Loading...
HomeMy WebLinkAboutSW1230601_Supplement-EZ Form_20230623SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name South Parking Area 2 Project Area (ac) 10.97 3 Coastal Wetland Area (ac) 0 4 Surface Water Area (ac) 0 5 Is this project High or Low Density? .project High 6 Does this use an off -site SCM? No ............................................................................................................................................................................................................................................................................................................................................................................................................................................ COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No ......................................................................................................................................................................................................................................................................................................................................................................................................................................... NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting (RWH) 18 Green Roof 19 Level Spreader -Filter Strip (LS-FS) 20 Disconnected Impervious Surface (DIS) 21 Treatment Swale .... 22 Dry Pond... 1 23 StormFilter 24 Silva Cell... .... 25 Bayfilter .... 26 Filterra I�IOIIl�lpl� DESIGNER CERTIFICATION 27 Name and Title: Dave Skurky, Chief Stormwater Engineer 28 Organization: Aulick Engineering, LLC 29 Street address: 600 Park Offices Dr. 30 City, State, Zip: Durham, NC, 27709 31 Phone number(s): 919-819-4242 32 Email: dskurky@aulickengineering.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision, that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer I-- "'k Si ature of Designer �0I Date DRAINAGE AREAS 1 Is this a high density project? Yes ...................................................................................................................................................................................................................................................................................... 2 If so, number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rul e 5 versions? No FOBMSI..OADFD DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Dry Pond 5 Total drainage area (sq ft) 263053 6 JOnsite drainage area (sq ft) 263053 7 Offsite drainage area (sq ft) 0 8 Total BUA in project (sq ft) 259713 sf ........................................................................................................................................................................................................................................................................................................................................................... New BUA on subdivided lots (subject to permitting) 9 (sq ft) New BUA not on subdivided lots (subject to 10 ........................................................................................................................................................................................................................................................................................................................................................... permitting) (so 234302 sf 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft) 152552 sf Sidewalk (sq ft) 4043 sf Roof (sq ft) Roadway (sq ft) 77707 sf Future (sq ft) .... Other, please specify in the comment box below (sq ft) New infiltrating permeable pavement on 13 subdivided lots (sq ft) New infiltrating permeable pavement not on 14 subdivided lots (sq ft) Existing BUA that will remain (not subject to 15 permitting) (sq ft) 25411 sf 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 89% 19 Design storm (inches) 1.0 in 20 Design volume of SCM (cu ft) 17110 cf 21 Calculatiori method for design volume Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): This project is within Asheville Regional Airport property, which has a property of 900ac. For the purposes of our calculations, the limits of our construction, 10.97 acres, was used when determining built upon area values. ,,area DRY POND 1 Drainage area number 1 2 Minimum required treatment volume 17110 cf GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered No side slopes? Are the inlets, outlets, and receiving stream protected from erosion 7 Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with No General MDC (10)? 14 Is there an O&M Agreement that complies with General MDC (11)? Yes ................................................................................................................................................................................................................................................................................................................................................................... 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM desi ned b an NC licensed rofessional . Yes DRY POND MDC FROM 02H .1062 18 SHWT elevation (fmsl) 2080 19 Elevation of the bottom of the dry pond (fmsl) 2080.5 20 Distance from bottom to SHWT (feet) 0.5ft 21 Elevation of the temporary pool during the design storm (feet) 2083 ft 22 Ponding depth of the design storm (feet) 3 ft 23 Will the dry pond be uniformly graded to flow toward the outlet? Yes 24 Is a low flow channel being provided? No 25 Are the inlet(s) and outlet located in a manner that avoids short- Yes circuiting? 26 Will berms or baffles be provided to increase the flow path? No 27 What method of pretreatment will be provided? Forebay 28 Design volume of SCM (cu ft) 35,826 29 Diameter of drawdown orifice (in) 3 in 30 Drawdown time for the temporary pool (hours) 40 Does the pond minimize impacts to the receiving channel from the 1- 31 Yes yr, 24-hr storm? 32 Is there a small permanent pool near the orifice to prevent clogging? No 33 Will the outlet be designed to prevent clogging? Yes 34 Are the dam and embankment planted in non -clumping turf grass? Yes 35 Species of turf that will be used on the dam and embankment Fescue 36 Will trees and shrubs be prevented from growing on the dam and Yes embankment? ADDITIONAL INFORMATION Please use tnlS s p ace to p rovioe an Y additional information about the 37 dry pond(s): There is no permanent pool proposed in the SCM, this is acceptable per Part E-4 of the Manual. Dry Pond 3 1:33 PM 6/15/2023