Loading...
HomeMy WebLinkAboutSW1230602_Plansheet - Field Surfacing_20230705 (2) PROJECT: 36' N 14"44'41'• E 795.48 (TOTAL) N 14"17'47" E 1200.78' (TOTAL) LEGACY EST, S0CCER PARK2024 N X X �f-X X---------X �w .. •YD ,t X_X X!4F ADDRESS: 520 PINEY RIDGE ROAD I FOREST CITY I RUTHERFORD COUNTY I NC 1 28043 I :, I NATURAL GRASS FIELD x X x I CLIENT: ' NATURAL GRASS ARTIFICIAL INFILL I x FIELD TURF FIELD I ' x ship4, 1 1 '` 1 1 ^b:: ' Fiel 4) I I ! L X �/M LEGACY Olif�lDATIOP x CONTACT: TERRY HINES, EXECUTIVE DIRECTOR 828.202.4630 ADDRESS: P.O. BOX 352 1 RUTHERFORDTON I s x RUTHERFORD COUNTY I NC 1 28139 XW x ,,. . ,. . ... ..:. . . •• . .�.. .I. .I. .I. .I. .I. .I. .I. .I. .I. .I. .I. .I. .I. .I. .I. .I. .I. .I. x LANDSCAPE ARCHITECT: e ARTIFICIAL INFILL ARTIFICIAL TURF FIELD (Mini INFILL !' JU D E TINATION a TURF FIELD I I 1 Field 1 v (Mini Field 2 r. .t BY SG NATURAL GRASS G)m D '? m z FIELD ARTIFICIAL INFILL ' o w FIETURF FIELD (Mini NATURAL o x ,Field,3) x A }: r G z f; o ADDRESS: 136 FURMAN ROAD, SUITE 6 1 BOONE I WATAUGA COUNTY I NC 1 28607 4vH SEAL: UU a a. _ 0 '' _ b b a ' DO NOT ENTER N tt t rrr��n 1 w `t'.. - � .o�- .•o. 0 X X J J LEGEND U 05/10/2023 w m ARTIFICIAL INFILL TURF FIELD REVISIONS DATE X SCM WET POND x ._ NATURAL GRASS x FIELD I ' NATURAL GRASS FIELD ' J m NOTES: N 1. ARTIFICIAL INFILL TURF SURFACE SHALL DEMONSTRATE AN INFILTRATION RATE x OF AT LEAST 50 INCHES PER HOUR X USING A HEAD LESS THAN OR EQUAL TO 4 INCHES. �z 2. SUBSURFACE DRAINAGE SYSTEM SHALL DEWATER THE DESIGN VOLUME TO THE TIFWAY 419 BERMUDA SOD 0 !+ L - BOTTOM OF THE SUBGRADE SURFACE �v WITHIN 72 HOURS. 1.33% SLOPE MAX. 1.33% SLOPE MAX. ` 3. CONCRETE EDGE RESTRAINT WITH (SEE GRADING PLAN) (SEE GRADING PLAN) DFTDR= _ F NAILER BOARD SHALL BE PROVIDED GEOTEXTILE FABRIC PROJECT MANAGER: CAG 12" SAND BASE AROUND PERIMETER OF TURF SURFACE. x! x `eeNTeROF F1eLD 'a v z 4. AFTER INSTALLATION,THE TURF 6" #57 STONE - DRAWING BY: CAG oNGP TE SURFACE SHALL BE PROTECTED FROM SUBGRADE -I I 12" PERFORATED a I I- - - - - - - - - - - - - - - COLLECTOR PIPE FOREST CITY NC GDR=\ nI R o.sT Tove s sroNE 075%5S FE 0.75&SLOFE_ DTUF ■� A SEDIMENT DEPOSITION UNTIL THE SITE _ - - - - - -I :1.ti-.+.':. �:::'.:.•. a: ::, .,.;'-.;.;.. :,.':::..;-:',:.:.,:: � JURISDICTION: , _ ,. L IS COMPLETED AND STABILIZED. AFTER - ,-1 I II I I(I 111 111 111 II I I-III-III I-III-I 111 111 111 I II I I I I„I I-1 - ::''•. ':: ,:: 09/20/22 •I I-(� DATE 5. THE SITE IS STABILIZED, AN IN-SITU � b b a� a� �w ,1• P PERMEABILITY TEST SHALL BE SHEET TITLE: _ CONDUCTED AND CERTIFIED ON THE 0 O o TURF SURFACE. F.FE DF.a1NNG-TD%L I2'FEiF ,R TED GOLLEGTDR `',LO,EFJ @ 0.34f ff.-F.TrI LINFR v \`FREE DMINING STONE TRENCH-DING PALL 5ID-= UNDISTURP�ED SUEGRgDEJ N Draw Down Time(15A NCAC 02h.1055) NOTES: ATHLETIC FIELD ZO Hydraulic 1. FIELD TO BE CONSTRUCTED TO ASTM F2396 STANDARDS (STANDARD o _ H Design stone Factorof Draw Down Conductivity MioReq. GUIDE FOR CONSTRUCTION OF HIGH PERFORMANCE SAND-BASED D W Area(sgft) Area(ac) Depth(in) Rv DV(cf) Depth(ft) safety Time(hrs) (in/hr(" sA(5gft) ROOTZONES FOR ATHLETIC FIELDS). SURFACING DETAILS _ Championship Field4 1Os300 142 1 0.95 8336.25 0.42 z 72 8.33 6.95 2. SAND BASE TO BE COMPRISED OF SAND AND PEAT MOSS MIXTURE. U) - Mini Field 1 4436.35 0.10 1 0.95 351.211 0.42 2 72 8.33 0.29 Mini Field 2 2958.45 0.07 1 0.95 234.2106 0.42 2 72 8.33 0.20 MIXTURE RATIO TO BE 8:2. SHEET NUMBER: U - Mini Field 3 7622.13 0.17 1 0.95 603.4186 0.42 2 72 8.33 0.50 L G 0 Calculations based on NCDEQ 2017 Stormwater Manual V■ 'Hydraulic Conductivity is based on the permeability specifications provided by the synthetic turf manufacturer(Sports Labs). a g W The hydraulic conductivity of the underlying sub-grade base(No 57 stone)exceeds the turf rate used in this calculation. fi m n • SCALE: 1n = 60' CAD(SR 21 60 30 0 60 120 -71 -.7 . RHI E7 0 1 ARTIFICIAL INFILL TURF FIELD 2 )_NATURAL GRASS FIELD SCALE IN FEET ow what's below SCALE NUMBER: 2020 Call before you dig