0111 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 151 Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020.4 Hyd. No. 18 Untreated Post -Development Hydrograph type = SDS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 0.460 ac Basin Slope = 0.0 % Tc method = User Total precip. = 12.60 in Storm duration = 24 hrs Friday, 05 / 20 / 2022 Peak discharge = 5.413 cfs Time to peak = 724 min Hyd. volume = 18,180 cuft Curve number = 92 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type III Shape factor = 484 Untreated Post -Development Q (ofs) Hyd. No. 18 -- 100 Year Q (ofs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0 00 - L 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 18 Time (min) Hydrograph Report 152 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 20 TOTAL SITE PRE -DEVELOPMENT Hydrograph type = Combine Storm frequency = 100 yrs Time interval = 2 min Inflow hyds. = 1, 5, 9, 13, 17 500.00 400.00 300.00 200.00 100.00 Friday, 05 / 20 / 2022 Peak discharge = 669.57 cfs Time to peak = 732 min Hyd. volume = 2,984,975 cuft Contrib. drain. area = 95.360 ac TOTAL SITE PRE -DEVELOPMENT Hyd. No. 20 --100 Year Q (cfs) 700.00 500.00 400.00 300.00 200.00 i 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 20 Hyd No. 1 --- Hyd No. 5 Hyd No. 9 Time (min) Hyd No. 13 Hyd No. 17 Hydrograph Report 153 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 21 TOTAL SITE POST -DEVELOPMENT Hydrograph type = Combine Storm frequency = 100 yrs Time interval = 2 min Inflow hyds. = 2, 6, 10, 14, 18 Q (cfs 966.00 828.00 552.00 414.00 276.00 138.00 Friday, 05 120 / 2022 Peak discharge = 960.46 cfs Time to peak = 728 min Hyd. volume = 4,014,047 cuft Contrib. drain. area = 95.360 ac TOTAL SITE POST -DEVELOPMENT Hyd. No. 21 —100 Year 0.00 - 0 Q (cfs) 966.00 552.00 414.00 276.00 138.00 r.T.ra 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 21 Hyd No. 2 — Hyd No. 6 Hyd No. 10 Time (min) Hyd No. 14 Hyd No. 18 Hydrograph Report 154 Hydraflow Hydrographs Extension forAutodesk® Civil 3D® by Autodesk, Inc. v2020.4 Hyd. No. 22 TOTAL SITE ROUTED Hydrograph type = Combine Storm frequency = 100 yrs Time interval = 2 min Inflow hyds. = 3, 7, 11, 15, 18 Q (cfs) 560.00 490.00 350.00 280.00 pliffliell 140.00 70.00 Friday, 05 / 20 / 2022 Peak discharge = 498.16 cfs Time to peak = 740 min Hyd. volume = 3,960,528 cuft Contrib. drain. area = 0.460 ac Q (cfs) 560.00 490.00 420.00 350.00 280.00 210.00 140.00 70.00 W I6 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 22 — Hyd No. 3 Hyd No. 7 — Hyd No. 11 Time (min) — Hyd No. 15 Hyd No. 18 Hydraflow Rainfall Report 155 Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020.4 Retum Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 84.8300 13.1000 0.9016 ------- 2 94.8190 13.0000 0.8825 -------- 3 1.0000 0.1000 0.0000 -- -- 5 80.4919 12.8000 0.8385 -- - 10 77.4253 12.2000 0.7985 ------- 25 68.8940 10.9000 0.7370 ---- 50 66.5178 10.4000 0.7046 ---- 100 58.8993 9.1000 0.6553 - - -- File name: 2021.10.19_Blue Clay_intensity-004940039.IDF Intensity = B / (Tc + D)^E Friday, 05 / 20 / 2022 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 6.23 5.00 4.19 3.62 3.19 2.85 2.58 2.36 2.18 2.02 1.89 1.77 2 7.40 5.96 5.01 4.33 3.83 3.43 3.11 2.85 2.63 2.45 2.29 2.15 3 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 5 7.20 5.85 4.95 4.31 3.83 3.45 3.14 2.89 2.68 2.50 2.35 2.21 10 7.99 6.51 5.54 4.84 4.31 3.90 3.57 3.29 3.06 2.86 2.69 2.54 25 8.97 7.33 6.26 5.50 4.92 4.47 4.11 3.80 3.55 3.33 3.15 2.98 50 9.69 7.95 6.81 6.00 5.39 4.91 4.52 4.20 3.93 3.70 3.50 3.32 100 10.40 8.52 7.32 6.47 5.83 5.33 4.93 4.59 4.31 4.07 3.86 3.67 Tc = time in minutes. Values may exceed 60. 10039\PDNR\20-Tech\24-Discipline Desiqn DocumentationlStormwater12021.10.19_Blue Clay Depth_004940039.pcp Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.82 4.63 1.50 5.99 7.19 9.04 10.70 12.60 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ATTACHMENT E - ECS SOILS REPORT ECS S i U T H EA .r s LLP "Setting the Standard for Service" Geotechnical - Construction Materials • Environmental - Facilities NC Registered E in.- Firm -1006 NC Registered Geeoloogists Finn C-406 SC Registered Engineering Firm 3239 October 14, 2021 Mr. Rick A. Moore, P.E. Mckim & Creed 243 North Front Street Wilmington, North Carolina 28401 Reference: Report of Seasonal High Water Table Estimation and Infiltration Testing Blue Clay Road Business Park Wilmington, New Hanover County, North Carolina ECS Project No. 49.15350 Dear Mr. Moore: ECS Southeast, LLP (ECS) recently conducted a seasonal high water table (SHWT) estimation and infiltration testing within the stormwater control measure (SCM) area(s) off of Blue Clay Road adjacent to Juvenile Center Road in Wilmington, New Hanover County, North Carolina. This letter, with attachments, is the report of our testing. Field Testing On October 13, 2021, ECS conducted an exploration of the subsurface soil and groundwater conditions, in accordance with the NCDEQ Stormwater Design Manual section A-2, at five requested locations shown on the attached Boring Location Plan (Figure 1). ECS used GPS equipment in order to determine the boring locations. The purpose of this exploration was to obtain subsurface information of the in situ soils for the SCM area(s). ECS explored the subsurface soil and groundwater conditions by advancing one hand auger boring into the existing ground surface at each of the requested boring locations. ECS visually classified the subsurface soils and obtained representative samples of each soil type encountered. ECS also recorded the SHWT and groundwater elevation observed at the time of the hand auger borings. The attached Infiltration Testing Form provides a summary of the subsurface conditions encountered at the hand auger boring locations. The SHWT and groundwater elevation was estimated at the boring locations below the existing grade elevation. A summary of the findings are as follows: Location SHWT Groundwater 1-1 18 inches 32 inches 1-2 16 inches 24 inches 1-3 18 inches 24 inches 1-4 20 inches 24 inches 1-5 18 inches 30 inches ECS Capitol Services, PLLC • ECS Florida, LLC - ECS Mid -Atlantic. LLC - ECS Midwest, LLC • ECS Southeast, LLP - ECS Texas, LLP www.er-s1iniited.co, m Report of SHWT Estimation and Infiltration Testing Blue Clay Road Business Park Wilmington, New Hanover County, North Carolina ECS Project No. 49.15350 October 13, 2021 ECS has conducted five infiltration tests utilizing a compact constant head permeameter near the hand auger borings in order to estimate the infiltration rate for the subsurface soils. Infiltration tests are typically conducted at two feet above the SHWT or in the most restrictive soil horizon. Tests in clayey conditions are conducted for durations of up to 30 minutes. If a more precise hydraulic conductivity value is desired for these locations, then ECS recommends collecting samples and performing laboratory permeability testing. Field Test Results Below is a summary of the infiltration test results: Location Description Depth Inches/ hour 1-1 Black silty SAND 10 inches 0.031 1-2 Gray/orange clayey SAND 10 inches 0.008 1-3 Gray/orange clayey SAND 10 inches 0.019 1-4 Gray/orange clayey SAND 10 inches 0.009 1-5 Gray/brown silty/clayey SAND 10 inches 0.074 Infiltration rates and SHWT may vary within the proposed site due to changes in elevation, soil classification and subsurface conditions. ECS recommends that a licensed surveyor provide the elevations of the boring locations. Closure ECS's analysis of the site has been based on our understanding of the site, the project information provided to us, and the data obtained during our exploration. If the project information provided to us is changed, please contact us so that our recommendations can be reviewed and appropriate revisions provided, if necessary. The discovery of any site or subsurface conditions during construction which deviate from the data outlined in this exploration should be reported to us for our review, analysis and revision of our recommendations, if necessary. The assessment of site environmental conditions for the presence of pollutants in the soil and groundwater of the site is beyond the scope of this geotechnical exploration. L Report of SHWT Estimation and Infiltration Testing Blue Clay Road Business Park VVilmington, New Hanover County, North Carolina ECS Project No. 49.15350 October 13, 2021 ECS appreciates the opportunity to provide our services to you on this project. If you have any questions concerning this report or this project, please contact us. Respectfully, ECS SOUTHEAST, LLP 2�ALi(t;' Allell K. Brooks Wall Project Manager bwalIO-ecslimited.com 910-686-9114 Attachments: Figure 1 - Boring Location Plan Infiltration Testing Form GBA Document W. Brandon Fulton, PSC, PWS, LSS Environmental Department Manager bfulton(cD-ecsl im ited. com 704-525-5152 Infiltration Testing Form Blue Clay Road Business Park Wilmington, New Hanover County, North Carolina ECS Project No. 49.15350 October 13, 2021 Location Depth USCS I-1 0-101, SM 10"-36" SC Soil Description Black silty SAND Tan/orange/gray clayey SAND Seasonal High Water Table was estimated to be at 18 inches below the existing grade elevation. Groundwater was encountered at 32 inches below the existing grade elevation. Test was conducted at 10 inches below existing grade elevation Infiltration Rate: 0.031 inches per hour Location Depth USCS Soil Description 1-2 0-30" Sc Gray/orange clayey SAND Seasonal High Water Table was estimated to be at 16 inches below the existing grade elevation. Groundwater was encountered at 24 inches below the existing grade elevation. Test was conducted at 10 inches below existing grade elevation Infiltration Rate: 0.008 inches per hour Location Depth USCS Soil Description 1-3 0-30" Sc Gray/orange clayey SAND Seasonal High Water Table was estimated to be at 18 inches below the existing grade elevation. Groundwater was encountered at 24 inches below the existing grade elevation. Test was conducted at 10 inches below existing grade elevation Infiltration Rate: 0.019 inches per hour Infiltration Testing Form Blue Clay Road Business Park Wilmington, New Hanover County, North Carolina ECS Project No. 49.15350 October 13, 2021 Location Depth USCS Soil Description 1-4 0-30" Sc Gray/orange clayey SAND Seasonal High Water Table was estimated to be at 20 inches below the existing grade elevation. Groundwater was encountered at 24 inches below the existing grade elevation. Test was conducted at 10 inches below existing grade elevation Infiltration Rate: 0.009 inches per hour Location Depth USCS Soil Description 1-5 0-30" Sc Gray/brown silty/clayey SAND Seasonal Hiah Water Table was estimated to be at 18 inches below the existing grade elevation. Groundwater was encountered at 30 inches below the existing grade elevation. Test was conducted at 10 inches below existing grade elevation Infiltration Rate: 0.074 inches per hour r- GeolechnicalmEngineeping Report ---) The Geoprofessional Business Association (GBA) has prepared this advisory to help you - assumedly a client representative - interpret and apply this geotechnical-engineering report as effectively as possible. In that way, clients can benefit from a lowered exposure to the subsurface problems that, for decades, have been a principal cause of construction delays, cost overruns, claims, and disputes. If you have questions or want more information about any of the issues discussed below, contact your GBA-member geotechnical engineer. Active involvement in the Geoprofessional Business Association exposes geotechnical engineers to a wide array of risk -confrontation techniques that can be of genuine benefit for everyone involved with a construction project. Geotechnical-Engineering Services Are Performed for Specific Purposes, Persons, and Projects Geotechnical engineers structure their services to meet the specific needs of their clients. A geotechnical-engineering study conducted for a given civil engineer will not likely meet the needs of a civil - works constructor or even a different civil engineer. Because each geotechnical-engineering study is unique, each geotechnical- engineering report is unique, prepared solely for the client. Those who rely on a geotechnical-engineering report prepared for a different client can be seriously misled. No one except authorized client representatives should rely on this geotechnical-engineering report without first conferring with the geotechnical engineer who prepared it. And no one - not even you - should apply this report for any purpose or project except the one originally contemplated. Read this Report in Full Costly problems have occurred because those relying on a geotechnical- engineering report did not read it in its entirety. Do not rely on an executive summary. Do not read selected elements only. Read this report in full. You Need to Inform Your Geotechnical Engineer about Change Your geotechnical engineer considered unique, project -specific factors when designing the study behind this report and developing the confirmation -dependent recommendations the report conveys. A few typical factors include: • the client's goals, objectives, budget, schedule, and risk -management preferences; • the general nature of the structure involved, its size, configuration, and performance criteria; • the structure's location and orientation on the site; and • other planned or existing site improvements, such as retaining walls, access roads, parking lots, and underground utilities. Typical changes that could erode the reliability of this report include those that affect: • the site's size or shape; • the function of the proposed structure, as when it's changed from a parking garage to an office building, or from a light -industrial plant to a refrigerated warehouse; • the elevation, configuration, location, orientation, or weight of the proposed structure; • the composition of the design team; or • project ownership. As a general rule, always inform your geotechnical engineer of project changes - even minor ones - and request an assessment of their impact. The geotechnical engineer who prepared this report cannot accept responsibility or liability for problems that arise because the geotechnical engineer was not informed about developments the engineer otherwise would have considered. This Report May Not Be Reliable Do not rely on this report if your geotechnical engineer prepared it: • for a different client; • for a different project; • for a different site (that may or may not include all or a portion of the original site); or • before important events occurred at the site or adjacent to it; e.g., man-made events like construction or environmental remediation, or natural events like floods, droughts, earthquakes, or groundwater fluctuations. Note, too, that it could be unwise to rely on a geotechnical-engineering report whose reliability may have been affected by the passage of time, because of factors like changed subsurface conditions; new or modified codes, standards, or regulations; or new techniques or tools. If your geotechnical engineer has not indicated an `apply -by" date on the report, ask what it should be, and, in general, if you are the least bit uncertain about the continued reliability of this report, contact your geotechnical engineer before applying it. A minor amount of additional testing or analysis - if any is required at all - could prevent major problems. Most of the "Findings" Related in This Report Are Professional Opinions Before construction begins, geotechnical engineers explore a site's subsurface through various sampling and testing procedures. Geotechnical engineers can observe actual subsurface conditions only at those specific locations where sampling and testing were performed. The data derived from that sampling and testing were reviewed by your geotechnical engineer, who then applied professional judgment to form opinions about subsurface conditions throughout the site. Actual sitewide-subsurface conditions may differ - maybe significantly - from those indicated in this report. Confront that risk by retaining your geotechnical engineer to serve on the design team from project start to project finish, so the individual can provide informed guidance quickly, whenever needed. This Report's Recommendations Are Confirmation -Dependent The recommendations included in this report - including any options or alternatives - are confirmation -dependent. In other words, they are not final, because the geotechnical engineer who developed them relied heavily on judgment and opinion to do so. Your geotechnical engineer can finalize the recommendations only after observing actual subsurface conditions revealed during construction. If through observation your geotechnical engineer confirms that the conditions assumed to exist actually do exist, the recommendations can be relied upon, assuming no other changes have occurred. The geotechnical engineer who prepared this report cannot assume responsibility or liability for confirmation - dependent recommendations if you fail to retain that engineer to perform construction observation. This Report Could Be Misinterpreted Other design professionals' misinterpretation of geotechnical- engineering reports has resulted in costly problems. Confront that risk by having your geotechnical engineer serve as a full-time member of the design team, to: • confer with other design -team members, help develop specifications, review pertinent elements of other design professionals' plans and specifications, and be on hand quickly whenever geotechnical-engineering guidance is needed. You should also confront the risk of constructors misinterpreting this report. Do so by retaining your geotechnical engineer to participate in prebid and preconstruction conferences and to perform construction observation. Give Constructors a Complete Report and Guidance Some owners and design professionals mistakenly believe they can shift unanticipated -subsurface -conditions liability to constructors by limiting the information they provide for bid preparation. To help prevent the costly, contentious problems this practice has caused, include the complete geotechnical-engineering report, along with any attachments or appendices, with your contract documents, but be certain to note conspicuously that you've included the material for informational purposes only. To avoid misunderstanding, you may also want to note that "informational purposes" means constructors have no right to rely on the interpretations, opinions, conclusions, or recommendations in the report, but they may rely on the factual data relative to the specific times, locations, and depths/elevations referenced. Be certain that constructors know they may learn about specific project requirements, including options selected from the report, only from the design drawings and specifications. Remind constructors that they may A perform their own studies if they want to, and be sure to allow enough time to permit them to do so. Only then might you be in a position to give constructors the information available to you, while requiring them to at least share some of the financial responsibilities stemming from unanticipated conditions. Conducting prebid and preconstruction conferences can also be valuable in this respect. Read Responsibility Provisions Closely Some client representatives, design professionals, and constructors do not realize that geotechnical engineering is far less exact than other engineering disciplines. That lack of understanding has nurtured unrealistic expectations that have resulted in disappointments, delays, cost overruns, claims, and disputes. To confront that risk, geotechnical engineers commonly include explanatory provisions in their reports. Sometimes labeled "limitations;' many of these provisions indicate where geotechnical engineers' responsibilities begin and end, to help others recognize their own responsibilities and risks. Read these provisions closely. Ask questions. Your geotechnical engineer should respond fully and frankly. Geoenvi ron mental Concerns Are Not Covered The personnel, equipment, and techniques used to perform an environmental study - e.g., a "phase -one" or "phase -two" environmental site assessment - differ significantly from those used to perform a geotechnical-engineering study. For that reason, a geotechnical- engineering report does not usually relate any environmental findings, conclusions, or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Unanticipated subsurface environmental problems have led to project failures. If you have not yet obtained your own environmental information, ask your geotechnical consultant for risk -management guidance. As a general rule, do not rely on an environmental report prepared for a different client site, or project or that is more than six months old. Obtain Professional Assistance to Deal with Moisture Infiltration and Mold While your geotechnical engineer may have addressed groundwater, water infiltration, or similar issues in this report, none of the engineer's services were designed, conducted, or intended to prevent uncontrolled migration of moisture - including water vapor - from the soil through building slabs and walls and into the building interior, where it can cause mold growth and material -performance deficiencies. Accordingly, proper implementation of the geotechnical engineer's recommendations will not of itself be sufficient to prevent moisture infiltration. Confront the risk of moisture infiltration by including building -envelope or mold specialists on the design team. Geotechnical engineers are not building - envelope or mold specialists. GEOPROFESSIONAL BUSINESS ASSOCIATION Telephone: 301 /565-2733 e-mail: info@geoprofessional.org wwwgeoprofessional.org Copyright 2016 by Geoprofessional Business Association (GBA). Duplication, reproduction, or copying of this document, in whole or in part, by any means whatsoever, is strictly prohibited, except with GBAs specific written permission. Excerpting, quoting, or otherwise extracting wording from this document is permitted only with the express written permission of GBA, and only for purposes of scholarly research or book review. Only members of GBA may use this document or its wording as a complement to or as an element of a report of any kind. Any other firm, individual, or other entity that so uses this document without being a GBA member could be committing negligent ATTACHMENT F - WETLANDS JURISDICTIONAL DETERMINATION U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2019-00891 County: New Hanover U.S.G.S. Quad: NC- Castle Havne NOTIFICATION OF JURISDICTIONAL DETERMINATION Requestor: ".Wilmington Business Development Agent: Timmons Group PO Box 1698 Christopher Inscore Wilmington, NC 28402 5410 Trinity Group Suite 102 Raleigh, NC 27607 Size (acres) 120 Nearest Town Castle Havne Nearest Waterway Prince George Creek River Basin Cape Fear USGS HUC 03030007 Coordinates Latitude: 34.317047 Longitude:-77.894888 Location description: Project area is located northwest of the intersection of Juvenile Center Road and Blue Clay Road in Castle Havne, New Hanover County, North Carolina. Project area is composed of farm fields forested areas and a commercial business located south of the Juvenile Detention Center. Indicate Which of the Following Apply: A. Preliminary Determination ® There appear to be waters on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. The approximate boundaries of these waters are shown on the enclosed delineation map dated 8/10/201S. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. ❑ There appear to be waters on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHA jurisdiction over all of the waters at the project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination ❑ There are Navigable Waters of the United States within the above described project area/property subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are waterson the above described project area/property subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ We recommend you have the waters on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. SAW-2019-00891 ❑ The waters on your project area/property have been delineated and the delineation has been verified by the Corps. The approximate boundaries of these waters are shown on the enclosed delineation map dated DATE. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. ❑ The waters have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below onDATE. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are no waters of the U.S., to include wetlands, present on the above described project area/property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ® The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA) You should contact the Division of Coastal Management in in Wilmington, NC, at (910) 796-7215 to determine their requirements. Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters of the United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Rachel Capito at (910)-251-4487 or Rachel.A.Caoito(&usace.armv. mil. C. Basis For Determination: Basis For Determination: See the preliminary jurisdictional determination form dated 5/31/2019. D. Remarks: None. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by Not applicable. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: Date of JD: 5/31/2019 Expiration Date of JD:Not applicable NOTIFICATION OF ADMINISTRATTVE APPEAL OPTIONS AND PROCESS AND K?QtT lST FOR APKAL . Applicant: Wilmin ton Business Development File Number: SAW-2019-00891 Date: 5/31/2019 Attached is: See Section below ❑ INITIAL PROFFERED PERMIT (Standard Permit or Letter ofpermission) A ❑ PROFFERED PERMIT (Standard Permit or Letter ofpermission) B ❑ PERMIT DENIAL C ❑ APPROVED JURISDICTIONAL DETERMINATION D ZI PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I. - The following identifies your rights and options regarding an administrative appeai of the above decision. ,Additional information maybe found at or httA°�lwwvi usage aty i�1—$$i n 51CW1yVorks/I gut &ry DgramandPermits aspx of the C . re cnt&:a t 33 CFR Part 331. . _. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form . must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMI NIATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SK TION II - REQMST FOR APPEAL or 494CTIONS TO AN INITIAL PRUFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT Q Poq�Af-T FOR IJ"TI4S OR INFORMATICS► " If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division Mr. Jason Steele, Administrative Appeal Review Officer Attn: Rachel Capito CESAD-PDO Wilmington Regulatory Office U.S. Army Corps of Engineers, South Atlantic Division U.S Army Corps of Engineers 60 Forsyth Street, Room 1OM15 69 Darlington Avenue Atlanta, Georgia 30303-8801 Wilmington, North Carolina 28403 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of anv site investigation, and will have the opportuni to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Rachel Capito, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 Estimated amount Type of aquatic Geographic authority to Latitude (decimal Longitude of aquatic resources resources (i.e., which the aquatic resource Site Number degrees). (decimal degrees) in review area wetland vs. non- "maybe" subject (i.e., (acreage and linear Section 404 or Section feet, if applicable wetland waters) 10/404) RPW F 34.319644 -77.89475 0.06 acre Non -wetland Section 404 waters RPW G 34.320101 -77.895973 0.05 acre Non -wetland Section 404 waters RPW H 34.320234 -77.897681 0.07 acre Non -wetland Section 404 waters RPW 1 34.319796 -77.898507 0.07 acre Non -wetland Section 404 waters RPW J 34.320255 -77.900041 0.09 acre Non -wetland Section 404 waters 1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre - construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT CONIPLETION DATE FOR PJD: 5/31/2019 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Wilmington Business Development, PO Box 1698, Wilmington, NC 28402 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, Blue Clay Road, SAW-2019-00891 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: Project area is located northwest of the intersection of Juvenile Center Road and Blue Clay Road in Castle Hayne, New Hanover County, North Carolina. Project area is composed of farm fields, forested areas, and a commercial business located south of the Juvenile Detention Center. (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County: New Hanover City: Castle Hayne Center coordinates of site (lat/long in degree decimal format): Latitude: 34.317047 Longitude:-77.894888 Universal Transverse Mercator: Name of nearest waterbody: Prince George Creek E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ❑ Office (Desk) Determination. Date: ® Field Determination. Date(s): December 19, 2019 TABLE OF AQUATIC RESOURCES INREVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION. Estimated amount Geographic authority to Latitude (decimal Longitude of aquatic resources Type of aquatic resources (i.e., which the aquatic resource Site Number degrees) (decimal degrees) in review area wetland vsnon- "may be subject (i.e., (acreageand linear . wetland waters) Section 404 or Section feet, if applicable 10/404) Wetland A 34.3199 -77.8928 8.14 acres Wetland Section 404 Wetland B 34.318844 -77.891836 0.003 acres Wetland Section 404 Wetland C 34.323637 -77.899402 4.3 acres Wetland Section 404 Stream D 34.319175 -77.896042 2,243 linedr feet Non -wetland Section 404 waters Stream E 34.3183 -77.893 732 linear feet Non -wetland Section 404 waters by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: ® Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map: ® Data sheets prepared/submitted by or on behalf of the PJD requestor. ® Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ❑ USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. ❑ U.S. Geological Survey map(s). Cite scale & quad name: ❑ Natural Resources Conservation Service Soil Survey. Citation: ❑ National wetlands inventory map(s). Cite name: ❑ State/local wetland inventory map(s): ❑ FEMA/F1RM maps: ❑ 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929) ® Photographs: ®Aerial (Name & Date): or ❑Other (Name & Date): ❑ Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinations. Signature and date of Regulatory Staff member completing PJD Signature and date of person requesting PJD (Required unless obtaining signature is impracticable)1 ' Districts may establish timframes for requester to return signed PJD fonns. If the requestor does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. Ilk mw LLI ' `� .. �• tea.:.•`• �-� .::.1° � lk .- - �::�. Av 0% - 16 A,. NO 0 do, - ..40- ® �. d E ai v O aJ r1 aii U C — O 3 ar v y m a/ O a v v v v v v v v v r c 3 0 Y In .= d `o = L u � d a L N A GO O a! C m ai ` 3 al N N N N N N A aJ al al o w w t N m C C a C C m m C m C m C m C m C m u 3 m m m - Y Y 0° 3 3 " 3 3 3 3 3 3 3 3 O 0 a c mc c °c c c c c c °c c °c c c c ° 'n W C 0: N . F a a F a 3 o v m a - ai u � m N W d m U C V V m U y w Q m 10 ati O M N m 0 0 0 0 0 O p L p N^ Ci CI O O u c �? m E m a a+ m E Y N W O 00 C 00 co 00 00 00 as 00 ar m oo a^ a m^ m^ Ln a v N o v m w rn vn Ln a 7 rl 0 00 00 lD M rl 01 lD 1� t0 01 .--I O N O Ol m N O +' N en rl m N M rl m ei m a-1 m N fn N M rl m N m v m v m v m v m v m v m v M v m v m v m a E a ATTACHMENT G - PROPERTY DEED Warranty Deed Excise Tax �iwn SFOR REGREa�R N REGISTER OF DEED' TH NEW HANOVER COUNTY, Nr 2008 JRN 31 12*05 PM BK:5274 K:257-252 FEEiV5.00 NC REV STAMP:$16,760.00 IMP 1100OME Recording time, book and page Parcel Identifier No. R02600-002-005-000 & R02600-002-005-003 Prepared by: W. Talmage Jones Hogue, Hill, Jones, Nash & Lynch, L.L.P. P. O. Drawer 2178 Wilmington, NC 28402 Grantee mailing address: 230 Government Center Drive, Wilmington, NC 28403 Returned to: Kemp Burpeau (New Hanover County) No certification or opinion on title is expressed by the preparer of this deed except as may appear from the preparer's signed certificate or opinion. Unless indicated otherwise In a writing signed by the attorney who drafted this instrument, by executing this deed, the Grantor (Seller) acknowledges disclosure that the attorney who drafted this instrument, and the law firm for whieh that attorney is associated or is a partner, represents the Grantee (Buyer), and does not represent Grantor (Seller), and cannot give legal advice to Grantor (Seller) other than the advice to secure legal counsel, and will prepare the deed consistent with the specifications in the purchase agreement, if any, but, in the absence of such specifications, will prepare a deed that will protect the interests of the Grantee (Buyer) and, therefore, Grantor (Seller) may desire to seek legal advice from independent le"l counsel. STATE OF NORTH CAROLINA WARRANTY DEED COUNTY OF NEW HANOVER KNOW ALL MEN BY THESE PRESENTS that PAUL G. BURTON, of New Hanover County, North Carolina, and BURTON STEEL COMPANY, a North Carolina Corporation, with offices located at 4101 Blue Clay Road, Castle Hayne, NC 28429, "GRANTOR;" and JANE LOVE BURTON, wife of PAUL G. BURTON, in consideration of TEN AND NO/100 ($10.00) DOLLARS and other good and valuable consideration, paid to GRANTOR by NEW HANOVER COUNTY, NORTH CAROLINA, a body politic of the State of North Carolina, "GRANTEE," the receipt of which is hereby acknowledged, by these presents, does give, grant, bargain, sell and convey unto the said GRANTEE, and GRANTEE'S successors, and assigns, forever, in fee simple, all that certain lot or parcel of land located in the County of New Hanover, State of North Carolina, and more particularly described as follows: See attached Exhibit A, incorporated herein as if set out in fu1L TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging, to the said GRANTEE and said GRANTEE's successors, and assigns, forever, in fee simple; and the GRANTOR, for itself, its successors and assigns, does covenant with the said GRANTEE and said GRANTEE's successors and assigns, that GRANTOR is seised of the premises in fee simple, and has the right to convey the same in the estate aforesaid, that title is marketable and free and clear of all encumbrances, except as herein stated, and that GRANTOR hereby will warrant and defend the title against the lawful claims of all persons whomsoever, except for the exceptions herein stated. Title to the property is subject to the following exceptions: The provisions of all applicable zoning and land use ordinances, statutes and regulations; current year ad valorem taxes; and all applicable restrictive covenants and easements of record. The designation GRANTOR and GRANTEE as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. JANE LOVE BURTON, wife of PAUL G. BURTON, signs this deed to release any and all rights she might have in the herein conveyed property by virtue of her status as the wife of PAUL G. BURTON, one of the GRANTORS. IN WITNESS WHEREOF, the GRANTOR has hereunto set his hand and seal, or if corporate, has caused this instrument to be signed in its corporate name by its duly authorized officer, this the¢ay of G (SEAL) PAUL G. BURTON, Grantor BURT=-.e Y, INC., Grantor By: Paul G. Burton, President � � � (SEAL) JANE LOVE BURTON STATE OF NORTH CAROLINA COUNTY OF NEW HANOVER I, E iAa 141W km s , a NotaryPublic, certify that the following person(s) personally appeared before me this day, and {� I have personal knowledge of the identity of the principal(s) ❑ I have seen satisfactory evidence of the principal's identity, by a current state or federal identification with the principal's photograph in the form of a A credible witness has sworn to the identity of the principal's); each acknowledging to me that he or she voluntarily signed the foregoing document for the purpose stated therein and in the capacity indicated: N i PAUL G. BURTON kndividual Date: (official4 llbt'y Puj L'NOW .. NC t"�=Zffx *MW 1 11 STATE OF NORTH CAROL( A COUNTY OF NEW HANOVER Notary Public .n—e (prim name) My commission expires: 2:,—,A0_/L L 1a 6 L k1d1 u ws . a Notary Public, certify that the following person(s) personally appeared before me this day, and 0( 1 have personal knowledge of the identity of the principal(s) ❑ I have seen satisfactory evidence of the principal's identity, by a current state or federal identification with the principal's photograph in the form of a A credible witness has sworn to the identity of the principal(s); each acknowledging to me that he or she voluntarily signed the foregoing document for the purpose stated therein and in the capacity indicated: e I Ca AUL G. BURTON President of Burton SS��Stt`ee`l Company, Inc. Qzz & � � Notary Public 1£ f/, L Je/ //.toms (print name) Co., NC J* STATE OF NORTH CAROOLIINA COUNTY OF NEW HANOVER My commission expires-,.^ 1, /iL..S , a Notary Public, certify that the following person(s) personally appeared before me this day, and 4 1 have personal knowledge of the identity of the principal(,) D I have seen satisfactory evidence of the principal's identity, by a current state or federal identification with the principal's photograph in the form of a A credible witness has sworn to the identity of the principal(s); each acknowledging to me that he or she voluntarily signed the foregoing document for the purpose stated therein and in the capacity indicated: Name I capacity WANE LOVE BURTON Individual Batg: ',29 i']i% Notary Public is v�ra l ' A(print name) Public (o al My commission expires:ZIRE// Ioverl ounty.wpd EXHIBIT "A" TRACT 1: Tax Parcel ID No: R02600-002-005-000 Owner of Record; Paul G. Burton BEGINNING at a point in the eastern right of way line of the Seaboard Coastline Railroad right of way, said point being located South 41 degrees 21 minutes East 83.11 feet from a point in the centerline of the Seaboard Coastline Railroad right of way. Said point in the center line of said Seaboard Coastline Railroad right of way being located 1939.73 feet as measured northwardly along the centerline of said Seaboard Coastline Railroad right of way from mile post #C238. Running thence from said beginning point with the eastern line of said Seaboard Coastline Railroad North 10 degrees 06 minutes East 1600.88 feet to an old pipe. Running thence South 37 degrees 04 minutes East 3,432.98 feet to a point in the western right of way line of the Blue Clay Road. Running thence with the western right of way line of the Blue Clay Road South 62 degrees 05 minutes 15 seconds West 105.24 feet to the North end of a curve to the East. Running thence with said curve to the East to a point that is located South 54 degrees 32 minutes 30 seconds West 325.11 feet from the preceding point. Running thence South 47 degrees 00 minutes West 198.99 feet to a point in the southeastern right of way line of a 60-foot roadway. Running thence with the southeastern right of way line of said 60-foot roadway, North 36 degrees 52 minutes West 1,510.39 feet to a point in the western end of said 60-foot roadway. Running thence with a ditch South 42 degrees 27 minutes West 491.28 feet to a point. Running thence North 41 degrees 21 minutes West 920.79 feet to the point of BEGINNING. Containing 58.33 acres, more or less. SUBJECT HOWEVER TO Carolina Power & Light Company right of way 100 feet in width running northeastwardly though said property. This tract is part of those parcels of land conveyed by Lua B. LeGrand (Widow) to Albert D. Cox, Jr., as recorded in Book 409, Page 559 of the New Hanover County Registry. Being the same property conveyed by Albert D. Cox, Jr. and wife, EIizabeth C. Cox to Paul G. Burton and wife, Mary Will W. Burton by Warranty Deed recorded in Book 1312 at Page 228 of the New Hanover County Registry. SAVING, RESERVING AND EXCEPTING the following tract of land conveyed to Hermitage Park Warehousing by Warranty Deed recorded in Book 2132 at Page 366, New Hanover County Registry: BEGINNING at a point in the southern Line of a 60- foot right of way easement, said point being located North 36 degrees 52 minutes West 1540.56 feet from the centerline of Blue Clay Road (SR #1318); thence as measured along said centerline South 47 degrees 00 minutes West 332.04, and North 62 degrees 05 minutes 15 seconds East 1,161.34 from its point of intersection with the Juvenile Center Road (SR 2025); running thence from said beginning point along the centerline of a ditch South 42 degrees 27 minutes West 491.28 feet to a point; thence North 41 degrees 21 minutes West 443.47 feet to the centerline of a 100-foot CP & L Power Line Right of way; thence North 41 degrees 21 minutes West 477.32 feet to a point in the eastern right of way line of CSX Railroad; thence along said eastern line North 10 degrees 06 minutes East 758.93 feet to a point; thence leaving said eastern line South 36 degrees 52 minutes East 1105.64 feet to the centerline of said CP & L 100-foot right of way; thence continuing South 36 degrees 52 minutes East 239.17 feet to the point of BEGINNING; containing 13.73 acres, more or less. SUBJECT TO a sixty (60) foot right of way described as follows: BEGINNING at an iron pipe situate N36-52 W 30.17 feet from a tack found in the centerline of Blue Clay Road, the southeasternmost corner of lands owned now or formerly, by Burton Steel, (Deed Book 1242, Page 1005, New Hanover County Registry) and the southwesternmost comer of lands owned, now or formerly, by Paid and Mary Burton (Deed Book 1312, Page 228, New Hanover County Registry); thence with the northeastern boundary line of the aforementioned lands of Burton Steel, of the aforementioned lands owned by Paul and Mary Burton (Deed Book 1161, Page 1792, New Hanover County Registry), and traversing a CP & L right of way, N36-52 W, 2,885.20, plus or minus, feet to an iron pipe found at or near the eastern right of way line of CSX Railroad, the northeasternmost corner of a 13.73 acres, more or less, tract and corner of the lands of Paul and Mary Burton; thence with the eastern right of way margin of the aforementioned CSX Railroad N-10-06 E, 60.0 plus or minus, feet to a point in the Burton Lands; thence, leaving the railroad right of way and with the northwestern line of the Burton Lands crossing the aforementioned CP & L right of way which traverses the aforesaid 13.73 acres tract, and the Burton Tract, (Deed Book 1312, Page 228) S 36-52 E, 2888, plus or minus, feet to a point in the northern right of way line of the aforementioned Blue Clay Road; thence with the northern right of way line of the aforementioned Blue Clay Road; thence with the northern right of way line of Blue Clay Road S 47-00 W 60.17, plus or minus, feet to an iron pipe, the BEGINNING. The same being the sixty (60') foot right of way shown on a map of survey for Hermitage Park Warehousing dated December 31, 1996 by Mark A. Stocks, RLS. This property is the very same property, conveyed by Paul G. Burton, and Mary Will Burton, to Paul G. Burton (Separated) by deed recorded in Book 4774 at Page 0837 of the New Hanover County Registry. MI Ta11 A Tax Parcel ID No: R02600-002-005-003 Owner of Record: Burton Steel Company, Inc. BEGINNING at a point in the eastern right of way line of the Seaboard Coastline Railroad right of way, said point being located South 79 degrees 54 minutes East 65.0 feet from a point in the center line of the Seaboard Coastline Railroad right of way. Said point in the centerline of said Seaboard Coastline Railroad right of way being located 3487.82 feet as measured northwardly along the center line of said Seaboard Coastline Railroad right of way from mile post #C238. Running thence from said beginning point South 79 degrees 54 minutes East 1458.6 feet to an old concrete monument. Running thence South 27 degrees 50 minutes 45 seconds East 2491.07 feet to a point in the western right of way line of the Blue Clay Road. Running thence with the western right of way line of the Blue Clay Road, South 62 degrees 05 minutes 15 seconds West 600.0 feet to a point. Running thence North 37 degrees 04 minutes West 3432.98 feet to the point of beginning. Containing 56.23 acres more or less. Subject however to Carolina Power & Light Company right of way, 100 feet in width running northeastwardly through said property. This tract is a portion of those tracts conveyed by Lua B. Legrand to Albert D. Cox, Jr., as recorded in Book 409, Page 559 of the New Hanover. This property is the very same property conveyed to Burton Steel Company, a North Carolina Corporation, by a deed recorded in Book 1312 at Page 231 of the New Hanover County Registry. REBECCA P. SMITH REGISTER OF DEEDS, NEW HANOVER 216 NORTH SECOND STREET WILMINGTON, NC 28401 Filed For Registration: 01/311200812:48:05 PM Book: RE 5274 Page: 257-262 Document No.: 2008004159 DEED 6 PGS $26.00 NC REAL ESTATE EXCISE TAX: $10,760.00 Recorder: SCOTT, NANCY A State of North Carolina, County of New Hanover YELLOW PROBATE SHEET IS A VITAL PART OF YOUR RECORDED DOCUMENT. PLEASE RETAIN WITH ORIGINAL DOCUMENT AND SUBMIT FOR RE-RECORDING. *2008004159* 2008004/59 Book 6196 Page 1187 BK: RB 6196 PG: 1187 -1201 2019004712 NC FEE $26.00 RECORDED: 02/21/2019 NEW HANOVER COUNTY, NC 08:35:45 AM TAMMY THEUSCH BEASLEY EXTX $0.00 REGISTER OF DEEDS BY: ANGELA ENGLISH DEPUTY ELECTRONICALLY RECORDED This instrument prepared by: Linda Miles, Consulting Attorney for Cape Fear Public Utility Authority, 235 Govemment Center Drive, Wihnington, NC 28403 Please return to: Cape Fear Public Utility Authority, 235 Government Center Drive, Wilmington, NC 28403 Revenue Stamps: $.00 Tax Parcel No. R01800-M-00i-oOo R02600-002-WS-003 R02519-001-011-000 NORTH CAROLINA EASEMENT NEW HANOVER COUNTY This DEED OF EASEMENT, made and entered into this 21St day of February, 2019, by and between NEW HANOVER COUNTY, hereinafter, whether one or more, referred to as "GRANTOR'; and CAPE FEAR PUBLIC UTILITY AUTHORITY, a body corporate and politic of the State of North Carolina created pursuant to Chapter 162A, Article 1 of the North Carolina Statutes, whose mailing address is 235 Government Center Drive, Wilmington, North Carolina 28403, its successors and assigns, hereinafter referred to as "GRANTEE'; WITNESSETH: WHEREAS, GRANTOR owns certain real property located in New Hanover County more particularly described on Exhibit A attached (the "Property"), and has agreed to convey to GRANTEE certain easements for public water and sewer utilities over portions of the Property; NOW, THEREFORE, GRANTOR, for and in consideration of the sum of One Dollar ($1.00) and other valuable consideration to it in hand paid by GRANTEE, and in consideration of the Sabmitted eleetroaicaft by Cape Fear Publk i7tility Authority - Ens in Compliance with North CaroUns statutes governing recordable documents and the terms of the submitter a4rement with the New Hanover County R 'stet of Deeds Book 6196 Page 1188 19R0821 Cape Fear Public Utility Authority Contract Number. mutual benefits inuring to the parties hereto, does hereby give, grant and convey unto GRANTEE the perpetual rights and easements as more fully described in the paragraphs below. 1. Public Utility Easement. A. GRANTEE shall have a permanent non-exclusive utility easement upon, through, in, and under the portions of the Property more specifically described as Exhibit B-1 through B-4 - New Public Utility Easement (47,562.07 SF), Exhibit C-1- New Public Utility Easement (1,267.78 SF), and Exhibit C-2 - New Public Utility Easement (12,411.72 SF), the Easement Areas. B. Purpose of Easements. The purpose of these easements is for the installation, operation, and maintenance of a system of pipelines or mains and related facilities for public utility purposes, including water and sanitary sewer (whether currently existing or later installed, collectively the "Facilities"). Said Facilities may include, without limitation, water lines, sewer lines, pipes, valves, hydrants, meters, and manholes. GRANTEE'S rights shall include the right to do all things necessary and convenient to satisfy said purposes, including without limitation constructing, laying, maintaining, inspecting, operating, protecting, repairing, changing the size of, replacing, removing or abandoningthe facilities. C. Specific Terms. Further specific terms and conditions applicable to the public utility easement are as follows: (i.) GRANTOR shad not place, construct, deposit, leave, permit to be or remain on, within or over the Easement Area, any construction materials, metals, lumber, trees, berms, water bodies, rubbish, refuse, fences, structures, buildings or other obstructions. Furthermore, GRANTOR shall not install, or permit to be installed, any utilrty lines or facilities within five (5) feet of the facilities located in the Easement Area or above or below said Facilities at any distance. Any such obstructions shall constitute an easement nuisance and shall be removed by GRANTOR, at its expense. (ii.) GRANTEE is authorized to remove from the Easement Area all structures, fences, trees, shrubs, vegetation, and other obstructions as necessary, in GRANTEE's sole 2 Book 6196 Page 1189 Cape Fear Public Utility Authority Contract Number 19R0821 discretion, to maintain, repair or protect the facilities. Notwithstanding the foregoing, GRANTOR may (11 construct, maintain, and use the Easement Area for paved rights of way, paved drives and parking areas of plain asphalt or concrete; and (2) plant and maintain shallow -rooted ground cover material within the Easement Area. For Private Street Rights -of -Way, GRANTOR may plant trees or allow trees to main within private street rights -of -way that are dedicated as Easement Area when such trees (1) are located greater than ten feet from the Facilities as measured from the center of the tree trunk to the nearest edge of the Facilities; and (2) are of a species approved in writing by GRANTEE. However, GRANTEE is authorized to remove such trees as necessary, in GRANTEE's sole discretion, to maintain, repair or protect the Facilities. GRANTEE shall not be responsible for replacing or compensating for removed trees. (iii.) GRANTOR shall retain fee simple ownership of the Property including the Easement Area; provided, however, no use may be made of the Easement Area which interferes with GRANTEE's full, reasonable use of the easements and rights described herein. (iv.) At the conclusion of any installation or maintenance of the facilities within the Easement Area, GRANTEE will regrade, mulch, and re -seed, or otherwise return the disturbed land within the Easement Areas to as near prior conditions as feasibly possible, and in compliance with municipal ordinances. Said restoration shall not include laying sod, landscaping, or driveways that are not of plain asphalt or concrete. 2. Ingress and Egress Easement. GRANTEE shall have the right of access, ingress and egress over, upon, through, and under the Easement Area. In addition thereto, GRANTEE shall have the right of access, ingress, and egress over such private roads, driveways, alleys and ways as may now or hereafter exist on the Property (collectively, the "Private Roads"), and if there are no public rights of way or Private Roads reasonably convenient to provide access to the Easement Area, then GRANTEE shall have the rights of ingress and egress over the portions of the Property adjacent to the Easement Area in such manner as shall reasonably minimize the inconvenience and damages to GRANTOR. GRANTEE will be responsible for damages to the Property outside of 3 Book 6196 - 1190 Cape Fear Public Utility Authority Contract Number: 19R0821 the Easement Area caused by GRANTEE's use of the same for ingress and egress as provided herein. 3. Temporary Construction Easement. A. GRANTEE shall have a non-exclusive temporary construction easement over and upon the portions of the Property more specifically described as a Temporary Construction Easement as depicted on that certain Map attached as EXHIBIT D 337.65 Sq. Ft. Temporary Construction Easement and 500 Sq. Ft. Temporary Construction Easement. B. Purvose of Easement. The purpose of this easement is for the installation and construction of the Facilities. GRANTEE's rights shall include the right to do all things necessary and convenient within the Temporary Construction Easement Area to install and construct the Facilities. C. Specific Terms. further specific terms and conditions applicable to the Temporary Construction Easement are as follows: (i.) GRANTOR shall retain fee simple ownership of the Property including the Temporary Construction Easement Area; provided however, no use may be made of the Temporary Construction Easement Area, which interferes with GRANTEE's full, reasonable use of the easements and rights described herein. (ii.) During the term of the Temporary Construction Easement, GRANTOR shall not place, construct, deposit, leave, permit to be or remain on, within or over the Temporary Construction Easement Area, any construction materials, metals, lumber, trees, berms, water bodies, rubbish, refuse, fences, structures, buildings orother obstructions. Any such obstructions shall constitute an easement nuisance and shall be removed by GRANTOR, at its expense. (III.) At the conclusion of the construction of the Facilities, GRANTEE will regrade, mulch, and re -seed, or otherwise return the disturbed land within the Temporary Construction Easement Area to as near prior conditions as feasibly possible. Said restoration shall not include laying sod, landscaping or non-standard driveways (exposed aggregate, etc.). 4 Book 6196 Page 1191 Cape Fear Public Utility Authority Contract Number: 19RO821 D. The term of the Temporary Construction Easement herein granted shall commence as of the date the GRANTEE issues the written notice to proceed to the awarded Contractor for the Installation of the proposed sewer line, which is part of the Northern Water Main Project and continue thereafter until said project is completed but not to exceed 365 days, at which time the Temporary Construction Easement shall terminate. 4 Indemnity. (a) To the extent permitted'by law, GRANTOR agrees to indemnify and hold harmless GRANTEE, and its independent contractors, agents, employees, successors and assigns from and against any and all claims, demands, causes of action, or other liability, including attorneys' fees, on account of damage resulting from the negligence of all GRANTOR, GRANTOR'S agents, employees, and subcontractors in connection with the installation of the Existing Facilities (b.) GRANTEE agrees to indemnify and hold harmless GRANTOR, and its independent contractors, agents, employees, successors and assigns from and against any and all claims, demands, causes of action, or other liability, including attomeys' fees, on account of property damage resulting from the negligence of all GRANTEE, GRANTEE's agents, employees and subcontractors in connection with the Existing Facilities. 5. Covenants by Grantor. GRANTOR, for itself, its heirs, executors, administrators and assigns, does covenant with GRANTEE, its successors and assigns, that it is the owner in fee simple of the Property on Exhibit A; that it has good right to grant and convey the easements and rights described herein and the easements shown on the attached plats; that said Property is free and clear from all restrictions, easements or encumbrances, except for encumbrances of record as of the date of this Deed of Easement which do not affect the easements granted herein to GRANTEE and the lien of local property taxes; and that it shall, and its heirs, executors, administrators and assigns shall, warrant and defend the title to said easements and rights against the lawful claims and demands of any and all persons whomsoever. GRANTOR further covenants that the individuals executing this document on behalf of GRANTOR have all necessary and appropriate authority to bind GRANTOR to the obligations and conveyances granted herein, and, in the event 5 Book 6196 Page 1192 19RO821 Cape Fear Public Utility Authority Cartract Number: that GRANTOR is a corporation or similar entity, that the execution of this document has been authorized by all appropriate and necessary corporate action. TO HAVE AND TO HOLD the rights and easements hereby granted to GRANTEE and its successors in title forever; it being agreed that the rights and easements hereby granted are appurtenant to and runs with the Property now owned by GRANTOR. IN TESTIMONY WHEREOF, the GRANTOR has hereunto set its hand and seal, the day and year first above written. (SEAL) �( ATTEST: CI rk to the Bo6fd • GRANTO N NOV OUNTY C (SEAL) Timothy C. rges�AssisCounty Manager Approved as to form: .i Kemp Burpe4b, Deputy County Attorney �j Book 6196 Page 1193 Cape Fear Public Utility Authority Contract Number..19RO821 STATE OF NORTH CAROUNA COUNTY OF NEW HANOVER cDi, a Notary Public of the State and County aforesaid, certify that Kymberleigh G. Crowel acknowledged that she is Clerkto the Board of Commissioners of New Hanover County, and that by authority duly given and as the act of the Board, the foregoing instrument was signed in Its name by its Assistant County Manager, sealed with its corporate seal and attested by herself as Clerk. WITNESS my hand and official seal, this 2Q% day of February, 2019. 1201, � Date: Signprure of Notary P Nc -a. (Official Seal) Notary's printed or typ d name My commission expires: l I GWO ICanpous Notary Public New Hanow r C o , NC Com �prM Notary seal or stamp must appear within this box. F] Book 6196 Page 1194 19R0821 Cape Fear Public Utility Authority Contract Number: EXHIBIT A PROPERTY That certain tractor parcel of land located in New Hanover County more particularly described as follows: R01800-007-001-000 — Being all of Hermitage Land — Juvenile Center Road area as described in Deed Book 459 Page 599 and recorded at the New Hanover County Registry. R02600-002-005-003 — Being all of Tract 2 as described in Deed Book 5274 Page 257 and recorded at the New Hanover County Registry. R02519-001-011-000 — Being all Lots 3,4 and 5 and part of Tract 2 — J. G. Seitter land as described in Deed Book 1639 Page 517 and recorded at the New Hanover County Registry. 8 ATTACHMENT H - COPY OF APPROVED PERMITS ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Envlromnental Quality April 4, 2022 LETTER OF APPROVAL WITH MODIFICATIONS AND PERFORMANCE RESERVATIONS New Hanover County ATTN: Kevin Caison 230 Government Center Drive, Suite 190 Wilmington, NC 28403 RE: Project Name: Blue Clay Road Business Park Acres Approved: 37.58 Project ID: NEWHA-2022-016 County: New Hanover City: Castle Hayne Address: Blue Clay Road River Basin: Cape Fear Stream Classification: Other Submitted By: Richard A. Moore, PE, McKim & Creed, Inc. Date Received by LQS: March 9, 2022, March 24, 2022 and March 25, 2022 Plan Type: Industrial Dear Mr. Caison: This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications and Performance Reservations. A list of the modifications and reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed atdeq.nc.gov/NCG0l. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. ^_ North Carolina Department of Environmental Quality i Division of Energy, Mtneral and Land Resources Wilmington Regional Office , 127 Cardinal Drive Extension i Wiimtngton, North Carolina 28405 Ahhi ..&@Qt4a d���.�. ore 910.796.7215 Letter of Approval with Modifications and Performance Reservations New Hanover County April 4, 2022 Page 2 of 5 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land - disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Rhonda Hall Assistant Regional Engineer Land Quality Section Enclosures: Modifications Required for Approval NPDES NCGO1 Fact Sheet cc: Richard A. Moore, PE, McKim & Creed, Inc. 243 North Front Street, Wilmington, NC 28401 Wilmington Regional Office file Letter of Approval with Modifications and Performance Reservations New Hanover County April 4, 2022 Page 3 of 5 MODIFICATIONS AND PERFORMANCE RESERVATIONS Project Name: Blue Clay Road Business Park Project ID: NEWHA-2022-016 County: New Hanover 1. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. 2. The developer is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site (NCGS I I3A-57(3)). Each sediment storage device must be inspected after each storm event (NCGS 113A-54.1(e)). Maintenance and/or clean out is necessary anytime the device is at 50% capacity. All sediment storage measures will remain on site and functional until all grading and final landscaping of the project is complete (15A NCAC 04B .0113). 3. Any and all existing ditches on this project site are assumed to be left undisturbed by the proposed development unless otherwise noted. The removal of vegetation within any existing ditch or channel is prohibited unless the ditch or channel is to be regarded with side slopes of 2 horizontal to 1 vertical or less steep (15A NCAC 04B .0124 (d)). Bank slopes may be mowed, but stripping of vegetation is considered new earth work and is subject to the same erosion control requirements as new ditches (NCGS 113A- 52(6)). 4. The developer is responsible for obtaining any and all permits and approvals necessary for the development of this project prior to the commencement of this land disturbing activity. This could include our agency's Stormwater regulations and the Division of Water Resources' enforcement requirements within Section 401 of the Clean Water Act, the U.S. Army Corps of Engineers' jurisdiction of Section 404 of the Clean Water Act, the Division of Coastal Management's CAMA requirements, the Division of Solid Waste Management's landfill regulations, the Environmental Protection Agency and/or The U.S. Army Corps of Engineers jurisdiction of the Clean Water Act, local County or Municipalities' ordinances, or others that may be required. This approval cannot supersede any other permit or approval; however, in the case of a Cease and Desist Order from the Corps of Engineers, that Order would only apply to wetland areas. All highland would still have to be in compliance with the N.C. Sedimentation Pollution Control Act. 5. If any area on site falls within the jurisdiction of Section 401 or 404 of the Clean Water Act, the developer is responsible for compliance with the requirements of the Division of Water Resources (DWR), the Corps of Engineers and the Environmental Protection Agency (EPA) respectively. Any erosion control measures that fall within jurisdictional wetland areas must be approved by the aforementioned agencies prior to installation. The Land Quality Section must be notified of a relocation of the measures in question to the transition point between the wetlands and the uplands to assure that the migration of sediment will not occur. If that relocation presents a problem or contradicts any requirements of either DWR, the Corps, or the EPA, it is the responsibility of the developer to inform the Land Quality Section regional office so that an adequate contingency plan can be made to assure sufficient erosion control remains on site. Failure to do so will be considered a violation of this approval (NCGS I I3A-54.I (b)). Letter of Approval with Modifications and Performance Reservations New Hanover County April 4, 2022 Page 4 of 5 6. Any borrow material brought onto this site must be from a legally operated mine or other approved source. Any soil waste that leaves this site can be transported to a permitted mine or separately permitted construction sites without additional permits under NCGS 74-49(7)(d). Disposal at any other location would have to be included as a permit revision for this approval. 7. This permit allows for a land disturbance, as called for on the application plan, not to exceed 37.58 acres. Exceeding that acreage will be a violation of this permit and would require a revised plan and additional application fee. Any addition in impervious surface, over that already noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion control measures and stormwater retention measures (NCGS I I 3A-54.1 (b)). 8. The construction of future buildings and parking lots associated with this site will require that a revised plan be submitted to this office. 9. The construction detail for the proposed silt fence requires reinforcing wire and steel posts a maximum of eight (8) feet apart. Omission of the reinforcing wire is a construction change that necessitates more posts for support, i.e., the spacing distance needs to be reduced to no greater than six (6) feet apart (E&SC Planning & Design Manual 6.63, Rev. 6/06). 10. Because the sediment traps and basins are shown on the plan as the primary sedimentation and erosion control devices on this project, it is necessary that the traps and basins and their collection systems be installed before any other grading takes place on site, and that every structure that receives more than one acre of drainage is built so that each dewaters only from the surface (NCGO10000). If that proves to be impractical, a revised plan must be submitted and approved that addresses erosion and sediment control needs during the interim period until the traps and basins are fully functioning (113A-54.1(b)). 11. A graveled construction entrance must be located at each point of access and egress available to construction vehicles during the grading and construction phases of this project. Access and egress from the project site at a point without a graveled entrance will be considered a violation of this approval. Routine maintenance of the entrances is critical (113A-54.1(b)). 12. As a condition of the NPDES General Stormwater Permit (NCGO10000), the financially responsible party shall comply with the NCG01 Ground Stabilization And Materials Handling requirements that became effective April 1, 2019. The NCGO1 Ground Stabilization And Materials Handling standard detail can be printed from the deq.nc.gov/NCGO1 website. 13. As a condition of the NPDES General Stormwater Permit (NCGO10000), the financially responsible party shall comply with the NCGO1 Self -Inspection, Recordkeeping and Reporting requirements that became effective April 1, 2019. The NCGO1 Self -Inspection, Recordkeeping and Reporting standard detail can be printed from the deq.nc.gov/NCGO 1 website. 14. As a part of routine monitoring of the approved land -disturbing activity, the financially responsible party shall assure inspections of the area covered by the approved plan after each phase of the plan has been completed and after establishment of temporary ground cover in accordance with North Carolina General Statute 113A-54.1(e). Letter of Approval with Modifications and Performance Reservations New Hanover County April 4, 2022 Page 5 of 5 15. In order to comply with the basic control objectives of the SPCA (15A NCAC 04B .0106), both exposed area and time of exposure should be limited. We recommend this project be phased so that uncovered area is limited to a maximum of 20 acres at any given time. As per North Carolina General Statute 113A-57(5), the land -disturbing activity shall be conducted in accordance with the approved erosion and sedimentation control plan. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2019-00891 County: New Hanover U.S.G.S. Quad: NC- Castle Hayne NOTIFICATION OF JURISDICTIONAL DETERNIINATION Requester: Wilmineton Business Development Agent: Timmons Group PO Box 1698 Christopher Inscore Wilmintton, NC 28402 5410 Trinity Group Suite 102 Raleieh, NC 27607 Size (acres) 120 Nearest Town Castle Havne Nearest Waterway Prince Georee Creek River Basin Cape Fear USGS HUC 03030007 Coordinates Latitude: 34317047 Longitude:-77.894888 Location description: Project area is located northwest of the intersection of Juvenile Center Road and Blue Clay Road m Castle Havne, New Hanover County, North Carolina. Project area is composed of farm fielft forested areas, and a commercial business located south of the Juvenile Detention Center. E Indicate Which of the Followine Avyly: MAY 2 S � A. Preliminary Determination P ® There appear to be waters on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. The approximate boundaries of these waters are shown on the enclosed delineation map dated 8/10/2018. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. ❑ There appear to be waters on the above described project areatproperty, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters have not been properly delineated, this preliminaryjurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHA jurisdiction over all of the waters at the project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination ❑ There are Navigable Waters of the United States within the above described project area/property subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are waterson the above described project area/property subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ We recommend you have the waters on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. SAW-2019-00891 ❑ The waters on your project area/property have been delineated and the delineation has been verified by the Corps. The approximate boundaries of these waters are shown on the enclosed delineation map dated DATE. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. ❑ The waters have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below onDATE. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are no waters of the U.S., to include wetlands, present on the above described project area/property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ® The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in in Wilmington, NC, at (910) 796-7215 to determine their requirements. Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters of the United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Rachel Capito at (910)-251-4487 or Rachel.A.Capitonusace.army.mil. C. Basis For Determination: Basis For Determination: See the preliminary jurisdictional determination form dated 5/31/2019. D. Remarks: None. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by Not applicable. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** CAPITO.RACHEL.ANN.153627 Digitally signed by CAPFOAACHELANN.1536276790 Corps Regulatory Official: 6790 Dam 2019.05.3116:06AO-"00' Date of JD: 5/31/2019 Expiration Date of JD:Not applicable Applicant: Wilmington Business Develo went File Number: SAW-2019-00891 Date: 5/31/2019 Attached is: See Section below ❑ INITIAL PROFFERED PERMIT Standard Permit or Letter ofpermission) A PROFFERED PERMIT Standard Permit or Letter ofpermission) B ❑ PERMIT DENIAL C ❑ APPROVED JURISDICTIONAL DETERMINATION D E ® PRELIMINARY JURISDICTIONAL DETERMINATION -vewyfm your ngtM; am options regarding an a€3ministrative appeal of the above decision. - ditional' may he found at nsViviIVa'orks Reguiator�Pro =ramandPerm its.as Vx A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a. Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terns and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be .received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION 11 - RFOi335T. e a E .aF.OBACTIONS TO AN REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. r u have questions regarding this decision and/or the If you only have questions regarding the appeal process you may al process you may contact:also contact: rict Engineer, Wilmington Regulatory Division Mr. Jason Steele, Administrative Appeal Review Officer : Rachel Capito CESAD-PDO mington Regulatory Office U.S. Army Corps of Engineers, South Atlantic Division U.S Army Corps of Engineers 60 Forsyth Street, Room 1OM15 69 Darlington Avenue Atlanta, Georgia 30303-8801 Wilmington, North Carolina 28403 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the oppoKqp to participate in all site investi ations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Rachel Capito, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: 5/31/2019 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Wilmington Business Development, PO Box 1698, Wilmington, NC 28402 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, Blue Clay Road, SAW-2019-00891 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: Project area is located northwest of the intersection of Juvenile Center Road and Blue Clay Road in Castle Hayne, New Hanover County, North Carolina Project area is composed of farm fields, forested areas, and a commercial business located south of the Juvenile Detention Center. (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County: New Hanover City: Castle Hayne Center coordinates of site (lat/long in degree decimal format): Latitude: 34.317047 Longitude:-77.894888 Universal Transverse Mercator: Name of nearest waterbody: Prince George Creek E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ❑ Office (Desk) Determination. Date: ® Field Determination. Date(s): December 19, 2019 TABLE OF AQUATIC RESOURCES INREVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION. Estimated amount Geographic authority to FSfteNumber Latitude (decimal Longitude of aquatic resources rYPe of aquatic resources (i.e., which the aquatic resource degrees) (decimal degrees) in review area wetland vs. non - may be' subject (i.e., (acreage and linear Section 404 or Section - wetland waters) _ 10/�) Wetland A 34.3199 -77.8928 8.14 acres Wetland Section 404 Wetland B 34.318844 -77.891836 0.003 acres Wetland Section 404 Wetland C 34.323637 -77.899402 4.3 acres Wetland Section 404 Stream D 34.319175 -77.896042 2,243 linear feet Non -wetland Section 404 waters Stream E 34.3183 -77.893 732 linear feet Non -wetland Section 404 waters Latitude (decimal Longitude Estimated amount of aquatic resources in Type of aquatic resources (i.e., Geographic authority to which the aquatic resource be" subject (i.e., Site Number degrees} tdecimal degrees) review area wetmay land vs non- (acreage and linear Section 404 or Section ` feet, if applicable wetland waters) 10/404) Non -wetland RPW F 34.319644 -77.89475 0.06 acre waters Section 404 Non -wetland RPW G 34.320101 -77.895973 0.05 acre waters Section 404 Non -wetland RPW H 34.320234 -77.897681 0.07 acre waters Section 404 Non -wetland RPW 1 34.319796 -77.898507 0.07 acre waters Section 404 Non -wetland RPW J 34.320255 -77.900041 0.09 acre waters Section 404 1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre - construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: ® Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map: ® Data sheets prepared/submitted by or on behalf of the PJD requestor. ® Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ❑ USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. ❑ U.S. Geological Survey map(s). Cite scale & quad name: ❑ Natural Resources Conservation Service Soil Survey. Citation: ❑ National wetlands inventory map(s). Cite name: ❑ State/local wetland inventory map(s): ❑ FEMANIRM maps: ❑ 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929) (� Photographs: ®Aerial (Name & Date): or ❑Other (Name & Date): ❑ Previous determination(s). File no. and date of response letter:_ ❑ Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinations. CAPITO.RACHEL Dotalymg-by CAMOAACNEEANNA SW276M ANN.1536276790' 20-31la0-0— Signature and date of Regulatory Staff member completing PJD Signature and date of person requesting PJD (Required unless obtaining signature is impracticable)1 i Districts may establish timframes for requester to return signed PJD forms. If the requestor does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. L Q V SR � p ® � is, B � $ �� e7 lb 4 dAl ffi 63 0.7 �� G 8Q v m E a � O 0 vN u c O � a v � m 0 La v v v a v r v v v a v r c 3 o u a � v o a a a u a N m 0 a c m w E 3 `a v a Y ✓ Y Y Y a u 3 0 0 0 3 3 3 3 3 V C C C C c � m C c m W ' u; U a v v 3 3 3 3 3 3 3 7 O 3 3 3 C C a a c a c o IO C c C c a c c c o > u a a a 3 a LL O ' N W � m a C r u o m o w I m c u m u w Q o c^ m N �o ui n r� o I `y 00 a rai m n o o 0 0 0 0 0 0 0 o u ci u G 'm_ o o a E a a m E w a Lni A m m yr o m m `n n m m m o v o •m m m a m 1-4m m m w o m m m ao m n m m m m 5 a m m v v n in n n Qr o o A m m m" Ln Ln o o m m w m m m m w l0 n w m m o o N o m m N o N m m m IV m li K? ri m N m N m m m N m v m v m v m v m v m v m v m v m v m v m `m E z Z a in a h Z Zaa b v w c = m rnu o a =O ry oS,po J O� W N V � Q r'4 M d Ln EL Z Q Z u Q vvMCKIM&CREED DELIVERED TO: NCDEMLR 127 Cardinal Drive Extension Wilmington, NC 28405 ATTENTION: Jessica Edmonds WE ARE SENDING: ❑ Originals ® Prints LETTER OF TRH,. DATE: May 25, 2022 PROJECT NO: 00494-0039 TASK NO: 40 RE: Blue Clay Road Business Park Express Stormwater Submittal TRANSMITTAL NO: 1 of 1 PAGE 1 OF 1 n Shop Drawings n Samples ❑ Specifications ❑ Calculations ❑ Other - Quantity Drawing No. Rev. Description Status EXPRESS STORMWATER SUBMITTAL 1 Comment Response Letter G 1 Revised SWU101 G 1 Revised Supplement EZ G 1 Revised O&M G 1 Revised Narrative G 1 Revised SCM Calcs G 2 1 Revised Plan Sheets Issue Status Code: A. Preliminary B. Fabrication Only C. For Information D. Bid E. Construction F. For Review & Comments G. For Approval H. See Remarks Action Status Code: 1. No Exceptions Taken 2. Make Corrections Noted 3.Other 4. Amend & Resubmit 5. Rejected - See Remarks REMARKS: 243 NORTH FRONT STREET, WILMINGTON, NC 28401 (910) 343-1048 FAX (910) 251-8282 cc: File, McKim & Creed, w/enc McKIM & CREED, Inc. Signed latt, �Richard A. Moore, PE Regional Manager v MCKIM&CREED E1JGI�JEERS SURVEYORS P L A N 14 E R S May 25, 2022 M&C 07401-0001 (40) Ms. Jessica Edmonds, EI, Environmental Engineer NCDEQ-DEMLR 127 Cardinal Drive Extension Wilmington, NC 28405 RE: Blue Clay Road Business Park Express Stormwater Submittal New Hanover County Ms. Edmonds: This is in response to the comments/notes that we discussed during the express stormwater submittal meeting for Blue Clay Road Business Park yesterday. Please find my nedotes that required revisions and some further discussion below: • Add top of bank lines - Top of bank lines have been added to the existing conditions and grading plan sheets. • Metes and bounds of the project boundary - Metes and bounds of the stormwater project boundary have been added. These are on the existing conditions sheet. • Add a spot grade in the forebay near the pipe entrances on the pond detail sheet to show the depression per the detail - Since the depression is 1' lower than the rest of the forebay, a contour was added to illustrate the depression to match the pond cross section. • Review swale discharges into the ponds to ensure non -erosive - swale velocities were confirmed to be non -erosive. All velocities are less than 243 N(c Yth Front Strect 2.5 FPS. • Add a detail for wetland planting rather than a note - a wetland planting W i l m i n J l V n, NC 28401 detail was added to the pond detail sheets; the note re: plantings was removed. • Get Kevin to sign the SWU101 and O&M and provide signatory authority 9 10 3 4 3. 10 4 8 documentation - Revised SWU101 and O&M is provided with Kevin's Fox 910.251 8282 www.mckinicreed.com 12 signature. A letter from the County Manager giving signatory authority to Kevin is attached. • Explain/justify the untreated BUA in narrative - This has been added to the revised narrative. • SCM2 - orifice note - cap and drill 3.5" or show 4" works in supplement form - A note has been added to the plans. • Supplement #48 - all should be answered "yes" - Revised Supplement EZ is enclosed. • Forebays - ensure the elevations are the same for them or provide additional detail - Forebays 1 and 2 in each SCM have the same bottom elevation. • Calcs - Stage/Storage for each forebay - Revised SCM calcs are enclosed showing stage/storage of Forebays 1 and 2 in each pond. • Calcs - Forebays - need to show both forebays for each SCM to ensure each one is sized for their contributing DA - Revised SCM calcs are enclosed showing sizing of Forebays 1 and 2 in each pond with their contributing drainage areas considered. If you have any questions, please do not hesitate to contact me at our office 910- 343-1048. Sincerely, McKIM & CREED, INC. Richard A. Moore, PE Regional Manager AW MCKIM&CREED J�MCKIM&CREED 444� DELIVERED TO: NCDEQ — Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 ATTENTION: Jessica Edmonds WE ARE SENDING: M Originals N Prints LETTER OF TRANSMITTAL DATE: May 20, 2022 PROJECT NO: 00494-0039 TASK NO: 19 RE: Blue Clay Road Business Park Express Stormwater Submittal TRANSMITTAL NO: 1 of 1 -T PAGE 1 OF 1 n Shot) Drawings n Samples ❑ Specifications ® Calculations ® Other — Check Quantity Drawing No. Rev. Description Status EXPRESS STORMWATER SUBMITTAL 2 SWU-101, Supplements and Calculations (Original & 1 Copy) G 2 Narrative and Supporting Documentation G 2 Blue Clay Road Business Park Permit Drawings G 2 Drainage Area Map 1 Express Fee Check for $4,000 1 CD Containing PDF of Submittal Package Issue Status Code: Action Status Code REMARKS: A. Preliminary B. Fabrication Only C. For Information D. Bid E. Construction F. For Review & Comments G. For Approval H. See Remarks 1. No Exceptions Taken 2. Make Corrections Noted 3.Other 4. Amend & Resubmit 5. Rejected - See Remarks 243 NORTH FRONT STREET, WILMINGTON, NC 28401(910) 343-1048 FAX (910) 251-8282 cc: File, McKim & Creed, Inc. w/enc McKIM &CREED, Inc. ECEIVE o MAY 2 0 2022 `+ Signed yap Spik r Senior Designer Norris, Kellie E From: Perry, John M Sent: Monday, March 14, 2022 3:47 PM To: Norris, Kellie E Subject: RE: Blue Clay Road Business Park Express Request Hello Kellie, After reviewing the topography, historical images and the JD from the Corps, the features labeled F-J are not determined to be jurisdictional streams. These features appear to be ditches that were cut to help drain the fields. They do not have crenulations, and are too straight to be considered streams. I agree with Rick that they do not require the vegetative setbacks but any impacts would require permitting. John Perry Environmental Specialist II Divison of Water Resources Department of Environmental Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Office: (910) 796-7341 Cell: (910) 617-9577 From: Norris, Kellie E Sent: Monday, March 14, 2022 12:17 PM To: Snider, Holley <holley.snider@ncdenr.gov>; Perry, John M <John.Perry@ncdenr.gov> Subject: FW: Blue Clay Road Business Park Express Request John & Holley, Hope you all are well. Below is an email I sent March 11 to Holley. Holley have you had a chance to look at this? If not, John could you help? I appreciate your assistance! Thank you, KtUi,, &6-, No-rri y, EIT Environmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone: 910.796.7345 EQD ,"Nothing Compares E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Norris, Kellie E Sent: Tuesday, March 1, 2022 9:09 AM To: Snider, Holley <holley.snider@ncdenr.gov> Cc: Hall, Christine <Christine.Hal I@ncdenr.gov>; Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: Blue Clay Road Business Park Express Request Good Morning Holley - Hope you are doing well. Attached is the JD for Blue Clay Business Park, an in house Express Request that is currently being reviewed. I have attached the Express Request and current JD. Also, below is the email chain where you can find Rick Moore's (the engineering consultant for this project) reasoning for the features F-J not being streams and therefore not requiring setbacks. Can you please confirm that only D & E are streams that would need vegetative setbacks and not RPW's F-J? Please let me know if you would like to talk about this project if that would be helpful. Thank you- Ke,U�i,� 3efk, Norris% EIT Environmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone: 910.796.7345 A' E 100� F rtma+i, ct I ... C�ver1 -- lothi-g E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Hall, Christine <Christine.Hall@ncdenr.eov> Sent: Monday, February 28, 2022 4:40 PM To: Norris, Kellie E <kellie.norris@ncdenr.gov> Subject: RE: [External] RE: Blue Clay Road Business Park Express Request Kellie, You had replied all. I have removed everyone else from this email. I would share his reasoning with DWR and see if they are aware of the site and concur with his conclusions. Christine Hall, PE Wilmington Regional Stormwater Program Supervisor Division of Energy, Mineral and Land Resources — State Stormwater Program North Carolina Department of Environmental Quality Office: 910 796 7215 Direct: 910 796 7339 Email: chdstine.hall(&-ncdenr.Qov Address: 127 Cardinal Drive Ext. Vlmington, NC 28405 Email correspondence to and from this address is subject to the Nort." Carolina Public Records Laiv and may be disclosed to third padres. From: Norris, Kellie E Sent: Monday, February 28, 2022 3:24 PM To: Richard (Rick) A. Moore <RAMoore@mckimcreed.com>; Coudriet, Chris <CCoudriet@nhcsov.com> Cc: Hall, Christine <Christine.HaII@ncdenr.eov>; Weaver, Cameron <cameron.weaver@ncdenr.eov> Subject: RE: [External] RE: Blue Clay Road Business Park Express Request Christine- On page 5/6 of the JD is does call out D and E to be streams and the rest as RPW's, so I am thinking that his reasoning is ok. Let me know your thoughts. FYI, he does say E-! for RPW's, but that looks like a typo. Thanks - KB From: Richard (Rick) A. Moore <RAMoore@mckimcreed.com> Sent: Thursday, February 24, 202210:33 PM To: Norris, Kellie E <ke!lie.norris@ncdenr.gov>; Coudriet, Chris <CCoudriet@nhcsov.com> Cc: Hall, Christine <Christine.Hall@ncdenr.eov>; Weaver, Cameron <cameron.weaver@ncdenr.eov> Subject: [External] RE: Blue Clay Road Business Park Express Request rAui i©N.- External email. Do not click finks or open attachments unless you verify. Send all suspicious email as an attachment to Report-.�Aam. Kellie- In regards to your first bullet, Sites D and E were labelled as perennial streams; sites E-J were identified as RPW's. Our wetland consultant indicated that in her experience, DWR only applies the setbacks to perennial waterbodies, perennial streams and intermittent streams - which is also how I read 15A NCAC 02H .1019 (6)(b). In her opinion the fact that these were called RPW's (and not streams) indicates that the firm that did the original delineation and the USACE agreed they weren't streams (lacking the geomorphology to be designated streams). Therefore only Sites D and E were provided with the 50' vegetated setback. Sites E-J are still jurisdictional and any impacts to them will be permitted. In regards to your second bullet, we will provide the appropriate calculations for the forebay sizing based upon the percentage of the SCM's total drainage basin each forebay receives. Hopefully this answers your questions. Thanks, Rick From: Norris, Kellie E <kellie. norris@ncdenr.gov> Sent: Thursday, February 24, 2022 10:39 AM To: Richard (Rick) A. Moore <RAMoore@mckimcreed.com>; Coudriet, Chris <CCoudriet@nhceov.com> Cc: Hall, Christine <Christine.Hall@ncdenr.gov>; Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: Blue Clay Road Business Park Express Request All - Thank you for the express request for the Blue Clay Road Business Park. Before this project can be scheduled, please address the following: The Express Request packet includes a Jurisdictional Determination that identifies specifically RPWs D, E, F, G, H, I, and J as non -wetland waters. It is unclear why only RPWs D and E include a 50' vegetated setback, while F, G,H, I, and J do not. Please remember that all intermittent and perennial surface waters are required to have a 50' vegetated setback as determined by DWR. Please confirm how these have been determined to (or to not) have the required 50' vegetated setback. On the site plan, it appears that some of the ponds have multiple forebays. Please confirm that at the express meeting calculations will be provided demonstrating that the forebays have been sized appropriately for their respective contributing drainage areas. Attached is an exhibit I send to everyone that has multiple forebays proposed to refer to if further information is needed. It is from the old BMP Manual. In order for this project to remain in line based on the date the express request was originally received, this requested information must be submitted within 5 business days. Thank you- K&U,ie, 133efi-, Norris,, EIT Environmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone: 910.796.7345 3 N"_ rai oIEiikp00'�O E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Disclaimer This e-mail and any files transmitted with it are confid,:!ntial and intended solely for the use o` the individual or entity to whom they are addressed. If you have received this e-mail in error please notify the system manager. Please note that any views or opinions presented in this e-mail are solely those of the author and do not necessarily represent those of the company. Finally, the recipient_ should check this e-mail and any attachments for the presence of viruses. The company accepts no liability for any damage caused by any virus transmitted by this e-mail. Norris, Kellie E From: Richard (Rick) A. Moore <RAMoore@mckimcreed.com> Sent: Monday, February 28, 2022 10:59 AM To: Norris, Kellie E Subject: [External] RE: Blue Clay Road Business Park Express Request CALMON: Externai email!, Leo not tlikk U,,nks oro'Wn ;,ttodiments unlessyrAl *•e6k Send cL susrtloc ,, �mviras an attachment o Rggaq5p Kellie- Just checking to make sure this was received and is acceptable. If we need any further discussion I want to make sure we do it in our 5-day window. Thanks, Rick From: Richard (Rick) A. Moore Sent: Thursday, February 24, 2022 10:33 PM To: Norris, Kellie E <kellie.norris@ncdenr.gov>; Coudriet, Chris <CCoudriet@nhcgov.com> Cc: Hall, Christine <Christine. Hall@ ncdenr.gov>; Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: RE: Blue Clay Road Business Park Express Request Kellie- In regards to your first bullet, Sites D and E were labelled as perennial streams; sites E-J were identified as RPW's. Our wetland consultant indicated that in her experience, DWR only applies the setbacks to perennial waterbodies, perennial streams and intermittent streams - which is also how I read 15A NCAC 02H .1019 (6)(b). In her opinion the fact that these were called RPW's (and not streams) indicates that the firm that did the original delineation and the USACE agreed they weren't streams (lacking the geomorphology to be designated streams). Therefore only Sites D and E were provided with the 50' vegetated setback. Sites E-J are still jurisdictional and any impacts to them will be permitted. In regards to your second bullet, we will provide the appropriate calculations for the forebay sizing based upon the percentage of the SCM's total drainage basin each forebay receives. Hopefully this answers your questions. Thanks, Rick From: Norris, Kellie E <kellie. norris@ncdenr.gov> Sent: Thursday, February 24, 2022 10:39 AM To: Richard (Rick) A. Moore <RAMoore@mckimcreed.com>; Coudriet, Chris <CCoudriet@nhceov.corn> Blue C!ay Load Business Park Express Request Norris, Kellie E <kellie.norris@ncdenr.gov> Thu 2; 24/2022 10:39 AM To: Richard (Rick) A. Moore <RAMoore@mckimcreed.com>; Coudriet, Chris <CCoudriet@nhcgov.com> Cc: Hall, Christine <Christine.Hall@ncdenr.gov>; Weaver, Cameron <cameron.weaver@ncdenr.gov> All - Thank you for the express request for the Blue Clay Road Business Park. Before this project can be scheduled, please address the following: The Express Request packet includes a Jurisdictional Determination that identifies specifically RPWs D, E, F, G, H, 1, and J as non -wetland waters. It is unclear why only RPWs D and E include a 50' vegetated setback, while F, G,H, I, and J do not. Please remember that all intermittent and perennial surface waters are required to have a 50' vegetated setback as determined by DWR. Please confirm how these have been determined to (or to not) have the required 50' vegetated setback. On the site plan, it appears that some of the ponds have multiple forebays. Please confirm that at the express meeting calculations will be provided demonstrating that the forebays have been sized appropriately for their respective contributing drainage areas. Attached is an exhibit I send to everyone that has multiple forebays proposed to refer to if further information is needed. It is from the old BMP Manual. In order for this project to remain in line based on the date the express request was originally received, this requested information must be submitted within 5 business days. Thank you- KeU,iz Betty No-rri s, EIT Environmental Engineer 01C Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone: 910.796.7345 D�Q� P-mail correspondence to and; �•om this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. For DEQ Us7- Request I�vlewer. North Carolina Department of Environmental Quality Review 61 a�`��� for Express Permit Review Time: 10 • C*'V%rW" Confirm: RLL-IN all the information below and CHECK the Permit(s) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative, site plan (PDF rile) and vicinity man (same items expected in the application ap cka_ae of the project location. Please include this form in the application package. • Asheville Region Alison Davidson 828-296.4698;alison.davidsoroncdenr.00v • Fayetteville and Raleigh Regions -David Lee 919-791-4204; david.leefncdenr oov • Mooresville and Winston-Salem Regions -Paul Williams 336-776-9631; paul.e.wiO(amsOncdenr pop • Washington Region -Lyn Hardison 252-948-3842 or Ivn.hard1son0ncdenr oov ■ Wilmington Region -Cameron Weaver 910-796-7265 or cameron.weaver®ncdenrpov NOTE: Project application received after 12 noon will be stamped in the following work day. Project Name: 21 . 7' Ci AY R^1^R o!^iP E __APK County: NEW HANOVER Applicant: KEVIN CAISON Company: COUNTY OF NEW HANOVER Address: 230 GOVERNMENT CENTER DRIVE, STE 195 City: WILMINGTON, State: NC Zip: 28403- related to this Project SW _ SW — SW _ NPDES NPDES V.,Q _ WQ _ E&S _ E&S _ Other Phone: 910-798-7184, Fax: 910-798-7277, Email: ccoudriet@nhcqov.com I I Physical Location:2.0 MILES NORTHEAST OF THE INTERSECTION OF N. KERR AVENUE (SR 1322) AND BLUE CLAY ROAD (SR 1318) Project Drains into PRINCE GEORGE CREEK waters — Water classification C:SW (DWR Surface Water Classifications Map) Project Located in NORTH EAST CAPE FEAR River Basin. Is project draining to class ORW waters? N within % mile and draining to class SA waters Li or within 1 mile and draining to class HQW waters? N Engineer/Consultant: RICHARD MOORE, PE Company: MCKIM & CREED. INC Address: 243 N. FRONT STREET City: WILMINGTON. State: NC Zip: 28401-_ E C E I V Phone: 910-343-1048. Fax: 910-251-8282, Email: ramoore5rr ckimcreed.com PLEASE PROVIDE ESTIMATED INVESTMENT AND EXPECTED EMPLOYMENT, IF AVAILABLE DEC 0 3 2021 $ # JOBS 9 SECTION ONE: REQUESTING A SCOPING MEETING ONLY BY. ❑ Scoping Meeting ONLY ❑ DWR, ❑ DCM, ❑ DEMLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING J Is R �as )� ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ElIntennittent/Perennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions JCr CAC CZe kJ ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) 5,a ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater• ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] -,I - r `r _4 4 Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density-Bio-Retention _ # Treatment Systems El High Density —SW Wetlands _ # Treatment Systems ❑ High Density Other _ #Treatment Systems / ❑ MOD: El Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide Permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with acres to be disturbed. (CK # & Amt. (for DEQ use)) SECTIO14 THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ® Yes ❑ No Wetlands Delineation has been completed: ® Yes ❑ No US ACOE Approval of Delineation completed: ® Yes ❑ No Received from US ACOE ® Yes ❑ No Buffer Impacts: ® No ❑ YES: _acre(s) Isolated wetland on Property ❑ Yes ® No 404 Application in Process w/ US ACOE: ❑ Yes ® No Permit For DEQ use on ., Fees lit for multi le ernrits: Check# To tat Fee Amount$ SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; ❑ Min) $ SW Cl HD, ❑ LD, ❑ Gen) $ 1 401: $ LQS $ Stream Deter,_ $ NCDEQ EXPRESS June 2019 CXW-inn Fc rm;t -0 Pull 0*0338-►noperM.i- Cewi "P) 4 ponds. r1 o ey-ostoh C-,0r4rdQ rec��c•s�`. G OOS%.0 f:ar-�-h .- � r�-h n9 by,i it LA,'-SQ:7S SV% o ws 5CU er a,l i n+erf� �'H-c r► S4-r'C a,m S l LL t only I has A So' Ve9e+atcdl cxsuwt �P �(7 SWa/n Cr Osf' BLUE CLAY ROAD BUSINESS PARK NEW HANOVER COUNTY, NC STORMWATER NARRATIVE Prepared for: COUNTY OF NEW HANOVER 230 Government Center Drive, Suite 195 Wilmington, NC 28403 Prepared by: yun0 (leAftk V�I.�M£�CRF.ED ,,6pyru�vy t "s Mid k 1ake I T61;3 243 North Front Street Wilmington, NC 28401 (910)343-1048 Project #00494-0039 (40) December 20.21 �,-oodows s. ,eA 8uvLe S-o ` r,-0*0C k ef�f wI lDf3' Ail U-.S 5qAAA4 --wcmAs 4bGul(5 s 5 0 tey 59(vtW f .51ac4vylw k65 911 04Ci- yb - or C kwtW r ,A (17 C>Ykce lb +tea G� r� s VJ;Z) ` l l"�ttrCt�'11Gi.9hV►�'" V c� � % �/� (A BLUE CLAY ROAD BUSINESS PARK STORMWATER NARRATIVE Table of Contents DESIGN NARRATIVE I. EXISTING SITE II. PROPOSED IMPROVEMENTS ATTACHMENTS — SUPPORTING INFORMATION A. USGS QUAD MAP B. SCS SOIL SURVEY MAP C. SITE PLANS . t Design Narrative I. Existing Site The proposed 120.0-acre development, known as Blue Clay Road Business Park, is in New Hanover County, 2.0 miles northeast of the intersection of N. Kerr Avenue (SR 1322) and Blue Clay Road (SR 1318). This development will consist of commercial properties, open space, and public streets. This development consists of approximately 95 acres of commercial development. The remaining 25 acres consisting of wetlands and will remain undeveloped. The existing site is undeveloped farmland and woods with vegetation that is primarily row crops with crop residue, woods, wetlands, and understory growth. A copy of the USGS quadrangle map is attached indicating project vicinity and general drainage patterns in the area. The New Hanover County SCS Soil Survey (copy attached) indicates the underlying soils within the project area predominantly, Leon Sand (Le), Murville Fine Sand (Mu), Pantego loam (Pn), Stallings fine sand (St), Torhunta loamy fine sand (To), and Wrightsboro fine sandy loam, 0 to 2 percent slopes (Wr). The Hydraulic Soil Group Classifications are B/D, A/D, B/D, C, C, and C respectively. The project site is in the Cape Fear River Basin and drains to Prince George Creek. According to the latest surface water classifications published by NCDEQ Prince George Creek is classified as C;Sw. Prince George Creek Drains to the North East Cape Fear River (B; Sw, Index-No.18-74- (47.5)) as illustrated on the attached USGS Topo Map. Wetlands do exist within the site boundary with approximately 0.5 acres to be disturbed. Wetland impact permitting is being performed by Land Management Group. These efforts are currently underway. The wetlands have been delineated and are represented on the attached drawings. The site does not drain to ORW designated waters; is not within 1h - mile of and draining to SA classified waters; and is not within 1-mile and draining to HWQ designated waters. II. Proposed Improvements The proposed improvements are consistent with most business park developments. The basic improvements proposed at this time consist of the construction of roadways with shoulder and ditch cross section, water and sewer utilities, and storm drainage collection and treatment systems (consisting of four wet detention ponds) to allow for the construction of future buildings and parking lots. The systems ultimately drain to the North East Cape Fear River via wetlands and Prince George Creek. Opt .P' � �' � , ' �. +^ moo. � � Y�-_'� •. �" _ 4, �, .. _�-'� ,�• ems+ �^ .. BLUE CLAY ROAD +- -.,.h t> . 4�OSURY RD �. BUSINESS PARK L"p fiERMf7AWRD ol ' O 17 C NTD � .ram -JAI t Tc ry.a f t�r..� xI .� .rSL r�• � 1�ir1 _ q Ivy Faring e�.:� mot. •1_ � �, � i i � � _+k '� ,`\-.��''I. yy � \• 99 4,6,lVr1� &CRE D BLUE CLAY ROAD BUSINESS PARK IV'243 Nwa Frmt Shw! USGS ENLARGEMENT 2 Phans (91 D)SINC FM UM. F—Z (910)257-8282 SCALE: ' m = 2000' /� 5/?OG1 IIL` F�01 G F1ffi ATTACHMENT A - USGS QUAD MAP MJS.(L ma.- ATTACHMENT B - SCS SOIL SURVEY MAP Z 0 O LL Z IL 0 Z W a W J IL (0 C n n w E d 0 0 T %7 a E V w a) y O O N O L H � O O N 7 U O 'm0 O c� 2 E C U to w w n'o w w w E ca03: rn D O) a) p c � w y w r N _Ewa c > a Cya Ot V C d 0 ID tu w E E a o a)w 0. to E nL� c ~ w D C C O w w cn aa) E ms+ m E m U .+ N w C � w w 7 n� imp C N m C C1 w E�cgw O w (a w w w > Z 0) O m O f6 I O. U m w V O O w O G O w O C E o o f wwv o N N c E rn m w Lto t E aaoi y 0 Z ,Lmmym��Q 07 (� O O o> Z EID « L w O L a d w Z Z Z N ".' 7 m L w O E U W WmE0E 0 cN tn a n V adTEy N 2 a wow O U an, Nc O. L 131 OgU c0 �wQ CC)? 2U0> E N cmO w O T_O E R y O� v C m E d a0 w _O a) w 0w) n nOa _ ' m N 2 m O w « w aG rac o NZa �tdmic rn� O O � �wH O C T w a7 wWUw e�.4w awi O�'�O n T m E U °Tw ` o t-0E2%coCw awE( 046 a> 7 ii C w O U m w O> > w 0 v m o 'C co m mm $a o Q n� o y —Z Eo 2 O am c mEm� dE f�SU MEa�am IL-o (A(p t� N HcoiErLn m w � to ate. t a a h LL m U t ® N W co CL c co y 0 m �U Cm= E o aN w �° O a fn N V w fn C cc, D r2 J Q 7 c W CL C Ts F m O Q N c a w N o 0 C o C � a U m a 'c '� a 'c m a m m LL CL O LL n 3 O w CY o22 N Q LLI a rl a n m !0 w W IL c o �' 0 C y m a o N @ �' N — C O LL t > m G 9 W C m 0 f/% 0 y a. �` E m C C v o 0 toy o to m m (] U C7 C7 A a W rn m m h v in in a w a � a o u y a co w Z 11 Soil Map —New Hanover County, North Carolina Map Unit Legend Leon sand h AW F*CM of AOa Le 0.4 0.3% Mu Murville fine sand 10.3 8.0% Pn Pantego loam 22.0 17.2% St Stallings fine sand 33.0 25.8% To Torhunta loamy fine sand 55.0 43.1 % Wr Wrightsboro fine sandy loam, D to 2 percent slopes 7.0 5.5% Totals for Area of Interest 127.7 100.0% USDA Natural Resources Web Soil Survey 10/19/2021 ice' Conservation Service National Cooperative Soil Survey Page 3 of 3 0 i o y F I 0 1a z-® op W 2iY r Ir a / E w z / Z � y / _ Q m 6 W z¢ 0 LU a g..- ---- - - -- ° - --- -- -- — --- -- -- c g Z e S —i rG ;xAg . Q-s 2%4 fag Eta e \ 8 c 0 W J m ATTACHMENT C - SITE PLANS Weaver, Cameron From: Richard (Rick) A. Moore <RAMoore@mckimcreed.com> Sent: Friday, December 3, 2021 4.46 PM To: Weaver, Cameron Subject: [External] Blue Clay Road Business Park - express stormwater submittal Attachments: 2021.12.03_Express Stormwater Submittal Package.pdf CAUTION. ExternaI email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to ReFort seam_ Cameron - Please find attached an express stormwater submittal package for Blue Clay Road Business Park on Blue Clay Road in northern New Hanover County. We do not need any other agencies since we will be permitted for erosion control through New Hanover County. Wetland and stream impacts are being handled by Land Management Group. Please review the attached and let us know if you need additional information or what date is available for submittal of our permitting package to the Express Program for review. Thank you and have a great weekend! Rick Richard (tick) A. Moore, PE, LEED AP I Regional Manager T 910.343.1048 1 M 910.386.6359 243 North Front Street, Wilmington, NC 28401 ramoore(&mckimcreed.com I www.mckimcreed.com Voted "Best Firm To Work For" - Zweig Group o I o �_____ ___ Oisclairreer This e-mail and any files transmitted with it are confidential and intended solely for the us.. of the individual or entity to whom they are addressed. If you have received this e-mail in error please notfy the system manar7please rote that any views cr opinions presented in this e-mail are solely those of the author and do not necessarily represent tiv)se of the company. Finally, the recipient should check this e-mail and any attachments for the presery a of viruses. The company accepts ro liability for any damage caused by any viI us transmitted by this -mail.