Loading...
HomeMy WebLinkAboutSW8960823_CURRENT PERMIT_20230209STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 DOC TYPE ® CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 7-o2'3 e 2 o°I YYYYMMDD ROY COOPER Governor ELIZABETH S. BISER Secretary DOUGLAS R. ANSEL interim Director February 9`h, 2023 Environmental Quality New Hanover County Schools Attn: Edward J. Anderson, Assistant Superintendent 6410 Carolina Beach Road Wilmington, NC 28412 Subject: Permit Renewal Post -Construction Stormwater Management Permit No. SW8960823 Wrightsboro Elementary School New Hanover County Dear Mr. Anderson: Effective August 1, 2013 the Post -Construction Stormwater Management Program has been transferred from the Division of Water Quality ("DWQ") to the Division of Energy, Mineral and Land Resources ("DEMI R" ). All previous references to DWQ will remain in older permits issued prior to August 1, 2013 until they 'are modified. Please note that this -permit will now reference DEMER as the Division responsible for enforcement of the permit The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on February 7th, 2023. The Division is hereby notifying you that permit SW8960823 has been renewed, updated, and re -issued on February 9'h, 2023, as attached. Please be aware that the renewal and re - issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until July 24`h, 2030 and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OW. The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the CAB within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their webs ite atwww.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Aisia Freeman in the Wilmington Regional Office, at phone # (910) 796- 7318 or Aisia.freeman@nedenrgov. Sincerely, G�UAii 97, Douglas R. Ansel, Interim Director Division of Energy, Mineral and Land Resources " North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources _ Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 u,� 0 �w_\ 40� 910.796:7215 State Stormwater Permit No. SW8960823 Page 2 of 2 Enclosures: Attachment A — Designer's Certification Form Attachment C — Permitting History Copy of the Renewal Application Documents DES/af. \\\Stormwater\Permits & Projects\] 996\960823 HD\2023 02 permit 960823 cc: Doug Haggett, PE; Haggett Engineering Associates, Inc. Wilmington Regional Office Stormwater File tt North Carolina Department of Environmental Quality I Division of Energy, Mneral and Land Resources _ �J/' Wilmington Regional Office I U7 Cardinal Drive Extension I Wflmington,North Carolma28405 wmHcvnuru, // v,� 910.796.7215 Post Construction Stormwater Management Permit No. SW8960823 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143; General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO George W Hance & New Hanover County Schools Wrightsboro Elementary School 2716 Castle Hayce Road, Wilmington, New Hanover County FOR THE operation and maintenance of one wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 effective September 1, 1995 (hereafter referred to as the "stormwater rules') as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until July 24', 2030 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 66,200 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. The built -upon area for the future development is limited to 0 square feet. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 1 of 5 Post Construction Stormwater Management Permit No. SW8960823 5. The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system. 6. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: 2.43 Onsite, ft2: 105,851 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 66,200 C. Design Storm, inches: 1 d. Average Pond Design Depth, feet: 3.5 e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMSL: 96 g. Permanent Pool Surface Area, ft2: 6,840 h. Permitted Storage Volume, ft3: 7,545 i. Temporary Storage Elevation, FMSL: 97 j. Controlling Orifice: 1.5"0 pipe k. Receiving Stream/River Basin: Ness Creek / Cape Fear River I. Stream Index Number: 18-74-62 M. Classification of Water Body: °C Sw" It. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans. and specifications. g. Other modifications as determined by the Director. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. Page 2 of 5 Post Construction Stormwater Management Permit No. SW8960823 6. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, Flow spreader, catch basins and piping. q. Access to the outlet structure must be available at all times. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 10. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. 12. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. Page 3 of 5 Post Construction Stormwater Management Permit No. SW8960823 TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased, ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved, iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur, V. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2), b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. c. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Page 4 of 5 Post Construction Stormwater Management Permit No. SW8960823 Permit renewed, updated, and reissued this the 9'" day of February 2023. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION IJAJ.l([ln.0 A j Douglas R. Ansel, Interim Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 5 Post Construction Stormwater Management Permit No. SW8960823 Wrightsboro Elementary School Stormwater Permit No. SW8 960823Mod New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date Page 1 of 2 SEAL Post Construction Stormwater Management Permit No. SW8960823 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. _16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. CC' NCDENR-DWQ Regional Office New Hanover County Engineering Page 2 of 2 Attachment C - Permitting History Wrightsboro Elementary School Permit No. SW8 960823 Approval Permit Action RIMS Desorption of the Changes Modified Plan Sheets Date Version High Density Commercial Stormwater Project -construction, operation and 9/11/1996 Original 1 0 maintenance of a Detention Pond in compliance with the provisions of 15A NCAC C 1 2 Approval 2H .1000. The storwater control has been designed to handle the runoff from rn 66,200 square feet of impervious area. High Density Commercial Project -operation and maintenance of one wet detention pond in compliance with the provisions of 15A NCAC 211 .1000 effective September 1, 1995. The stormwater control has been designed to handle the runoff from 66,200 7/24/2009 Renewal 4.0 square feet of impervious area. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. The built -upon area For the future development is limited to 0 square feet. 2/92023 Renewal 3.0 his permit shall be effective until July 24", 2030 Page 1 of 1 POND MAINTENANCE REQUIREMENTS Project Name: Wrightsboro Elementary School Project Number Responsible Party: New Hanover County Schools Phone No A&K #96155 SW8 960823 910-763-5431 Address: 1802 S. 15th Street Wilmington, NC 28401 I. Monthly, or after every runoff -producing rainfall event, whichever comes first: A. Inspect the trash rack; remove accumulated debris, repair/replace if it is not functioning. B. Inspect and clear the orifice of any obstructions. If a pump is used as the drawdown mechanism, pump operation will be checked. A log of test runs of the pump will be kept on site and made available to DWQ personnel upon request. C. Inspect the pond side slopes and grassed inlet swales; remove trash, and repair eroded areas before the next rainfall event. D. If the pond is operated with a vegetated filter, the filter will be checked for sediment accumulation, trash accumulation, erosion and proper operation of the flow spreader mechanism. Repairs/cleaning will be done as necessary. II. Quarterly (Four times a year): A. Inspect the collection system (i.e., catch basins, piping, grassed swales) for proper functioning. Accumulated trash will be cleared from basin grates, basin bottoms, and piping will be checked for obstructions and cleared as required. B. Pond inlet pipes will be checked for undercutting. Riprap or other energy dissipation structures will be replaced, and broken pipes will be repaired. III. Semi-annually (twice a year): A. Accumulated sediment from the bottom of the outlet structure will be removed. B. The forebay depth will be checked at various points. Sediment removal is required when the depth is reduced to 75 % of original design depth of 3.5 feet C. Grassed swales, including the vegetated filter if applicable, will be reseeded twice a year as necessary. Repair eroded areas immediately. POND MAINTENANCE REQUIREMENTS PAGE 2 IV. Annually (Once a year): A. The pond depth will be checked at various points. Sediment removal is required when the depth is reduced to 75 % of the original design depth or 3', whichever is greater. Design depth is 3.5 feet, measured vertically from the orifice down to the pond's bottom. Sediment must be removed to at least the original design depth. V. General: A. Mowing of the side slopes will be accomplished according to the season. Maximum grass height will be 6". B. Cattails are encouraged along the pond perimeter; however, they will be removed when they cover more than 1/2 the surface area of the pond. The best time to cut them is at the end of the growing season, in November. Environmentally sensitive chemicals for use in killing cattails can also be used. Contact your nearest Agricultural Extension Agent. C. The orifice/pump is designed to draw down the pond in 2-5 days. If drawdown is not accomplished in that time, the orifice will be replaced with a larger or smaller orifice. Slow drawdown may be attributed to a clogged system. The source of the clogging will be found and eliminated. D. All components of the detention pond system will be kept in good working order. Repair or replacement components will meet the original design specifications as per the approved stormwater plan. If previously approved components are determined to be ineffective, the component will be redesigned and/or replaced. V. Special Requirements: Edward J. Anderson I, Director of Facilities and Planning hereby acknowledge that I am the financially (please print or type mmne clearly) responsible party for maintenance of this detention pond. I will be responsible for the performance of the maintenance as outlined above, as part of the Stormwater Management Permit received for this project. Signature: Revised 2/25/97 Date: 4./Zhgy DEMLR USE ONLY Date Recei ed Fee Paid Permit Number a f� I o 1 o i 0 3 8 OS123 NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section K(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 960823 2. Project name: Wrightsboro Elementary School 3. Project street address: 2716 Castle Hayne Road City: Wilmington County: New Hanover ZIP : 28401 4. What, if any, changes have been made to the project as permitted? None If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at: https://deg.nc.gov/abouUdivisions/energy- m i neral-land-resources/energy-m i nera I-land-rules/stormwaler-program/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https://deg.nc.gov/about/divisions/energy-mineral-land- resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: New Hanover County Schools 2. Signing Official's Name: Edward J. Anderson 3. Signing Official's Title: Assistant Superintendent of Planning and Operations 4. Mailing Address: 6410 Carolina Beach Road City: Wilmington State: NC ZIP : 28412 5. Street Address: 6410 Carolina Beach Road City: Wilmington State: NC Zip : 28412 6. Phone: ( 910 ) 254-4242 Email: eddie.anderson@nhcs.net FEB 0 7 2023 BY: Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: DN*S 1. A permit application processing fee of $505.00 payable to NCDEQ. 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president, b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor, or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. NA 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. 'b+-k\-% 4. O&M Agreements, Please select one: ❑ I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit, or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 0� 5. Designer Certifications, Please select one: ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. NA 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc.gov/online services/search/by title/ Business Registration FEB 01 2023 BY: Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION Edward J. Anderson the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my knowledge, correct and complete. NOTARIZA North Carolina , County of New Hanover that Edward J. Anderson ©AWE a Notary Public for the State of do hereby certify personally appeared before me this the 5 day of S , 20� , and acknowledge the due execution of the forgoing instrument. Witness my ha and official seal, (Notary Seal) Notary Signature: �VY� a- 'V4Xe My commission expires � 1'a/ C6s�ta V FEB 0 7 2023 BY: Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 A&K'#96155 x RMWATER Permit No. nECE1VED APR 0 31998 State of North Carolina Department of Environment and Natural Resources D E M Division of Water Quality PROJ# SW8 960823 (to be provided by DWQ) STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review• A complete stormwater management plan submittal includes a wet detention basin supplement for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. I. PROJECT INFORMATION (please complete the following information): Project Name: Wrightsboro Elementary School Contact Person: Eddie Anderson Phone Number: (910) 763-5431 For projects with multiple basins, specify which basin this worksheet applies to N/A Basin Bottom Elevation Permanent Pool Elevation Temporary Pool Elevation Permanent Pool Surface Area Drainage Area Impervious Area Permanent Pool Volume Temporary Pool Volume Forebay Volume SA/DAl Diameter of Orifice Design TSS Removal 92.5 ft. (average elevation of the floor of the basin 96.0 ft. (elevation of the orifice) 97.0 ft. (Elevation of the discharge structure overflow 6,840 sq. ft. (water surface area at the orifice elevation) 2.43 ac. (on -site and off -site drainage to the basin) 1.515 ac. (on -site and off -site drainage to the basin) 11,760 cu. ft. (combined volume of main basin and forebay) 7,545 cu. ft. (volume detained above the permanent pool) 2,470 cu. ft. 6.45 (surface area to drainage area ratio) 1'h in. 90 % (85 % TSS removal required, see item k below) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (NC Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Form SWU-102 January 1998 Page 1 of Applicants Initials a. The temporary pool controls runoff from the 1 inch storm event. b. The basin length to width ratio is greater than 3:1. c. The basin side slopes above the permanent pool are no steeper than 3:1. d. A submerged and vegetated perimeter shelf at less than 6:1 is provided (show detail). e. Vegetation above the permanent pool elevation is specified. f. An emergency drain is provided to empty the basin. g. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). h. The temporary pool draws down is 2 to 5 days. i. A trash rack is provided for both the overflow and orifice. j. The forebay volume is approximately equal to 20% of the total basin volume. k. Sediment storage is provided in the permanent pool. 1. 30-foot vegetative filter is provided at the outlet2 (include erosive flow calculations in. Recorded drainage easement for each basin including access to nearest right-of-way. n. A site specific operation and maintenance (O&M) plan is provided. o. A vegetation management/mowing schedule is provided in the O&M plan. p. Semi-annual inspections are specified in the O&M plan. q. A debris check to be performed after every storm event is specified in the O&M plan. r. Specific clean -out benchmarks are specified in the 0&M plan (elevation or depth). s. A legally responsible party is designated in the O&M plan3 (include name and title). t. If the basin is used for sediment and erosion control during construction, clean out of the. basin is specified to be performed prior to use as a wet detention basin 1When using the Division SA/DA table, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2The requirement for a vegetative filter may be waived if the wet detention basin is designed to meet 90% TSS removal. 3The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. Form SWU-102 January 1998 Page 2 of Haggett Engineering Associates, Inc. January 5, 2023 Ms. Ashley Smith Renewal Specialist Division of Energy, Mineral and Land Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28404 Subject: STORMWATER SCM INSPECTION FOR PERMIT RENEWAL Wrightsboro Elementary School — SW8 960823 2716 Castle Hayne Road, Wilmington, NC 28401 HEA Project No. 22-1003 Dear Ms. Smith: Haggett Engineering Associates, Inc. (HEA) is providing this letter regarding our inspection of the stonnwater SCM's as required for the permit renewal. I. HEA has visited the subject site to visually inspect the Stornnwater Control Measures (SCM's) including the Wet Detention Pond. The SCM's appear to have been built in substantial compliance with the permit and were observed to be properly maintained. 2. RPS Environmental is currently under contract with the New Hanover County Board of Education to properly maintain the stormwater SCM's at this facility. Please contact me at (910) 397-0808 if you have any questions. Sincerely, Haggett Engineef n = Associates, Inc. ouglas N. Haggett, PE ECEIVE FEB 0 7 2023 BY:_------ P.O. Box 15104 • Wilmington, North Carolina 28408 • 910-397-0808 ,, `� ': p�. _�•.� '•,.1+. I r; �^ ., '.I � � . i�: