Loading...
HomeMy WebLinkAboutNCC232009_ESC Approval Submitted_20230707 '' Et"`STATE aF",, ROY COOPER Governor °,, `a. ELIZABETH S.BISER z � ,a ' Secretary �Af QUU n°0— DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Quality January 25, 2023 LETTER OF APPROVAL WITH MODIFICATIONS Bearing Construction Co. ATTN: Jim Merrell 805 Shine Smith Road Suldersville, MD 21668 RE: Project Name: Mountaire MBBR Renovations Acres Approved: 3.52 Acres Project ID: CHATH-2023-006 County: Chatham City: Siler City Address: East 3rd Street River Basin: Cape Fear Stream Classification: Submitted By: C Date Received by LQS: January 4, 2023 Plan Type: E&SC Dear Mr. Merrell, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOl) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed,you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOl form to the Stormwater Program staff in the Raleigh central Q vvv North Carolina Department of Environmental Quality 1 Division of Energy,Mineral and Land Resources D_E Raleigh Regional Office 11628 Mail Service Center 1 3800 Barrett Drive 1 Raleigh,North Carolina 27609 NORTH CAROLINA oePanmem m En.�ronmenmi aaar� /� 919.791.4200 Letter of Approval Bearing Construction Co. January 25, 2023 Page 2 of 4 office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If,following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided. This permit allows for a land-disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Letter of Approval Bearing Construction Co. January 25, 2023 Page 3 of 4 Sincerely, , k,e4 Abdulrahman Fayad Assistant Regional Engineer I Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCGO1 Fact Sheet cc: Regional Office file Kevin Rosensky Letter of Approval Bearing Construction Co. January 25, 2023 Page 4 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Mountaire MBBR Renovations Project ID: CHATH-2023-006 County: Chatham 1. Provide copies of access/encroachment agreements from NCDOT and other public or private party entities. (GS 113A-54.1(a)) Provide the document once obtained. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities