Loading...
HomeMy WebLinkAboutNCC232143_ESC Approval Submitted_20230718 1 y} ROY COOPER `' # ,„ .1 n f Governor . ''`'. 2 Pt ELIZABETH S.BISER 'N*� volto :. Secretary_ DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Quality July 10, 2023 LETTER OF APPROVAL Public Service Company of North Carolina, Incorporated ATTN: Mr.Andrew Moore 800 Gaston Road Gastonia, NC 28056 RE: Project Name: P73160 - Fair Haven Rest Home Gas Main Extension Acres Approved: 4.1 Project ID: RUTHE-2024-001 County: Rutherford City: Forest City Address: Bethany Church Road River Basin: Broad Stream Classification: C Submitted By: S&ME - Matthew Kunkle, PE Date Received by LQS: July 10, 2023 Plan Type: Utility Dear Mr. Moore, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed,you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any Iand disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new-responsible party must obtain a new COC. D_E Q' North Carolina Department oltnviironmental Quality I Division of Energy.Mineral and Land Resources Asheville Regional Office 1 2090 U.S.Highway 70 I Swannanoa.North Carolina 28778 NO C CL aroertment m Environmental uucnq 828.296.4500 Letter of Approval Public Service Company of North Carolina, Incorporated ATTN: Mr.Andrew Moore July 10, 2023 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Laura Christiansen Engineer II Land Quality Section Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet Modifications Required for Approval ec: Mr. Matthew Kunkle, PE (mkunkle@smeinc.com) Mr. Andrew Moore, PE (andrew.moore@dominionenergy.com) cc: Regional Office file Letter of Approval Public Service Company of North Carolina, Incorporated ATTN: Mr. Andrew Moore July 10, 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: P73160 - Fair Haven Rest Home Gas Main Extension Project ID: RUTHE-2024-001 County: Rutherford For final plan approval, please submit to this office the following modifications on or before Friday.July 14. 2023. 1. Please extend the limits of disturbance (LOD) to include all proposed land- disturbing activity. {G.S. 113A-57.3}