Loading...
HomeMy WebLinkAboutNCC232080_Site Plan or Location Map_20230711 2,..„,............. ,,, .,,,,,,...........,„,,,„,„ , ...„.........„,,,„..t.„...........),„ ,,,.,,,,....... ..„........,„ __, 41 DUKE '4) WIS. 1" ipat ���� p�� ® PROJECT � LOCATION 441016*4 ‘,, ENERGY® ",,,. KO G R E S S NORTH & SOUTH CAROLINA STATE HAP PROJECT NARRATIVE - THE PROPOSED CAPE FEAR-WEST END 230KV LINE PROJECT IS LOCATED IN MOORE AND LEE SCOUNTY, TA SOLARPR.THE PROJECT INCLUDES BEGINS AT STR3 UPGRADE A CAPE FEAR WEST END 230 kV LINE F APPROXIMATELY 32 MILES OF EXISTING TRANSMISSION LINE IN MOORE AND LEE COUNTIES TO SUPPORT A SOLAR PROJECT.THE PROJECT BEGINS STR 3 NEAR AN EXISTING SUBSTATION IN MOORE COUNTY AND ENDS AT FARRELL ROAD JUST PAST STR 457 IN LEE COUNTY.THE PROJECT IS LOCATED WITHIN DUKE ENERGY'S MOWED AND MAINTAINED RIGHT OF WAY.THE PRIOR USE OF THE SITE IS TRANSMISSION REBUILD LINE PROJECT INFRASTRUCTURE AND THE PROJECT WILL NOT CHANGE THE EXISTING LAND USE. PRIOR TO CONSTRUCTION,A DUKE ENERGY CONSTRUCTION CONTRACTOR WILL INSTALL EROSION CONTROL MEASURES TO ENCOMPASS THE ANTICIPATED CONSTRUCTION BE S LIMITS.PD PRIOR OCOMP CONDITIONS CS WINSTL BE ION.RESTORED ANDIDTHE M O O F .E & LEE COUNTIES, N O RT I--I CA R O L I N A AREA WILL BE STABILIZED PRIOR TO COMPLETION OF CONSTRUCTION.AN AVOIDANCE AND MINIMIZATION OF DISTURBANCE APPROACH HAS BEEN INCORPORATED INTO THE DESIGN OF THE EROSION CONTROL MEASURES BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED RIGHT-OF-WAY ACCESS ROUTES,WHENEVER POSSIBLE.EROSION C /\/�� CONTROL MEASURES ARE INDICATED HEREIN FOR PERMITTING USE ONLY BY NCDEQ. EROSION (8 SEDIMENT CONTROL & ACCESS P LA N THE INITIAL PROJECT DURATION IS ANTICIPATED TO START IN FEBRUARY OF 2024 AND (VyV, BE COMPLETED BY DECEMBER OF 2026. SHEET LIST: LATITUDE: 35.410271° SHEET LIST: COVER SHEET CT-77439 SHT 1 OF 41 EROSION&SEDIMENT CONTROL PLAN(LEE COUNTY) CT-77439 SHT 22 OF 41 OVERALL PROJECT LAYOUT(MOORE COUNTY) CT-77439 SHT 2 OF 41 LONGITUDE: -79.297073° EROSION&SEDIMENT CONTROL PLAN(LEE COUNTY) CT-77439 SHT 23 OF 41 OVERALL PROJECT LAYOUT(MOORE&LEE COUNTY) CT-77439 SHT 3 OF 41 y EROSION&SEDIMENT CONTROL PLAN(LEE COUNTY) CT-77439 SHT 24 OF 41 EROSION CONTROL MEASURE QUANTITIES CT-77439 SHT 4 OF 41 EROSION&SEDIMENT CONTROL PLAN(LEE COUNTY) CT-77439 SHT 25 OF 41 EROSION&SEDIMENT CONTROL PLAN(MOORE COUNTY) CT-77439 SHT 5 OF 41 EROSION&SEDIMENT CONTROL PLAN(LEE COUNTY) CT-77439 SHT 26 OF 41 EROSION&SEDIMENT CONTROL PLAN(MOORE COUNTY) CT-77439 SHT 6 OF 41 ,, / EROSION&SEDIMENT CONTROL PLAN(LEE COUNTY) CT-77439 SHT 27 OF 41 EROSION&SEDIMENT CONTROL PLAN(MOORE COUNTY) CT-77439 SHT 7 OF 41 / N EROSION&SEDIMENT CONTROL PLAN(LEE COUNTY) CT-77439 SHT 28 OF 41 EROSION&SEDIMENT CONTROL PLAN(MOORE COUNTY) CT-77439 SHT 8 OF 41 EROSION&SEDIMENT CONTROL PLAN(LEE COUNTY) CT-77439 SHT 29 OF 41 EROSION&SEDIMENT CONTROL PLAN(MOORE COUNTY) CT-77439 SHT 9 OF 41 ACCESS INSETS CT-77439 SHT 30 OF 41 EROSION&SEDIMENT CONTROL PLAN(MOORE COUNTY) CT-77439 SHT 10 OF 41 CHATHAMCOUNTY& ACCESS INSETS CT-77439 SHT 31 OF 41 EROSION&SEDIMENT CONTROL PLAN(MOORE COUNTY) CT-77439 SHT 11 OF 41 LEE COUNTY LINE ACCESS INSETS CT-77439 SHT 32 OF 41 EROSION&SEDIMENT CONTROL PLAN(MOORE COUNTY) CT-77439 SHT 12 OF 41 ACCESS INSETS CT-77439 SHT 33 OF 41 STR 446-1 EROSION&SEDIMENT CONTROL PLAN(MOORE COUNTY) CT-77439 SHT 13 OF 41 ACCESS INSETS CT-77439 SHT 34 OF 41 EROSION&SEDIMENT CONTROL PLAN(MOORE COUNTY) CT-77439 SHT 14 OF 41 STR415 ACCESS INSETS CT-77439 SHT 35 OF 41 EROSION&SEDIMENT CONTROL PLAN(MOORE COUNTY) CT-77439 SHT 15 OF 41 EROSION&SEDIMENT CONTROL DETAILS 1 CT-77439 SHT 36 OF 41 EROSION&SEDIMENT CONTROL PLAN(MOORE COUNTY) CT-77439 SHT 16 OF 41 EROSION&SEDIMENT CONTROL DETAILS 2 CT-77439 SHT 37 OF 41 EROSION&SEDIMENT CONTROL PLAN(MOORE COUNTY) CT-77439 SHT 17 OF 41 MOORE COUNTY& EROSION&SEDIMENT CONTROL DETAILS 3 CT-77439 SHT 38 OF 41 EROSION&SEDIMENT CONTROL PLAN(MOORE COUNTY) CT-77439 SHT 18 OF 41 LEE COUNTY LINE EROSION&SEDIMENT CONTROL DETAILS 3 CT-77439 SHT 39 OF 41 co - w EROSION&SEDIMENT CONTROL PLAN(MOORE COUNTY) CT-77439 SHT 19 OF 41 us NCG01 DETAILS 1 CT-77439 SHT 40 OF 41 a . Z HWY 421�. EROSION&SEDIMENT CONTROL PLAN(MOORE COUNTY) CT-77439 SHT 20 OF 41 ? NCG01 DETAILS 2 CT-77439 SHT 41 OF 41 cc a EROSION&SEDIMENT CONTROL PLAN(MOORE&LEE COUNTY) CT-77439 SHT 21 OF 41 ' NO HWY2a z T SPILL REPORTING HOTLINE ` IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT,FEDERAL AND STATE LAWS J NC HWY Za" a .., REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER ,a,< MIGRATORY BIRD HOTLINE REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION.IMMEDIATELY NOTIFY YOUR m STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY SUPERVISOR AND THE FIELD ENVIRONMENTAUEHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS CC tis. „„ DISCOVERED.IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAUEHS PROFESSIONAL,CONTACT ONE OF SERVICE AREA.INTERACTIONS OF BIRDS WITH GENERATING FACILITIES,TRANSMISSION AND DISTRIBUTIONS, \ SUBSTATIONS,OTHER STRUCTURES AND EQUIPMENT,AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO 7- " \l THE DUKE ENERGY SPILL REPORTING HOTLINES AT: W BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND 27' PROJECT STARTS CAROLINAS&MIDWEST:800.527.3853 Z CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. STR 3,4,211 FLORIDA:866.769.1266 CAROLINAS:800.573.3853 FLORIDA:727.386.3084 MIDWEST:317.430.4497 ,„. g o CONTACTS o z r- DUKE ENERGY PROGRESS,LLC ENGINEER: W NUWAN WIJESURIYA DEWBERRY ENGINEERS INC. F- 410 SOUTH WILMINGTON STREET ZACHARY EULO,PE w VICINITY MAP RALEIGH,NC 27601 2610 WYCLIFF ROAD SUITE 410 2� PH:(919)546-2090 RALEIGH,NC 27607 NUWAN.WIJESURIYA@DUKE-ENERGY.COM PH:(919)425-7610 CC CONTRACTOR SHALL NOTIFY"NORTH CAROLINA ONE CALL"(811)OR SCALE: 1:32,000 ZEULO@DEWBERRY.COM w (1-800-632-4949)AT LEAST 48 HOURS PRIOR TO BEGINNING �U111OIIOO1b,,, w CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. OQ�N CA1/1/4 0 CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDED 2c.1.,0“/0A U THEIR OWN LOCATOR SERVICES INDEPENDENT OR"NORTH CAROLINA811 = :a SEAL C• ONE CALL".REPORT ANY DISCREPANCIES TO THE ENGINEER I 055132 • c CAPE FEAR-WEST END 230KV LINE IMMEDIATELY. * igs°N FEe o �1 Dewberry `f'' DUKE REBUILD LINE PROJECT it D E2200820105/19/2023 100%FOR PERMITTING DM JFA ZAE !NUM 5Ii61.5 >I"Ir , `-rv'_veers Inc. ENERGY® 2610 WYCLIFF ROAD C E22008201 04/21/2023 90%MODIFIED DESIGN DM JFA ZAE SUITE 410 PROGRESS COVER SHEET 100% FOR PERMITTING RALEIGH, NC 27607 B CT-77439 01/10/2020 90%DESIGN DAR PAK EBS PHONE: 919.881.9939 A CT-77439 09/20/2019 60%DESIGN DAR PAK EBS FAX: 919.881.9923 411 FAYETTEVILLE STREETDO NOT USE FOR CONSTRUCTION NCBELS#F-0929 RALEIGH N.C.27601 SIZE DRAWING SHEET REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED Dewberry Project No.50130755 www.dewberry.com TELEPHONE NO.(919)546-2090 D E22008201 1 OF 41