Loading...
HomeMy WebLinkAboutSWA000192_email_20230405 Peck, Kaitlin From:Farkas, Jim J Sent:Wednesday, April 5, 2023 9:34 AM To:timstrickland@stancilbuilders.com; keith.roberts@timmons.com Cc:freddiestancil@stancilbuilders.com; Joyner, Melissa Subject:RE: SWA000192; Woodbridge South Please upload the electronic files for this project to the link provided below. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov From: Farkas, Jim J Sent: Wednesday, March 15, 2023 3:44 PM To: timstrickland@stancilbuilders.com; keith.roberts@timmons.com Cc: freddiestancil@stancilbuilders.com; Joyner, Melissa <melissa.joyner@ncdenr.gov> Subject: SWA000192; Woodbridge South Good Afternoon, We received your post-construction stormwater Authorization to Construct (ATC) permit application for the above mentioned project on 3/14/2023. Reviews under the Fast-Track permitting process can take up to 30 calendar days to complete. You can see where this project stands in the review queue by emailing me (I have an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the “State Stormwater Information Uploads” section of the form. YOU MUST CLICK ON THE “ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD” TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding additional file uploads) will upload all of the files as the last file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps 1 expedite the review process. NOTE: We do not require and we discourage the upload/submission of extraneous plan sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc…) as these files are not needed for review. Please type in permit #: SWA000192 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646 (email is preferred). Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov 2