Loading...
HomeMy WebLinkAboutNCC231982_Site Plan or Location Map_20230707 o CONSTRUCTION SCHEDULE \ ,# / / . Obtain all necessary pentits and plan approvals.Erosion and Sediment Control / /^ // ' " (E&SC)permit and a Certificate of Coverage(COC)must be obtained before any land disnubing activities \ ,M ..s 8\ occur.A copy of the E&SC permit,the COC and a hard copy of the plan moat be kept on site,preferably in a ...es. \ \ \ ,A / / //`- / / b Permits box,and eta tioSle dining inspection \ \ \ \ / / / 2. install gravel nnnawetien mtranere fins rum silt fences,reinforced silt once outlets and wants. a. aegmiagraang�e.oeationnemivities n the mmasmey are started. SODDING \ \ \ / \ / Allfr 5. Begin or continue with house construction activates. \ / /J 6. Pinish all rough)padivg and houaz conawction. / I/p9 7. install driveways,walks and Patios �� 0.0 \ \ II/4°"� 'TA° 8. Begin fine grading of lot areas 'MOM nn' MASONS TROWEL IS A HANDY \ \ \ \ �� / I I ,(0�' 9. Final It fence mulching and lace stabilizing of la.In most cases this will involve the installation of sod on the lotOl FOP 111CKING DOWN THE OA„ �(' r The silt fence will remain in place until the lot is sodded or grossing is stabilized and lakes hold. M�� cnoseno rwMr.PIECES. \ fP 10. The wnhactor shall conduct self-inspections of the erosion and sedimentation control measures and complete I Q the following combined self-inspection form found on the DEMLR webs, IMAM e - \ \ \ Fg hoop(Mil /cdeq/Energy%20Mmeral%20and%20Land%20Resources/S MPDES%20mpTicsoncuirEP \ ) SITE Gen I/20P DEMLR CSWM iWdng Fo ins RevAg t82019 pdfT I h (complete o \ e 'nsp f M1 II b kep [e d available for inspec II .I dN copy be \ N L keptp b (GS 113A541()15A NCAC 04B 0131 NCGOI Part III Sections A dB) �/ U. Self-inspections f d m 1 i performed d I shall en \ / / p� cal d daysd within 24h f cry t of greater h ea inch Any neededrepairshall be f \\ 11\ �Tp mad immediately de geed All ESCshallb d specified in / / / i °'9' the detail thisplan.A gauge Mallb installed h protectf monitoring. P 12 Inspectiondfi I p I Whenh protect PI thep shall DEMLAro / close out the E&SC Plan.After DEMLR informs the permrm of the protect I inspection report VprT rT� �I TTyy/r'1�,AL T� �i 1 tbepermnttee shall visit`daq vc.govMCA01'to submit an el N of termination(a NOT).A g100 NWTI0 h ANl1WA: 1 FA E 1 y E LE 1 D E� 1 annual 1 fee will bec d until the NOT has been filled out Il''',6 4lM1+XI05 I 1` lORNSON Manx tie genera permit barge di li ,!'�f'0 Y-,�,!1,�.n:N f III K MOWN/HEN THE SOD lb GROUND STABILIZATION wmxTxEarIL .:ro �.AS`Ws" MnwEa \ / \\ \ VICINITY MAP / DESISCRPTE TEON A STIMEILIE RAMON E EXCEPTION61,140, S„APPEARANCE OFGO000 SOD ° / \\ \\ / / ) N.T.S. PERIMETER DIKES, 7 DAYS NONE E. / \\ \ / SWAG S, DITCHES a, / \\ \ &SLOPES �n'"°""°"`' \\ ,, \ ___ ___ HIGH QUALITY 7 DAYS NONE ear's \\ (P`�(S \\\ \ v\ WATER ZONES V..'oP.°'°'"`"' L. (HQW) oaa�x.ra re"..same., — —> 1. \ \ \\ �(P \\ r SLOPES STEEPER 7 DAYS IF SLOPES ARE \ \\ i \\ A SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY THAN 3:1 10'OR LESS IN L 1 I \ \\ `t \\ NCGS 113A-54.1`IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR LENGTH AND ARE I \\ 'rG \ COMPLETED AS AN EXCEL SPREADSHEET. NOT STEEPER General the Erosion Control Notes / /" \ I `� \\ AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED THAN 2:1, 14 / \ \ /�{��' \ /�— EROSION AND DAYS ARE 1.Only the areas shown shall be disturbed. I \ \ \\ SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A ALLOWED 2.AU disturbed areas shall be grassed land \ I I \\ 7 \\ NCAC 046.0131 STATES h1AT-...DOCUMENTATION SHALL BE ACCOMPLISHED BY mulched ass n as possible and attained \ \ I \\ \ INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE SLOPES 3:1 OR 14 DAYS 7 DAYS FOR until pemanent cover Is established. APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING. FLATTER SLOPES GREATER \ 1 \ \\ \ DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, THAN 50'IN \ \\ PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION LENGTH \ I I I \ \\ CONTROL PLAN." ALL OTHER AREAS 14 DAYS NONE(EXCEPT) N. II I I \ I I 1 \ ----1 \\ WITH SLOPES FOR PERIMETERS 1 FLATTER THAN 4:1 AND HOW ZONES eRooxsTONE PARTNERS,tic 1 I I 1 \ DB 14ai,PG 654 \ PBC/3,PG OOP (FUTURE DEVELOPMENT) I I I DATE: PAGE: / / / r aROgC6rONE PARTNE•5 LLC / S S /Wattle S S / tt NOT DATE: PAGE: \ FLOW_ _ Other matenals providing equivalent protecbon Ares ° IL =a...N�I t far E DEVELOP13,1173,PG B'ENT) CON L MITSTIONn I 1 Mn'I II_.II; E roar deform .A' e c O c• „ / IStakesStakes 1 1SECTION SECTIONtrl ma �� r � rr�r �� �// 2� s' � 95 5. / _�a land instant/anoua to�u ea su niN�Icpero ¶ '� ���:� ( 0 \ Lo[Plan male/.g /l 41‘,('''' rAJ I iWAY 1 1Lo P�ian LlAY L� J I� �.� r / \ \ 1 \ r / S \ C&D 4 .,s 4 ll �. ll on should be Omen ,center of,ellt sock/wattle Stakes should be placed at a '" � 1 2maximum interval of 4 feet or a rnammurn f0 R pRO AY �RRAV RO WAV SRO Y \ 1 \ / \ I of 8 feet d Wood Mulch or Com ground a MIn. 5trench the satao plact staking is not passim(minie naa^interval n CURB INLET Laoaaorcuae Note / umRErvc06D1/O height Of 9pavement)!easy 1.If needed,Tree Protection fencing should be installed along the buffer zone,wetland \ \ / // \ LotPlan INconcrete blocks shall be used mom.silt boundary and/or around protected trees,providing a radius of at least 1.25 feet for each 1 \ \ t P /'""'""`""°"`"°,••"'®"""`r'•c""`""""'•"TMX1e' hold place a g off events. LEGEND inch of trunk diameter. \ \ / \ // ISOMETRIC VIEWMAINTENANCE 2.Install Silt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on Il \ 4111k,1' °M'"each 1 inch or greater rainfall Remove N schematic/diagram and field adlusted,if necessary,for placement at low points.If lots are73 !'�•r. \ y0 ,,,.I(�'.'STRUCTIONBROOKSTONE PARTNERS,LLC PG 007 Mulch or ompw, Oat INlnu now RATES as a Fentcesous and have different land owners or builders,each lot should have individual Silt / \ \ CONSTRU TION / LIMITS Oe,486.PG B64 ^,�rm c(,6 's"ca .1.;: 90 a(,n'so 2. ante must!.replaced Kammea or ® 3.Install re d DM Fence within l0 feet of h flct with \ SILT FENC. ENTRANC CONSTRUCTION \ ✓ 987. (FUTURE DEVELOPMErvn 00 nr UntrencneaSake pr.aTORe d dF w.n•,s (jo0gym)(as0nm)(a00nm) quire property inn m ensure t ere is nD con i \ \ \ ;� 1 needed to al.for adequate nm) nm) ENTRAIJ septic system.It is the responsibilityofthe builder to ensure the installation of sediment \ 72 LIMITS \Shea Flow—� 'Se<k � Control measures does not impact the septic system a.repair area(s). \ \ \ - \ OMqSilt Sock/uLenywm(axj (iaSrmj(uSrmj 1`M� 1r..eci 'k s a cuRBINLET 4.Atleas[One Construction Entrance/Exi[is to be installed [ \ , 0Wattle . (305 m) (age m) (500 m) - per o. \ G ''• 89 `y A Work Are „ v„n' 6 5.Waste bins and other areas dedicated for managing building material waste shall be al \ \ " „ Z B o• ],%n oT,f, 'm%n m%n mjn .all be inspected until lam least 50 feet away from storm drain inlets or drainage ditches unless it can be shown that S.LT FENCE —\ socks/wattles am the area above me \ 1 \ Lot Plan/ (sa m/ (tea (eat m/ ' bee . tab, a no other alternative exists.It this separation cannotbe achieved,these areas must be \ \ \ \;v /; \ \ ../.. \ xG /m/m) /m/m) /m/m) /m/m) /m/m) meaty disturbance Mae6 npemlane y. iize. \ REINFOR ED 7r kkk"'21, "G" I contained behind Silt Fence. WATTS E ..NC-Envir mental LTFENC Av"j1\ o m r ipeg SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION 6.IMeN downstream of disturbances should be protected;streets should be swept when ` \ 2\ '+,`� 7 "� / sediment from the construction activity is present. 1\\ \ N. UTLET `�;,.•. VDU ..\NC-Environmen tel.jpeq ].Details for Silt Fence,Silt Fence Outlets,Construction Entrances and other measures are \\ \ \ \ \ \ \ \ provided on additional sheets.Erosion and sediment control details are not dawn to scale. Co NSTRUCT N I LIMITS TYPICAL LOT LAYOUT WITH CURB AND GUTTER \*... /'1 DATE: , - -, Filter Fabric PAGE: \ \ \ \\?,O 7t ,"t/�1.{�� \ \ 101 Steel Post DATE: PAGE: I , \ \ C., \ Wire B ckflll trench \ \ yT/!' \a Wire Fence , I' and rou Compact aB�T \ \ hly e •J k Steel Post tho / r 1- \ MAS ER ASSpCIENGINC\ 110 /I' DB41]3 B6]\ \\ •wee ties 036 ,i t \ \ \ \ \ \ Willig II I.ism I I. k ea.wnaamlwamarogn ., e•�m Qv�;`c 0 /.'� �pM,w]F,Mm \� ��� \ \\ \ \ 7 \\\ �, nbre _ kph v CROSS SECTION VIEW / ��• \\ `\\ \\ \ \ \ G91a38,PG 661 1 e.:emwr..e z4 nu. wm:.<•nao:ar aFw•vrewnxila _jai rrar � • W �.• \ \ `w. (FIINRE DEVELOPMENT) I / 04 �ar^"'.'oremroo. pose. n. 6 Mn I - .4 _�' \` \\ I I I \ \ \ \ \ l\ an• inn a nw•arcann•been� / _I dd end. \ \ \ c6 a afmlmem p,.;,,I nil,;,,, Thoroughmma� �wmahme a yy .y �\ \\ \ 1 \ \ \\ 1 m.� mn ,ar. ..na. na.ma 1.Clear the entrance and wat area of ranee as a grade vegetation,agMsam�heroaectweb. �a da�reach,mm�rgeaternima 1 1� �� \ \ \ ) Plac he hown a Use...Ile nit nordert°m of ll n oceans tie m. .p washed m onto a � \ \ \ \ )smoI vNC—Ere enbal.jpeq subject to rhihwatertabla m.,.w 11 1 v �m SILT FENCE ( I 1 ( ( ' vie-Envh�I�neI1luLJyeg ` I I I I I I I \ \\\\ \ \ 1 i CONSTRUCTION ENTRANCE/EXIT ) I I I I /\/) DATE: PAGE: / / / I J I i I 1 \ \ \ \ I 1 els _� FENCE PAGE 1 of 2 + Illllli milli'.milli 1 - - MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION TOTAL DISTURBED ACREAGE: 1.22 ACRES ---. LOT EROSION CONTROL PLAN General-All measures will be inspected and corrections made after runoff produang rainfalls,orat least once per week minimum.The builder wall insure that the construction actvitieson any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be LOTS 71, 72, 89 & 95-97 TNEwasoED j �v relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. - - Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all BROOKST ONE VILLAGE STEEL FENCE ST 17,7-FRONT objectionable materials spilled,washed,or tracked onto public roadways. PHASE 1 HARDWARE Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure FOR WIRE FEN .._...._...._.. Y WIRE.FENCE, FILTER FABRIC, \BUR that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence duringcleanout operations. AND HARDWARE FILTER g q g CATES BUILDING INC. WASHED sro SET MAX REAR CLOTH IN TRENCH Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth f OF GROUND FABRIC FD GROUND MIN 18.INTO SOIJID and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. ON McLAUCHLIN TOWNSHIP HOKE COUNTY ld overlay the slit fence at least 12 incheS Us_reth MilShould SIOneon low elapanro aaa.maln fence am Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be 0o`17�� on field conditions. repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. SCALE: 1"_1 00' JUNE 2023 GRAPHIC SCALE k,napalm eaiich Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed c BURY WIRE FENCE AND rwMowA CLom oS'"a3 Keep Imhaa. sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. s 0 100 200 UM NLTERFAeRic IN or mesh free of dehns.provide adequate flow - 4 Remove...it,.heliolatry.outlet is covered 5.R•omo.atone as needed m faalmm de vannng. Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next min to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout Remove and replace stone as necessary as it becomes clogged with sediment.Remove all NC-En rJ q"" SECTION VIEW fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. ( IN FEET ) ...n , deg SILT FENCE OUTLET MOORMAN,KIZER&REITZEL,INC.1-r-r r E TT 115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 ,O.. PHONE(910)484-5191 FAX(910)484-0388 LICENSE BF-0106 LAST SAVED:6/1/2023 9:41 AM LAST PLOTTED:6/21/2023 12:21 Pa PLOTTED BY.Dennis Gibed FILENAME:G\CURRENT JOBS\CATES BUILDING INC\23-1803-01 BROOKSTONE VILLAGE-EC\PUMS\BROOKSTONE EC-LOTS 71.72.B9 A 95-97.DWG