Loading...
HomeMy WebLinkAboutNCC231657_Modification Review_20230803 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 8/1/2023 9:01:37 AM(ADD TO FILE Submittal) Approve by bethany.georgoulias 8/3/2023 11:16:03 AM(Construction COC ADD TO FILE Review-NCC231657) • The task was assigned to bethany.georgoulias.The due date is:August 4,2023 5:00 PM 8/1/2023 9:01:38 AM Ago DEQMODIFICATION Permit for Construction Activities 0itltl 0000 Certificate of NCC231657 Coverage(COC)No.* Enter the Certificate of Coverage Number(Use capital letters) Information associated with this permit: Project Name FUEL FARM COMPLEX Address 2780 JETPORT ROAD, KINSTON, NC County Lenoir Latitude 35.3173 Longitude -77.6172 Permittee Listed North Carolina Global Transpark Legally Responsible Richard Barkes Individual At the time of Modification Request(not looked up again at review) NC Reference No. NCG01-2023-1657 E&SC Plan ID Lenoi-2023-011 Original NOI Tracking 143679 No.* Date COC Issued* 06/06/2023 Prior Rescission Date This field will populate only if COC has already been rescinded. Modification Information: Reason for Modification* Closed-Out Lots/Outparcels in E&SC Plan Additional Lots/Outparcels Approved-E&SC Revised Other Revision(s)to E&SC Plan Legally Responsible Individual and/or Site Contact Has Changed Multiple Reasons(List) Addional Explanation More information(e.g.,new Site Contact details).If lots are being added,please include specific lot numbers. Additional land disturbance activities added to the project for two t-hangars and associated pavement and a parking lot.The additional paving and t-hangars will be done in a future project,only the site preparation for those areas will be conducted during this project. You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting Documentation Upload Supporting Documentation(Revised E&SC Approval,Close-Out Doc,etc.) Lenoi-2023-011 Fuel Farm Complex-07312023(REV).pdf 962.93KB Must be PDF format Is this project funded with ARPA(American Rescue Plan Act)grant funds? No Yes This question was added to the eNOl on 2/3/2023 and will not be answered in applications submitted prior to that date. North Carolina General Statute 143-215.613(i)provides that: Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). * I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true,complete and accurate. Specify if you are:* The Legally Responsible Individual Authorized Responsible Person' "This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item (6)of that permit. Signature jj�A'F!t-tQ�r�'Jll-t.�J Type Name* Richard Barkes Title* Airport Director Organization* North Carolina Global Transpark Date* 08/01/2023 Email Address* rbarkes@ncdot.gov Email for confirmation Telephone Number* 1-252-522-2922 Contact number if we need to reach you Note:Original permittee and site contact are copied on modification correspondence. Additional Email mwynn@avconinc.com (Optional) Additional email for confirmation Original Permittee rbarkes@ncdot.gov Email Original Site Contact rbarkes@ncdot.gov Email Review Date 08/03/2023 Rescinded Since Submitted?