Loading...
HomeMy WebLinkAboutNCC232240_Site Plan or Location Map_20230727 o CONSTRUCTION SCHEDULE \ 208 / \ \ pP I. Obtain all necessary permits and plan approvals.Erosion and Sediment Control ?� O (E&BC)permit and a Cem'Bcata aP Coverage(CAC)moat be ebmived before any land disrobing activities \ \ \ \ ........... \ rc$ occu.A copy d the E&SC permit,the COC and a M1ard copy of Ne plan moat be kept ov site,prafirably iv a L \ \ o tCP permits box,and accessible during inspection. \ \ hOJ OJ 2. Install gravel construction entrances fires the silt Fracas,reinforced silt fence outlets and wattles. t0 O 3. Finish clearing and grabbing any necessary areas on the lots as they are started. \ 4. Begin lot grading and excavation activities '12- be 5. Begin or continue with house construction activities. 2- 1 202 \ 0 6. Finish all rough grading and house construction. Zg ]. install driveways,walks and patios. 08 S. Begin fine sing,mulching lot areas / \ \ R7o 4p 9. Final greasing,mulching and stabilizing of la.In most cases this will involve the installation of sod on the lot \I / &o p0 �� The silt fence will remain in place until the lot is sodded or grassing is stabilized and takes hold. \'19 198 P 10. The wnhactor shall conduct self-inspections of the erosion and sedimentation<onuul measures and complete \ \\ \ \ \ S c$`0" G 2`' oo the following combined self-inspection form found on the DEMLR website �08R Rjoq ROAD 56�Z�o General%200ermns/DEMUR-CSW-Montori g-Fmms-Rev-Augut882019.pdf tTwelveemonths of complete // \1 inspection forms shall be kept on site and available for inspection at all times.ft is recommended a copy be 1 26 \ N kept in a permits box.(GS 113A-54.1(e),15A NCAC 04B.0131,NCGOI Part III Sections A and 13) A3\ I \ BgRxO T 11. Self-inspectirtsfor erosion and sedimentation control measures are to be performed at least once every seven 1 / C(AO;fJSTRUCT N RO,W ,4. calendar days and within 24 hours of every rain event of greater than l inch.Any needed repairs shall be \LIMITS / \ o W mad immediately to maintain measures azdesigned All ESC shall be d specified in 2ap � /\�O. DN the details on this plan A min gauge shall be installed h projectf monitoring. V I \ N / \'G�. ^w 12 Inspectiond final acceptance letters.When the project is complete,h p shall DENIER to \ \ \ 24 N `SM \ \ Apo clo M1 E&SC Plan After DEMLR informs the perms fh p It t I p 'on report 1I rid}'? the permonee shall visit`eglboehMCAeesll submit an el N oP termination(a NOT).A SIN 198 \\, o, / ///y, \ - -00 ep ` `s' annual general permit fee will be charged until the NOT has been tilled out LT FEN E r., yygTTLE\ \. �\ SILT FENCE L•+ \ \ /^� i5 7 SIL FENCE I \ °'" GROUND STABILIZATION 2DDf J P' 3 202 VICINITY MAP DESCRIPTIONE AREA STABILIZATION 4 1 ,, 2 EXCEPTIONS *Sr TIME FRAME - Ra iz. h / \ e` � dal `� 29 N.T.S. PERIMETER DIKES, 7 DAYS NONE j ~ WATTLE q'_ 210 /� � ' \ SWA c S, DITCHES CONSTRUCTION 4.+,• a•. •-�� \ ',fat:h \ 2N -- \ f"-----... ..............._ &SLOPES '� LIMITS r \\T O HIGH QUALITY 7 DAYS NONE 4 •w.r� -CONSTRUC ION \. / / �•s. 20 202 WATER ZONES 'V \ ,.-SILTF NC //j / NCE\ / \ y \ HQW CC SLOPES STEEPER 7 DAYS IF SLOPES ARE / \ C"er j/ 29 ?'•/ ` \� ?pe f 19 J �3 1 210\ 204 A SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY THAN 3:1 10'OR LESS IN Stree o°' 1 NCGS 113A-54.1.1S AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR LENGTH AND ARE 11'A _v/ 30 17 COMPLETED AS AN EXCEL SPREADSHEET. NOT STEEPER INFO ED rT� _ ;E .o A, 0 / AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED THAN 2:1, 14 TFEN -� EROSION AND DAYS ARE TLN ?� •� 4 ATTLE-��y- / \\\\ \ / SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A ALLOWED / / V SIL FEN E 212 31 \ / NCAC 04B.0131 STATES THAT-...DOCUMENTATION SHALL BE ACCOMPLISHED BY 1 P) 08 \ // INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE SLOPES 3:1 OR 14 DAYS 7 DAYS FOR / \ 18 / FLATTER SLOPES GREATER LE REINFOR ED SIT I\ APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING. \�' • ` 32 0 FENCE TLE DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, THAN 50 IN ) / / \ 4qG. PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION I WATTLE I 7 FF 202 CONTROL PLAN." LENGTH / / / E..,-* 12 / / / / Sy --- ALL OTHER AREAS 14 DAYS NONE(EXCEPT ` ' :::**1•Ij . , / /\ _ 16 ///��� WITH SLOPES FOR PERIMETERS / I ` ,�� / <C' / / \ zoo FLATTER THAN 4:1 SILT FENCE CONSTRUCTION ,L! 1}~ / AND HOW ZONES) (TYP.) l� T NCE CA4 CONS"UCTION // / / 2 o ONL RUCION Q /' I 2 REI FORCED•:~ .`\„ ' � / SIL FENC &?¢ R(NITS FORCED 3 e // CON TLIMRTSTI O TLET II1.♦ . FENCELdf -n PJ'S /DATE: PAGE / WATTLE WATTLE�II •\ �' a� UTL / / eS° / 15It 5 ck/Wattle / e / 1 •oµ`�� s-MI a. �I pmleam / .... I ET EINFFENCED / // � NN�� etiwtedfar • _ - 'gee Il If N.�= - r CONSTRUCTION``� W•TILE 2 1 OUTLET / ...6. / -'e lI:IIE - tm compret • / / 4: ENTRANCE _' RE FORCED 210 Z0� 35 / ( 14 '1 one deform, n SI:FENCE / S ekes Stakes 1 1 pea / / „,� SILT FENCE ` TLET s Lot Plan UU11 200 SECTION SECTION minimumand a me of .-..I / : c "Hit ? / pet () / N // WAT LE / / tam aa'w:"m:(�i -The ends ofthe silt flat areas should be located et Me edge of the / �vti 11pII.' 1 \& )r .. OPEN,* 36 // 13 202 42 <O a,µ' Ro etfe* silt me from(s�goinground the end time /11 per \ .}' WATTLE SILT FENtE LIMITS / 08 �\ Vi7 Q ' CONSTRUCTION / / \ inch x 2 inch cross section shouklbe driven W / \ 1 SIOUTLETE 37 / $ / WIV veracally plurnb.glrough the center of the slit soddwattle stakes should be Mced a REINFORCED 1•j CONSTRUCTION\ \\ p WArn j N CO'STRUCTI•N / I /7 12ry I maximum interval ot 4feet or a maximum interval LIMITS 1 11 \ e (LIMITS JJ,, • LTFENCE ID1J` P.g'/ 208 Wood Mulch or Com st Tgrounana-Mn. • meslmcknm placed- in. / / OUTLET \ �'�• CONSTRU'y1,�TION 3 t of 5, In the event slaking Is not • o t/iilsTALuhT ON u9 71114...K1.1 µ m.�IMIN�� , Shell be asrim pusedapeg mhefslIt . • �r / 206 UNTRENCHED pavement) 202 •'1 I I \I ENTRANCEH \ //(/�08 \ �f ISOMETRICMEwMAINTENANCE, II. Inspect silt sock/wattle at least weekly and after 3 u CA2 ��G. • NJ pe m«INaAL sow aA,Ta n Mulch or Compostas ,^ I 4 I \ 1' / for Untrenched Socks Deets.Dtemne.c(R0O (aoo.m)(.toe )Ac111 o te) a(Teoh z ante must be replaced clogged or Y1r� \ / / SILT CEO ,jam Praeaeaa ecmP• a* rim) cm� / left II \ /' / )Shen'w-"- g,m,,,, s' \ / /wnMAr r sta seek, (a,1oeo`m) mami (� m) (facol (6»0.T larger diameter or a afferent measure. a / )Reinstall if damaged or dislodged. I 1 I \ 4 . / 11 r wet le �ir°1 . gym:" i:," gi5�" g,(;(, is,:" 6. h shall inspected �aabw:tn. z1 / / ' I I5 \\ `G GOJ" /// r IL P�10 WATTLE / \ vim) vim) vim) vmim) vim) disturbance is \ / i ���/ SILT SOCK/WATTLE FOR PERIMETER AND INLETPROTECTION / / / '4- �/ 202 c L �y �. 21 //o � �/ �l) / kb .. , DATE: PAGE: 2 2 /.C" O /I -1a'f y O / 1tll SILTFP. 4' ,WA V�lirli . 7// /r.....---?M --...... l�N ,llNOUS ll1 Nous . e. ,I Nous r�� oLJ �v®ice WA EN = ■G lu LJ I / \ 20220EOL/'Trwr Tn-Tn-v yrw�r is-T. : Tra-.Tit nr +r-->--e r TO-F--FT n.-x Try I L GEND ties A1 If needetl Tree Protecton fencng should be installed along the buffer zone wetland / r'FtAwDRECT ON boundary andloraround protected trees proud ngared us of at least125 feet for each IJ&_ __ inchof trun Fence the / I I • SILT FENCE 2 Install Silt Fence on the low elevation sides of each lot Install S tt Fence outlets shown on /I DIVERSION DITCH TD-TD- achemat'dtl agree and field adjusted,f necessary,for placement at low points.If lots are wnnDLE)s LT socks a oantiguous and have different land owners or builders,each lot should haveindividualStt / • SILT FENCE OUTLET I® 3.Install required Silt Fence within 10 feet of to ensure there is no conflict with I 200 CONSTRUCTION ENTRANCE eqt re property he / I \� -�/ / _ 414 / / septic system It s the responsibility of the builder to ensure the installation of sediment control measures does not impact the septic system and repair area(s) 202 _�' 4.A[least one and other re Entrance/Exit t s to be managing bed per lot / / 10.8 5.Waste bins and other areas trance/Ex for managing building material waste shall be at least 50 feet away from storm drain inlets or drainage ditches unless it can be shown that / / / no other alternative exists.If this separation cannot be achieved,these areas must be 20'2 contained behind Silt Fence. / ' / / 6.Inlets downstream of disturbances should be protected;streets should be swept when / / sediment from the construction activity is present. / 2, -� �202 7.Details for Silt Fence,Silt Fence Outlets,Construction Entrances and other measures are provided on additional sheets.Erosion and sediment control details are not drawn to L- -- - scale. TYPICAL LOT LAYOUT WITH ROADSIDE DITCHES / // L/0 •/ / \ // // DATE: PAGE: i0- PAGE 1 of 2 Ai l �oIP /r��t. TOTAL DISTURBED ACREAGE: 4.69 ACRES MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION LOT EROSION CONTROL PLAN vn`� .6.4a.. - �"a.eF P producing per weanypa y yLOTS 1-3, 27, 28, 34, 35, 40 & 41 General-All measures will be inspected and corrections made after runoff rodudn rainfalls or at least once week minimum.The builder will insure that the construction activities on particular lot do not adverse) affect an of the installed erosion control measures.If lot construction dictates,measures will be r SPELL ESTATES '°a'or relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. Q r� r� r r r r� r `bps, �7r7r�7r7r7r7r'lr7r`r`�"I�t /�'y'y'y'y�'y'y�y�y�y'y'j�'j�'y'y-_�- Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to imp sediment and clean it out as necessary. Immediately remove all r r r 2 Y r r r r.r 2 2 2 2 2 �:=- a T�`11-=1`11`r`r`rY`I`I`I-`I_ objectionable materials spilled,washed,or tracked onto public roadways. FOR / s M n r r-r r r r r r r r r _ •�,• , it it�r fr lr ar iiii iii.lr p y repairs should be made Immediate) Damaged or decomposed fabric should be replaced r r r,.r r r r.r-_.r � Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event An y g p p promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure Or' • r�Yl I I I I I I" that the removed sect ment does not wash back the fence. lume should be for beh nd the fence at tall t mes.Take care to not underm ne the fence dui n leanoat D erations. BENJAMIN STOUT REAL ESTATE againstAdequatestorage vo providedg c p ''`7rIt'g=`' SERVICES, INC. :�•_6:. it o�.� Sodding-The sod should be property maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth -- N and stabilization of the mot bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. PARKTO N TOWNSHIP ROBESON COUNTY Construction: Maintenance: Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be SCALE: 1"= 100' J U NE 2023 1.Clear the entrance antl exit area of all vegetation,rot,and other objectionable 1.Per NCG-01 inspect at least once a week and after each l inch or repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. material and properly grade it. greater rainfall;make any required repairs Immediately. GRAPHIC SCALE 2.Place the gravel to the specific grade and dimensions shown on the plans,and 2.Maintain the gravel pad in a condition to prevent mud or sediment smooth it. from leaving the construction site.This may require periodic Wattles-Wattles shall be inspected after signficaM rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed 3.Provide drainage to carry water to a sediment trap or other suitable outlet. topdressing with 2 inch stone. sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. 4.Use geotextile fabrics in order to improve stability of the foundation in locations 3.Immediately remove all objectionable materials spilled,washed or d ,� subject to seepage or high water table. tracked onto public roadways. Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid underminingthe fence during cleanout.Remove and replace stone as necessary g p ryas it becomes clogged with sediment.Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. ( IN FEET ) CONSTRUCTION ENTRANCE/EXIT 1 inch = 100 Pt. MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 PHONE(910)484-5191 FAX(910)484-0388 LICENSE BF-0106 LAST SAVED:0/22/2023 4:26 PM LAST PLOTTED:5/22/2023 4:48 PM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\BENJAMIN STOUT REAL ESTATE SERVICES INC\23-2510-07 SPELL ESTATES-EC\PLANS\SPELL ESTATES-LOTS 1-3.27.28.34.35.40&41.51/10