Loading...
HomeMy WebLinkAboutNCC232005_Site Plan or Location Map_20230703 irmi......mr.w. ..,v,, 1.40.1-40.1swir ,vic letwii•Allit. f DUKE ... ,,,„„,6 40 434121Aikt Vrriotlfs.0411442)(-: 440.1fripdb, �� �lfr.4440111 PROJECT T;N 411404111* ENERGY. ,tie 10 41 G R E S S NORTH & SOUTH CAROLINA STATE MAP CASTLE HAYNE - FOLKSTONE 230 KV RAISE THE LINE OVER 1-40 PROJECT NARRATIVE EROSION & SEDIMENT CONTROL & ACCESS PLAN THE PROPOSED CASTLE HET OF-FOLKSTONE C30KVASTL RAISE THE LINE OVER 230KV PROJECT IS NEW H A N O V E R COUNTY NORTH CAROLINA LOCATED IN NEW HANOVER COUNTY,NORTH CAROLINA.THE PROJECT INCLUDES THE REBUILD OF LOAPCATED NTELYW 1500 ER CO THE NOTINGRTH CASTLE A.THE THE RE SION LINE FROM CASTLE HAYNE SUBSTATION TO STR 5.THE PROJECT IS LOCATED WITHIN DUKE ENERGY'S MOWED AND MAINTAINED RIGHT OF WAY.THE PRIOR USE OF THE SITE IS (�TRANSMISSION INFRASTRUCTURE AND THE PROJECT WILL NOT CHANGE THE EXISTING LAND USE. LATITUDE: 34.329 57 8° PRIOR TO CONSTRUCTION,A DUKE ENERGY CONSTRUCTION CONTRACTOR WILL INSTALL EROSION CONTROL MEASURES TO ENCOMPASS THE ANTICIPATED CONSTRUCTION LIMITS. LONGITUDE: -77.H747 Z8� PREDEVELOPMENT CONDITIONS WILL BE RESTORED AND THE AREA WILL BE STABILIZED PRIOR TO COMPLETION OF CONSTRUCTION.AN AVOIDANCE AND MINIMIZATION OF DISTURBANCE APPROACH SHEET LIST: HAS BEEN INCORPORATED INTO THE DESIGN OF THE EROSION CONTROL MEASURES BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED RIGHT-OF-WAY ACCESS ROUTES,WHENEVER SPOSSIBLE.EROSION CONTROL MEASURES ARE INDICATED HEREIN FOR PERMITTING USE ONLY BY COVER SHEET SHT 1 OF 9 NCDEQ.THE INITIAL PROJECT DURATION IS ANTICIPATED TO START IN AUGUST 2023. "�'°°oo, OVERALL PROJECT LAYOUT SHT 2 OF 9 ° "`°' m EROSION CONTROL MEASURE QUANTITIES SHT 3 OF 9 EROSION&SEDIMENT CONTROL PLAN SHT 4 OF 9 EROSION&SEDIMENT CONTROL DETAILS 1 SHT 5 OF 9 „�"a ,� _ "`�"�°..,,, EROSION&SEDIMENT CONTROL DETAILS 2 SHT 652 OF 9 EROSION&SEDIMENT CONTROL DETAILS 3 SHT 7 OF 9 NCG01 DETAIL 1 SHT 8 OF 9 NCGO1 DETAIL SHT 90F9 „I GENERAL NOTES 1. APPROXIMATE STRUCTURE LOCATIONS WERE PROVIDED TO DUKE ENERGY LINE ENGINEER AND ARE FOR _ lb PROJECT AREA REFERENCE ONLY. THESE DRAWINGS SHALL NOT BE USED FOR LINE CONSTRUCTION. 2. BASE DRAWINGS WERE CREATED BY GIS DATA OBTAINED FROM VARIOUS SOURCES.AERIAL PHOTOGRAPHY WAS OBTAINED FROM STATE AGENCIES. ro 3. NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE MIGRATORY BIRD HOTLINE CONTRACTOR'S RESPONSIBILITY TO ACCURATELY LOCATE,BOTH VERTICAL AND HORIZONTAL,EXISTING STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY UTILITIES PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY NC 811 PRIOR TO CASTLE HAYNE SERVICE AREA.INTERACTIONS OF BIRDS WITH GENERATING FACILITIES,TRANSMISSION AND DISTRIBUTIONS, EXCAVATION. CONTRACTOR SHALL NOTIFY DUKE ENERGY IMMEDIATELY IN THE EVENT OF -SUBSTATION SUBSTATIONS,OTHER STRUCTURES AND EQUIPMENT,AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM THE PLAN. COST TO 4? BIRDS. . BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND REPAIR DAMAGED UTILITIES SHALL BE BORNE BY THE CONTRACTOR. 8 CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. 4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR SHALL NOT DISTURB UTILITY POLES,GUYS WIRES,OR ANCHORS WITHOUT PERMISSION FROM DUKE CAROLINAS:800.573.3853 FLORIDA:727.386.3084 MIDWEST:317.430.4497 0v ENERGY. 5. PROJECT IS LOCATED IN THE CAPE FEAR RIVER BASIN. THE PROJECT IS NOT SUBJECT TO CC STATE-REGULATED BUFFER REQUIREMENTS. 4,o., Y W 6. SEE SHEETS 5 AND 6 FOR EROSION AND SEDIMENTATION CONTROL SEQUENCE AND SEEDING SCHEDULE. "a O 7. STREAMS EXTEND BEYOND THE RIGHT-OF-WAY. APPROPRIATE BRIDGING AND MATTING OF THESE SPILL REPORTING HOTLINE w FEATURES IS REQUIRED SHOULD THE CONTRACTOR USE ANY ACCESS ROUTES LOCATED OUTSIDE OF a°w+"° Z THE RIGHT-OF-WAY. S\06URY RO IN ORDER TO ENSUEFEDERAL AND REQUIRE THAT CERTAINHE TYPES OF SPILLPRTECTIONS AND UNPERMITTED RELEASESF HUMAN HEALTH AND THEVIRONMENT,BE REPORTED TO THE PROPERTE LAWS W 8. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DUKE ENERGY US REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION.IMMEDIATELY NOTIFY YOUR F PERMITTING PRIOR TO USE. c// SUPERVISOR AND THE FIELD ENVIRONMENTAUEHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS W 9. CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY. HEAVY MATS MAY BE USED IN LIEU OF J co sa°w+as DISCOVERED.IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAUEHS PROFESSIONAL CONTACT ONE OF ROCK CONSTRUCTION ENTRANCES IF DEEMED SUFFICIENT BY A DUKE ENERGY REPRESENTATIVE. 0THE DUKE ENERGY SPILL REPORTING HOTLINES AT: Q CAPE FEAR COMMUNITY X 10. WETLAND MATTING SHALL BE COMPOSITE MATS. NO LATTICE OR TWO-PLY MATTING SHALL BE USED IN CAROLINAS&MIDWEST:800.527.3853 COLLEGE NORTH CAMPUS JURISDICTIONAL WETLANDS AND/OR STREAMS. FLORIDA:866.769.1266 Y 11. NO OIUFUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 100 FEET OF WETLANDS OR , o SURFACE WATER WITHOUT CONTAINMENT. cMv 12. SITE SHOULD BE"STORM READY"AT THE END OF EACH WORK DAY/WEEK. - s° 3 W Z 13. SECURE WRITTEN ACCESS AGREEMENT IS REQUIRED FOR ALL 3RD PARTY ACCESS AND PRIVATE DRIVES 0 NOT INCLUDED IN ROW DOCUMENTATION PRIOR TO BEGINNING CONSTRUCTION. 5 1- 14. ALL DISTURBED AREAS SHALL BE RESTORED TO SAME OR BETTER CONDITION.PERMANENT GROUND CONTACTS Y COVER SHALL BE USED FOR STABILIZATION. VICINITY MAP OWNER: ENGINEER: 0 DUKE ENERGY PROGRESS,LLC DEWBERRY ENGINEERS INC. LL SCALE:1:10,000 NUWAN WIJESURIYA ZACHARY EULO,PE 410 SOUTH WILMINGTON STREET 2610 WYCLIFF ROAD SUITE 410 LU RALEIGH,NC 27601 RALEIGH,NC 27607 >- PH:919-546-2090 PH:(919)425-7610 I CONTRACTOR SHALL NOTIFY"NORTH CAROLINA ONE CALL"(811)OR NUWAN.WIJESURIYA%DUKE-ENERGY.COM ZEULO%DEWBERRY.COM (1-800-632-4949)AT LEAST 48 HOURS PRIOR TO BEGINNING p\1u911p/�� Lu CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. ���X�H CAROO�i� CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDED 2�b ESSI�y?v a THEIR OWN LOCATOR SERVICES INDEPENDENT OR"NORTH CAROLINA . - - SEAL '. = 0 O ONE CALL".REPORT ANY DISCREPANCIES TO THE ENGINEER • . = 055132 = DUKE TIRE CASTLE HAYNE-FOLKSTONE 230 KV IMMEDIATELY. - .8_ = _.o Dewberry® of RAISE THE LINE OVER 1-40 fW r q IN 1\\\\� D E20016103 05/24/2023 100%FOR PERMITTING-NCDEQ EXPRESS REVIEW MODIFICATION CAG DAR ZAE Mern 0 Dewberry Engineers Inc. t, ENERGY 5/Zylz3 2610 WYCLIFF ROAD ® C E20016103 04/17/2023 100%FOR PERMITTING DM DAR ZAE SUITE 410 PROGRESS COVER SHEET 100% FOR PERMTTING RALEIGH, NC 27607 B E20016103 03/28/2023 90%DESIGN FOR DEP REVIEW DM FDR ZAE PHONE: 919.881.9939 A E20016103 02/17/2023 60%DESIGN FOR DEP REVIEW DM FDR ZAE FAX s1s0929 23 411 ALEIGH N.C. STREET6 NCBELS#F-0929 RALEIGH N.C.27601 SIZE MOMS SHEET REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED DO NOT USE FOR CONSTRUCTION Dewberry Project No.50161068 www.dewberry.00m TELEPHONE NO.(919)546-2090 D E20016103 1 OF 9