Loading...
HomeMy WebLinkAboutNCC231843_Site Plan or Location Map_20230614 T � 401 PA E vwako D / �. <.¢-E}. . . . . . . . . Agit' \ / DATE: z----- Op /\) Z�- - EINF CED �� /Co ST CTION p II J L. ..L\''.\i. / .. r SIOUFE TE - 'i. 2S CON RU TI•N .-C. \ 't• �.� .n L Lrtl �.J Li `.�I a L.L.I_ .0 A:..I r 1 : ii,4 ::;li r: :, 'W-IH--1 -1 „ , F.;, ,,,,, i L t i \� Z. .i - - 1 SILT FENCE LI ITS - - - - - ...................... --.--r f° RGA rku AV -KO AV -ku cox -RO WAY rRO �V WAY -ROADWAY i % / ,;',.. •NSTRUCTIot4 2]4� (TYP.) \ 9 �. .\. soasorcwm Notes: r --- ,� '4, L i f ( . \ \� / CURB INLET 1.If needed,Tree Protection fencing should be installed along the buffer zone,wetland IoxNsory maL ltOAO Sa-L4o9 - • - .' - - - - ,.�- \ 6 ( 1 (o00 beunearyand/orarouneprotectetl trees,provitlin9 a retlius of at leas[1.25 feet for each , s L//. - _ EaEND•�,,, -'- ( h oftrunktliameter.A TLE \h - -----:I:/. - ;, ,..aJ','y'y \ . IN. - - ; 2.Install Silt Fence on the law elevation sides of each tat.Install Silt Fence outlets shown on 2 CscM1ematicldlegram end fold adlus ed.if necessary,for placement at low points.If lots are '6 '• J tsBrx , CONSTRUCTION v\/ \\\\\ _- - . . . . Si FENCE DIRECTION _ contiguous and have different land owners or buildere,each lot should have individual Silt 4 \ "�" \ SILT FENCE /- ENTRANCE `\ Fences. 4T z ---- �- - - / - - \, (ryp,) ,, e \ - - �- 1, SILT FENCE OUTLET I� 3.Install required Silt Fence within 10 feet of property line to ensure there is no conflict with --401 `N� _ _���_ -F . - _ _ - - - ON IMITS ION ` \ ` r_ \ \ - - - - CCONSTRUCTION URB INLET ENS septic system.It is the responsibility of the builder to ensure the installation of sediment b \ •• \ � CONSTRUCTION ,� _J / `S ORM I mntrol measures does not mpact the cep!c system one repsY area:et: ) - l Oj \ At leas[one ConsVucfon EMrancelEut's to be hstalled per lot ,,I 1 _ - - CONST SCTION . ---� ` \ ��ON . :\. 1 1 e, Waste b'ns antl other areas tletl catetl for manag n9 bdltl ng meter al waste shall be at �� p r 21� ENTRANCE / - \ 111 / 1 least 50 feet away from storm era n nl:t or tlee none d ledhes unless t can be shown that �- I no other alternative exists.If this cepamdon cannot ba achieved these areas must be P i - % QJ r - nts dow strew Sitt Fence. rt _ / ') 1 1/ 6.Inlats downstream of dialurbances should be protected;streets should be swept when SITE b '_ rr- " _"_'-�\�20 ,® 2Z•��0 1/��/ �`,46 49 Lot Plan ` � '•� \\ 1 / � l )� - � I I I sediment from the censWcgon activity is Present. P L ` g 'a �/ i \ I I ..\NC-Environmental.jpeg 7.Details Silt Fence,Silt Fence Outlets,Construction Entrances and other measures are i \ i - •'1 \` I / �' provided on additional sheets.Erasion and sediment control details are not arzwnroscale. o'g Po eT 19••\•• \\ /rr 22 1Ad •••••---- 51 , /r / / ��' �- --_ TYPICAL LOT LAYOUT WITH CURB AND GUTTER Dqr To f.. ' • r . i ! / V / Q] CONSTRUCTION i•1 / \ \• �; ,t LIMITS , // / I l \ s DATE: \ b _ r ROCKFISH ROAD �� \ l 7 4'\ _ / / � 1 / • VICINITY MAP �, �h� ' r �1 as = t N.T.S. �w 1� / 46 ��-A 53 �� 4, - - -3,1 ( \V 1 I ,..:e � \..4011,04 i: '°'m` ^�(e/ \ \ �G 45 ) a \\ r s ;.tt.t ale / / " o \ \ \ / � � t. � • 58 \ y L \ J� 32 O~ \\ 1 \ I I ; �� DATE: PAGE: \ _ 133\I I ( 1 I I I I { • / �' a•non. � e. �.x•• 'WW2.- _ s Sock/wort �1 Silt s / NOTE: 59 �,y¢.+ ,aI NgL► sylys 'je. tots IArea to be , Other matedals prmdding equivalent protection 410 / )�� \\ I I-.11, II t �' Stokes - , 'i -n-.k: 3 �� z_D #14 / l 1III \ 1 stoles cal Ire 226 _� 60 ¢ 34 \ r� \ ��( � IImoo, areafa g `tin andom I onaba .afterea.1nchogreateranfaSECnaN aEOTON graded Pal areas � ;„� rn. 42 / / \ • 3�� \\a.a minimum of 10 feet beyond the.of a V1 �� � o� material and properly grade it rnake any require ,repairs immediately. 2.Place the gravel wwaapa�egmaeaa thePanaana<° �° gM ""runsill aeima be tomed ro nland disturbance.The ends of esilt me - 35LLO � ��� \ g �z a M Ne Wefoxneeaonnweg a wa.M a sediment trap or other suitable outlet re,eImm - Nemar.a see ,aeaor page W 4 e driven �32 �, 61 / \ ` ,6 -e5b •.-.-..�___�� I Ik\ \\ \\ \ \ <'R .Use waeePe9eo\ 3.Provide drainage to,Im me / C -- """ • ..•-_`. \ ..\NC-Env'r lal.jpegainch x 2 inch cross section should�eaaGinter \ \ ` \ 41 \ / , •'ss1 I III\I`\ \\\ \\% \\ grmen CONSTRUCTION ENTRANCEI EXIT �s efine�aion�aeaa (ie.hen a I I 1 of rate leis ma ENTRENCHED INSTALLATION* maximum Trenen m a msoeMw ge is paced ) 1 Wood Mulch or Cora at groans a•Irvin. In the event staking not possible tle.when �� To 1/2 height of log uBaMENCHED mm VIEW ATIDN m.us�_..w.U,ED.�aa,.®.90,,, , ,. a a hold pavement tie \ ��" \, ' I IIIIII I \\o5a a race / �"•-23Q- ;%/ \ CO SODDING so 1 MAINTENANCE: Warn \ CONSTRUCTION SCHEDULE 1. accumulated at least any debris and soar each or rainfall.Remcve • _--.................... I) I 1. Obtain all necessary pennite and plan approvals.Erosion and Sediment Control Mulch or.mpOat c Pa M INaAt FLOW RATES N ,m \ {ly / I \ (E&SC)pmnit and a Certificate of Coverage(COC)m et be obtaimd before any land disturbing ac for Unbenmee socks Area To Be PmL P Demeter T1 Ixoncan0 4,00 4so )(eno.m) s('m m 2' atlle must e v n cloggedor �236 �(1 / J \ 1 I 1 o w.A copy of[tie E&SC permit,[tie COC and a hard copy of Ne plan must be kept on e,preferably'nee �� Shoed Fl a s. \ tP \ 38 • /\ I permits box,and accessible during inspection. sit M e owy _ e ( \ l \ 2. Install gravel co es first,then silt fences, silt fence outlets and wattles. Silt Sock te„un(!t HLFm) Me raj \ I • - _ I 3. Finish clearin and ctbbiv as on the lots asth started.wattle /M (sosm) (srsam) (soosm) 0 Ir!// �� 8 gru gany necessary are ey are M � cxosexorwumlNc vlEces.wart Area r� xpaabtin s #1;;,„ '� \39 I �� I , I I 4. Begin lot grading and excavation activities s rn oas me p%x ae 5 ix ;5 .-. nett ee ins ease until Iona /JJ s. aegin or continue won nonce conatmcrion activirie. a(aa (tn anee a(2er a(sra esn+pemtl ampeeareaen1bove the -\ /r / I 1 Il 6. Finish all rough grading and house conevuction. MIS c^ /m/m) /m/m) /m/m) /m/m) /m/m) measure hoe been peimaremly aaMlvne. '...›4 0. i I c � J \ T. Install driveways,walks and pas ANC-Envir•Innen lul.Jpey - -- -- \ • /;• / / \\\\\\g. Begin fine grading of lot areas patios. Ma�NoollilEci unmHEo corwrttty. SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION 9. Five gassivgmulchmg a stabilizing of lot.m most caaz n u I me installationne oannmelot.//J 1)1 r C (/ / The sib fence will rem placel the lot is sodded or grassing'stabilizedand takes hold. 410 /I r i / / r \\\\10. The contractor shall conduct self-inspections of the erosion dsedimentationcontrol measures and complete Ir I \ the following combined self' pe f f J the DEMLR webslte DATE: LL , _ _,_ Filter Fabric PAGE: \ \ ( f r / ntfpe//Klee Dc¢ov/ncdgry/Ener¢y'/a2aMm 1/2o d/2DLe a/2oR .lsmrmwelerMPDE9%20 \ \J\ \ ( Ge I/20P Ts`DEMLRCSWMonT gF R AR 82019_Jf.Twelve months of complete • Steel Prat Poste a \\ \ I I \ \ \\ inspe f shall be kept on site and available f inspectionII- .I is recommended a copy be Wore Bockfll trench __ \ \ leap pmtn bo (03113A 541(e)154 NCAC 04B 0131 NCG01P III Sedans AaldB) r Wire Fence / ' and Compact 6 (...(____ \ \11. Sel[ivapec ns fore and sedime trolm to be performed al lean once every seven Steel Post thoroughly \ \ �vv\ \ \ \ calendar days and with'24h f ery fg h 1- h.A y ded p hall be �r1N�l 4 1 \ \ �� \ �_ �� I construction o wrHTHESot r^m PSTHESoos aMawea mad immediately designed.d.All ESC shall J p ified in tv rc LAID. onDEPmoF a' MOW WHEN THE Son is the details h'plan.Are gauge hall b insulted h project f g f \ •• `\��/ \12. Inspectiond final acceptanceletters.WhenM1 project DI h D it shall 1 DEMLR to a As xeeosv.wnreawau 1 to z4 b uo p N 5 / ••\• = I I closetheE&SC Plan.AR DEMLR f h permittee f h prof 1 inspection report, x APPEARANCE OF GOOD SOD xcx r s Wire tiesn \ / J the pennittee till s dq. .govMCG01 bra el N of termination(e NOI).A$100 4 1 I ji I / annual general permit he will be charged until the o-NNOT has been filled out. Eaaown.forwaro a the^� a-�In ► /// a� GROUND STABILIZATION ��li����11)� ,����� ee a I / L SITE AREA STABILIZATION F Fabric CROSS SECTION VIEW \ \ \ / I /� //// \ (/ EXCEPTIONS o..eaaoermr \ I DESCRIPTION TIME FRAME ova-.sae ,o an nwa�w rem,a,° °m w w \ 1 \3 \ /////� ��\\ \\2.Ensure suli tid.del9ki of die sedlniumienuk...dui a.m.,24.bedutiontlki,dvdu Nuke.-fork.may imPound vdvined oi waterPERIMETER DIKES. DAYS NONE « a wro a SWALES,DITCHES W mme9e umen1 msae ma \ \ \ \ / A ,I////// \\ &soPEs General Erosion Control Notes / / / \ HIGH QUALITY 7 DAYS NONE \ WATER ZONES 1.Only the areas shown shall be disturbed. orem.rwwsw,same .,a.c.werwmm. amaamawn eaa. ran �.,mawrea7aeae ere=canoe, \ \ 2\ \ \ I // //// �\ \\\ (HOW) 2.All distmulched as s areas s posll be sble and maintained and 1 SLOPES STEEPER 7 DAYS IF SLOPES ARE m Iched a m.De naell«ne Mop treed \ %,, /// ` \\\ THAN 3:1 10'OR LESS IN until pemanent cover s establ'shed.a i \ \ \ 1 \ \ ' / / /// \ \� LENGTH ST STEEPER E ew /// /�/ \\ \y THAN 2:1, 14 DAYS ARE ANC-En lal.Ions \ , 1 \ / ALLOWED EFFECTIVE rurE,,.T roe SILT FENCE SLOPES 3:1 OR 14 DAYS 7 DAYS FOR A SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY FLATTER SLOPES GREATER \ \ I 1/ NCGS 113A-54.1'IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR THAN 50'IN 1 \ I COMPLETED AS AN EXCEL SPREADSHEET. LENGTH AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED ALL OTHER AREAS 14 DAYS NONE(EXCEPT DATE: PAGE: \ \ ` EROSION AND WITH SLOPES FOR PERIMETERS ee 4 MIN. - FENCE \ 1\ \' NCAC E04B TI0131C STATEES THAT Y.DOCUMENT....DOCUMENTATION TSHALL OBE CACCOMP ACCOMPLISHED BY FLATTER THAN 4:1 AND HOW ZONES) - - \ \ INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE PAGE 1 of 2 L T T T APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, J \ \ \ DATNG AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, \ \ PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION TOTAL DISTURBED ACREAGE: 1.11 ACRES / CONTROL PLAN.' LOT EROSION CONTROL PLAN TOP OF SILT FENCE MUST BE MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION LOTS 25, 28 & 50 THE fAS N I TOWNSEND ESTATES STEEL FENCE ST , • General-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be SUBDIVISION HARDWIRE WARE • FrvsnSn w relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. SUBDI/ ISION FEN Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all FOR AND HARDWARE wABkED sroSET MA% srA CLOTH IN TRENCH objectionable materials spilled,washed,or tracked onto public roadways. A8IG RESIDENTIAL GMIN.'S.INTOROUND Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure °5 urouSo that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence et tall times.Take care to not undermine the fence during cleanout operations. RDF 1.Hardware cloth a.gravel Stone outlets should be placed on Iveow aytheenemeeefles.12 fenCe,ne McLAUCHLIN TOWNSHIP HOKE COUNTY o o es$ basedon commons.. Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth SCALE: 1 n=100' APRIL 2023 and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible.11.Per NCO-01,inspect outlet at I.once a week andafter ea.1 in. GRAPHIC SCALE BURY WIRE FENCE AND HARM CLOTH E og.F ,nv,es_ r Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be lop 0 50 100 200 400 FlLTEa EAeaic IN mEN a.3.Keep mesh amfree re as needed to rovMngastone>uate flow. covered.t Is repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. - II 4.Remove sediment when SECTION vlEw Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed ( IN FEET ) NC-Envh enlal sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. .. \ .1`eg 1 inch = 100 ft. SILT FENCE OUTLET Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the net rain to reduce pressure°n the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE WF-0106 LAST SAVED:4/19/2023 3:48 PM LAST PLOTTED:4/19/2023 4:29 PM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\A&G RESIDENTIAL LLc\22-2855-06 TOWNSEND ESTATES-EC\PLANS\TOWNSEND EC-LOTS 25.28&SO.OWG