Loading...
HomeMy WebLinkAboutNCC231855_ESC Approval Submitted_20230620 ______\ ROCKY MOUNT ENGINEERING E CENTER OF iT ALL LETTER OF APPROVAL FOR SEDIMENTATION & EROSION CONTROL May 11, 2023 Englewood Baptist Church 1350 S Winstead Ave Rocky Mount,NC 27803 Re: Project Name: Mission Field—Phase I Permit Number. 2022-03 042 Location: S Winstead Ave Submitted By: Kevin Varnell, Stocks Engineering Acres Approved 6.21 acres To whom it may concern: This office has reviewed the subject erosion and sedimentation control plan sealed by J. Michael Stocks, PE on March 23, 2023. We find the plan to be acceptable and hereby issue this letter of approval. This letter of approval shall be valid for a period not to exceed twenty-four months or the time required for the proposed construction activities, whichever comes first. Please be advised that Section 801, Sub-section E12 of the City of Rocky Mount's Land Development Code(hereinafter referred to as LDC)requires that a copy of the approved erosion control plan be on file at the job site. Also, you should consider this letter the notice required by the LDC, Section 802, Sub-section Q 1 of our right of periodic inspection to ensure compliance with the approved plan. The City of Rocky Mount's Sedimentation Pollution Control Program is performance oriented, requiring protection of the natural resources and adjoining properties. If following the commencement of this project,it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Soil Erosion and Sedimentation Control Ordinance of the City of Rocky Mount(Section 801 of the LDC,also NCGS 113A-51 through 66,)this office will require revisions to the plan and implementation of the revisions to ensure compliance with the Ordinance. Performance Reservations for this plan are included as part of this approval. The 1252 97? 121 / 331 3 :rinklui St Pi-Box 11'R0 Ruckv Mount NI:27F,22 11'-i0 / , tkw rockw oixtf r 1uv developer is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the developer must take additional steps necessary to stop sediment from leaving this site. Each sediment storage device must be inspected after each storm event. Maintenance and/or clean out, is necessary anytime the device is at 50% capacity. Please be aware that this approval is based in part on the accuracy of the information in the Financial Responsibility/Ownership Form, which you have provided. You are required to file an amended form if there is any change in the information included on the form. Also, please note that this approval does not relieve the pennittee of the responsibility to obtain any other Federal, State, or Local approvals or permits. The responsible party may need to contact the appropriate Federal, State, and Local agencies prior to beginning work. This approval does not permit the construction of any impervious surface, nor does it allow for the placement of fill in any area for which a floodplain development permit is required. In addition,LDC Section 801-E 10 requires that you notify this office of the proposed starting date for this project. Your cooperation is appreciated,and we look forward to working with you on this project. Also, this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure compliance with the approved plan. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI)form requesting a Certificate of Coverage (COC)under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above project. The NOI form may be accessed at deq.nc.gov/NCGOI. Please direct questions about the NOI form to Annette Lucas at Annette.lucas(a ncdenr.gov or Paul Clark at Paul.clark(aincdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A $100 fee will be charged annually. This fee must be sent to the DEMR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. (252)972-1325 / 331 S.Franklin St.,PO Box 1180,Rocky Mount,NC 27802-1180 / www.rockymountnc.gov7 Also,this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure compliance with the approved plan. Please complete the e-NOI submittal process as soon as you receive this letter for the subject site. Please visit: https://deq.nc.gov/NCG01 The General Contractor or delegated agent is required to set up a Pre-construction meeting (before construction begins) with the Control Inspector. Sincerely, Gabrielle Bryson Stormwater Engineer City of Rocky Mount 252-972-1340 (252)972-1325 / 331 S.Franklin St.,PO Box 1180,Rocky Mount,NC 27802-1180 / www.rockymountnc.gov3