Loading...
HomeMy WebLinkAboutNCC232303_Site Plan or Location Map_20230801 HAMLET YARD INTERNATIONAL TIE DISPOSAL EROSION CONTROL NOTES GRADING , DRAINAGE 1 ALL EROSION D D ACCORDANCE W TH THEI O MEASURESMUST BE DESIGNED NORTH CAROLINA EROSION AND SEDIMENT IN CONTROL PLANNING AND DESIGN MANUAL. AND TRACK PLANS 2. ALL EROSION CONTROL MEASURES MUST BE INSTALLED PRIOR TO ANY SITE INDEX OF SHEETS OREXCAVATION COVERED BYBU REGRADING. DISTURBED DI GSOR PAVEMENT, M AREAS SITE,UST BE STAABILIZ DWT NOT COVERED SEED AND MULCH, OR OTHER METHODS AS REQUIRED. CONSTRUCTION MUST NOT BEGIN UNTIL ALL TEMPORARY EROSION AND SEDIMENT CONTROL SHEET # DRAWING TITLE MEASURES, AS SPECIFIED ON THE PLANS, HAVE BEEN INSTALLED. 1 COVER SHEET 3. EROSION CONTROL MEASURES MUST BE MAINTAINED AT ALL TIMES. IF 2 GENERAL NOTES & SPECIFICATIONS FULL IMPLEMENTATION OF THE PLAN DOES NOT PROVIDE FOR EFFECTIVE 3 OVERALL SITE PLAN EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES MUST BE IMPLEMENTED TO CONTROL OR TREAT 4 — 7 EXISTING CONDITIONS & DEMOLITION PLANS THE SEDIMENT SOURCE. 8 — 11 SITE PLANS 4. DISTURBED AREAS LEFT IDLE MUST BE STABILIZED WITH TEMPORARY 12 DRIVEWAY PLAN AND PROFILE _ VEGETATION AFTER 7 OR 4 DAYS PER NCG010000 PART II.E.1. 13 16 GRADING PLANS ,, 11. , PERMANENT GROUND COVER MUST BE ESTABLISHED AS SOON 17 HEAVY DUTY ROAD CROSSING CONCRETE DETAILS AS PRACTICLE BUT IN NO CASE LONGER THAN 90 CALENDAR 18 ROADBED SECTIONS AND GRADING DETAILS DAYS AFTER THE LAST LAND DISTURBING ACTIVITY. 19 #10 TURNOUT RAILBOUND MANGANESE FROG 136RE RAIL 4. ` . 5. EROSION CONTROL MEASURES WILL BE INSPECTED AT LEAST WEEKLY, 20 1 1'-0" VERTICAL LIFT DERAIL DETAILS } PRCf.1EC-- LOCATION AFTER EACH RAIN AND REPAIRED BY THE GENERAL CONTRACTOR. 21 MAIN AND SIDING TRACK SPIKING PATTERNS ' y'� r, 6. EXCAVATION LAYBACKS MUST NOT EXCEED 2H:1V SLOPES. 22 SITE AND PAVEMENT DETAILS 23 FENCING AND GATE DETAILS - �, 7. IF THE SAME PERSON CONDUCTS THE LAND—DISTURBING ACTIVITY & - 24 — 27 EROSION CONTROL PLANS 'J f r� ANY RELATED BORROW OR WASTE ACTIVITY, THE RELATED BORROW 28 SEEDING SCHEDULE -� OR WASTE ACTIVITY MUST CONSTITUTE PART OF THE LAND—DISTURBING ACTIVITY UNLESS OR 29 — 31 EROSION CONTROL DETAILS MARKS CREEK oHORH Ro IS REGULA ED UNDER THE MINING 1971, OR IS LANDFILL Y 32 NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING - Roao REGULATED BY THE DIVISION OF WASTE MANAGEMENT. IF THE • CAMRBELL 33 NCGO1 SELF INSPECTION, RECORDKEEPING AND REPORTING a " 8. LAND—DISTURBING ACTIVITY AND ANY RELATED BORROW OR WASTE ACTIVITY ARE NOT CONDUCTED BY THE SAME PERSON, THEY MUST 34 EROSION CONTROL CALCULATIONS - BE CONSIDERED SEPARATE LAND DISTURBING ACTIVITIES AND MUST 35 DRAINAGE AREA MAP EXISTING BE PERMITTED EITHER THROUGH THE SEDIMENTATION POLLUTION 36 DRAINAGE AREA MAP PROPOSED CD - , CONTROL ACT AS A ONE—USE BORROW SITE OR THROUGH THE 37 — 40 TRACK PLAN & PROFILES MINING ACT. 41 TYPICAL SECTIONS t ROP° ,�E o 9. THE CONTRACTOR MUST PROVIDE A NCDOT EROSION CONTROL FIELD 44 — 45 TRACK 2 CROSS SECTIONS , yo m GUIDE FOR ONSITE PURPOSES MADE AVAILABLE AT ALL TIMES. 44 — 52 TRACK 1 CROSS SECTIONS .,,: i' eo 0 53 BOUNDARY SURVEY m 10. NO WETLANDS WITHIN THE PROJECT LIMITS. ns ale ghcs 1 PROJECT NARRATIVE INDEX OF ELECTRICAL SHEETS � "�. ° " N' �(tr` a`' ` ' ' • THE PROPOSED PROJECT WILL DEVELOP THE GREEN FIELD SITE INTO A SHEET # DRAWING TITLE rh c 1 '' RAILROAD WOOD TIE RECYCLING FACILITY. THE CONSTRUCTION CONSISTS OF MASS GRADING TO BRING THE SITE TO GRADE, PAVING, RAIL AND s E-001 SYMBOLS, ABBREVIATIONS & GENERAL NOTES DME' f • ' STORM SEWER INSTALLATION. THE VEHICLE AND WORKING AREAS WILL BE • v 7, PAVED WITH GRAVEL AND ASPHALT. THE TIE STORAGE AREA WILL BE m E-100 OVERALL ELECTRICAL SITE PLAN 1%1 ' ' ' GRASS AND NATIVE GROUND. E-101 — E-104 PARTIAL ELECTRICAL SITE PLANS ® • y F .1, 91 E-201 — E-204 ENLARGED ELECTRICAL PLANS AF, t E-301 ELECTRICAL RISER DIAGRAM +r. _ -44-, fN- E-401 — E-404 ELECTRICAL DETAILS 4 '."J ;1 """'' , E-501 — E-504 ELECTRICAL SCHEDULES 11 �` II �N CARS ' 8 PERMIT INFORMATION 'aamlet .r. n z..� q�..�; 4 STORMWATER RUNOFF FROM THIS PROJECT DRAINS / . 1i c a1; 0562W ;}_ ° TO THE — LUMBER RIVER BASIN — Ate. N.T.S. :�c3C '. 0 2023 ,--\ e �,T •%1N. EFIGP�� RECEIVING STREAM NAME MILL CREEK VICINITY MAP '''M;CHAe\--,'s Q STREAM CLASSIFICATION — C HAMLET, NORTH CAROLINA STREAM INDEX NUMBER — 14-32-3 ISSUED FOR 6 ! EROSION CONTACT CONSTRUCTION o' BASIL POLIVKA 7/31/2023 1859 SUMMERVILLE AVE TRANSYSTEMS SUITE600 980-328-8975 ` CHONE:54ON,SC29406 E PHONE:843-266-9300 Eo basilp©polivkaintl.com WWW.TRANSYSTEMS.COM