Loading...
HomeMy WebLinkAboutNCC232316_ESC Approval Submitted_20230802 ytAn ROY COOPER i Governor ,,r y ELIZABETH S.BISER Az it ,.. ) ¢ Secretary 1 t" ,�. 4 BRIAN WRENN p"",'< Director ,, ,I s CAROLINA Erp vat ontr=vna`)!Quality December 13, 2021 LETTER OF APPROVAL WITH MODIFICATIONS Catawba County Attention: Mick Berry,County Manager 25 Government Drive Newton,North Carolina 28658 RE: Project Name: E. Maiden Road&Highway 150 Gravity Sewer Acres Approved: 2.63 Project ID: CATAW-2022=008 County:Catawba,City: Maiden Address: Highway 150 River Basin: Catawba Stream Classification: Other Submitted By: Catawba County Date Received by LQS: November 19,2021 Plan Type: New Dear Mr.Berry: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications.The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land- disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a$100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a)and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. , --...,1,) North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Mooresville Regional Office 610 East Center Avenue,Suite 301 Mooresville,North Carolina 28115 704-663-1699 orw4� Letter of Approval with Modifications Catawba County December 13, 2021 Page 2 of 3 Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, 1A4 9� Christopher Graybeal Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCG01 Fact Sheet c: Highfill Infrastructure Engineering Attention: Jordan T. Taylor,PE 380 Knollwood Street, Suite 734 Winston Salem,North Carolina 27103 Inspection Department Letter of Approval with Modifications Catawba County December 13, 2021 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: E.maiden Road&Highway 150 Gravity Sewer Project ID: CATAW-2022-006 County: Catawba 1. The new NCGO 1 Construction stormwater permit requires Ground Stabilization and Materials Handling and Self-Inspection, Recordkeeping and Reporting requirements on your plans. The NCGO1 compliance plan sheets for these can be found at https://deq.ne.gov/about/divisions/energy-mineral-land-resources/energy-mineral-land- permits/stormwater-permits/construction-sw. 2. Copies of any wetland determinations or Water Quality Certifications (401/404) for this project from the Army Corps and/or Water Quality Regional Operations Section, as well as any local approvals for activity within the buffers must be provided to our office prior to conducting land disturbing activities in those areas. All requested information must be received and approved prior to construction. Please submit all requested information at one time. [15A NCAC 4B .0106(1), Clean Water Act, Sections 401 and 404]. Reference sheet C-1.1