Loading...
HomeMy WebLinkAboutNCC232082_Site Plan or Location Map_20230711 — / CONSTRUCTION SCHEDULE DATE \ \ Rockfish-Rea '_ _ __ (EASE) all necessary p mi and planapprovals.Erosion and Sediment Control / :_-- � � (E&SC)permit and a Certificate of Coverage(COC)moat be obtained before any land disturbing activities \ ` �\ c :roc:.A wpy oP the P.R6C permit,the COC and a M1ard copy ofA plan most be kept ov site,prafaably iv ay r rwets box,and acussible during irispectiov. \ % 2. sl grovel eons000uUo entrances BrsU then Odd thoces,reinforced silt Enos outlets avd wattles. \ \ \ � � � �/ � � \� 3. inh clearivg avd grubbing any vecessary areas on the lots as[M1ey are started. 7_t, � �� � '= I R� I � Y! ✓! � �/ �� � � � \ Ia. lot gmaing and excavation activities 1' 4 � �. �y/ \ \ \ ' / / // / 5. Begin orcoatinuewitn House construction aclivirea. Mom` �1�\ / 6. Finish all rough g,adiag avd house conawction. tiana\ � 276 fSADnLegpyo�� '^ \\ \ \ � '/. Install driveways,walks and patios. osI8. Be in tine radio of lot areas1 AP \ \\ \ �_ / ry1j �D \ I w I 9. Final grassing,mulching and stabilizing of lot.In most cases this will involve the installation of sod on the lot .n L Ill Y J J4 � AV \ J ` J `� ukp y \\ \ / ______ d Q The sill fence will remain in place until the lot is sodded or grossing is stabilized and lakes hold. JJJ®®®���===yyy ®y JJJ///®®®���vvv 0 1 \\ \ \ — n%-- I I / 10. The contractor shall conduct self-inspections of the erosion and sedimentation control measures and complete RGA A�' U AY SRO AV RO WAY SRO (HAY RO WAY -RO V '� A ------- ......./ pp I the following combined self-inspection form found on the DEMLR website IIr L...:: p \ \\ \ \ / 21g� / / rz2, hops://files.nc.gov/ncdedEnerpy%20Mmeral%20and%20Laad%20Resources/StormwaterMPDES%a2U CURB INLET Notes. 1.If needed,Tree Protection fencing should be installed aeon the buffer zone,wetland ----- ROCKFISH ROAD b \ �- -� �' / General%20P000lIo/DEMLR-CSW-Monitoring-Pones-Rev-August-B-2019,edf.Twelve months of complete FLOW g g SR- \ \\ \ \ / 29 3 I p I / forms shall be k d available for inspection at all times.It is recommended a co be boundary and/or around protected trees,providing a radius of at leas[1.25 feet for each inspection apt on site an P copy ,7 ��/ �i inch of trunk diameter. .c \ \ -- 'I�" j — j' / kept in a tattoos box.in 1 hours o.1 every ISA NCAC 04E0fgreat r t Nan 1 in Pan Ili Sections A and B) ) \ �— R ( 2.Install Silt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on / ✓/ $� I \ \\\ J \ 11. Self-inspections for erosion and sedimenmaon control measures are to be performed a[least once every seven N gram and l ry, p points.If lots are I 1 ——— — I Menderme s and within 24 hours sure t of ter than 1 inch.l b dart repairs shall ed p contiguous an d feed adudt ow if owners or builders.a for ach lot sh et low Silt � I TJ y ery rzin even grea y neeFLow wREereo contiguous diagram a d field t lantl ownarecesSa each lot at have individualts.Ilotsare y�+ \ \ / made immediately to maintain measures as designed.All ESC measures shall be mamrained as specified in SILT FENCE Fences. SIT Ps \\� _ — — Ne constructiond ails on this Pla Amngauge bell be installed the project site for monitoring. SILTrENceourLETOM o z8 12. Inspection and final acceptance letters.When the complete,the hall convect DEMLA m ENTRANCE 3.Install required Silt Fence within 10 feet of property line to ensure there is no conflict with \ \ I{\ p p project is comp permittees sCONSTRUCTION septic t It Is the responsibility f the builder to ensure the installation of sediment '� \ � �O„ 4 close out the E&SC Plan.After DEMLR inf the of lose out,via inspection ep c system. tons ltY o nominee an o project c p report, Fence measures does not impact the set tand re ay2tpPt - —� \ hall visit"de MCG01"to submit an electronic Notice of termination NO AS100 CURB INLETpat tic system pair area(s). eJ+uacyROAD SA-1432 ? \ \ \ .-:" \ the ualrgener s qll be charged ('- 4.At least one Construction Entrance/Exit is to be installed per lot. :11 ,\ \ C�JSTRUCTION \ annual general permit fee will be chargedwnl die 4-NOT has been filled out. LIMITS I r� I S.Waste bins and other areas dedicated for managing building material waste shall beat _ \ least 50 feet away from stone drain inlets or drainage ditches unless it can be shown that o other alternative exists.If this separation cannot be achieved these areas must be - z71/ 6 A SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY 21 DRAINAG SEMENT I contained behind Silt Fence. �N0� — — \ NCGS 113A-54.1•IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR 6.Inlats downstream of disturbances should\\ protected:streets should be swept when _ COMPLETED AS AN EXCEL SPREADSHEET. 198 /� SILT FENCE a LT AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED sediment from the construction activity is present. • \ ` •UTLET `'p FE'CE , \ \.\NC-Environ mental.jpeg T.Details for Silt Fence,Silt Fence Outlets,Construction Entrances end other measures are 11Lr� s ,ATTL 31 EROSION AND provided on additional sheets.Erosion and sediment control details are not drawn to scale. _ K SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A i>N - �... 6 \ -- TYPICAL LOT LAYOUT WITH CURB AND GUTTER \� / _ NCAC 04B.0131 STATES THAT....DOCUMENTATION SHALL BE ACCOMPLISHED BY 7B2 / INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE / 5 „£; r_ \ APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, \ '% / coN:TRuofNØ / L. OPEN \ \ DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, DATE: \ PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION / CONTROL PLAN.6/ ENTRANCE 'SPACE \ /Tilk \ ��4fr VICINITY MAP = —:::: \', A \ J�\`GRo \ iftt�} °"w — Iy' ao�70 , cUV \ \ 4, ��� °.�°°O .�\b. 43 a / � • • �it�..\ � A\III �,��-.DATE: PAGE: \ i1pr + ' \ \ \ �' Nn -� �t6 5 / att 51 S / .,FLOW�� R O Other T Inst _ •• 4 \ Imo'.`O'u.. Are°• .II._i II �- io ` , Mn I. ,- II".IL x. te:ve wetStakes Stoles a �� a Inn ana aH. nrealer,aNraSECn� aEGTIoN flat areas should be located at Me edge of the d A nthepanaana The ends of the silt soc1KraMe(, smooth it. constru.on site This may require pedodictopdressing with 2 inch stone. land tumeupsope CONSTRUCTI4 �' ,61 ` f __) 'G#‘1#\104 mare 1 odemalare v ea as eaol seaa tovub c40 A.r+a*, ''Io he -UdITS > suet., wa�PaS a Mar table. stabilitytexbie Mb.s in order to improve the foundation nMcanona msawan silt sockNiatde(s). II� REINFtltlRqCED ' I n W W SILTFEN 1D \ \ \ ..ANC En enlal.jpegnw maximumi.Stakes e o maxi at s OUTLET ////\ vrq�m• CONSTRUCTION ENTRANCEI EXIT Mna interval Tren°nm socks/wattles annaP�alaaedwa4iny, �i0 cev ma.imnmim.vertically interval through of ���� � \ \ \ \� ofarea slit Wood Mulch or Com at grnana 4'Min. trench To 1/2 height of l09 e. In me even) 1 Ids(Ie.when \\ NTRENDHroINBT TIDN E a reINaTA ATIDN• .=Xtat linpla °eae°"ht e� \ 41111W. •EI� \ N RENDHED We.are..aa m 1. Inch or greater rel., In a event sta.nal .e„a ISOMETRIC w .. a �w wa. a ,. MAINTENANCE: W.a stn Weekly a .� \ \\\�\\ \\ \ l/ �AU� \\ \ \ \ SODDING move no LeAv forDnLAY SOD INA STAGGERED n ea Sacks ` aaTaa.Pm P ama.r CwO mKIMpAL FLOW a N namaan p d as w \ \acm sediment and any dares as \ \,\�\ STORMWATER 52 j\'.-1 r# \\\\ \\\ \ \ L \ �� Bheetnaw� t ('mi (bn°;",,c4«n.;,( .m, �('m� a \ 1\ 1 N) TREATMEENT ONSTRUCTION \ sxx ` \ � \ LIMITS z \ 1,0 \ \ \Jl ��SI It sa=k/" 4Zi `mii a`mi \ %53 \\ o µoraMMlnpPlEeEa won •,•f wattle (ws«) (isa m) (sm'm) /�\ \ l \ \ Lot Plan • \ \ \ \ e M��ale er oug ole s(a n (iia s(ieen Wzee m,i` s. compem.n°i e / \\ \ l \ \\ \ „A/; C EO ,. \ \ \\ \ \ \erepete sl wim4. Reinstall if UST BE a�°areas°Ie, J m/m) /m/rel /m/m) /m/m) men°a na° p mw�M M NI e. / \\ \ � \ \ \ _ �..,v�y \ \ \ \ imp�M mnEaeORRECTL..00CUTTERM..\NC-Envir nrcentuL JHOO / \ \ `-- \\ 1 SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION •�— / / \\ \\\\\\N \\ \ \ P� / qp•" \\\ \I� \ \ \ • 1 _ s�P DATE: Filter Fabric PAGE. \ \ SLeaI POM Past lY a thoroughly trench _— \�\\ \\ \1�\ \ 14/ B \ 1 I I \ \ r woe Fence , ' e compete . \ \ I I :IE Steel Post moroagnry �� \ \ \\ I \ \ )&{ ,nNl�4 II \ �� _ ���\ \ %� / )I I wrnmaaor n.EonaDEPPIOF son is Ng-s wretI f GROUND STABILIZATION �� �\\� \ ��� /�_—� \\ / / I \ \ \ I IAPPEARANQIE F GOOD SOD 4 t SITE AREA STABILIZATION , ` down g "IT' e� DESCRIPTION TIME FRAME EXCEPTIONS \� �� A\ � \� /���_� � � \ /7// A V �� 1e��d� a��� n= eve z4 [a the °n PERIMETER DIKES, 7 DAYS NONE \ \ \ \� OP� \\�� \(7 \ \ �w m re °rem SWALES DITCHES 1 \ \\\ / \ Frey Fnbre CROSS SECTIONvew &SLOPES \ \ ...... '/��^\\` ` / I (\ 1\ n..,°.e" I.Can.,.sediment lamer a standard sirengtncEnte.vngOi syntliegggnerradEs. HIGH QUALITY 7 DAYS NONE \ \ \\ \\\� /' I I ( \ \ \\ \\\\ \ 2.Ensure tai Mg kolgki of to segment len. ..°�..4024,Mesawe... .I..amn..may Noon�ww.m«a..w WATER ZONES `\.......L.,. .' am.Newnanp,war.N.....y.mwreyf.euNwe a.,..mtl en u� HQW) .� \ ` \\ \��� , Il/ \ \ \ \ N \\ aaaala as wa,eawm wa \ \\ N. �, General Erosion Control Notes M.mama.a,aNaaNa.Na,aa.al.naa�aaaa,ara.aao...wla.ra�I.a..aa an..Ia.awa SLOPES STEEPER 7 DAYS IF SLOPES ARE THAN :1 effea 3 � � \ \ o�aNaa.,aa .s o.�..va,.,m,N.rawaa naa.m.nwla N.awN.w INNN.p.Na. 10'OR LESS IN N v w vv r.Nw.r.«e®aN..a�o ro 1 I \ 1.Onl the a show shall be disturbed. \ \ \ N a� Y °n.x.s.w r NN.nwrrmd.a�moon. LENGTH AND ARE � Il\ re n �.n ar,maw.aa7.w..,..wn.., NOT STEEPER \\ �� Th I 1 \ \ \ \ \\ M 2.All di Curbed a shall be grassed a d "vemeO°aa° THAN 2:1, 14 \ \ l \ \ \ o�Q m had an over pssss le de eta ned m.Do nwaite0g1MrMNN.N.Mnntn.. 'naw..n m,,..wTaamaah.a.p.,aa,arm.ha<mn..ee.I N.IaM.a,..eam,.z.. DAYS ARE ----"---,„2,- .'\ \ \\ \\\ \\\\ \\\ \\\ qz untl taro ant c e tabl'sh d.o ALLOWED \ \ \\ \ .. SLOPES 3:1 OR 14 DAYS 7 DAYS FOR `— — — \ \ \ \ FLATTER SLOPES GREATER �— —� \ \ \ �\� \ \ �\ \\ \\ \ THAN 50'IN �� �i \ ANC—Envlrcn,nm�ml.jpeg SILT FENCE LENGTH // \�� \\ M:........ _�� \\N\ \\FFFFCTIVF Ns,1,vt,, ALL OTHER AREAS 14 DAYS NONE EXCEPT WITH SLOPES FOR PERIMETERS /� \�� —� \ \ �\ _ FLATTER THAN 4:1 AND HQW ZONES) / ' \\ � \\ \ � — DATE: PAGE: \ _/ / \ / \\ \ \ \\ —\ \\\\ \ \ /� _ MIN H FENCE \\� 1 - PAGE 1 of 2 \ \ �— —�\ / \ \\..._\ \\ \ 11 � i TOTAL DISTURBED ACREAGE: 0.70 ACRES 1 i LOT EROSION CONTROL PLAN TOP �- � / \ \ \\ \ ( LOTS 33, 53, 71 & 73 ABMUSOVE ET -- _7_ , ^��\\ ( \ \\\��� BLACKHAWK THEWASHEDSTO STEEL FENCE ST , HARDWIRE WARE RaNTwno — ��^�\\\\ �— ( / / -� \ \ \\� \ )/ LANDING F°L\ / FOR FILTER FABRIC, AND HARDWARE MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION DREAM FINDERS FILTER WASHED sro SET MANZ MIN.'S.INTOs° ID 3'FILTER FABRIC GROUND CLOTH IN TRENCH General-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be oF\ ON GROUND NOTES, relocated on the lotto insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. HOMES L LC �8�m1.Hardware al.a.gra.shook,overlay Me silt fence at least 12 Inches. d on low elevation arena of fence and Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all o swan.. objectionable materials spilled,washed,or tracked onto public roadways. McLAUCHLIN TOWNSHIP HOKE COUNTY MAINTENANCE Slit Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure SCALE:1"=100' MAY 2023 1.Per NCG-01,inspect outlet at lest once a week and after ea.1 in.soar WIRE FENCE AND HARM ctom y that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. nLrexF=17,mBUE op'Fa '°U'°°- Soddinq-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth GRAPHIC SCALE a.Keep meanrteel... aoH viee°eeq.now 5 100 0 50 100 200 400 of stone outlet Is covered. and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. s.Reek,.SIOne aS..ad tofe<IN.de-waterlog. Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be = MMI SECTION VIEW repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. ..\NC-Envtr enlal.Jpeg Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed ( IN FEET ) FF SILT FENCE OUTLET sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. 1 inch = 100 ft Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE BF-0106 LAST SAVED:5/24/2023 3:57 PM LAST PLOTTED:5/24/2023 4:04 PM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\H&H CONSTRUCTORS\23-1367-03 BLACKHAWK LANDING-EC\PLANS\BLACKHAWM EC-LOTS 33.53.71&73.0WG