Loading...
HomeMy WebLinkAboutSW1230601_Stormwater Report_20230623 STORMWATER MANAGEMENT REPORT FOR ASHEVILLE REGIONAL AIRPORT SOUTH PARKING LOT y ,, • y_ - of'- ry -rti3 g, 7,5 „ A 1 t_ 4. _ I1 , _ ,.,.,,, ,,..41::::,,,.i.,:E;,.„;•,---1:1------1, -,.:-;4,. ..,71:;,-....'-',-,;:iV2,: „. V.,t-;7'jf,,7=1",,', `7 A 47 _ ,,,'',..1,4,,,, .,,-- ‘-,,..,. ...,;,---_,r., ,,,,,7-2'il.„1- N,Y1':.'--:4---..-"S- '''',=':, A,';',"-7:,:,,."-,-Itli -- %. s FLETCHER, NORTH CAROLINA INITIAL SUBMITTAL: APRIL 2023 ,�4oFESs%p �'Lq'%, STORMWATER ENGINEER: = SEAL AULICK ENGINEERING, LLC - 040195 • A. SKURKY, P.E. 600 PARK OFFICES DRIVE,SUITE 300 •••••FNGINEE-�••' DURHAM, NC 27709 /�'q`it/IAIi.S't\\ /- DAVID mm .••u•1111111 Ui8�g V%![IKI�IL I . ' `'`'y'y ULICK ENGINEERING LLC 4om.o.rlroi°v's• STORMWATER HYDRAULICS EROSION CONTROL P. ity AIRFIELD&CIVIL SITE I CONSTRUCTION SERVICES TABLE OF CONTENTS Section 1 PROJECT OVERVIEW 1.1 Narrative 3 1.2 Introduction and Site Description 3 1.3 Construction Sequence and Cost 3 Section 2 HYDROLOGY 2.1 Project Methodology 4 2.2 Drainage and Erosion Control Design 7 2.3 Operation and Maintenance Manual 7 2.4 Design Software and Manuals 7 Appendices REFERENCE MATERIAL Appendix A-Vicinity, Soil Survey, FEMA Maps and NOAA Rainfall Data Appendix B- Airport Layout Plan (ALP) Appendix C- Stormwater Sheets& Details, Drainage Computations Appendix D -Operation and Maintenance Manual Appendix E - Supplemental EZ Storm Appendix F- BUA Exhibit Appendix G -Water of the U.S. Delineation Report 2 AVL SOUTH PARKING LOT INITIAL SUBMITTAL:APRIL 2023 STORMWATER MANAGEMENT REPORT Section 1 PROJECT OVERVIEW 1.1 Narrative The Asheville Regional South Parking Lot project includes the construction of a new parking lot, driveway, sidewalk, and associated grading, drainage, landscaping and erosion control. This report includes the computations that show compliance with the NCDEQ High Density Project.A Secondary SCM (Dry Pond) will be used to treat the stormwater runoff from the proposed site. 1.2 Introduction and Site Description The site is located at Asheville Regional Airport in Fletcher, NC,south of Asheville, North Carolina near New Airport Road (35° 25' 42.94" N, 82° 32' 6.81"W). O The area that includes airport related operations ,,., encompasses approximately 900 acres. For a larger "'"°��a vicinity map, see Appendix A. The Asheville South ® aF°° Parking Lot project site is located is a wooded area ag Asheville in the southwest region of the airport, located along Regional New Airport Road. Airport For hydrologic planning purposes, the site is comprised of Hydrologic Soil Group (HSG) B soils. Appendix A contains the NRCS Soil Survey Maps forEdney the parking lot.The existing land use of the project is grass, gravel, forest, and impervious. The proposed land use will impervious(parking lot,driveway, and sidewalk) and grass for landscaping and bioretention. As shown in the FEMA FIRMs 3700964300K and 3700964300K (January 6, 2010) in Appendix A, the disturbance is not located within 200ft of a FEMA floodplain. 1.3 Construction Sequence and Cost As explained later in the report, a dry detention pond is proposed as a secondary stormwater conveyance measure(SCM).The rough outline of the permanent dry detention pond will occur during the grading phase of the project and a portion of it will be used as a temporary sediment trap to protect downstream receiving stormwater systems from construction activity. After the site is stabilized, the sediment trap will be cleaned out and re-graded to final dry detention pond design grades. No mechanical stabilization will occur. The cost of the dry detention pond is unknown at this time and will be finalized during bidding. The Asheville Regional Airport will be the end-user and responsible for annual inspection, maintenance and repairs of the system. Section 2.3 discusses the operation and maintenance of the pond. 3 AVL SOUTH PARKING LOT INITIAL SUBMITTAL:APRIL 2023 STORMWATER MANAGEMENT REPORT Section 2 HYDROLOGY 2.1 Project Methodology In order to qualify for a secondary Stormwater Conveyance Measure (SCM) for a Dry Pond, several minimum design criteria (MDC) must be met. The recommendations will also be met to maximum extent practical. NCDEQ Stormwater Design Manual Appendix E-4 Airports, Table 1 "SCMs that do not Pond Water with Suggestions for Airport Application". Below is a list justifying why the suggest SCMs were implausible for this site: Bioretention Cell requires 2ft of separation between its bottom and the SHWT along with a minimum of 2.5ft of soil underneath the surface layer. According to the soil report, SHWT was found 1-5ft below the surface.Therefore,with the required depth of soil and bedrock so shallow beneath the surface, a bioretention cell is not plausible. Infiltration System requires 2ft of separation between its bottom and the SHWT.According to the soil report, SHWT was found 1-5ft below the surface. Therefore, a layer of stone would not be plausible which is insufficient for an adequate infiltration system. Sand Filter requires 1-2ft of separation between its bottom and the SHWT along with a minimum of 1.5ft of filter bed + 1ft of sand above the underdrain pipe. According to the soil report, SHWT was found 1-5ft below the surface. Therefore, with the required amount of filter bed + sand, a sand filter is not plausible. Rainwater Harvesting is infeasible because the proposed project is only a parking lot that does not include a building, so roof drainage will not occur on the site. Permeable Pavement is not feasible with the amount of snow at this location. Airport maintenance requires salts and deicers for safety precautions. The use of these additives is prohibited for permeable pavement and therefore makes this SCM infeasible. Treatment Swale (Secondary) the minimum inlet to outlet flow length of 100ft could not be achieved due to the limited green space that this project provides. Neither a Wet Pond nor a Stormwater Wetland are recommended at airports. These SMCs create standing water that attracts wildlife that pose safety risks as they may damage aircrafts. See Figure 3 in Appendix E-4 of the NCDEQ Stormwater Design Manual for data relating to this potential hazard. 4 AVL SOUTH PARKING LOT INITIAL SUBMITTAL:APRIL 2023 STORMWATER MANAGEMENT REPORT Below are the MDC for the proposed Dry Pond SCM, and how they have either been met or could not be met: MDC 1:Separation from the SHWT The SWHT was found to be in a range of elevations from 2079 — 2080. The dry pond bottom elevation is 2080.5,therefore, the lowest point of the dry pond will be 6 inches above the SHWT. MDC 2:Temporary Pool Depth There is no temporary pool in this dry detention pond due to its location at an airport (See Appendix E-4 of the NCDEQ Stormwater Design Manual, therefore the maximum depth of 10ft is not a concern. MDC 3: Uniform Grading and Positive Drainage The bottom of the dry pond will be graded uniformly to flow toward the outlet control structure without low or high spots, per the grading pond and detail. MDC 4: Location of Inlet(s)and Outlet The inlets and outlet of the pond are in a manner that will avoid short circuiting.The outlet control structure is the furthest point of the pond thus providing the longest flow path of water until the outlet location. MDC 5: Pretreatment A forebay is provided as pretreatment to settle sediment and prevent erosion before the runoff enters the dry detention pond. MDC 6: Drawdown Time The pond outlet control structure has an 3.0" orifice to provide drawdown of 40 hours. The calculations show an orifice size of 2.6", but a 3.0" minimum will be used. See calculations below: Drawn Down Calcs Draw Qavg Start Vol Vol Vol g Draw Down Down Qavg Ext. Qcp. Havg A Detention Pond ID Provided Bottom Top C (ft/ Orifce and Time (cfs) Det. (cfs) (ft) (ft^2) Orif/Weir (cf) Elev. Elev. s^2) Elevation (hr) (cfs) @ Elev. Dry Pond 35,826 2080.5 2084.5 40 0.25 0.0 0.25 2.0 0.6 32.2 0.037 2.6 @ 2080.5 2084.5 MDC 7: Protection of the Receiving Stream The addition of the parking lot, sidewalk, and roads results in an increase of 5.60acres of impervious in the onsite drainage area. The pond detention resulted in a decrease of the post project flow rate in the 1 year, 24-hour storm. See delineations and flow rates in the following tables: 5 AVL SOUTH PARKING LOT INITIAL SUBMITTAL:APRIL 2023 STORMWATER MANAGEMENT REPORT PRE-CONSTRUCTION Grassed Forest Total Imperv. Basin Area (HSG B) (HSG B) C CN Tc (AC) 0.95 0.30 0.15 (min) 98 69 55 Pre 1 6.33 0.00 0.92 5.4 0.17 57 10 POST-CONSTRUCTION Grassed Total Imperv. (HSG B) Tc Basin Area C CN (AC) 0.95 0.30 (min) 98 69 Post 1 6.33 5.60 0.73 0.87 95 5 Pre-Construction Post-Construction Post Project Study Point Storm Return Flow Total Flow Total Decrease Frequency (cfs) (cfs) (%) 1 1 0.7 0.6 24.5 MDC 8: Outlet There is no permanent pool in this dry detention pond due to its location at an airport. A trash rack is provided to prevent trash and debris from entering the outlet system. MDC 9:Vegetation A note has been added to detail sheet SW-03 with the MDC 9 dry pond vegetation requirements as show in the manual. Fescue is proposed in the parking lot landscape areas and the dam. Recommendation 1: Freeboard The pond will provide more than one foot of freeboard above the design pool elevation. The elevation of the design pool volume is 2083.2 and the pond top of dam is 2086.0. The dry pond was designed to treat all of the proposed parking lot.See below for volume calculations,the proposed dry pond will provide adequate volume per the table below: Design Volume - Provided Design Volume Surface Area Depth Design Volume Basin Required Provided Provided Provided (cf) (sf) (ft) (cf) Dry Pond I 17,110 14,828 4.0 35,826 6 AVL SOUTH PARKING LOT INITIAL SUBMITTAL:APRIL 2023 STORMWATER MANAGEMENT REPORT The Rational Method was used for the parking lot design on the development. Onsite drainage calculations were performed by AVCON and not Aulick Engineering.The Intensity Duration Frequency (IDF) curve for Fletcher, NC below was used for the calculations.: Int(Yip 2100— 21.00 tee WE 11[00 um sa. 1500 — ordm 25 Yr 12.00 1200 ,LW too � = aoo kw � �• 3_00 1 VS MOO OAO 0 5 10 15 20 25 30 35 40 45 50 55 50 Tie(nil) The following runoff coefficients were also used for hydraulic (storm inlet, pipe) analysis of this project: c=0.15 (Forest, HSG B) c=0.30 (Grass, HSG B) c=0.95 (Impervious area) 2.2 Drainage& Erosion Control Design Drainage designed was performed by AVCON but a brief description is provided here. 24" RCP and 36" RCP is proposed along the west edge of the parking lot.Stormwater runoff from the entire parking lot will sheet flow into curb inlets along the west edge. Water will then be conveyed through the 24" RCP and eventually 36" RCP into a dry pond forebay, then into the dry pond itself. Stormwater will outfall from the dry pond into the existing creek through an OCS and 18" RCP.These pipes have been designed to safely convey the 25-year storm. AVCON pipe capacity computations can be found in Appendix C3. 2.3 Operation and Maintenance Manual The dry pond requires maintenance in order to work properly. An O&M plan has been developed and can be found in Appendix D. 2.4 Design Software and Manuals The following design software programs were used in analysis and development of the stormwater and documents: • Hydraflow Hydrographs for AutoCAD Civil 3D 2021 • AutoCAD Civil 3D 2021 • Microsoft Office 2021 The following design manuals and literature were used in analysis and development of the stormwater documents: • NCDEQ Storm water Design Manual—2017 Edition 7 AVL SOUTH PARKING LOT INITIAL SUBMITTAL:APRIL 2023 STORMWATER MANAGEMENT REPORT APPENDIX A VICINITY MAP, SOILS SURVEY, FEMA MAPS & NOAA RAINFALL DATA s: j N� 9 ,., d0 Asheville Regional �lo a- Quality Inn Airport Viewing Area ?S a Asheville Airport i_ Q 3.4*(297) 1 3 2-star hotel _� 11356] 9 t o a -.:.. cr . 0 a.- . , 1 Q , , 3 Apple Tree Preowned ' Used car dealer z 2 _.) Super 8 by Wyndham Pre WNC Aviation Asheville Airport , , Q 3.0*(385) 113561 2-star hotel 4viatio,W ay Parking Lot 9 Mercedes-Benz of Asheville 9 Mercedes-Benz dealer G1i Civil Air Patrol Q AZ Car Rental a Asheville Airport ®, -Asheville Composite... N• z r 0 O D 9 Carolina Clean Machine - 73 a Wreck-Amended Q Greater Asheville o Auto Collision Bre Regional Airport... O Wingate b \ Wyndham Fletcher at...9 ' 4.1 *(677) 90\ 2-star hotel \ A4. —1 e 0 S. 3 S. a �O s0' Allegiant 9 i. 1 Asheville Asheville Airport stonal Parking Garage y Regco Airport 9 ..., (3. 7... s .0 s .., Hertz Car Rental A wo 0 -Asheville Regional... Google ,. 3. 7 Map data 82023 Google VICINITY MAP N.T.S. 1-26 -> New Airport Road (280) (0.5 miles) ->Terminal Drive (0.4 miles) -> Rental Car Drive (0.3 miles) 3 Hydrologic Soil Group—Buncombe County, North Carolina,and Henderson County,North Carolina Q3Q� N M M N N W W 360200 360300 360403 360500 360600 360700 360800 360900 361000 35°25'56"N m"iwcf ins y eii°•w i 35°25'56"N \ , : t.' ' !�lil' y t G Y '; Fir- .I '' -......' Urh E t -...,:i.. ill:1. (ir (10A , § rigisk,, ,_41;.•<riiii i fit.- 8 1I `� ..__ - .0of , , _ cuc ill '1 __ ,., t.\livi , 1 IlX TmC ,, j • ` � III ,, ' r - MMM .,,, ,•, , , .. ..,. ,,i1 1 , . § p�$ .., Cr_` Cam'$ iiii 4 r , 3 8 ` § N_ 0 lto ck 8 4, r 8 IP y § 'ta U h E __ - �., §_ l p •p •n Ng Yra d a�t G_o� _ .J7 ,. �' 35°25'18"N . -- , - Ill i - 35°25'18"N 360200 360300 360400 360.530 360600 360700 360803 360900 361000 3 3 Map Scale:1:5,780 if printed on A portrait(8.5"x 11")sheet. " Meters N 0 50 100 200 300 Feet 0 250 500 1000 1500 Map projection:Web Mercator Corner coordinates:WGS84 Edge tics:UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 4/6/2023 111-1-111 Conservation Service National Cooperative Soil Survey Page 1 of 5 Hydrologic Soil Group—Buncombe County,North Carolina,and Henderson County,North Carolina MAP LEGEND MAP INFORMATION Area of Interest(AOI) p c The soil surveys that comprise your AOI were mapped at scales Area of Interest(AOI) G C/D ranging from 1:12,000 to 1:20,000. Soils • D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons 0 A p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil n A/D Water Features line placement.The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed n B scale. Transportation Q B/D r4-1. Rails Please rely on the bar scale on each map sheet for map n C measurements. ti Interstate Highways C/D US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: 0 D Major Roads Coordinate System: Web Mercator(EPSG:3857) n Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection,which preserves direction and shape but distorts • • A distance and area.A projection that preserves area,such as the 1111 Aerial Photography Albers equal-area conic projection,should be used if more • A/D accurate calculations of distance or area are required. ^r B This product is generated from the USDA-NRCS certified data as .v B/D of the version date(s)listed below. • r C Soil Survey Area: Buncombe County, North Carolina Survey Area Data: Version 20,Sep 8,2022 • • C/D Soil Survey Area: Henderson County, North Carolina • • D Survey Area Data: Version 23,Sep 8,2022 • w Not rated or not available Your area of interest(AOI)includes more than one soil survey Soil Rating Points area.These survey areas may have been mapped at different scales,with a different land use in mind,at different times,or at O A different levels of detail.This may result in map unit symbols,soil O A/D properties,and interpretations that do not completely agree across soil survey area boundaries. • B Soil map units are labeled(as space allows)for map scales • B/D 1:50,000 or larger. Date(s)aerial images were photographed: Apr 1,2022—May 9, 2022 USDA Natural Resources Web Soil Survey 4/6/2023 Conservation Service National Cooperative Soil Survey Page 2 of 5 Hydrologic Soil Group—Buncombe County,North Carolina,and Henderson County, North Carolina MAP LEGEND MAP INFORMATION The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps.As a result,some minor shifting of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 4/6/2023 Conservation Service National Cooperative Soil Survey Page 3 of 5 Hydrologic Soil Group—Buncombe County, North Carolina,and Henderson County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CuC Clifton-Urban land B 6.8 4.6% complex,8 to 15 percent slopes TmB Tate-Urban land B 3.2 2.1% complex,2 to 8 percent slopes TmC Tate-Urban land B 3.2 2.2% complex,8 to 15 percent slopes Ud Udorthents,loamy C 48.4 32.5% UhE Udorthents-Urban land A 64.1 43.0% complex,2 to 50 percent slopes Ux Urban land 20.8 14.0% W Water 0.7 0.5% Subtotals for Soil Survey Area 147.3 98.9% Totals for Area of Interest 149.0 100.0% Map unit symbol Map unit name Rating Acres in AOI Percent of AOI Ko Kinkora loam C/D 1.7 1.1% Subtotals for Soil Survey Area 1.7 1.1% Totals for Area of Interest 149.0 100.0% USDA Natural Resources Web Soil Survey 4/6/2023 Conservation Service National Cooperative Soil Survey Page 4 of 5 Hydrologic Soil Group—Buncombe County, North Carolina,and Henderson County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey 4/6/2023 Conservation Service National Cooperative Soil Survey Page 5 of 5 STATE OF NORTH CAROLINA FIRM PANEL LOCATOR DIAGRAM LEGEND ZOAE , ,,.....-7. MO OM FEET ....T .' ' -,/,' •,,, -.-,W58\ rN _ il,r,,,,,,,,,,,,, ,c,f., '5 ,., WV.Of sruoy, .i,pi, • ,, s•h..,,.., 8a 88 .:8..8 r1117M177 TA.i .,• ., . „.. -• . ) .-... ZONE X • ''''''''. '''''''Y"'• rr.I"-ri.'s'al -, • S r''' ZONE X .\ ,..."•"; • cl) \ZONE AE -, p no,„,,Nog,A.A,„,g,g,„g A,.A°Au,,..,,..,,,, rn.n.,,,, . \ , 8 LONE AE • ../ ' - c3 A. -, ' / „-:,,„ , -..• .0..,,,,,,,a,,,,,de,,,,.,, '. //A- \8LE„.18,E„ FLOODING EFFECTS \ MM. Base..Elevations oeleonined . Y.:11'N,I.'.':' 1. ...7 •' , ''-'8- .•:..... \ 0 FROM FRENCH BROAD RIVER TRIBUTARY 189 \ ' ''--4=,' ...,, ''' MICAH Mad depths or 1 to 3 feel(usually areas of....Base Rood i '' ,„.8' 80NE AO Flood der.of 1 to 3.t fusually Mod now on slop.wren,: average cepths delermr.For areae or elk.fan flood.vetoer. • , • ZONE X % Z as• : . . z 8-8-;-.Jez ao\*. 80NE An ' .% ....." . SP..Mo.Hazard Area formedy"dec.eorn the 1,6 annual '4" . 1.,'4,4,=8'•..,'e 0 I..)41, •„.080 .-_„ • - . ZONE X arcertned.Lone AR...tee S.Me former ikma a..system le • Immo restored M pro*pmto.on Frorn Me 1%arneal chance or greater.. /I '.....--'•-•-40. ...-.--.-..-- LONE Ae9 Area to be protected Rom 1,6 ann....flood by a Federal TRANSYLVA. i - .8 .-. 1.4 pro.lean systan under conamorco,ro Base Face Bunion rr..-- determines rrcrcar.no /1.:•or-- \ : "': . o -' .."a. • '1 ' I determ.d. PJbe'''' EON E x .,,,.,...A , •• i\miti \ \ ____./-- m . l' ,.j FLOODWAY AREAS IN ZONE AE '•' \ .----"-- Tne kodway Is.onarmot of a stream plus any gement goo..mos Mal mei be ......) .,-. ../' ' ... .. . , -.. •-----' '----'---1-- ,,,L,_:,___,..'' '. ''''-'\ \ Impt free of en....hrnent.thal Me 1%arnual chance nood am be caned ar.ut substenbal increases..od heights Buncombe liount5 /..•.•..]OTHER FLOOD AREAS "."'".--./::i:'':, '---- ,- '',;,, . ' "•••/-- . 1 ' 11,in:0, DATUM INFORMATION 0r:tied Ardas •., r EOM X arees o.OS'S emus!arena rm.ben Of 1%ernual mama nom mimeo t ms.„... 370031 . •„, SI7500 FEET eft ederape depths of less than 1 hot or enth dranage awe a.1 ': ' • '\ ,. , :•22 " :',, "17;*. :,sq..nes and areas p.c.by enees from.i.a.annuet oh.. Rood Znell.Pri07:200N71811=1:117Urrr87:671=Zarnin1.021: •, . ., Idnitimilie Coma, I 5 =OTHER AREAS of INS.ORSBO ellipsoid.Differences In datum,ellipsoid,pnleolon or Universal Smosrcrrc Mercator sores used In the praludion Of FIRMS.1"Ca M.o. ‘.... (mineoretrcaled Areas ‘, i 8cf4e 0 Mess le.88.4 snares en,namennese.automate. lunsdetions May reeult In elighl...al diffemnoes In map Nature.woes 370031 lunedictIonal boundadea.These<Memnon do nal Med.e.....rcy of thie a I FIRM.All coordinaNs on Me map are In U.S.Suomy Feet,where 1 U.S.Seamy -.--..--_______oo Fool•12005027 Menem. ,. .: -"ZONE% \\.....--, \ , i EM]COASTAL BARRIER RESOURCES SYSTEM MORS)AREAS F:•.;;.j OTHERVMSEPR::::::„..REAS...(01:13) F.0 e.ations or thls map are referenced.Me North Amencen Vedas.Datum r.'-'‘ ri 1 <EPS areaa.0..are nons............eni le Poe..FOsexes.... Of 1886(NAVD BB).The.de.ele.Nne MUst be...pared to encl.end '.• \ :• o, '''''rrurasaa no an oa,or (\,,,.. ..)grOun”levellOne Wotan.tO Me eaMO Vert.,MUM.An aVerage CI. between NAVD 88 end the Nal.al Geode.Ver1.1 Datum of 1828 NOVO 20) \:• .\ :•i"a, /-_-• ii, \ r cans sed oneeemdey i '''''.i, ,,, _has bean computed for each North Ca..,men,.1.off.wn Men mop. (\ C:Alt lo the NOVO 20 flood elevations that were not revised during the Oreatbn Of 8116 '8;', statewlde formal FIRM.The offsets for arch county shown on thls FIRM penal ZONE X 9,Ix are shown In Ma rcra.1.1.rn offeet table below.Where a county boundary and :\:i.I •:‘''''' 1=1,_ _::::::::_:.7.....7„,:::......„.:..:_____.=.....:........1,....,_ a...In source with unrevised NOVO 20 flood olevatrcne aro coine.nt,an '• .,,.•:: "''''" udNelual mrset has Peen...wed and applied during the Creagan Of this 52', 45' Statewide fennel FIRM.See Section 6.1 Of the accompanying Flood insuran. •,. . ' ...Al ID , '',.,.- , ----513".", s.Rees 81•8men.delay anal.reef n of Neogene benv.n InformatIon for bench mar.shown on thls map,Meese cont.the North Carolina Geode.Survey el the address shown below.you may also contact the . . _ BUNCOMBE COUNTY ,, ,,,,1\ I .., ... infommtion ServIces Branch of.NatIonal GeodMic Survey at MOM 11942,12, HENDERSON COUNTY ....-___ i North Carolina Gerceto Survey [Am. Ver8carDebre Va.VD d2 1.\.2,7,L5:•.::\:.i..1.\::!,,ii,5, 2 Henderson Counts -'------'--7----.-- , BUNCOMBE COUNTy L,'.1 m•s7 88.'2,288- 1.1=7=7....'........a , L.nineorpormed Areas- -5 ....e 555%55',,,,AN-ops.F.,--=-,0 -'12,,,,A HENDERSON COUN, ,.,1 Raleigh,NC 27•601 (818)13248M ;i. 370125 '"""'''T :=FIZrZZNE1200T.etrea'It='''''''"' hq,,,,,,nous.state,no,u, ,„....i.,„,,,,,,,,o.N,r,,r,.,,,.,,, e2 ...:..\.,..\• : -- \.., ,...i,A4P,STA A ;''' 1111441il '..,-.....,....„,‘ .....8 ..\ 1 \ S IISIGS,LH ‘4, 16s , ZONE X i,.sone,...8 dor more...mom All tree.bled In the Flood Havarel Data Table bel.were Studled by .....0 n'ti=n8aaaa.1 ONE X • ' '-- detailed M.0818..inq field Suniey.Other 80Cd hazard date Shawl On thle '''''. ''.:\...... 1.:Ar z Al,map may neve been embed using either a coaStal analySIS Or IIMIted detal. •,, '..i.i." Marine analyele.Nide Information on the 11.0.0 SO..etudled by dieee analyses Is contained In me Flood Insurance StUdY NV.. '.•••,.i.:1.:\.,; L ,, , e $ 8184.LONE AE .'V ,, IS •1.1 5 m.8,8. M l 6'l FLOOD HAZARD DATA TABLE ..Y,".".' .... .. . ' \ -0 •P zr. 174. ,„„,, CI 1 gIfeTZT ,or • •• : :' ij e,,,, To,ii ofrIctc188- yi 49 o....24,,,t, mane. ' ''''%';'''' ....'„:4t.. ,tEri,..:.°. rti7 •- • •, • (--- '-, \•. . , •.....,._..,‘„,.or Milk Ili oir i "So 2165*, -•• FRENCH BROAD RIVER 370025 ON erc,SM NA .2.0.1. IAN / arc Mi.. . las" MO ZONE X/ Me ee0,322 NA ,..,, Ne I lenders.,Connie • ,4,..., tl,t,. ZONE X pll.Si\.. we me,. NA 2.0.56.0 We •• . Unincorporated Armlet• 7--5i Meg .MAN . NA 2.0a7.• e. 370125 \, '5.`..2ed"-••••• /8. UM an,108 NA atice.o tom \ HIGGINS BRANCH :: , ,/ • .1 •ZONE X • .., , A 122 .F130402 ,, ZONE X 011 2128 NO 2.080.0 01 M1 . AIRPORT.• DO5617 - O. 2120 010 _ 2.080.4 de II. \ . 2,201 a20 SP. se'Is 0,, ,,,,,,, .D ",D_ le,,2 oK.e..00rEE-r / I InincOrpOrated Areas „ 2129 1 AO ri 2 370125 , AVL ARP Neguna,,OcEoRSOsN,COUNI, 21. ORMIORTII a45 4,574 am _ 22,113.2 .„ MO 6144 020 .1188 16/10 ,,-.,/,.,..:....,,./.-•.. -, 7 ''''.,,,4:\ , \ .FB.0090 \ MB OUN, °8,.8 I•eile SCALE I.=SW 88.SAM .8 e,e,S 0.0 2.122.2 16/10 \ -:..,,'-::::_, C.) Buncombe Count, "....,g, . Ceel eeD adroe re r. " .s • Unincorporated Arent ZONE AE--22.t ,__. .__. .__. °es arcs .68 2.142e M/24 . ,,- / ;• '2 0..v,000,000R _,"-----\\ '''' \\.° 8 0 370031 1 torne„a 0 Li't ma ma an hot ,,,, aith ydy,y lomi B 122 '81,1 0 ,,,,,,. ;•i FB0403 11111 PANEL 9663K -') '." ' ' ' • Parking Lot , .,. -......,,,.,. „. .g-ck_. -1111 FIRM . ZONE X *.•'.'•• '''''' . / : I 0,8 or Mill,River , '•, 1,..... ti... ..,. ,t.-.. .. X FLOOD INSURANCE RATE MAP dm' ) /° ) 17:9_ pNAONRE:9643H CAROLINA I i e CM YAP OIDEXFOR FIRM, 1'I1T II 4EN'Erif:JOCAC"'"' , ‘17 . U1111180810raltd Arens... • _ . ... .., -no8.68,,,,. 370125 ete'rogay""ono JOINS PANEL 9642 hej;7.7,. ,,,.„.0. ...lean..Tomo, mon leo 4 I; ,.. oh) NOTES TO USERS ,. ott=""Tot ,P"'". ,'"'",'"' 1°47,.7, Z,I,=2Z17,1=',==1=====" WP REPOSITORY' CID arcetniry'r:14"e'tiositary shounithe'oons.Z1 Mr P.N.uplre:raTillionerlanea:d irconnatOn on...crime.specter'.A 1.....coon .prercous FiRel may have be.adiusted to conform to these new stream channel Refer lo feting of Mep Repose...Map indea or we 111.11.......... iltst:,' is information. .nliguratiOn.As a result.F1.Profiles end Floo.ay Data tables in.Flo.Insurer. 0 EFFECTIVE DATE OF Ft0ODISISDPANCE RATE MOP PANEL Base map infonnelion and geospatial dale Load to develop this FIRM were obtained horn verious Sturly repon lwran=Mars autrcotalive hydrae.drce,Fn.ruled stream Glen.disternos. To o.ln more arca.intonation SI areas where.se Flood ENseliona.BFEN andor oreanrcations,...Ins Me ea...local community.,state end federal agencies,and. ...an.amet a shown on tn.map 0 IcElomlosep endgrIgeahtniacvyle F Aploagoretdnn ecInrys sh,uFirpEa nbNceIAebo lml.R PaeMni e t MhSeat.p.,FtoeIf oNfo rNas hp roCdaurcoeld tnrougn a unique DbeInettelant.,d are7Ldifd mMiITtreA df oVoDdeE t:ia.niVle hd7e.eVF..logo ndr=a Hnag zpatre1d1y1p 1,oDspe=tse.o nalnr1yZ dano1nrd:Ss1hu=omumldpe r.y Oeb7fe S=used 116ac:s st.h eT nremseoslee sBoF uEtrcs ea roef RMwd . 8c.ons.ide.red.M.e p.na..red b-.y tohrec elo feodr deoevne-mlooprnment so,r Minaet emaeste F BmEo.MapA..b.Saesee Cmgoeaumon t.ys oie.maafi gmceaer.yt ins.s 2 w,1e02re Ppalena.se ordn ewrh tioc ht heea.se ocoe mratme.ly,pr.i nst e ldoc Rataepd Index foMr an overview map of the.unty sn owing the ' ,PNm08IS .m8M.8.eA8nPRmy EV.S0re.E D N...........M.YtAe.rP NUM Be Ee lR t .ew . p . n pded o ppg se 3,33. JANUARY 6,2010 3700964300K e long term approach of hoodplain management to.crease.costs Base map..tures Mown on.map,such as ow..Mts.are bas.on Me moet up-to- Program in general,please ull 1.871.FELIA NAP.1.87.338.282,or vieit the FEMA w.site at map flosdplain areas al Me local Mvel.As a pad of this&lot the State of 0 North Carolina has foined in a C.perating Teo..State agreement with ..- ilmIted detailed methods are provH.In.EIS report for this jurisdIction.1.EIS report also heatiwww.nollcodnepecom or cornea the FENA Map.vice Censer A I-Pea-SS.P.M0. p.ne wribers cr web., www.ncfloodmaps.com provides instructions for determining a Poo.,ealnp ron.smoarnmant vrrchs.flooring infernal.On ell MIS.08:81.1$en.iet.with 1.FIRM TINFEMA Map Service Center rosy SI.ni,onh Carolina sources MudiodbylMiled detall.rwthods also be reeet.by Fax et 1430-358-93.20 end es webs.at isaggrams...ma Ors NC DIM.of Erne•gen,Management Nebo.Fbodln.ranc•Rogram , . Federal kmergenes Management Agencs_a OF NORTH CAROLINA FIRM PANEL LOCATOR DIAGRAM LEGEND a JOINS 1 SO, >a, FLOOO HAZARD AREAISFHAs�sUBJEC' as L OB9°° nor Nd�W LL Wo wnFF• NE M0000FE BUNCOMBE R \ h ,--FROM D Th\ Hu /� a sm�o i I. +f df ORB \\ II ll, f / IA ZONE Are ewe I in <ated5re, ,?0011 >lo loon tll heat /parklngLot ZONE% a 05ag _ rem e ONE% • N \ I ,Ito ill,: BEAR a n determined For areas of alluv al armn prates..From td,fusualy snag!flow on °ve new p gvP', '1•.-s.� 3701132 Piz m9 )n�sl IOW AR Be.Free Hae.A I rw r 1A, •• 'y. P� II I County O r[}' z\p `SI?v »cod M• v,eretwfl000 comat mesrom n rem . eRury rtri t ne AR � I 1 nor ohm- Ala 21 un p nd Area zOi • ea prey.Mod.from o Ile an,.o,a <S,noD< a.save &\ I "?IS\ � ® 3711125 '5d , J BOW AH from ax an-ua enure r/ CN'comemcmcA rnrar xA "" ZONE AE j 1 0 J' ZONE X systemfreed protereon urge...c con.no Base Flood Elm ZONE • EMI ZONE VEdelonamed }y r // / o a»nnead wvmn whodbnnan twaw adore eau ow E. _ prdenad ow by a f 47 1 r r pb �s •\ / ZONE% 1 \ E%. - cos.,.m -rl my rz / ,�= \ ZONEX I FLOODWAY AREAS IN ZONE AE �� � o Bd.w..p..�.da�n�anare t�r aNT. a COUNT. , ' .( q m t.•.1 OTMER FArects LOOD,. a��a� m„, wa DATUM INFORMATION ZONE AE - /(� / ..'-' y �H, / _ a wsn average and mnn s wmedeeoot by or Momm1%annual c ear State eas les ctf¢ M1yp41,1.� / .. L c szo )me Datum >w t! ... R vim D casedellipsoid.Differencesd n n Universal / OTHER AREAS ons bourrams Theseose Mercator zones differ may result in slight encesArmco dlN differences in apf b aaamh / / to st0025 Rsc ® \ f-� \ -5 1. Awn»m Rmwew..mw.e..e.wwrswewdwNar in the production of FIRM. t thisT/ s, r y w • n mrMo Area cease ore oaxnnww eareas scow / i?011?5 u.LL �nr+r' r+r '+; A . All coordinate.on thre map are n U.S.Survey Feel where t accuracy Surrey / u. f r \ •\ s.---� `ii{{FF COASTAL BARRIER RESOURCES SYSTEM(CMS)AREA: ZONE X r" / 0 \I - ---- , 1` :A OTHERWISE PROTECTED AREAS(OPAs) levalions on this pre 3 'lines n nll'1e1che' II - nC \ CMS wwawoPAa.s nemnN'�muwmnnadpesmmep.dw Rood Revd. •( anon must be compaEh a m Vertical e re my '� \ 3?056X 1 p, d',r, \\ gene ,ru1z� / �\ �', n NAVbne erenmd to National MGecdem Ve reme crma Oewm miOpB�NGVO 0) r in computed for each Nacre Carmna county.The onset was t appliedn 07 ZONE \ \./' pvy \ \ \ \ / .r.n.wounm.wry !CVO 26 flood elevations that were not revived during the sereon of � 6' le format FIRM. dd r -- The onsets for each county shown co this FIRM pane ' " ✓ wn ulna wdb OaNm ousel table CYow.Where ecoucty boundary and 1 J /sr/ne souse with unreM»d Novo ie mod.vat one am co nctlem an oea --> // /• �` The Sac.nred Hare area red., a offset h..been calculated and applied during we credmn m ml. _ e...Foe le format FIRM.S»Section 01 Y me accompanying Flood!neurones uxcnu hn c ux I�///'''��� V reDodm abmin NNMflMortnetlm on we conwrYon of YeHmne betwe» ZONE `, a"a NGVDpB TB=rreirrem e1:1 =441lon sod Z1r1" I-"4___, \ ar sass.new."rocs,amn lion for bench maks mown on the map Please contact the Norlh / \ I'r. mselasArnss�vmo cewm<r,we e GeodetiSur,at we address shown below.You may else contact the as3° 0 / I d.\,�:hn \ O n »re raw lava Ibn b.at V.m the Natlom Geodetic Survey Y(i01))1BJp10 \ /1" 1 I / - \ / vo-or ire. io dro"+q=mernrerc,rena.,,,ens Noose tyre \ ss os'o are row more.mxn, • NC 2)001 Bmaw.raen J5 Ian ear!!fl sream,F1FSZOXE Ina Slate Plane wirer sore 333830 BM6510x % \ ag 1 of l'Ivtchvr ,sL ' /' Ore Pore..no! e o—a / an ams I' d'M Fbotl H rd D Table below we studied by _ !?IDM1X Foy ( vt • / BM... erw'"n'w'• .to imwr nos no.cov, d d field Ow flood hazard data shore n thnalysis or limited is ` D oH� \/ •a nacontain.More in information e Fbotl ens on thece Thad.. s studied by.ese ZONE AE y, \ m tudy reportya EV / \ • 3 e5Ha5® mmmutun.ea• ts,s FLOOD HAZARD DATA TABLE my have been derived using ereer a coastal am """"" a ZONE% Lea"ewna D Q•/ _. i • VyCaEEKne a.n.we® e.oemrwrwem s- p e I t </�J� I .. ZONE 3, w1N aASF BR Zomo* orsrna 1 •/</:.••.i. Henderson Cot nb CH BROAD RIVER 11 P % `1n /! • Unincorporated Areas %n 3701>5 R0.R, \ \ FM. �b INB BRANCH Ns P,roM6 Mm0 \ µ 1x \ 9V V _ b Rel MO BWSB ter II \re O r \ o,", E \\ -. ZONE SH RP bO iEET N xu uaoeocre I' e' ONE AE ..II^III'.Rc 3�0 151 I3 se aa'ao^ 030 F1yAn 00. -a "s Ian me 2,omB ,ens hr. A aw ,p°"`� u.I� OPoD D. y :N NB Ba a NtH MAR.SCALE,••.!» n:.BON pAR " '� n • xApe WO soNc 5vu �) ® " y„. - n .'.. ,� °�' aY CREEK OREN DG0659 I cc" O'N _.,,,,,. tH 0 ,50 ]00 An ,AeB c nlN / r we ono act a acts doe = 51 NJELL CREEK } t noun pw\� I Air HENS( 1vTr —o® °BBy `° ES. PANEL 9642K 3. . �B ZONE 1 • v �� F� me.ee_r Toe oFMIIIaRiver i �� FIRM .m..w......,..".era...n..,....mrm"m.�arrar.h..n�.n....w" t3?OOn5 \ • I II We ( Q cone / \ / AE ' I nhp t ti.\v,,. 1` x - »,s i)l_c FLOOD INSURANCE RATE nor ZONE -- � �6 ® NORTH CAROLINA f co co PANEL 9642 \ n�uen. ..... .. PxELur «NwlxmXro �___ ,e jyr� t sun an 000 FEET t v • f • � . ... .. .\........... .r) 1 rwMM1 D I�l NpppprElTgy- DNB PANEL9B, » `" ,gogggogogygyryweawwgr m. .R NOTES TO USERS TVS map le for use In admindbdp Ms NMbnY P.Insure.Prop..It EON nd»weeedy pen,Fbotl Mune Areas may be et by hood conbY ebnmrw. usmore ONlHd me...ere.charnel cmnOurNans than Pose moan MAP REPOSITORY Identify all areas weledbhootlw0.»dlculaM from howl drainage eoacea memYl size.The urw m wrero Study report far Ms PrvowFFgRVM for inleludWdN.w B�aOplalm haven Amwryatnd were transferred Iran React NlnpdMap Repo4lalwsent»Imwo Nes tlM'fMww MlolMrmscom flymas repo»ory snwH»exultedro pmapleupage oraes of onlwehwm Rotor monro nos cowim ePlwectIon nelmlee of T. ems hue ppdwe oubb ben were Flood o mil" /1�q IMamNon F t or guanaco.As y �1 I..gk,' - t�9.U• In lyre detailed information s p a offie t is FIRM MPomn°eral1 imagery ouse.retread y Bunc Buncombe venous Study report.n("bRh mum on were Mar EFFECTIVE DATE Cr FLoo01NSLRANCE RATE MAP PANEL e m enctior The z..r.nnm nor., { m� Elevations n .. wanre by h`hgeci rpm Yssiren ors m'k a.Imryrm.dY rem E ocroeERz3BM `� »eWey n<n on i e Flood w°:•h:'Yen"'anm"where `toe Flood Fo»ed'Pr » oetlwa: .�,e County natn.Sanderson mm.nizaoi':ne m: » __ er'eY`°ae :Th�Nm w, Summary m 6tlewalx Eewticos tads PxueevMe'to the asps rented Map an aver ry EFFECTIVE MTEIS)OF RENMOH31 i0 THSPNiEL contalned.a. the Rood Limited ran Sludy(FS)repo tire accompanies FRM.Uaem shore wAomm the Buncombe Imagery is In..and O»epYN date wen'» map panels commYnry map rwoery atlarsear and a Listing c Cornmeal'w lade uaweswaea wary betel Flood lmuwnm RYa Map(FIRM)was pmtluce0 wmu0M1eunp» be aware th06FEss wen on the FIRM repnemt rounded sMo600,elevelone.Thew BFE.are un. /.met FEM ee map soakage.wen mongerd Re Prefer, eneleh�Net..Flees Innuaea Progern rates Pp wen wmmunb as wYl as a aping ear the JANUARY B.2010 Allen _ partnership between the Slate of North Carollre end the Federelinterred flood mwmrpe rYlm mmww only anE mount me, In t as the We coons of erente(Or Mr aWI11ona Imonmarge abeer bane are-epergne. m Ia w meseamiat diggerWhen earn mmmunny a located 0I07 Age,)FEMA) a Slate m Noah caolba lens Ire flood elevation in onct.with.a FIRM for flood Ynw111 ram prwnme In the HS mood Wrong]be Pne a0w de ma or questions concerning the National Flees Insurance NAP REVISED MAP M. 3aae reapw re�a anrrn on mla map.sure ore aarpore Bret.ere eased on them p �eme e w mmnwmllm with the FlaMr«vexesammnmrmpn.hwrornocdplYn manage.. II you lure w.Yln vpmmdnmalM>emarorarenta®mhn.•aan„u.mapYm JONUARY41070 370096 a mach m rasldm matted by Ip most general,qw.e wlilm-FPeMA mAr�nan-me-:ei))pr.,Yt tI.IFEMA waslbm !Mooing. Boon or regulatory nddtlw. ahem p we F rorflooding.deam. m by as corporate80010 Program one. a 0m.y m b do ednrmn.y Men Hmrr ?. t..lain areas pad the attar the Stare of rulings were .a crow ens and on between roe amnmatlThe was pea nde be SiWyw ibr mrc urar CD _ Carolina has 1p and oeperet rg Techn cot State wnn n hydra.conetler»ens Ww� yea,current N Stuff report Letter on(LOMR)or Letter c Map to produre and maintain the digital FIRM. Rccd»ym re,p�s„,»naps,deb M where ent(LOBMA!even preen m tns panel,and I sa cod.dryml no nmonymecmo»I wascrmted a woumon nth.'statan»Irmm FRM. a»,. Manage,.a Be Nasma Floodnarance Program at de Moog were rem d detailed M.O.ere e�tlM»nw the EIS ieorl for Nehtltl m Tea EIS�ePvoe ¢m,oacr.adNtn phone se avertsmw www.ncfloodmaps.com P„a readied edmemma yusing non-encroachment wren. D also Se reamed ley ra.Y;aodnr�620 red'aw...shhwrlwwe maeren..m:`�� (NC 9t9))son of fEergency Memm°ment0AMP m500LS1e-0020...nal rim.anmmmhrewanm \ Z Federal Emergency Management Al 6/20/2019 Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 n`\ Location name: Fletcher,North Carolina,USA* +`noonecin Latitude:35.4347°, Longitude:-82.5374° a Na. "I Elevation:2145.24 ft** i �i *source:ESRI Maps k,,,.. <:p` **source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 5-min 4.38 5.22 6.25 7.04 8.08 8.86 9.65 10.4 11.5 I 12.3 (3.95-4.87) (4.72-5.80) (5.64-6.95) (6.32-7.81) (7.20-8.94) (7.86-9.79) (8.52-10.7) (9.16-11.6) (9.92-12.8) (10.5-13.8) 10-min 3.50 4.17 5.01 5.63 6.43 7.06 7.67 8.27 9.07 9.68 (3.16-3.89) (3.77-4.63) (4.51-5.57) (5.06-6.24) (5.74-7.12) (6.26-7.80) (6.77-8.50) (7.25-9.19) (7.85-10.1) (8.30-10.9) 15-min 2.92 3.50 4.22 4.75 5.44 5.96 6.46 I 6.96 7.61 8.10 (2.63-3.24) (3.16-3.88) (3.80-4.70) (4.27-5.26) (4.85-6.02) (5.28-6.58) (5.70-7.16) (6.10-7.73) (6.59-8.50) (6.94-9.10) 30-min 2.00 2.41 3.00 3.44 4.03 4.48 4.95 5.42 6.05 6.56 (1.80-2.22) (2.18-2.68) (2.70-3.34) (3.09-3.81) _(3.59-4.46) (3.98-4.96) (4.37-5.48) (4.75-6.02) (5.24-6.77) (5.62-7.37) 60-min 1.25 1.51 1.92 2.24 2.68 3.04 3.41 3.80 4.34 4.79 (1.12-1.39) (1.37-1.68) (1.73-2.14) (2.01-2.48) (2.39-2.97) I (2.69-3.36) I (3.01-3.78) I (3.33-4.22) (3.76-4.85) I (4.10-5.38) 2-hr 0.729 0.885 1.12 1.30 1.56 1.77 2.00 1 2.23 1 2.56 I 2.83 (0.655-0.809) (0.796-0.980) (1.00-1.24) (1.16-1.44) (1.39-1.73) (1.56-1.97) (1.75-2.22) (1.94-2.48) (2.20-2.86) (2.40-3.18) 3-hr 0.520 0.626 0.786 0.916 1.11 1.26 1.43 1.62 1.88 2.10 (0.469-0.581) (0.564-0.698) (0.706-0.873) (0.820-1.02) (0.982-1.23) (1.11-1.41) (1.25-1.60) (1.40-1.80) (1.60-2.11) (1.76-2.37) 6-hr 0.325 0.387 0.477 1 0.554 0.666 0.761 1 0.864 0.976 1.14 1.27 (0.297-0.358) (0.353-0.425) (0.435-0.524)1(0.503-0.609)1(0.600-0.732)1(0.680-0.835) (0.764-0.951) (0.853-1.08) (0.978-1.26) (1.08-1.42) 12-hr 0.204 0.243 0.298 0.342 0.404 0.454 0.506 0.560 0.635 0.694 (0.188-0.223) (0.223-0.265) (0.274-0.325) (0.314-0.373) (0.368-0.440) (0.412-0.496)1(0.457-0.553) (0.502-0.614) (0.563-0.702) (0.609-0.773) 24-hr 0.121 0.145 0.179 0.206 0.243 0.273 0.303 0.335 0.380 0.415 (0.112-0.131) (0.135-0.158) (0.166-0.194) (0.190-0.223) (0.223-0.262) (0.250-0.295) (0.277-0.328) (0.305-0.362) (0.342-0.411) (0.371-0.450) 2-day 0.072 0.086 0.105 0.120 0.140 0.157 0.174 0.192 0.216 0.235 (0.067-0.078) (0.080-0.093) (0.097-0.113) (0.111-0.129) (0.130-0.151) (0.145-0.169)1(0.160-0.188)1(0.175-0.207)1(0.196-0.234) (0.212-0.255) 3-day 0.051 0.061 0.074 0.084 0.098 0.109 0.120 0.131 0.147 0.159 (0.048-0.055) (0.057-0.066) (0.069-0.079) (0.078-0.090) (0.091-0.105) (0.100-0.117) (0.110-0.129) (0.120-0.141) (0.133-0.158) (0.144-0.172) 4-day 0.041 0.049 0.058 0.066 0.076 1 0.084 0.093 0.101 0.112 0.121 (0.038-0.044) (0.045-0.052) (0.054-0.062) (0.061-0.071) (0.071-0.082) (0.078-0.090) (0.085-0.099) (0.093-0.108) (0.102-0.120) (0.110-0.130) 7-day 0.027 0.032 0.039 0.044 0.051 I 0.056 0.062 0.067 0.075 0.081 (0.025-0.029) (0.030-0.035) (0.036-0.041) (0.041-0.047) (0.047-0.054) (0.052-0.060) (0.057-0.066) (0.062-0.072) (0.069-0.081) (0.074-0.088) 10-day 0.022 0.026 0.031 0.034 0.040 0.044 0.048 0.052 0.057 0.062 (0.021-0.023) (0.024-0.027) (0.029-0.033) (0.032-0.037) (0.037-0.042) (0.041-0.046) (0.044-0.051) (0.048-0.055) (0.053-0.061) (0.057-0.066) 20-day 0.015 0.017 0.020 0.022 0.025 0.027 0.030 0.032 0.034 0.036 (0.014-0.016) (0.016-0.018) (0.019-0.021) (0.021-0.024) (0.024-0.027) (0.026-0.029) (0.028-0.031) (0.030-0.033) (0.032-0.036) (0.034-0.038), 30-day 0.012 0.014 0.016 0.018 0.020 0.021 0.023 0.024 0.025 0.027 (0.011-0.013) (0.013-0.015) (0.015-0.017) (0.017-0.019) (0.019-0.021) (0.020-0.022) (0.021-0.024) (0.022-0.025) (0.024-0.027) (0.025-0.028) 45-day 0.010 0.012 0.014 0.015 0.016 0.017 0.018 0.019 0.020 0.020 (0.010-0.011) (0.011-0.013) (0.013-0.014) (0.014-0.015) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.018-0.020) (0.018-0.021) (0.019-0.021) 60-day 0.009 0.011 0.012 0.013 0.014 0.015 0.015 0.016 0.017 0.017 (0.009-0.010) (0.010-0.011) (0.011-0.013) (0.012-0.014) (0.013-0.015) (0.014-0.016) (0.015-0.016) (0.015-0.017) (0.016-0.018) (0.016-0.018) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.4347&Ion=-82.5374&data=intensity&units=english&series=pds 1/4 6/20/2019 Precipitation Frequency Data Server PDS-based intensity-duration-frequency (IDF) curves Latitude: 35.4347°, Longitude: -82.5374° 100.000 , I , , , r - Average recurrence interval -- 10.000 `- _ (years) • 2 47 1.000 -..... — 5 a c • — 10 C — 25 +, 0.100 -... - a - _ — 100 •� - -- — 200 N o_ 0.010 -- 500 — 1000 0.001 —_I c c c c 6- I 6- 6- >, >,>, >. >, >, >, >,>. .F .- ' '� . L L L L L 43 43 /0 N r0 ro ro ro Z IA 0 -I rn lD r-1 fV N f�1 r- O N I rfl cr ID Duration 100.000 r I 10.000 _c --- Duration 71 1.000 - — 5-min — 2-day c — — 10-mn — 3-day c ___ — 15-nun — 4-day ▪ 0-100 ^ • - — 30-min — 7-day .- 60�rnn 10 day 'w — 2-fir — 20-day a 0.010 - - — 3-hr — 30-day — 6-hr — 45-day — 12-hr — 60-day 0.001 — 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Thu Jun 20 13:16:24 2019 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.4347&Ion=-82.5374&data=intensity&units=english&series=pds 2/4 6/20/2019 Precipitation Frequency Data Server Arden^;/ _ •�I ASHEVILLE RGNL A!R p0 R7�Iown ,6;e fir' I Fletcher'. I racii ' MILLS a + KNOB 3km �. 2mi r. Naples Large scale terrain Kingsport• Bristol Johnson City• 0 Winston-Saler Knoxville • ^` G t., Mt Mitchell ty (-0 'Asheville NORTH C. t. I •Charlc ti toga • e Greenville lookm ` CLITH CARO 60mi Large scale map — - Kingsport Eristrl tip Johnson City • inston-E pZtylll ��- shevilte artot, Greenville El- 100km 60mi Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.4347&Ion=-82.5374&data=intensity&units=english&series=pds 3/4 6/20/2019 Precipitation Frequency Data Server KingsRort_•_Bnstol ohnso/n Cif • / Winston-' Knoxville • Ashrnl , C harlot iga Greenville • 100km 60mi \� Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.4347&Ion=-82.5374&data=intensity&units=english&series=pds 4/4 6/20/2019 Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 -`\ Location name: Fletcher,North Carolina,USA* +` , '�` Latitude:35.4347°, Longitude:-82.5374° i none 1%. "I Elevation:2145.24 ft** i *source:ESRI Maps k,,,, <:p` 131 **source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval(years) Duration 1 2 5 10 I 25 50 100 200 500 1000 5-min 0.365 0.435 0.521 I 0.587 0.673 0.738 0.804 0.870 0.955 I 1.02 (0.329-0.406) (0.393-0.483) (0.470-0.579) (0.527-0.651) (0.600-0.745) (0.655-0.816) (0.710-0.891) (0.763-0.966),(0.827-1.07) (0.878-1.15) 10-min 0.584 0.695 0.835 0.939 1.07 1.18 1.28 1.38 1.51 1.61 (0.526-0.649) (0.628-0.772) (0.752-0.928) (0.843-1.04) (0.956-1.19) (1.04-1.30) (1.13-1.42) (1.21-1.53) (1.31-1.69) (1.38-1.81) 15-min 0.729 0.874 1.06 1.19 1.36 I 1.49 1.62 1.74 1.90 2.02 (0.657-0.811) (0.789-0.971) (0.951-1.17) (1.07-1.32) (1.21-1.50) (1.32-1.65) (1.43-1.79) (1.53-1.93) (1.65-2.13)I (1.74-2.28) 30-min 1.00 1.21 1.50 1.72 2.01 2.24 2.47 2.71 3.03 3.28 (0.901-1.11) (1.09-1.34) (1.35-1.67) (1.55-1.91) , (1.80-2.23) (1.99-2.48) (2.18-2.74) (2.37-3.01) (2.62-3.38) (2.81-3.69) 60-min I 1.25 1.51 1.92 2.24 2.68 3.04 3.41 3.80 4.34 4.79 (1.12-1.39) (1.37-1.68) (1.73-2.14) I (2.01-2.48) (2.39-2.97) I (2.69-3.36) (3.01-3.78) (3.33-4.22) (3.76-4.85) (4.10-5.38) 2-hr 1.46 1.77 2.24 2.60 3.13 I 3.55 3.99 4.47 5.13 5.67 I (1.31-1.62) (1.59-1.96) (2.00-2.47) (2.33-2.88) -(2.77-3.47) (3.13-3.93) (3.49-4.43) (3.88-4.96) (4.39-5.73) (4.81-6.37) 3-hr 1.56 1.88 2.36 2.75 3.33 3.80 4.31 1 4.86 5.65 6.30 (1.41-1.75) (1.70-2.10) (2.12-2.62) (2.46-3.06) 1 (2.95-3.70) (3.35-4.23) (3.76-4.79) (4.19-5.41) (4.80-6.34) (5.29-7.11) 6-hr 1.95 1 2.32 2.86 1 3.32 3.99 4.56 5.18 5.85 6.82 7.64 (1.78-2.14) (2.11-2.55) (2.60-3.14) I (3.01-3.65) (3.59-4.38) (4.07-5.00) (4.57-5.69) (5.11-6.44) (5.86-7.56) (6.48-8.52) 12-hr 2.46 2.93 3.59 4.12 4.87 5.47 6.09 6.74 7.65 8.36 I (2.26-2.68) (2.69-3.20) (3.30-3.92) (3.78-4.50) (4.44-5.31) (4.97-5.97) (5.50-6.66) I (6.05-7.40) (6.78-8.45) (7.34-9.31) 24-hr 2.91 3.49 4.29 4.94 5.82 6.54 7.28 L 8.05 9.12 9.97 (2.69-3.15) (3.24-3.79) (3.97-4.66) (4.56-5.34) (5.36-6.30) , (6.00-7.07) (6.65-7.86) (7.31-8.70) (8.21-9.87) (8.90-10.8) 2-day 3.46 4.13 5.03 5.75 6.74 7.54 8.36 9.20 10.4 11.3 (3.22-3.73) I (3.84-4.45) I (4.67-5.42) (5.33-6.19) (6.23-7.25) (6.94-8.11) (7.67-9.00) (8.40-9.93) (9.39-11.2) (10.2-12.2) 3-day 3.69 4.39 5.32 6.04 7.03 7.82 8.62 9.44 10.6 11.4 (3.44-3.96) (4.10-4.72) (4.95-5.71) (5.62-6.48) (6.52-7.54) (7.22-8.39) (7.93-9.27) I (8.65-10.2) (9.60-11.4)I (10.3-12.4) 4-day 3.92 4.67 5.60 6.34 7.33 8.10 I 8.89 9.68 10.7 11.6 (3.66-4.19) (4.35-5.00) (5.22-5.99) (5.90-6.78) (6.80-7.84) (7.50-8.67) (8.20-9.53) (8.90-10.4) (9.81-11.6) (10.5-12.5) 7-day 4.57 5.42 6.50 7.36 8.52 9.44 10.4 11.3 12.6 13.7 (4.27-4.89) (5.07-5.82) (6.07-6.97) (6.86-7.88) (7.92-9.11) (8.75-10.1) (9.59-11.1) (10.4-12.1) (11.5-13.6) (12.4-14.7) 10-day 5.23 6.19 7.34 8.25 9.49 10.5 11.4 12.4 13.8 14.8 (4.93-5.56) (5.83-6.58) (6.92-7.81) (7.77-8.77) (8.90-10.1) (9.79-11.1) (10.7-12.2) (11.6-13.2) (12.7-14.7) (13.6-15.9) 20-day 7.11 8.36 9.71 10.8 12.1 13.2 r 14.2 15.1 16.4 17.4 (6.72-7.51) (7.91-8.84) (9.18-10.3) (10.2-11.4) (11.4-12.8) (12.4-13.9) (13.3-15.0) (14.2-16.0) (15.3-17.4) (16.1-18.5) 30-day 8.72 10.2 11.7 12.8 14.2 15.3 16.2 17.2 18.3 19.1 (8.28-9.20) (9.72-10.8) (11.1-12.3) (12.2-13.5) (13.5-15.0) (14.4-16.1) (15.3-17.1) (16.2-18.1) (17.2-19.4) (17.9-20.3) 45-day 11.1 13.0 14.6 15.8 17.3 18.3 19.2 20.1 21.1 21.8 (10.6-11.6) (12.3-13.6) (13.9-15.3) (15.0-16.6) (16.4-18.1) (17.4-19.2) I (18.2-20.2) (19.0-21.1) (20.0-22.2) (20.6-23.0) 60-day 13.3 15.5 17.3 18.6 20.2 21.3 22.3 23.2 24.2 24.9 (12.7-14.0) (14.8-16.3) (16.5-18.2) (17.8-19.6) (19.2-21.3) I (20.2-22.4) (21.2-23.5) (22.0-24.4) (22.9-25.6) (23.5-26.3) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.4347&Ion=-82.5374&data=depth&units=english&series=pds 1/4 6/20/2019 Precipitation Frequency Data Server PDS-based depth-duration-frequency (DDF) curves Latitude: 35.4347°, Longitude: -82.5374° 25 t I I 1 1 1 Average recurrence interval 20 (years) c — 1 1: 1: 1 •..... . ._ — 50 V • v — 100 o_ — 200 5 _ 500 _1 — 1000 0 --t— t t i i i i i i -5. E •� � •� r0 r0 /0 L L L L L N r0 l0 l0 r0 �0 IA O� � rn lD r-1 fV N AI� O N rfl .7IDD Duration 25 20 . c . •._ Duration _C • ani 15 - — 5-min — 2-day c — 10-min — 3-day O • 15-rn1n — 4-day r6 10 — 30-min — 7-day 'G --- • — 60-min — 10-day v • a` • — 2fir — 20-day 5 - • —J — 3fir - 30-day _ - ----- _ _ — 6fir - 45-day — 12-hr — 60-clay 0, i t t t t i I I — 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Thu Jun 20 13:18:29 2019 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.4347&Ion=-82.5374&data=depth&units=english&series=pds 2/4 6/20/2019 Precipitation Frequency Data Server Arden^;/ _ •�I ASHEVILLE RGNL I, A!R p0 R7� 6;e fir' I Fletcher'. I racii ' MILLS a + KNOB 3km �. 2mi r. _Naples Large scale terrain Kingsport• Bristol Johnson City• 0 Winston-Saler Knoxville • 0,0 ^` G A/ 5' Mt Mitchell ty (-0 1 'Asheville NORTH C. t. I •Charlc ti toga • e Greenville 100km ` CLITH CARO 60mi Large scale map — - Kingsport Erist,l tip Johnson City • inston-E pZtylll ��- shevilte artot, Greenville 100km 60mi Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.4347&Ion=-82.5374&data=depth&units=english&series=pds 3/4 6/20/2019 Precipitation Frequency Data Server ___‘------ KingsRort_•_Bnstol Johnso /n Ci • / Winston-' Knoxville . • Ashrnl , C harlot iga Greenville 0 . • III 100km 60mi 4� Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.4347&Ion=-82.5374&data=depth&units=english&series=pds 4/4 APPENDIX B AIRPORT LAYOUT PLAN (ALP) 40}�� `-J „UNCOMBE C UNTY no BUNCOMBE COUNTY HENDERSON COUNTY WINDSHEAR,aI- O P•ce ED TERMINAL C' FRTy� ..... �OCMWOOD ROq�� - / \ 'C, `" • -- -_ MEATS • Z 0 4 W/VR • y� � SYSTEM LLW NEW ROCKW MOD ROAD ,0 \\ -„,•.w rn:PR,,,,,,,:..s,,,,..0PoSE L "" A Z= AND NOSN AE A.KING,LnOMMERyeFw'O :•`..........„.„._ V-`--�.IIIU 1 O� RUNWAY a35.2°32E SOBS' MAGNETIC �J HENDERSON COUNTY ELEVA :2,1108 LOW N DECLINATION 0 9p` _ I ' IAL so ( PROPOSED AIR TRAFF NTR / ND •N{iE '..•- UILS :. ,i JD PROPOSED PARKI GD $ POINT ei \ f /, MULTI-USE[II ���TT�.^� _ � -- I ,TOWER(ATCT)AND CRITIC A / / /'.- �"I__''/' 1, I III].._ n1""- [III] - PROPOSEO.ARFF p] - �" / PROPOSE•D , PROPOSED COMMERCIAL AND ❑` _ :ILITATIONc&,�. ONON-AERONAUTICAL MULTI-USE Q / PROPERTY RELEASE -'� PROPOSED COMMERCI- • IMPRO TS -./^'�``-..,,� -- O [III] _ .��� REQUIRED'FOR NCDOT ROW `\ / FVEHICLE LANE / [I •*""^� <•�,� PROPOSED GENERAL 1, ► - (. r [I] ,MINGB 'J Ril AVIATION DEVELOPMENT „� a Z = o ��T�- CKrillibl• PROP SED RUNWAYS END - - [III) -nna w� �4� [I�� _ .4 L (ACT 1 p - LAT 035°25'32.87"N5,""` „_ EXPANDED""` `I _ -- - x 15 \- _�_ __- [II] / /- ` �NDDM�� • CON. 82°32'14.70"W *aE_-_ ROAD FUEL FARM .0 - / / H - / ,, _ �''• OSED MMERCIAL] D ELEV. 2,1 .8 -L. j iv. p [III] "' _r' O �Mir � ERON' TICAL MUL II K 41bf [I]1 _ �1 7 I ! � 10 L r _ 1. 8/ �� 0 • / PROPOSED RUNWAY 35 ' //2 p ' ! +) _'_ GiE- l - �_ �, - [ • o o -• *AL- O T, RUNWAY PROTECTION ZONE )V� -UNWAY 16 PR ZONE Cw 1 }_ • [Q� -�,.__ r ,.. ��� / Q0(9�> v ... 40 'I y [IL '� a o0 '�M � �/ VISIBILITY<3/4 MILE b .( I � f_• _ � I II ifi8 F 4 MILE o o I. /y I _ ,,:.2„ (1000 x1750'x 2,500') (1,000xl.7sox25oo) •[]� 1 _� ® � - �I � / �� p] o �' iQ� ) no PROPOSED RUNWAY 17 END �./ 5 CS O O I��O.[]p, I�U' °'., -I E - i m 'J �r l 0lRUNWAY 34 PROTECTION 1JJJ II:� Im �� R mr ,) / J \' ZONE VISIBILITY<3/4 LAT:35'26 47.13 N oo MILE CON:82°32'48 04'W o ° - __� L x z, PROPOSED RUNWAY ELEV 2,164.4 o i� . / (1 000 x 1]50' S00) iR LK ��i Pz o 0 4 D n )e :: TilifierikIff 1` . ,. _ " J/ / ppZ�-AONE NRUNWAY is END - -F PRIMARY-_SURFACE �'�, 35 a ° o SOS 67 ,�312 YLAT:35°25'4]39"N ' " GOLF COURSE RUNWAY PROTECTION ZONE `� - • ,_ -.A `7 , ❑�®VISIBILITY<3/4 MIKE Z2 CON:82°32'41.19"W - ^TOFA - ITOFA - - r A F -- �� TOFA J(1,000'x 1,750'X2,50 ELEV:2,1644 HIGH POINT vc-a0 L -. I� - -- - - _ - E o - '� FAQ � <®� _[I] IRE ROFA ... ROFA Ir"R ROFA ROFA 1 1JER ORN i - ."-� ., 5 �� \�,9 r- - _....... lig Ofi�_ Iw��" MALSR - SUM VG /�' -R7I:ihIL7.1 n„ isz ,.:....,......oW�` ..L��G1�li� 1r i; II= -- LF� - O� ti ��•AiR A9_' A6 ,. • A5 •Z'�..a A4 OFZ OFZ A2 Ai f- I --:_-_-_-_-1 -- _ • r (",], rsi.��l �4-H__-WIC - _ C • Rr 12 z. \' ' ' 7i96P2...i4KI- : �'� OPOSED�RU BEAR G S20 05 33 E RUNWAY 17 35 I11IGi MALSR \ ,��. _ _ •R - - - - __ __ E IN ° g,l '.1 l- IWS f'� '�® =MW OFZ I7� Of -o: • o DPP �� I ,aD AIRPO' ��ia■, •' a(CA uFz R.c� B�' . RSA 9p i�1 f� �Irk 1 I Ei .. _ iEc: !*�` �R'� r'�y I I SERVICE•.AD i�u�l 1,1 �1�_ - J,l R I A- .� _ _ M V° RUNWAY 34 � �p _ vA •r �`' - uF -- 6 - I. I I •,♦ RUN AV 16 LOCALIZER 1.8 Tcn--- --- 0 - - L / �� iiA TO - - Tx TTNRE TO OFA -� A e`_ V VG as J- -A- ' -'' - ACE 4 .... --- I OC Z� _ 1, I !' " TEMPORARY.�'> ry ..., i BRL • -R! BRL _/�1�•R -'��__ • 1- RPZ / 5.0 / Ee AY \` GLIDE SLOPE ,T,•.,, 25. / VG os 25' -a 25' PRIMARY SURFACE __- o k ':.�5mr. r'r 1 - \_�C � �PZ c - / °ORo CRITICAL AREA ¢ �° �� ' '✓ A' PROPOSED RELOCATED _y -_ y'- I �.(( 1 T°'� • / \ ter "ROPOSED GLIDESLOPE > O ./ F F a a / RUNWAY 16-34 -ARP - CRITICAL AREA ^-.,. EU LAT:35.26 10.30 N - • - C / ..OO_ _• PROPOSED / l '� y'�_ r C .c, X/ ,rv\ L051 82.32 30.50 �.^/ ] / Q \ tOGV LEVEL DSHEAR -�, e GLIDESLOPE �/ �L I,I� ! RUNWAY 34 PART TI O t1 ALERT SYS EM LLWAS d RELOCATE ) X` / PROPOSED, •! f APPROACH SURFACE • GLEN ,�O ( „CRITICAL AREA / '/ PAPI4 LOW LEVEL WINDSHEAR `PROPOSES-A� / �11 / : OCATE .SO) / BRIDGE ROAD$E _ �, • I)� II] O eJe'e'e'e'e'e'e'e'e'e' ALERT SYSTEM LLWAS LAT:35°26'09. l� 't, L •/ AND IRIT AL AiA •RECISION INSTRUMENT O Q < ( ) LON:82°32'31.34" RELOCATE O _ PROPOSED 50:1 APP.s' H INNER(10,000) Z �t�, / / VASI 4 O COMMERCIAL AND 0,111 40:1 APPROACH.. R(40,000') -UNWAV 16 PART]] ¢ i / - G` / /�///i/// [] Q.� NON-AERONAUTICAL VISIBILITY< „LE ` AP•IOA 5HSURFACE LL 'll i A 4 2\ ~�p (} O O OQ / - T c / PROPOSED TEMPORARY YYY�������, 1♦ a� BUNCOMBE COUNTY 000x 16,000'z60,000' , O VO b //// / __ / MULTI-USE (1, PRECISIO t * O [U] �� 1 APPROACH INN 10.000 t ° f n ` ,: .STRUMENT ll 401 PROACH OUTER(-1 LOOj -L Y, ,_ RUNWAY FUTURE WEST SIDE - T� - _ __I <3/4 MI- -.! 0 0 / ,. / / - Y/PARALLEL TAXIWAY °� "P ,....-.- VISIBILITY ---" (1,000 x 16,000 x 50,000') t - ry _/ _ / _ ° ] - / PROPOSED AIR CARGO / 0 } ',` JET L�� O� y '4 / J G C_, I ,; HENDERSON COUNTY =w O Q '"� <' a ., DEVELOPMENT AREA O t } ,-� "" PO ~ PROPOSED RUNWAY 35 PROPOSED RUNWAY O / - '1�- - - [U] L O PART 77 APPROACH SURFACE � 4,1 � �- v'/r / j� m„ � NgP o PART 77 APPROACH SURFACE PRECISION INSTRUMENT V •'.. ;j'` " 04O J U PRECISION INSTRUMENT 50:1 APPROACH INNER 10,000' O O •e TRAFFIC CIRCLE P z ti PROPOSED +x'= }[ F ° 50:1 APPROACH INNER(10,000') ( ) 2C /l �, m*!ay R�`�� / NCDOT PROJECT / �� O y 40:1 APPROACH OUTER 40,000' 40:1 APPROACH OUTER(40,000') '" ti /,l/T OMMERGIAL AND / ,L(U p ^m roq ��_ /.- ( ) VISIBILITY<3/4 MILE �O NON-COMMERCIAL / to , �/ ��/ d '_ >� • j�� j - _! /f'� VISIBILITY<3/4 MILE 1,000'x 16,000'x 50,000' MULTI-USE / n0 • '^""„„m�„_ ! (1,000'x 16,000'x 50,000') [DI P'' Om L - `IVERVIEWOR14, 2.------ ART „ // r/ f ' '''''-'-'- '-'<1:-_,-,-'-'17' mn 01 . ('S, i:, FRENCH BROADA R y 0 ( �\ • I--- RIVE BUNCOMBE COUNTY 11 t 7 HENDERSON COUNTY �` ----s(` \t j /� li' �� 1 �'`, I) ` t FACILITIES TABLE EXISTING PROPOSED MODIFICATIONS OF DESIGN STANDARDS DEVELOPMENT PROGRAM IL RUNWAY DATA TABLE a REF FACILITY NAME TOP REF FACILITY NAME 1 TOP ELEV NO, STANDARD MODIFIED FAA STANDARDS EXISTING CONDITION PROPOSED ACTION DATE APPROVED AERONAUTICAL STUDY PHASE I DEVELOPMENT ) [I] 1 RUNWAY 16/34 RUNWAY 17/35 ELEV (EST.) 1 RUNWAY LONGITUDINAL GRADE <0.5%1ST QUARTER 80.5%1ST QUARTERRELOCATE RUNWAY AUGUST 18,4578 ATL-603:7288:8-07-73 DESCRIPTION 16 NWrvTErvnrvcEo ICE BUILDING * A TRTRAFFIECWPJHSa NIIIO 2 RUNWAY TO TAXIWAY SEPARATION 400 325 BPS RUNWAY AUGUST18, 78 ATL-603:7288:8-07-73 PHASE II DEVELOPMENT I [II] 1 EXISTING PROPOSED RUNWAY END COORDINATES(NAD 83) (AVIATION WAY)FF BTO ER(Arcr)pIp .._ PHASE III DEVELOPMENT [III] I 6)35•s' S•s' LEGEND 93 p.39'N p.13'N VEHICLE STORAGE HANGARS°° NON-STANDARD CONDITIONS AIRPORT DATA TABLE ULTIMATE DEVELOPMENT I IU] 1 Q• LATITUDE (34)35.2993.12•N (35)35.25'32.87•N DESCRIPTION 1 EXISTING 1 PROPOSED ULTIMATE 16B MAINTENANCE STORAGE D GARS IIII _. 16)82°32'4].19"W n 02•ar48.04"w -_ _ - _ _ WITH OFFICE(MNOBERGH LANE) DEVELOPMENT[u] _, NO. NONSTANDARD CONDITION EXISTING CONDITION FAA STANDARD AIRPORT DATA EXISTING PROPOSED LONGITUDE ( ( I AIRPORT PROPERTY LINESAME (34)02°32'13.85"W (35)02.32114.70.W AIRPORT SURVEILLANCE RADAR20 T-HANGARS3(20UNIT)(T-ANGAR ROW) * F DEVELOPMENT[III] -2 1 RUNWAY LONG GRADE -1.0%1ST OUARTER(RW 34) 30..I ST QUARTER ELEVATION(MS, 2,165' SAME = ASHEVILLE REGIONAL AIRPORT 21 OFFICE BUILDING(AVIATION WAY) . G PART CATEGORY OTHER THAN UTILITY SAME ( ) SAME SAME 30 BULK HANGAR(LINDBERGH LANE) * H COMMERCIAL/NON-AERONAUTIC.O -= REPARATION 325' 400' AIRPORT o (16)<y4 MILE (1])<y4 MILE CRITICAL AREA 2 RUNWAY TO TPXIWAY REFERENCE POINT(NA003) APPROACH MINIMUMS RUNWAY CENTERLINE SAME LATITUDE 35.26'10.30"N 35°26'09.99"N (31)<3I4 MILE (35)<3I4 MILE £�+ PART Ti SURFACE SAME I LONGITUDE 62°32'30.50'W 62°32'31.34"W MEAN MAX.TEMPERATURE HOTTEST APPROVED DATE Bn 116150:1 117150:1 PAVEMENT 31 CONVENTIONAL HANGAR(AVIATION WAY) * H MULTI-USE DEVELOPMENToN-NON-AERONAUTICAL i MONTH 833 F SAME APPROACH SURFACE SLOPEPARKING.COMMERCIAL,N lu)AER ° (34)sO:+ (35)50:+ BUILDING RESTRICTION LINE(BRL) ADT ROTATING BEACON,SEGMENTED CIRCLE, NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BRL BRL SAME HANGAR WITH OFF * ARO AIRPORT TERMINAL AREA NAVAIDS SAME 10 RUNWAY WIDTH 150' SAME 35 OFFICE AVIATION wan J MULTIUSE DEVELOPMENT IU)cu -s NOTES LORIMAR-SMALL-LOPE DIVISION OF AVIATION RUNWAY SAFETY AREA(RSA) RSA RSA SAME FBO OFFICE BUILD AND HANGAR NPIAS SERVICE LEVEL PRIMARY-SMPLL-HUB SAME RUNWAY LENGTH 8,001' SAME 40 TT-HANGAR ROW)'NG * K FUEL FARM IIIII -' 1. FAA'S APPROVAL OF THIS AIRPORT LAYOUT PLAN(ALP)REPRESENTS COMMERCIAL SERVICE DISPLACED THRESHOLD NONE NONE RUNWAY OBJECT FREE AREA(ROFA) ROFA ROFA SAME STATE SERVICE LEVEL OM AIR CARRIER IC SAME 95, GAR N2(+7UNRI ITHANGAR ROW) ACCEPTANCE OF THE GENERAL LOCATION OF THE FUTURE FACILITIES 'a SURFACE ASPHALT-GROOVED SAME RUNWAY PROTECTION ZONE RPZ RPZ SAME 21es DEPICTED.DURING THE PRELIMINARY DESIGN PHASE,THE AIRPORT OWNER IS AIRPORT REFERENCECODE(ARC) GIII SAME APPROVED DATE TSTR ING/TERMINAL DRIVE) REQUIRED TO SUBMITFST APPROVAL THE FINAL LOCATIONS,HEIGHTS AND TAXIWAY LIGHTING MITL SAME PAVEMENT STRENGTH(LBS) OBSTACLE FREE ZONE(OFZ) OFZ OFZ SAME 4 BUILDING DRIVE) EXTERIOR FINISHES OF STRUCTURES.FANS CONCERNS ARE OBSTRUCTIONS, FEDERAL AVIATION ADMINISTRATION v LO IMPACT ON ELECTRONIC AIDS AND ADVERSE EFFECT ON CONTROLLER W TAXIWAY MARKING ENHANCED SAME SINGLE WHEEL 160.000 SAME 9' DUAL WHEEL 1fi0.000 SAME TAXIWAY OBJECT FREE AREA(TOFA) 70fA TOFU SAME 45 HANGAR(AVIATION WAY) OF AIRCRAFTGROUND MOVEMENTSWHICH COULD ADVERSELY AFFECT THE SAFETY EFFICIENCY OR UTILITY OF THE AIRPORT BO TLAWGAR 81 IT-HANGAR RO0I * TAXIWAY SAFETY AREA(TSAI TSA TSA SAME$ DUAL TANDEM 260.000 SAME BUILDING(ATCT EL 2226) gals 2. ALL ELEVATIONS ARE IN FEET ABOVE MEAN SBA LEVEL(MSC). APPROVED DATE d RUNWAY LIGHTING HIRL SAME PRECISION OBJECT FREE ZONE(POFZI POf7 ♦1„"1��'V SAME 61 (TERMINAL DRIVE/ RUNWAY MARKING PRECISION SAME x x x x x x x 85 RENTAL CAR MAINTENANCE FACILITY * ALL ELEVATIONS ARE IN ACCORDANCE WITH NATIONAL MAP ACCURACY FENCE SAME (RENTAL CAR DRNE) 3 STANDARDS.SPOT ELEVATIONS AND GROUND CONTOURS ARE DERIVED FROM EFFECTIVE GRADIENT(%) 0.87 SAME AERIAL PHOTOGRAMMERTY AND ARE APPROXIMATE.GROUND SURVEYS ARE FLOODWAY(100-YEAR) - NA NA 07 (TERMINAL DRIVE) * RECOMMENDED TO VERIFY ACCURACY, 500 0 500 1000 MAXIMUM GRADE 02) UTILITY BUILDING LINE OF SIGHT VIOLATIONS GROUND ELEVATION CONTOURS / BO (TE NA NA RMINAL wiNEI VAULT * 4. ALL LATITUDE AND LONGITUDE COORDINATES ARE NAD 83, IRE(16 KNOTS)99.9193 SAME TREE LINE NA NA 70 PARKING TOLL PLAZAITERMIN.L DRIVE) * 5 SURVEYS OBTAINED FROM SCALE:1"=500' FEET WIND COVERAGE(%) VFR:(16 KNOTS)99.51% SAME NON AERONAUTICAL DEVELOPMENT SAME s] RENTAL CARMGNHE CEFACIUTV * WOOLPERT.IINC..SURVEY DATE NOVEMBER 29,2011. 0 (RENTPL CAR AINEI ALL WEATHER(16 KNOTS)GR OS% SAME fi. WETLANDS FROM LLASHEVIA REGIONAL AIRPORT RUNWAYASSESSMENT RECONSTRUCTION LPN GLIDESLOPE CRITICAL AREA - -- -- -- - SAME FORTPBLE OFF CE BU LD NG AND NEW PARALLELTAX WAY ENVIRONMENTAL ASSESSMENT DRAFT THE LPA 3 ry61MALSRRELS 71.17" (n)MusRRELSPAP174 91 (vmGHTBRorHERGWAn * GROUP AVIATION CONSULTANTS MAY 201, REVISIONS BY APP. DATE -�-^ -^- RENTAL CAR READY/ CENTERLINE LIGHTING CEMERLINE LIGHTING LOCALIZER CRITICAL AREA SAME_ AIRPORT LAYOUT DRAWING Q VISUAL APPROACH AIDS (34)MALS1/(M S,VASI(Ig (35)MPLSR NLL11 VASI(V4L1. _ _ ___ _ BOOTH * 7, THERE ARE NO KNOWN OFZ OBJECT PENETRATIONS, ___ _ RETURN SERVICE BOO E Ca n TDZBCEMERLINE LIGHTING TDZBCEMERLINE LIGHTING AIRPORT BUILDINGS HANGAR(31 AND. INSTRUMENT APPROACH AIDS (16)ILS,GPS (IT)ILS,GPS UNUSABLE PAVEMENT IT04-xZ xx- NA NA 104 (WRIGHT BROTHERS VIA.IL t * 8. THERE ARE NO KNOWN THRESHOLD SITING SURFACE ITSS)PENETRATIONS. (34)ILS,GPS (35)ILS,GPS WETLANDS HANGAR WITHGFFIDE 2181 9. ALL FUTURE DEVELOPMENT MUST MEET THE FULL DESIGN STANDARDS LISTED ASHEVILLE REGIONAL AIRPORT AIRPORT REFERENCE CODE(ARC) r""s✓ •- x' 'r I NA NA 12° ONRIr(BROTHERS WAn IN FAA AC 150/5300-13. AIRCRAFT ROTATING BEACON f� SAME ARDW3IGHTBRDHERGWAY, 2.,BB ASHEVILLE, NORTH CAROLINA NG 737-]f10 LN ,+ HANG 10.THE BUILDING RESTRICTION LINEE((BRLOSHOULD BE LOCATED ON AN AIRPORT HI RUNWAY SAFETY AREA(RSA)DIM. x , BOSAME 57 WIND CONE/MDSMCK @/g @ I> SAME 13a OFFICE FIGHTBILDING BROTHERS 2'+� LAYOUT PLAN TO IDENTIFY SUT LE CATIONS FOR BUILDING AREAS ON 2 1 AIRPORT PROPERTY.THE BRL IS DEPICTED BASED ON FAR PART n SURFACE t, RUNWAY OBJECT FREE AREA(ROFAI DIM. 800'x10,W+' SAME AIRPORT REFERENCE POINT(ARP) 4> Y NA 136 (AR FRAWRIGHT BROTHEFT RESCUE 8, EFIGHTIN FACILITY * FOR A DEVELOPMENT MUST FURTHER RUNWAY CENTERLINE.SPECIFIC SITEMead SHEET '. )(WRIGHT BROTHERS WA.G DEVELOPMENT MUST BE FURTHER EVALUATED BASED ON TOP ELEVATION OF T`�,.` E OBSTACLE FREE ZONE(OFZ)DIM, 40013 9,401' SAME AUTOMATED SURFACE OBSERVING SYSTEMS(ASOS) O SAME SAME 140 CONVENTIONAL HANGAR PI 2..8 PROPOSED STRUCTURE.IT IS RECOMMENDED THAT THE BRL ENCOMPASS /'� nL PRECISION OBSTACLE FREE ZONE(POFZ)DIM. 200'x800' SAME a BULK HANGAR(WRIGHT BROTHERS WAY) THERUEDFONWAY RAIRPORTTRAFFROTECTION ESTHEROLTOWEUNWAY ISILEARLINESOBIL,ZONE, SIGHTS �Unt 3 MEDIUM INTENSITY APPROACH LIGHTING SYSTEM WITH REQUIRED FOR CONTROL TOWER CLEAR LINES OF SIGHT. (i6)2,164.4 (1]12,164.4 RUNWAY ALIGNMENT INDICATOR LIGHTS(MALSR) n/° n/} SAME * DELTA AIRPORT 8A RUNWAY END ELEVATIONS(MSL) 220 AIRPORT SURVEILLANCE RADAR 11.LEGEND ELEMENTS REPRESENT DEPICTIONS ON DRAWING,BUT MAY VARY IN (24)2,110.8 (35)2110.8 PRECISION APPROACH PATH INDICATOR(PAR) l0000 I.•o NA BUILDING AND HANGAR * SIZE DUE TO SCALING ON DRAWING. CONSULTANTS,INC. OF o- MAX.ELEVATION(MSC) 2,164.4 SAME 12GEOMETRICS DEVELOPED AND APPROVED PRIOR TO THE PUBLICATION OF (18)2,1844 (17)21844 VISUAL APPROACH SLOPE INDICATOR(VAS/) 8 SAME SAME - DRAWN BY: MY SCALE: 1°=500 3W MG ELEVATIONI I 912 RENTAL CAR FUEL FARM * ADVISORY CIRCULAR 150I5300-13APRO �'I g,' (24)2,140.0 (25)2,140.0 LOW LEVEL WINDSHEAR ALERT SYSTEM(LLWAS) 0 SAME SAME A ELEVATIONS NOT AVAILABLE CHECKED BY: RGL DATE: MARCH 2013 APPENDIX C STORMWATER SHEETS & DETAILS, DRAINAGE COMPUTATIONS r 1 r 1 P4 s �- \ I. AiASn4levRn9brneaal �f$ Quality lnn I rpa 9 ,= AsheyIn Airport Z — .., �20 1.4.E s h evi l l e C. �� 1 s REGIONAL AIRPORT i. AV G ONa 0' 75' 150' 300' 450' ¢ e .dld $ h Pr' saPeraDywynahan, MC Aviation1 Asheville Airport 1"=150' ^•taa,,,w0 / \� \j\1 AVCON INC. \ ENGINEERS&PLANNERS Parking LotQ Mercedes-Rena \\\\ 10115 KMCEY AVENUE,SUITE DF Asheville Q \v 140 HUNTERSVILLE,NC 28078 5. Mersxssrnz5eolez N • OFFICE:(704)954-9008 J \ • www.evconme com Civil Alr Palro AZ Car Rental i g �A.ehevllle Nrport �S Asheville Gonipuaife.� �A Al i � o RELEASED FOR �p a QCarollna clean lnachina A CONSTRUCTION v i. Greater AehevillPA 6 ``.�\W�'-ek-An ndetl Re4lonal Airport. O Wingate by �•°oouCAR Wyndham Fletcher 1,;© 3 'Pi : 4E Fj /- megient9 INE..J�y`�cc. Asheville Asl'ev Ile A01,I1 • M Regional Parking Garage ., ` / N Airport Q i -26 —>NEW AIRPORT ROAD • la HPrtaGnrRPntal - (280)(0.5 MILES) -> / TERMINAL DRIVE(0.4 MILES) ASH EVILLE -Ashevllloonal.. VICINITY MAP —>RENTAL CAR DRIVE(0.3 ASHEVILLE o - Google N.T.S. MILES) o REGIONAL AIRPORT o .O — - — l FLETCHER s =� — -- NORTH CAROLINA z T� ��_ - v P x c1,0' ^_mil,_. — _ _ __. ' • — jt�. _ co 7,7zfrcs=cizzo —� Ikti MIDI+�i�/ of •�N. I \ III �_ .� ' I �I' �.. � KEY PLAN 0 la [ 0n _ I \ —•"'tom `` �.�� w —� :1.Y 1 1 �`�1 C' � _ — _ _ A �� '�'- 7ii1j ii,A���(I `� e' N ,1. Ili .. � .01,,* � — ;' — _ '\ 10,4„,l �Lii ., `�:' / SOUTH PARKING AREA 7) '', \\I Ci ,,•. " ►*" 0000• • B EXISTING CONDITIONS iii000 r n ri1/40100. � �� z a O O l,ll, #lI © • AI ATTENTION: _ ✓A *# ** �' �/ THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY CO Q * • /// { INFORMATION,ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON,INC., -I « • ' !E FOR USE BY THE INTENDED RECIPIENT,AND FORA SPECIFIC PURPOSE. Q • •. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON,INC.ANY CO * / • � � x .0' DISTRIBUTION,REPRODUCTION,OR OTHER USE OF THIS DOCUMENT,IN Q J/ • ^ �� i WHOLE OR IN PART,IS STRICTLY PROHIBITED al ' . - 1 ' SCALE:1"=150' AS NOTED • o p� , • REVISIONS: + � �• NO. DATE BY DESCRIPTION •• ' .- .. ... .. .... .- .- .. .. .. ' -" ./M \ • 1 ©O DESIGNED BY: W.M.M. a 1 1 o „l* * OA - • . ©Q© DRAWN BY: W.M.M. E •�+�1 v ` 0 CHECKED BY: D.A.S. 111 w * *t • ` APPROVED BY: D.A.S. z :�, � * DATE: JUNE 2023 w 1 1 1 * * *1 • 1 II STATE LICENSE# N.C.C-2450 Y - Ns 18' i PROJECT NO. 2022.0157.02B m .rrOL. a �� s — SHEET NUMBER SW-00 e 1 e 1 Design Volume-Required STORMWATER NOTES: g q 1. CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION L, Drainage Impervious IA Rv RD(Design Design Volume ACTIVITY. UTILITY LOCATIONS PROVIDED HEREIN ARE FOR PLANNING PURPOSES ONLY. \ i a r Basin Area Area m e viou (O.oS*0.9 3630*R *Rv*A 2. CONTRACTOR SHALL MAINTAIN AND PROTECT ALL EXISTING SIGNS, LIGHTS, EXISTING UTILITIES ( p Storm Depth) ( D ) AND CIRCUITS UNLESS OTHERWISE NOTED ON THE PLANS OR UNTIL REQUIRED TO BE REMOVED. Z . s h evi I I e (ac) (ac) s Fraction) *IA) (in) (cf) 3. CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY OF ANY DISCREPANCIES IN THE / 1 PLANS AND SHALL NOT PROCEED UNTIL CLARIFICATION IS PROVIDED. REGIONAL AIRPORT Dry Pond 6.33 4.89 0.77 0.74 1.0 17,110 4. THE CONTOUR INTERVAL ON THE PLAN SHEET IS 1.0 FT. 5. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING SUITABILITY OF TIE-INS TO EXISTING 0' 15' 30' 60' 90' STRUCTURES. Design Volume-Provided 6. NON—EROSIVE FLOWS ARE LEAVING THE SITE. 1"=30' AV`"ON Design Volume Surface Area Depth Design Volume Basin Required Provided Provided Provided WETLAND DELINEATION NOTES: AVCON,INC. (cf) (sf) (ft) (cf) PER THE 'JURISDICTIONAL WETLAND AND STREAM REPORT — AVL SOUTH PARKING LOT' BY S&ME, ENGINEERS&PLANNERS INC. DATED JULY 21, 2022, JURISDICTIONAL WETLANDS OF THE U.S. WERE IDENTIFED IN THE 10115('WENAVENUE, T f Dry Pond 17,110 14,828 4.0 35,826 SUBJECT PROPERTY. THESE AFOREMENTIONED WETLANDS ARE LOCATED AROUND THE MOST 0rmccnILL954-9008 E,NC2 NORTHERN SIDE OF THE PROPOSED PARKING LOT. SEE APPENDIX G OF THIS PROJECTS ASSOCIATEDa w wm STORMWATER REPORT FOR THE 2022 WETLANDS REPORT. IDENTITY AND QUALIFICATIONS OF THE RELEASED FOR PEAK FLOW RATES DETERMINATORS CAN BE FOUND IN THIS REPORT. Storm CONSTRUCTION Return Pre-Construction Post-Construction Post Project MITIGATION EFFORTS ARE UNDERWAY AND 401 / 404 APPLICATIONS ARE UNDER REVIEW AS OF Study Point Flow Total Flow Total Decrease Frequency (ds) (cfs) (%) JUNE 2023. (yr) N C A RO�� S N°' 1 1 0.7 0.6 24.5 QP k\.. �A9'k / / / / Inv.OUL2077.63' = '•. 1,t �/.., IW --- / ( �� OUTLET �� "'o��A.SVcc. _-i �/ -' CONTROL /�� ` J _ --- ------ _-- - _ STRUCTURE,SEE � �\;, - - _ DETAIL SHEET / / , ASHEVILLE �� bey__ - ----- - --- - - - ---- -___SW-03 --- -/- - REGIONAL AIRPORT _ ��� '( ����'►— ��.—��_ ��T �. _ - 8FT POND DAM .——— e FLETCHER `" Tr._ '' — II( ,�T�� r� — NORTH CAROLINA -.wA ,, ___-- MAINTENANCE _ CCESS � 10FT WIDE SPILLWAY litir z0B3`- �� \ A� / / �\ �sBOTTOM ELEV.2084.5 I G�,� ,.► / / \ / - / fi TOP ELEV:2085.0 I ��{� ��! / 1 I 53 LF OF � • I' �,�1► .� .1 / , \ 5-16 24" RCP @ 1.89% i / y I ,t111111117111 I I I // / / / / � I / 1J/ //NA KEY PLAN l7 JE / 2 ,.I I /� / / /� '�/ w /11 E.� Yt,* I 1 —— • u co RIPRAP LINES / / / I r'' r`-� W FOREBAY �j�� / / / IIII S-17;, } 2 \\ I SOUTH PARKING AREA 10 / / LIJI � Ai A (� SEE EROSION CONTROL 36"RCP I 1' // :74$41:7 N / Z,� / `I \\\I \ III ,2 PLANS FOR RIPRAP OUTLET N INV OUT:2082.17 �� / pee \ \eilmillE _:� z / / \� II\ \ `\I PROTECTION SIZING STORMWATER PLAN F " 24" FES OUTFACE / II \ \ I 1 o 0�- II / / INV.2078.5 // II III \, \\ o 2 i l�� u♦�I I I II 111 A� \l1� / 1� • 1 I I I ATTENTON: �� ��WI ��11 i b- ofilr4 / / I\ pp _ �` I' 11I,g �_/Pl 1 1 YI Fr——\II / 18iR ., THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY F I / / / ,0 1 INFORMATION,ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON,INC., I / \ I \III F X 082.7 / FOR USE BY THE INTENDED RECIPIENT,AND FOR A SPECIFIC PURPOSE. A WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON,INC.ANY 51.1111111111111111111 ,� IV / / / I \\\\I I�,20$4.1 /v2B83.6 ,T' DISTRIBUTION,REPRODUCTION,OR OTHER USE OF THIS DOCUMENT,IN J / /J U WHOLE OR IN PART,IS STRICTLY PROHIBITED 1 / J SCALE:1"=20' AS NOTED SOO- _ CONTRACTOR TO LOCATE, \ \\\\\ —J ._ Il anzoso 20 \ \�� —— —0 REVISIONS J r _!� — _ PROTECT,AND LEAVE --� -- \ \\\\``__ __ Tel NO. DATE BY DESCRIPTION i SSM _1 UNDISTURBED THE EXISTING =�______ \ \\\\ - - - ' ■ /' Inv.In:2074.29 UTILITY LINE DURING - -- - (0 Inv.out:2o74.22' --——— —�—/ W ®�! ! �j I ,,,—— INSTALLATION OF DRAINAGE ,' -��� / --�� /i/. o s-12 2osa.s -_=__________=AND DRY POND EXCAVATION —----- -- _ �� - /�' a. ma - ____-- - ; e%- - - I /%% STUDY POINT I a --_- ----- =- --7--- _ _- ----- ---- x jI DESIGNED BY: W.M.M. 3 —_—— _—— _ — ——_-- �I:r• 1 } �j�9 DRAWN BY: W.M.M. z — IIIIII�f.�-i — — ,-- -� :__ -- z_ _— `I —-� curb nie _. CHECKED BY: D.A.S. EI)'—�/ _ GATE/TICKETINGKIOSK __------ -- Sos R zoZ�sa6 — Lli � �'I ----- __ KIO _ / -------_ ,,�� nY.. / � 1wis ° APPROVED BY: D.A.S. wWeli� ;i WO _r=— _ — 11, 1 / /_=_ —��—XQ8_3.4 — e // o� �-.'-. // I DATE: JUNE 2023 �_ I �:.e - _ _--_--\ \ I mac / ! ' -- -- -- C rb lnl J ! ��';—-- �� \\ - /F'S20 7.69P / Rm et 33' A / - i STATE LICENSE# N.C.C-2450 • r.� 3D1` \ / J` / / ' o773i'" - ._.— ------ PROJECT NO. 2022.0157.02B YA /North 8l1 J ———x -.5-- / �� / '--0i_ �` , WORK IS NOT TO BE PERFORMED IN RIGHT `\\ ': 11, - ,_ / — _ OF WAY UNTIL NCDOT ENCROACHMENT SHEET NUMBER 3 �e�\� °aAft / \ / ��,.` r �►=rr:—.� PERMIT IS RECEIVED ♦ , SW-01 / 1 / O Al o sheviIIe REGIONAL AIRPORT c W N a co N 2 Ix!LLo� AVCON y OH ON N= d NZ 0 O c a Or U W AVCON,INC. O ENGINEERS&PLANNERS w Or SUITE 2090 I 2090 1405RUNTE SVILLE,KINCEYUNC 28078 OFFICE.ITGG 954-9008 ISSUED FOR BID NOT RELEASED R 2085 — 2085 CONSTRUCTION 24"RCP 2080 � , 2080 _ 53.01 L.F.-1.89% \ // 2075 2075 2070 2070 ASHEVILLE REGIONAL AIRPORT FLETCHER 2065 I 2065 NORTH CAROLINA 0+00 0+50 1+00 1+31 • Arai m, u �Y Dry Pond Outfall HORIZONTAL SCALE 1" =40' KEY PLAN VERTICAL SCALE 1" = 10' SOUTH PARKING AREA STORMWATER DETAILS NO. 1 t J ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION,ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON,INC., FOR USE BY THE INTENDED RECIPIENT,AND FORA SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON,INC.ANY DISTRIBUTION,REPRODUCTION,OR OTHER USE OF THIS DOCUMENT,IN WHOLE OR IN PART,IS STRICTLY PROHIBITED SCALE:N.T.S. AS NOTED REVISIONS: NO. DATE BY DESCRIPTION DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: APRIL 2023 STATE LICENSE# N.C.C-2450 PROJECT NO. 2022.0157.02E SHEET NUMBER SW-02 r 1 r 1 Ir NOTE:THE DRY DETENTION POND DAM,INCLUDING FRONT AND BACK EMBANKEMENT SLOPES SHALL BE PLANTED s h ev i I I e WITH NON-CLUMPING TURF GRASS, AND TREES AND WOODY SHRUBS SHALL NOT BE ALLOWED REGIONAL AIRPORT PRETREATMENT:FOREBAY, AVCON SEE SW-01 FOR LOCATION. TOP OF DAM ELEVATION BOTTOM ELEV.2082.0 2086.0 OUTLET CONTROL TOP ELEV.2085.0 SPILLWAY ELEV.2084.5 STRUCTURE,SEE DETAIL AVCON,INC.THIS SHEET.RISER CREST EMERGENCY SPILLWAY ENGINEERS&PLANNERS loosxErcav AVENUE,SUITE F ELEV.:2084.5 ONLY WHERE SHOWN ON 140HUNTERSVDLE NC 26m8 THE PLANS.ELEV.:2085.0 oF-cel2w�2sa-9ms �j j�j1/�A /: ///////�. ISSUED FOR BID /////�!/��/N�� 5.0' POND BOTTOM AT GP 404' NOT RELEASED FOR //�////�//���//O',`,'`�;� 0417 , _' WQv RISER ELEV.:2080.5 �� '' ' y `S!4b,c PROPOSED 24" FES CONSTRUCTION /����-,�:i•:w`//!N/1 1c44.44‘v r r v �/ j'.jj'�#•*!•*!! ,,•- •- N�1� .ro-v y. • iteiti:et:14,:* /.✓/.. `4. !/�`!/il$4:1;444*,• /,:•..:W �� • //~//~/i�Q��i�Q �Ii�O� - /N/ �Ni��N/�i/�✓li/L��i / pG�/>i/•/ ���,����—, ���� ` �i ASHEVILLE :�``�"/•�!.Z,, ���� 4.aoa� V,-' REGIONAL AIRPORT OUTLET PIPE.SEE GRADING AND DRAINAGE co N PLANS FOR SIZE AND LOCATION.SEE PIPE F LETC H ER N PROFILES FOR INVERTS,SHEET SW-02 NORTH CAROLINA N - a o DRY DETENTION POND - a 03 N T S S I�^} n m huih,..,d- Z LB KEY PLAN 1 PRE-CAST CONCRETE o TRASH RACK REQUIRED ON TOP OF STRUCTURE. TRASH STRUCTURE OR AN APPROVED w RACK SHALL BE APPROVED BY THE ENGINEER PRIOR TO EQUAL IS ACCEPTABLE.ALL w CONSTRUCTION. SEE SHEET SW-04 FOR DETAILS. ORIFICE AND WEIR ELEVATIONS x N SHALL BE MAINTAINED. SOUTH PARKING AREA wo 8" 36" 8" f 8" 36" 8" f w z z O / / 1 STORMWATER o #4 @ 8"VERT.E.F. 2084.5 DETAILS 2„CLR. (— O p.. gyp.) .', • A, #4 @ 8"VERT.E.F. • #4 @ 8"VERT.E.F. NO. 2 z ce TYP. #4 @ 8"VERT.E.F. i a2"CLR. . 'Q— ATTENTION: x 3 0' (TYP.) ~ .sue THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY •F MANHOLE STEPS @ 1'-2"CTS • INFORMATION,ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON,INC., i•• FOR USE BY THE INTENDED RECIPIENT,AND FORA SPECIFIC PURPOSE. O WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON,INC.ANY N IA•MO= '6"'' DISTRIBUTION,REPRODUCTION,OR OTHER USE OF THIS DOCUMENT,IN 1 5 0' r� WHOLE OR IN PART,IS STRICTLY PROHIBITED a1 6"PVC STAND PIPE WITH o4 ROUNDED • ENTRANCE w SCALE:N.T.S. AS NOTED ORIFICE END CAP ;.,., : ORIFICE SEE DETAIL ON SW-04. OPENING 24 REVISIONS: WITH END � :, • •'- 6 NO.I DATE BY DESCRIPTION a CAP.SEE FLOW 12" • 0 2080.5 I • DETAIL. (TYR) 2080.5 Tr —12" • F t 2" a - 2079.5 O •a 24"OUTLET PIPE y•. a A7 a z t' W.M.M. a1 12"— H 6" #5 @ 8"E.W. 12"_ H 6" #5 @ 8"E.W.TOP&BOTTOM DRAWN BD BY: W.M.M. a TOP&BOTTOM z STONE BEDDING STONE BEDDING CHECKED BY: D.A.S. SECTION X-X w SECTION Y-Y w (SEE SIDE VIEW-GRATE DETAIL)N.T.S. APPROVED BY: D.A.S. z N.T.S. Co DATE: APRIL 2023 z w Y — STATE LICENSE# N.C.C-2450 OUTLET CONTROL STRUCTURE PROJECT NO. 2022.0157.02B Y j N.T.S. SHEET NUMBER ii SW-03 r N r 1 TRASH RACK SPACING SET BY PLASTIC SOLUTIONS INC. TOP OF�� s h ev i l l e STRUCTURE EDEED 1 rh r rl r i.6.=r1 r 5 r \ REGIONAL AIRPORT EEO B gfffE'HIEHIGH ❑❑❑❑❑� . l"lr r-r�r�r r r�r(�i/r r �L r41�" r rlr rumor rlr iJ DENSITY =r l AVCON,INC. POLYETHYLENE A� '��..� - \�-..\�� ENGIN EEEeSY&vPLANNETRS STRUCTURAL TOP VIEW TRASH RACK ASSEMBLY �oR E(7 aw50-"o 880Te PLASTIC , --,c,o„ ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION TRASH RACK MANUFACTURED ElI®000� C BY PLASTIC SOLUTIONS INC. 877-877-5727 OR APPROVED --.—A t EQUAL. TRASH RACK SHALL HAVE A REMOVABLE ACCESS HATCH AND SHALL BE BOLTED TO THE CONCRETE STRUCTURES ` -0, PER MANUFACTURER'S INSTRUCTIONS. CONCRETE RISER ASHEVILLE REGIONAL AIRPORT N OUTLET PIPE— FLETCHER 0 N NORTH CAROLINA CT o ELEV. A 1. rri a S n m hu I`^} �d 1- ih�� - LB POND A B C 0 43 43 NI 1 5/8" 5/8" 2 KEY PLAN N tO I- W W N TOP VIEW a SOUTH PARKING AREA w 0 3 TRASH RACK w N.T.S. 0 z N STORMWATER o SCHEDULE 40 PVC CONTRACTOR TO SECURE STAND c��OF' E, DETAILS -� PIPE TO OUTLET CONTROL rP Q c00 THREADEDPVC END THREA EDP PLITH UG DEVICE SHALL E. STRAP BE WATOER OTHER RESISTANT JQS�S�P�O NO. 4 Y AND SHALL BE APPROVED BY THE ' ENGINEER PRIOR TO CONSTRUCTION. ` ATTENTION: a •ce o 0 0 0 6" DIAM. SCHEDULE 40 PVC x SCHEDULE 40 0000 THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY I- INFORMATION,ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON,INC., m PERFORATED PVC (6" MIN. o0o SCHEDULE 40 SOLID 6" DIAM. SCHEDULE 40 PVC FOR USE BY THE INTENDED RECIPIENT,AND FOR A SPECIFIC PURPOSE. DIA. 3 8" HOLE DIA. 0000 PVC 6" MIN. DIA. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON,INC.ANY ( / ) ( ) THREADED END CAP DISTRIBUTION,REPRODUCTION,OR OTHER USE OF THIS DOCUMENT,IN > OVO O - ,I 'I WHOLE OR IN PART,IS STRICTLY PROHIBITED al SCHEDULE o 0 0 0 ? - > SCHEDULE 40 PVC11111111111011, SCALE:N.T.S. AS NOTED 0 40 PLUG o 000 o , ' THREADED END CAP WITH DRILL 3.0" DRAWDOWN ORIFICE HOLE IN ♦ 0000 coo PVC THREADED PLUG CENTER OF THREADED PLUG REVISIONS: _, 000 T 3�� ' > ` NO.I DATE BY DESCRIPTION O°00 I > 411110 oo°oo _i_ ..40.14‘, , v 000000 00000 H o o°000 o°o ,00000 0 6 003.0" LB a 45 BEND 111—III—Ill— —iI-I i- 6" MIN o_ 111E11 =III111 .1 3 0 CLEAR FILL GAP BETWEEN STRUCTURE 0 TEE AND PIPE TO BE ' (MIN.) - DESIGNED BY: W.M.M. > AND PVC PIPE WITH MORTAR a PERFORATED TO WITHIN 01 - DRAWN BY: W.M.M. a 3" OF WALL/STRUCTURE �` / 6" DIAM. PVC THREADED PLUG. PLUG MAY z CONCRETE WALL/OUTLET J BE PERIODICALLY REMOVED FROM END CHECKED BY: D.A.S. w STRUCTURE ' > - r CAP FOR CLEANING AND MAINTENANCE. LiI > \ (DO NOT CEMENT PLUG TO END CAP) APPROVED BY: D.A.S. z ' I' ORIFICE END CAP DETAIL C - DATE: APRIL 2023 z Y �Li > > / N.T.S. 7 STATE LICENSE# N.C.C-2450 Y ORIFICE STAND PIPE DETAIL PROJECT NO. 2022.0157.02B U 7, N.T.S. SHEET NUMBER o SW-04 GI through sss SS GRATE 2095.15 S-1705-2 Class ill 410 425 Meets Meets 0.5016 Slope PunnIng Running Flow Flow INV.OUT 2091.50 3.65 18 21.00 Length CFS Total CFS Total plpe Slope CFS 410 @5 S2 GRATE 2095.25 S-2705-3 Class IV S1 2.10 2.10 2.42 2.42 5-2 TO S3 18" 0.50% .44 Yes Yes INV.IN 2091.40 3.86 18" 0.50% Slope S3/3 0.5016 7. Yes Yes INV.OUT 2091.20 405 18 21.00 Length S3 GRATE 2095.25 S-3705-0 Class ill S6 4.19 14.62 4.81 16.28 S6 TO S2 24" 0.6516 1826 Yes Yes INV.IN 2091.09 4.16 18" 0.75% Slope 0.50% 29.08 Yes Yes INV.OUT 2090.59 4.66 18 27.00 Length 6 Yes Yes S4 GRATE 2094.00 S-4705-5 Class III S]0 444 31.10 509 3569 TOG. 30" 0.80% 3.09 Yes Yes INV.IN 2090.39 3.61 18" 0.50% Slope -11/12/13 0.50% 47.28 INV.OUT 2089.89 4.11 24 12s.00 Length S14 6.08 38.67 6.98 44.39 S5 GRATE 2094.00 S-5705-6 Class III 40.35 46.31 G.TO S35 36" 0.5016 47.28 Yes Yes INV.IN 2089.26 4.74 24" 0.50% Slope INV.OUT 2089.06 4.94 24 1 .00 Length S6 GRATE 2093.30 S67O S-) Class III 0.6.% Slope INV.OUT 2088.24 5.06 24" 125.00 Length S) GRATE 2092.50 S-)TO S-8 Class III INV.IN 2087.43 S.07 24" 0.509E Slope INV.OUT 2087.23 5.27 30 1 .00 Length S8 GRATE 209180 S-870 S-9 Class III 0.509E Slope INV.OUT 2086.40 5.40 30 125.00 Length S9 GRATE 209305 5-9 TO S-10 Class ill 0.6.% Slope INV.OUT 2085.58 5.47 30 12s.00 Length S10 GRATE 2090.35 S107O S-11 Class ill 0.80% Slope INV.OUT 2084.56 5.99 30 66.00 Length S11 GRATE 2090.20 Sll TO S-12 Class ill 0.50% Slope INV.OUT 2083.83 6.37 36" 21.00 Length S12 GRATE 2090.15 S127O S-13 Class ill 0.50% Slope INV.OUT 2083.53 6.62 36" 20.00 Length S13 GRATE 2090.60 S137O S-14 Class ill 0.5U% Slope INV.OUT 2083.23 7.37 36 1..00 Length S14 GRATE 2090.00 S147O S-15 Class ill 0.50% Slope INV.OUT 2082.40 9.60 36" 47.00 Length S15 FES INV.OUT 2082.17 3-16 SEI INV.OUT 20T9.00 S14 TO515 Class69% Slope 24 64.00 Length FES SST INV.OUT 2076.00 24" S18 9 Class IV ExIstIng 18" GOO. 23.57 cfs cfs INV..OUT 2087.39 12.61 24" 300.00 Length S19 24" 1.25% 25.53 cfs INV.IN 208139 4.11 24" 1.25. Slope INV.OUT 2080.39 5.11 24" 28.00 Length G20 FES INV.OUT 2080.04 S-21 2 Class IV E 0.5396 16.56 cfs Slope cfs INV.OUT 2086.60 13.40 24" 263.00 Length 5-22 24 0.95% 19.78 cfs G. Slope INV.OUT 2078.84 6.66 24" 47.00 Length S-23 FES INV.OUT 2078.49 G. GRATE 2090.00 S247O S-25 Class ill 0.9496 Slope INV.OUT 2082.00 8.00 24" 53.00 Length S25 FES Existing)2" 1.82. 58278 cfs 20882 585 INV.OUT 208750 24Existing 96 0.5T1% cfs 2082 Total 1273.02 2083.236 S26 GRATE 2097.75 S267O S-22 Class ill Existing 72" 0.61696 332.97 cfs 2084.1. INV.IN 2093.21 4.54 3.55% Slope Existing 0.740% cfs 2087.5476 INV.OUT 2090.71 9.W 36 20.00 Length Total 2 697.92 S27 MANHOLE 2100.00 S277O S-28 Class ill Existing 22" 2.67596 693.87 cfs INV.IN 2088.10 1130 0.8. Slope Existing 2.6T5% cfs INV.IN 2090.00 Total 2 1389.74 INV.OUT 2087.85 12.15 96 585.00 Length 2098.71 INV.OUT 2083.17 S29 MANHOLE 2090.00 S297O S-30 Class ill 12% Slope INV.OUT 2084.00 6.00 24" 81.00 Length S30 FES INV.OUT 2083.00 S31 HEADWALL S31 TO S-32 Class ill INV.OUT 2082.00 84 0.83% Slope 120.00 Length S32 H.DWALL INV.OUT 2081.00 04" 3-33 CURB INLET 2083.50 3-33 T05-0 0 30016 Slope INV.OUT 2078.00 5.50 18 34.00 Length 3-34 lass ill INV. LE 2083.25 20T/.66 5.59 534 5-35 1.0016 Slope INV.OUT 2074.16 9.09 24" 47.00 Length FES 3-35 INV.OUT 2073.69 24" S36 4 Class IV EX INV.IN 2096.10 3.90 24" 2.0096 Slope INV..OUT 2086.60 13.40 24" 26300 Length INV.IN 208134 4.16 24" 0.7596 Slope INV.OUT 2078.84 6.66 24" 47.00 Length APPENDIX D OPERATION AND MAINTENANCE MANUAL Environmental NCDEQ Stormwater Design Manual Quality A-7. SCM Operation & Maintenance Chapter Contents • Access & Maintenance Easements • Inspection & Maintenance Agreements • Inspection & Maintenance Record Keeping • Maintenance Responsibilities • Providing for Maintenance Expenses • Emergency Maintenance • Debris & Litter Removal • Sediment Removal & Disposal • Stability & Erosion Control • Maintenance of Mechanical Components • Vegetation Maintenance • Maintenance of the Aquatic Environment • Insect Control • Maintenance of Other Project Features The Importance of Maintaining SCMs SCMs are crucial in protecting water quality from the impacts of development. However, no matter how well they are designed and constructed, SCMs will not function correctly nor remain attractive unless they are properly operated and maintained. Maintenance problems with SCMs are also less costly to correct when they are caught early. Regular inspection and maintenance is an ongoing regulatory responsibility for most required SCMs—These responsibilities typically include regular inspections throughout the year, maintaining inspection records, and often annual inspections and reporting. A qualified professional should conduct SCM inspections. NC State University offers a SCM Inspection and Maintenance Certification Program: http://www.bae.ncsu.edu/topic/bmp-im/ There are also many companies in NC that specialize specifically in SCM inspection and maintenance. This chapter will discuss the logistical issues associated with SCM operation and maintenance as well as provide an overview of some of the typical tasks associated with maintaining most SCMs. Each of the individual SCM chapters in this manual also include a table explaining specific inspection and maintenance activities required for a particular SCM to ensure its proper functioning. A-7. SCM Operation & Maintenance 1 Revised: 2-11-2018 NCDEQ Stormwater Design Manual Environmental Access and Maintenance Easements SCMs on private property should have access and maintenance easements to provide the legal authority for inspections and maintenance activities. The location and configuration of easements should be established during the design phase and be clearly shown on the design drawings. The entire footprint of the SCM system should be included in the access and maintenance easement, plus an additional ten or more feet around the SCM to provide enough room for the equipment and activities necessary to complete maintenance tasks. This SCM system includes components such as the side slopes, forebay, riser structure, SCM device, and basin outlet, dam embankment, outlet, and emergency spillway. Access and maintenance easements should be designed and constructed considering the maintenance tasks that may be needed. If heavy equipment will be necessary to perform maintenance tasks (such as for devices with a forebay that will require sediment clean-out), typically a roadway with a minimum width of ten feet to the SCM needs to be available. Easements are usually held by the person responsible for the SCM facility, whether an individual, a corporation, or a government. Easements for SCMs that are not publicly maintained require provisions that allow the permitting entity access for inspection and maintenance. Inspection & Maintenance Agreements SCM facilities are typically built, owned and maintained by non-governmental entities. To insure proper long-term maintenance, an Inspection and Maintenance Agreement should be part of the design plans for any SCM. For regulatory purposes, authorities may require that these agreements be signed and notarized. An Inspection and Maintenance Agreement will typically include the following: • The frequency of inspections that are needed (based on the type of SCM proposed). • The components of the SCM that need to be inspected. • The types of problems that may be observed with each SCM component. • The appropriate remedy for any problems that may occur. Sample Inspection and Maintenance Agreement provisions are included at the end of each SCM chapter. The most effective Inspection and Maintenance Agreements are site- specific for the SCM components that are used on the site as well as any conditions that are unique to the site (for example, the presence of steep slopes that should be inspected for soil stability). A-7. SCM Operation & Maintenance 2 Revised: 2-11-2018 ntal NCDEQ Stormwater Design Manual EnvirQualay onmental Table 1: Required Inspection Frequency for SCMs Inspection Frequency SCM Monthly and within 24 hours after every water Stormwater Wetlands quality storm (greater than 1.5 inches in Wet Detention Basins Coastal Counties and greater than 1.0 inch Bioretention Cells elsewhere) Level Spreaders Infiltration Devices Quarterly and within 24 hours after every water Sand Filters quality storm (greater than 1.5 inches in Extended Dry Detention Basins Coastal Counties and greater than 1.0 inch Permeable Pavement elsewhere) Rooftop Runoff Management Filter Strips Grassed Swales * Restored Riparian Buffers * *Although these devices require quarterly inspection, mowing will usually be done at more frequent intervals during the growing season. To summarize Table 1, devices that include vegetation in a highly engineered system require inspection monthly and after large storm events to catch any problems with flow conveyance or vegetative health before they become serious. All other SCMs should be inspected at least quarterly and after large storm events. When required, signed and notarized Inspection and Maintenance Agreements should be recorded with the appropriate Register of Deeds. The responsible party should keep a copy of the Inspection and Maintenance Agreement along with a current set of SCM plans at a known set location. It is also crucial that these documents be passed on when responsibility for maintenance is transferred to a different party. Inspection & Maintenance Record Keeping All inspection and maintenance activities should be recorded. One easy way to do this is to create an Inspection and Maintenance checklist based on the Inspection and Maintenance Agreement. The checklist, at a minimum, should include the following: • Date of inspection. • Condition of each of the SCM elements. • Any maintenance work that was performed (as well as who performed the work). • Any issues noted for future maintenance (sediment accumulating, vegetation needing pruning or replacement, etc.). A-7. SCM Operation & Maintenance 3 Revised: 2-11-2018 NCDEQ Stormwater Design Manual Environmental Each SCM should have its own maintenance record. Records should be kept in a log in a known set location. Any deficient SCM elements noted in the inspection should be corrected, repaired or replaced in a timely manner. Some deficiencies can affect the integrity of structures, safety of the public, and the function of the SCM. Major repairs or maintenance work should include the same level of inspection and documentation as original installations. Inspection checklists and record logs should be kept in a known set location. Maintenance Responsibilities As stated in the section above, maintenance is usually the responsibility of the owner, which in most cases is a private individual, corporation, or home owner's association. Simple maintenance items such as minor landscaping tasks, litter removal, and mowing can be done by the owner, or can be incorporated in conventional grounds maintenance contracts for the overall property. Although a non-professional can undertake many maintenance tasks effectively, a professional should be consulted periodically to ensure that all needs of the SCM facility are met. Some elements that would benefit from professional judgment include structures, outlets, embankments, and dams by a professional engineer, as well as plant system health by an appropriate plant professional. Some developing problems may not be obvious to the untrained eye. In addition, it is advisable to have professionals do the more difficult or specialized work. Filling eroded areas and soil-disturbing activities, such as re-sodding or replanting vegetation, are tasks that are best assigned to a professional landscaping firm. If the work is not done properly the first time, not only will the effort have been wasted, but also the facility may have been damaged by excessive erosion. Grading and sediment removal are best left to professional contractors. Appropriate professionals (e.g. SCM maintenance specialists, professional engineers, aquatic plant specialists, etc.) should be hired for specialized tasks such as inspections of vegetation and structures. Providing for Maintenance Expenses The expenses associated with maintaining a SCM are highly dependent on the SCM type and design. However, the most important factor that determines the cost of SCM maintenance is the condition of the drainage area upstream of the SCM. If a drainage area conveys a high load of sediment and other pollutants to a SCM, the cost of maintaining the SCM will increase dramatically. Preventing pollution in the drainage area as much as possible will reduce the cost of SCM maintenance. A funding mechanism should be created and maintained at a level that provides adequate funding to pay for the maintenance expenses over the lifetime of the SCM. One option is to A-7. SCM Operation & Maintenance 4 Revised: 2-11-2018 NC Environmental NCDEQ Stormwater Design Manual Qaality establish an escrow account, which can be spent solely for sediment removal, structural, biological or vegetative replacement, major repair, or reconstruction of the SCMs. In the case of a residential subdivision, the escrow account could be funded by a combination of an initial payment by the developer and regular contributions by the homeowners' association. For an example of how to legally structure such an account, please see the Phase II model stormwater ordinance at the Stormwater Program web site. Routine maintenance costs may be relatively easy to estimate, and include the expenses associated with the following activities: • Conducting SCM inspections at the intervals shown in Table 1. • Maintaining site safety, including any perimeter fences and other access inhibitors (trash racks or pipe grates). • Removing trash. • Removing sediment that has accumulated in any components of the SCM. • For infiltration-type systems, maintaining the filtering media and cleaning or replacing it when necessary. • Restoring soils to assure performance. • Mowing turf grasses or maintaining other types of ground covers • Controlling weeds and other invasive plants • Pruning woody vegetation. • Thinning desired vegetation • Replacing dead vegetation. • Stabilizing any eroding side slopes. • Repairing damaged or eroded outlet devices and conveyance systems. • Repairing embankments, dams, and channels due to erosion or rodents. Emergency maintenance costs are more difficult to estimate. They depend on the frequency of occurrence and the nature of the problem, which could vary from storm erosion repairs to complete failure of a structure. Emergency Maintenance Maintenance after floods and other emergencies requires immediate mobilization. It can include replanting and repairs to structures. Living systems are likely to need at least minor repairs after emergencies. Following an emergency such as a flood, standing water may pose health risks because of mosquitoes. Mosquito control should be considered if this becomes a problem. For all installations, obstructions and debris deposited during storm events should be removed immediately. Exceptions include debris that provides habitat and does not damage vegetation or divert currents to, from, or in the SCM. In fact, because of the high quality habitat that can be found in woody debris, careful re-positioning rather than complete removal may be desirable. There may be instances where debris is even added. Such locations should be noted so that this debris is not accidentally removed. Educating adjacent property owners about the habitat benefits of debris and vegetation can decrease requests for removal. A-7. SCM Operation & Maintenance 5 Revised: 2-11-2018 ntal NCDEQ Stormwater Design Manual EnvirQuality onmental Debris & Litter Removal Regularly removing debris and litter is well worth the effort and can be expected to help in the following ways: • Reduce the chance of clogging in outlet structures, trash racks, and other facility components. • Prevent damage to vegetated areas. • Reduce mosquito breeding habitats. • Maintain facility appearance. • Reduce conditions for excessive surface algae. • Reduce the likelihood of stagnant pool formation. Special attention should be given to removing floating debris, which can clog outlet devices and risers. Sediment Removal & Disposal Sediment gradually accumulates in many SCMs. For most SCMs, accumulated sediment must eventually be removed. However, removal intervals vary so dramatically among facilities that no "rules of thumb" are applicable. The specific setting of a SCM is important in determining how often sediment must be removed. Important factors that determine rates of sedimentation include the current and future land uses upstream and the presence of other sediment-trapping SCMs upstream. Before installing a SCM, designers should estimate the lifetime sediment accumulation that the SCM will have to handle. Several time periods may be considered, representing expected changes in land use in the watershed. To estimate sediment accumulation, first, an estimate of the long term sediment load from upstream is needed, then an estimate of SCM sediment removal efficiency (see Sections 3.0 and 4.0). The analysis of watershed sediment loss and SCM efficiency can be expedited by using a sediment delivery computer model. The frequency of sediment removal is then based on the sediment accumulation rate described above versus the amount of sediment storage volume that is inherently provided in the SCM without affecting treatment efficiency or stormwater storage volume. Again, the frequency of sediment removal is SCM and site specific, and could be as frequent as every couple years, or longer than 15-25 years. The volume of sediment needing to be removed and disposed of per dredging cycle is the volume calculated above multiplied by any density or dewatering factors, as appropriate. Wet sediment is more difficult and expensive to remove than dry sediment. Ideally, the entire facility can be drained and allowed to dry sufficiently so that heavy equipment can operate on the bottom. Provisions for draining permanent pools should be incorporated in the design of water impoundments where feasible. Also, low flow channels and outlets should be included in all SCMs to bypass stormwater flow during maintenance. However, in many impoundments, periodic rainfall keeps the sediment soft, preventing access by heavy equipment. In these A-7. SCM Operation & Maintenance 6 Revised: 2-11-2018 NC Environmental NCDEQ Stormwater Design Manual Qaality cases, sediment may have to be removed from the shoreline by using backhoes, grade-ails, or similar equipment. Proper disposal of the sediment removed from a SCM must be considered. It is least expensive if an onsite area or a nearby site has been set aside for the sediment. This area should be located outside of the floodplain to prevent migration of the sediment if flooding occurs prior to stabilization. If such a disposal area is not set aside, transportation and landfill tipping fees can greatly increase the cost of maintaining the SCM, especially where disposal of wet sediment is not allowed in the local landfill., Often, the material must be dewatered before disposal, which again adds more cost and requires land area where wet material can be temporarily placed to dry. Sediment removal is usually the largest single cost of maintaining a SCM facility so the necessary funds should be allocated in advance. Since sediment removal costs are so site specific and dependent on disposal plans, it is difficult to provide good estimates. Actual estimates should be obtained during the design phase of the SCM from sediment removal contractors based on the planned situation. The estimates should include: mobilization expenses, sediment removal expenses, material transport expenses (if applicable), and disposal expenses (if applicable). Stability & Erosion Control The best way to promote soil stability and erosion control is to maintain a healthy ground cover in and around SCMs. Areas of bare soil quickly erode, potentially clogging the facility with sediment and threatening its integrity. Therefore, bare areas must be re- stabilized as quickly as possible. Newly seeded areas should be protected with mulch and/or an erosion mat that is securely staked. For SCM's that rely on filtration, such as bioretention facilities, it is critical that adjacent soils do not contaminate the selected media during or after construction. If the site is not permanently stabilized with vegetation when the filter media is installed, the best design practice is to specify sod or other robust erosion control practices for all slopes in and immediately around the SCM. Erosion more often occurs in or around the inlet and outlet of SCM facilities and should be repaired as soon as possible. The roots of woody growth such as young trees and bushes in embankments are destabilizing and may result in premature failure if unchecked. Consistent mowing of the embankment controls stray seedlings that take root. Woody growth, such as trees and bushes, further away from the embankment should not pose a threat to the stability of the embankment and can provide important runoff filtering benefits. Trees and bushes may be planted outside maintenance and access areas. Animal burrows also diminish the structural integrity of an embankment. Muskrats, in particular, burrow tunnels up to 6 inches in diameter. Efforts should be made to control animal burrowing. Burrows should be filled as soon as possible. A-7. SCM Operation & Maintenance 7 Revised: 2-11-2018 Environmental NCDEQ Stormwater Design Manual Qaality Maintenance of Mechanical Components SCMs may incorporate mechanical components that need periodic attention. For example, valves, sluice gates, fence gates, locks, and access hatches should be functional at all times. The routine inspection, exercising, and preventive maintenance on such mechanical components should be included on a routine inspection and maintenance checklist. Vegetation Maintenance Vegetation maintenance is an important component of any maintenance program. The grasses and plants in all SCMs, but particularly in vegetative SCMs such as filter strips, grass swales, restored riparian buffers, bioretention facilities, and stormwater wetlands, require regular attention. The development of distressed vegetation, bare spots, and rills indicates that a SCM is not functioning properly. Problems can have many sources, such as: • Excessive sediment accumulation, which clogs the soil pores and produces anaerobic conditions. • Nutrient deficiencies or imbalances, including pH and potassium. • Water-logged conditions caused by reduced soil drainage or high seasonal water table. • Competition from invasive weeds. • Animal grazing The soil in vegetated areas should be tested every other year and adjustments made to sustain vigorous plant growth with deep, well-developed root systems. Aeration of soils is recommended for filter strips and grassed swales where sediment accumulation rates are high. Ideally, vegetative covers should be mown infrequently, allowing them to develop thick stands of tall grass and other plant vegetation. Also, trampling from pedestrian traffic should be prevented. Areas immediately up and downstream of some SCM plant installations are more likely to experience increased erosion. Properly designed, located, and transitioned installations experience may reduce accelerated erosion. All erosion should be repaired immediately to prevent spreading. Table 2 below describes some typical vegetation maintenance. It is important to note that specific requirements related to some management practices, such as those performed within buffers, must be followed. In addition, any vegetation that poses threats to human safety, buildings, fences, and other important structures should be addressed. Finally, vegetation maintenance activities typically change as the project ages. A-7. SCM Operation & Maintenance 8 Revised: 2-11-2018 Environmental NCDEQ Stormwater Design Manual Quality Table 2: Vegetation Maintenance for SCMs Maintenance Instructions Activity Replacement All dead plants should be removed and disposed of. Before vegetation that of Dead has failed on a large scale is replaced, the cause of such failure should be Plants investigated. If the cause can be determined, it should be eliminated before any reinstallation. The objective of fertilizing at a SCM is to secure optimum vegetative growth rather than yield (often the objective with other activities such as farming). Fertilization Infertile soils should be amended before installation and then fertilized periodically thereafter. Fertilizer can be composed of minerals, organic matter(manure), compost, green crops, or other materials. Watering of the vegetation can often be required during the germination and establishment of the vegetation, as well as occasionally to preserve the Irrigation/ vegetation through drought conditions. This can typically be accomplished Watering by pumping water retained in the SCM or from the stream, installing a permanent irrigation system or frost-proof hose bib, or using portable water trucks. Mulching should be used to maintain soil temperature and moisture, as Mulching well as site aesthetics. A half-inch layer is typically adequate. Ideally, mulch should be removed before winter to prevent an infestation of rodents. Weeding is often necessary in the first growing season, particularly if herbaceous grasses are out-competing the young woody vegetation growth. The need for weeding may be largely eliminated by minimizing the amount Weeding of seed used for temporary erosion control. Weeding may also be required if, over time, invasive or undesirable species are entering the site and out- competing plants that are specifically involved in the treatment of the stormwater. Cultivating/ Hoeing is often required to loosen overly compacted soil and eliminate Hoeing weeds that compete with the desirable vegetation. Pruning Pruning is used to trim to shape and remove dead wood. It can force single- shoot shrubs and trees to assume a bushier configuration. A-7. SCM Operation & Maintenance 9 Revised: 2-11-2018 NCDEQ Stormwater Design Manual Environmental Thinning dense vegetation may be necessary to thrive, to maintain open areas of water as well as aesthetics, increase the vigor of individual specimens, to reduce Thinning flow obstructions, and to increase the ability of maintenance staff to access the entire SCM. Tall maturing trees, for the most part, have no place in a SCM (except for buffers) and should be removed as soon as possible. Saplings of tall trees planted in or near the SCM may require staking. Care Staking should be taken not to damage the tree's roots with stakes. Stakes should be kept in place for 6 to 18 months, and the condition of stakes and ties should be checked periodically. Wound The wounds on any trees found broken off or damaged should be dressed Dressing following recommendations from a trained arborist. Disease Based on monitoring observations, either insecticides or(preferably)organic means Control of pest and fungal control should be used. Fencing and signage should be installed to warn pedestrians and to prevent damage due to trampling. These measures are often most necessary during early Protection phases of installation but may be required at any time. Measures for controlling from Animal human foot traffic include signs, fencing, floating log barriers, impenetrable bushes, & Human ditches, paths, and piled brush.Wildlife damage is caused by the animals browsing, Foot Traffic grazing, and rubbing the plants. The use of chemical wildlife repellents should be avoided. Fences and meshes can be used to deter entry to the SCM. Tree tubes can be used to prevent damage to individual specimens. Mowing of perennial herbaceous grasses and wildflowers, especially once seed heads have set, promotes redistribution of seed for this self-sustaining system. Mowing Mowing should be carefully controlled, however, especially when performed for aesthetics. As adjacent property owners and customers in general learn more about SCMs, their vision of what is aesthetically pleasing can change. Grasses, in healthy herbaceous stands, should never be mown more than once per year. Maintenance of the Aquatic Environment An important yet often overlooked aspect of SCMs that maintain a permanent pool is the need to regularly monitor and manage conditions to promote a healthy aquatic environment. An indicator of excess nutrients (a common problem) is excessive algae growth in the permanent pool of water. Often, these problems can be addressed by encouraging the growth of more desirable aquatic and semi-aquatic vegetation in and around the permanent pool. The plants selected should be tolerant of varying water levels and have a high capacity to incorporate the specific nutrients associated with the problem. Unchecked algae growth may result in aesthetic and odor problems and algae-laden water can be washed downstream during rain contributing to nuisance odors and stresses in downstream aquatic habitat. A-7. SCM Operation & Maintenance 10 Revised: 2-11-2018 NCDEQ Stormwater Design Manual Environmental Insect Control Under the right conditions, ponded water can become a breeding ground for mosquitoes. Many mosquito problems can be minimized through proper design and maintenance. The best control technique for SCMs that maintain a permanent pool of water is to ensure that the design discourages mosquito breeding habitat and encourages mosquito predators. Research at NC State University has shown that Mosquitofish (Gambusia holbrooki) can be effective in the control of mosquito populations in SCMs. This may include establishing combinations of deep and shallow areas that encourage Mosquitofish as well as avoiding overhanging trees and other vegetation that creates shade conducive to mosquito breeding and discourages dragonflies, birds, bats, and other desirable predators. In larger basins, fish, which feed on mosquito larvae, can be stocked. Additionally, splash aerators can be employed to prevent stagnant water, however, this requires electricity at the site, increases maintenance costs and must be properly designed so as to not decrease the settling efficiency of the SCM. Where feasible, SCMs may incorporate a source of steady dry weather flow to reduce stagnant water. Maintenance of Other Project Features All other devices and features associated with the SCM should be monitored and maintained appropriately. These additional items could affect the safety or aesthetics of the facility, which can be as important if not more important than the operational efficiency of the facility. Such items could include: • Fences • Access roads • Trails • Lighting • Signage (e.g. no trespassing, emergency notification contact information, etc.) • Nest boxes • Platforms • Watering system A-7. SCM Operation & Maintenance 11 Revised: 2-11-2018 NC Environmental NCDEQ Stormwater Design Manual QaartY Maintenance Bioretention maintenance requirements are typical landscape care procedures and include: • Watering: Plants should be selected to be tolerant of the bioretention facility's particular conditions. Watering may be required to initially establish the vegetation. Watering should not be required after establishment (about 2 to 3 years). However, watering may be required during prolonged dry periods after plants are established. • Erosion Control: Inspect flow entrances, ponding area, and surface overflow areas periodically. Replace soil, plant material, and/or mulch in areas where erosion has occurred. Erosion problems should not occur with proper design except during extreme weather events. If erosion problems do occur, the following issues should be re- assessed: flow volumes from the contributing drainage area and bioretention size; flow velocities and gradients within the bioretention facility; flow dissipation and erosion protection methods in the pretreatment and in-flow areas. If sediment is deposited in the bioretention facility, immediately determine the source, remove excess deposits, and correct the problem. • Plant Material: Depending on plants selected and aesthetic requirements, occasional pruning and removal of dead plant material may be necessary. Be careful to prune trees and shrubs to maintain lines of sight in parking lots and along roadways. NCDOT states: "Shrubs must be kept low, and trees and large shrubs under-trimmed sufficiently to permit clear sight in the area between 2 feet and 6 feet above roadway elevations. Replace all dead plants. However, if specific plants consistently have a high mortality rate, assess the cause and replace with appropriate species. Periodic weeding is necessary until groundcover plants are established. Weeding should become less frequent if an appropriate plant density has been established. • Nutrients and Pesticides: The soil media and plant material should have been selected for optimum fertility, plant establishment, and growth within the particular conditions of each bioretention facility. Nutrient and pesticide inputs should NOT be required and will degrade the pollutant processing capability of the bioretention facility, as well as contribute to additional pollutant loading to receiving waters. By design, bioretention facilities are typically specified in watersheds where phosphorous and nitrogen levels are often elevated. Therefore, these should not be limiting nutrients with regard to plant health. If in question, have the soil analyzed for fertility. Addition of commercial fertilizer or compost to bioretention will likely result in nutrient export from the bed. • Mulch: Replace mulch annually in bioretention facilities where heavy metal deposition is likely (e.g., drainage areas that include commercial/industrial uses, parking lots, or roads). Metal 'hot spots' occur where water enters the bed. In residential or other settings where metal deposition is not a concern, replace or add mulch as needed to maintain a 2 to 4-inch depth. • Filtering Capacity: When the filtering capacity diminishes substantially (e.g., when water ponds on the surface for more than 12 hours), remedial actions must be taken. If the water still ponds for more than 12 hours, the top few inches of material should be removed and replaced with fresh material. The removed sediments should be disposed of in an acceptable manner (e.g., landfill) or land application. If that does not solve the C-2. Bioretention Cell 17 Revised: 1-19-2018 NIC Environmental NCDEQ Stormwater Design Manual Quality problem, more extensive rebuilding is required. If the bed has filter fabric installed under the media and above the washed rock, the filter fabric may be clogged with sediment. If clogged filter fabric is present, the bed will need to be rebuilt. Figure 5: Soil Probe Showing a Profile of Bioretention Cell Media -��t Y ... ,_r ,.•. 'N\lik: --'- • -':,,,X,' • -2.'. { It' or. s,J _ �A _ , C\� i / s� . t 4 ' p "Y , \ .. ' a , w S^ 3 t Figure 6: Examples of When to Perform Maintenance �, Al'. :~Z j 4 �K \ `. (1�t. �f[ � .j,l. t. ... w t'.r,k', Ott. .. '1 , .,..:.&'fry tr i}+ Al'r i '�i .f , '''t .G,3 ;I 1 i. lr :pik 4:. .4.3,.tAie.',IA4 .. - . "` P.-1-Vil:1.-2-----...r.:-' _le...s.--',.-. •:• . :, 4''d 1 r. .., t s%-,a 7-4,,.. ;\4 4,i'•;I, , 44 14' _^`., a ^` j,,..c '1. kt Replace gravel when it has become Replace mulch when it becomes thin clogged with sediment or is taken over by grass. Manually or mechanically remove grass — do not spray herbicide! C-2. Bioretention Cell 18 Revised: 1-19-2018 Environmental NCDEQ Stormwater Design Manual QaartY Sample Operation and Maintenance Provisions Important operation and maintenance procedures: • Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). • Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. • Heavy equipment will NEVER be driven over the bioretention cell. • Special care will be taken to prevent sediment from entering the bioretention cell. • Once a year, a soil test of the soil media will be conducted. • After the bioretention cell is established, Inspect it once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. • Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. • Remove top layer of fill media when the pool does not drain quickly. Based on the media specification, the pool should drain within 24 hours. Table 6: Sample Operation and Maintenance Provisions for Bioretention Cells SCM element: Potential problems: How to remediate the problem: The entire bioretention cell Trash/debris is present. Remove the trash/debris. Regrade the soil if necessary to The perimeter of the Areas of bare soil and/or remove the gully, and then plant a bioretention cell erosive gullies have formed. ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet Blocking/Clogging? Unclog the pipe. Dispose of the sediment off-site. The pipe is cracked or Replace or repair the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary swale (if applicable). and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. C-2. Bioretention Cell 19 Revised: 1-19-2018 NC Environmental NCDEQ Stormwater Design Manual Quality Stone verge is clogged or Remove sediment and clogged covered in sediment(if stone and replace with clean applicable). stone. Flow is bypassing pretreatment Regrade if necessary to route all area and/or gullies have flow to the pretreatment area. formed. Restabilize the area after grading. Sediment has accumulated to a Search for the source of the depth greater than three inches. sediment and remedy the problem if possible. Remove the sediment and restabilize the pretreatment The pretreatment system area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. Best professional practices Prune according to best show that pruning is needed to professional practices maintain optimal plant health. Maintain lines of sight between 2'- 6'. Determine the source of the problem: soils, hydrology, Plants are dead, diseased or disease, etc. Remedy the problem Plant material dying. and replace plants. Provide a one- Plant time fertilizer or lime application to establish the ground cover if a soil test indicates it is necessary. Remove the weeds, preferably by Weeds are present. hand. If an herbicide is used, wipe it on the plants rather than spraying. Best professional practices Prune according to best show that pruning is needed to professional practices. Maintain maintain optimal plant health. lines of sight Bioretention cell vegetation Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one- time fertilizer application to C-2. Bioretention Cell 20 Revised: 1-19-2018 Environmental NCDEQ Stormwater Design Manual Quality establish the ground cover if a soil test indicates it is necessary. If sod was used, check to see that it was not grown on clay or impermeable soils. Replace sod if necessary. Tree stakes/wires are present Remove tree stake/wires (which six months after planting. can kill the tree if not removed). Mulch is breaking down or has Spot mulch if there are only floated away. random void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of four inches. Soils and/or mulch are clogged Determine the extent of the with sediment. clogging - remove and replace either just the top layers or the Bioretention cell mulch and entire media as needed. Dispose media of the spoil in an appropriate off- site location. Use triple shredded hard wood mulch at a maximum depth of four inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that Dolomitic lime shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in the toxic soils shall be removed, soil media. disposed of properly and replaced with new planting media. Clogging has occurred. Wash out the underdrain system. The underdrain, filter fabric Clogging has occurred. Clean out the drop inlet. Dispose element, and outlet system of the sediment off-site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Resources. outlet. C-2. Bioretention Cell 21 Revised: 1-19-2018 APPENDIX E SUPPLEMENTAL EZ STORM SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name i South Parking Area 2 Project Area(ac) 10.97 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 0 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 1 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Dave Skurky,Chief Stormwater Engineer 28 Organization: Aulick Engineering,LLC 29 Street address: 600 Park Offices Dr. 30 City,State,Zip: Durham,NC,27709 31 Phone number(s): 919-819-4242 32 Email: dskurky@aulickengineering.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer ,,,,,ttttCAIR ;• �L Si ature of Designer 0 019 ,, (\ c I2 344. S /lllliiiUttt" Seal Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 4 Type of SCM Dry Pond 5 Total drainage area(sq ft) 263053 6 Onsite drainage area(sq ft) 263053 7 Offsite drainage area(sq ft) 0 8 Total BUA in project(sq ft) 259713 sf New BUA on subdivided lots(subject to permitting) 9 (sq ft) New BUA not on subdivided lots(subject to 10 permitting)(sf) 234302 sf 11 Offsite BUA(sq ft) 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) 152552 sf -Sidewalk(sq ft) 4043 sf -Roof(sq ft) -Roadway(sq ft) 77707 sf -Future(sq ft) -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 13 subdivided lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq ft) Existing BUA that will remain(not subject to 15 permitting)(sq ft) 25411 sf 16 Existing BUA that is already permitted(sq ft) 17 Existing BUA that will be removed(sq ft) 18 Percent BUA 89% 19 Design storm(inches) 1.0 in 20 Design volume of SCM(cu ft) 17110 cf 21 Calculation method for design volume Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): This project is within Asheville Regional Airport property,which has a property area of 900ac.For the purposes of our calculations,the limits of our construction,10.97 acres,was used when determining built upon area values. DRY POND 1 Drainage area number 1 2 Minimum required treatment volume(cu ft) 17110 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered No side slopes? Are the inlets,outlets,and receiving stream protected from erosion 7 Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with No General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM desi ned b an NC licensed rofessional? Yes DRY POND MDC FROM 02H.1062 18 SHWT elevation(fmsl) 2080 19 Elevation of the bottom of the dry pond(fmsl) 2080.5 20 Distance from bottom to SHWT(feet) 0.5ft 21 Elevation of the temporary pool during the design storm(feet) 2083 ft 22 Ponding depth of the design storm(feet) 3 ft 23 Will the dry pond be uniformly graded to flow toward the outlet? Yes 24 Is a low flow channel being provided? No 25 Are the inlet(s)and outlet located in a manner that avoids short- Yes circuiting? 26 Will berms or baffles be provided to increase the flow path? No 27 What method of pretreatment will be provided? Forebay 28 Design volume of SCM(cu ft) 35,826 29 Diameter of drawdown orifice(in) 3 in 30 Drawdown time for the temporary pool(hours) 40 Does the pond minimize impacts to the receiving channel from the 1- 31 Yes yr,24-hr storm? 32 Is there a small permanent pool near the orifice to prevent clogging? No 33 Will the outlet be designed to prevent clogging? Yes 34 Are the dam and embankment planted in non-clumping turf grass? Yes 35 Species of turf that will be used on the dam and embankment Fescue 36 Will trees and shrubs be prevented from growing on the dam and Yes embankment? ADDITIONAL INFORMATION Please use this space to provide any additional information about the 37 dry pond(s): There is no permanent pool proposed in the SCM,this is acceptable per Part E-4 of the Manual. Dry Pond 3 1:33 PM 6/15/2023 APPENDIX F BUA EXHIBIT r 1 r 1 NOTE 1:THIS PROJECT IS WITHIN IMPERVIOUS SURFACE AREA CALCULATIONS ASHEVILLE REGIONAL AIRPORT / PROPERTY,WHICH HAS A PROPERTY PROPOSED ON-SITE STREET(SF):77,707 AREA OF 900AC.FOR THE PURPOSED OF PROPOSED ON-SITE PARKING(SF):152,552 �, OUR CALCULATIONS,THE LIMITS OF PROPOSED ON-SITE SIDEWALKS(SF):4,043 Z •`!'° h e v i I le OUR CONSTRUCTION(10.97 AC)WERE1 it USED WHEN DETERMINING BUILT UPON EXISTING BUA(SF):25,411 REGIONAL AIRPORT AREA VALUES. TOTAL IMPERVIOUS AREA(SF):285,124 TOTAL IMPERVIOUS AREA(AC):6.55 0' 75' 150' 300' 450' 1111 TOTAL PROJECT AREA(AC):10.97(SEE NOTE 1) I, MD PROJECT PERCENT OF IMPERVIOUS AREA: 1"=1 0' (TOTAL IMPERVIOUS AREA/TOTAL PROJECT AREA)X 100 / — 6.55 AC / 10.97 AC X 100 / AVCON,INC. =59 7% / ENGINEERS&PLANNERS MIS MACEY AVENUE,SUITE / II I I // MO HUNTERSVILL,NC80]8 www avco„i„c com RELEASED FOR II // CONSTRUCTION c I I / .o•%kk CARpz°'', / O SS%' Tic I 2•`"�FS�AL� ,' , x / _ 1 040195 /iii .9 A.I SK,.o••o. I( I\\ ASHEVILLE / \\ REGIONAL AIRPORT - FLETCHER PROJECT AREA:10.97AC \ /...7. NORTH CAROLINA o \\ l - - - - t - - - - - — - M® a= � . L U IM.falm T — — — — \ o vi \ k �� /� y p��]�p(�. ;; iiil 1�:: r q xzr . s, \\ KEY PLAN rn I 0 L 0a`'* + a .. = PROPOSED ON-SITE PARKING:152,552 SFI _ 1n� ,,, ,.t .� ��.' €€¢R tl rc'F - 0 . ,..._ v ,4, — o ®� "" ,� "� SOUTH PARKING AREA 1� ry N \ . k ���� - —9:i0-,OG{OG:GGA,G�������������/�1�/��������tt����������������������tt���������tltt���.,asY° �Q i � /� ,esu,� �}tC ,nv $ P o .,� 11 .... ` _� + ems . �m N�MM W „a,„ , " ,:.� g.—.. ce �N�a„�,w >a,se � ;a a�a�..ae�Y, `t-- — ^' • ..••• � °�N �_�PROPOSED DRY POND .N�a E �o l\ � W rs ,��` - � �., „„ SP °� / :, 1\ BUILT-UPON-AREA PROPOSED ON-SITE `\, la 0 s��'�/" EXISTING BUA:25,411 SF °°°" o SIDEWALK:4,043SF I � ` o �a,,� p% '°'°° M.��� �S�rvs s oo ` EXHIBIT 1 a _ Ea ,° pOpp�+� •`� PROPOSED ON-SITE STREETS:77,707 SF \ • •S, i./ \ \ \ \\ ATTENTION: _ • rL11v ,°�, ** ear s. i \ . THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY H M* �> • ,. ® / / \\ \ INFORMATION.ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON.INC., 0 .9 gr lvlll�y 11 FOR USE BY THE INTENDED RECIPIENT,AND FOR A SPECIFIC PURPOSE. O - �� ' wE ,ems} WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON,INC ANY J °°° , Ira�h 6.J"' x. • ' L0 a Ili / DISTRIBUTION,REPRODUCTION OR OTHER USE OF THIS DOCUMENT,IN `I�rf , WHOLE OR IN PART,S STRICTLY PROHIBa o �'w"; _ B SI' d ,�+ O. f .G�xx ' :� oo \ I 1 PROHIBITED O oa,,: _',Jo " /j oc " - / ` / SCALE: AS NOTED a / s"/oc oo s/j I I > l Q \J � / g� # � - _ - /SP / I /� I NO. DATE BY REVISIONS: R % c �O S - // v SP/ L� * T �SP /� ROFPIU #> • % oo-/SP ::sV:-------:°- / �� flDESIGNED BY: W.M.M. v - . " sr, 14 tr 00-\/sP I I I ���� DRAWN BY:RR W.M.M. • /� / 9 ® j / I CHECKED BY: D.A.S. z . sP /° op� .otsP/ _ II I C�Qa0 APPROVED BY: D.A.S. w sr, Q ® sP . . _ . Iir / �/0 /.. DATE: JUNE2023 jam" �.--! sP // / .e„a� / / STATE LICENSE# N.C.C-2450 sP� 2 // / / / PROJECT NO. 2022.0157.02B •% ' ": a SP // „� I SHEETSW 05 ER l APPENDIX G WATERS OF THE U.S. DELINEATION REPORT s III = November 30, 2022 AVCON 10115 Kincey Avenue, Suite 140 Huntersville, North Carolina 28078 Attention: Mr. James Moose Reference: Jurisdictional Wetland and Stream Report AVL South Parking Lot Fletcher, Buncombe County, North Carolina S&ME Project No. 22410080 Dear Mr. Moose: S&ME, Inc. (S&ME) has conducted a preliminary jurisdictional wetland and stream assessment in general accordance with S&ME Proposal No. 22410080 dated July 21, 2022. Background Information We understand that a new parking area is to be constructed at the south end of the existing Asheville Regional Airport property. This proposed parking area is bordered to the north by a Marathon Gas Station, to the east by Airport Road, and to the south and west is Rental Car Road and the rental car storage and maintenance area.The total site area is about 15.5 acres and is wooded with a drainage feature along the western side of the site and crossing the site near the southern end. A roadway was cleared through the western side of the site and mostly follows along the eastern side of the drainage feature. The property is depicted on the attached United States Department of Agriculture (USDA) Soil Conservation Service (SCS) Buncombe County Soil Survey Exhibit (Figure 1), United States Geologic Service (USGS) Topographic Exhibit (Figure 2), Color Aerial and Topographic map (Figure 3), LIDAR Exhibit (Figure 5), National Wetlands Inventory (NWI) Exhibit (Figure 6), National Hydrography Dataset (NHD) Exhibit (Figure 7) and Federal Emergency Management Act (FEMA) Flood Zone Exhibit (Figure 8). Scope of Services Preliminary Jurisdictional Wetland and Stream Assessment The preliminary jurisdictional wetland assessment consisted of traversing the site to assess soils, vegetation, and hydrology in search of areas that meet the minimum criteria for jurisdictional wetlands as described by the procedures set forth in the United States Army Corps of Engineers (USACE) "Wetlands Delineation Manual" (January 1987— Final Report). Proof of wetland hydrology would be the existence of S&ME, Inc. 3201 Spring Forest Road I Raleigh, NC 276161 p 919.872.2660 f 919.876.3958I www.smeinc.com Jurisdictional Wetland and Stream Report AVL South Parking Lot Fletcher, Buncombe County, North Carolina I I I S&ME Project No. 22410080 hydric soils with oxidized root channels in the upper 12 inches of the soil profile, water borne deposits, drift lines, scour marks, drainage patterns, regional indicators of soil saturation, etc. It is important to note that wetlands are also classified as waters of the US and regulated by the USACE under authority of the Clean Water Act (33 USC 1344). On November 21, 2022, multiple hand auger borings to assess the soil conditions for evidence of hydric soil indicators and for wetland hydrology were performed in drainage areas and topographically concave areas within the project boundary. In addition, USACE data forms were completed documenting the plant, soil and hydrology findings of suspected wetland areas on-site, which are included as Appendix I.The area where the data forms were recorded was located with a GPS receiver and is shown on the attached Figure 4 labeled as DP-1 and DP-2. The preliminary stream assessment consisted of examining features on the site using North Carolina Department of Environmental Quality(NCDEQ) Division of Water Resources (DWR) stream evaluation techniques contained in the NCDEQ-DWR publication, Identification Methods for the Origins of Intermittent and Perennial Streams, v 4.11. NCDWR Stream Identification Forms (Version 4.11) were completed for stream features identified on-site and are included in Appendix II. The area where the stream forms were recorded were located with a GPS receiver and is shown on the attached Figure 4 labeled as SF-1 through SF-3. Site photographs documenting the conditions of features identified on-site are included in Appendix Ill. Findings The attached Figure 4 depicts the potentially jurisdictional wetlands and streams identified on-site. Stream Feature S1, which was flagged from the outlet culvert that extends underneath Terminal Drive to the inlet culvert that extends underneath Rental Car Drive is represented by Flags S1.1 through S1.69.This stream feature is approximately 2020-feet in length and rated as a perennial stream on NCDWR Stream Identification Form SF-1. Stream Feature S2, which was flagged from the outlet culvert that extends underneath New Airport Road to the confluence of stream Feature S1 is represented by Flags S2.1 through S2.8. This stream feature is approximately 145-feet in length and rated as an intermittent stream on NCDWR Stream Identification Form SF-2. Stream Feature S3, which was flagged from the outlet culvert that extends underneath the Dunkin Donuts/Marathon Gas Station parking lot to the confluence of stream Feature S1 is represented by Flags S3.1 through S3.24.This stream feature is approximately 485-feet in length and rated as a perennial stream on NCDWR Stream Identification Form SF-3. Wetland Feature W1 is represented by Flags W1.1 through W1.4 and is approximately 0.004 acres in size. November 30, 2022 2 Jurisdictional Wetland and Stream Report AVL South Parking Lot Fletcher, Buncombe County, North Carolina I I S&ME Project No. 22410080 Wetland Feature W2 is represented by Flags W2.1 through W2.10 and is approximately 0.06 acres in size. Recommendations S&ME's jurisdictional wetland and stream assessment should be considered preliminary. A Jurisdictional Determination (JD) request would need to be submitted to the USACE after which a site meeting would need to be conducted to confirm our findings regarding wetlands and streams on-site. If requested, S&ME can submit a proposal for these additional services. Closing S&ME appreciates the opportunity to provide natural resource services for this project. If you have any questions please contact Walter Cole at 919-872-2660 or wcole@smeinc.com. Sincerely, S&ME, Inc. Walter Cole, LSS, REHS Thomas P. Raymond, PE Senior Project Manager Senior Reviewer Enclosed: Figure 1: USDA-SCS Buncombe County Soil Survey Figure 2: USGS Topographic Quadrangle Figure 3: Color Aerial and Topographic Map Figure 4: Feature Exhibit Figure 5: LIDAR Exhibit Figure 6: National Wetland Inventory Exhibit Figure 7: NHD Exhibit Figure 8: FEMA Flood Zone Exhibit Appendix I: USACE Data Forms Appendix II: NCDWR Stream Identification Forms Appendix III: Site Photographs November 30, 2022 3 Figures ;- , _ _ _ °. ,, i UX \'T74 : j . ASHEVILLE \ GIONAL AIRPORT ' --.,--k- Ilk 1 R UhE - y �-, 280 ti'"" �� .. i % % p)i\ . a y c Ud 1 Ux- I . ��� N ' TmB * + 'Cud ' v '° V Uh 2 \.2,4 Un8 4,1 iP s .- w 1 ,114 1,1 i.. ft; ,; t Ud . , No IN a I sB II ill -� ���' - 1 UX ux 1 8 . + N N N 0 aco tow1 • SOILS: 'FEET' i • s CuC:Clifton-Urban land complex,8-15%slopes 0 ir A. TmB:Tate-Urban land complex,2-8%slopes Lt 0 REFERENCE: TmC:Tate-Urban land complex,8-15%slopes i� GIS BASE LAYERS WERE OBTAINED FROM THE 2009 USDA-NRCS PUBLISHED SOIL SURVEY - Ud:Udorthents,loamy OF BUNCOMBE COUNTY,NORTH CAROLINA,SHEET 64. THIS MAP IS FOR INFORMATIONAL _ j Y PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED.THEY ARE I . a a� • o NOT BASED ON CIVIL SURVEY INFORMATION,UNLESS STATED OTHERWISE. 4 4 a *11+ 1 , - a = Project Site SCALE: FIGURE NO. iII USDA-NRCS SOIL SURVEY EXHIBIT 1 " = 500 ' dr DATE: I I -- ASHEVILLE REGIONAL AIRPORT - SOUTH PARKING AREA 11-30-22 1 TERMINAL DRIVE PROJECT NUMBER FLETCHER, BUNCOMBE COUNTY, NORTH CAROLINA 22410080 N� Z , 26 O � t A 1 sR1D "i' 4 ( FANNIN• It � • 1 , O � a 1 a l7 it Z � S w I t I I 0 � I 0 co o � N 0 500 1,000 (FEET) _ _ . REFERENCE: j GIS BASE LAYERS WERE OBTAINED FROM USGS NATIONAL TOPO MAP VIEWER. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE • a APPROXIMATED.THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION,UNLESS STATED m OTHERWISE. Project Site SCALE: FIGURE NO. USGS TOPOGRAPHIC EXHIBIT 1 " = 500 ' DATE: I I ASHEVILLE REGIONAL AIRPORT - SOUTH PARKING AREA 11-30-22 2 TERMINAL DRIVE PROJECT NUMBER FLETCHER, BUNCOMBE COUNTY, NORTH CAROLINA 22410080 ','''- -ft.,.......--";'-i, \[ C.---...- 0\1 _\_ -'-.---------:- .__ _--7 --,-------"' '7 Ar- 1 \ \ ti._\ T1. ERMINAL DR ,,,,,_ )i_____,_____ _ ' ' i6 - .� II o 1} ~ IIIiiii \ , ,,, 0 liikiq i I r-Nr t ) \ I \ 1 0 ,......41,\\y,s ilti \ \ ' t" *'11:3 -1''''",...11'5- k ,,,,,, JJ z _.,.....,,,,,.. i ,... ,,, f_i-------i...„•fit--- -- --, -___Apr \ 141 it i 1 _ .0 ,i___, ,‘iiiciir.,,,,,,IN,L,„ , Ilkiil , 0 ,. \AI, . ,e,‘" _ __,--_,__________ ,__,,,sr O 4-'2' \' ', ' 10 ! \\ �� Iliiiiii 1 O 4s1,‘,, •`1 .1 ICO rAt\r 22 i H- yam, v OA<,.� C Z J o > A wI!I1( ', A11 \f \ il I \ l''''i''' ' ' , t 111\ \\L- tI\ • _ ' t -,t •1‘i & 0_ , ;kl i ,Ili, 11,,:.* .----41.-\1111111\immin 0 J 0 IIM ; ' i a )t)* t1,11liNit arii718.41 o o o ,--- 0 250 AlliKA500 !,„„,„,„, 4 ,,,,i," . ' c*\%11) ,.. a REFERENCE: r\ GIS BASE LAYERS WERE OBTAINED FROM THE 2019 NCONEMAP AERIALtp ,Ct'yj�� 1- ORTHOIMAGERY LAYER AND THE NC EMERGENCY MANAGEMENT LIDAR = V 1 Foot ContoursII Y DATASET THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL r� i _ • FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED.THEY ARE NOT ;$} tb ' ' ��� i BASED ON CIVIL SURVEY INFORMATION,UNLESS STATED OTHERWISE. fil Protect Site I SCALE: FIGURE NO. iII COLOR AERIAL AND TOPOGRAPHIC EXHIBIT 1 " = 250 ' DATE: I I - ASHEVILLE REGIONAL AIRPORT - SOUTH PARKING AREA 11-30-22 3 TERMINAL DRIVE PROJECT NUMBER FLETCHER, BUNCOMBE COUNTY, NORTH CAROLINA 22410080 _ ... , . .! : . : , ..:. P------ IA F '.n. tir Stream Feature S3;485 LF A. . 4 - Represented by Flags 53.1 53.31 6 .T 1 _ Wetland Feature W2;0.06 ac r Represented by Flags W2.1-W2.16 :' ,, , • itOrlIP, : , ea tt t e SF7• DP2 1 —— —� .—_IN , 0 Wetland Feature W1;0.004 ac Represented by Flags W1.1-W1.3 0 ,- - o Stream Feature S1;2,020 LF -0 Represented by Flags S1.1-S1.69 . ' Lu z _ W z a z Lk .._ J LL ', 1 I 1; Stream Feature S2; 145 LF -r l!;;„'i Represented by Flags S2.1-S2.8 O �: a �' -- ! 0 d i III- 0 1 _.„,i0110 , . o' 0 0 QM 0 DWR Stream Form Location • 0 250 500, o • USACE Data Form Location Y • Culvert a• REFERENCE: 1 o GIS BASE LAYERS WERE OBTAINED FROM THE 2019 NCONEMAP AERIAL - Stream i� r ORTHOIMAGERY LAYER. THIS MAP IS FOR INFORMATIONAL PURPOSES Wetland Y ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED.THEY ▪ ARE NOT BASED ON CIVIL SURVEY INFORMATION,UNLESS STATED r = Project Site 3 OTHERWISE. 0 SCALE: FIGURE NO. iII FEATURE EXHIBIT 1 " = 250 ' DATE: I I -- ASHEVILLE REGIONAL AIRPORT - SOUTH PARKING AREA 11-30-22 4 TERMINAL DRIVE PROJECT NUMBER FLETCHER, BUNCOMBE COUNTY, NORTH CAROLINA 22410080 Alp .lit,., FANNING4BRIDGE RD w, IA g . oR I , IrE.'"'4241B- il.-• f ( .: • o • • 141 ��. Illi R 1 % , _o v 4 ,i::1.1.. ." . e . -ft • Q 0 I t 6111114 II r ' • ,, 6 J 1 1 Q o s :' a \ ' ., 0 o a o . r o 0 v Nj o __ 0 00 600 Project Site (FEET) II \ . Elevation a REFERENCE: - High : 2186.51 i Lu GIS BASE LAYERS WERE OBTAINED FROM THE 2019 NCONEMAP AERIAL /1- ORTHOIMAGERY LAYER AND THE NC EMERGENCY MANAGEMENT LIDAR a DATASET THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL Q j - Low : 2044.2 o, FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED.THEY ARE NOT -- 3 BASED ON CIVIL SURVEY INFORMATION,UNLESS STATED OTHERWISE. W k.;r Z _ -- _....m titri SCALE: FIGURE NO. iII LIDAR EXHIBIT 1 " = 300 ' 11, DATE: I I -- ASHEVILLE REGIONAL AIRPORT - SOUTH PARKING AREA 11-30-22 5 TERMINAL DRIVE PROJECT NUMBER FLETCHER, BUNCOMBE COUNTY, NORTH CAROLINA 22410080 '-'"A `r- T �: r 1 _ pt fI' A' i 0 �, , i i`*` yl,..rtrs:Ali m �' •4, • Stier, , a ''" \` . \` _ - " 14w g1t1DGEG� 1 \ \ '! Ci:I a i ""� ' ,�^ , a, g\ e� 1` iii -' V4 % \ i �.!'' N x —= ,17 IT frl ' _ y��' II C C,ro Ill J +:- - T VI � ��.. .. ice+ . 1 -r a : \ I 1 I,; i tt - ;;' 0+ 14 z J I *It 6 Pia r` k T T' V : lt , z - 3y , I R Y > 114041\ ti ri 10 El ill/ • o \ ,....-.. ,, 2 c ° II p I' 2 _ Project Site C% _ )1 Wetlands 1 I Estuarine and Marine Deepwater a itiYr, , Estuarine and Marine Wetland *P0 4y . Freshwater Emergent Wetland 0 Kr) 1,000 0 \ y . - 1 Freshwater Forested/Shrub Wetland Y Otte _ Q�� Freshwater Pond 97 Z REFERENCE: GIS BASE LAYERS WERE OBTAINED FROM THE 2019 NCONEMAP AERIAL Lake if ORTHOIMAGERY LAYER AND THE USFWS NATIONAL WETLANDS INVENTORY Other Y DATASET REST SERVICE. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. o, ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED.THEY ARE NOT BASED Riverine ON CIVIL SURVEY INFORMATION,UNLESS STATED OTHERWISE. i SCALE: FIGURE NO. 0 NATIONAL WETLANDS INVENTORY EXHIBIT 1 " = 500 ' DATE: III glI ASHEVILLE REGIONAL AIRPORT SOUTH PARKING AREA 11 30 22 6 TERMINAL DRIVE PROJECT NUMBER FLETCHER, BUNCOMBE COUNTY, NORTH CAROLINA 22410080 �:;"4„'tip ti WW1 r7 11, 0 or 3 `' 4. « I ce "L writ f - '—" a w'•" g�t1DGEG� _ a� ;� 9 \ , '. . 1......_ - \ rt' V) -40 , 1\1,\ *\ . \ \40i,� •_ fl r X r Orsj 41r11111111111.1 F.; p \ \ _m , 1\ \ % co , 111=1_ i m rn 75 44'' II lif F: : \`' ' A �t .. — - _.... \ s, L \ \ '1- I , , P • r 0 y i z ,red a /y r 0 m o .0 c. N .0. Kr.) 1,000 c \�y _ T yam. a• REFERENCE: W���!/ GIS BASE LAYERS WERE OBTAINED FROM THE 2019 NCONEMAP AERIAL i_ ORTHOIMAGERY LAYER AND THE USGS NATIONAL HYDROGRAPHY DATASET Y% REST SERVICE. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. ALL ' o FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED.THEY ARE NOT BASED ON a/1 Project Site CIVIL SURVEY INFORMATION,UNLESS STATED OTHERWISE. • o a: a .� SCALE: FIGURE NO. NATIONAL HYDROGRAPHY DATASET EXHIBIT 1 " = 500 ' DATE: I I -- ASHEVILLE REGIONAL AIRPORT - SOUTH PARKING AREA 11-30-22 7 TERMINAL DRIVE PROJECT NUMBER FLETCHER, BUNCOMBE COUNTY, NORTH CAROLINA 22410080 ai , , ) . 4 voi ,- .--- -- '''557 . .. .04k .-- • — - \ \ ( iil � V libe I~� CITY�OF: z } \;: \ ASHEVIL"-LE °F• 370032' lii' 3\ \\0\ \ , t4 , 1 - NI MUM _a_ , __ 7.,.).A,_ _ 6+ i % _. . 0 .. . \\. 1 1 iit". 1: Erill m ul 73 • ni N "• .• al oN ,r nm a :\ o A l'' ' ' , - . • 41Vi. \p ♦y f O ID • V3 '� ASHEVILL 8 . — 370032 '`,`` \ .1. ' : - - , 45it 0 t r o, is i V.*" .F\ 0 CI 9 c� 111110 7 L� a k ae . c ,,o a Project Site \\ ° - oco . .v - Flood Hazard Zones w�PvP �` z N 61 Zone Type 2�61 / r 1%Annual Chance Flood Hazard o Regulatory Floodway N - ••• Special Floodway o [ e e 2.06A 1,000 • Area of Undetermined Flood Hazard u yes' \ (F i r rRi3, 0.2% Annual Chance Flood Hazard _-nt REFERENCE: o GIS BASE LAYERS WERE OBTAINED FROM THE 2019 NCONEMAP AERIAL Future Conditions 1%Annual Chance Flood Hazard ORTHOIMAGERY LAYER AND THE FEMA FIRMETTE REST SERVICE. THIS MAP IS Area with Reduced Risk Due to Levee Y FOR INFORMATIONAL PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED o, ARE APPROXIMATED.THEY ARE NOT BASED ON CIVIL SURVEY INFORMATION, Area with Risk Due to Levee 3 UNLESS STATED OTHERWISE. a ee<-: tee'z Mr/ SCALE: FIGURE NO. iII FEMA FLOOD ZONE EXHIBIT 1 " = 500 ' DATE:I I -- 8 ASHEVILLE REGIONAL AIRPORT - SOUTH PARKING AREA 11-30-22 TERMINAL DRIVE PROJECT NUMBER FLETCHER, BUNCOMBE COUNTY, NORTH CAROLINA 22410080 Appendix I U.S. Army Corps of Engineers OMB Control#:0710-0024,Exp:11/30/2024 WETLAND DETERMINATION DATA SHEET—Eastern Mountains and Piedmont Region Requirement Control Symbol EXEMPT: See ERDC/EL TR-12-9; the proponent agency is CECW-CO-R (Authority:AR 335-15,paragraph 5-2a) Project/Site: Asheville Regional Airport South Parking Lot City/County: Fletcher/Buncombe Sampling Date: 11/2/22 Applicant/Owner: Asheville Regional Airport State: NC Sampling Point: DP-1 Investigator(s): Walter Cole, S&ME Section,Township, Range: Landform (hillside,terrace,etc.): Toe Slope Local relief(concave,convex, none): Concave Slope(%): 5% Subregion(LRR or MLRA): LRR N, MLRA 130A Lat: 35.429701 Long:-82.535914 Datum: NAD 83 Soil Map Unit Name: Tate-Urban Land Complex,2 to 8%slopes NWI classification: N/A Are climatic/hydrologic conditions on the site typical for this time of year? Yes X No (If no,explain in Remarks.) Are Vegetation , Soil ,or Hydrology significantly disturbed? Are"Normal Circumstances"present? Yes X No Are Vegetation , Soil ,or Hydrology naturally problematic? (If needed,explain any answers in Remarks.) SUMMARY OF FINDINGS—Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes X No Is the Sampled Area Hydric Soil Present? Yes X No within a Wetland? Yes X No Wetland Hydrology Present? Yes X No Remarks: HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators(minimum of two required) Primary Indicators(minimum of one is required;check all that apply) Surface Soil Cracks(B6) Surface Water(A1) _True Aquatic Plants(B14) Sparsely Vegetated Concave Surface(B8) _High Water Table(A2) _Hydrogen Sulfide Odor(C1) X Drainage Patterns(B10) _Saturation(A3) Oxidized Rhizospheres on Living Roots(C3) _Moss Trim Lines(B16) _Water Marks(B1) _Presence of Reduced Iron(C4) Dry-Season Water Table(C2) _Sediment Deposits(B2) _Recent Iron Reduction in Tilled Soils(C6) Crayfish Burrows(C8) _Drift Deposits(B3) _Thin Muck Surface(C7) Saturation Visible on Aerial Imagery(C9) Algal Mat or Crust(B4) Other(Explain in Remarks) Stunted or Stressed Plants(D1) Iron Deposits(B5) Geomorphic Position(D2) Inundation Visible on Aerial Imagery(B7) Shallow Aquitard(D3) X Water-Stained Leaves(B9) Microtopographic Relief(D4) Aquatic Fauna(B13) FAC-Neutral Test(D5) Field Observations: Surface Water Present? Yes No Depth(inches): Water Table Present? Yes No Depth(inches): Saturation Present? Yes No Depth(inches): Wetland Hydrology Present? Yes X No (includes capillary fringe) Describe Recorded Data(stream gauge, monitoring well,aerial photos,previous inspections), if available: Remarks: ENG FORM 6116-4,JUL 2018 Eastern Mountains and Piedmont—Version 2.0 VEGETATION (Four Strata) - Use scientific names of plants. Sampling Point: DP-1 Absolute Dominant Indicator Tree Stratum (Plot size: 40'X 40' ) %Cover Species? Status Dominance Test worksheet: 1. Acer rubrum 30 Yes FAC Number of Dominant Species 2. Liquidambar styraciflua 30 Yes FAC That Are OBL, FACW,or FAC: 3 (A) 3. Carpinus caroliniana 15 No _ FAC Total Number of Dominant 4. Ilex opaca 15 No FACU Species Across All Strata: 5 (B) 5• Percent of Dominant Species 6. That Are OBL, FACW,or FAC: 60.0% (A/B) 7. Prevalence Index worksheet: 90 =Total Cover Total%Cover of: Multiply by: 50%of total cover: 45 20%of total cover: 18 OBL species 0 x 1 = 0 Sapling/Shrub Stratum (Plot size: 40'X 40' ) FACW species 0 x 2= 0 1. Ligustrum sinense 15 Yes FACU FAC species 85 x 3= 255 2. Rosa multiflora 15 Yes FACU FACU species 45 x 4= 180 3. UPL species 0 x 5= 0 4. Column Totals: 130 (A) 435 (B) 5. Prevalence Index =B/A= 3.35 6. Hydrophytic Vegetation Indicators: 7. 1 -Rapid Test for Hydrophytic Vegetation 8. _ X 2-Dominance Test is>50% 9. 3-Prevalence Index is<_3.0' 30 =Total Cover 4-Morphological Adaptations'(Provide supporting 50%of total cover: 15 20%of total cover: 6 data in Remarks or on a separate sheet) Herb Stratum (Plot size: ) _Problematic Hydrophytic Vegetation' (Explain) 1• 'Indicators of hydric soil and wetland hydrology must be 2. _ present, unless disturbed or problematic. 3. Definitions of Four Vegetation Strata: 4. _ Tree-Woody plants,excluding vines, 3 in.(7.6 cm)or 5. more in diameter at breast height(DBH), regardless of 6. - height. 7. Sapling/Shrub-Woody plants,excluding vines, less 8. than 3 in. DBH and greater than or equal to 3.28 ft 9. - (1 m)tall. 10. Herb-All herbaceous(non-woody)plants, regardless 11. of size,and woody plants less than 3.28 ft tall. =Total Cover Woody Vine-All woody vines greater than 3.28 ft in 50%of total cover: 20%of total cover: height. Woody Vine Stratum (Plot size: 40'X 40' ) 1. Smilax rotundifolia 10 Yes FAC 2. 3. 4. 5. Hydrophytic 10 =Total Cover Vegetation 50%of total cover: 5 20%of total cover: 2 Present? Yes X No Remarks:(Include photo numbers here or on a separate sheet.) ENG FORM 6116-4,JUL 2018 Eastern Mountains and Piedmont-Version 2.0 SOIL Sampling Point: DP-1 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color(moist) % Color(moist) % Type' Loc2 Texture Remarks 0-4 10YR 4/4 100 Loamy/Clayey 4-18 10YR 5/1 80 10YR 4/4 20 C M Distinct redox concentrations 'Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. 2Location: PL=Pore Lining, M=Matrix. Hydric Soil Indicators: Indicators for Problematic Hydric Soils3: Histosol(Al) Polyvalue Below Surface(S8)(MLRA 147, 148) _2 cm Muck(A10)(MLRA 147) Histic Epipedon(A2) _Thin Dark Surface(S9)(MLRA 147, 148) Coast Prairie Redox(A16) Black Histic(A3) _Loamy Mucky Mineral(F1)(MLRA 136) (MLRA 147, 148) _Hydrogen Sulfide(A4) _Loamy Gleyed Matrix(F2) _Piedmont Floodplain Soils(F19) _Stratified Layers(A5) X Depleted Matrix(F3) (MLRA 136, 147) _2 cm Muck(A10)(LRR N) _Redox Dark Surface(F6) _Red Parent Material(F21) _Depleted Below Dark Surface(A11) _Depleted Dark Surface(F7) (outside MLRA 127, 147, 148) _Thick Dark Surface(Al2) _Redox Depressions(F8) Very Shallow Dark Surface(F22) _Sandy Mucky Mineral(S1) Iron-Manganese Masses(F12)(LRR N, Other(Explain in Remarks) Sandy Gleyed Matrix(S4) MLRA 136) _Sandy Redox(S5) _Umbric Surface(F13)(MLRA 122, 136) 3lndicators of hydrophytic vegetation and Stripped Matrix(S6) Piedmont Floodplain Soils(F19)(MLRA 148) wetland hydrology must be present, Dark Surface(S7) Red Parent Material(F21)(MLRA 127, 147, 148) unless disturbed or problematic. Restrictive Layer(if observed): Type: Depth(inches): Hydric Soil Present? Yes X No Remarks: ENG FORM 6116-4,JUL 2018 Eastern Mountains and Piedmont—Version 2.0 U.S. Army Corps of Engineers OMB Control#:0710-0024,Exp:11/30/2024 WETLAND DETERMINATION DATA SHEET—Eastern Mountains and Piedmont Region Requirement Control Symbol EXEMPT: See ERDC/EL TR-12-9; the proponent agency is CECW-CO-R (Authority:AR 335-15,paragraph 5-2a) Project/Site: Asheville Regional Airport South Parking Lot City/County: Fletcher/Buncombe Sampling Date: 11/2/22 Applicant/Owner: Asheville Regional Airport State: NC Sampling Point: DP-2 Investigator(s): Walter Cole, S&ME Section,Township, Range: Landform (hillside,terrace,etc.): Foot Slope Local relief(concave,convex, none): Convex Slope(%): 5% Subregion(LRR or MLRA): LRR N, MLRA 130A Lat: 35.429697 Long:-82.535745 Datum: NAD 83 Soil Map Unit Name: Tate-Urban Land Complex,2 to 8%slopes NWI classification: N/A Are climatic/hydrologic conditions on the site typical for this time of year? Yes X No (If no,explain in Remarks.) Are Vegetation , Soil ,or Hydrology significantly disturbed? Are"Normal Circumstances"present? Yes X No Are Vegetation , Soil ,or Hydrology naturally problematic? (If needed,explain any answers in Remarks.) SUMMARY OF FINDINGS—Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes No X Is the Sampled Area Hydric Soil Present? Yes X No within a Wetland? Yes No X Wetland Hydrology Present? Yes No X Remarks: HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators(minimum of two required) Primary Indicators(minimum of one is required;check all that apply) Surface Soil Cracks(B6) Surface Water(A1) _True Aquatic Plants(B14) Sparsely Vegetated Concave Surface(B8) _High Water Table(A2) _Hydrogen Sulfide Odor(C1) _Drainage Patterns(B10) _Saturation(A3) Oxidized Rhizospheres on Living Roots(C3) _Moss Trim Lines(B16) _Water Marks(B1) _Presence of Reduced Iron(C4) Dry-Season Water Table(C2) _Sediment Deposits(B2) _Recent Iron Reduction in Tilled Soils(C6) Crayfish Burrows(C8) _Drift Deposits(B3) _Thin Muck Surface(C7) Saturation Visible on Aerial Imagery(C9) Algal Mat or Crust(B4) Other(Explain in Remarks) Stunted or Stressed Plants(D1) Iron Deposits(B5) Geomorphic Position(D2) Inundation Visible on Aerial Imagery(B7) Shallow Aquitard(D3) _Water-Stained Leaves(B9) Microtopographic Relief(D4) Aquatic Fauna(B13) FAC-Neutral Test(D5) Field Observations: Surface Water Present? Yes No Depth(inches): Water Table Present? Yes No Depth(inches): Saturation Present? Yes No Depth(inches): Wetland Hydrology Present? Yes No X (includes capillary fringe) Describe Recorded Data(stream gauge, monitoring well,aerial photos,previous inspections), if available: Remarks: ENG FORM 6116-4,JUL 2018 Eastern Mountains and Piedmont—Version 2.0 VEGETATION (Four Strata) - Use scientific names of plants. Sampling Point: DP-2 Absolute Dominant Indicator Tree Stratum (Plot size: 40'X 40' ) %Cover Species? Status Dominance Test worksheet: 1. Acer rubrum 30 Yes FAC Number of Dominant Species 2. Liquidambar styraciflua 15 Yes FAC That Are OBL, FACW,or FAC: 3 (A) 3. Prunus serotina _ 15 Yes _FACU Total Number of Dominant 4. Ilex opaca 15 Yes FACU Species Across All Strata: 8 (B) 5. Quercus rubra _ 10 No _ FACU Percent of Dominant Species 6. That Are OBL, FACW,or FAC: 37.5% (A/B) 7. Prevalence Index worksheet: 85 =Total Cover Total%Cover of: Multiply by: 50%of total cover: 43 20%of total cover: 17 OBL species 0 x 1 = 0 Sapling/Shrub Stratum (Plot size: 40'X 40' ) FACW species 0 x 2= 0 1. Ligustrum sinense 10 Yes FACU FAC species 55 x 3= 165 2. FACU species 65 x 4= 260 3. UPL species 0 x 5= 0 4. Column Totals: 120 (A) 425 (B) 5. Prevalence Index =B/A= 3.54 6. Hydrophytic Vegetation Indicators: 7. _1 -Rapid Test for Hydrophytic Vegetation 8. _ _2-Dominance Test is>50% 9. 3-Prevalence Index is<_3.0' 10 =Total Cover 4-Morphological Adaptations'(Provide supporting 50%of total cover: 5 20%of total cover: 2 data in Remarks or on a separate sheet) Herb Stratum (Plot size: 40'X 40' ) _Problematic Hydrophytic Vegetation' (Explain) 1. Polystichum acrostichoides 10 Yes FACU 'Indicators of hydric soil and wetland hydrology must be 2. present, unless disturbed or problematic. 3. Definitions of Four Vegetation Strata: 4. Tree-Woody plants,excluding vines, 3 in.(7.6 cm)or 5. more in diameter at breast height(DBH), regardless of 6. height. 7. _ Sapling/Shrub-Woody plants,excluding vines, less 8. than 3 in. DBH and greater than or equal to 3.28 ft 9. (1 m)tall. 10. Herb-All herbaceous(non-woody)plants, regardless 11. of size,and woody plants less than 3.28 ft tall. 10 =Total Cover Woody Vine-All woody vines greater than 3.28 ft in 50%of total cover: 5 20%of total cover: 2 height. Woody Vine Stratum (Plot size: 40'X 40' ) 1. Smilax rotundifolia 10 Yes FAC 2. Lonicera japonica 5 Yes FACU 3. 4. 5. Hydrophytic 15 =Total Cover Vegetation 50%of total cover: 8 20%of total cover: 3 Present? Yes No X Remarks:(Include photo numbers here or on a separate sheet.) ENG FORM 6116-4,JUL 2018 Eastern Mountains and Piedmont-Version 2.0 SOIL Sampling Point: DP-2 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color(moist) % Color(moist) % Type' Loc2 Texture Remarks 0-8 10YR 4/4 100 Loamy/Clayey 8-18 10YR 5/1 90 10YR 4/4 10 C M Distinct redox concentrations 'Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. 2Location: PL=Pore Lining, M=Matrix. Hydric Soil Indicators: Indicators for Problematic Hydric Soils3: Histosol(Al) Polyvalue Below Surface(S8)(MLRA 147, 148) _2 cm Muck(A10)(MLRA 147) Histic Epipedon(A2) _Thin Dark Surface(S9)(MLRA 147, 148) _Coast Prairie Redox(A16) Black Histic(A3) _Loamy Mucky Mineral(F1)(MLRA 136) (MLRA 147, 148) _Hydrogen Sulfide(A4) _Loamy Gleyed Matrix(F2) _Piedmont Floodplain Soils(F19) _Stratified Layers(A5) X Depleted Matrix(F3) (MLRA 136, 147) _2 cm Muck(A10)(LRR N) _Redox Dark Surface(F6) _Red Parent Material(F21) _Depleted Below Dark Surface(A11) _Depleted Dark Surface(F7) (outside MLRA 127, 147, 148) _Thick Dark Surface(Al2) _Redox Depressions(F8) Very Shallow Dark Surface(F22) _Sandy Mucky Mineral(S1) Iron-Manganese Masses(F12)(LRR N, Other(Explain in Remarks) Sandy Gleyed Matrix(S4) MLRA 136) _Sandy Redox(S5) _Umbric Surface(F13)(MLRA 122, 136) 3lndicators of hydrophytic vegetation and Stripped Matrix(S6) Piedmont Floodplain Soils(F19)(MLRA 148) wetland hydrology must be present, Dark Surface(S7) Red Parent Material(F21)(MLRA 127, 147, 148) unless disturbed or problematic. Restrictive Layer(if observed): Type: Depth(inches): Hydric Soil Present? Yes X No Remarks: ENG FORM 6116-4,JUL 2018 Eastern Mountains and Piedmont—Version 2.0 Appendix II NC Division of Water Quality-Methodology for Identification of Intermittent and Perennial Streams and Their Origins v. 4.11 NC DWQ Stream Identification Form Version 4.11 Date: 11/22/2022 Project/Site:AVL South Parking Lot Latitude:35.429440 Evaluator:W. Cole County: Buncombe Longitude:-77.535987 Total Points: Stream Determination (circle one) Other Stream is at least intermittent 36 SF-1 @ S1.18 if>_ 19 or perennial if>_30" Perennial e.g. Quad Name: A. Geomorphology (Subtotal = 17 ) Absent Weak Moderate Strong 1 a.Continuity of channel bed and bank 0 0 1 0 2 0 3 0 2. Sinuosity of channel along thalweg 0 0 1 0 2 0 3 3. In-channel structure: ex. riffle-pool, step-pool, 0 0 1 0 2 0 3 1 ripple-pool sequence 4. Particle size of stream substrate 0 0 1 0 2 0 3 0 5.Active/relict floodplain 0 0 1 0 2 0 3 6. Depositional bars or benches 0 Q 1 0 2 e 3 7. Recent alluvial deposits 0 0 1 () 2 Q 3 8. Headcuts 0 0 1 0 2 0 3 9. Grade control 0 0 0.50 1 ® 1.50 10. Natural valley 0 0 0.50 1 0 1.50 11. Second or greater order channel No=00 Yes=3 0 a artificial ditches are not rated;see discussions in manual B. Hydrology (Subtotal = 12 ) 12. Presence of Baseflow 0 0 10 2 0 3 0 13. Iron oxidizing bacteria 0 0 10 2 0 3 14. Leaf litter 1.50 10 0.50 00 15. Sediment on plants or debris 0 0 0.50 1 0 1.50 16. Organic debris lines or piles 0 0 0.50 1 0 1.50 17. Soil-based evidence of high water table? No=0 0 Yes=3 0 C. Biology (Subtotal = 7 ) 18. Fibrous roots in streambed 30 2 0 10 0 19. Rooted upland plants in streambed 30 2 0 10 0 1 20. Macrobenthos(note diversity and abundance) 0 • 1® 2 3 21.Aquatic Mollusks 0 • 10 28 38 22. Fish 00 0.50 10 1.50 23. Crayfish 00 0.50 1 0 1.50 24.Amphibians 00 0.50 10 1.5 25.Algae 00 0.50 1 0 1.58 26.Wetland plants in streambed 0 FACW=0.7500BL= 1.500ther=0 "perennial streams may also be identified using other methods.See p.35 of manual. Notes: Sketch: 41 NC Division of Water Quality-Methodology for Identification of Intermittent and Perennial Streams and Their Origins v. 4.11 NC DWQ Stream Identification Form Version 4.11 Date: 11/22/2022 Project/Site:AVL South Parking Lot Latitude:35.425831 Evaluator:W. Cole County: Buncombe Longitude:-77.534979 ' Total Points: Stream Determination (circle one) Other Stream is at least intermittent 28.5 SF-2 @ S2.3 if>_ 19 or perennial if>_30" Intermittent e.g. Quad Name: A. Geomorphology (Subtotal = 12 ) Absent Weak Moderate Strong 1a.Continuity of channel bed and bank 0 0 1 0 2 0 3 2. Sinuosity of channel along thalweg 0 0 1 ® 2 0 3 3. In-channel structure: ex. riffle-pool, step-pool, 0 ® 1 ® 2 0 3 1 ripple-pool sequence 4. Particle size of stream substrate 0 0 1 0 2 © 3 0 5.Active/relict floodplain 0 ® 1 ® 2 0 3 6. Depositional bars or benches 0 ® 1 0 2 0 3 7. Recent alluvial deposits 0 0 1 () 2 © 3 8. Headcuts 0 ® 1 0 2 © 3 9. Grade control 0 0 0.50 1 0 1.50 10. Natural valley 0 0 0.5®• 1 0 1.5® 11. Second or greater order channel No=0® Yes=3 a artificial ditches are not rated;see discussions in manual B. Hydrology (Subtotal = 10.5 ) 12. Presence of Baseflow 0 0 10 2 0 3 13. Iron oxidizing bacteria 0 0 10 2 ®• 3 14. Leaf litter 1.50 10 O. 00 15. Sediment on plants or debris 0 0 0.50 1 ® 1.50 16. Organic debris lines or piles 0 0 0.5® 1 0 1.50 17. Soil-based evidence of high water table? No=0 0 Yes=3 0 C. Biology (Subtotal = 6 ) 18. Fibrous roots in streambed 3e 2 0 10 0 19. Rooted upland plants in streambed 30 2 0 10 0 1 20. Macrobenthos(note diversity and abundance) 0 400 1® 2 3 21.Aquatic Mollusks 0 • 10 2� 3g 22. Fish 00 0.50 10 1.50 23. Crayfish O® 0.50 1® 1.50 24.Amphibians OQ 0.50 10 1.5 25.Algae 0 C) 0.5 0 1 0 1.5g 26.Wetland plants in streambed 0 FACW=0.7500BL= 1.500ther=0 "perennial streams may also be identified using other methods.See p.35 of manual. Notes: Sketch: 41 NC Division of Water Quality-Methodology for Identification of Intermittent and Perennial Streams and Their Origins v. 4.11 NC DWQ Stream Identification Form Version 4.11 Date: 11/22/2022 Project/Site:AVL South Parking Lot Latitude:35.429565 Evaluator:W. Cole County: Buncombe Longitude:-77.535658 Total Points: Stream Determination (circle one) Other Stream is at least intermittent 30 SF 3 @ S3.24 if>_ 19 or perennial if>_30" Perennial e.g. Quad Name: A. Geomorphology (Subtotal = 13.5 ) Absent Weak Moderate Strong 1a.Continuity of channel bed and bank 0 0 1 0 2 0 3 2. Sinuosity of channel along thalweg 0 ® 1 0 2 0 3 3. In-channel structure: ex. riffle-pool, step-pool, 0 0 1 0 2 0 3 1 ripple-pool sequence 4. Particle size of stream substrate 0 0 1 0 2 © 3 0 5.Active/relict floodplain 0 0 1 0 2 © 3 6. Depositional bars or benches 0 ® 1 0 2 0 3 7. Recent alluvial deposits 0 0 1 () 2 © 3 fp 8. Headcuts 0 0 1 0 2 © 3 9. Grade control 0 0 0.50 1 0 1.50 10. Natural valley 0 0 0.5®• 1 0 1.50 11. Second or greater order channel No=0® Yes=3 a artificial ditches are not rated;see discussions in manual B. Hydrology (Subtotal = 10.5 ) 12. Presence of Baseflow 0 0 10 2 0 3 13. Iron oxidizing bacteria 0 0 1 ®' 2 0 30 14. Leaf litter 1.50 10 0.50 00 15. Sediment on plants or debris 0 0 0.50 1 0 1.50 16. Organic debris lines or piles 0 0 0.50 1 0 1.50 17. Soil-based evidence of high water table? No=0 0 Yes=3 0 C. Biology (Subtotal = 6 ) 18. Fibrous roots in streambed 30 2 0 10 0 19. Rooted upland plants in streambed 30 2 0 10 0 1 20. Macrobenthos(note diversity and abundance) 0 • 1 0 2 3 21.Aquatic Mollusks 0 • 10 28 38 22. Fish 00 0.50 10 1.50 23. Crayfish 00 0.50 1 0 1.50 24.Amphibians 00 0.50 10 1.5 25.Algae 0 0 0.5 0 1 0 1.58 26.Wetland plants in streambed 0 FACW=0.7500BL= 1.500ther=0 "perennial streams may also be identified using other methods.See p.35 of manual. Notes: Sketch: 41 Appendix III - -- f '',`•-k'' ic--,,r, ,Autt..,-,, ., 1., r.lk . 0„,<!,,,,,i;:, :- : . ` ., 'I.,..lorlilimplro, 411, ".. .• -,-,=:‘: :,-k it ,. ,s , ' ,,,, i .., °-.,14te4' 4,iiiiiit ,OP,` 1 .:_ ,, —74,, :.,7 ' ,./...r 7,,-; A 1 iew of stream Feature S1 and outlet culvert that extends 2 iew of stream Feature S1 looking downstream of outlet underneath Terminal Drive at Flag S1.1. culvert that extends underneath Terminal Drive at Flag S1.1. Aa � �� 7...,,jt. 4,,,.,--1.„:„,,,,,,-.3i , , .-,,,,,,-, -7,- ,,,, , ,,,c-'4•N' ' '''1:'•:,•'7 os,'•.. .7.,::'4 ..' '' 'A.1144,..' :, -'):. 2., '� ° _ ` ♦c,, a i•i ,1 '� i 4 � per :�.\ gab . - h ` '!�' , _ i. % �. 5.• _ ,.......i,,,,-.,,,,r,..,-,-,;•,..,,,,,-.„,,,,,,',-...1, •ilki„. ,... #, 1 '. - t,. 4 ` a - of '4 0 ;-.,'• . t4,47 ,/...--_---a , ,. ._. -.,-s- .,* -.., r,. 3 View of stream Feature S1 at Flag S1.18 looking 4 iew of stream Feature S1 at Flag S1.18 looking upstream where NCDWR Stream Form (SF-1)was downstream where NCDWR Stream Form (SF-1)was recorded. recorded. a Asheville Regional Airport South Parking Lot Site Photographs S&ME Project No. 22410080 /1 I . Terminal Road, Fletcher, Buncombe County, North Carolina Taken by: W. Cole I Date Taken: 11/21/22 1 i • y , h N.. _ m jw y,r - l- a - -, — _ ? :'1 - t �E• View of stream Feature S1 looking upstream of inlet 5t 6 iew of stream Feature Si and inlet culvert that extends culvert that extends underneath Rental Car Drive at Flag underneath Rental Car Drive at Flag S1.69. S1.69. 3 iiiii; , • ,., 610 le; • s►r _ Y,. At 1-r r: C• s'• .s ` -r ax +� r 1 a ..,r f'. _ yam— —` 4' ',y �.: 'a a 7.12:. e4+1 +' K-,1 •► s .r�F i ,< e "� i "S' \ tun \ ..^' i'4 _ '. N # ' h 4 „sus r .4 * `. _SAL ` _'Y, ` R _ a l •'.. f n ,a: "-`..•" 9_ fl. ,j r , ��yy 7. ' tAlt ' 7 View of stream Feature S2 and outlet culvert that extends 8 iew of stream Feature S2 and inlet culvert that extends underneath New Airport Road at Flag S2.1. underneath sewer access easement at Flag S2.2. a Asheville Regional Airport South Parking Lot Site Photographs S&ME Project No. 22410080 /1 I . Terminal Road, Fletcher, Buncombe County, North Carolina Taken by: W. Cole I Date Taken: 11/21/22 2 - ; ,, F, ,, ,, ` a ~< i t r R ,.- ,. i • if `:n ,,ii- xr"r Foy i j T , v. _A .tea -a -........... - yi. 'I` • .'l 9 View of stream Feature S2 and outlet culvert that extends 1 0 View of stream Feature S2 downstream of outlet culvert underneath sewer access easement at Flag S2.3 where that extends underneath sewer access easement at Flag NCDWR Stream Form SF-2 was recorded.. S2.3 where NCDWR Stream Form SF-2 was recorded. t 0F 1p�_� f! A'"1 - I r3 ..r _ � {, - . j_ A M I 77 +.` �.fig I o�`�3 t r' y.S f`° ;:.Fy4� ��.� �� ..r1 ��' -fig rr•' � ,` it 4. I-: .- a' " .7f04., a;-•A 7s- , i", I 4'r 1 R 1 - f r'. to , / , `a� y.,^.:. - 4. ',.. 4 1 (%, 11 View of stream Feature S3 and outlet culvert that extends 12 iew of stream Feature S3 looking downstream of outlet underneath Dunkin Donuts parking lot at Flag S3.1. culvert that extends underneath Dunkin Donuts parking lot at Flag S3.1. i Asheville Regional Airport South Parking Lot Site Photographs S&ME Project No. 22410080 /1 I . Terminal Road, Fletcher, Buncombe County, North Carolina Taken by: W. Cole I Date Taken: 11/21/22 3 a r,ttw`y 1wv i i` _ t• - -C .7.F • ` i'.` `� i R^ .L ' 4 *-J� .R.St '~4} :2r'_ .'J •. !Af 't 5�.-Y n. • *, y - 'S 1• - z i - 'K „,,,.....4;.:,- - +'c , 'x y 13 A view of stream Feature S3 at Flag S3.24 looking 14 A view of stream Feature S3 at Flag S3.24 looking upstream where NCDWR Stream Form (SF-3)was downstream where NCDWR Stream Form (SF-3)was recorded. recorded. s � F i �7 1 L/\ - .c. 1& 4µ, v .,...!,t..f4 ., ,: ,. --- ,11 . , r4,,t-..,_ __.,--.:-,..,..,„‘,..747, 7 ` ate, ,,. .„ , .....,,,.„,, ,,, ,„ --__. _. -_,..., -1,_. r J T k� rN'J .-„...,,„:..,,.. r 54�.� ry j,M "' ( u it ,. - __ d ,,�+Rn - t .▪„ :. R ' : v A . A r x �� w'r a'7� �i .:+i s'; '� 1�?e/ 1 9'L ��J. ,r. S4 ,7. i.• 7"Z•}iT7Y =_.a k, r,t .- 1E a 6r <, 'a\ ,. c,t`i '' t `,ate '":I' ;.q:ir? (Y Ji# 4 '! �,. " �^- r�,. �%*�-. r" '' J* k a k^-vp�r. +d'� i -`r F r lr•- .t i li ,y/: t � �' �``� tw..ow i`s . ` -aJ. �,'{ y+,.� 5 ;y. ,y � 5yy, z�' - ,al � � "�i"+Qd t ram".< 1, . , ,'< -f \ ;r x r s -:— e \ pus 4 1 -=,,'-". 1,4,:t:;,i4g,o...7' -,.„...:,::,.',-i',a..-t-y,:r1'' '4,'c,.1,i, ,',-- -....„*.--V't1' 4k,1,,,1„1:I1,-E I. 1 ' i ' "bf'• - *'wy 7 _ 2 - 1:TV r- „df4,, �r}�'.s ,f'!.e •,' k-. _ ' tti ..�.+ \mow, a1- ` .: f r• -? ;.. Yr'. \I-! <. r k. ott f t, i i 4%14 ,, �4 %r y A - `i r �. �. eft .1 in, fi g►,-go.,. �� \yJp- , j.. 4 View of wetland Feature W1 at Flag W1.1 looking toward 16 A view of stormwater control measure outlet culvert and stream Feature S3. etland Feature W2 at Flag W2.1. A Asheville Regional Airport South Parking Lot Site Photographs S&ME Project No. 22410080 /1 I . Terminal Road, Fletcher, Buncombe County, North Carolina Taken by: W. Cole I Date Taken: 11/21/22 4 -- 4- er. ..— ! , , L .. ,i'., � i - it •15 4 ! .. N . r'I c h . .': -;-,.4.-;-- ,,,,, ,, ... 1.,k, ' . re.,„„„,,,, -,,, ,, � ,der r' 1",,. 3 al. +4 , .i ti sir' , ' # . 4.,t.. '' '', P,• ..+- �` .1F lam .„4, • i a y: ma's s,.i. s A3` iY, H•s t.� i .. ` .. 'ir• •h i'f.Gi3t; .`' r + ,..1 ,'y+ %' .k t t. . ts•• 0, Al, ..L-r tf -.2\ ' six 0 `,,.. ,`, .0 `, ���� ‘c.02!.*:.:,„ : 11.4..! ,:,.. ...r.. ' ••i• 4 jot - "* + ' r _ 4► i _- ~ i �� 7 ice , , t , 4 p , d w i t �'" •- *f ``p� ,..,, t• "9r :.L' yam ' s' t: ✓ . '• i 4w, 1 7 A view of the hydric soil located in wetland Feature W2 18 A view of the standing water located in wetland Feature where USACE Data Point (DP-1)was recorded. W2 where USACE Data Point (DP-1)was recorded. . - ",.'r y , ' r,, , i- „>'� -fie -'E a i •i ' � a k 5 .:tea l,., i 'd r • iJ% i.r' 7t �.. kreetA fie - 4 _ x ) s T . 1 I_ .. J- y r)y,,_:„..:: ,,,,,,,,..,,,.... ,� , . ..,.,....„,,,,0.-- 4.,‘ if • \ v ''�'�� 6 'ti,;:.�i ,fir,( { _- `r .'� 1. r - 1. ' 19 A view of the water stained leaves and drainage patterns 20 located in wetland Feature W2 where USACE Data Point (DP-1)was recorded. � Asheville Regional Airport South Parking Lot Site Photographs S&ME Project No. 22410080 /1 I Terminal Road, Fletcher, Buncombe County, North Carolina Taken by: W. Cole I Date Taken: 11/21/22 5