Loading...
HomeMy WebLinkAboutSW8960424_HISTORICAL FILE_20171208STORMWATER DIVISION CODING SHEET POST• -CONSTRUCTION PERMITS PERMIT NO. SW8 q`p�y2 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑x HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 20 N-N a O 8 YYYYMMDD Energy, Mineral & Land Resources ENVIRONMENTAL QUALITY December 8, 2017 Dr. Joint Hauser, President Carteret Community College 3505 Arendell Street Morehead City, NC 28557 Subject: Permit Renewal State Stormwater Dlanagement Permit No. SN8 960424 Carteret Community College. Carteret County Dear Dr. Hauser ROY COOPER Governor MICHAEL S. REGAN Secretary TRACY DAVIS Ott ector Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Qualm, (DWQ) to the Division of Energy, Mineral and Land Resources (DENILR). All previous references to DWQ will remain in older stormvater permits issued prior to August 1, 2013 until they are modified. Please note that the updated permit or any updated pages to the permit will now reference DEMLR as the Division responsible for issuance of the permit. On November 29, 2017, the Division of Energy, Mineral and Land Resources (DEMLR) received a permit Renewal application for the subject project. The Division is hereby notifying you that permit SUr8 960424 has been renewed as follows: 1. 7/16/96: Original permit issued with the expiration date of 7/16/06. 2. 12/6/17: Permit renewed to extend the expiration date by eight years to 7/16/14. 3. 12/7/17: Permit renewed to extend the expiration date by eight years to 7/16/22. 4. 12/8/17: Permit modification application accepted for review. For your records, please find enclosed it copy of the renewed permit, and a copy of the renewal forms submitted on November 29, 2017. This permit is subject to the conditions and limitations as specified in the renewed permit. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the 13MP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stor mwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this pennit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conforn•to Chapter 150D of the North Carolina General Statutes, and must be filed with the OA14 within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing, fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. State or NortlTCarol,na I Encironmcnial Quality I Energy, Mineral and Land Resources Wilmington Regional Omer 1 127 Cardinal Drivv Extension I Wilmington, NC 2,9405 910 796 7215 State Stoi riwater Peiinit iATo. SU'S 960424 Page 2 of 2 . If you have any questions, need additional copies ofthe permit or approved plans; please contact KeIIy Johnson with DE1vI1,R in the AviITT liIIgton Regional Office at (910) 796-7331. Sincerely, LEO- >'o.Tracy Davis; P.h., Director Division of Energy, Mineral and Land Resources GDS/kpj: %StorntwaterAPermits �C, ProjectsA] 996\960,124 HD\2017 12 permit 960424 cc: Ron Cullipher, PE, Siroud Engineering Wilmington Regional office Stormwater Pile State of North Carolina I Environmental Quality I Energy. Mineral and Land Resources Wiliningtun Regional Office 112i Cardlnal Drivc Esiension I Wilmingtun.NC 28405 9107967215 State Stormwater Management Systems Permit No. S\V8 960424 SPATE OF NORTH CAROLINA DEPARTAI T OF ENVlliO'"- TENTAL QUALITY DIVISION OF ENERGY.A-3LV`ERALAND LAND RESOURCES STATE. STOR.,MWATE12 FUG1I DESIGN DEVELOPAIEENT In accordance with the provisions of Article'21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS IiF,REBY GRANTED TO Carteret Community College Ulrleret community, College Exponsion Carteret County I.OR TI E construction; operation and maintenance of an Alternative Design consisting of three Wet Detention Ponds used for pre- treatment of 1.5" of runoff prior to final polishing in Infiltration Ponds, and a fourth infiltration system alone, in compliance with the provisions of 15A \CAC 211 .1000, effective September 1, 1995 (hereafter referred to as the "stornnvater rides') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Fnergy, Nlineral and Land Resources (DLN41,R) and considered a pan ofthis permit. This permit shall be effective from the date of issuance until July 16, 2022 and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of Stormwater runoff as described in the Project Data Sheets of this permit. The stormwater controls have been designed to handle the runoff from a total of 121,100 square feet of impervious area. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The tract will be limited to the amount of built -upon area indicated in this permit, and per the approved plans. 5. The perniurce is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. State Stormwater Management Systems Permit No. SWR 960424 6. The following itans will require a modification to the permit On addition, the Director may determine that other revisions to the project should require a modification to the permit.): a. Any revision to the approved plans, regardless of size. b. project name change. c. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. C. Purther subdivision of the project area. f. Pilling in, altering, or piping of any vegetative conveyance shown on the approved plan. g. The construction of permeable pavement for impervious area credit. 7. The Director may notify the permittec when the pennitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittec shall provide copies of revised plans and cenification in writing to the Director that the changes have been made. State Stormwater Management Systems Permit No. SNV8 960424 DIVISION OF ENERGY, MUNERAL AND LAND RESOURCES PROJECT DATA - SYSTEM I Water Body Receiving Stormwater Runoff: Bogue Sound Classification of Water Body: "SA" Total Impervious Surfaces Allowed: 1 7581 square feet WE'I'POND INFILTRATION Depth: 4.5' T Required Surface Area: 1,424 square feet N/A Provided Surface Area: 2,331 square feet 5,747 square feet Pennanent fool Flevation: 9.2 MSL N/A Bottom Elevation: 4.7 MS 14 NISL Design Pool Elevation: 10.05 NISL, 14.7 MSL Required Volumc: 2,088 cubic feet 2,088 cubic feet Provided Volume: 2,195 cubic feet 4,295 cubic feet Type of Soil: N/A Sand fill Expected Infiltration Rate: N/A .52" per hour Drawdown: .75" pipe 17.2 hours Depth to Seasonal High Water Table: N/A <2' State Stonnwater Management Systems Permit No. S W8 960424 DIVISION OF ENERGY,AVINFRALA1"U LAIN IRESOGNCES PROJIiCT DATA - SYSTE-Is'1 2 Water Body Receiving Stormwater Runoff: Bogue Sound Classification of Water Body "SA" Total Impervious Surfaces Allowed: 72,558 square feet NVII-I'll,POND UN I'll Depth: 4.5' 1.95' Required Surface Area: 5,831 square feet N/A Provided Surface Area: 6,031 square feet 4,174 square feet Permanent Pool Elevation: 13 MSL N/A Bottom Elevation: 8.5 \MSL 18 MSI., Design pool Ilevation: 14.39 MSL 1995 MSL Required Volume: 8,648 cubic feet 8,648 cubic feet Provided Volume: 9,630 cubic feet 9,656 cubic feet 'hype of Soil N/A Sand fill Expected Infiltration Rate: N/A .52" per hour Drawdown: 1.25" pipe 53.4 hours Depth to Seasonal High Water "fable: N/A <2' r, State Stormwater Management Systems permit No. S\W8 960424 DIVISION OP ENERGY. MINERAL AND l:A�\U REISOURCEIS PROJECT DATA — SYS E-M 3' Water Body Receiving Stormwater Runoff: Bogue Sound Classification of Water Body: "SA" Total Impervious Surfaces Allowed: 19,900 square feet NVET POND INTILTRATION Dcpth: 4.5' 1.36' Required Surface Area: 1,592 square feet N/A Provided Surface Area: 2,084 square feet 5,581 square feet Permanent Pool Elevation: 3 MSL N/A Bottom Elevation: -1.5 MSL 12 MSL Design Pool Elevation: 4.22 NISI, I 13 6 �-1SI Required Volume: 2,389 cubic feet 8,544 cubic feet Provided Volume: 3,000 cubic feet 8,899 cubic feet 'type of Soil: N/A Sand Expected Infiltration Rate: N/A 6" per hour Drawdown: .75" pipe 3.2 hours Elevation of Seasonal High \Water Table: N/A -3.5 MSL 'The infiltration basin for System f3 has been permitted under nSW8 940419. This project provides for the expansion of the existing basin to accommodate the additional runoff from the wet pond. 7 Stale Stormwater Management Systems Permit No. SW8 960424 DIVISION OF I NEIRGY. DII_NGRAL AND LA\D RE.SOURCES ]PROJECT DATA — SYSI EIM 4 Water Body Receiving Stonnwatcr Runoff: Rogue Sound Classification of Water Body: "SA" Total Impervious Surfaces Allowed: 1 1061 square feet Pond Depth: 1' Bottom Elevation: 16 MSL - Design pool Elevation: 17 AISL Required Volume: 1,383 cubic feet Provided Volume: 1,506 cubic feet Type of Soil: Sand fill Ispected Infiltration Rate: .52" per hour Drawdown: 24.8 hours Elevation of Seasonal I Iigh Water Table: 15 NISL State Stormwater Management Systems Permit No. S W 8 960424 II. SCHEDUl E oR COMPHANCr 1. The perminee will comply with the following schedule for construction and maintenance of the stormwatcr management system: a. The stormwatcr management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. c. All connections into the permitted system from future areas shall be made such that short-circuiting of the system does not occur. 2. The pcnnittee shall at all times provide the operation and maintenance necessary to assure the permitted stonmwatcr system functions at optimum efficiency. The approved Operation and Nlaintenance Plan must be followed in ii s entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. -Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. g. Access to the outlet structure must be available at all times. It. Check the ability ofthc infiltration systems to drawdown within 5 days. 3. Records of maintenance activities must be kept and made available upon request to authorized personnel of DHQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 4. The facilities shall be constructed; operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 5. Upon completion of construction, priorto issuance of a Certificate Of Occupancy, and prior to operation ofthis permitted facility; a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 6. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of the recording. The recorded copy must be signed by the pcnnittee, dated, stamped with the deed book number and page, and bear the stamp of the Register of Deeds. 7. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum often years from the date of the completion of construction. S. If the use of permeable pavement for 13UA credit within the lot is desired, the permince shall direct the lot owner to submit an application with all supporting documentation and the application fee to the Division and receive a permit prior to construction of the permeable pavement. State Stormwater Management Systems Permit No. SW8 960424 GF,NERAL CONmITIONS 1. '['his permit is not transferable to any person or entity except after notice to and approval by the Director. "fhe permittee shall submit a completed and signed Namc/Ownership Change Form, accompanied by the supposing documentation as listed on the form, to the Division cf I%nergy, Mincral and Land Resources at least 60 days prior to any one or more of the following events: a. An ownership change including the sale or conveyance of the project area in whole or in pas, except in the case of an individual lot sale that is made subject to the recorded deed restrictions: b. The sale or conveyance of the common areas to a I lomcowner's or Properly Owner's Association, subject to the requirements of Session Law 2011-256; c. Bankruptcy; d. Foreclosure, subject to the requirements of Session Law 2013-121; e. Dissolution of the partnership or corporate entity, subject to NCGS 571)-2-01(e) and NCGS 57D-6- 07: f. A name change of the current pcnnittce; g. A name change of the project; h. A mailing address change of the pcnnittce: 2. Failure to abide by the conditions and limitations contained in this permit may subject the Pernimce to enforcement action by the DFMLR, in accordance with Nosh Carolina General Statute 143-215.6(a) to 143-215.6(c). 3. The issuance ofthis permit does not preclude the Permittce from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state; and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Pennittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stonnwater management systems. 5. The permittee grants DLQ Staff permission to enter the property for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuarice or termination does not stay any permit condition. 7. Any individual or entity found to be in noncompliance with the provisions of this stormwater management permit or the requirements of the Stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. 8. The permittee is responsible,for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project, in whole or in pas, nor the conveyance of common area to a third party constitutes an approved transfer of the stortmvater permit. 9. The pcnnittce shall submit a permit renewal application request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. State Stormwater Managemcni Systems Permit No. SVV8 960424 I'cnnit renewed and reissued on this the DATE NORTH CAROLEN"A GNV'IRONNIENfALMANAGEA91 N"I'CO.\,ty9ISSION Tracy D is; P.E., Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SNi'8 960424 State Stormwatcr Management Systems Permit No. SW8 960424 Carteret Communip, College Expansion Stormwatcr Permit No. SW8 960424 Carteret County Engineer's Certification as a duly registered Professional Engincer in the State ofV'orth Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Voted deviations from approved plans and specification: Signature Registration Number Date cc: NCDEQ-DIcMI,R Regional Office Inspector, "['own of ivlorchead City Building Inspections Io ��t.'�.la'@'i N. Ala �l'ni ill ;fl.. h� S. A.; �.,i� ial: ql., •a_ i�.i uJ���6�D• M RTUSE-ONL"Yy�'� tf:. I�.�.����.. �i��i� .Y l.u. �3T'�""I''� �� Ui �ln ,.i'e.�� h. Iwi h'!•Pp Date Received Fee Paid Permit Number _ 0� 5,00 S q a\ State of North Carolina Department of Environment and Natural Resources Division of Energy Mineral and Land Resources (NCDENR DEMLR) STORMWATER MANAGEMENT PERMIT RENEWAL APPLICATION FORM I. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the North Carolina Department of Environment and Natural Resources (NCDENR) Division of Energy Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DEMLR Regional Office. (The appropriate office may be found b cliicc� the interactive online map at http://portal.ncdlenr.org web/guest/regional-offices. Copies ��xrieQp�f be obtained from the Regional Office of the Division of Energy, Mineral and Land Reso es`)JOV 2 9 2017 This Renewal is for STORMWATER PERMIT #: SW 8 960424�— Please check which of the following permit renewal scenarios apply. Initial in the spaces provided that you have provided the required information. ® A. Renewal Only: - fee -Renewal Form -Sign and complete all sections (send original & 1 copy) -Recorded Documents Required By Permit: Deed restrictions, covenants, condominium/planned community declaration & easements (if not already submitted to NCDENR DEMLR). Copies are acceptable. -Designer's Certification (if required by permit and not already received by NCDENR DEMLR) (See the � "' last page of your permit for a copy of the certification form.) I}=== -I Have a Copy of the Current Operation and Maintenance Agreement (O&M): Please Keep this on File d I _ with your permit. —` �L/�L -I Do Not Have a Copy of the Current O&M: Initial This Line to Request a copy. (If NCDENR DEMLR does not have a copy on file, then you will be notified to submit a new O & M formJ ❑ B. Renewal and Modification: -$505 Fee and Pages 1 & 2 of this Renewal Form -SWU-101 Application Form ( liltmortal.ncde)ir.org/roeb/wq/ws/su/statesw/forms does ) -Recorded Documents Required By Permit: Deed restrictions, covenants, condominium/planned community declaration & easements (if riot already submitted to NCDENR DEMLR). Copies are acceptable. - Under #1I. 1. on SWU-101 Application Form — Check Box for Modification w/Renewal -Designer's Certification (if required by permit and not already received by NCDENR DEMLR) (See the last page of your permit for a copy of the certification form.) - O&M Agreement (http://yortal.ticdeiir.org/7veb/7i7q/7VS/Sti/btiip-ittaiiiial Form SWU-102 (Renewal Form) Rev. Oct. 31, 2013 Page 1 of ❑ C. Renewal and Either: 1.) Permit Transfer to a New Permittee, or 2.) Project Name Change: Please submit all items in I.A. and: Request a NCDENR DEMLR site inspection if transferring permit to new property owner. Submit One of the Two Following Forms below (forms available at http://portal.ncdenr.org/web/ir/state- stormwater-forms does). 1. HOA Name/Ownership Change Form: For planned communities (per Chapter 47C or Chapter 47F of the General Statutes) 2. Name/Ownership Chance Form: For all other transfers ❑ D. Renewal, Modification, and Transfer (or Name Change): Please submit pages 1 and 2 of this Renewal form along with all items listed in 1. B. and C. above (check this box and initial items in B. & C. that you are submitting to NCDENI, DEMLR). II. APPLICANT'S CERTIFICATION Note: The legally responsible party is the current permittee and/or the legally responsible representative until such time that the permit is officially transferred through a request to DEMLR by the permittee. I, (print or type name of permittee or person legally responsible for the permit ) lohn Hauser certify that I have a copy of the DEMLR Approved Permit and O&M Agreement on -site (OR I have obtained a c from DEMLR and it will be kept on site), that I am responsible for the performance of thein a��� and the site has been, and will be, maintained according to the O & M Agreement. I agree notify DEMLR ofjan problems with the system and prior to an changes to the system or changes in ownership it orjhave thirou h P Y P� }' g Y g P R(_ g this renewal application) notify NCDENR DEMLR and submit the proper forms to modify transfer the permit. All information provided on this permit renewal application is, to the best of my knowledgVorr Permittee Title:Persident Address:3505 Arendell St., Morehead City NC 28557 NOTARIZATION: I, may-\ L64-\ 0K_L(,✓1 Notary PublicNicfor the State of I (V% County of C&f+e_r + do hereby certify that �l'�Yl r1 rMJse ►� personally appeared before me this day of 8_1, X0 . and acknowledge the due execution of the forgoing stormwater BMP maintenance requirements. Witness my hand and official seal, My commission Notary Signaturf NOTARY PUBLIC Form SWU-102 (Renewal Form) Rev. Oct. 31, 2013 Page 2 of 4 III.. GENERAL INFORMATION 1. Stormwater Management Permit Number: SW8 960424 2. Permit Holder's name (specify the name of the corporation, individual, etc.): Carteret Community College 3. Print Owner/Signing Official's name and title (person legally responsible for permit): John D. Hauser 4. Mailing Address for person listed in item 2 above: City:Morehead City State: NC Zip: 28557 Phone: (252 ) 222-6140 Fax: (252 ) 222-6274 Email:ionathandl845@carteret.edu 5. Project Name: Carteret Community College 6. Location of Project (street address): city: OCL County: Ca �kP�� t Zip: 7. Directions to project (from nearest major intersection): On south side of Arendell St (Hw}_70) lust east of the intersection of Arendell and 35�h St IV EA mny Is Lull gY------------------�� Form SWU-102 (Renewal Form) Rev. Oct. 31, 2013 Page 3 of IV. PERMIT INFORMATION: 1. Specify the type of stormwater treatment: ❑Constructed Wetland ❑Bioretention , ❑Wet Detention Pond ❑Dry Detention Basin ®Infiltration Basin ❑Infiltration Trench ❑Sand Filter ❑Other: 2. If any changes were made to the original DEMLR approved project list them in the space below (attach additional pages if needed and provide "As -Built' drawings with this application). If major changes have been made to your project please request a plan revision or modification of the permit and submit "As Built' drawings along with a final or updated stormwater system engineer certification (if not already provided to NCDENR). DEMLR Engineer and Designer Certification Forms are available from each NCDENR DEMLR Regional Office. Form SWU-102 (Renewal Form) Rev. Oct. 31, 2013 Page 4 of4 Department of Environment and Natural Resources Division of Energy Mineral and Land Resources (NCDENR DEMLR) STORMWATER MANAGEMENT PERMIT RENEWAL APPLICATION FORM This form may be vhotocovied for use as an I. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the North Carolina Department of Environment and Natural Resources (NCDENR) Division of Energy Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DEMLR Regional Office. (The appropriate office may be found by clicking on the interactive online map at http:ZZ12ortal.ncderir.org/web/guest/regional-offices. Copies of the original permit can be obtained from the Regional Office of the Division of Energy, Mineral and Land Resources.) This Renewal is for STORMWATER PERMIT #: SW 8 960424 Please check which of the following permit renewal scenarios apply. hnitial in the spaces provided that you have provided the required information. ® A. Renewal Only: - fee -Renewal Form -Sign and complete all sections (send original & 1 copy) -Recorded Documents Required By Permit: Deed restrictions, covenants, condominium/planned community declaration & easements (if not already submitted to NCDENR DEMLR). Copies are acceptable. -Designer's Certification (if required by permit and not already received by NCDENR DEMLR) (See the last page of your permit for a copy of the certification form.) -I Have a Copy of the Current Operation and Maintenance Agreement (O&M): Please Keep this on File - with your permit. „[L -I Do Not Have a Copy of the Current O&M: Initial This Line to Request a copy. (If NCDENR DEMLR does not have a copy on file, then you will be notified to submit a new O & M form.) ❑ B. Renewal and Modification: -$505 Fee and Pages 1 & 2 of this Renewal Form �+�® -SWU-101 Application Form (htty:/PoTrtal.ncdenr.or /web/w /ws/si iBr' orris �does�i1 -Recorded Documents Required By Permit: Deed restrictions, cov nts fo�ndgminium/pl ed community declaration & easements (if not already submitted to ENR DEMLR). Co ' are acceptable. -Under #II. 1. on SWU-101 Application Form —Check Box for Modif�t on w/Renewal -Designer's Certification (if required by permit and not already received by NCDENR DEMLR) (See the last page of your permit for a copy of the certification form.) - O&M Agreement (http:/lportal.ncdenr.orylweblwglwslsulbmp-manual) Form SWU-102 (Renewal Form) Rev. Oct. 31, 2013 Page 1 of 4 feD O. Renewal and Either: 1.) Permit Transfer to a New Permittee, or 2.) Project Name Change: Please subinit all items in I.A, and: Request.a NCDENR DEMLR site inspection if transferring permit to new property owner. Submit One of the Two Following Forms below (forms available at http://12ortal.ncdenr.org/web/Ir/state- stormwater-forms dots). 1. HOA Name/Ownership Change Form: For planned communities (per Chapter 47C or Chapter 47F of the General Statutes) ❑ D. Renewal, Modification, and Transfer (or Name Change): Please submit pages 1 and 2 of this Renewal form along with all items listed in I. B. and C. above (check this box and initial items in B. & C. that you are submitting to NCDENR DEMLR). II. APPLICANT'S CERTIFICATION Note: The legally responsible party is the current pennittee and/or the legally responsible representative until such time that the permit is officially transferred through a request to DEMLR by the permittee. I, (print or type name of permittee or person legally responsible for the permit ) /ohn Hauser certify that I have a copy of the DEMLR Approved Permit and O&M Agreement on -site (OR I have obtained a copy from DEMLR and it will be kept on site), that I am responsible for the performance of the maintenance procedures and the site has been, and will be, maintained according to the O & M Agreement. I agree to notify DEMLR of any problems with the system and prior to any changes to the system or changes in ownership I will (or have through this renewal application) notify NCDENR DEMLR and submit the proper forms to modify or transfer the permit. All information provided on this permit renewal application is, to the best of my knowledge, correct and complete. Permittee TitleTersident Address:3505 Arendell_St., Morehead City NC 25557 NOTARIZATION: I, WG'o v-\ W 1G� OI' V� Notary Publicforthe State of Mo 1 1 �1 �c� County of rLk r C+B� C 1 do hereby certify that ��hn r Use- V— personally appeared before me this day of UWtftJ ,,� c)-) XI-) and acknowledge the due execution of the forgoing stormwater BMP maintenance requirements. Witness my hand and official seal, My commission Notary Signatur LEI Gy NOTARY PUBLIC Form SWU-102 (Renewal Form) Rev. Oct. 31, 2013 Page 2 of 4 III.• GENERAL INFORMATION 1: Stormwater Management Permit Number: SW8 960424 2. Permit Holder's name (specify the name of the corporation, individual, etc.): Carteret Community College 3. Print Owner/Signing Official's name and title (person legally responsible for permit): fohn D. Hauser 4. Mailing Address for person listed in item 2 above: City:Morehead City State: NC Zip: 28557 Phone: (252 ) 222-6140 Fax: (252 ) 222-6274 Emafl:ionathandl845@carteret.edu 5. Project Name: Carteret Community College 6. Location of Project (street address): City: M06Keejt County: CQ rkP.r-e--�c zip:-a55 7. Directions to project (from nearest major intersection): On south side of Arendell St (Hwy 70) just east of the intersection of Arendell and 35Lh st Fonn SWU-102 (Renewal Form) Rev. Oct. 31, 2013 Page 3 of IV. ' PERMIT INFORMATION: 1. Specify the type of stormwater treatment: ❑Constructed Wetland ❑Bioretention ❑Wet Detention Pond ❑Dry Detention Basin ®Infiltration Basin ❑Infiltration Trench ❑Sand Filter ❑Other: 2. If any changes were made to the original DEMLR approved project list them in the space below (attach additional pages if needed and provide "As -Built' drawings with this application). If maior changes have been made to your project please request a plan revision or modification of the permit and submit "As Built' drawings along with a final or updated stormwater system engineer certification (if not already provided to NCDENR). DEMLR Engineer and Designer Certification Forms are available from each NCDENR DEMLR Regional Office. Form SWU-102 (Renewal Form) Rev. Oct. 31, 2013 Page 4 of 4 Hauser named Carteret Community College president -journalpatriot: News ,iI cU�%'(v Q- E 1111 Page 1 of 5 14 CyRii-C� witkesboro baptist church b„Ix rownvs has eSuter-(mwwrw 1i1tl NlANq-rnevw ]D] Wwt Ilai+A wle4wo. rIC 1 Welcome to the sial Login or Signup below. .__.._......_...e..._...__..._.... .... LOain Signals North Wilkesboro. NC News Sports Lifestyles Opinion Obituaries Calendar Multimedia Search Contact Us Classifiers Legals Subscribe Home News Hauser named Carteret Community College president Story commands Share Pont Font Size: TweetPosted LiNe 19 Saff1'lh0 commoncay Mays 20fl 1b00 Pm i ,aarc I o comments �Y PDr, John Hauser, vice president of Applied Career r jechnologesand Noghany General Wlkes Community College its named as the filth prosiderl ,. i Carteret Community College(CCC) Tuesday lollawing a' I�pecial meeting of that college s board. F iM.rT The CDC Board o1 Trustees selected Hauser it the conclusion of a six month search effort that attracted 65 candidates. if "We are extremely pleased to have Dr. Hauser joining us as the college's new president.' said Dr. Malt Zettl, chairman of the CCC Board of Trustees. 'With his experience as a creative leader. (fie college can look forward to further development of existing programs, and Dr. John Hauser exploration and Initiation of new opportunities. We expect he will serve the college and community well' 'I am honored for the opportunely to build on the remarkable legacy by the predecessors of Carteret Community College; Hauser said. 'Carteret has established itself as one of the stab's foremost comprehensive community colleges, marked by excellence in are and sciences education for transfer students, leadership in scholarship and technical expertise across all disciplines, and an unsurpassed culture of innovation and service in workforce development It provides to support the region's economy. It will be a phvilege to join the Carteret team and community and lead this extraordinary institution.' Hauser earned his Ed.). in Educational Leadership from Appalachian Slate University. lie has spent 19 years In the North Carolina Community Coleco System, with 10 years of administrative responsibilities. He has been a vice president at WCC since 2011. 'John Hauser has made significant conbdbulions to Wilkes Community College and the region we serve" said or, Jeff Cox, N.'CC's president'He has been particularly involved In economic development activities throughout the northwestern part of the state. His latest notable conlnbutions at WCC were In Career and ISfimo u far Imo tllixm9lbna tl or Irclraeed 376�16-233 1rm11(Ndt hv0araslbamSmldlal.mm a m11L4. http://www.j ournalpatriot.com/neNvs/hauser-named-carterct-community-college-presidentJ... 12/8/2017 Coastal Management ENVIRONMENTAL QUALITY 12/5/17 MEMORANDUM TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: ROY COOPER Govc,nor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director lv�� V Georgette Scott Division of Energy, Mineral, & Land Resources Gregg Bodnar Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review Carteret Community College c/o David Cerino Carteret County, 301/303 College Circle, in Morehead City Construction of a mariculture demonstration center Please indicate below your agency's position or viewpoint on the proposed project and return this form by December 26, 2017. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. 50'kf- k S W P011-rrf/� This agency objects to the project for reasons described in the attached comments. SIGNED �� DATE Nothing Compares State of North Carolina I Environmental Quality l Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 252 808 2808 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Carteret Community College c/o David Cerino 2. LOCATION OF PROJECT SITE: 301/303 College Circle, in Morehead City, Carteret County. Photo Index - 2006: 39-8050 grid H-14, grid G- 15,16 & 18 Longitude: 34°43'19.05 Latitude: 76'45'35.81 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit—11/17/17 Was Applicant Present —No Photos Taken — Yes 5. PROCESSING PROCEDURE: Application Received: Officially Submitted: 11/3/17 Complete—11/3/17 Office - MI -IC 6. SITE DESCRIPTION: (A) Local Land Use Plan — Morehead City- Certified 9/28/2007 Land Classification from LUP — Public Institutional/Conservation (B) AEC(s) Involved: E W, PTA (C) Water Dependent: Yes (D) Intended Use: Public/Government (E) Wastewater Treatment: Existing — Morehead City Sewer Planned - None (F) Type of Structures: Existing — research pier, platform and slip with boatlift, riprap, buildings, existing utilities Planned-Mariculture Demonstration Center (G) Estimated Annual Rate of Erosion: N/A Source — N/A 7. HABITAT DESCRI_PT'ION: DREDGED FILLED OTHER (A) Shallow bottom N/A 542 ftz N/A (B) Open water N/A N/A 596 ftz shaded/Inc. (C) High Ground N/A 4,000 ftz N/A (D) Total Area Disturbed 5,138 ftz (E) Primary Nursery Area: No (F) Water Classification: HQW/SA Open: Yes 8. Project Summary: The proposed project is for the construction of a Mariculture Demonstration Center to provide hands on training for the shellfish industry via workshops, seminars, short courses and community college curriculum courses. Field Investigation Report Carteret Community College 301/303 College Circle Page 2 of 3 Narrative Description: The Carteret Community College/Sea Grant project is located at 301 and 303 College Circle within Morehead City, Carteret County. The site is found by following 70 Fast (Arendell St.) towards Carteret Health Care hospital. The college will be located directly across from the hospital entrance along Arendell St. The site location is along the west side of the college property and at the NCSU Center for Marine Sciences and Technology building (301/303 College Circle). The college property is 269 acres (1,171,764s1) in its entirety and 0' to 5' above nhw depending on location and is along Bogue Sound. The upland vegetation mainly consists of lawn grasses and trees. There are wetlands along this area of the property and consist of Spartina alt6niflora, Spartina patens, Jtuicus roemerianus and non -coastal wetlands. ']'here arc existing groins and breakwaters along the property (cove areas) that were permitted in the past. The Division of Water Resources classifies this area as HQW/SA Waters. This area of Bogue Sound is not designated as a Primary Nursery Area and is open to the taking of shellfish. The Morehead City Land Use Plan classifies this area as Public Institutional with Conservation within the AECs. Water depths within this project location are -6 inches nlw/mlw to -1.5' nlw/mlw (field verified), depending on location. The bottom substrate is sand and there are SAV located and marked within the middle cove. The width of the waterbody within this location is approximately 2,800 feet per Google Earth. 10) Proposed Development: Due to the proximity of the CMAST and CCC buildings, easy access, ADA compliancy and existing classroom facilities, the applicants are proposing the demonstration center within this location of the CCC property. The applicants are proposing to construct a covered pavilion area, as well as non -permanent culture gear such as bottom cages, floating oyster bags, floating cages, netting panels, FLUPSY and a floating platform. There would be 4 bottom culture netting located within the most western cove, 9 total locations of floating/suspended gear (4 in middle cove, 3 in most eastern cove and 2 along the west side of the existing pier), 11 total of bottom cages (3 in middle cove, 6 in the eastern cove and 5 along the east side of the existing pier). The FLUPSY would be located along the southeast side of the existing pier (secured to the pier and held in place by anchored with helical screws) as well as a floating platform with gangway along the north- east side of the existing pier. Per the applicant no anchors, riser pipes or bottom culture gear will be placed within 5' of marked SAV. Per the installation specifications for the type of gear (off bottom cages, floating bags, LowproGro cages, Oystube baskets, OysterGro floating cages'), the equipment would be held in place by spans or lengths of rope, pvc risers, weights, rebar or other staking material. All portions of the development would be approximately 1,000 feet from the most eastern riparian access line and a minimum of 15' from the: western riparian access line. The dimension of the gear are as follows; Field Investigation Report Carteret Community College 301/303 College Circle Page 3 of 3 • Bottom Cages: 45.5" Ix 41 w x 25"h with 6 legs • Floating Bags: 40" 1 x. 18" w (w. floats) 12 bags per 30' span (6 bags on each of line) • LowProgro cages: 36" 1 x 24" w x8" h (total of 12 cages per 60' span) •Oystube basket: using 4" sch. 80 live riser 4' above water; 36"1 x 12" h with 12 baskets per 75' span •Protective netting panels: up tp four 10' x 10' panels and 4 each of 4' square mesh bags and cages •Floating platform with gangway: 7' x 20' platform with a 4' x 20' gangway •Flupsy: 12' x 24' but can be configured to a 10' x 20' if necessary To accommodate outside training, the applicants are proposing a covered pavilion area (includes pumps and 3000 holding tanks over existing impervious) within the existing aquaculture : equipment areaThe pavilion would be 40' x 70', located over existing impervious acid 30' to 50' landward of normal high water. A total of 16.16% of impervious surface would be covered within the AEC. The existing impervious coverage is unknown for the entire tract. 11. Anticipated Impacts: The proposed development would shade and usurp 542sf of shallow bottom habitat, 596 sf of open water and grade, fill and disturb 4, 000 sf of high ground. Because all proposed development is located within the existing pier location as well as cove areas, there should be no navigation issues. Name: Heather M. Styron Date: 11/30/17 Office: Morehead City e DCM MP-1 RECEIVED APPLICATION for Nov ® 3.2017 Major Development Permit DCM- MHD CITY (last revised 12/27106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Nano (if applicable) Carteret Community College Bogue Sound Shellfish Aquaculture Demonstration Center Applicant 1: First Name MI Last Name John Hauser Applicant 2: First Name - MI Last Name David Cerino If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City Stale 3505 Arendell St Morehead City N.C. ZIP Country Phone No. FAXNo. 28557 USA 252-222-6114 ext. - - StreetAddress(if different from above) Cily Slate ZIP 301 College Circle Morehead City NC 28557-',"'" Email cerinod@carteret.edu 2. Agent/Contractor Information Business Name North Carolina Sea Grant Agent/ Contractor 1: First Name Charles MI R Last Name Weirich - Agent/ Contractor 2: First Name MI Last Name Mailing Address 303 College Circle PO Box City Morehead City State NC ZIP 28557 Phone No. 1 252-222-6314 ext. Phone No. 2 - - ext. FAX No. Contractor # Street Address (if different from above) city State ZIP Email crweiric@nesu.edu <Form continues on back> 252.608-2808 .. 1.888-4nCOAST .. www.ncconstnimanagament.net Form DCM MP-1 (Page 2 of 6) , APPLICATION for Major Development Permit r 252-808-2808 .. 1-888.4RCOAST .. www.ncconstalmnnagement.net Form DCM MP-1 (Page 3 of 6) , 1 7 NOV,O 3.2017 APPLICATION for Major Development Permit 3.: Project Location County (can be multiple) Street AddressE)CM Slate Rd. # Carteret 3011303 College Circle Subdivision Name City State Zip N/A Morehead City NC 28557 - Phone No. Lot No.(s) (if many, attach additional page with list) 252 - 222 - 6114 ext. , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project While Oak Bogue Sound c. is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site, ®Natural ❑Manmade ❑Unknown Bogue.Sound e. Is proposed work within city limits or planning jurisdiction? L If applicable, list the planning jurisdiction or city limit the proposed NYes ❑No work fails within Morehead City $, $ite Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 2,665 1,171,764 ' c. Size of Individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or N/A, I I NWL (normal water level) (If many lot sizes, please attach additional page with a list) 0-5' ❑NHW or NNWL e. Vegetation on tract Uplands on site are mostly maintained grasses with areas of gravel and concrete. Wetlands along the shoreline contain wax myrtle, ground bushes, weeds, and grasses. , t. Man-made features and uses now on tract Education facilities owned and operated by Carteret Community College and NC State University g. Identify and describe the existing land uses adiacent to the proposed project site. NC Division of Marine Fisheries Headquarters (east) and private residence with pier (west). . h. How does local government zone the tract'? i. Is the proposed project consistent with the applicable zoning? Op (Attach zoning compliance certificate, it applicable) ®Yes ❑No ❑NA I. Is the proposed activity pan of an urban waterfront redevelopment proposal? ❑Yes NNo' k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes NNo ❑NA If yes, by whom? I. Is the proposed project located In a National Registered Historic District or does it involve a ❑Yes NNo ❑NA National Register listed or eligible property? <Form continues on next page> 252-808-2808 .. 1-888-4RC OAST ., www.nceonstalinanagement.net Form DCM MP-1 (Page 4 of 6) APPLICATION for Major Development Permit m. 0i Are there wetlands on the site? ®Yes ❑No ti) Are there coastal wetlands on the site? IDYes ❑No ff) If yes to either (i) or (if) above, has a delineation been conducted? ❑Yes NNo (Attach documentation, i/ available) n. Describe existing wastewater treatment facilities. Wastewater is captured and processed by the Morehead City sewer system. o. Describe existing drinking water supply source. Drinking water is provided by the Morehead City water distribution system. p. Describe existing storm water management or treatment systems. Stormwaler treatment via wet detention and infiltration. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ®PubllclGovernment ❑PrlvatelCommunity b. Give a brief description of purpose, use, and daily operations of the project when complete. The purpose of the proposed Shellfish Mariculture Demonstration Center is to provide a site for hands-on training of entrepreneurs and existing shellfish producers. NO Sea Grant is partnering with COG in development of the demonstration center and the educational focus will be on how. to properly site, build, and manage a shellfish farm using best practices, thereby supporting development of shellfish mariculture in the state. The demonstration center will also serve as a site to conduct ongoing experiments to help develop best management practices for the industry including evaluation of various culture gear types, shellfish strain performance, stocking and culling strategies, mitigation of biofouling, and evaluation of native shellfish species with potential for culture in NO. Daily operation of the center will involve maintaining and managing culture gear and livestock. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where II is to be stored. The long term plan for the in -water portion of the site is to install non -permanent structures (anchor screws and PVC pipe risers) for support of various water column culture gear types. In addition, installation of non -permanent bottom culture gear including netting, mesh bags, and cages is planned. Shellfish culture activities will be supported by construction of a covered area on land (Aquaculture Pavllllon). Access to the water will be improved by a gangway and floating dock installed adjacent to the exiting pier. Please see attached project narrative for details. d. List all development activilles you propose. 1. Construction of a T wide by 20' long aluminum gangway and a 7x20' floating platform. 2. Construction of pavilion and stormwater harvest system. 3. Installation of shellfish culture gear. 4. Deployment of a Floating upweller system e. Are the proposed activities maintenance of an existing project, new work, or both? New work. f. What is the approximate total disturbed land area resulting from the proposed project? 4,000 ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state, Two water streams exist that are discharged into Bogue Sound through a pipe located under the existing pier. 1. A raw water system that feeds flow -through tanks, primarily for shellfish. This water is discharged into Bogue Sound after a single pass through the tanks. 2. Water from the Carteret Community College Aquaculture teaching facility (Howard Building) floor drains, This includes discharge from Flow -through and recirculating aquatic animal systems. Less than 100 Ibs, of feed is used by the entire facility in a typical year. Olherwaterdischarged in this stream is freshwater used to wash equipment. 252-808.2008 .. 1-888.4RCOMST .. www.nccoastal me nayemen (.not Form DCM MP-1 (Page 5 of 6) wastewater or a RECEIVE® NOV2017 APPLICATION for Major Development Permit If yes, will this discharged water be of the same salinity as the receiving water? []Yes [:]No ®NA j. Is there any mitigation proposed? []Yes ❑No ®NA If yes, attach a mitigation proposal. <Form continues on back> 6. 'Additional Information In addition to this completed application form,, IMP-1) the (ollawing items below, If applicable, must be submitted in order for the application,.. . package to be complete. Items (a) -. (8 am aAvays applicable to any major development application. Please consult the application instruction booklet on how to prope{iy'prepare the: required items Getow. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-secllonal drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly Indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days In which to submit comments on the proposed project to the Division of Coastal Management. Name NC Riwsion of Marne Fisheries ' Phone No. 252.726-7021 Address 3411 Arendell St. Morehead City, NC 28557 . Name Albert and Made Libby Phone No, 305-238-0324 Address 147 Banks St., Morehead City, NC 28557 -Name ..... _.:., :- .: .... ...:.rPhone No': Address .:. g. A list of previous state or federal permits Issued for work on the project tract. Include permit numbers, permittee, and issuing dates. NC Coastal Stormwater Permit No. 960424 CAMA 143-97 h. Signed consultant or agent authorization form, If applicable. I. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlel areas. (Must be signed by properly owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10). if necessary. If the project Involves expenditure of public funds or use of public lands, attach a statement documenting compliance Win the North Carolina Environmental Policy Act. 7. Certification and Permission to, Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date 08/ /17 Print Name John Hauser Signature —• r�... 252.808-2808 .. I.888.4RGOAST .. www.neconstalmanagement.net Form DCM MP-1 (Page 6 of 6) 1 1 1 APPLICATION for Major Development Permit Please Indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ®DCM MP-3 Upland Development ®DCM MP-4 Structures Information 252-808.2608 :. 1.888.4RCOAST :: www.nccosstalrnnna0oment.net RECE ED Form DCM MP-3 NOV;® 3. 2017 UPLAND DEVELOPMENT pp (Construction and/or land disturbing activities) ®CM- MHD CITY Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERALa UPLANDDEVELtOPMEItTv, "� vv .:,„� , ,yl,ky 3r r H r a - ti5h 0. 4i isi,i ..s�`'.'; a. Type and number of buildings, facilities, units or structures b. Number of lots or parcels. proposed. Demonstration pavilion (structure over aquaculture equipment) c. Density (give the number of residential units and the units per acre). nla If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (1) if applicable, has a sedimentation and eroslcn control plan been submitted to the Division of Land Resources? []Yes ❑No ®NA (u) If yes, list the dale submitted: g. Give the percentage of the tract within the coastal shoreline AEC to be covered by Impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways w parking, 16.16% I. Give the percentage of the entire tract to be covered by Impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. unknown - multiple permitted stormwater Irea'Iment systems on -site j. Describe proposed method of sewage disposal. none proposed or needed for this project Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, Industrial/ commercial effluent, 'wash down" and residential discharges). Two waterstreams exist that are discharged Into Bogen Sound through a pipe located under the existing plar. 1. raw water system a foods flow -through a i t�maTor shellfish. This water Is discharged Into Bogue Sound after a single pass through the tanks. d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. 4,006 sf 2. Water from the Carteret Community College AgdaculLure leaching facllty (Howard Building) Moor drains. This Includes discharge from flow -through and redralating aquatic animal systems, ess than 10o lbs. of race is uses Dythe entire facility in a typical year. Other water discharged In this stream Is freshwater used to wash equipmenL f. List the materials (such as marl, paver stone. asphalt, or concrete) to be used for Impervious surfaces. only the structure over the aquaculture system proposed h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. (1) Has a site development plan been submitted to the Division of Water Quality for review? []Yes ❑x No ❑NA (if) If yes, list the date submitted: k. Have the facilities described In item (1) received state or local approval? ❑Yes MNo ❑NA II yes, attach appropriate documentation. m. Does the proposed project Include an Innovative stormwater design? ®Yes ❑No ❑NA If yes, attach appropriate documentallon. Rainwater harvesting for reuse 252-800.28082:: 1-880.4RCOA5T :: wevvi.necoastaimanagemont.net revised: 12126106 r Form DCM MP.3 (Upland Development, Page 2 of 2) m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) _public system by Town of Morehead City o. When was the lot(s) platted and recorded? n/a n. (I) Will water be Impounded? ❑Yes ®No []NA (it) If yes, how many acres? p. It proposed development is a subdivision, will additional utilities be Installed for this upland development? ❑Yes []No (]NA 252-808.2808::1-888-4RCOAST:: www.nccoasialmanagement.net revised: 12/26106 Form DCM MP-4 (Construction within Public Trust Areas) Nov.® 9. 2017 DCM- MGM® CITY Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of (he Joint Application that relate to this proposed project. ?lease Include all supplemental Information. a. (I) Is the docking facllitylmarina: ❑Commercial [EPublictGovernment ❑Pri✓ate/Community c. (1) Dock(s) and/or pier(s) (H)Number 1(gangway) (ili) Length 20' (iv) Width 6 (v) Floating ❑Yes ❑No e. (1) Are Platforms included?(Yes ❑No If yes: (it) Number (iil) Length 20' (iv) Width 7' (v) Floating ©Yes ❑No Note: Reeled areas are calculated /rom dr(pline dimensions. g. (1) Number of slips proposed 0 (It) Number of slips exlsting 1. Check the proposed type of siting: ❑ Land out and access channel []Open water; dredging for basin and/or charnel ®Open water; no dredging required ❑Other, please describe: k. Typical boat length: We m. (i) Will the facility have tie pilings? ❑Yes ®No (11) if yes number of tie pilings? b. (I) Will the facility be open to the general public? ❑Yos ®No d. (1) Are Finger Piers Included? ❑Yes ❑x No If yes: (it)Number _ (iil) Length (Iv) Width _ (v) Floating []Yes ❑No f. (1) Are Boatiifts included? ❑Yes QNo If yes: (11) Number fill)Length _ (iv) Width h. Check all the types of services to be provided. No ❑ Full service, Including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ('/vet slips") only, number of slips: _ ❑ Dry storage; number of boats: _ ❑ Boat ramp(s); number of boat ramps: _ ❑ Other, please describe: I. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). nla I. (1) Will the facility be open to the general public? []Yes I]No 252-808-2808 :a 1-888-4141COAST :: www.necoastalmanagement.net revised: 12/27106 Form DCNI MP-4 (Structures, Page 2 of 4) a. Check each of the following sanitary facilities that will be Included in the proposed project. NIA ❑ Office Toilets - ❑ Toilets for patrons; Number: Location: ❑ Showers ❑ eoatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. NIA c. Describe the disposal of solid waste, fish offal and trash. N/A d. How will overboard discharge of sewage from boats be controlled? NIA e. (1) Give the location and number of "No Sewage Discharge" signs proposed. NIA (11) Give the location and number of'Pumpout Available' signs proposed. N/A I. Describe the special design, If applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. N/A g. Where will residue from vessel maintenance be disposed of? N/A h. Give the number of channel markers and `No Wake" signs proposed. N/A I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? NIA I. If this project is an expansion of an existing marina, what types of services are currently provided? NIA 252.808.2808 :: 1-888.4RCOAST :: vvww.nccoastalmana(lement.not revlsed: 12/27/06 m ECE @9 E® FOYIYt DCM MP-4 (Structures, Page 3, of A) m. Is the marinaldocking facility proposed within a primary or secondary nursery area? NOV 'O 9, 201! ❑Yes ©No n. Is the marinaldocking facility proposed within or adjacent to any shellfish harvesting area? ®CM- M H ® CITY CITY ElYes ❑No o. Is the marinaldocking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL []None p. Is the proposed marina/docking facility located within orvdthin close proximity to any shellfish leases? ❑Yes ❑x No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. a. (1) Is the boathouse slructure(s): ❑Commercial ❑Public/Government ❑Private/Community (ii) Number - (iii) Length (Iv)Width Note; Roofed areas are calculated from driciine dimensions. ASS tell 1S V- �} +'r� r7x t �i� as f avlF x 3 4+rGROINr (e g��w,00d'xheefpllk„'efc� I/lardek groin usd.MP 2 sExcafvat(On fa�rjd F(II )tit 5 � 7� �<it, 4� dty�®Th/$ �sechop ndt�apphcable�a a. (i) Number (d) Length (iii) Width a. Length _ c. Maximum distance beyond NHW, NWL or wetlands a. Is the structure(s): []Commercial ❑Public;Government ❑PrNate/Community c. Distance to be, placed beyond shoreline __ Note: This should be measured from marsh edge, ifpresent. e. Arc of the swing b.. Average distance from NHW, NWL, or wetlands b. Number d. Description of buoy (color, Inscription, size, anchor, etc.) 252-808.2808 :: 1.888-41RCOAST :: www.necoastaimanagement.net revised: 12127108 Form UCM MP-4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines 700' west; 1500' east Note: For buoy or mooting piling, use arc of swing Including length ofvesseL c. Width of water body 0_5 mile e. (1) Will navigational aids be required as a result of the project? ❑Yes ❑No ❑x NA (II) If yes, explain what type and how they will be Implemented. a. Give complete description: 1. Construction of a 5' wide The long term plan for the In -water of the site Is to Install a 7x20' b. Proximity of structure(s) to adjacent docking facilities. 850, west; 1500' east d. Water depth at waterward end of structure at NLW or NWL unknown water will be improved by a floating dock Installed adjacent to the exiling pier. structures (anchor screws and PVC of various rages for iss to the 252-808-2808 :: 1-888.4RCOAST :: wuvvvnccoastalmanagement.net revised: 12127/06 CARTERET COMMUNITY COLLEGE/NC SEA GRANT SHELLFISH MARICUI.TURE DEMONSTRATION CENTER RECEIVED PROJECT NARRATIVE NOV O 3 Z017 Primary Applicant: Dave Cerino, Carteret Community College Agent: Chuck Weirich, NC Sea Grant ®CM` MH® CITY Background: In 2015, Weirich and Cerino, along with Ami Wilbur and'froy Alphin of UNCW developed a proposal entitled "Expansion and Diversification of the North Carolina Shellfish Aquaculture Industry' that was submitted to the NOAA Aquaculture Extension and Technology Program. The proposal was successful and funds were received to initiate work that involves comparison of oyster gear types and different native oyster strains at industry partner sites, evaluation of sunray venus clams as a means to diversify the industry, and establishing shellfish mariculture demonstration centers at UNCW and at a site on Bogue Sound shared by NCSU CMAST and CCC in Morehead City. 'Permitting is being requested for the latter component of the parent project. Permitting for culture activities was initially sought via a research lease through NCDMF, however due to the presence of SAV on the site it was deemed necessary to seek CAMA permitting. Purpose: The purpose of the proposed shellfish mariculture demonstration center is to provide a site for hands on training of entrepreneurs and existing shellfish producers via workshops, seminars, short courses, and community college curriculum courses. NC Sea Grant will partner with CCC in development of the demonstration center and the educational focus will be on how to properly site, build, and manage a shellfish farm using best practices, thereby supporting development of shellfish mariculture in the state. The demonstration center will also serve as a site to conduct experiments to help develop best management practices for the industry including evaluation of various culture gear types, shellfish strain performance, stocking and.culling strategies, mitigation of biofouhng, and evaluation of native shellfish species with potential for culture in NC. Shellfish mariculture demonstration centers are critical to industry development and several state institutions have established centers including Auburn University and Louisiana State University (Figure 1). Site description: The proposed site consists of a 26.9 acre parcel of land containing the Carteret Community College (CCC) Campus and the North Carolina State University Center for Marine Sciences and Technology (CMAST). CCC and CMAST maintain two adjacent Research Sanctuaries, located on Bogue Sound and the ICW with a total acreage of approximately 0.6 acres (Figure 2). The site includes a research pier and associated infrastructure and 2.5 coves with constructed tombolos. Sediment samples from 10 locations in the research sanctuaries were obtained in 2015 and submitted to the University of Florida for analysis, revealing predominately sandy bottom with some loamy sand bottom which are suitable for bottom clam culture. Depth at the site ranges from 0 in on the northern edges of coves to approximately 10 in at the southern border of the site proximal to the ICW. There is considerable current at the southern edge of the site. Salinity ranges from 28 to 34 ppt. There is SAV present in one of the coves of the site (Figure 3). Dr. Dave Eggleston of CMAST has characterized and marked existing SAV growth. Site attributes: Because the proposed demonstration center is located adjacent to CMAST and CCC, the site will be accessible without the need for a vessel. In addition, the site is ADA compliant with classroom facilities in place that will facilitate meeting and educational opportunities. Also, as part of the grant from NOAA, CCC received funding for the construction of a covered pavilion next to the demonstration site which will be incorporated into training activities. The site is suitable for deployment of water column as well as bottom culture gear and the presence of SAV would allow collaborative research to be conducted with Dr. Eggleston to evaluate SAV/shellfish aquaculture interactions. Site plan and gear deployment: The long term plan for the site is to install non-pernment structures (anchor screws and PVC pipe risers) for support of various water column culture gear types. In addition, it is planned to install non -permanent bottom culture gear including netting and mesh bags and cages for clam culture. No anchors, riser pipes, or bottom culture gear will be placed within 5' of SAV areas and no water column culture gear will be placed above SAV areas. .An initial plan for the layout of gear types on the site is shown in Figure 4. Please note that this is only an initial suggestion and gear and associated structure will be placed according to permit guidelines, if approved. Initially, the following oyster culture gear types are proposed to be deployed: off bottom cages (Figure 5), floating bags (Figure 6), LowProGro® cages (Figure 7), Oystube® baskets as part of a long -line culture system (Figures 8 and 9) and OysterGro® floating cages (Figure 10). As described in Figures 6-8, spans or length of rope or line supporting floating or suspended gear will range from 30 to 75'. Anchor screws will be twisted fully into the bottom manually and PVC risers will be jetted in via water pump. For clam culture, deployment of protective netting panels, mesh bags, and mesh cages is proposed (Figure 11). These gear types will be secured to the bottom with weights, rebar, or other staking material. Access to the CMAST cove with SAV will be allowed only through a single marked pathway to avoid foot traffic through the SAV. Access to the portion of the site close to the research pier will be improved by the addition of a floating dock with gangway (Figure 12). The bottom underneath this proposed location is sand with some rocks, no vegetation is present on this part of the site. To support the shellfish culture activities on the site and demonstrate shellfish nursery techniques, nursery tanks will be maintained within the pavilion area and a Floating Upweller System (FLUPSY) (Figure 13) will be deployed on the East side of the pier. Research on the use of tidal flow to support shellfish growth within the FLUPSY will be evaluated. The FLUPSY will be secured to the pier and the East end will be anchored with helical screws. Access to the floating platform will be gained from the pier. Additional nursery facilities and workspace will be sheltered by the construction of a demonstration pavilion, an open sided covered area located between the Howard Building and the Shoreline (Figure 14). A Stormwater Management Permit Application has been submitted to NCDENR for this project. Environmental monitoring: Salinity and water temperature of the site will be monitored daily. As part of the NOAA grant monthly assessment of primary productivity of the site will be conducted through chl a measurements: In addition, Dr. Eggleston will continue regular sampling and assessment of SAV. Storm and hurricane plan: The: site will be managed according to CMAST and CCC storm and hurricane policy.. If deemed necessary, gear and associated structures will be secured or removed to prevent loss as well as marine debris. RECE ED NOV A3 2017 DCM- MH® CITY Figure 5: Diagram of proposed off -bottom cage deployment (L) and photo of individual cage with mesh bag inserts (R). Dimensions of cages are 45.5" L x 41" W x 25" H with 6" legs. Figure 6: Diagram of proposed floating bag deployment (L) and photo of individual floating bag (R). Dimensions of bags are 40" L x 18". W including floats. A total of 12 bags will be deployed per 30' span (6 bags on each side of line). RECENED Nov.® 3 2017 DC"tVj- MHO CITY Figure 7: Diagram of proposed LowProGro ° deployment (L).and photo of individual cage (R). Dimensions of cages are 36" L x 24" W x 8" H. A total of 12 cages will be deployed per 60' span. 4" sched 80 PVC riser (extending approx. 4' above water surface Screw anchor Plastic -coated metal tension line Figure 8: Diagram of proposed Oystube° basket deployment using a long -line suspension system(L) and photo of individual basket (R). Dimensions of baskets are 36" L x 12" H. A total of 12 baskets will be deployed per 75' span. FaSCE J C7 NOV 13 2017 DCM- MHD ClJTY Figure 10. OysterGro floating cages are increasingly popular among NC oyster producers but their use has not been evaluated with respect to production capacity and biofouling control strategies. Left, oystergro.com illustration showing feeding and air exposure placements, Right, OysterGro floating cages deployed at an NC industry partner site µREC NED NOV :0 3 2017 DoWj= MHO CITY ibrY ineimd a`6'_3 Lkhgft ire PWfUR Doti L[ Lord 30 b"Ift f/'.WT1C�=�Yctd�'1 Peck2a2edSis�tue"_I`c Auen atistii.-xl EZ ibh lxi mtci:�tt�icci 1 yc�.c rddr cssvcdh'�-m'sd .,•. efE2P kNvSs2st6r==,�. --�-�sariam:cNa` Figure 12: Schematic of proposed -floating dock with gangway ® aL muxw�..ae.m' surc,xr DimTuor2;ame: osa rnam 3 Drava x:nC Date% DQ"G Kaiae: rm_emxiwun. FZDock:!cc. 873 =asa',#M 50. .Mc tdimomi 65703 General Notm 1 rybL"y uN eI.It4ti 4M W'ue c w Y U.l� �..� Owwd�aMryYc. t1304 Y. �.u.vY/� ra...vNYr wi6my�Y b W Yr�liy s mytr� YL ws�+csv. r:Ya�n.�amv.+v YQ4a tvc•yc. Qa.v.CafOe•. ,i..Wwm RECE ED OVA 3 2017 DC M- MHU CITY Figure 13: Diagram of a Tidal Floating Upweller System s { t ! �il � MPS � BTOFlISNTRA N.iA 9tri/�1 OP HOWAnD WIW Ki uaFE4Ei CGtdM�NITY CO}1EGE !t UII I) Preliminary Drawings Not For Construction Figure 14a: Location of Demonstration Pavilion (Yellow) and rainwater storage tanks (blue) that will be used for stormwater management RECEIVED Nov .0 3 2017 DCM- MHD CITY EXISTING HG6APD BUILDING :NTAKEEdASLHESE SYSTEM .' WATER8 -�- ` ^: - e • ' DIAL 3000 GALLON ____ PROPOSED ' LOA c TION HOLDING TANKS A J ': ---� / B Figure 14b: Inset of 14a Location of Demonstration Pavilion (Yellow) and rainwater storage tanks (blue) that will be used for stormwater management Work Plat .w.cLLTME sNEETEe.oW Im so 0 mo 200 5CALE:I'- 100' MAP LAMA DATA ¢NER6E 6RE E.11.1. IVAK 19..69E IF RvaxpilEW T1 Iv III I W e�TN IN IS 6EC — )0.91] 51 RPEPVIWS NEROVEO vial uvEPVeIaSER 6iMIN115'1E1 ]I..Se Si KKEITRINAVIWS Nov.® 3 2017 ®CM- MHD CITY SOUTH OF HOWARD BUILDING - CARTERETCOMMUNITY COLLEGE :oeEs 11. e1;. .11 Nc IIT w' ti,zt,u i4xt•4P � Y54+ 1 l EXISTING `�`x '. 3T'��• HOWARD BUILDING E4 , bh Er'•GENERdroR VIEW OF THE EAST SIDE OF THE^ ;TU REMd IN MECHANICAL BUILDING AND EXISTING CONCRETE BASIN - lul ' -,••, ' " SdNOT{RER 1-E%.LIGW LpcdTEq pOHE:, t'QNC :.::' '. v,•, .• ... (x RETE e9G IM ^!1t, '1 3 E NECHPNI CAL { ?� ev: R COMCRFTg- 51N TO CA A, 90G GER. 1•� ;::LI•': '1.1•� "Ew.ELEVATED SEA.IgJE4—`'• NT REMd -N E EE T- YSTEM •I''•,p _ _ 1 R 111 _ ____ •- PNK __ _ _ 0• ------------ BOGUE SOUND MEvl$l e l SOUTH OF HOWARD BUILDING CARTERET COMMUNITY COLLEGE 1RTERET YCIMPTY. .11w YITY si cE5 T". W�ciEci .ISK 3lHIE4[ 10 5 0 10 20 vuE STROVUZBNGINHH0.INO.PA ' SCPLE:1•=10' wzm.rnm i 1-1. BOGUE SOUND DESIGN FILE SxEt IEP.MM BOGUE SOUND RECENED NOV.©322017 ®CM— M D CITp STTORMWATER DATA o6vogS .€::IN.Y,,,E NLq :.., IF SOUTH OF HOWARD BUILDING CARTERET COMMUNITY COLLEGE IN CAPN)L IN' wecx ni¢c� o Lx [�[i. it i Eii]61t.••1u[EiEz11 .n' -..- -_-. .. .. ...- ..... Y 1 y is�o - _. - -- _ T.. — r - ---.. EA Ap _�. -.. - - - .wa. ,.., ....E. SECTION A —A :o....__....______._._..............--- _._.. _.-._......-. SOUTH OF HOWARD BUILDING CARTERET COMMUNITY COLLEGE W.IEssir [AII sue U [Ili']i'c 3e]]i[tE E STROVD HNDINHHRIYV.PA �� y �mmmr r.n i�d5r n aac O.t r D.NI.,iaxeA rUATE O� Real E�kte NORTH UROLIM, CITE The forogojfl� Exr,cr T�.y INA ofts. Is (are) certified Ir. I)t coned. sented for registration and recorded in this office in rdr— 'N A�E at &±00V4 Am. Fa This day o 19 0 Sh aron Pirter rate" Is wi Deputy mer.1dirg Mrs, Dealt vus P., I. Tax Lot No . .......... ..... .......... .......... ............. ........... ............ Parcel Identifier No... 13-14—F-4-22 ..... ................... ................................ . ........... Verifiedby ...... ... ............... ........ . . ........... County on the ......... day of . ................... ........... .......... .... ...... .... 17............ 1. SI by ...................... ................. ......... ... .................... ........... ....... .......... .......... ................. .............................................................. Mail after recording to . . . ..... .... . .. . ... ......... .. .. .. ....... ................................... ............................. ................... . ....... ..... ............ . ... ...... ................. ....... ... ................... ...... ........... ........ This instrument was prepared by Raleigh, NC 27602 .... ................... Brief description for the Index 12 tracts Morehead Township NORTH CAROLINA GENERAL WARRANTY DEED THIS DEED made this ... day of ... ....... Auqu st ........... .......... .. . ....... by and between GRANTOR GRANTEE Standard Products of North Carteret Technical College Carolina, Incorporated 3505 Arendell Street Morehead City, North Carolina, 28557-2999 Erkr In appropriate bbrU for c.0h 1slIY: sona, ruldrs., and, II appropMak, of runny, e.,, clrp.r.n.. or .d.r,,hIv The doodgmition Grantor and Grantee as used herein shall Include said parties, their hofre, aucaeesore, and resigns, and shall include singular, pi - oral, maicullueJerninina or-nauti�i as.,required by cents WITNESSETH, that the Grantor, for 4'"lunble consideration paid by the Grantee, the receipt of which is hereby acknilwledj6d, has end by these presents does Kralt; bargain, sell end convey unto the Grftntie iA fee simple, all that certain lot or parcel of land situated In the City or KU!��PFI4 .... ........... .. .......Moreh........ .... To .. ihbip, ...... ...... . .. County, North Carolina and more particularly described as follows; See attached Exhibit A.*- N.C. Bar Aeve. Vol. ae. 3 0 1976, lt"Wd I'll, Work Plat mEET n Ir SCALE:1-- 100' OESIOx FILE x. PUT66-13/PxT66- x ITEP.04x I*j''�!� 0 v��al CAMA DATA RPAQXjWIE LP xc15'E" - 11—IF ]E v1O5 Allxc aV E11xlx 1]'PE[ VEPVI W5 =', cal"I, IV 15 5E[ 1EP1FA1 wExv IE. I6.16s RECOVER Nov .0 3 2017 -SOUTH OF HOWARD BUILDING CARTERET COMMUNITY COLLEGE 1xi EPEI[c PESS: bvLAE 0 [1i1. xI xesfl cxu2: 35S-Iliillx ___ e a � EXISTING HOWARD BUILDING •- ii_ n RE `• ` -- - EXISTING CONCRETE BASIN _ EN�LENEflATOR . I VIEW OF THE EAST SIDE OF THE ___ _ -'/ o wN i �i MECHANICAL BUILDING AND ' , SAND1q LTER A. TO 8€- R tpCAT ,1Q E.A IN E%vyNCRt TE A95 : �� 1 J E IIpECNAN ICAL o. •.:. '. .. r --I '�,-A T '. fCOIFCRjT B%$IN 50 CARA OVR[JI y _I F%.ELEVATED SEAW5 I£R. IIf EMANSCR M .•..' 'I..�. lit •• - .' _ _ ._ ,...._ - N ,. -. _... TOP OF AN_ _ _ - .ice:• ROGUE SOUND REVIz,Ms: _ SOUTH OF HOWARD BUILDING CARTERET COMMUNITY COLLEGE erc.Ee c rGEI [vlir [0.lEtE O IESSi 11. ..1uil .KE3e55r 10 5 0 10 20 HTgOVO BNGINHHRING.PA ^NE SULft 1'=1P mu Egg'O mm.ne v:1r Al - fIZ ST{ORMWATER DATA / 'PEIIITIFIFR61'm ,o nn, ..... E, .�xY� o - . FALL— ROGUE SOUND R V f� BOGUE SOUND WECENL_-. NOV,® 3 2017 10 5 q 10 20 .1 of • I � III SCALE:1'= 10' SOUTH OF HOWARD BUILDING CARTEREf COMMUNITY COLLEGE ,mE"EN ,.. C.xiEUEi [tY0. EL[ " [ lu'[Oxs Fz� .DOP[Ss: IS PE[ COb.:RiPE7. E R .x. x0 �Ex�N�f llv. x[ 551 x'a0va. a[amaxea, c`x . xo.00.., I , "T 11 - - __ 20 __ - - — -- - -- -- -------- - It - ------ It ------------- - --- - -- - -- L .. 6L .... . ..... .. .... A 1.11Al .. I w1AFtIL lo .. ......... .... ... ---- ------- — -------- - -- - - ----------------- -------- ---- -- --- ---------- 7 Z. llll SECTION A -A ........... SECTION B-B 0 SCALE:1­10' --------- -- ID STRUCTURAL 116TRIHALSTER RLELA DDESIGN BY LOCATIONS ONE ARE APPROXIMATE. TANKS TO 51 INSTALLED PER MANUFACTURER REQUIREMENTS AND SHOULD INCLUDE WIND RESTRAINT CABLES. SOUTH OF: HOWARD BUILDING CARTERET COMMUNITY COLLEGE l0Rt$5; 35illlExl R I'll'AT A � "CL qR t _l�illll I.c Alts' 0 sTarg or flORTH CAROUNI, C EPET Real E;kte = Eyc,�c The foregoinp to ti 1 of is (are) certified to in con -ect Misinstru seated for regi$je:ttifni and recorded in this office in Book — This Pa,ffTay of 119 at M—q`i0'c1n1t AM, Sharon Pinter egister y Deputy Rsv.rdln, 71rae, nook and P., Tax Lot No . .......... ....... ........ ...................... .................... .. ......... Parcel. Identifier No. .. ............................ ....... Verifiedby ...... .................. ................ . ............................ County on the ................ day of ......................................................... 19............ A - by...................... ... ... .................................................................... ...... ............................. ...... Mail after recording to ......... . ..... ........ ... ................. , ... .... .......... ...... .......... . ....... ..... ...... ...................... ...................... ............ ga Thin instrument wan prepared by ...... .... Brief dvncrl,tfim for the Index NORTH CAROLINA GENERAL WARRANTY DEED THIS DEED made this ... ;l..... day of ...... AUg.U,S-t ........... ......... ... ....... by and between GRANTOR GRANTEE Standard Products of North Carteret Technical College Carolina, Incorporated 3505 Arendell Street Morehead City, North Carolina 28557-2989 Ind,r In appli,pilittr bl.vU her each .rly: nn-r, address, and, It appropriate, h.rs.iv, of vent, ver,.icail .. .. ... The designation Grantor send Grantee as used herein shall Include said parties, their and assigns, and shall include singular, or. e teli as required b context... ne n u I WITNESSM, that the Grantor, for A "luabbi c.milderation inald by the Qruntiae, the rea6id, of which is hereby acknowledged, has and by these presents does grant, bargain, sell avid eorivivy unto the fivan& in fee simple, all that certain lot or parcel of land situated in the City of ........... 14prehead Morehead ..... ............... ..... ....... P, ........ ...... Township, ........... ........ Canary, North Carolina and more particularly des6 lived a. follows See attached Exhibit A. M Mail-jo.casmer@ncdenr.gov Page 1 of 1 Carteret Community College; Stormwater Permit SW8 960424 Casmer, Jo Wed 11/29/2017 12:49 PM Tojonathandl845@carteret.edu <jonathand1845@carteret.edu>; The Wilmington Regional Office of the: Division of Energy, Mineral, and Land Resources (Stormwater Section) accepted the Stormwater Permit Renewal Application and $505.00 fee on November 29. 2017. The project has been assigned to Kelly Johnson and you will be notified if additional information is needed. Jo Casmer Administrative Assistant for DEMLR/Stormwater Section . North Carolina Department of Environmental Quality Department of Environmental Assistance & Customer Service 910 796-7336 office 910 350-2004 fax io.casmer(a),ncdenr.00v 127 Cardinal Drive Extension Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. https:Houtlook.office365.com/owa/?realm=nc.gov&path=/mail/sentitems 11/29/2017 Completeness Review Checklist Project Name: q' Received Date: Project Location: L Accepted Date: NaJ 2- 17 Rule(s)' �2008 Coastal �1995 Coastal Phase II (WiRO.) Universal �1988 Coastal Type of Permit: New or Mod or PR Existing Permit # (Mod or PR): I (� d�2 [::]PE Cert on File? Density: HD or ID %: OK?) Type: Commercial or Residential FJNCG: r-1Offsite to SW8 Exempt Stream Class: _ El SA Map Subdivided?: Subdivision or Sinzle Lot ORW Map Paperwork Emailed Engineer on: ®Supplement(s) (1 original per BMP) BMP Type(s): �O&M with correct/original signatures (1 on''ginol per BMP except LS/VFS and swoles) ff'A-/pplication with correct/original signature<I1 Deed Corp or LLC: Sig. Auth. per SoS or letter Email Address: [�05 (within 6mo) GP E Email Address: Design Engineer Owner ❑Soils Report with SHWT `I, Note to Reviewer: ❑Calculations (signed/sealed) �No obvious errors "r Density includes common areas, etc Deed Restrictions, if subdivided: MSigned & Notarized Plans �2 Sets Details (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) GradingWetlands: Delineated or No Wetlands Vicinity Map Layout (proposed BUA dimensions) Legend �DA Maps Project Boundaries Is Report ottom isited: Additional Information: Permitted BUA (sf) DA (sf) PP (el) SHWT (el) Depth (ft) SA (sf) Wet Pond Soils Re art �SHWT: II PP: Proposed: Offsite Cert for Master JDeed Rest for Master BUA Permitted (Master): BUA Proposed (Offsite): Proposed: Lot #: Lot # Matches Master sf Proposed: sf Scott, Georgette From: Stephen Sparks <sparkss@carteret.edu> Sent: Tuesday, November 28, 2017 3:48 PM To: David Cerino; Ran Cullipher; Scott, Georgette Cc: John Hauser; Logan Okun; Tracy Mancini, Steven Davis Subject: [External] SW8960424 permit renewal and Modification. CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to report.spam@nc.gov. FYI, Completed renewal permit application and checks for the renewal and modification have been sent over night via FedX. It should arrive tomorrow. Thanks, Steve Steve Sparks Director of Operations and Facilities Carteret Community College 3505 Arendell St. Morehead City NC 28557 Office; (252)222-6087 Fax:(252)222-6077 Privacy & Confidentiality Notice - Email correspondence to and from this address is subject to the North Carolina Public Records Law and shall be disclosed to third parties when required. (N.C.G.S. Ch. 132) Scott, Georgette From: Scott, Georgette Sent: Tuesday, November 21. 2017 10:11 AM To: Ronald Cullipher (rullipher@stroudengineer.com) Subject: Carteret Community College SW8 960424 Ron, In reviewing the application package for this project I found that this permit expired in 2006. This means that this modification can not be completed until the permit is renewed. I have a check here that we can use for a renewal but the problem is that it will only renew it for 8 years (until 2014). So it will still need another renewal to get the permit into compliance and active. So you have a couple of choices: 1. The current check you sent is only good for 60 days which means it will expire 12/4/2017. So if you wanted to use this check for renewal of the permit you would have to immediately send me another check and the renewal application so we can do a double renewal on this project to get it into compliance. Plus we will also need another separate check for the modification. Once the renewals are complete we can do the modification. 2. OR, if you can not get a new check to us before the 12/4/2017 date, we can return the check and you will have to renew and mod later. We will not return the mod package so you can pick up the mod submittal package to submit later. Please let me know what you would like to do. If I do not hear from you before Nov 301h I will have to just return the check . Georgette Scott State Stormwater Program Supervisor Department of Environmental Quality Office (910) 796 7215 Fax (910) 350-2004 Georgette. Scott(a)ncden r. g ov 127 Cardinal Drive Ext. Wilmington, INC 28405 -'-�"Nlothing . .. c Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third patties. • Upload a PDF Filing • Order a Document Online • Add Entity to My Email Notification List • View Filings Non -Profit Corporation Legal Name Carteret Community College Foundation, Inc. Prev Legal Name Carteret Technical College Endowment: Corporation Prev Legal Name Carteret Technical Institute Endowment Corporation Information Sosld: 0024538 Status: Current -Active Annual Report Status: Not Applicable Citizenship: Domestic Date Formed: 2/18/1976 Registered Agent: Youngblood, Kerry L. Addresses Mailing 3505 Arendell Street Morehead City, NC 28557 Reg Office 3505 Arendell Street Morehead City, NC 28557 Reg Mailing 3505 Arendell Street Morehead City, NC 28557 I" ConnectGIS Feature Report Page 1 of 2 AWCONNECTGIS WEB 11051'ING Carteret2 Printed August 10. 2017 See Below for Disclaimer Address Points Parcels - Updated 07-31-2017 F) Centerlines NNCC Railroad Right of Way County Boundary Other County <all othervalues> Cart PIN Acreage I M Parcel Dimensions Lot Number 1:120� ECEIVE https://carteret.connectgis.com/DownloadFile.ashx7i=_ags_map7223OfD2b9a94af6bbee2f .. 8/10/2017 CoruicctGI S Featurc Report Page 2 of 2 357 1292240 MOREHEAD CITY 3272864 FIRE DISTRICT PDOT 573 MOTHER PRID 0 13014FO422 OWNER D OOK CARTERET COMMUNITY COLLEG� 544 CURRENT' DEED DATE CE 0 0 STRUCTURE VALUE 1954700 MAILING ADDRESS HOUSE NUMBER 3505 MAILING ADDRESS STATE NC CITY LIMIT MOREHEAD EAD CITY LEGAL DIESCRIPTION CARTEREr COMMUNITY COLLEGE TOWN OF MOREHEAD CITY ACREAGE BANKS STREET ROLL TYPE E HOUSE NUMBER (7 Digits) 0000000 APT # PLAT BOOK 0 OTHER VALUE 25924 MAILING ADDRESS DIRECTION MAILING ADDRESS STREET ARENDELI. ST MAILING ADDRESS ZIP 28557 NEIGHBORHOOD CODE 510022 TOTAL ACRES 4.48 YEAR BUILT 2005 BATHROOMS 0 STREET NAME CITY PLAT PAGE 0 rict aicuz RISK LEVEL L http://tax.carteretcouiitygov.org/acui z.asp? NOISE LEVEL pid=637618310573000&risk1=&nois el= OBJECTID 1 29696 ormation displayed by this website is prepared for the inventory of real property found within this jurisdiction and is compiled from recorded deedsplats, and otI records and data. Users of this information arc hereby notified that the aforementioned public primary iNormation sources should be consulted for verification carnation contained on this site. Carteret County assumes no lagal responsibility for the Information contained on this site. Carteret County does not guarantee if to and map serviceswill be available to users without interruption or error. furthermore, Carteret County may modify or remove ntap services and access methods littps://cattcret.comicctgis.com/DownloadFile.aslix?i= ags map72230fb269a94af6bbec2l'... 8/10/2017 r 1A,E 0, Ra,l Eel„lc — weals a 5 0. Do -es i I n, I F.reL[eJTar MOM C1901-11I4, MTEREf CQ The foregoing cr, t "cn:^(s) of S (NL is (are) ct rtiEed 1c h: correct. This instrum pl vlas pre seated for regisir: t o.^. and recorded in this spice in OnO�(��_ Pay,B)_ This � day afll..(( 9u�, , 19 � at Mo0'clooh re I Sharon Piper ASs t Deputy Necardleg Tdmq Flask and Page NORTH CAROLINA GENERAL WARRANTY DEED THIS HEED mode thin ..... l..._ day of .._....... Mugu G.k.... ...._............ 19. U.G. ..., by and between GRANTOR GRANTEE Standard products of North Carteret Technical College Carolina, Incorporated 3505 Arendell Street Morehead City, North Carolina 2a557-2999 rater in apnrsnrlalr Mues far such psrlr: same, addrrs:, end, 1I e- m elaie, ebaraelrr, ar array, e.q, car9,snllau or ymtn.rAl, The dasignelion Granter and Grantee as used hon:in;shall include meld parties, their hairs,.succaesors, and assigns, and shall include singular, plural,'�r asculinu, -.feminine or neuter ss, required by cantex0.., — WITNESSMI, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant; bargain, sell and convey unto the preforms in fee simple, all that certain lot or parcel of land situated in the City of ..:....._IAopehead : _Ngreliead... , ,,,; Tou.u,hip, _... County, North Carolina and more particularly described as follows: . See attached Exhibit A. NA nn Auoc Farm No.1 n 191 a. llrv'.d I'll. RECEIVE OCt 2 7 2�' 1 The property herefnahove described was acquired by Greater by instrument recorded in A map showing the above described properly is recorded in Plat Book .-.. - ..................... Doge....................., TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee dimple. And the Grantor covenants with the Grantee, thld. Grantor is seized of the premises in fw: simple, has the right to convey the time in fee simple, that title is marketable null free and clear of nil encumbrances, dud that Granter kill wan'nnt and defend the title against the lawful Claims of all persons whomsoever excapt far the exceptiats hereinafter stated. Title to the property hercinabove described in subject to the following exceptions: Subject to the right of way of the spur track of Atlantic & North Carolina Railroad Company as set out in (look 18, page 11, and the right of way of the State Highway Commission; and casement to Carolina Telephone & Telegraph Company recorded in Book 180, page 155; all in the Office of the Register of Deeds of Carteret County. as Wit.... IVNeneoYu We enter., be, nn..... net his "coastal ...1. s I, ryont,. hasearnedthis an ::meat to oe dined In Ill �beva alltlt4:m0 by It, duly a armuned Nlma ne 11, nett (o ne forensic Marco by . ah.dlr .1 la IN t INI- oo, tea. a.r and year neat Standard. Products of North :Carolina, T c. Neme1 L(/ ? . .__.. _._,�yl.• •------------- Air". y 'e orate soon ,✓Wi --(sent' hoary Public at (lit County and emte.tmenla. rarity mat \ �q i mswanr star ...ea before eat ads day one ae rsowledtad the eXamtlon of the rmeeolnr Instrument. wllnnt toy a nova ..it .rode a.mv .r .eel, era. .: ..__ der or ..__._ __...._...._.... es:..._. ,MY e.mmillon explra: ... x. ------ .. .. ... .. . Net;" Puhllc __// naAUBTAMY Na�LL4:Al1LMfM- (`D- O/f 4l0"Q .. _Cash, •lam �% / a able, Puhue of the County And State .fnmaa, easily ma 1!_[Rl✓.ec.. AV ( u.✓_--_, pmonallY came before TO this aq ..n(a.(Atxnowleate,l Cast --A na In .... ..------ ...:Y�1_G_/.. secretary ear ;; Sf9Nl(odylP66.d��Za� :Oa I:L_C!fjfd A_wMJ_' Is NmIh Cnmun, eoryoutam' and tul by anlhonfy ay,Y Wor ...a a is, nd of the wlfenaunn, are mretmaa mtlmmm<vae arum Mac L.me.by Its ----- .......... m Srealaenl, scads with Its eoryomt< sail and otk:lee by _._........ v� Il_ ___________________________ aecaeurY." v : Wllneu my hand and official Bunn dt teal, lha .��.�. rank of ._/�J.�.ICS.. .._..__.... IP. PG.... m-�! trye.mmlul.n .toter ..__ Q'1'M` .-. N.4rY'eublle The romaaln. Cetllllnhts) of .. ... ....... ...... ... ........ bM1m eeltalea le be Correct Ta luslmrnt and are eerWM nbte lc ... duly trea at the dat< and time and In she Bonk and Is,,rhmrn oa W< nhallry rat all Clear, - ..... ... .. ... .... ..... .............. .Kris in nF Dead, rot......... nY __- __. __..._ .. aeorn,......u4 .tm 11rills, Verde N.C. Ilai Ael.r. Perm Nn.I to idle, twined 1111. Cl jf TRACT 1 EXHIBIT A .? In Morehead Township: The south 50 feet of Lot Twenty -Four (24), part of Lot Thirty-Pive (35), and all of Lot , Thirty -Six (36), of the John C. Banks Subdivision, according to .y� the map thereof (not recorded) by Philip K. Ball, Registered Sur- .. -a veyor, made September, 1949, described by metes and.bounds, as follows: .Beginning at a point in the north line of the right of way (see Book 18, page 11) of the spur track of the Atlantic & North Carolina Railroad Company, it being the southeast corner of the lot conveyed by John C. Banks to R. W. Taylor & Company by deed recorded in Book 121., page 536, Office of the Register of Deeds of Carteret County; also, it being the southwest corner of Lot 36 aforesaid; runs thence North 4° 00' East, along the west s line of Lot 36 and Lot 24, 03 feet: to a point in the west: line of 'y=j` Lot 29 of said map; thence South 860 00' East, 100 fact to a .` point in the east line of Lot 24, thence South 40 00' Went, 53.2 ._ feet to the north line of the right of way of said spur track; thence North 59° 30' East, along the north line ofsnid spur track, 70.5 feet to a point; thence South 4° 00' West, approxi- mately 86 feet to the north line of R. W. Taylor & Company; and thence North 830 017' West, along the R. W. Taylor & Company 'line, approximately 159.4 feet to the point of beginning; and �i(wy being the identical lands conveyed to Grantor herein by deed from :.R W Taylor & Co., Inc., ,. -dated July.G, 1964."and duly recorded.,in the Cat tarot :County Registry in book.252, page 486.' i 5�, . "' TRACT 2 Cr .. 'S, Being allthatcertain other parcel of land conveyed to Gran torby deed from R. W. Taylor & Company, -Inc„ dated Jul.y.(, .1664. 1n.Moreheaa Township: "beginning at:a point.in. the. " . north line of the right. of.way (book IS, page 11).of the spur ;., track of, the Atlantic & North Carolina Railroad atthesoutheast. corner of the, lot conveyed by John C. Banks to R. W. Taylor 6, `r Company.hy deed recorded :in Book 1211 page 536, Of fice 'of the" Register_Of"Deeds of.Carteret County; runsthence.South. 020 19'. East, 189. 2'feet to a point' in Wallace Fisheries west line; thence South 7°. 36' West; along Wallace fisheries'' west line, 487 .feet to the navigable waters of -Hogue Sound; thence along the '.. - navigable .waters or Bogoo sound to a point on Bogus Soundwhich in two.dttaight lines is :go:ith 610'28'. West, 97 feet,' and North v L 85° 49' West, 133 feet; thence North 50 061 West, crossing the right of way of the spur track of the Atlantic and North Carolina Railroad, and the paved State Highway, 534.7 feet to a point; thence South 79° 20' East, crossing the paved State Highway, 181.8 feet to a point in the east line of the dead end of Banks Street; thence South 40 58' West, 143.5 feet to the point of be- ginning. NOTE: Tracts 1 and 2 described above comprise all of the property owned by Grantor that is adjoined on the Fast by proper- ty now owned by Grantee, and adjoined on the West by property owned by the State of North Carolina. 2_ Completeness Review Checklist Project Name: �t<flho�yK�'" CAL tQ Received Date: Project Location: Accepted Date: Rule(s)' r-12008 Coastal 1995 Coastal Phase II (WiRO) Universal El1988 Coastal Type of Permit: New or Vod) or PR Existing Permit # (Mod or PR): q(a 6`{ a q OPE Cert on File? Density: HD or LD Type: Commercial or' Residential FJNCG: %: tol(% OK?) Stream Class: 'I_ nSA Map nOffsite to SW8 Subdivided?: Subdivision or Single Lot j InORW Map I nExemat Paperwork 22Rrn-i Emailed Engineer on: Supplements) (1 original perBMP) BMP ifype(s): &M with correct/original signatures (1 original per BMP except LS/VFS and swales) pplication with correct/original signatures eed �o� or LLC: Sig. Auth. per Soy or letter) ma' ddress: Design Engineer 05 (within 6mo) Email Address: Owner ❑Soils Report with SHWT Note to eview2 ' Calculations (signed/sealed) Su- F1No obvious errors Density includes common ,d Restrictions, if subdivid & Notarized I tc Plans t7 2 Sets O$etails (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) c/ D�a� GradingWetlands: Delineated or No Wetlands cinity Map Layout (proposed BUA dimensions) Legend E DA Maps oject Boundaries Infiltration Wet Pond Offsite Soils Report Soils Report �PE Cert for Master Lot #: SHWT: Deed Rest for Master Lot 9 Matches Master Bottom: �SHWT: PP: BUA Permitted (Master): sf Visited: d BUA Proposed (Offsite): sf Additional Information: Permitted BUA (sf) DA (sf) PP (el) SHWT (el) Depth (ft) SA (sf) Proposed: Proposed: Proposed: Re: Carteret Comm. Coll. 4� Subject: Re: Carteret Comm. Coll. From: Rick Shiver <Rick.Shiver@ncmail.net> Date: Wed, 22 Oct 2003 16:34:21 -0400 To: Linda Lewis <Linda.Lewis@ncmail.net> CC: Vincent Chirichella <vchirichella@stewart-eng.com>, lorenzen@stewart-eng.com Hi, all, Rol 0To I concur with Linda. I've gone out of my way to offer the community college other options available to them concerning the storage and infiltration basin, and I don't think the college has lived up to its part of the bargain, so I don't see much way to help you all with this one. Rick Linda Lewis wrote: Vincent: I think that the college is in enough trouble already for the past liberties it has taken with the permit conditions (i.e., construction of a building without the necessary pump in place to get the runoff from the holding pond to the infiltration area). I cannot, in good conscience, approve the construction of any changes to the permitted design prior to issuing the permit modification. Linda Vincent Chirichella wrote: Ms. Lewis, The plans that you approved for construction have two preliminary basins during construction and being combined at the end of construction. Within the next two weeks, I will be submitting for a modification which includes additional impervious and a slight redesign of the final pond so it may be constructed prior to removal of a building in the Phase II work. Could the ponds be combined into the final design before we receive the final approval? This would be done with the understanding that if the design of the pond is not acceptable to you and needs to be changed, the changes will be made to be in compliance with the permit. Thank you for your assistance. Vincent J. Chirichella, EI Stewart Engineering, Inc. 1 of 2 10/23/200319:04 AM Re: Carteret Comm. Coll. 260 Town Hall Drive Suite C Morrisville, NC 27560 (p)919.380.8750 x142 (0919.380.8752 Rick Shiver <Rick.Shiverpricmail.ner> 2 of 10/23/2003 9:04 AM Carteret Community College Joseph T. Barwick, President 3505 Arendell Street Morehead City, NC 28557-2989 July 23, 2003 Mr. Rick Shiver Water Quality Regional Supervisor N.C. Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Dear Rick: Education For Life " (252) 247-6000 Ext. 141 Fax: (252) 240-0770 j tb@carteret, cc.nc.us Attached please find our notes from the July I meeting with you, Linda Lewis, and Laurie Munn. Following that meeting I asked Ron Cullipher to contact you to get more details concerning a proposal to monitor the ground water for a period of time before installing the pond liner. As I have not heard back from him, I assume that contact has not yet occurred, and I will follow up with him. r We sincerely appreciate your willingness to make this site visit and to offer your advice about how we should proceed. 1 have talked with all my Board members, and they are very interested in our developing a monitoring proposal for your consideration. Again, Rick, thank you very much for your help on this project. We are continuing to move forward in the direction you gave us, and I look forward to working with you and Linda as the plan progresses. R rwick, Ph.D. President Js Attachment C: Bill Henderson, Board Chair Hugh Talton, Building and Grounds Chair Janet Spriggs, Vice President, Administrative Services An Equal Opportunity Educational Institution Serving the Community without regard to Race, Creed, Sex, National Origin or Disability Meeting with N.O. Division of Water Quality July 1, 2003 A meeting was held today in the McGee Boardroom to discuss the storm water retention and infiltration system being built as part of the new construction projects currently underway. Those present included: Trustees, Mr. Bill Henderson and Mr. Holt Faircloth; Carteret Community College (CCC) President, Dr. Joe Barwick; CCC Vice President for Administrative Services, Ms. Janet Spriggs; CCC Director of Operations, Mr. Tommy Rime; CCC Director of Public Affairs, Mr. Morgan Smith; and North Carolina Division of Water Quality Representatives (DWQ), Rick Shiver, Linda Lewis, and Laurie Munn. The purpose of the meeting was to discuss possible alternatives to requiring the college install an impervious liner in the storm water retention pond south of the new Wayne West building. During the discussion, Mr. Shiver said one of the concerns is that the holding pond may be too close to the groundwater table. He stated the lowest part must be at least two feet above the seasonal high level for groundwater. The new storm water system will include a storm water retention pond located south of the new Wayne West Building, which will be connected through a series of pumps and pipes to an infiltration pond located on higher ground northwest of the new Marine Training and Education Center (MARTEC). Storm water will be collected from parking lots and impervious surfaces, gutters, etc., and channeled first to the retention pond before being pumped to the infiltration pond. Mr. Henderson commented that he thought the college was exempt from having to include the liner under the new regulations because the pond was part of the original master plan. Ms. Lewis responded that the new regulations have been in place since 1988 and that there could be no grand fathering allowed, particularly since this is a significant modification of the original plan. Any modification would require it to be updated to today's standards. There was a great deal of uncertainty regarding the elevation associated with the seasonal high level for the water table, and a call was made to Stewart Engineering to try to obtain more information. By meeting's end, no exact data on the seasonal high level for ground water could be obtained. Mr. Rhue is working with the engineers to obtain this information. Ms. Lewis said she had emailed K.C. Underwood with Hayes -Howell in January 2003 asking for water table data, specifically the seasonal high information, and she had not received a response with that information. Mr. Shiver gave the group an explanation on infiltration requirements and why two feet of vertical separation is required between the bottom of the holding pond and the seasonal high level for ground water. He said engineers could use soil discolorations from boring samples to determine where the seasonal high is located. Mr. Faircloth asked if the college could make the retention pond shallower. Ms. Lewis answered that first they needed to determine what the seasonal high is. She noted the engineers were not required to show the seasonal high level on the specifications because the retention pond in question was originally designed as a storage pond. They did not anticipate that it would require a liner, which could cost anywhere from $100,000 to $146,000, according to Ms. Spriggs. Ms. Lewis said that other alternatives exist such as using clay soil to create the impervious liner. She recommended using an engineer that is familiar with the special rules associated with storm water retention systems in the coastal areas adjacent to SA waters. Projects within one-half mile of SA waters come under special scrutiny and rules. Mr. Shiver said that if you want a successful storm water project, then pick a consultant who works a lot in the counties most affected. Mr. Shiver noted that the project is not in compliance by not having the pumping system in place before any impervious surfaces have been installed. The participants then toured the site of the storm water retention pond. Mr. Shiver said he was willing to consider as an option a ground water monitoring system as part of a pilot project that would forego the need for a liner on the storm water retention pond south of the new Wayne West building. It would have to be designed by the college's engineers and would include approximately three shallow water table monitoring wells near the perimeter of the storm water retention pond. This would be less expensive than the liner. If the tests showed significant contamination of groundwater, then the college would be required to install a liner on the retention pond. He added this approach is innovative and is in keeping with the Triangle J initiatives. He also stated that DWQ might also obtain some useful information from the project. Mr. Shiver noted that the ground water monitoring tests would be over a finite time period that would involve periodic sampling from the test wells. The college would still need the infiltration pond that will be located northwest of MARTEC. Mr. Shiver suggested that Dr. Barwick send DWQ a letter after talking to Stroud Engineering, stating that the college is proposing an alternative that includes design of a series of test wells for monitoring ground water adjacent to the storm water retention pond instead of installing an impervious liner. Cart. Com. College Subject: Cart. Com. College Date: Fri, 06 Jun 2003 15:24:42 -0400 From: Linda Lewis <Linda.Lewis@ncmail.net> Organization: NC DENR To: Rick Shiver <Rick.Shiver@ncmail. net> Cf7�'1i !�I The school cannot request coverage in System #2 of the 960424 permit without first modifying it, because the project they want to permit far exceeds the built -upon that was allotted to system #2. It was originally permitted with a drainage area of 1.78 acres, and a BUA limit of 72,558 sq. ft. The new building and parking they propose has a 5.34 acre drainage area and proposes 129,113 sq. ft. of BUA. They will have to modify the previously approved alternative system to demonstrate that it can handle the increased drainage area ,and BUA. When they do that, we have to review it under current rules, which means lining the storage pond may still be needed, but they will have another shot at adjudication. Linda I of 1 6/6/2003 3:25 PM STROUD ENGINEERING, P.A. Y ENGINEERS HESTRHESTRONPLAZA PLAZA TWO 151-A HWY.24 -, MOREHEAD CITY, NORTH CAROLINA 28557 (252) 247-7479 1 MEMORANDUM TO: CARTERET COMMUNITY COLLEGE ATTN: DR. JOSEPH BARWICK. PRESIDENT FROM: RONALD D. CULLIPHER, P.E. DATE: MAY 28. 2003 SUBJECT: SUBSTANTIATING DATA- REQUEST FOR RELEASE OF CLAY LINER REQUIREMENT IN WET HOLDING POND - _ 3 J AT YOUR REQUEST. I HAVE REEVALUATED THE AVAILABLE INFORMATION CONCERNING THE RECENT REQUIREMENT FOR THE ADDITION OF A CLAY LINER AS A CONDITION OF APPROVAL FOR YOUR STORMWATER MANAGEMENT PERMIT SW8020908, THIS CONDITION IS FOR THE WAYNE WEST AND MARINE TECHNOLOGY BUILDINGS CURRENTLY UNDER CONSTRUCTION, AS YOU KNOW, WE PROVIDED SOME: ASSISTANCE TO STEWART ENGINEERING IN THEIR ROLE AS CIVIL ENGINEERING CONSULTANT TO THE ARCHITECT FOR THIS PROJECT. IN CONJUNCTION WITH THIS COOPERATIVE EFFORT, WE DISCUSSED THIS REQUIREMENT WITH NCDWQ'S MS. LINDA LEWIS. MS. LEWIS, AT OUR REQUEST, REVIEWED THIS CONDITION WITH NCDWQ STAFF MEMBERS IN RALEIGH. AFTER REVIEW THIS CONDITION WAS UPHELD AND BECAME A PART OF THE PROJECT REQUIREMENTS. SUBSEQUENT DISCUSSIONS BETWEEN YOU AND MR. RICK SHIVER, NCDWQ REGIONAL SUPERVISOR IN WILMINGTON, REVEALED THAT SOME RECENT PRECEDENCE HAS BEEN SET FOR REQUIRING A LINER IN A WET HOLDING BASIN PRIOR TO INFILTRATION OF THE DESIGN STORM. THESE ARE ISSUES FOR ULTIMATE DISCHARGES TO CLASS SA WATERS, THE SAME CLASSIFICATION OF BOGUE SOUND. WHILE MR. SHIVER INDICATED THAT COST AND OLDER INTERPRETATIONS OF THE REGULATIONS WOULD NOT BE A VALID ARGUMENT FOR RECONSIDERATION, HE DID INDICATE THAT HE WOULD EVALUATE ANY NEW IDEAS. WITH THIS BEING SAID, THE BACKGROUND TO STORMWATER MANAGEMENT AT THE CARTERET COMMUNITY COLLEGE CAMPUS BEGAN WITH A STUDY, DESIGN AND PERMITTING BY NCDWQ FOR A CAMPUS WIDE STORMWATER MASTERPLAN. THIS STUDY WAS INITIATED IN 1995 AND PERMITTED IN 1996 UNDER STORMWATER PERMIT SW8960424. THIS MASTERPLAN INCLUDED SYSTEM tit THAT IS GENERALLY IN THE SAME LOCATION OF THE PROJECT PERMITTED UNDER SW8020908. SYSTEM #i2 ACCOUNTED FOR 71130 SF OF IMPERVIOUS SURFACE AND REDEVELOPMENT ON CAMPUS OF APPROXIMATELY 112000 SF OF IMPERVIOUS COVERAGE. THIS ORIGINAL PERMIT HAS BEEN MODIFIED BUT IS NOT SCHEDULED TO EXPIRE UNTIL JULY 2006, 1 BELIEVE THAT THE BEST AVAILABLE OPTION FOR THE COLLEGE WOULD BE TO REQUEST A MODIFICATION TO ITS ORIGINAL PERMIT TO INCORPORATE THE PROJECT AS CURRENTLY 107 COMMERCE ST. HESTRON PLAZA TWO SUITE B 102-D CINEMA DRIVE 151-A HWY. 24 GREENVILLE, NC 27858 WILMING ION, NC 28403 MOREHEAD CITY, NC 28557 (252) 756-9352 (910) 815-0775 (252) 247-7479 PROPOSED. THE PERMIT CONDITIONS IN THE ORIGINAL PERMIT DID NOT INCLUDE THE CLAY LINER AS A CONDITION OF APPROVAL. PLEASE REVIEW THE FOREGOING. ALONG WITH THE ATTACHED COPIES OF THE ORIGINAL MASTER PLAN AND STORMWATER PERMIT. IF I CAN PROVIDE ANY ADDITIONAL INFORMATION. PLEASE LET ME KNOW. Carteret Community College Joseph T. Barwick, President 3505 Arendell Street Morehead City, NC 28557-2989 June 5, 2003 Mr. Rick Shiver Water Quality Regional Supervisor NC Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Dear Rick: U J�V V a 2003 i (252)222-6140 Fax: (252) 222-6274 jtb@carteret.cc.nc.us I apologize for taking so long to get back to you after our phone conversation on May 7; however, 1 am trying to be as deliberative as possible in order to resolve this issue. After our conversation, I retained Stroud Engineering to give us a professional opinion concerning the requirement of a clay liner for one of our proposed storm water retention ponds. Stroud Engineering assisted the college in developing and permitting a campus -wide storm water plan in 1996 and also provided technical assistance to Stewart Engineering in designing the proposed pond for our current construction. We hastily accepted the new permit because we had a deadline that would have jeopardized a $1.5 million Economic Development Authority grant. Also, as the pond was designed with the original permit in hand, we did not anticipate the addition of the clay linernor the amount of change this would require in the original bid. I realize that through the published procedures, we had 30 days to appeal the new permit. Hopefully, you understand why our appeal in this letter has fallen out of the normal process. What we would like for you to consider is to allow us to operate with a modification of permit SW8 960424. For your convenience, a copy of that permit is enclosed, along with a copy of the letter from Stroud Engineering, and copies of the campus wide storm water plan on which SW8 960424 was based. As that permit does not expire until July 2006, 1 request that we be allowed to comply with those conditions. It is my understanding that our new construction does not exceed the impervious surface and retention capacity in the 1996 design and permit. Please let me know if I can provide any additional information for this request. I will wait to hear from you. Sincerely, a Cjsep'h4 . Barwick, Ph.D. President Enclosures C: Ms. Janet Spriggs Mr. Hugh Talton, Chair, Building and Grounds An Equal Opportunity Educational Institution Serving the Community without regard to Race, Creed, Sex, National Origin or Disability