Loading...
HomeMy WebLinkAboutNCC231337_ESC Approval Submitted_20230707 Planning&Development Services TOWN of CARY NMI II U1011NA Town of Cary 316 N.PcademySt.I Cary,NC 27513 (919)469-4000 drc@townofcary.org March 29,2023 121 Balaji Place Cary, NC 27513 RE:Development Review Committee Approval of Sri Venkateswara Religious Hall Project Number: Appointment: BKNG-YDEVSN2AWX61 Town of Cary Project Number: 22-DP-6356 Property Real Estate ID Number(s): The Town of Cary Development Review Committee is pleased to inform you that your plan is approved,effective March 29,2023 SCOPE OF WORK APPROVED: This project proposes to add a new 40,000 square foot religious hall and an administration building along with parking and site layout improvements.Several existing structures and features will need to be relocated or demolished to accommodate the new buildings and infrastrucure.This will be a two-phase project with the final phase leading to the widening of NC- 54 along the extents of the property line. DURATION AND EFFECT OF APPROVAL • Substantial Commencement by March 23,2024 • This approval shall become null and void if the applicant fails to substantially commence work authorized by this approval prior to the date noted above CONSTRUCTION COMPLETION • In no case shall this plan or parts of this plan be valid if work is intentionally or voluntarily discontinued for a period of not less than 24 months. If a plan is deemed to no longer be valid,the owner or applicant will be required to resubmit for approval a plan that meets current development ordinances unless otherwise noted in this Ordinance. • No change(s)may be made to the above-referenced development plan unless approved by the Town of Cary. SITE DEVELOPMENT PROCEDURES AND NOTES: • Unless stated otherwise in this letter,all permits, procedures,and development fees addressed in the original letter of approval remain in effect as so noted. PAYMENT OF FEES: • Before a pre-construction meeting can be scheduled and any work begin on this project,all fees included in the attached Statement of Fees must be paid either online (following the below instructions), by phone(311 inside Cary,919-469-4046 outside Cary),or by check. • Failure to do so may result in delays to processing times for related applications and permits,and may also result in the Town initiating appropriate enforcement action in accordance with Chapter 11 of the LDO. Such action may include, but is not limited to, issuance of civil penalties and/or withholding issuance of building and occupancy permits. To Pay Fees Online: www.townofcary.org Select Permit Created with idtPlans Review Sri Venkateswara Religious Hall Page 1 of 3 3/29/23 Put in permit number View Application Fees To Pay Fees by check: • Mail your check(payable to Town of Cary)to Development Services,PO Box 8005, Cary,NC 27512-you must reference your Development Plan number on the check. If paying by check,allow approximately 2 weeks for us to receive and process the check. GRADING PERMIT APPROVAL: A Town of Cary Grading Permit is required for the proposed land disturbing activities. Please email the following documents to Lisa Booze(lisa.booze@townofcary.org): • Completed Grading Permit Application for 6.93 acres,found here • Financial Responsibility Form,found here • Grading Contractors Certificate of Insurance Additional step by step guidance is available at Applying for a Grading Permit on the Town's website A Soil and Erosion Certificate of Compliance must be obtained from Town of Cary Stormwater Management prior to issuance of any building permits. PRE-CONSTRUCTION MEETINGS: • E-mail 311atownofcary.orq to arrange a pre-construction meeting prior to any construction activity and after the above requirements have been met. • Pre-construction meetings are available weekly on Tuesdays between 1 pm-3pm and Thursdays between 10am-12pm on a first come first serve basis. • Once all requirements have been meta Pre-construction meeting should be scheduled a minimum of 3 business days prior to the meeting date. A Record Drawing of this plan set per Section 10000 of Town of Cary Standard Specifications shall be provided to the Town at the conclusion of development,and prior to the final site inspection.This final set shall include all revisions, Minor Alterations,field changes,and other modifications to the original approval so that the site inspector has the most accurate plans possible to perform their inspection. ADDITIONAL APPROVALS REQUIRED Constructing and/or occupying buildings or other structures • A building permit issued by the Town of Cary is required prior to commencing the construction,alteration,repair or removal of a building or structure,or part thereof,including interior and/or exterior work. • A building permit is required prior to a change in the use or occupancy of any existing building,or part thereof, regardless of work(interior or exterior) to be performed on the building. • All required building permit and development fees will be due prior to the issuance of a building permit. For questions about building permits, inspections or fees,contact Development Services at(919)469-4046 or dre@townofcary.org. No Certificate of Occupancy or Certificate of Compliance maybe issued until all on-site and off-site improvements have been completed unless otherwise approved by the Town of Cary. SIGNS • Signage is a separate application and approval process and has not been reviewed or approved as part of this development plan. • A sign permit must be obtained prior to erecting any permanent or time-limited sign(s)on the property. • For information about sign requirements and application process,contact Development Services at(919)469-4046 or drc@townofcary.org. Created with idtPlans Review Sri Venkateswara Religious Hall Page 2 of 3 3/29/23 For any questions about this development plan approval, please contact Development Services at(919)469-4046 or email drc@townofcary.org.We thank you for choosing the Town of Cary! Sincerely, TOWN of CARY Created with idtPlans Review Sri Venkateswara Religious Hall Page 3 of 3 3/29/23