Loading...
HomeMy WebLinkAboutSW8960329_HISTORICAL FILE_20100709STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 O 3 Z DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑X HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 20 � o 0-1 o YYYYMMDD i NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director July 9, 2010 Carl Baker, Deputy Public Works Officer for Commanding Officer and US MCB Camp Lejeune Bldg. 1005 Michael Road Camp Lejeune, NC 28547 Subject: State Stormwater Management Permit No. SW8 960329 Modification Camp Lejeune Naval Hospital High Density Commercial Wet Detention Pond and Infiltration Project Onslow County Dear Mr. Baker: Dee Freeman Secretary The Wilmington Regional Office received a complete modified Stormwater Management Permit Application for Camp Lejeune Naval Hospital on June 21, 2010 with additional information submitted on July 7, 2010. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 960329 Modification dated July 9, 2010 for the construction of the subject project. This permit shall be effective from the date of issuance until February 20, 2018, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and. maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming,to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, INC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions regarding this permit, please do not hesitate to contact me or Linda Lewis at (910) 796-7215. Sincerely, zorgetteb. Stormwater Supervisor Division of Water Quality GDS/ mjn: S:\WQS\STORMWATER\PERMIT\960329mod jul10 cc: Vincent Chirichella, PE, Clark Nexsen ' Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-7215 \ FAX: 910-350-20041 Customer service: 1-877-623-6748 IntemeC NprthCarolina wvnv.ncwaterquality.org atura!!y An Equal Opportunity 1 Affirmative Action Employer State Stormwater Management Systems Permit No. SW8 960329 Mod STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO US Marine Corps Base, Camp Lejeune Camp Lejeune Naval Hospital Building NH 100, Hospital Blvd, Camp, Lejeune, Onslow County FOR THE construction, operation and maintenance of seven (7) wet detention ponds and one (1) infiltration basin in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until February 20, 2018, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Sections 1.8 and 1.9 of this permit. The stormwater control has been designed to handle the runoff from the following impervious areas: East Pond (existing) 60,039 square feet (sf); West Pond (existing) 35,902 sf; Pond -A 68,668 sf; Pond-B 183,793 sf; Pond-C 77,011 sf; Pond-D 38,410 sf; Pond-E 23,668 sf; and Infiltration Basin-F 10,296 sf. An additional 27,450 square feet of untreated impervious area was previously approved under the permit issued July 1996, and renewed on February 20, 2008. 3. A 50 foot wide vegetative buffer must be provided adjacent impounded structures, streams, rivers and tidal waters. 4. The wet detention ponds and infiltration basin do not require a vegetated filter strip. 5. The tract will be limited to the amount of built -upon area indicated on the application and in Sections 1.8 and 1.9 of this permit, and per approved plans. There is no built -upon area allocated for the future development. Page 2 of 8 State Stormwater Management Systems Permit No. SW8 960329 Mod 6. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 7. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the permitted stormwater control system within drainage areas labeled East, West, A, B, C, D, E and F. 8. The following design criteria have been provided in the wet detention ponds and must be maintained at design condition: Pond East West A B C D E Existing under 1995 rule Proposed under 2008 rule a. Drainage area, acres 2.4 1.71 2.97 7.48 4.0 1.43 2.5 Onsite, ft2: 104,544 74,792 129,312 325,700 174,326 62,409 108,222 Offsite, ft2: none b. Impervious Surface: 6Q039 35,902 68,668 183,793 77,011 38,410 23,668 Onsite, ft2: 60,039 35,902 68,668 183,793 77,011 38,410 23,668 Offsite, ftz: none c. Pond Depth, ft: 3 3 3 4 3 3 3 d. TSS removal eff 90% 90% 90% 90% 90% 90% 90% e. Design Storm, inches: 1 1 1.5 1.5 1.5 1.5 1.5 f Permanent Pool El. 97.2 88.8 9.5 8.5 22.5 22.5 16.5 g. Permanent Pool Surface Area, ftZ: 7,400 6,150 8,653 23,580 16,232 5,888 3,788 h. Permitted Storage Volume at TP; ft3 5,897 4,187 8,586 25,149 12,982 4,897 3,734 i. Storage Elevation, TP 97.9 89.35 10.4 9.5 23.2 23.2 17.25 j. Controlling Orifice 3-0.75"0 3-0.75"0 1.5"0 3"0 2"0 1.25"0 F'O k. Pre-dev, I yr-24 hr discharge rate, cfs: n/a 2.59 23.98 11.18 2.35 3.99 1. Orifice Flow rate, cfs: n/a 0.03 0.12 0.04 0.02 0.01 m. Forebay Volume, ft3 n/a 3,289 15,967 6,891 1,799 1,432 n. Maximum Fountain Horsepower: n/a 1/3 HP 1/8 HP n/a o. Receiving Stream/River Basin Northeast Creek / White Oak Stream Index No. 19-16-3.5 Classification SC;NSWJI W Page 3 of 8 State Stormwater Management Systems Permit No. SW8 960329 Mod 9. The following design criteria have been provided in the infiltration basin F and must be maintained at design condition: a. Drainage Area, acres: Onsite, ft2: Offsite, ft2: b. Total Impervious Surfaces, ft2: Onsite, ft2: Offsite, ft2: C. Design Storm: d. Basin Depth, feet: e. Bottom Elevation, FMSL: f. Bottom Surface Area, ft2: g. Bypass Weir Elevation, FMSL: h. Permitted Storage Volume, ft3: i. Type of Soil: j. Expected Infiltration Rate, in/hr: k. Seasonal High Water Table, FMSL: I. Time to Draw Down, hours: M. Receiving Stream/River Basin: n. Stream Index Number: o. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 0.7 30,279 none 10,296 10,296 none 3 inches 2 15 1746 16.35 2,798 Fine sand 2.2 13 8 hours Northeast Creek / White Oak 19-16-3.5 "SC;NSW,HQW" 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structures, orifice devices, flow spreaders, infiltration media, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Infiltration BMP's that are used as Erosion Control devices shall be inspected and cleaned out on a more frequent basis during construction. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 960329 Mod 7. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2 foot below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in this pond is identified in this permit Section 1.8. Ponds with less than 30,000 cubic feet of permanent pool volume may not have a fountain. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. Prior to the construction of any permitted future areas shown on the approved plans, the permittee shall submit final site layout and grading plans to the Division for approval. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 30 days prior to change of ownership, or a name change of the permittee or of the project, or a mailing address change, the permittee must submit a completed and signed Name/Ownership Change Form to the Division of Water Quality, accompanied by the supporting documentation as listed on the form. The approval of this request will be considered on its merits and may or may not be approved. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 960329 Mod 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit remains in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 9th day of July, 2010. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION 6&0 ('J� - - C r"Coleep,;H. SullinDirector Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Management Systems Permit No. SW8 960329 Mod Camp Lejeune Naval Hospital Stormwater Permit No. SW8 960329 Modification Onslow County Designer's Certification Page 1 of 2 I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 2 of 2 Page 7 of 8 State Stormwater Management Systems Permit No. SW8 960329 Mod Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDENR-DWQ Regional Office David Towler — Camp Lejeune Page 8 of 8 OPERATION & MAINTENANCE OF STORMWATER MANAGEMENT & EROSION CONTROL STRUCTURES .Maintenance and inspection activities shall be performed as i follows: 1. At Least Semi -Annually: ten a. Inspect the structure for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Inspection findings could result in the following actions to be taken: (1) Check & clear orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days for wet ponds and within 12 to 48 hours for bioretention/infiltration basins. (2) Remove any clogging debris from the Main Outlet Pipe. (2) Remove trash accumulation from the Trash Rack/Pond Side Slopes/Inlet Piping/Catch Basins/Grass Swales. (3) Repair eroded areas immediately, which may be located along Pond Side Slopes, Grass Swales or Vegetated Filter. Reseed as necessary to maintain good vegetative cover. Vegetative cover will be mowed to maintain a maximum height of 6 inches. as necessary to maintain good vegetative cover, m - Repair eroded areas and/or remove trash/debris (4) .Repair undercutting, remove interior trash, replace',rip-rap as required in Inlet Piping. {'5) Remove accumulated sediment. The permanent pool elevation and basin/fore-bay elevations will be identified via the bench mark post gauge. a) Wet Pond - Sediment shall be removed when the fore -bay bottom elevation'is 75% of the original design depth or when the main pond bottom elevation is 75% of the original design depth. (note post gauge benchmark bottom elevation to determine sediment accumulation) b) Bioretention/Infiltration Basins - Sediment/Mulch/Topsoil shall be removed and/or replaced when infiltration/draw down rates exceed 48 hours. (6) While vegetation growth is encouraged along the aquatic shelf and the forebay, it will be removed upon reaching 50% coverage of the main basin surface. '(7) Remove Heavy Woody Vegetation as required. 2. At Least Annually, following a Significant Runoff Producing Rainfall Event: Inspect to ensure that drawdown of the temporary Pool occurs within 2,to 5 days for wet onds and within 12 to 48 hours for bioretention/infiltration b s. D pu[y, Public Works OEEicer SW8 q6 t) 3A! / 6&-M91co�{r VA 1 AiA, �'etiKe_ r Project Loca ion ' DWQ USE ONLY I Date Received Fee Paid Permit Number LA -2 - to txo �� ty D 29 mole Applicable Rules: Coastal SW —1995 oastal SW — 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): 2. Location of Project (street address): Building NH100 Hospital Blvd City:Camp Lejeune County:Onslow Zip:28547 3. Directions to project (from nearest major intersection): 4. Latitude:34° 43' 21.2" N Longitude:77° 21' 44.05" W of the main entrance to the project. if. PERMIT INFORMATION 1. a. Specify whether project is (check one): ❑New ®Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number SW8 960329 , its issue date (if known)2/20/08 and the status of construction: []Not Started ❑Partially Completed* ® Completed* *provide a designer's certification 2. Specify the type of project (check one): [—]Low Density ®High Density []Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, N/A and the previous name of the project, if different than currently proposed, N/A 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control: 22.4 ac of Disturbed Area 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:Not acquired at time of permit application JUN 2 1 2010 Form SWU-101 Version 07Jun2010 Page I of 6 III. CONTACT INFORMATION I. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/ Organization: Coin mandin2 Officer Marine Corps Base Camp Lejeune Signing Official & Title:Carl Baker Deputy Public Works Officer b.Contact information for person listed in item I above: Street Address:BldQ. 1005 Michael Road City:MCB Camp Lejeune State:NC Zip28547 Mailing Address (if applicable):Bldg 1005 Michael Road City:MCB Camp Leieune State:NC Zip:28547 Phone: (910 1 451-2213 Fax: (910 ) 451-2927 Emaibcarl.h.bakerOO usmc.nA c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b.Contact information for person listed in item 2a above: Street Address: City: Mailing Address (if applicable): City:_ Phone: ( 1 Fax: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing Address: City: State: Phone: ( 1 Fax: ( 1 4. Local jurisdiction for building permits: Point of Contact:N/A Phone #: ( 1 Form SWU-101 Version 07Jun2010 Page 2 of 7 JUN 1 S 2010 BY:_ - --- IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. The existing parking lot permit (SW8 960329) BMP's will remain and will be added to by this modification This permit modification will.provide stormwater treatment for all new BUA using five (5) wet detention basins and one (1) infiltration basin. Stormwater will be conveyed to the various BMPs by means of grassed swales and stormwater pipe networks. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ® Coastal SW - 1995 ® Ph II - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 23.95 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area':23.95 acres Total project area shall be calculated to exclude the followingg the normal {7ool of im)lrounded structures, the area behveen the bunks of streams and rivers, the area below the Nornnnl High Wafer (NHW) line or Mean High Water (MHW) line, and coastal wetlands iaudeoard from the NHW for MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total 9. How many drainage areas does the project (For high densihit, count 1 for each proposed engineered storuuvater the whole properhj area) Area) X 100 = 47.7 % use 1 for 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Fonn SWU-101 Version 07Jun2010 n r .i✓1 V i� D JUN 1 8 2010 Page 3 of 7 BY: Fbr1D MOP -poND pa,ND •Basin tnforniadon .' • ", " `' `. braina e Area A Drains e-Area B ' Drains e Area C: ,Drains e ,*ea.D Receiving Stream Name Northeast Creek Northeast Creek Northeast Creek Northeast Creek Stream Class * SC; NSW, HQW SC; NSW, HQW SC; NSW, HQW SC; NSW, HQW Stream Index Number * 19-16-j4-.i45. 19-16-(4 3, 19-16-'(4`5)_5. 19-16-j'4�a),_3, Total Drainage Area (so 129,312 325,700 174,326 62,409 On -site Drainage Area (so 129,312 325,700 174,326 62,409 Off -site Drainage Area (so 0 1 0 0 0 Proposed Impervious Area*' (so 68,668 183,793 77,011 38,410 Impervious Area*' total 53.1% 56.4% 44.2% 61.5% Impervious*' Surface Area - - 's ',Drainage Area A= Draiha e Area•B Drains eYlrea.C; Drains e Area,D, On -site Buildings/Lots (so 0 58,405 15,699 On -site Streets (so 0 10,314 75,302 13,939 On -site Parking (so 61,751 79,462 1,803 On -site Sidewalks (so 6,917 35,612 1,709 6,969 Other on -site (so 0 0 0 0 Future (so 0 1 0 1 0 1 0 Off -site (so 0 0 0 0 Existing BUA*** (so 0 0 0 0 Total (so: 68,668 183,793 77,011 38,410 Stream Class and Index Number can be determined at: http:/4i2o.enr.state.nc.us/bittts/reports/reportsWB.hbnl ** Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. * Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Measured via AutoCAD Civil3D software utilizing a certified Existing Conditions surevy to NC coordinate grid. Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded fromhn://h2o.enr.state.nc.us/su/bmp forms.htm. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://h2o.enr.state.nc.us/su/bmp forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://h2o.enr.state.nc.us/su/msi maps.htm.) Please indicate that the following required information have been provided by initialing in the each item. All original documents MUST be signed and initialed in blue ink. Download the h each submitted application package from hM2://h2o.enr.state.nc.us/su/bmp_forms.htm. 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Cove Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review hqp://www.envhelp.org[pages/onestopexpress.html for information on the Expres and the associated fees. Contact the appropriate regional office Express Permit Coon additional information and to schedule the required application meeting.) to eWrovided for versions for J _Z a Q JUN 1 8 2010 Form SWU-101 Version 07July2009 Page 4 of 7 By : yt-�tTCry `► lRlo Po�� ItJ�ll, �`N5"�G z�sr N Basin Information Drainage Area E Drainage Area F East Pond (Ex.) West Pond (Ex.) Receiving Stream Name Northeast Creek Northeast Creek Northeast Creek Northeast Creek Stream Class * SC; NSW, HQW SC; NSW, HQW SC; NSW, HQW SC; NSW, HQW Stream Index Number * 19-16-(3.5) 19-16-(3.5) 19-16-(3.5) 19-16-(3.5) Total Drainage Area (sf) 108,222 30,279 104,544 74,792 On -site Drainage Area (so 108,222 30,279 104,544 74,792 Off -site Drainage Area (so 0 1 0 0 0 Proposed Impervious Area** (so 23,668 10,296 60,039 35,902 % Impervious Area** (total) 21.9% 34.0% 57.4% 48.0% Impervious" Surface Area Draina e Area E Draina e Area F East Pond (Ex.) West Pond (Ex.) On -site Buildings/Lots (so 15,120 3,834 0 0 On -site Streets (so 0 6,462 0 0 On -site Parking (sf) 0 0 60,039 35,902 On -site Sidewalks (sf) 8,548 0 0 0 Other on -site (sf) 0 0 0 0 Future (sf) 0 0 0 0 Off -site (so 0 1 0 10 0 Existing BUA*** (sf) 0 0 0 0 Total (so: 23,668 10,296 60,039 35,902 E'u ST T q l94 ?MM\VtD Basin Information Untreated Areas Receiving Stream Name Northeast Creek Stream Class * SC; NSW, FIQW Stream Index Number * 19-16-(3.5) Total Drainage Area (so 73,629 On -site Drainage Area (so 73,629 Off -site Drainage Area (so 0 Proposed Impervious Area** (sf) 27,450 % Impervious Area** (total) 37.3% Im ervious" Surface Area Drainage Area E On -site Buildings/Lots (so 0 On -site Streets (sf) 16,263 On -site Parking (so 0 On -site Sidewalks (sf) 11,187 Other on -site (so 0 Future (so 0 Off -site (sf) 0 Existing BUA*** (sf) 0 Total (so: 27,450 ML-Q, Rec�D. q�[,QiLO 5.. A detailed narrative (one to two pages) describing the stormwater treatment/ managementfor 'U1JC� the project. This is required in addition to the brief summary provided in the Project —✓� Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verifij the SHIVT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: N/A Page No: N/A n A 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Nlk Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. hqp://www.secretary.state.nc.us/Corl2orations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://h2o.enr.state.nc.us/su/bmv forms.htm#deed restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changedorr deleted without concurrence from the NC DWQ and that they will be recorded.priorao:the sale of:ahy lot. JUN 1 S 2010 Form SWU-101 Version 07July2009 Page 5 of 7 PY: VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Vincent Chirichella, PE, LEED AP Consulting Firm: Clark Nexsen Architects & Engineers Mailing Address:4000 Westchase Blvd., Suite 280 Phone: (919 ) 828-1876 Email:vchirichella@clarknexsen.com State:NC Zip:27607 Fax: (919 ) 828-1877 IX, PROPERTY OWNER AUTHORIZATION (if Contact Infonuation, item 2 has been filled out, complete this section) I, (print or hjpe name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or hjpe name of person listed in Contact Information, item la) with (print or type name of organization listed iu Contact Information, item 1b) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of . County of do hereby certify that personally appeared before me this _ day of . and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission Form SWU-101 Version 071uly2009 Page 6 of 7 JUN 1 8 2010 I1.3Y: w X. APPLICANT'S CERTIFICATION I, (print or hype name of person listed in Contact Inforniation, item 2) Carl Baker, PE - Depuht Public Works Officer certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwMer rules under 15A NCAC 2H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. Date: 4O " 7% U I, A c < . zJ ' a Notary Public for the State of 1A'County of do he eby certify that Ul--/Jyui personally appeared before me this % day of and acowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, ALICE A BONNETTE Notary Public Onslow County State of North Carolina My Commission Expires Oct 23, 2010 SEAL My commission expires c2� Form SWU-101 Version 07July2009 Page 7 of 7 JUN 1 5 2010 -x Permit No. (to be Provided byDWO) T�O�O( G NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Camp Leleune Naval Parking Lot Addition Contact person Vincent Chinchella Phone number 919-828-1876 Date 12/14/200916:26 Drainage area number E II. DESIGN INFORMATION Site Characteristics Drainage area 108,222 ft3 Impervious area, post -development 23,668 fly % impervious 21.87 Design rainfall depth 1.5 in Storage Volume: Non -SA Waters Minimum volume required 3,340 ft3 OK Volume provided 3,734 ff3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5" runoff volume fl3 Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr mnoff fill Minimum volume required it, Volume provided ft3 Peak Flow Calculations Is the prelpost control of the 1 yr 24hr stone peak flow required? N (Y or N) 1-yr, 24-hr rainfall depth 3.7 in Rational C, pre -development 0.47 (unitless) Rational C, post -development 0.43 (unitless) Rainfall intensity. 1 -yr. 24-hr storm 4.72 inlhr OK Pre -development 1-yr, 24-hr peak Flow 3.99 ft Isec Post -development 1-yr, 24-hr peak flow 5.87 ft3lsec Pre/Post 1-yr, 24-hr peak flow control 1.88 ft3lsec Elevations Temporary pool elevation 17,25 fmsl Permanent pool elevation 16.50 fmsl SHWT elevation (approx. at the perm. pool elevation) 16.00 fmsl Top of 10ff vegetated shelf elevation 17.00 fmsl Bottom of 10ft vegetated shelf elevation 16.00 fmsl Sediment cleanout, top elevation (bottom of pond) 11.50 fmsl Sediment cleanout, bottom elevation 10.50 fmsl Sediment storage provided 1.00 It Is there additional volume stored above the state -required temp. pool? N (Y or N) JOK Elevation of the top of the additional volume 17.3 host Form SW401-Wet Detention Basin-Rev.8-9117109 J U N 1 8 2010 Paris I. & II. Design Summary, Page 1 of 2 BY Permit po be provldod by DWOI,.- (` 1 II. DESIGN INFORMATION Surface Areas Area, temporary pool 5,737 ft' Area REQUIRED, permanent pool 3,788 ft2 SAIDA ratio 3.50 (unitless) Area PROVIDED, permanent pool, A,_,, 3,941 ft` OK Area, bottom of 1Oft vegetated shelf, A, 2,780 ft` Area, sediment cleanout, top elevation (bottom of pond), AW,_.a 415 ft` Volumes Volume, temporary pool 3,734 ft' OK Volume, permanent pool, Va,,,, P, 7,123 ft' Volume, forebay (sum of forebays if more than one forebay) 1,432 ft' Forebay % of permanent pool volume 20.1 % % OK SAIDA Table Data Design TSS removal 90 Coastal SAIDA Table Used? Y (Y or N) Mountain/Piedmont SAIDA Table Used? N (Y or N) SAIDA ratio 3.50 limitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) (Y or N) Volume, permanent pool, V.m_wm 7, 123 W Area provided, permanent pool, Aim_ow 3,941 W Average depth calculated it Need 3 it min. Average depth used in SAIDA, dm., (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool, A.-. 3,941 ft` Area, bottom of 1 Oft vegetated shelf, Aw, u�i 2,780 it` Area, sediment cleanout, top elevation (bottom of pond), Ate. 415 ft' "Depth' (distance b/w bottom of 1Oft shelf and top of sediment) 4.50 ft Average depth calculated 3,01 It OK Average depth used in SAIDA, J., (Round to nearest 0.5ft) 3.0 it OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 1.00 in Area of orifice (if -non -circular) in' Coefficient of discharge (Cc) 0.60 (unitless) Driving head (Hv) 0.24 it Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (C..) limitless) Length of weir (L) ft Driving head (H) ft Pre -development 1-yr, 24-hr peak Flow 3.99 ft'/sec Post -development 1-yr, 24-hr peak flow 5.87 ft/sec; Storage volume discharge rate (through discharge orifice or weir) 0.01 ft`/sec Storage volume drawdown time 3.20 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of 8owpath to width ratio 3 :1 OK Length to width ratio 2.0 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 it OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: Emergency Spillway Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts L & 11. Design Summary, Page 2 of 2 t„ Permit No. (to be provided by D WQJ III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. >1kAP 1. Plans (1" - 50' or larger) of the entire site showing: CT— 100 Design at ultimate build -out, CC4_100 Off -site drainage (if applicable), /rrr �Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High Flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. yip jp�P1331). Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, W Maintenance access, Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. �V155t). Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. qr+.' 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes 8 accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (08M) agreement. 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9117I09 ti- C JUN 1 8 2010 By Part III. Required Items Checklist, Page 1 of 1 MEMORY TRANSMISSION REPORT TIME :07-12-'10 12:07 FILE NO. DATE TO DOCUMENT PAGES START TIME END TIME PAGES SENT STATUS 312 07.12 12:03 8 919198281877 9 07.12 12:05 SUCCESSFUL TX NOTICE FAX NO.1 k .rwl ' Statn of North Ca roiinn Dapartmuut ui Hnxiron went nod Numroi ilmnurem Wlimlogton AaglovnlOMm Bea+e W 6�r,nr Pardra. C'ovnrnor FAX COVER SKEET :910-350-2018 :DENR Wilmington Dev JM1vransw. Secretary No. Pages (exc). covey: O 127 CwJ l Drlve NC ..05 - (910) 7.-7113 M SQusl OppasrmaJay Alfl avr.sai.ra Actbn 9mployvr State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, governor FAX COVER SKEET Date: / — /Z — / To: I///I CP7 /- ��1i/i:c "i //,!- Dee Freeman, Secretary No. Pages (excl. cover): r From: Jo Casmer Co: CGg�� NG�%�S�n p���7'<< �� Phone: (910) 796-7336 Fax: �l �' O Z �' %D 7 / Fax: (910) 350-2004 Re: %;w%/- /SSde w_ a �el 6--D 127 Cardinal Drive Extension, Wilmington, NC 28405 0 (910) 796-7215 a An Equal Opportunity Affirmative Action Employer MEMORY TRANSMISSION REPORT FILE NO. 311 DATE 07.12 12:03 TO : 8 919104512976 DOCUMENT PAGES 9 START TIME 07.12 12:03 END TIME 12:05 PAGES SENT 9 �: STATUS OK *** TIME :07-12-'10 12:05 FAX NO.1 :910-350-2018 NAME :DENR Wilmington SUCCESSFUL TX NOTICE *** St_ee of Nort4 Cu�oDua Dapar[man[ of Huvtronmeo[ aad Nutu ru[ Awoufcw . WOm[u6[ou RaQ19ea1 OTce Ba��e/(V Bmav Pn�d n. Govut'au� FAX COVER 3l�$$T Ds� F loon. 9ac['e<ury 0 Dale: �/J / / / No. Pages (axd. cover): yrr "�- issdcd //Qi'a� c-oy� %ice iji+ "� 127 Cud ] Unva 6itaa 1s WOmlaQ A. NC 28405 � (91 O) 79 7213 M E9val OPPo�.W Alanna[1vn ACO oa E,1, Beverly Eaves Perdue, Governor State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office FAX COVER SHEET Date: Fax: Re: Dee Freeman, Secretary No. Pages (excl. cover): From: Jo Casmer Phone: (910) 796-7336 Fax: (910) 350-2004 /7�5-'� ? /7VI'—' d cue i; ter. 4L , 127 Cardinal Drive Extension, Wilmington, NC 28405 0 (910) 796-7215 9 An Equal Opportunity Affirmative Action Employer Naugle, Mary 2 From: Jason T. Rupert jjrupert@ClarkNexsen.com] Sent: Tuesday, July 06, 2010 3:17 PM To: Naugle, Mary Subject: RE: QUESTIONS about application... RE: Camp Lejeune Hospital Addition and Renovation - state stormwater Attachments: Application-Add.lnfo.docx Mary Jean, No problem. Keep sending me emails if you have any more questions. There are a total of six (6) new bmps, five (5) wet detention basins, and one (1) infiltration basin. There are two existing ponds on the East Pond & West Pond, making a total of eight (8) bmps for the permit. The updated application information for section IV (10) is attached to the email. Thanks. Jason T. Rupert El, LEED AP Civil Engineer Intern 9(kft CLARK NEXSEN Architecture & Engineering 4000 Westchase Boulevard Suite 280 Raleigh, NC 27607 919.828.1876 Tel. 919.828.1877 Fax iruoe r(Rclarknexsen.com w .clarknexsen.com From: Naugle, Mary [mailto:mary.naugle@ncdenr.gov] Sent: Tuesday, July 06, 2010 2:41 PM To: Jason T. Rupert Cc: Vincent J. Chirichella Subject: RE: QUESTIONS about application... RE: Camp Lejeune Hospital Addition and Renovation- state stormwater Jason; Please help clarify these items: 1. Application, pg 3, section IV (9) Are there six (6) new bmps = 5 ponds+ 1 infil? 2. How much drainage area and bua are not treated but within the permit area? Existing amounts not treated. Please add another column in section IV(10) of the application for the other drainage area and bua amounts. The permit needs to report all drainage areas and bua. I realize these are nickel and dime questions.... But it helps speed the review process if you can answer as the review proceeds. I appreciate your help with the questions for additional information. Thank you! ko ( tl�Fo Naugle, Mary eIET-O-D From: Jason T. Rupert Urupert@ClarkNexsen.com] Sent: Tuesday, July 06, 2010 11:04 AM To: Naugle, Mary Cc: Vincent J. Chirichella Subject: RE: QUESTION about pond E... RE: Camp Lejeune Hospital Addition and Renovation- state stormwater Attachments: Application-Add.lnfo.docx Mary Jean, The correct DA and SUA for drainage area/pond E is 108,222 and 23,668 respectively. I have attached an updated copy of the updated application information. Thanks Jason T. Rupert El, LEED AP Civil Engineer Intem 910ft CLARK NEXSEN Architecture & Engineering 4000 Westchase Boulevard Suite 280 Raleigh, NC 27607 919.828.1876.Tel. 919.828.1877 Fax i ruoertncla rknexsen.com w .clarknexsen.com From: Naugle, Mary [mailto:mary.naugle@ncdenr.gov] Sent: Tuesday, July 06, 2010 10:43 AM To: Naugle, Mary; Vincent J. Chirichella; Jason T. Rupert Subject: RE: QUESTION about pond E... RE: Camp Lejeune Hospital Addition and Renovation- state stormwater Vince or Jason; Please look at the drainage area and bua for drainage area/pond E. the application reports 66,035 and 13,813 sf for da and bua respectively. The supplement and calcs report 108,222 and 23,668 for da and bua respectively. Please clarify. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mart nauole@ncdenr.gov Architecture & Engineering 4000 Westchase Boulevard, Suite 280 Raleigh, NC 27607 P. 919.828.1876 F. 919.828.1877 www.clarknexsen.com . transmittal DATE: We transmit the following: June 16, 2010 PROJECT: ® Drawings Camp Lejeune Naval Hospital ❑ Change Order Addition & Renovation TO: ❑ Computer File(s) ATTN. Express Mary lean Naugle ❑ Product Literature 127 Cardinal Drive Extension Wilmington, NC 28405 FROM: Vincent Chirichella, PE ❑ Specifications ❑ Shop Drawings ❑ Samples ® Application, Report, Check, Summary of Comments from Meeting on 06/10/2010 SUBJECT: Copies Description Camp Lejeune Naval Hospital 2 Plans Parking Lot Addition- 1 Original Signed Application stormwater Submittal 1 Sealed Stormwater Report, Calculations & COMMISSION NUMBER: Soils Report 3053 & 3156 1 Check in the amount of $4,000 VIA: Mail Remarks: ROUTE TO: J I Mary Jean, 2 3 4 5 6 7 8 9 10 Please find the stormwater submittal package for the modification of SW8960329 Camp Lejeune Naval Hospital Parking Lot Addition. Should you have any questions or additional comments, please contact me. Regards, Vincent Chirichella, PE CC: L 1� IV,1� LJUN 1 8 2010 BY:(✓x 4 r ASS_ Page 1 of 1 Comments from Express Permitting Meeting on 6-10-2010 Stormwater • Provide vegetation around pond, including species. - Landscape plans added to plan set • Revise swale detail to say 'sod' not seed - Detail revised • Revise supplements to show temporary pool elevation equal to the next available outlet above the permanent pool elevation - Supplements revised • Add column in table on plans for temporary pool elevation. - Column added • Use temporary pool elevation on volume drawdown calculation in spreadsheet. - Do not concur. From the 'Stormwater Submittal Requirements: Wet Detention Pond', "The orifice is sized based on drawing down the calculated minimum volume in 2-5 days." The calculation provided in the Stormwater Report for volume drawdown uses the calculated minimum volume required to be drawndown in 2-5 days. • For the driving head in the orifice equation calculation, use one-third of the distance between the permanent pool elevation and the elevation of the next available outlet above the permanent pool. - Orifice calculations reviewed • Provide Drainage Area for existing ponds on the Drainage Area Map - Drainage Areas provided on DA MAP sheets • Add existing ponds on application - Existing pond information provided on Application JUN 1 8 2010 CN Comm. No.: 305313156 Camp Lejeune, North Carolina Camp Leieune Naiad Hospital Addition & Renovation EROSION & SEDIMENTATION CONTROL PLAN NARRATIVE & CALCULATIONS Permit Submittal 18 June 2010 Hngincer (s): Vincent Chirichella, RE- jason Rupert, E.I. i031441 ;• _ aun�na�� � • 17 • to JUN 1 9 2010 BY: NARRATIVE Project Description The new site will be comprised of building additions on the south and west wings of the facility and 273 additional parking spaces distributed around the site (150 employee and 123 visitor spaces). Parking lot shall be concrete or bituminous pavement with vehicle stall dimensions of 9 ft wide by 18 It deep and 24 It wide aisles. Handicap parking spaces will be provided in accordance with Uniform Federal Accessibility Standards. Two way traffic entrances will be provided for the parking lots from the existing circulation drives. Sidewalks will be constructed of 4-inch concrete and facilitate ADA compliant pedestrian movements to and from the facility. The greenway, currently being constructed as part of the adjacent Wounded Warrior project, will be realigned around the proposed parking lot as part of this project and will be designed in accordance with current design criteria. The renovation portion of the project will be comprised of a building addition on the north of the facility with a service yard and service drive connecting to the existing asphalt path. Improvements will also be made to the western portion of the Emergency Department drive. These improvements include driveway, parking, retaining walls, and new canopies. Mobile buildings will be placed in the southwestern portion of the site to facilitate the phasing of departments within the Hospital. Site Description The project site is located within the MCB Camp Lejeune, North Carolina due west of the main gate and north of Brewster Boulevard. The site measures approximately 100 acres and consists of existing buildings, driveways, parking lots, sidewalks, loading/mechanical areas, and a helicopter pad. There is an existing wetland on the western side of the site which will not be impacted by this development. The facility is served by an existing 8-inch and 10-inch water loop around the building which is served by a 10-inch main from Brewster Boulevard. The sanitary sewer system gravity drains through both a 10" main from the west and an 8" main from the east flowing to an existing pump station located north of the facility. The force main is pumped through a 10-inch force main to Brewster Boulevard. (Existing utility information was obtained from field survey and original design drawings for the facility.) Calculations indicate that the total post developed drainage area within the project limits is 22.4 acres. The post developed conditions are 48% impervious. Due to the phasing of the project, no more than 20 acres will be disturbed at a given period of time. The remote employee parking lot in the southeast corner of the site will be disturbed and constructed prior to any disturbance/demolition of the existing parking lots. The remote employee lot will have a limits of disturbance of 4.12 acres. For complete phasing details, please see sheet GC101- Site Phasing. 1. JUN � � 2010 There is approximately 10,385 linear feet of sediment fence used on this project. Double rows of sediment fence will be used for the disturbed areas adjacent to wetlands. Approximately 1.95 acres of the disturbed project area will be treated solely by sediment fence. There shall be no disturbance within (5) feet of the wetlands except at the location of an existing outlet pipe to be removed, west of the proposed building. Wetlands are located at the existing pipe outlet and headwall. The headwall will remain in place preventing any disturbance of the wetlands. The remainder of the project will be treated by means of five (5) sediment basins, and block and gravel inlet protection. Grassed swales and temporary diversion ditches will be used to convey stormwater to the sediment basins. There will be four (4) stone construction entrances to the site. Adjacent Property The surrounding area is all within MCB Camp Lejeune military base. The site is located on Hospital Corps Blvd. To west of the site is the Wounded Warrior facilities, the New River to the north, existing Bachelor Enlisted Quarters to the south, and undeveloped land to the east. Soils See the attached geotechnical engineering report completed by ECS Carolinas, LLP for detailed soil information. Planned Erosion and Sediment Control Practices Temporary Gravel Construction Control Entrance/Exit — Practice 6.06 These devices will provide easy access for vehicles to the construction site, a place for vehicles to be cleaned of their mud and sediment before entering paved roads/areas and will help control erosion from surface runoff. During wet weather it may be necessary to designate an area on the entrance to wash vehicle tires. Runoff from this device will be directed towards temporary sediment basins, sediment fencing or temporary block & gravel inlets. 2. Temporary Sediment Basin — Practice 6.61 Temporary sediment basins will be used to control the runoff in drainage areas that are larger than 1 acre but not exceeding 5 acres. They will be used to detain sediment -laden runoff and trap the sediment before the runoff leaves the project site. Also, the sediment basins along with the silt fence and diversion dikes will prevent runoff from entering neighboring roadways. Temporary Diversion Dike — Practice 6.20 Temporary diversion dikes will be used on the site to divert sediment -laden water to temporary sediment traps. They may be used for drainage areas of 5 acres or less. The velocities in the diversion dikes will be maintained at 2.5 fps or less to prevent 2 the need to line the channel. Where the velocity is greater than 2.5 fps, appropriate channel lining has been designed and specified on the plans. Diversion dikes may be a ridge, excavated channel, or combination of both, and be made from soil or gravel. Gravel should be used where vehicles must cross frequently. 4. Temporary Block and Gravel Drop Inlet Protection — Practice 6.52 Temporary block and gravel drop inlet protection devices will be installed on the property. These devices will help prevent sediment from entering storm drains before the detention area is stabilized, while also allowing early use of the storm drain system. 5. Land Grading — Practice 6.02 Grading will occur on this site throughout the construction period. Grading will cause shifts in the established drainage areas, so after each period of grading, erosion and sediment control practices will be adjusted to compensate for any changes. 6. Sediment Fence — Practice 6.62 Sediment fence (silt fence) will be used around the perimeter of the property. This fencing will retain sediment by reducing sheet flows and promoting deposition. Also, deposition areas should be placed at readily accessible points to encourage routine cleaning and maintenance. Caution should be used during the design of a sediment fence to prevent failure from undercutting, overtopping or collapsing, and to ensure that flow bypass areas and overflow outlets are stable. 7. Permanent Seeding— Practice 6.11 All disturbed area will be soded. 8. Temporary Seeding— Practice 6.10 Temporary seeding will be used throughout the site. This practice will help control runoff and erosion until permanent vegetation or other erosion control members can be established. Temporary seeding also provides residue for soil protection and seedbed preparation and helps reduce mud and dust production during construction. Plant selection can be aided with the help of Tables 6.1 Oa-6.1 Oc. Table 6.1 Oa should be using for seeding in late winter and early spring, 6.1 Ob for summer and 6.1 Oc for fall. Seedbed preparation, liming and fertilizer are essential for success. Also, mulching may be needed under harsh site conditions. MAINTENANCE PLAN 1. Erosion and sediment control practices will be checked for stability and operation following every runoff -producing rainfall. Any repairs will be made immediately to maintain the design of the practices. 2. The temporary gravel construction entrances/exits may require periodic topdressing to prevent mud or sediment from leaving the site. All objectionable materials spilled, washed, or tracked on to public roadways will be removed. 3. Temporary sediment traps should be inspected after each period of significant rainfall. Remove sediment and restore the trap to its original dimensions when the sediment has accumulated to one-half the design depth of the trap. Remove the sediment and replace the contaminated part of the gravel facing. 4. Temporary diversion dikes should be inspected once a week and after every rainfall. Immediately remove sediment from the flow area and repair the ridge of the diversion. As the block and gravel drop inlets accumulate sediment after each rainfall, occasional removal of the sediment will occur to provide adequate storage volume for future rains. 6. The sediment fence will be repaired as necessary to provide a sturdy barrier. Sediment will be removed from the fence periodically to reduce pressure on the fence and to allow enough space for accumulation from future rainfalls. 7. Permanent seeding will be inspected for failure and repairs will be made within the same planting season, if possible. Re-evaluation of planting materials, quantities of lime and fertilizer will occur if inadequate coverage is produced. 8. Reseed and mulch areas where temporary seeding seedling emergence is poor, or where erosion occurs, as soon as possible. Do not mow the areas where temporary seeding is present, and protect from traffic as much as possible. 9. Inspect all straw nef blankets periodically, and after heavy rainfall to check for erosion, dislocation or failure. Where erosion or washout occurs, repair the slope grade, and reinstall. E&S CALCULATIONS & STORMWATER REPORT DATE' PROJECT, PRIOEL1 NO oECEPITGe. 25 , >° 10 5 RIP RAP APRON DESIGN SHEET A.1. xm0 10 So A. pibl APrn ID. No Is,, NL E: 0-1 Outlet Protection LOCATION Rip Rap Zone Delineation YONEB 1I �ZON 5it ZONE, I`I 20f�i'E° zorvE 2 I I �'j�� ONE 11 11 Cap I.,NA NC Q . 0 5 10 15 20 25 Do, Depth of Flow (ft.) Ndn: I. Vaa rcn pU O1p 05. T, IP, x foi pyre eitfl, ar[A, Wn culwrL Wwe3 NAi wibla, ute¢-Crna seclmal aru d Mbl Aow, Number of Culverts: Design Velocity, Vfl: e.n nn Ft.,0: rewas Pipe Diameter. Do: xn. Slope. seam 0013E ftA Using NCDOT Rip Rap Apron Design: Use: Zone u L,: 6 ft. IT, 12 ft. w: 6.0 ft. W: 6.8It. CLASS'B' RIP RAP USE MINIMUM 18' STONE THICKNESS TOTAL STONE VOLUME= 51.E ft' 122 4 ft' • Design Point 'Based upon L, 'Based upon 1.2 SHEET 1 OT a DESIGN BY: JTn CHECREO OY: VJL MINIMUM CLASS LI STONE PCOOT RIP OF Coetricb,n L,Coemdurt THICKNESS ZONE RAP CLASS STONE ft T IS.R in A In, x H LIGHT ] 6 I6 1 M.IUM a B ]a POP, J $ x HEAVY 5 0 N B x HEAVY 3 T. x6 JNAPP. Be Nay d1M1a NetivM L I I sTb Prouc, CUi 113sgN b Pawl SW V HW uNo ..RC RAN Ri STALL AIDE. It. RIP RAP APRON DESIGN SHEET PATE "I ton, l0'A AM PROJECT: Ce PA Leeu YIAWivo I . No.. PROJECT NO: ]os] FILE: pescemnoN 0-1 Outlet Protection LOCATION Rip Rap Zone Delineation 25 20 ZONE ZONE, i 15" oI ZON s .Design Point > 10, ZONE 5 1� I I zoNE ZONED l T IDNE t 0 5 10 15 20 25 Do, Depth of Flow (ft.) F.I.. I. uyA-H1F--eP,mem HC% 2.F«"nu. , w.ea.«L w+a IIw.�.lwwu. one wa R— . AHPo AAansee. Number of Culverts: Design Velocity. Ve: ael n.,e Ft., O: ]505 C, Pipe Diameter, Di ] e Slope, e,o,o, Using NCDOT Rip Rap Apron Design: Use: Zone 2 9 ft, 18 ft. W: 6.6 ft, W: 10.2 ft. CLASS RIP RAP USE MINIMUM 18- STONE THICKNESS TOTAL STONE VOLUME= 89.1 ft' 'Based upon LI 2150 ft' 'Based now L2 SHEET 3 OF B DESIGN By. OR CHECKED 6v: VJC MINIMUM CLASS L, STONE NCDOT RIP OF Coefficient L, CIHMAiENH THICKNESS ZONE RAP CLASS STONE ft 11 IF. FINE 3 ] H' LIGHT ] 1] ] NE➢IV11 8 2e H FAW B se 5 3 EPW 5 10 ]S 0 2 IISAW 5 10 b 2 Pen o Lt ie,pll, uPruxl aMn L3=leryN b P,ewnl5mui HP, App SPECIFICATIONS NOMORIETHAPTIMSHALLWEIGNITIESS THAN 15 LOS EACH do PC THAN 5% SHALL WEIGH LESS SAs IT 21 AT LEAST IS Lee EPCIP T AN LOS EACH EROSION CONTROL STONE �o GA`pA ON SPECIFIED RIP RAP APRON DESIGN SHEET BnTE A-, 1. .To IS /JA SHEET x of e Pa0]ECT. an, A -PA Ho.muI ADYovo LB. Go: pESIW eY UP PROhCT No', 3o5J FILE: CHECKED BV WC OESCRIPTNSI 0-1 Outlet Protaction LOCATION. a11, NC MIS 20 _N 15 0 j 10 5 0 -1- 0 Rip Rap Zone Delineation 5 10 15 20 25 Do, Depth of Flow (ft.) N. pa Nelms—m, w•p ,G`. x:Fwpp••rn.•2n.Wa.a.erL p•vM �n.nml wu.,...:. Tc,m. x[Knm.,wptw,kl now. Number of Culverts: Design Velocity. V, aw En Flow, O: IE311. Pipe Diameter, Do: 2E fl. Slope, ennm o.AO M1.'n Using NCDOT Rip Rap Apron Design: Use: Zone x L,: 7.5 ft. Lx: 15 ff. W: 6.0 ft. w: 8.5 ft. CLASS'B' RIP RAP USE MINIMUM 18' STONE THICKNESS TOTAL STONE VOLUME;; 675 ft' 191.3 ft' • Design Poinl 'Based upon L, 'Based up. Lx MINIMUM CLASS L, STONE NCDOTRIP OF C.A iem LICaeM1wieM THICKNESS ZONE RAP CLASS STONE fit ft). �B NE 3 LIOPT d E Is s a EAw e S xe HEAw E H w m x T o...p�He xs aTl.. u.Pm �zt.�ou�m v,a:I ol.en a•pem m p,.+„ sw Ha. GAL. Wsl,�T Mile SPECIFICATIONS �SUPLTWEIGGATUAM�Tsi EACH NO MOTE THAH 10% SHALL Wall LESS CLASS 2 �1-2. 60% SHALL WEIGH AT LEAST W LEE EACH H. POPE THAN 5% SHALL WEIGH LESS THAN SO IS$ EACH EROSION CONTROL STONE RIP RAP APRON DESIGN SHEET DATE MY,. On. ,o'... SHEET I OF e PROJECT. WmpLEieav Hmpul A4blo1 ID. NO: DESIGN Bv: JTR PROJECT NO.: ]05I FILE'. CHECKED BY. Vic DescamnoN. 0-1 Outlet Protection tOCATION C.,y.eeIL. No 25 4•. 4 0 .= 0 Rip Rap Zone Delineation 5 10 15 20 25 Da, Depth of Flow (ft.) z FCIPPo Al,JF1 W. cul rt paw]Ono^^Iw,LI. oa. P-cm.. a•cwo.Llo o, wlYllww. Number of Culverts: Design Velocity, Vn: act Pn Flow, O: 111e ne Pipe Diameter, Do: T5 n Slope. S,K oa,B li Using NCDOT Rip Rap Apron Design: Use zone L,: 4.5 ft LE: 9 ft. W'. 6.0 ft. IN 6.0 ft, CLASS RIP RAP USE MINIMUM 18' STONE THICKNESS TOTAL STONE VOLUME- 40.5 ft' 81,0 ft' • Design Poinl 'Based upon L, 'Based upon L1 MINIMUM CLASS L, STONE NCDOT RIP OF Coeficent LICOealClenl THICKNESS 201 RAPCLASS STONE ONINS M1. M1. 1 4 ,1 ] B LIGHT ] 6 16 MFDNM 4$ EAW 4 Di 5 3 HEAW I. 5 3 HEAW 5 10 36 ] DeP nISBe MTeS Ll b PMtrcl CUMn L3 GrgN b P—, scw, Htle NAME SEE SPEOnuneNE 1 7.1 Ss RIP -RAP CLAS51 STO JJ% 6NLLL KEIGH AT LEAST M LBS. EACH. NO MORE THAN IM SHALL K£IGH LESS THAN 15LBS. EACH CLASS 1S]50 OBF $HALL WEIGH AT LEAST 60 LBS. EACH. NO MORE TH. 5%SHALL veBGN LESS THAN'A L15. EACH EROSION CONTROL STONE CLASS A 18' ,D% TOP 6 BOTTOM STNE5. NO CRADATIOv mrcFlFo CLAS5e l5.'N s, s- N NAGATKK!$PECInEO RIP RAP APRON DESIGN SHEET DPTE: "1. A,D RED. SHEET 5 OF B FROJECT: CemF I.—Ni.1.F Io.NO: PROJECT NO: 3053 FILE'. DESCRIPTION 0-1 Outlet Protection LOORLON Now. ,. H 7N,--b, PHEW,'.%. z. vEI Pi W •Ion IS, w. Lwwn. w—nW—I—HiS, —'o— EI Dula N- Number of Culverts: Design Velocity. Va : a to nn Flo., O: "Ia. Rpe Diameter. D.: ,.sn Slope..._= D.,De non Using NCDOT Rip RED Apron Design: Use: Zone Li 45 ft, Lz: 9 ft, W: 6.0 ft. W: 6 0 ft. CLASS'B' RIP RAP USE MINIMUM 18' STONE THICKNESS TOTAL STONE VOLUME= 40.5 ft' 61,0 e 'Based upon L, 'Based upon Lz EFFIGN a'. JTR cewxED sr. VIC RIP RAP APRON DESIGN SHEET DATE'. All TRIO Tallow PRWECT: —111-Oleo lM}mn I. D.NO: PHNIECT Nn: 305] FTE ocscwpnON 0-1 Outlet Protection LOCATION. 25 20 5 Rip Rap Zone Delineation ONE4 IS II II I ZONET l l r ZONEJ L • ZON12 DONE tl ZONE � 0 . 0 5 10 15 20 25 Do, Depth of Flow (ft.) Corp Le-m. NC N.... o"I"i-S ea,pe-11s.. i, Foe,soch—rh.W... ly p•w].hnmelwu,M.u,DC,M.,e[Ymel•rMo,oullelMM Number of Culverts: Design Velocity, Va: a.ID Tn Flow, O: aa<e Pipe Diameter, D. i s n. Slope, S.,-- BBBB rt'a Using NCDOT Rip Rap Apron Oil Use: Zone D L,: 4.5 ft. L,: 9 ft. W: 60 ft, W: 60 ft, CLASS RIP RAP USE MINIMUM 18' STONE THICKNESS TOTAL STONE VOLUME= 40.5 ite 81.0 ft' • Design Point 'Based Upon Lr 'Based upon LB SHEET o Oi D ESSION eV: lie CHECKED BY: VJC MINIMUM CLASS Lr STONE NCWT RIP OF C,r1fidenl Lr Cv ffkiml THICKNESS ZONE RAP CLASS STONE it ft FINE li 3 H' ] Eal MEDIUM < B N ; gW a e N $ 1 5 in ]B B „sAW W 0 Oe•nre Be MPa rel INTIve R LI ell. bICNvn i•LenDlh b N-1 Smu Hole SIZE SPECIFICATIONS (to RIP RAP THAN 151.1is EACH NO MORE uAr 5% SHALL vvSGH LESS EROSION CONTROL STORE vvGAADATP)N SPECIFIED RIP RAP APRON DESIGN SHEET DATE: A, 1. Is 1. SO AM till 7 OF 4 PROJECT CEE Le— Pri Aeawn I NO: OESIGNSY, 'a PROJECT NO: ]Ow me. CHECKED By: Vic DESCRIPTION. 0-1 Outlet Protection LOCATION CaTELelevrcNC 25 20 m 15 O 10 5 91 Rip Rap Zone Delineation 0 5 10 15 20 25 De, Depth of Flow (ft.) N. I. U. rcn 1. m<b PH— N u 3.1 pce Pm..,<n.M.<ulal P—mann.loN.e. u.ept,ue u<imma,w Ol culbinw. Number O1 Culverts: Design Velocity, Vd: 111 Iva Flaw, O: 1¢111. Pipe Diameter, Do: I z5 n Slope, S•„p,= o.S., mn. Using NC HOT Rip Rep Apron Design: Use: Zone 3 LI: 3.75 ft. Lr: 7.5 ft. W: 6.0 ft W: 6.0 ft. CLASS'B' RIP RAP USE MINIMUM 18- STONE THICKNESS TOTAL STONE VOLUME= 338 h' 6L511' • Design Point 'Based upon LI 'Based upon L3 MINIMUM CLASS L, STONE NCOOT RIP OF Coefllcienl L, COOBICient THICKNESS ZONE RAP CLASS STONE X. fl. 'HE tY 8' LIGHT ] 6 16 1 E.D.0 a 31 EnW 4 1 x 5 W 6 3 XEAW 5 10 J9 3 Ce0 nle Be NNe Sm Ll M Prolecl Culren LI Ss .J.—I Sur, NA. NAME KEI.T 512E SPECIRCAUENE I OS RIP R P CLASS SAO 30% SHALL WEIGH AT LEAST 60 LBs EACH. NONORE THAN 10%SHILL Well Lt. THAN I5LBS. EACH CLASS] 2s1W 60% SHALL WEIGH AT LEAST 50 LBG EACH, NO MORE THAN 5%SHALL WEIGH LESS AN So LOS. EACH EROSION CONTROL STONE CLASS 14 D 10%'OR 6B TOM sl3Es. ND GRPG ATIDT N SPECIEIEO CLASSB 1S]lq S13' NO GRAOATIW SPECIEIEO RIP RAP APRON DESIGN SHEET DATE. A,,I IS 1o:50 M, SHEET a HE e PROJECT Comm LANA. Hmo-m AsASn ID. No.: DESIGN er. JTH PROJECT NO: 30W FILE: CHECKED BY: VJC DESCRIPTION 0-1 Outlet Protection LOCATION Caro L, Nc Rip Rap Zone Delineation 25 20 15 •Design Painl O 10 5 0 -. 0 5 10 15 20 25 Do, Depth of Flow (ft.) i Now. 1. U.....,npler mr QodeV,O%. 3. F. PR.111 —S. W. al. Paved 1.1ANera. uu pCrm. recleul au e, elver eve Number of CUNeris: Design velocity, VS : • 3 v. Flow, O : zm A Pipe Diameter, D.: r 11. Slope, S„ OWa O.N Using NCDOT Rip Rap Apron Design: Use'. Zone 3 L,: 4.5 ft. L3: 9 ft. W'. 6.0 tt. My fi.0 ft. CLASS'B' RIP RAP USE MINIMUM 18' STONE THICKNESS TOTAL STONE VOLUME= 40.5 ft' 'Based upon L, 81.0 g' 'Based upon L3 MINIMUM CUSS 4 STONE NCDOT RIP OF LoeXl<iant LHCVaXicixn, THICKNESS ZONE RAP CLASS STONE X. M1. A' FINE 3 H' LIWI J la 3 I MEDIUM . a 39 HEAw e to E 3 „FAV! 5 IO J9 6 3 FAW 10 SB 3 Oeei 1.9a M NiM. MCOM �zay.LmmPm,ec,CUMn xeARu m PAwm sru, Ha. RIP RAP APRON DESIGN SHEET DATE. Aplr 1,.1L PIRGA1 snEEl 4 of PROJECT. Cerro Lemule Noanul MdIA1 Lo. NO: DESIGN BY JTR PROJECT NO: 3053 Li CRECMED 61: Vic DESO11111 N. 0-1 DIJi PIDteCllGn LOCATION Camp Laleum, NG Rip Rap Zone Delineation 25 20 15 .Design Paint O >° 10 5 0 0 5 10 15 20 25 Do, Depth of Flow (ft.) ua.. 1. Ow nee mmk-1—.lox. a. RA.aoe.IT, m..rm. m. ewwn n.wa on.nn.I d,uee. �,.paoe...ao,.a.,,. a o„u.I nm.. PONE Number Of Culverts: Design velocity, VA Flow, O: 1II. CE Pipe Diameter. CA: 2IT Slope, s.,A, 000s nm Using NCDOT flip Rap Apron Design: Use: Zone 2 16 ft. 1 12 ft. w: 6 0 ft. W: 6 8 ft, CILASS'B' RIP RAP USE MINIMUM 18' STONE THICKNESS TOTAL STONE VOLUME- sd O ft' 'Based upon L, 122 4 ft' 'Based upon L2 L1 .LegN b Prolxl Culwn L2 c.gNa n...1, srae lab Sediment Basin Design North Carolina Erosion and Sedimentation Planning and Design Manual Project Name: MCB Camp Lejeune Clinic Sediment Basin Number: A Project Number: 3053 Basin Location: Southwest corner of site Disturbed earth (this project) _ Undisturbed, wooded areas = Undisturbed, grassy areas = Other areas = 2.40: @ c= 0.60 0.00: @ c= 0.25 0.00: @ c= 0.30 0.00: @ c= 0.00 Total Drainage Area (ac) = 2.40 @ c= 0.60 Flow Length (ft) High Point (ft) Low Point (ft) 600 ft 18ft 8.5 ft Calculated Time of Concentration "Tc" (min) = 5.30 min (Kirpich Formula) Rainfall Intensity, 2-yr Storm = 5.57 in/hr (from local i-d-f curveltable) Rainfall Intensity, 10-yr Storm = 7.25 in/hr (from local i-d-f curve/table) Flow "Q = CIA" (10-yr) = 10.42 cfs Basin Volume: Minimum Required Volume = 3600 cf/acre of disturbed area Volume Required (cf) = 8,626 cf Minimum Surface Area required = 0.01.10-yr Peak Flow (cfs) Surface Area Required (sf) = 4,540 sf Shape is assumed to be trapezoidal - excavation may be required Depth of Basin (ft) = 2 ft (from surface - 3.5 ft maximum) Sideslopes (11:1) = 3 A (2:1 minimum) Bottom Width (ft) = 51 ft Bottom Length (ft) = 175 ft (try to be 2X width) Surface Width (ft) = 63 ft Surface Length (ft) = 187 ft Bottom Area (sf) = 8925 sf Surface Area (sf) = 5636 sf 4,540 OK Volume Provided (cf) = 18376 cf > 8625.6 OK Sediment Basin Design North Carolina Erosion and Sedimentation Planning and Design Manual Stone Outlet: Required Capacity = Peak Flow from a 10 yr storm event. Required Capacity (cfs) = 10.42 cfs Sideslopes (11:1) = 3 :1 Bottom Width (ft) = 35 ft Depth of flow (ft) = 0.23 ft Provided Capacity = C L HA1.5 Spillway Capacity (cfs) _ min. = 20ft (usually less than 1 ft) 10.81 cfs OK Sediment Trap Summary: Bottom Width = 51 ft Approximate Bottom Length = 175 ft dimensions. See actual Top Width = 63 ft pond design for layout. Top Length = 187 ft Stone Outlet Width = 35 ft Outlet Sideslopes = 3 :1 Storage Depth = 2 ft Dam Height = 3.5 ft Sideslopes = 3:1 Note: All Calculations are based on a 10 year return rainfall and in accordance with the North Carolina Erosion and Sedimentation Planning and Design Manual. Sediment Basin Design North Carolina Erosion and Sedimentation Planning and Design Manual Project Name: MCB Camp Lejeune Clinic Sediment Basin Number: B Project Number: 3053 Basin Location: Northwest corner of site Flow: Disturbed earth (this project) _ Undisturbed, wooded areas = Undisturbed, grassy areas = Other areas = 7.16: @ c= 0.60 0.00: @ c= 0.25 0.00: @ c= 0.30 0.00 @ c= 0.00 Total Drainage Area (ac) = 7.16 @ c= 0.60 Flow Length (ft) High Point (ft) Low Point (ft) = 920 ft 20 ft = 8.5 ft - GG771 Calculated Time of Concentration "Tc" (min) = 8.07 min (Kirpich Formula) Rainfall Intensity, 2-yr Storm = 5.57 in/hr (from local i-d-f curve/table) Rainfall Intensity, 10-yr Storm = 7.25 in/hr (from local i-d-f curve/table) Flow "Q = CIA" (10-yr) = 31.15 cfs n Volume: Minimum Required Volume = 3600 cf/acre of disturbed area Volume Required (cf) = 25,776 cf Minimum Surface Area required = 0.01*10-yr Peak Flow (cfs) Surface Area Required (sf) = 13,567 sf Shape is assumed to be trapezoidal - excavation may be required Depth of Basin (ft) = 2 ft (from surface - 3.5 ft maximum) Sideslopes (h:1) = 3 :1 (2:1 minimum) Bottom Width (ft) = 70 ft Bottom Length (ft) = 285 ft (try to be 2X width) Surface Width (ft) = 82 ft Surface Length (ft) = 297 ft Bottom Area (sf) = 19950 sf Surface Area (sf) = 29451 sf 13,567 OK Volume Provided (cf) = 49566 cf > 25776 OK Sediment Basin Design North Carolina Erosion and Sedimentation Planning and Design Manual Required Capacity = Peak Flow from a 10 yr storm event. Required Capacity (cfs) = 31.15 cfs Sideslopes (h:1) = 3 :1 Bottom Width (ft) = 35 ft min. = 20ft Depth of flow (ft) = 0.47 ft (usually less than 1 ft) Provided Capacity = C L HA1.5 Spillway Capacity (cfs) = 31.58 cfs OK Sediment Trap Summary: Bottom Width = 70 ft Approximate Bottom Length = 285 ft dimensions. See actual Top Width = 82 ft pond design for layout. Top Length = 297 ft Stone Outlet Width = 35 ft Outlet Sideslopes = 3 :1 Storage Depth = 2 ft Dam Height = 3.5 ft Sideslopes = 3:1 Note: All Calculations are based on a 10 year return rainfall and in accordance with the North Carolina Erosion and Sedimentation Planning and Design Manual. Sediment Basin Design North Carolina Erosion and Sedimentation Planning and Design Manual Project Name: MCB Camp Lejeune Clinic Sediment Basin Number: C Project Number: 3053 Basin Location: Southeast corner of site " �i Flow: Disturbed earth (this project) _ Undisturbed, wooded areas = Undisturbed, grassy areas = Other areas = 3.10: @ c= 0.60 0.00: @ c= 0.25 0.00: @ c= 0.30 0.00 @ c= 0.00 Total Drainage Area (ac) = 3.10 @ c= 0.60 Flow Length (ft) = 500 ft High Point (ft) = 27.5 ft Low Point (ft) = 22 ft Calculated Time of Concentration "Tc" (min) = 5.30 min (Kirpich Formula) Rainfall Intensity, 2-yr Storm = 5.57 in/hr (from local i-d-f curve/table) Rainfall Intensity, 10-yr Storm = 7.25 in/hr (from local i-d-f curve/table) Flow "Q = CIA" (10-yr) = 13.49 cfs Basin Volume: Minimum Required Volume = 3600 cf/acre of disturbed area Volume Required (cf) = 11,160 cf Minimum Surface Area required = 0.01'10-yr Peak Flow (cfs) Surface Area Required (sf) = 5,874 sf Shape is assumed to be trapezoidal - excavation may be required Depth of Basin (ft) = 2 ft (from surface - 3.5 ft maximum) Sideslopes (h:1) = 3 :1 (2:1 minimum) Bottom Width (ft) = 40 ft Bottom Length (ft) = 240 ft (try to be 2X width) Surface Width (ft) = 52 ft Surface Length (ft) = 252 ft Bottom Area (sf) = 9600 sf Surface Area (sf) = 20861 sf 5,874 OK Volume Provided (cf) = 32730 cf > 11160 OK Sediment Basin Design North Carolina Erosion and Sedimentation Planning and Design Manual Outlet: Required Capacity = Peak Flow from a 10 yr storm event. Required Capacity (cfs) = 13.49 cfs Sideslopes (h:1) = 3 :1 Bottom Width (ft) = 25 ft min. = 20ft Depth of flow (ft) = 0.34 ft (usually less than 1 ft) Provided Capacity = C L HA1.5 Spillway Capacity (cfs) = 13.88 cfs OK Sediment Trap Summary: Bottom Width = 40 ft Approximate Bottom Length = 240 ft dimensions. See actual Top Width = 52 ft pond design for layout. Top Length = 252 ft Stone Outlet Width = 25 ft Outlet Sideslopes = 3 :1 Storage Depth = 2 ft Dam Height = 3.5 ft Sideslopes = 3:1 Note: All Calculations are based on a 10 year return rainfall and in accordance with the North Carolina Erosion and Sedimentation Planning and Design Manual. Sediment Basin Design North Carolina Erosion and Sedimentation Planning and Design Manual Project Name: MCB Camp Lejeune Clinic Sediment Basin Number: D Project Number: 3053 Basin Location: Center of site Disturbed earth (this project) _ Undisturbed, wooded areas = Undisturbed, grassy areas = Other areas = 0.76 : @ c= 0.60 0.00: @ c= 0.25 0.10: @ c= 0.30 0.34: @ c= 0.95 Total Drainage Area (ac) = 1.20 @ c= 0.67 Flow Length (ft) High Point (ft) Low Point (ft) 300 ft 37.5 ft = 32.5 ft Calculated Time of Concentration "Tc" (min) = 3.05 min (Kirpich Formula) Rainfall Intensity, 2-yr Storm = 5.57 in/hr (from local i-d-f curve/table) Rainfall Intensity, 10-yr Storm = 7.25 in/hr (from local i-d-f curve/table) Flow "Q = CIA" (10-yr) = 5.87 cfs n Volume: Minimum Required Volume = 3600 cf/acre of disturbed area Volume Required (cf) = 2,736 cf Minimum Surface Area required = 0.01.10-yr Peak Flow (cfs) Surface Area Required (sf) = 2,555 sf Shape is assumed to be trapezoidal - excavation may be required Depth of Basin (ft) = 2 ft (from surface - 3.5 ft maximum) Sideslopes (h:1) = 3 :1 (2:1 minimum) Bottom Width (ft) = 35 ft Bottom Length (ft) = 100 ft (try to be 2X width) Surface Width (ft) = 47 ft Surface Length (ft) = 112 ft Bottom Area (sf) = 3500 sf Surface Area (sf) = 8320 sf 2,555 OK Volume Provided (cf) = 12394 cf > 2736 OK Sediment Basin Design North Carolina Erosion and Sedimentation Planning and Design Manual Stone Outlet: Required Capacity = Peak Flow from a 10 yr storm event. Required Capacity (cfs) = 5.87 cfs Sideslopes (h:1) = 3 :1 Bottom Width (ft) = 50 ft Depth of flow (ft) = 0.13 ft Provided Capacity = C L HA1.5 Spillway Capacity (cfs) _ min. = 20ft (usually less than 1 ft) 6.56 cfs OK Sediment Trap Summary: Bottom Width = 35 ft Approximate Bottom Length = 100 ft dimensions. See actual Top Width = 47 ft pond design for layout. Top Length = 112 ft Stone Outlet Width = 50 ft Outlet Sideslopes = 3 :1 Storage Depth = 2 ft Dam Height = 3.5 ft Sideslopes = 3:1 Note: All Calculations are based on a 10 year return rainfall and in accordance with the North Carolina Erosion and Sedimentation Planning and Design Manual. Sediment Basin Design North Carolina Erosion and Sedimentation Planning and Design Manual Project Name: MCB Camp Lejeune Clinic Sediment Basin Number: E Project Number: 3053 Basin Location: Southeast corner of site Flow: Disturbed earth (this project) _ Undisturbed, wooded areas = Undisturbed, grassy areas = Other areas = 0.50: @ c= 0.60 0.00: @ c= 0.25 0.63: @ c= 0.30 0.00 @ c= 0.00 Total Drainage Area (ac) = 1.13 @ c= 0.43 Flow Length (ft) = 300 ft High Point (ft) = 22 ft Low Point (ft) = 16 ft Calculated Time of Concentration "Tc" (min) = 2.84 min (Kirpich Formula) Rainfall Intensity, 2-yr Storm = 5.57 in/hr (from local i-d-f curve/table) Rainfall Intensity, 10-yr Storm = 7.25 in/hr (from local i-d-f curve/table) Flow "Q = CIA" (10-yr) = 3.55 cfs Basin Volume: Minimum Required Volume = 3600 cf/acre of disturbed area Volume Required (co = 1,800 cf Minimum Surface Area required = 0.01*10-yr Peak Flow (cfs) Surface Area Required (so = 1,544 sf Shape is assumed to be trapezoidal - excavation may be required Depth of Basin (ft) = 2 ft (from surface - 3.5 ft maximum) Sideslopes (h:1) = 3 :1 (2:1 minimum) Bottom Width (ft) = 31 ft Bottom Length (ft) = 85 ft (try to be 2X width) Surface Width (ft) = 43 ft Surface Length (ft) = 97 ft Bottom Area (so = 2635 sf Surface Area (sf) = 5684 sf 1,544 OK Volume Provided (co = 8146 cf > 1800 OK Sediment Basin Design North Carolina Erosion and Sedimentation Planning and Design Manual Required Capacity = Peak Flow from a 10 yr storm event. Required Capacity (cfs) = 3.55 cfs Sideslopes (h:1) = 3 :1 Bottom Width (ft) = 20 ft min. = 20ft Depth of flow (ft) = 0.16 ft (usually less than 1 ft) Provided Capacity = C L HA1.5 Spillway Capacity (cfs) = 3.58 cfs OK Sediment Trap Summary: Bottom Width = 31 ft Approximate Bottom Length = 85 ft dimensions. See actual Top Width = 43 ft pond design for layout. Top Length = 97 ft Stone Outlet Width = 20 ft Outlet Sideslopes = 3 :1 Storage Depth = 2 ft Dam Height = 3.5 ft Sideslopes = 3:1 Note: All Calculations are based on a 10 year return rainfall and in accordance with the North Carolina Erosion and Sedimentation Planning and Design Manual. Architecture & Engineering Channel Design TRAPEZOIDAL SHAPE T �\ d m b —}— e Channel Location: Channel Al Estimate 10-yr Peak Runoff: Rational C 0.20 Intensity in/hr 7.25 Drainage Area 0.85 ac Qio 1.23 cfs Additional Flow 0.00 cfs Qio Total, Qdesign 1.23 cfs Channel Information: Channel Bottom Width, b 0.0 fUft Side Slo a x.1 3.0 Channel Slo e, S 0.013 ft/ft Flow Depth, d 0.42 It Selected Channel Lining: Selected Channel LiningUnlined-Bare Soil Maximum Permissible Velocity max (fps) 2.5 Permissible Shear Stress (tp) (psf 0.35 Calculations: e 1.3 ft Side Sloe Length, m 1.3 ft Top Width, T 2.5 ft Channel Area, A 0.53 sq ft Wetted Perimeter, Pw 2.66 ft Hydraulic Radius, Rh 0.20 ft Mannin s "n" 0.023 Calculated Flow Rate, Q.ic 1.31 cfs Calculated Velocity, Vcalc 2.47 fps Calculated Shear Stress, tcaic 0.33 psf Q calc > Q design? yes V calc 5 V max? yes t calc 5 t p i• yes Architecture & Engineering Channel Design TRAPEZOIDAL SHAPE T �\ d m \ b Channel Location: Channel A2 Estimate 10-vr Peak Runoff: Rational C 0.60 Intensity in/hr 7.25 Drainage Area 0.64 ac CIO 2.78 cfs Additional Flow 0.00 cfs Qio Total, Qdesien 2.78 cfs Channel Information: Channel Bottom Width, b 2.0 ft/ft Side Slo a x:1 3.0 Channel Slope,S 0.027 fUft Flow Depth, d 0.30 ft Selected Channel Lininq: Selected Channel Lining Fiberglass Nettin Maximum Permissible Velocity max (fps) 4.5 Permissible Shear Stress (tp) (psf 1 0.60 Calculations: e 0.9 ft Side Slope Length, m 0.9 ft Top Width, T 3.8 ft Channel Area, A 0.87 sq ft Wetted Perimeter, Pw 3.90 ft Hydraulic Radius, Rh 0.22 ft Mannin s "n" 0.028 Calculated Flow Rate, Qcaic 2.80 cfs Calculated Velocity, Vwic 3.22 fps Calculated Shear Stress, twit, 0.51 psf Q eam >_ Q da:Ian? yes V calc S V ma.? yes t calc S t P? yes Architecture & Engineering Channel Design TRAPEZOIDAL SHAPE d mb e Channel Location: Channel A3 Estimate 10-vr Peak Runoff: Rational C 0.60 Intensity in/hr 7.25 Drainage Area 1.25 ac Q10 5.44 cfs Additional Flow 0.00 cfs Q10 Total, QdesiBn 5.44 cfs Channel Information: Channel Bottom Width, b 13.0 ft/tt Side Slope x:1 3.0 Channel Slope, S 0.022 fUft Flow Depth, d 0.38 ft Selected Channel Lining: Selected Channel LiningFiberglass Netting Maximum Permissible Velocity max (fps) 4.5 Permissible Shear Stress tp (psf) 1 0.60 Calculations: e 1.1 ft Side Slope Length, m 1.2 ft Top Width, T 5.3 ft Channel Area, A 1.57 sq ft Wetted Perimeter, P. 5.40 ft Hydraulic Radius, Rh 0.29 ft Mannin s "n" 0.028 Calculated Flow Rate, Q.ic 5.46 cfs Calculated Velocity, Veaic 3.47 fps Calculated Shear Stress, tcalc 0.52 psf Q calc >_ Q design? yes V calc S V max? yes t calc 5 t p? yes Architecture & Engineering Channel Design TRAPEZOIDAL SHAPE �\ d m�—b 1 e Channel Location: Channel B1-1 Estimate 10-yr Peak Runoff: Rational C 0.60 Intensity in/hr 7.25 Drainage Area 3.89 ac Qio 16.92 cfs Additional Flow 0.00 cfs Qio Total, Qdesign 16.92 cfs Channel Information: Channel Bottom Width, b 7.5 ft/ft Side Slo a x:1 3.0 Channel Slo e, S 0.017 ft/ft Flow Depth, d 0.50 ft Selected Channel Lining: Selected Channel Linin Fiber lass Nettin Maximum Permissible Velocity max (f s) 4.5 Permissible Shear Stress (tp) (psf) 0.60 Calculations: e 1.5 ft Side Sloe Length, in 1.6 ft Top Width, T 10.5 ft Channel Area, A 4.50 sq ft Wetted Perimeter, Pw 10.66 ft Hydraulic Radius, Rh 0.42 ft Mannin s "n" 0.028 Calculated Flow Rate, Qeaic 17.41 cfs Calculated Velocity, Vwic 3.87 fps Calculated Shear Stress, team 0.52 psf Q calc >_ Q design? yes V calc 5 V max? yes t cam 5 t p? yes Architecture & Engineering Channel Design TRAPEZOIDAL SHAPE / T -� r\ d I m r— b Channel Location: Channel B1-2 Estimate 10-vr Peak Runoff: Rational C 0.60 Intensity in/hr 7.25 Drainage Area 2.84 ac Q m 12.35 cfs Additional Flow 0.00 cfs QioTotal, Qdesign 12.35 cfs Channel Information: Channel Bottom Width, b 5.5 ft/ft Side Slope x:1 3.0 Channel Slope, S 0.017 ft/ft Flow Depth, d 0.49 ft Selected Channel Lininq: Selected Channel Lining Fiberglass Nettin Maximum Permissible Velocity max f s 4.5 Permissible Shear Stress (tp) (psf) 0.60 Calculations: e 1.5 ft Side Sloe Length, m 1.5 ft Top Width, T 8.4 ft Channel Area, A 3.42 sq ft Wetted Perimeter, Pw 8.60 ft Hydraulic Radius, Rh 0.40 ft Mannin s "n" 0.028 Calculated Flow Rate, Qcalc 12.69 cfs Calculated Velocity, Vcaic 3.72 fps Calculated Shear Stress, tcnic 0.51 psf Q calc > Q design? yes V calc 5 V maa? yes t calc 5 t p? yes Architecture & Engineering Channel Design TRAPEZOIDAL SHAPE T �\ d m 7 f- b -i- e Channel Location: Channel B1-3 Estimate 10-yr Peak Runoff: Rational C 0.60 Intensity in/hr 7.25 Drainage Area 1.58 ac Qio 6.87 cfs Additional Flow 0.00 cfs Qio Total, Qdeslgn 6.87 cfs Channel Information: Channel Bottom Width, b 3.0 ft/ft Side Slope x:1) 3.0 Channel Slope, S 1 0,017 ft/ft Flow Depth, d 1 0.47 ft Selected Channel Lining: Selected Channel Lining Fiberglass Nettin Maximum Permissible Velocity max (fps) 4.5 Permissible Shear Stress (tp) (psf) 0.60 Calculations: e 1.4 ft Side Sloe Length, m 1.5 ft Top Width, T 5.8 ft Channel Area, A 2.07 sq ft Wetted Perimeter, P. 5.97 ft Hydraulic Radius, Rh 0.35 ft Mannin s "n" 0.028 Calculated Flow Rate, Q.ie 7.04 cfs Calculated Velocity, Veaic 3.40 fps Calculated Shear Stress, tcaic 0.49 psf Q calc Q design? yes V calc 5 V flla.? yes t caic 5 t p? yes Architecture & Engineering Channel Design TRAPEZOIDAL SHAPE T �\ d Channel Location: Channel B2-1 Estimate 10-vr Peak Runoff: Rational C 0.60 Intensity in/hr) 7.25 Drainage Area 1.46 ac Qio 6.35 cfs Additional Flow 0.00 cfs Qio Total, Qdesign 6.35 cfs Channel Information: Channel Bottom Width, b 3.0 ft/ft Side Slope x:1 3.0 Channel Slope, S 0.0600 ft/ft Flow Depth, d 0.37 ft Selected Channel Lininq: Selected Channel LiningSynthetic Mat Maximum Permissible Velocity max (fps) 4.5 Permissible Shear Stress tp) (psf) 2.00 Calculations: e 1.1 ft Side Sloe Length, in 1.2 ft Top Width, T 5.2 ft Channel Area, A 1.52 sq ft Wetted Perimeter, Pw 5.34 ft Hydraulic Radius, Rh 0.28 ft Mannin s "n" 0.036 Calculated Flow Rate, Qcaic 6.67 cfs Calculated Velocity, Vmic 1 4.39 fps Calculated Shear Stress, tceic 1 1.39 psf Q cam > Q design? yes V talc 5 V max? yes t talc 5 It p? yes Architecture & Engineering Channel Design TRAPEZOIDAL SHAPE T d m Channel Location: Channel B2-2 Estimate 10-yr Peak Runoff: Rational C 0.60 Intensity (in/hr) 7.25 Drainage Area 0.77 ac 010 3.35 cfs Additional Flow 0.00 cfs Qm Total, Qdesign 3.35 cfs Channel Information: Channel Bottom Width, b 3.0 ft/ft Side Slope x:1 N. Channel Slope, S 0.0080 ft/ft Flow Depth, d 0.35 ft Selected Channel Lining: Selected Channel Linin Unlined -Bare Soil Maximum Permissible Velocity max (fps) 2.5 Permissible Shear Stress 1p} (ps9 0.35 Calculations: e 1.1 ft Side Sloe Length, m 1.1 ft Top Width, T 5.1 ft Channel Area, A 1.42 sq ft Wetted Perimeter, P. 5.21 It Hydraulic Radius, Rh 0.27 ft Mannin s "n" 0.023 Calculated Flow Rate, Q.m 3.45 cfs Calculated Velocity, Vwic 2.43 fps Calculated Shear Stress, team 0.17 psf Q talc > Q design? yes V talc S V max? yes t talc 5 t p? yes Architecture & Engineering Channel Design TRAPEZOIDAL SHAPE T d m 7 f— b -T-- e Channel Location: Channel B2-3 Estimate 10-yr Peak Runoff: Rational C 0.60 Intensity in/hr 7.25 Drainage Area 0.15 ac Qio 0.65 cfs Additional Flow 0.00 cfs QioTotal, Qdesign 0.65 Cfs Channel Information: Channel Bottom Width, b 0.0 ft/ft Side Slope x:1 3.0 Channel Slope, S 1 0.0100 ft/ft Flow Depth, d 1 0.34 ft Selected Channel Lining: Selected Channel LiningUnlined-Bare Soil Maximum Permissible Velocity max fps 2.5 Permissible Shear Stress (tp) (psq 0.35 Calculations: e 1.0 ft Side Slope Length, m 1.1 ft Top Width, T 2.0 ft Channel Area, A 0.35 sq ft Wetted Perimeter, Pw 2.15 ft Hydraulic Radius, Rh 0.16 ft Mannin s "n" 0.023 Calculated Flow Rate, Qcak 0.67 cfs Calculated Velocity, V.m 1 M fps Calculated Shear Stress, tcelc 0.21 psf Q calc >_ Q design? yes V calc 5 V maa? yes t calc 5 t p? yes Architecture & Engineering Channel Design TRAPEZOIDAL SHAPE T �\ d m �— b Channel Location: ChannelCl Estimate 10-vr Peak Runoff: Rational C 0.30 Intensity in/hr 7.25 Drainage Area 1.51 ac Q m 3.28 cfs Additional Flow 0.00 cfs Clio Total, Qdesign 3.28 cfs Channel Information: Channel Bottom Width, b 2.ft/ft 5. Side Slope (x:1) 1. Channel Slope, S 0.004 ft/ft Flow Depth, d 0.45 ft Selected Channel Lining: Selected Channel LiningUnlined-Bare Soil Maximum Permissible Velocity max (fps) 2.5 Permissible Shear Stress (lp) (psf) 0.35 Calculations: e 1.4 ft Side Sloe Length, m 1.4 ft Top Width, T 5.2 ft Channel Area, A 1.73 sq ft Wetted Perimeter, P. 5.35 ft Hydraulic Radius, Rh 0.32 ft Mannin s "n" 0.023 Calculated Flow Rate, Qcaic 3.35 cfs Calculated Velocity, V.ic 1.93 fps Calculated Shear Stress, t.ic 0.11 psf Q calc >_ Q design? yes V calc 5 V mac? yes t calc S It p7 yes Architecture & Engineering Channel Design TRAPEZOIDAL SHAPE T �\ m n d Channel Location: Channel C2 Estimate 10-vr Peak Runoff: Rational C 0.30 Intensity inlhr) 7.25 Drainage Area 1.45 ac Qio 3.15 cfs Additional Flow 0.00 cfs Qio Total, Qdesign 3.15 cfs Channel Information: Channel Bottom Width, b 2.5 ft/ft Side Slo a x:1 3.0 Channel Slo e, S 0.010 ft/ft Flow Depth, d 0.38 ft Selected Channel Lining: Selected Channel LiningJule Nettin Maximum Permissible Velocity max (fps) 2.5 Permissible Shear Stress (tp) (pst) 0.45 Calculations: e 1.1 ft Side Slope Length, m 1.2 ft Top Width, T 4.8 ft Channel Area, A 1.38 sq ft Wetted Perimeter, Pw 4.90 ft Hydraulic Radius, Rh 0.28 ft Mannin s "n" 0.028 Calculated Flow Rate, Qcalc 3.17 cfs Calculated Velocity, Vcalc 2.29 fps Calculated Shear Stress, tcaic 0.24 psf Q calc Q design? yes V calc S V mac? yes t calc 5 t p? yes Arebitecture & Engineering Channel Design TRAPEZOIDAL SHAPE T d b — e Channel Location: Channel C3 Estimate 10-yr Peak Runoff: Rational C 0.60 Intensity (in/hr) 7.25 Drainage Area 2.49 ac Qio 10.83 cfs Additional Flow 0.00 cfs Qm Total, Qaesign 10.83 cfs Channel Information: Channel Bottom Width, b 2.5 ft/ft Side Slo a x:t 3.0 Channel Slop e, S 0.010 ft/ft Flow Depth, d 0.72 ft Selected Channel Lining: Selected Channel LiningJute Netting Maximum Permissible Velocity max (fps) 4.5 Permissible Shear Stress (tp (psf) 1 0.45 Calculations: e 2.2 ft Side Slope Length, m 2.3 ft Top Width, T 6.8 ft Channel Area, A 3.36 sq ft Wetted Perimeter, P. 7.05 ft Hydraulic Radius, Rh 0.48 ft Mannin s "n" 0.028 Calculated Flow Rate, Qwk 10.88 cfs Calculated Velocity, V.I. 3.24 fps Calculated Shear Stress, twin 0.45 psf Q Cale Q design? yes V talc 5 V max? yes t Cale S t p? yes Architecture & Engineering Channel Design TRAPEZOIDAL SHAPE T r\ d m -- b I e Channel Location: ChannelEl Estimate 10-yr Peak Runoff: Rational C 0.30 Intensity in/hr 7.25 Drainage Area 0.55 ac Qio 1.20 cis Additional Flow 0.00 cis Qio Total, Qdeslgn 1.20 cis Channel Information: Channel Bottom Width, b 0.0 ft/ft Side Soa xA 3.0 Channel Slope,S 0.0125 fUft Flow Depth, d 0.41 R Selected Channel Lining: Selected Channel LiningUnlined-Bare Soil Maximum Permissible Velocity max (fps) 2.5 Permissible Shear Stress tp) (psl) 0.35 Calculations: e 1.2 ft Side Sloe Length, m 1.3 ft Top Width, T 2.5 ft Channel Area, A 0.50 sq It Wetted Perimeter, Pw 2.59 ft Hydraulic Radius, Rh 0.19 ft Mannin s "n" 0.023 Calculated Flow Rate, Qcalc 1.23 cfs Calculated Velocity, Vcaio 1 2.43 f s Calculated Shear Stress, twin 1 0.32 sf Q calc Z Q design? yes V calc S V maxi yes It calc S t pi yes Architecture & Engineering Channel Design TRAPEZOIDAL SHAPE T Channel Location: Channel E2 Estimate 10-yr Peak Runoff: Rational C 0.30 Intensity (in/hr) 7.25 Drainage Area 0.33 ac Qlo 0.72 cfs Additional Flow 0.00 cfs Qlo Total, Qdesign 0.72 cfs Channel Information: Channel Bottom Width, b 0.0 ft/ft Side Slo a z:1 3.0 Channel Slo e, S 0.0250 ft/ft Flow Depth, d 0.32 ft Selected Channel Lining: Selected Channel LiningFiberglass Nettin Maximum Permissible Velocity max (fps) 4.5 Permissible Shear Stress (tp) (psf) 0.60 Calculations: e 1.0 ft Side Slope Length, m 1.0 R Top Width, T 1.9 It Channel Area, A 0.31 sq ft Wetted Perimeter, Pw 2.02 ft Hydraulic Radius, Rh 0.15 ft Mannin s "n" 0.028 Calculated Flow Rate, Qcalc 0.74 cis Calculated Velocity, Vcaic 2.39 fps Calculated Shear Stress, tcaic 0.50 psf Q calc a Q design? yes V talc S V max? yes t calc 5 t g? yes Architecture & Engineering Manning's Roughness Coefficient, n Manning's Roughness Coefficient for Temporary Lining Materials: Table 8.05e from Erosion and Sediment Control Planning and Design Manual Lining Type 0-0.5 ft 0.5-2.0 ft >2.0 ft Woven Paper Net 0.016 0.015 0.015 Jute Net 0.028 0.022 0.019 Fiberglass Roving 0.028 0.021 0.019 Straw with Net 0.065 0.033 0.025 Curled Wood Mat 0.066 0.035 0.028 Synthetic Mat 0.036 0.025 0.021 Manning's Roughness Coefficient: Table 8.05f from Erosion and Sediment Control Planning and Design Manual Lining Category Lining Type 0-0.5 ft 0.5-2.0 ft >2.0 ft Rigid Concrete 0.015 0.013 0.013 Grouted Riprap 0.04 0.03 0.028 Stone Masonry 0.042 0.032 0.03 Soil Cement 0.025 0.022 0.02 Asphalt 0.018 0.016 0.016 Unlined Bare Soil 0.023 0.02 0.02 Rock Cut 0.045 0.035 0.025 Gravel Riprap 1-inch D50 0.044 0.033 0.03 2-inch D50 0.066 0.041 0.034 Rock Riprap 6-inch D50 0.104 0.069 0.035 12-inch D50 ---- 1 0.078 1 0.04 TEL 919 677 2000 FAX 919 677 2050 Architecture & Engineering Maximum Permissible Velocities Maximum Permissible Velocities: Table 8.05d from Erosion and Sediment Control Planning and Design Manual Materials Maximum Permissible Velocities (fps) Fine Sand (noncolloidal) 2.5 Sand Loam (noncolloidal) 2.5 Silt Loam (noncolloidal) 3 Ordinary Firm Loam 3.5 Fine Gravel 5 Stiff Clay (very colloidal) 5 Graded, Loam to Cobbles (noncolloidal) 5 Graded, Silt to Cobbles (colloidal) 5.5 Alluvial Silts (noncolloidal) 3.5 Alluvial Silts (colloidal) 5 Coarse Gravel (noncolloidal) 6 Cobbles and Shingles 5.5 Maximum Permissible Velocities: Hydrology and Urbam Water systems by Dr. Rooney Malcom Maximum Permissible Materials Velocities (fps) Grass - Uncertain Maintenance 4 Grass - Good Cover, Proper Maintenance 5 Architecture & Engineering Maximum Permissible Shear Stress Permissible Shear Stresses for Riprap and Temporary Liners: Table 8.05g from Erosion and Sediment Control Planning and Design Manual Lining Category Lining Type Permissible Unit Shear Stress Td (ps Temporary Woven Paper Net 0.15 Jute Net 0.45 Fiberglass Roving: Single 0.60 Double 0.85 Straw with Net 1.45 Curled Wood Mat 1.55 Synthetic Mat 2.00 d50 Stone Sizes in Gravel Riprap 1 0.33 2 0.67 Rock Riprap 6 2.00 9 3.00 12 4.00 15 5.00 18 6.00 21 7.80 24 8.00 Permissible Shear Stresses for Vegetation: Table 2 from HEC 15: Design of Roadside Channels with Flexible Linings Permissible Unit Shear Stress Td Lining Category Lining Type (psf) Vegetation Class A 3.70 Class B 2.10 Class C 1.00 Class D 0.60 Class E 0.35 "See attached table for classifications. Classification of Vegetal Covers: Table 1 from HEC 15: Design of Roadside Channels with Flexible Linings Retardance Class Cover Condition A Weeping lovegrass Excellent stand, tall(average 30")(76cm) Yellow bluestem Excellent stand, tall avers a 36" 91cm B Kudzu Very dense growth, uncut Bermuda grass Good stand, tall (avg. 12")(30cm) Native grass mixture Good stand, unmowed Weeping lovegrass Good stand, tall (avg. 24")(61cm) Lespedeza sericea Good stand, not woody, tall (avg. 19")(48cm) Alfalfa Good stand, uncut (avg. 13")(33cm) Weeping lovegrass Good stand, unmowed (avg. 13")(33cm) Kudzu Dense growth, uncut Blue gamma Good stand, uncut (avg. 13" 28cm C Crabgrass Fair stand, uncut (10 to 48")(25 to 120cm) Bermuda grass Good stand, mowed (avg. 6")(15cm) Common lespedeza Good stand, uncut (avg. 11")(28cm) Grass -legume mixture Good stand, uncut (6 to 8")(15 to 20cm) Centipede grass Very dense cover (avg. 6")(15cm) Kentucky bluegrass Good stand, headed 6 to 12" 15 to 30cm D Bermuda grass Good stand, cut (2.5")(6cm) Common lespedeza Excellent stand, uncut (avg. 4.5")(11cm) Buffalo grass Good stand, uncut (3 to 6")(8 to 15cm) Grass -legume mixture Good stand, uncut (4 to 5")(10 to 13cm) Les edeza sericea After cutting to 2"(5cm), Very good stand before E Bermuda grass Good stand (1.5")(4cm) Bermuda grass Burned stubble CNComm. No.: 305313156 Camn Leieune. North Carolina Camp Lejeune Addition & Renovation STORMWATER NARRATIVE & CALCULATIONS Stormwater Management Permit Submittal 18 June 2010 Engineer (s): Vincent Chirichella, P.E. Jason Rupert, E.I. / U31441 c CHIR0o" 5 JUN 1 8 2010 TABLE OF CONTENTS 1.0 PROJECT NARRATIVE..................................................................................................1 1.1 GEOTECHNICAL INVESTIGATION........................................................................................ 10 2.0 DESIGN APPROACH.....................................................................................................10 2.1 STORM DRAINAGE PIPING.................................................................................................. 10 3.0 WATER QUALITY ANALYSIS...................................................................................11 4.0 WATER QUANTITY ANALYSIS.................................................................................11 4.1 PREDEVEI.OPNIENT CONDITIONS........................................................................................ 11 4.2 POST DEVELOPMENT CONDITIONS.....................................................................................12 APPENDIX A: STORM DRAINAGE CALCULATIONS AND MAPS APPENDIX B: GEOTECHNICAL REPORT APPENDIX C: INFILTRATION SYSTEM INVESTIGATION APPENDIX D: LOCATION AND VICINITY MAPS APPENDIX E: WETLAND DETERMINATION JUN 1 8 2010 Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 305313156 Stormwater Narrative Clark*Nexsen 1.0 PROJECT NARRATIVE 1. General Information A. Name of Project- Camp Lejeune Naval Hospital Addition & Renovation B. Street Address, City, County- 100 Brewster Blvd., Camp Lejeune, Onslow C. Acres in Tract- 81 acres D. Acres Being Disturbed- 22.4 acres E. Acres in Wetlands- 3.06 acres 1. Wetlands Must Be Delineated- Wetlands are delineated and the Jurisdictional Determination OD) has been approved by the Army Corps of Engineers. See Appendix E for JD submittal. 2. Proposed Wetland Impacts Require Permits from Corps & DWQ- There will be no disturbance of wetlands. F. Ownership Information From NC Secretary of State Web Site- Camp Lejeune, NC G. Description of Development Proposal The Camp Lejeune Naval Hospital Addition & Renovation is comprised of 6 major areas of development. Stormwater on the site will be treated by five (5) wet detention basins and one (1) infiltration basin. Stormwater will be conveyed to the various Best Management Practice's (BMP's) by means of grassed swales and stormwater pipe networks. Area 1: Clinic Addition & Parking Lot The Clinic Addition & Parking Lot will include the addition of a 59,000 square foot footprint, 2-story building to the western end of the existing budding, approximately 194,000 square feet of additional parking, roads and sidewalks. This area is proposed to be treated with two (2) wet detention basins. Low impact development (LID) measures will be implemented in parking lot islands and other locations through the use of grassed swales. Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 3053/3156 Stormwater Narrative Clark*Ncxsen The medians were not used as BMP's due to the elevation of the Seasonal High Water Table (SHWT) Area 2: Mechanical Room Addition The Mechanical Room Addition will include the addition of 10,296 square feet of proposed BUA (mechanical room, cooling tower yard, and driveway) at the northwest corner of the existing west wing of the Naval Hospital. This new BUA will be treated by an infiltration basin. Stormwater will be conveyed to the infiltration basin through a pipe network and also a swale that directs some of the runoff to an area drain. Area 3: New Employee Parking Lot The New Employee Parking Lot will include the addition of 77,011 square feet of proposed BUA consisting of sidewalk and parking. This area is proposed to be treated with one (1) wet detention basin. The parking lot will provide an additional 150 parking spaces. LID measures will be implemented in this area through the use of grassed swales in the parking lot islands. Area 4: Emergency Department The Emergency Department will include the addition of a 16,000 square foot, 2-story building in the approximate location of the current Emergency Department (southern part of the existing Naval Hospital). The area also includes 22,711 square feet of existing and proposed parking, driveway, and sidewalks. This area of development is proposed to be treated with one (1) wet detention basin. LID measures will not be implemented in this area due to its location within the developed area and confined space due to topography. Area 5: Employee Entrance The Employee Entrance will involve the re -development of the employee parking lot and associated walkways for entering the building due to the Emergency Department addition. The proposed development in this area will result in the reduction of existing BUA resulting in improved stormwater quality. The details of the area can be viewed in Section 2 Part E, `Stormwater Information; Will All Built Upon Area Be Collected' of this report. 2 Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 3053/3156 Stommwater Narrative Clark*Nexsen Area 6: Mobile Buildings The Mobile Buildings Area will include the addition of four (7) 2,160 square foot temporary trailers. The area also includes 8,548 square feet of walkways for access to the trailers. This area is proposed to be treated with one (1) wet detention basin. LID measures will be implemented in this area through the use of a grassed swale, north and west of the mobile buildings, which will convey stormwater to the basin. 1. Previous or Existing Permits. SW8 960329- Camp Lejeune Naval Hospital Parking Lot Addition SW8 081115- Wounded Warrior Greenway Facilities As part of this stormwater permit submittal, Stormwater Permit SW8 081115- Wounded Warrior Greenway Facilities will be modified to reflect the re-routing of the greenway to accommodate for the proposed Clinic Addition Parking Lots. All areas of the greenway that have been removed and replace will be directed into the wet detention basins; therefore, reducing the amount of impervious area covered by the original permit. Further, SW8 960329- Camp Lejeune Naval Hospital Parking Lot Addition, will be modified to include all proposed development including the replaced greenway. It is important to note that the areas including the stotmwater networks, impervious area and BMPs associated with stormwater permit SW8 960329 will not be disturbed or modified in any way. 2. Tax parcel ID Number- N/A H. Pre-1988 Built Upon Area - Camp Lejeune Naval Hospital has an extensive amount of Pre-1988 built upon area (BUA). The BUA includes sidewalks, buildings, roads and parking and is approximately 20 acres. The current site has only two wet detention basins as BMPs that treat specific areas of the parking lot that were added after the original development, and are permitted through DWQ under SW8 960329- Camp Lejeune Naval Hospital Parking Lot Addition. The proposed development has no effect on these BMPs or their drainage areas. The remaining BUA is 3 Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 3053/3156 Stormwater Narrative Clark*Nexsen captured by means of drop inlets, curb inlets and grassed swales which _convey the stormwater offsite. The existing stormwater pipe network is proposed to be rerouted in certain areas to allow for the proposed development. Delineated drainage area maps are provided within Appendix A. L Discuss Phasing of the Project & Stormwater Facilities When Applicable. See sheet GC101- Site Phasing for project phasing. J. Discuss Proposed Waste Water Treatment & Water Supply Water and Waste Water Treatment services will be extended from the existing building or new service connecting to existing utility infrastructure onsite. Additional Fire hydrants will be provided as necessary. Sanitary sewer for the addition will be connected to an existing 8" sewer main on the north side of the building. The existing waterline loop will be relocated around the new addition. K. Identify Historic Sites & Projects Being Funded With Public Monies- N/A L. Disclose Any/All Non-Comphance Issues with DENR Agencies - Not all BUA will be collected and treated by a proposed BMP. These areas are discussed in detail in Section 2 Part E. 2. Stormwater Information A. I. Provide River Basin- White Oak II. Stream Classification- SC; HQW, NSW III. Index Number- 19-16-(4.5) B. Identify Whether the Stormwater Design is High Density or Low Density, Commercial or Residential, State Stormwater or Coastal Stormwater, Address Vested Rights When Applicable; Identify Pockets of High Density. High Density, Commercial, Coastal Stormwater. El Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 3053/3156 Stormwater Narrative q Clad:*Nexsen C. Proposed Total % Impervious Surface. 48% Total Impervious D. Number of Proposed Treatment Measures, Type(s) of Collection System 6 BMPs: Five (5) Wet Detention Basins & One (1) Infiltration Basin. All Wet Detention Basins are designed to treat a design rainfall depth of 1.5 inches (Quality), pre/post control of the 1-yr and 2-yr 24-hr storm peak flow (Quantity), and a design Total Suspended Solids (TSS) removal of 90%. The pre -development and post -development drainage area maps and storm system calculations are included in Appendix A. Wet Detention Basin A Wet Detention Basin A has a drainage area of 129,312 sq.ft. (2.97 acres). The drainage area of wet detention basin A is 53.1% impervious, with a total impervious area of 68,668 sq.ft. (1.58 acres). The BUA consists primarily of parking lot, with sidewalk and greenway also present. Stormwater is conveyed within the parking lot using LID methods of two grassed swale islands within the parking lot. The stormwater is picked up on the northern end of the swales by drop inlets and conveyed to the forebay of the wet detention basin. The Wounded Warrior Greenway Facilities are modified in the area to the southwest of the basin to accommodate for the parking lot addition. Stormwater from the relocated Wounded Warrior Greenway sheet flows into the wet detention basin. Areas of the Wounded Warrior Greenway not modified by this project will remain under the existing Low Density Stormwater permit and will not be treated with the new BMPs. A grassed swale is proposed along the western side of the parking lot addition to capture and divert offsite Stormwater before it enters the parking lot. The swale will convey the stormwater to its existing outlet, 40 LF of 18" RCP passing under the greenway, located to the northwest of the wet detention basin. We are proposing to extend the outlet pipe with the addition of 114 LF of 18"RCP and two manholes. The additional stormwater piping and two manholes are being proposed to allow for the stormwater to be diverted around the proposed wet detention basin. The stormwater will exit the pipe and overland flow into the wetlands. The basin is drawndown through a 1.5 inch orifice in the riser in approximately 3.3 days, outletting at a rate of 0.03 cfs (ft'/s). An emergency spillway is proposed as a drain 5 Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 3053/3156 Stormwater Narrative Clark*Nexsen mechanism during emergency storm events. The wet detention basin provides 2.76 feet of freeboard over the staging elevation of the 100-yr storm and has been designed per NCDENR Requirements to have a treatment efficiency of 90% TSS Removal. Wet Detention Basin B Wet Detention Basin B has a drainage area of 325,700 sq.ft. (7.48 acres). The drainage area of the basin is 56.4% impervious, with an impervious area of 183,793 sq.ft. (4.22 acres). The BUA consists of the hospital clinic addition, sidewalk, parking lot addition, and streets. The proposed system of pipes and inlets will collect storm water runoff from roof leader downspouts for roof runoff, overland flow from the parking area, and some lawn areas. A section of existing stormwater pipe, including a discharge point, will be removed to accommodate for the proposed development to meet the requirement to treat all new impervious area. LID measures will be implemented in parking islands, where possible, throughout the proposed parking area in the form of grassed swales. The basin is drawndown through a three (3) inch orifice in the riser in approxunately 2.3 days and outletting at a rate of 0.116 cfs (ft'/s). An emergency spillway is proposed as a drain mechanism during emergency storm events. The wet detention basin provides 2.53 feet of freeboard over the staging elevation of the 100-yr storm event and has been designed per NCDENR Requirements to have a treatment efficiency of 90% TSS Removal. Wet Detention Basin C Wet Detention Basin C has a drainage area of 174,326 sq.ft. (4.00 acres). The drainage area of the basin is 44.2% impervious, with an impervious area of 77,011 sq.ft. (1.77 acres). The BUA consists of the new employee parking lot and sidewalk. Stormwater will overland flow from the parking lot and sidewalks to one of two LID measures in the form of grassed swales making up the parking lot islands. The two grassed swales will convey the stormwater to the western end of the swales where it will enter the stormwater pipe network via drop inlets connected to the stormwater network. The pipe network will outlet the stormwater to the forebay of the wet detention basin. The wet detention basin is drawndown through a two (2) inch orifice in the riser in approximately 2.8 days, outletting at a rate of 0.041 cfs (ft'/s). An emergency spillway is proposed as a drain mechanism during emergency storm events. The wet detention basin 10 Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 3053/3156 Stonnwater Narrative Clark*Nexsen provides 1.82 feet of freeboard over the staging elevation of the 100-yr storm event and has been designed per NCDENR Requirements to have a treatment efficiency of 90% TSS Removal. Wet Detention Basin D Wet Detention Basin D has a drainage area of 62,409 sq.ft. (1.43 acres). The drainage area of the basin is 61.5% impervious, with an impervious area of 38,410 sq.ft. (0.88 acres). The BUA consists of the Emergency Department addition, existing and proposed sidewalk, driveway and parking. The proposed system of pipes and inlets will collect stormwater runoff from roof leader downspouts for roof runoff, overland flow from the parking area, sidewalks, driveway, and some lawn/planter areas. The stormwater will be conveyed to the forebay of the basin located to the south of the Emergency Department. Because of the location of the development area (surrounded entirely by existing development and located on a hill), there will be no opportunities to incorporate LID measures for this stormwater system. The wet detention basin is drawndown through a 1.25 inch orifice in the riser in approximately 2.9 days, outletting at a rate of 0.019 cfs (ft3/s). An emergency spillway is proposed as a drain mechanism during emergency storm events. The wet detention basin provides 1.77 feet of freeboard over the staging elevation of the 100-yr storm event and has been designed per NCDENR Requirements to have a treatment efficiency of 90% TSS Removal. Wet Detention Basin E Wet Detention Basin E has a drainage area of 108,222sq.ft. (2.48 acres). The drainage area of the basin is 21.9% impervious, with an impervious area of 23,668 sq.ft. (0.54 acres). The BUA consists of seven (7) mobile buildings and sidewalks. Stormwater will overland flow from the area in a northwest direction to be diverted to the forebay of the BMP by grassed swales. The wet detention basin is drawndown through a one (1) inch orifice in the riser in approximately 3.2 days, outletting at a rate of 0.012 cfs (ft3/s). An emergency spillway is proposed as a drain mechanism during emergency storm events. The wet detention basin provides 1.52 feet of freeboard over the staging elevation of the 100-yr storm event and has 7 Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 3053/3156 Stomtwater Narrative Clark*NCxsen been designed Per NCDL:NR Requirements to have a treaunent effieimxy of 90% TSS 1Zemoval. Infiltration Basin F Infiltration Basin F has a drainage area of 30 279sq.ft. (0.70 acres). The drainage area of the basin is 34.0'V(� impcI-Vious, with an impervious area of 10,296 sq.ft. (024 acres). The BUA consists of the new mechanical room, cooling tower yard, and access driveway. Stormwater will be conveyed to the infiltration basin through a pipe network and also a Swale that directs some of the runoff to an area drain. The infiltration basin is designed to treat a design rainfall depth of 3.0 inches. A rainfall depth of 3 inches was used to allow this sytena to be exempt from providing an off-line bypass structure. The basin is designed to drawdown the design storm in approximately 0.14 days. An emergency spillways is proposed as a drain naechaninsm during emergency storm events. The infiltration basin provides 1.02 feet of freeboard over the staged elevation of the 100-vr storm event and to treat 85% T'SS Removal. E. Will All Built Upon Area Be Collected- No. Fhe following areas will not be treated as discussed in the Stormwater Scoping Meeting on November 24, 2009. Area 4: Emergency Department- Cut Through and New Stairs 'I lie Emergency Department drive isle cut through into the visitor parking lot, and the new stairway near the Emergency Department entrance down to the visitor parking lot will be treated by existing grassed swales. The cut through and new stairs accounts for 1,813 sq.ft. Area 5: P.mploycc Untrancc In its existing condition, this portion of the site is approximately 63,238 sq.ft. (1.45 acres) with 42,662 sq.ft. (0.98 acres) of BUA. The proposed development calls for 18,637 sq.ft. (0.43 acres) of BUA to be demolished and replaced with pervious cover, resulting in a proposed 24,025sq.ft. (055 acres) of BUA. Treatnem of stornnwater for dais area is not possible unless utilizing a storinwater vault and pumping to a retnotc 13l113. The employee F Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 305313156 Stoml\vater Narrative Clark*Ncxsen parking lot is sloped towards the existing hospital employee entrance where the low point is located approxnnately 30-feet from the face of the existing building. The stormwatcr is captured by the existing stormwater pipe network and is outlettcd to existing grassed swales. 'Chc runoff from this area of the site will be treated by existing grassed sxvalcs. The reduction in BUA for this area results in better stonnwatcr duality by providing more area for inftltration and less pollutant runoff. Area 6: Visitor Entrance There are two proposed cut through areas in the median of the main entrance of the hospital. These cut throughs allow access for incoming visitors to the proposed parking lots. Thcse two areas account for 1,323 sq.ft. of BUA and will be treated by existing grassed wales. Area 7: New Employee Parking Lot Sidewalk ]'here is a proposed section of sidewalk across the street from The Ncw li.mployec Parking Lot. This sidewalk anll allow for pedestrian access from the proposed parking lot to the hospital. The area of sidewalk accounts for 206 sq.ft. (.01 acres) of BUA and will be treated by existing grassed wwales. F. Identify Whether or Not the Project Has Buffer Requiremcuts & \Mlether or Not Development Is Proposed V"ithin A Buffer. N/A G. Discuss Coastal Management Areas of Environmental Concern AChen Applicable. N/A H. Disclose Whether or Not Off -Site Runoff Is Coming Onto The Site or Into The Proposed BNIP. N/A I. Discuss Whether Road Construction Across Other Property Is Necessary To Access This Project. None Necessary. N/A 9 Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 305313156 Stumiwater Narrative Clark*Ncxscn J. If An On -Site Evaluation Of The Soils Has 13ecn Donc, Discuss Infiltration Rates, Seasonal High VV"ater Table, etc., and lnclude Date Of Site Hvaluatio❑ (This Is Required For Infiltration projects). Two Gcotechtucal Reports have been completed for this project (Sec Appendix 13). In the area of the Infiltration Basin, the Sl-I\V'T has been detcrnuned to be located 30 inches below existing grade elevation with an infiltration rate of 2.2 inches per hour. An on -site meeting with Vincent Dorsey occurred on slay 5°' at 9:30 am where the above information was verified. K. Is The Department of Transportation Requiring The Construction Of A Turn Lane Or Road Widening Associated With The Project. NSA 1.1 GEOTECHNICAL INVESTIGATION Geotechnical investigation was performed by 1---'CS Carolinas, LLP. A copy of the Gcotechnical report is included in Appendix B. 2.0 DESIGN APPROACH 2.1 STORM DRAINAGE PIPING Permanent storm drainage piping systems are designed for a 10-year storm event using the Rational Nlerhod for rainfall analysis. Rainfall intensity Values were taken from the NOAA website. Runoff coefficients are based on the folloxving values: Description Runoff Coefficient, C Paved and Roof Areas 0.95 Unimproved Areas 0.35 Using Bentley StortnCAD \18i, the post -development storm water collection system was modeled. An analysis of the hydraulic grade line for the 10-year design rainfall event found the existing and proposed structures' rim elevations to be above the water level. See Appendix A for detailed information of the post -developed analysis. �n Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 305313156 Stormwater Narrative Clark*Nexscn 3.0 WATER QUALITY ANALYSIS According to the NCDI NR Design Guide, the infiltration basin stornawater treatment system is designed to remove 85 percent of the average annual post development total suspended solids (1'SS), 30 percent of the average antral post development total nitrogen (IN), and 35 percent of the average annual post development total phosphorus (11)), by implementing Best 'Management Practices (IMP's). According to the NCDHNR Design Guide, the wet detention basin stormxvater treatment system is designed to remove 85 or 90 percent of the average annual post development total suspended solids (1"SS), 25 percent of the average annual post development total nitrogen (1 N), and 40 percent of the average annual post development total phosphorus (1'P), by implementing Best '4anagenentPractices (13MP's). 4.0 WATER QUANTITY ANALYSIS The BiMP routings were performed using the triangular hydrograph storage estimation method in the Hydraflow Hydrographs 2009 computer program. The analysis indicates that the total site post development condition peak runoff for the 1-year, 2-rear, 10-year, and 100-year design storms is less than the predevclopment condition. 4.1 PREDEVELOPMENT CONDITIONS The total development area is approximately 20 acres. There are two (2) existing wet detention basins on site that collect areas of the existing parking lot. \\'here there is existing development, stormwater is conveyed offsitc via stormwater pipe networks and grassed swales. The site ultimatclp drains to the north into the New River of the \Vhite Oak River basin. 'Che table below summarizes the predevclopment conditions peak runoff for the drainage areas. Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 3053/3156 Stonnwater Narrative Clark*Nexsen Drainage Areas Predevelopment Condition Peak Runoff Summary 1-year Peak Runoff (cfs) 2-year Peak Runoff (cfs) 10-year Peak Runoff (cfs) 100-year Peak Runoff (cfs) A 2591 3.O66 4.141 5.657 B 1358 16.06 21.70 29.64 C 2.877 3.403 4597 6.279 D 2.351 2.781 3.757 5.131 E 3.992 4.723 6.379 8.713 F 1.056 1246 L666 2.250 Total Existing Drainage Area Runoff 26.447 31.279 42.24 57.67 4.2 POST DEVELOPMENT CONDITIONS "file proposed post development BUA drains to one of five BMI's; five (5) wet detention basins, one (1) infiltration basin. The majority of built upon area (BUA) is captured and treated at the 6 131\913s, except for those areas previously discussed. The method of conveyance is a piped system that includes drop and curb inlets, as wcll as implementing LID measures in the form of grassed swalcs. Details arc provided on the plans and storm system sizing and basin routing calculations are provided in Appendix A. The table below summarizes the post development conditions peak runoff after being routed to through the associated 13NIP. 12 Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 305313156 Stormwater Narrative Clark*Nessen Drainage Areas Post development Condition Peak Runoff Summary 1-year Peak Runoff (cfs) 2-year Peak Runoff (cfs) 10-year Peak Runoff (cfs) 100-year Peak Runoff (cfs) A 0.040 0.043 0.050 2.794 B 0.141 0.155 0.181 2.535 C 0.055 0.061 0.071 0.593 D 0.023 0.025 0.029 0.876 E 0.019 0.020 0.771 2.056 F 0 0 0 0 Total Existing Drainage Area Runoff 0278 0.304 1.102 8.854 The analysis shows a decrease in post development runoff. The table below summarizes the total predcvelopment and post development runoff for the project. 1-year Peak 2-year Peak 10-year Peak 100-year Runoff (cfs) Runoff (cfs) Runoff (cfs) Peak Runoff (cfs) Total Predevelopment Runoff 26.447 31.279 42.24 57.67 Total Postdevelopment 0.278 0.304 1.102 8.854 Runoff Net Difference in Runoff -26.169 -30.975 -41.138 -48.816 13 1 G =[I �y CRNnmmm�„ .x E 11 ,�A •�� �' ° � u l GRAPHIC SCALE 2 3 4 5 ap j I 1 � \ c C { nq \ \� a \'� �i ) S/� •- f � I _ C RNGROUP/ f TI/ ♦♦��\� a 'i\ \ /; �R' F O' �m vl.nn vlaa i4 MIE1 ItSEN. pll�VENTRE + / ♦ ♦ t \�'�� / ._ ��� � n� wa.a¢ ns pf, q 91111iE®~ \\(\ \ \14, IVII \ w l 9p lq j(I r . ` ♦o 0 11 GRAPHIC SCALE V v �• 0 tll' Im' lM=�bti-�� �DA MAP 1 2 3 4"— Precipitation Frequency Data Server Page I of 3 POINT PRECIPITATION 1 FREQUENCY ESTIMATES FROM NOAA ATLAS 14 .,, North Carolina 34.68R N 77.343 NA' 6 feet Rom "Pie6pimtion-Fsuquency Atlas of the united States•• NOAA Arm 14, volume 2. Version 3 G.M. Dounin. Il. klan in, 6. Lin, I Paapbnk, WYcktn. and D_ Rilcy .NOAA. National N'umhw Smdee. Sri, ur Senng. Mar, land. 2004 Ei trrcted: Thu Fier 25 2010 to Estimates (y\car5) Sarin min min min 60 in 121 min iI4 _r 6hr 12 hr 2 14yp' 10 day 21 Jay 30 Aar 4S Jay fin31 fl:n' �I 5.90 ]KD 3.93 2.69 1.63 L02 0.73 Q45 0.2G 0.15 0.09 0.05 0.03 OA3 OD2 0.01 Q01 0.01 6.96 E.E6 4.66 3 .2 202 I �4 0.89 11.54 U.32 0.18 0.1 I 1L06 0.04 0.03 11.02 0.02 U.01 0.11 l 0 8.05 6.44 5.44 3.86 2.48 L56 1.12 IL69 11.41 0.24 0.14 0.118 0.05 0.04 0.02 11.02 f1.02 0.01 III 9A5 7.23 G.10 4.42 2.SR L85 1.34 0.32 0.49 0.28 F 1-61 070 97 OD6 OA4 0.03 IID2 0.02 0.02 25 10.21 8.14 6.88 5.09 3.39 2.2T LGS L01 0.60 0.35 0.20 0.11 0.07 0.05 OA3 U.03 0.02 0.112 511 ILIS 8.88 7.49 5.64 382 2.58 192 LIS 0.71 0.42 0.24 11.13 0.08 0.0G fL114 I1.03 OA2 Q02 I110 12.07 9.59 B.IIN G.19 426 2 94 2.22 1.37 0.83 0.48 fLR 0.14 0.09 0.07 0.04 11.03 0.03 0.02 21111 12.98 1029 3.66 G74 4.72 3.33 2.54 L58 0.96 0.56 0.32 0.16 0.10 0.08 0.05 0.04 0.03 OD2 SITU 14.0 11.20 9.39 7.47 E36 3.R) 3.02 1.38 LIS 0.67 0.39 0.20 0.12 0.09 UD5 0.04 0.03 0.113 111110 I$.IR 11.95 IO.UO 8.10 5.91 4.3R 3.44 2.16 133 0.77 0.44 11.22 0.13 0.111 0.116 004 1L114 U.113 - These peapBathan hequency amounted are based on a ppr¢al duratpd_cl,a ARI Is the Average Recurrence Interval. Please refer N NOMkirGas 14 Document fa mae intorma4on. NOTE: FormaNng forces estedates new two 0 appea As zero. * Upper bound of the 90 U confidence interval Precipitation Intensity Estimates (in/hr) ARI*• (rc:vx) 5 min 10 min IS min i0 min fill min 1211 min i hr 6 hr 12 hr t4 hr 48 hr 4 dry 7 day III flay 211 ihi 311 day 45 d:n' fill d:p' 06.41 5.12 4.2G 2.92 1.82 1.1I 0.81 0.50 0�9 0.17 0.10 0.05 0.04 0.03 O.U2 0.01 0.01 Q01 �7.52 6.112 5.04 3.43 2.19 1.35 09S 0.60 0.J5 TO 0.12 0.07 0.04 OA3 0.02 0.02 0.01 0.01 8.69 6.96 5.87 4.17 2.67 L69 1.23 0.7G 0.45 0.26 0.15 1 0.08 0.U5 OII4 0.03 IIA2 OA2 002 III 9.77 7.81 6.59 4.77 3.1 I 2111 1.47 11.91 0.54 0,} I fl.l R 0.10 O.Ofi 0.05 0.03 0.02 0.02 0.02 25 IIA2 8.77 7A2 SA9 },fi( 2.43 L80 1.12 0.67 O.J9 0.22 0.12 0.08 0.06 004 003 002 2A2 SII 12.02 9.58 R.OS 6.09 4.12 2.R0 2.10 1.30 0.79 0.46 0,26 0.14 0.09 O.U7 0.04 U.03 0.07 2A2 11111 13.03 10.36 8.72 6.68 4.60 3.19 2.41 L51 092 0.53 ILJI 0.16 O.III O.U7 11.05 0.03 0.01 0, 22 2110 1404 ILi3 9.36 7.29 5.11 3.(,2 2.77 1.73 LO6 O.GI 11.35 O.IR 0.11 0.08 0.115 Q04 0.03 0. 33 51111 15.35 L.14 10.19 8.10 5.81 4.23 3.29 2.07 1.28 0.74 OA3 0.22 0.13 0.10 0.06 0.0T 0.04 0.03 1000 16.50 I2.99 10.37 S.SO 6A2 4.75 3.77 2.38 I AS O.SG 0.50 0.25 0.15 0.11 U.06 QOS 0.04 0. 33 ' The upper bound of the cradi ence Interval at give mnrth nce level is the value which 5%of the simulated quartile values for a given hequency are greater Nan. "Them peapterson hequency estimates we based on a Mal Qunne wy4gpeF, ARI er the Average Recurrence Interval. Please refer to NOAA At 14 Document flu raw information. NOTE: Formatting prevents saturated near are to appear as zero. * Lower bound of the 90% confidence interval Precipitation Intensity Estimates (in/hr) nla** (yarns) s min m min Is min 30 min 6o min Izo min i hr 6 hr Iz hr zT hr 4R hr a day 7 der w day za day 30 der 45 day 6o Jay 05.47 437 3.64 2.50 L56 094 11.68 OAI 024 0.14 U.U8 U.OE 0.03 0.02 11.02 0.01 OAI lLlll 06.44 5.1E 4.32 2.9R 1.87 1.14 ILRZ 0.511 0.29 0.17 11.10 0.05 0.04 0.03 0.02 11.02 0.01 0. 11 0 7.44 5 96 5.02 3.57 2.29 I A3 1.03 0.63 0.37 0.22 0.12 0.07 0.05 0.03 0.02 0.02 0.02 0.01 10 8.34 6.(,7 5.63 4.03 2b5 1.70 1.23 0.75 OAT 036 OJS OOS 0.05 0.04 0.03 0.02 0.02 0.02 25 937 7A( G31 4.67 3.11 2.U4 L50 0.92 0.54 0.32 0.18 O.IU OAb UAS O.07 0.02 0.112 21 2 50 10.19 8.11 6.85 5.16 3.49 2.34 1.74 LOfi 0.63 0.37 0.21 0.11 0.07 0.05 0.03 QAJ 0.02 O.112 IIIO 109R 8.72 7.35 E.63 3.SR 2.65 199 1.22 0.73 0.4J 11.24 0.13 0.08 O.11b Q04 0.03 0.02 0.02 200 11.74 9.30 7.32 6.09 T.27 2.93 2.26 1.39 O.R3 0.49 0.23 0.14 Q09 0.07 Q04 0.03 0.113 002 500 12(i6 IOAI R.40 6.69 4.80 3.45 2.6E 1.63 099 0.58 U.33 0.17 0.11 11.08 0.0E 0.114 0.03 0. 22 1000 13.45 10.(i0 8.86 7.18 5.24 3.35 2.99 LR$ 1.13 L6S 0.37 0.19 0.12 0.09 0.0E 0.04 0.03 IL113 -The lower bound of Ne confidenceinterval a 90%confidence level is the venue Mlch 5%of the madlaed quartile values fa a given trequerlcy ae less Nat. http://dippei-.nws.noaa.gov/cgi-bin/hdse/bui Idout.perl?type=idt &units=us&series=pd&stat... 3/25/2010 Hydraflow Rainfall Report Hydra0ow Hydrographs Extension for AutoCADOO Civil 3130 2009 by Autodesk, Inc. v6.066 Thursday, Mar 25, 2010 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) 8 D E (NIA) 1 77.3751 12.8000 0.8932 -------- 2 82.2689 12A000 0.8657 -------- 3 0.0000 0.0000 0.0000 -------- 5 86.1922 12.5000 0,8284 -------- 10 89.3188 12A000 0,8028 -------- 25 81,0229 11.2000 0,7448 -------- 50 73.3488 10.1000 0.6959 ------- 100 68.6623 9.2000 0.6572 -------- File name: Jacksonville. I DF * INPUT FROM NOAA DATA Intensity = B I (Tc + D)^E Return Period * * Intensity Values (inlhr) (Yrs) 5 min 10 15 20 25 30 1 35 40 45 50 55 60 1 5.91 4.74 3.97 3.42 3.02 2.70 2.45 2.24 2.06 1.92 1.79 1.68 2 6.94 5.58 4.68 4.05 3.58 3.21 2.91 2.67 2.47 2.30 2.15 2.02 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 8.05 6.54 5.54 4.82 4.28 3.86 3.52 3.24 3.00 2.80 2.63 2.48 10 9.02 7,36 6.26 5A7 4.88 4.41 4.03 3.72 3.46 3.23 3.04 2.87 25 10.18 8.33 7.12 6.25 5.59 5.08 4.66 4.32 4.03 3.78 3.57 3.38 50 11.09 9.09 7.79 6.86 6.17 5.62 5.18 4.81 4.50 4.24 4.01 3.81 100 12,01 9.85 8.46 7.48 6.74 6.16 5.69 5.31 4.98 4.70 4.45 4.24 Tc = time in minutes. Values may exceed 60. Preci . file name: JacksonvilleNC. cp Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-h6ur 3.66 4.45 0.00 0.00 6.90 0.00 0.00 11.00 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PROJECT: PROJECT NO.: DESCRIPTION: DRAINAGE AREA A: WET POND A Post Development C A tt' A ac 1 Building 0.95 0.00 2 Sidewalk 0.95 6,917 0.16 3 Parkin 0,95 61,751 142 4 Street 0.95 0.00 6 Grass 0.35 60,644 1.39 7 8 Weighted C 0.67 Total Area 129,312 2.97 Im ervious Area 68.668 1.58 Percent Impervious 53.1% DESIGN BY: CHECKEDBY: WET DETENTION POND Pond A Project Information Project Name: Camp Lejeune Hospital Addition and Renovation Project #: 3053 and 3156 Designed by: JTR Date: 6/15/2010 Checked by: Date: Site Information Sub Area Location: Proposed Pond A Drainage Area (DA) = 2.969 Acres Impervious Area (IA) = 1.580 Acres Percent Impervious (I) = 53.2 % Elevations Top of Bank Elevation = 13.00 ft Emergency Elevation = 10.85 ft Permanent Pool Elevation = 9.50 ft Bottom of Pond Elevation = 5.00 It Basin AreasfVolumes Area of Permanent Pool = 8,653 sf Ape,,,,_,oi (includes main pond & forebays) (Elev = 9.50 ) Area of Bottom of Shelf = 6,232 sf Aber shen (includes main pond & forebays) Area of Bottom of Pond = 1,644 sf Awtt nd (excluding sediment storage & forebays) Average Depth Depth of Pond = 4 ft Depth (dist. btwn. bot. of shelf & btm. of pond, excludes sediment) Average Depth = 3.00 ft Use Average Depth of = 3.00 ft Required Surface Area - Wetland SA/DA = 5.6 (90% TSS Removal via Pond) Min Req'd Surface Area = 7.242 sf (at Permanent Pool) Required Storage Volume - Using Simple Method Design Storm = 1.5 inch (Project Does Not Drain to SA waters) Determine Rv Value = 0.05 + 0.009 (1) = 0.53 in/in Storage Volume Required = 8,551 cf (above Permanent Pool) Side Slopes of Pond = 3 : 1 Is Permenant Pool Surface Area Sufficient (yes/no)? Yes _ ( 8653 > 7242 ) sf WET DETENTION POND Pond A Project Information Project Name: Camp Leisure Hospital Addition and Renovation Project #: 3053 and 3156 Designed by: JTR Date: 6/15/2010 Checked by: Date: 1.5" Volume Elevation Target Volume = 8,551 cu ft Lower Elevation = 10.00 Upper Elevation = 11.00 Lower Volume = 4,808 cu ft Upper Volume = 16.099 cu ft Target Elevation = 10.33 Orifice Sizing - Dry Detention Oi o.y.= 0.0495 cis Os o.y.= 0.0198 cfs Orifice Size = 1.50 in O 0.030 cfs Drawdown Time = 3.3 days less than 5 days (yes/no) ? Yes greater than 2 days (yes/no) ? Yes Anti -Flotation Device 6-ft x 6-ft Riser Box Area: 36.0 sf Volume: 288.0 cf Weight: 17,971 Ibs Factor of Safety 1.10 WT Req'd of Anti -Flotation Device: 19,768 Ibs Volume of Concrete Req'd: 131.8 cf Volume Provided: 135.0 cf Contour Contour Area Incremental Accumulated Volume Volume, S Stage, Z sq ft cu It cu ft It 9.50 8,653 0 0 0.00 10.00 10,577 4,808 4.808 0.50 11.00 12.005 11,291 16,099 1.50 12.00 13,489 12.747 28,846 2.50 (Flowrate required for a 2 day drawdown) (Flowmte required for a 5 day drawdown) (Diameter) (Outside Dim. = 6-ft x 6-ft, Inside Dim. = 5-ft x 5-ft) (Water Displaced - Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) (6-ft x 6-ft Box filled 3.75-ft deep with concrete) Hydraflow Table of Contents Wet Pond A.gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hydrograph Return Period Recap............................................................................ 1 1 -Year SummaryReport ....................................................................................................................... 2 HydrographReports................................................................................................................. 3 Hydrograph No. 1, Rational, Pre Development...................................................................... 3 Hydrograph No. 2, Rational, Post Development..................................................................... 4 Hydrograph No. 4, Reservoir, Rational Routing..................................................................... 5 PondReport - Temp Pool.................................................................................................. 6 2 - Year SummaryReport ....................................................................................................................... 7 HydrographReports................................................................................................................. 8 Hydrograph No. 1, Rational, Pre Development...................................................................... 8 Hydrograph No. 2, Rational, Post Development..................................................................... 9 Hydrograph No. 4, Reservoir, Rational Routing................................................................... 10 10 - Year SummaryReport ..................................................................................................................... 11 HydrographReports............................................................................................................... 12 Hydrograph No. 1, Rational, Pre Development.................................................................... 12 Hydrograph No. 2, Rational, Post Development................................................................... 13 Hydrograph No. 4, Reservoir, Rational Routing................................................................... 14 100 - Year SummaryReport ..................................................................................................................... 15 HydrographReports............................................................................................................... 16 Hydrograph No. 1, Rational, Pre Development.................................................................... 16 Hydrograph No. 2, Rational, Post Development................................................................... 17 Hydrograph No. 4, Reservoir, Rational Routing................................................................... 18 Hydrograph Return Period ReJc� ydra w Hydrographs Extension for AutoCAD® Civil 3Dm 2009 by Autotlesk, Inc. v6.066 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 Rational ------ 2,591 3,066 ------- ------- 4.141 ------- ------- 5,657 Pre Development 2 Rational ------ 9.815 11.54 ------- ------- 15.19 ------- ------- 20.30 Post Development 4 Reservoir 2 0.040 0.043 ------- ------- 0.050 ------- ------- 2,794 Rational Routing Proj. file: Wet Pond A.gpvv Tuesday, Jun 15, 2010 2 Hydrograph Summary Re portydraflow Hydrographs Extension for AutoCAD®Civil 3D82009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 2.591 1 20 3,110 ------ ------ ------ Pre Development 2 Rational 9.815 1 9 5,300 ------ ------ ------ Post Development 4 Reservoir 0.040 1 18 4,397 2 10.04 5,276 Rational Routing Wet Pond A.gpw Return Period: 1 Year Tuesday, Jun 15, 2010 a Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 Pre Development Hydrograph type = Rational Storm frequency = 1 yrs Time interval = 1 min Drainage area = 3.290 ac Intensity = 3.424 in/hr OF Curve = Jacksonville. OF Composite (Area/C) = [(3.170 x 0.20) + (0,120 x 0.95)] / 3,290 Q (Cfs) 3.00 2.00 1.00 Pre Development Hyd. No. 1 -- 1 Year Tuesday, Jun 15, 2010 Peak discharge = 2.591 cfs Time to peak = 0.33 hrs Hyd. volume = 3,110 cuft Runoff coeff. = 0.23' Tc by User = 20.00 min Asc/Rec limb fact = 1/1 0.00 V I I I I I I I I I I I I I I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 — Hyd No. 1 Q (Cfs) 3.00 1.00 0.00 1 Time (hrs) 4 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil Me 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 2 Post Development Hydrograph type = Rational Peak discharge = 9.815 cfs Storm frequency = 1 yrs Time to peak = 0.15 hrs Time interval = 1 min Hyd. volume = 5,300 cuft Drainage area = 2.970 ac Runoff coeff. = 0.67' Intensity = 4.932 in/hr Tc by User = 9.00 min OF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(1.580 x 0.95) + (1.390 x 0.35)] / 2.970 Q (Cfs) 10.00 M . M 4.00 2.00 0.00 V ' 0.0 0.0 0.1 Hyd No. 2 Post Development Hyd. No. 2 -- 1 Year 0.1 0.1 Q (Cfs) 10.00 NMI 4.00 2.00 0.00 0.2 0.2 0.2 0.3 0.3 Time (hrs) 1 Hydrograph Report 5 Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 4 Rational Routing Hydrograph type = Reservoir Peak discharge = 0.040 cfs Storm frequency = 1 yrs Time to peak = 0.30 hrs Time interval = 1 min Hyd. volume = 4,397 cuft Inflow hyd. No. = 2 -Post Development Max. Elevation = 10.04 fit Reservoir name = Temp Pool Max. Storage = 5,276 cuft Storage Indication method used Q (cfs) 10.00 WO 4.00 2.00 0.00 0 5 Hyd No. 4 Rational Routing Hyd. No. 4 -- 1 Year 10 15 1 20 Hyd No. 2 25 30 35 40 45 ® Total storage used = 5,276 cuff Q (cfs) 10.00 "fit, . 11 4.00 2.00 -L 0.00 50 Time (hrs) Pond Report s Hydraflow Hydrographs Extension for Autoi Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Pond No. 1 - Temp Pool Pond Data Contours - User -defined contour areas. Conic method used for volume calculation. Begining Elevation = 9.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (soft) Inch. Storage (cult) Total storage (cult) 0.00 9.50 8,653 0 0 0.50 10.00 10,577 4,799 4,799 0.85 10.35 11,070 3,788 8,586 1.50 11.00 12,005 7,497 16,083 2.50 12.00 13,489 12,739 28,822 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 18.00 1.50 10.00 Inactive Crest Len (ft) = 25.00 35.00 Inactive Inactive Span (in) = 18.00 1.50 60.00 0.00 Crest El. (ft) = 11.50 10.85 0.00 0.00 No. Barrels = 1 1 3 0 Weir Call = 3.33 3.33 3.33 3.33 Invert El. (ft) = 9.50 9,50 10.35 0.00 Weir Type = Riser Rec( Rect --- Length (ft) = 50.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope I%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 1 Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes Yes No TIN Elev. (ft) = 0.00 Note: culveNOrrice outil are analyzed under inlet (ic) and outlet(m) control. Weir risers decked for orifice conditions fc) and submergence (a). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C Pri Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 9.50 0.00 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 0.50 4,799 10.00 0.04 is 0.04 is 0.00 --- 0.00 0.00 --- --- --- --- 0.03E 0.85 8,586 10.35 0.05 is 0.05 is 0.00 --- 0.00 0.00 --- --- --- --- 0,051 1.50 16,083 11.00 4.63 oc 0.01 is 4.60 is --- 0.00 6.77 --- --- --- --- 11.3E 2.50 28,822 12.00 10.21 oc 0.00 is 4.29 is --- 5.88 s 143.73 --- --- --- --- 153.91 7 Hydrograph Summary Re pogydraflow Hydrographs Extension for AutoCAD®Civil 3D®2009 by Aulodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 3.066 1 20 3,679 ------ ------ ------ Pre Development 2 Rational 11.54 1 9 6,234 ------ ------ ------ Post Development 4 Reservoir 0.043 1 18 5,056 2 10.12 6,207 Rational Routing Wet Pond A.gpw Return Period: 2 Year Tuesday, Jun 15, 2010 Hydrograph Report HydraOow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 Pre Development Hydrograph type = Rational Storm frequency = 2 yrs Time interval = 1 min Drainage area = 3.290 ac Intensity = 4.052 in/hr OF Curve = Jacksonville. IDF Composite (Area/C) = [(3.170 x 0.20) + (0.120 x 0.95)] / 3.290 Q (Cfs) 4.00 3.00 2.00 1.00 Pre Development Hyd. No. 1 -- 2 Year Tuesday, Jun 15, 2010 Peak discharge = 3.066 cfs Time to peak = 0.33 hrs Hyd. volume = 3,679 cuft Runoff coeff. = 0.23' Tc by User = 20.00 min Asc/Rec limb fact = 1/1 0.00 V 1 1 I 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Hyd No. 1 Q (cfs) 4.00 3.00 2.00 1.00 IL 0.00 1 Time (hrs) Hydrograph Report 0 Hydraflow Hydrographs Extension for AutoCADS Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 2 Post Development Hydrograph type = Rational Peak discharge = 11.54 cfs Storm frequency = 2 yrs Time to peak = 0.15 hrs Time interval = 1 min Hyd. volume = 6,234 cuft Drainage area = 2.970 ac Runoff coeff. = 0.67" Intensity = 5.802 in/hr Tc by User = 9.00 min OF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 ' Composite (Area/C) = [(1.580 x 0.95) + (1.390 x 0.35)] / 2.970 0 (cfs) 12.00 10.00 M . M 4.00 P.)tiI11l 0.00 " ' ' 0.0 0.0 0.1 Hyd No. 2 Post Development Hyd. No. 2 -- 2 Year 0.1 0.1 0 (cfs) 12.00 10.00 "Bill 4.00 2.00 � 0.00 0.2 0.2 0.2 0.3 0.3 Time (hrs) 10 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 4 Rational Routing Hydrograph type = Reservoir Peak discharge = 0.043 cfs Storm frequency = 2 yrs Time to peak = 0.30 hrs Time interval = 1 min Hyd. volume = 5,056 cuft Inflow hyd. No. = 2 -Post Development Max. Elevation = 10.12 ft Reservoir name = Temp Pool Max. Storage = 6,207 cuft Storage Indication method used Q (cfs) 12.00 IDIOM M :IGO • m M 0.00 0 5 Hyd No. 4 Rational Routing Hyd. No. 4 -- 2 Year 10 15 20 Hyd No. 2 25 30 35 40 45 ®1® Total storage used = 6,207 cult Q (cfs 12.00 10.00 . e] 4.00 2.00 1 0.00 50 Time (hrsl 11 Hydrograph Summary Re porttiydraflow, Hydrographs Extension for AuloCAD®Civil 3D02009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 4.141 1 20 4,970 ------ ------ ------ Pre Development 2 Rational 15.19 1 9 8,205 ------ ------ ------ Post Development 4 Reservoir 0.050 1 18 6,258 2 10.30 8,173 Rational Routing Wet Pond A.gpw Return Period: 10 Year Tuesday, Jun 15, 2010 Hydrograph Report 12 Hydraflow Hydrographs Extension for AutoCAD® Civil 31D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 Pre Development Hydrograph type = Rational Storm frequency = 10 yrs Time interval = 1 min Drainage area = 3.290 ac Intensity = 5.473 in/hr IDF Curve = Jacksonville.IDF Composite (Area/C) = [(3.170 x 0.20) + (0.120 x 0.95)] / 3.290 Q (Cfs) 5.00 4.00 3.00 2.00 1.00 Pre Development Hyd. No. 1 -- 10 Year Tuesday, Jun 15, 2010 Peak discharge = 4.141 cfs Time to peak = 0.33 hrs Hyd. volume = 4,970 cult Runoff coeff. = 0.23* Tc by User = 20.00 min Asc/Rec limb fact = 1/1 000 V 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Hyd No. 1 Q (cfs) 5.00 [KrI1" 3.00 1.00 0.00 1 Time (hrs) 13 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 2 Post Development Hydrograph type = Rational Peak discharge = 15.19 cfs Storm frequency = 10 yrs Time to peak = 0.15 hrs Time interval = 1 min Hyd. volume = 8,205 cuft Drainage area = 2.970 ac Runoff coeff. = 0.67* Intensity = 7.636 in/hr Tc by User = 9.00 min OF Curve = Jacksonville. OF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(1.580 x 0.95) + (1.390 x 0.35)] / 2.970 Q (Cfs) 18.00 15.00 12.00 • M OM 3.00 0.00 1 0.0 0.0 0.1 0.1 Hyd No. 2 Post Development Hyd. No. 2 -- 10 Year 0.1 Q (Cfs) 18.00 MR91161 12.00 M011 I I I I V 0.00 0.2 0.2 0.2 0.3 0.3 Time (hrs) 14 Hydrograph Report Hydra low Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 4 Rational Routing Hydrograph type = Reservoir Peak discharge = 0.050 cfs Storm frequency = 10 yrs Time to peak = 0.30 hrs Time interval = 1 min Hyd. volume = 6,258 cuft Inflow hyd. No. = 2 -Post Development Max. Elevation = 10.30 ft Reservoir name = Temp Pool Max. Storage = 8,173 cuft Storage Indication method used. Q (cfs) 18.00 15.00 12.00 W tt i �� 4311I11 0.00 0 5 Hyd No. 4 Rational Routing Hyd. No. 4 -- 10 Year 10 15 20 Hyd No. 2 25 30 35 40 45 I® Total storage used = 8,173 cuft Q (cf: 18.00 15.00 12.00 3.00 1 0.00 50 Time (hrs) 15 Hydrograph Summary Re po gydrailow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 5.657 1 20 6,788 ------ ------ ------ Pre Development 2 Rational 20.30 1 9 10,960 ------ - --- ------ Post Development 4 Reservoir 2.794 1 17 8,880 2 10.49 10,349 Rational Routing Wet Pond A.gpw Return Period: 100 Year Tuesday, Jun 15, 2010 Hydrograph Report 16 Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 Pre Development Hydrograph type = Rational Storm frequency = 100 yrs Time interval = 1 min Drainage area = 3.290 ac Intensity = 7.476 in/hr OF Curve = Jacksonville. IDF Composite (Area/C) = [(3.170 x 0.20) . (0.120 x 0.95)] / 3.290 Q (Cfs) 6.00 61DIII 3.00 2.00 1.00 Pre Development Hyd. No. 1 -- 100 Year Tuesday, Jun 15, 2010 Peak discharge = 5.657 cfs Time to peak = 0.33 hrs Hyd. volume = 6,788 cuft Runoff coeff. = 0.23' Tc by User = 20.00 min Asc/Rec limb fact = 1/1 Q (Cfs) 6.00 5.00 NWili] 3.00 2.00 1.00 0.00 w i -- x 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 Hyd No. 1 Time (hrs) 17 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 2 Post Development Hydrograph type = Rational Peak discharge = 20.30 cfs Storm frequency = 100 yrs Time to peak = 0.15 hrs Time interval = 1 min Hyd. volume = 10,960 cuft Drainage area = 2.970 ac Runoff coeff. = 0.67" Intensity = 10.199 in/hr Tc by User = 9.00 min OF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 Composite (Area/C) = I(1.580 x 0.95) + (1.390 x 0.35)] / 2.970 Q (cfs) 21.00 i6xfl01 15.00 12.00 9.00 M- 1114 3.00 000 0.0 0.0 0.1 Hyd No. 2 Post Development Hyd. No. 2 -- 100 Year Q (cfs) 21.00 11RAIII] 15.00 12.00 9.00 6.00 3.00 0.00 0.1 0.1 •0.2 0.2 0.2 0.3 0.3 Time (hrs) Hydrograph Report 18 Hydraflow Hydrographs Extension for AutoCAD® Civil 3DB 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 4 Rational Routing Hydrograph type = Reservoir Peak discharge = 2.794 cfs Storm frequency = 100 yrs Time to peak = 0.28 hrs Time interval = 1 min Hyd. volume = 8,880 cuft Inflow hyd. No. = 2 -Post Development Max. Elevation = 10.49 ft Reservoir name = Temp Pool Max. Storage = 10,349 cuft Storage Indication method used. Q (cfs) 21.00 11:116I07 15.00 12.00 • M . M 3.00 0.00 'yam 0 4 8 Hyd No. 4 Rational Routing Hyd. No. 4 -- 100 Year Q (cfs) 21.00 18.00 15.00 111111ifflIl1 W]Kl1 3.00 0.00 12 16 20 24 28 32 36 40 — Hyd No. 2 ® Total storage used = 10,349 CA Time (hrs) PROJECT'. PROJECT NO.'. DESCRIPTION: DRAINAGE AREA DESIGN SHEET DRAINAGE AREA B: WET POND B Post Development C Aft° A ac 1 Building 0.95 58,405 1,34 2 Sidewalk 0,95 35,612 0.82 3 Parking 0,95 79,462 1.82 4 Street 0.95 10,314 0.24 6 Grass 0.35 65,361 1.50 7 Woods 0.20 76,546 1.76 8 Weighted C 0.65 Total Area 325,700 7.48 Impervious Area 183,793 4.22 Percent Impervious 56.4% DESIGN BY: CHECKED BY: Project Information WET DETENTION POND Pond B Project Name: Camp Lejeune Hospital Addition and Renovation Project #: 3053 and 3156 Designed by: JTR Date: 6/15/2010 Checked by: Date: Site Information Sub Area Location: Proposed Pond B Drainage Area (DA) = 7.48 Acres Impervious Area (IA) = 4.220 Acres Percent Impervious (1) = 56.4 e/ Elevations Top of Bank Elevation = 12.00 It Emergency Elevation = 10.00 ft Permanent Pool Elevation = 8.50 it Bottom of Pond Elevation = 4.00 ft Bottom of Sediment Elevation = 3.00 ft Basin Areas[Volumes Area of Permanent Pool = 23,580 sf Area of Bottom of Shelf = 20,115 sf Area of Bottom of Pond = 7,853 sf Average Depth Depth of Pond = 5 It Average Depth = 3.94 It Use Average Depth of = 3.50 it (includes main pond & forebays) (Elev = 8.50 ) A ens men (includes main pond & forebays) A enl_,na (excluding sediment storage & forebays) Depth (dist. btwn. bot. of shelf & btm. of pond, excludes sediment) Required Surface Area - Wetland SA/DA = 6 (90% TSS Removal via Pond) Min Req'd Surface Area = 19,550 'sf (at Permanent Pool) Required Storage Volume - Using Simple Method Design Storm = 1.5 inch (Project Does Not Drain to SA waters) Determine Rv Value = 0.05 + 0.009 (I) = 0.56 infn Storage Volume Required = 22,717 cf (above Permanent Pool) Side Slopes of Pond = 3 : 1 Is Permenanl Pool Surface Area Sufficient (yes/no)? Yes ( 23580 > 19550 ) sf WET DETENTION POND Pond B Project Information Project Name: Camp Lejeune Hospital Addition and Renovation Project #: 3053 and 3156 Designed by: JTR Date: 6/15/2010 Checked by: Date: 1.5' Volume Elevation Target Volume = 22,717 cu it Lower Elevation = 9.00 Upper Elevation = 10.00 Lower Volume = 12,696 cu it Upper Volume = 41,022 cu it Target Elevation = 9.35 Contour Incremental Accumulated Contour Area Volume Volume, S Stage, Z sq it cu It cu fl it 8.50 23,580 0 0 0.00 9.00 27.202 12,696 12.696 0.50 10.00 29,451 28,327 41,022 1.50 11.00 31.756 30.604 71.626 2.50 12.00 34.118 32,937 104,563 3.50 Orifice Sizing - Dry Detention %a...= 0.1315 cfs (Flowrate required for a 2 day drawdown) Cs m,.= 0.0526 cfs (Flowrate required for a 5 day drawdown) Orifice Size = 3.00 in (Diameter) O o,m.= 0.116 cfs Drawdown Time = 2.3 days less than 5 days (yes/no) ? Yes greater than 2 days (yes/no) ? Yes Anti -Flotation Device 6-ft x 6-ft Riser Box Area: 36.0 sf Volume: 288.0 cf Weight: 17,971 Ibs Factor of Safety 1.10 WT Req'd of Anti -Flotation Device: 19,768 Ibs Volume of Concrete Req'd: 131.8 cf (Outside Dim. = 6-ft x 6-ft, Inside Dim. = 5-ft x 5-ft) (Water Displaced - Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) Volume Provided: 153.0 cf (6-ft x 6-ft Box filled 4.25-ft deep with concrete) Hydraflow Table of Contents Wet Pond B.gpw Hydraflow Hydrographs Extension for AutoCAD© Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hydrograph Return Period Recap............................................................................ 1 1 -Year SummaryReport ....................................................................................................................... 2 HydrographReports................................................................................................................. 3 Hydrograph No. 1, Rational, Pre Development...................................................................... 3 Hydrograph No. 2, Rational, Post Development..................................................................... 4 Hydrograph No. 4, Reservoir, Rational Post to Pond............................................................. 5 PondReport - Temp Pool.................................................................................................. 6 2 - Year SummaryReport ....................................................................................................................... 7 HydrographReports................................................................................................................. 8 Hydrograph No. 1, Rational, Pre Development...................................................................... 8 Hydrograph No. 2, Rational, Post Development..................................................................... 9 Hydrograph No. 4, Reservoir, Rational Post to Pond.......................................................:... 10 10 -Year SummaryReport ..................................................................................................................... 11 HydrographReports............................................................................................................... 12 Hydrograph No. 1, Rational, Pre Development.................................................................... 12 Hydrograph No. 2, Rational, Post Development................................................................... 13 Hydrograph No. 4, Reservoir, Rational Post to Pond........................................................... 14 100 - Year SummaryReport ..................................................................................................................... 15 HydrographReports............................................................................................................... 16 Hydrograph No. 1, Rational, Pre Development.................................................................... 16 Hydrograph No. 2, Rational, Post Development................................................................... 17 Hydrograph No. 4, Reservoir, Rational Post to Pond........................................................... 18 L J Hydrograph Return Period Re, ## ytlra w Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 Rational ------ 13.58 16.06 ------- ------- 21.70 ------- ------- 29.64 Pre Development 2 Rational --- -- 23.98 28.21 ------- ------- 37.12 ------- ------- 49.59 Post Development 4 Reservoir 2 0.141 0.155 ------- ------- 0.181 ------- ------- 2.535 Rational Post to Pond Proj. file: Wet Pond B.gpw Tuesday, Jun 15, 2010 Hydrograph Summary Re po }lydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Aulodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 13.58 1 20 16,291 ------ ------ ------ Pre Development 2 Rational 23.98 1 9 12,950 ------ ------ ------ Post Development 4 Reservoir 0.141 1 18 10,873 2 9.01 12,871 Rational Post to Pond Wet Pond B.gpw Return Period: 1 Year Tuesday, Jun 15, 2010 Hydrograph Report 3 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 1 Pre Development Hydrograph type = Rational Peak discharge = 13.58 cfs Storm frequency = 1 yrs Time to peak = 0.33 hrs Time interval = 1 min Hyd. volume = 16,291 cult Drainage area = 7.480 ac Runoff coeff. = 0.53* Intensity = 3.424 in/hr Tc by User = 20.00 min OF Curve = Jacksonville. OF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(5.280 x 0.35) . (2.200 x 0.95)] / 7,480 Q (Cfs) 14.00 12.00 10.00 M .M 4.00 wo Pre Development Hyd. No. 1 -- 1 Year Q (Cfs) 14.00 12.00 10.00 M . 11 4.00 2.00 0.00 V 1 1 1 1 I I I I I I I I I I I I I 1 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 Hyd No. 1 Time (hrs) 4 Hydrograph Report HydraFlow Hydrographs Extension for AutoCAD® Civil 3D8 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 2 Post Development Hydrograph type = Rational Peak discharge = 23.98 cfs Storm frequency = 1 yrs Time to peak = 0.15 hrs Time interval = 1 min Hyd. volume = 12,950 cuft Drainage area = 7.480 ac Runoff coeff. = 0.65` Intensity = 4.932 in/hr Tc by User = 9.00 min OF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(4.220 x 0.95) . (1.500 x 0.35) + (1.760 x 0.20)] 17.480 Q (Cfs) 24.00 f 101i11 12.00 I m Post Development Hyd. No. 2 -- 1 Year Q (Cfs) 24.00 20.00 16.00 12.00 11511111 0.00 1, 1 1 1 1 1 1 1 1 0.00 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 Time (hrs) — Hyd No. 2 Hydrograph Report 5 Hydranow Hydrographs Extension for AutoCAD® Civil 31D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 4 Rational Post to Pond Hydrograph type = Reservoir Peak discharge = 0.141 cfs Storm frequency = 1 yrs Time to peak = 0.30 hrs Time interval = 1 min Hyd. volume = 10,873 cuft Inflow hyd. No. = 2 - Post Development Max. Elevation = 9.01 ft Reservoir name = Temp Pool Max. Storage = 12,871 cuft Storage Indication method used. Q (cfs) 24.00 20.00 f6t;11P1 12.00 M 4.00 0.00 e 0 5 Hyd No. 4 Rational Post to Pond Hyd. No. 4 -- 1 Year 10 15 20 Hyd No. 2 25 30 35 40 45 ® Total storage used = 12,871 cuft Q (cfF 24.00 20.0.0 12.00 4.00 -L 0.00 50 Time (hrs, Pond Report s Hydraflow Hydrographs Extension for AutoCAD® Civil 3DE) 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Pond No. 1 - Temp Pool Pond Data Contours - User -defined contour areas. Conic method used for volume calculation. Begining Elevation = 8.50 It Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Ines. Storage (cuft) Total storage (cult) 0.00 8.50 23,580 0 0 0.50 9.00 27,202 12,683 12,683 0.95 9.45 28,207 12,465 25,149 1.50 10.00 29,451 15,853 41,002 2.50 11.00 31,756 30,593 71,595 3.50 12.00 34,118 32,927 104,522 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 24.00 3.00 10.00 Inactive Crest Len (ft) = 25.00 35.00 Inactive Inactive Span (in) = 24.00 3.00 60.00 0.00 Crest El. (ft) = 11.00 10.00 0.00 0.00 No. Barrels = 1 1 3 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 8.50 8.50 9.45 0.00 Weir Type = Riser Rect --- --- Length (ft) = 50.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.50 0.00 0.00 n/a N•Value = .013 .013 .013 nla Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(inlhr) = 0.000 (by Contour) Multi -Stage = nla Yes Yes No TW Elev. (ft) = 0.00 Note: CulverUOrifce outflows are analyzed under inlet (ic) and outlet (m) control. Weir risers checked for orifice conditions (ic) and submergence (a). Stage / Storage 1 Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total It cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 8.50 0.00 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0,000 0.50 12,683 9.00 0.15 is 0.14 is 0,00 --- 0.00 0.00 --- --- --- --- 0.140 0.95 25,149 9.45 0.22 is 0.21 is 0.00 --- 0.00 0.00 --- --- --- --- 0.207 1.50 41,002 10.00 7.11 oc 0.04 is 7.06 is --- 0.00 0.00 --- --- --- --- 7.103 2.50 71,595 11.00 14.43 oc 0.06 is 14.36 is --- 0.00 116.55 --- --- --- --- 130.96 3.50 104,522 12.00 22.86 oc 0.02 is 6.11 is --- 16.69 s 329.65 --- --- --- --- 352.48 Hydrograph Summary Re poqydraflow Hydrographs Extension for AutoCADS Civil 3D®2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 16.06 1 20 19,275 ------ ------ ------ Pre Development 2 Rational 28.21 1 9 15,232 ------ ------ ----- Post Development 4 Reservoir 0.155 1 18 12,918 2 9.09 15,143 Rational Post to Pond Wet Pond B.gpw Return Period: 2 Year Tuesday, Jun 15, 2010 0 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 Pre Development Hydrograph type = Rational Storm frequency = 2 yrs Time interval = 1 min Drainage area = 7.480 ac Intensity = 4.052 in/hr IDF Curve = Jacksonville. IDF Composite (Area/C) _ [(5.280 x 0.35) + (2.200 x 0.95)] / 7.480 Q (Cfs) 18.00 15.00 12.00 9.00 wo 1911111➢ Pre Development Hyd. No. 1 -- 2 Year Tuesday, Jun 15, 2010 Peak discharge = 16.06 cfs Time to peak = 0.33 hrs Hyd. volume = 19,275 cuft Runoff coeff. = 0.53* Tc by User = 20.00 min Asc/Rec limb fact = 1/1 Q (cfs) 18.00 15.00 12.00 3.00 0.00 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 Time (hrs) Hyd No. 1 Hydrograph Report 9 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 2 Post Development Hydrograph type = Rational Peak discharge = 28.21 cfs Storm frequency = 2 yrs Time to peak = 0.15 hrs Time interval = 1 min Hyd. volume = 15,232 cuft Drainage area = 7.480 ac Runoff coeff. = 0.65" Intensity = 5.802 in/hr Tc by User = 9.00 min OF Curve = Jacksonville. OF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(4.220 x 0.95) + (1.500 x 0.35) + (1.760 x 0.20)] / 7.480 Q (Cfs) 30.00 25.00 20.00 15.00 10.00 5.00 Post Development Hyd. No. 2 -- 2 Year Q (Cfs) 30.00 25.00 20.00 f[1I1I11 5.00 0.00 I I I I I I- 0.00 f 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 — Hyd No. 2 Time (hrs) 10 Hydrograph Report Hydrallow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 4 Rational Post to Pond Hydrograph type = Reservoir Peak discharge = 0.155 cfs Storm frequency = 2 yrs Time to peak = 0.30 hrs Time interval = 1 min Hyd. volume = 12,918 cuft Inflow hyd. No. = 2 - Post Development Max. Elevation = 9.09 ft Reservoir name = Temp Pool Max. Storage = 15,143 cuft Storage Indication method used. Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 �® 0 5 Hyd No. 4 Rational Post to Pond Hyd. No. 4 -- 2 Year 10 15 20 Hyd No. 2 25 30 35 40 45 ® Total storage used = 15,143 cult Q (cfs) 30.00 25.00 20.00 15.00 5.00 1 0.00 50 Time (hrs) 11 Hydrograph Summary Report ydraFlow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 21.70 1 20 26,037 ------ ------ ------ Pre Development 2 Rational 37.12 1 9 20,047 ------ ------ ------ Post Development 4 Reservoir 0.181 1 18 17,150 2 9.26 19,939 Rational Post to Pond Wet Pond B.gpw Return Period: 10 Year Tuesday, Jun 15, 2010 12 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 1 Pre Development Hydrograph type = Rational Peak discharge = 21.70 cfs Storm frequency = 10 yrs Time to peak = 0.33 hrs Time interval = 1 min Hyd. volume = 26,037 cuft Drainage area = 7.480 ac Runoff coeff. = 0.53" Intensity = 5.473 in/hr Tc by User = 20.00 min OF Curve = Jacksonville. OF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(5.280 x 0.35) + (2200 x 0.95)] / 7.480 Q (cfs) 24.00 20.00 11IiKiZ1l 12.00 : 11 Milli Pre Development Hyd. No. 1 -- 10 Year Q (Cfs) 24.00 20.00 101<1Zr1 12.00 4.00 0.00 V 1 1 1 1 1 1 1 1 1 1 1 I I I I I I I fit- 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 Hyd No. 1 Time (hrs) 13 Hydrograph Report HydraFlow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 2 Post Development Hydrograph type = Rational Peak discharge = 37.12 cfs Storm frequency = 10 yrs Time to peak = 0.15 hrs Time interval = 1 min Hyd. volume = 20,047 cuft Drainage area = 7.480 ac Runoff coeff. = 0.65' Intensity = 7.636 in/hr Tc by User = 9.00 min OF Curve = Jacksonville. OF Asc/Rec limb fact = 1/1 Composite (Area/C) = j(4.220 x 0.95) + (1.500 x 0.35) + (1.760 x 0.20)] / 7.480 Q (Cfs) 40.00 `zlxln liIx111ll 0.00 If 0.0 0.0 0.1 Hyd No. 2 Post Development Hyd. No. 2 -- 10 Year 0.1 0.1 Q (Cfs) 40.00 991011101 20.00 10.00 N 0.00 0.2 0.2 0.2 0.3 0.3 Time (hrs) Hydrograph Report 14 Hydraflow Hydrographs Extension for AutoCAD® Civil 3M 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 4 Rational Post to Pond Hydrograph type = Reservoir Peak discharge = 0.181 cfs Storm frequency = 10 yrs Time to peak = 0.30 hrs Time interval = 1 min Hyd. volume = 17,150 cuft Inflow hyd. No. = 2 - Post Development Max. Elevation = 9.26 ft Reservoir name = Temp Pool Max. Storage = 19,939 cult Storage Indication method used Q (cfs) 40.00 30.00 20.00 tttxoiill 0.00 0 5 Hyd No. 4 Rational Post to Pond Hyd. No. 4 -- 10 Year 10 15 20 Hyd No. 2 25 30 35 40 45 I� Total storage used = 19,939 cult Q (cfs) 40.00 30.00 20.00 10.00 L 0.00 50 Time (hrs) 15 Hydrograph Summary Re pogydraflow Hydrographs Extension for AutoCAD®Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 29.64 1 20 35,563 ------ ------ ------ Pre Development 2 Rational 49.59 1 9 26,778 ------ ------ ------ Post Development 4 Reservoir 2.535 1 18 23,444 2 9.48 26,182 Rational Post to Pond Wet Pond B.gpw Return Period: 100 Year Tuesday, Jun 15, 2010 16 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@ 2009 by Autodesk. Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 1 Pre Development Hydrograph type = Rational Peak discharge = 29.64 cfs Storm frequency = 100 yrs Time to peak = 0.33 hrs Time interval = 1 min Hyd. volume = 35,563 cuft Drainage area = 7.480 ac Runoff coeff. = 0.53" Intensity = 7.476 in/hr Tc by User = 20.00 min OF Curve = Jacksonville. I D F Asc/Rec limb fact = 1/1 Composite (Area/C) = 1(5.280 x 0.35) + (2.200 x 0.95)1 / T480 Q (cfs) 30.00 25.00 20.00 15.00 rtexeitil 5.00 Pre Development Hyd. No. 1 -- 100 Year Q (Cfs) 30.00 25.00 20.00 15.00 `11111a1 5.00 0.00 v 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 Hyd No. 1 Time (hrs) 17 Hydrograph Report Hydraflow Hydrographs Extension for AuloCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 2 Post Development Hydrograph type = Rational Peak discharge = 49.59 cfs Storm frequency = 100 yrs Time to peak = 0.15 hrs Time interval = 1 min Hyd. volume = 26,778 cuft Drainage area = 7.480 ac Runoff coeff. = 0.65' Intensity = 10.199 in/hr Tc by User = 9.00 min OF Curve = Jacksonville. OF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(4.220 x 0.95) + (1.500 x 0.35) + (1.760 x 0.20)] / 7,480 Q (cfs) 50.00 40.00 30.00 millitl 10.00 Post Development Hyd. No. 2 -- 100 Year Q (Cfs) 50.00 40.00 30.00 20.00 10.00 0.00 " 0.00 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 Hyd No. 2 Time (hrs) Hydrograph Report 18 Hydraflow Hydrographs Extension for AutoCAD® Civil 3130 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 4 Rational Post to Pond Hydrograph type = Reservoir Peak discharge = 2.535 cfs Storm frequency = 100 yrs Time to peak = 0.30 hrs Time interval = 1 min Hyd. volume = 23,444 cuft Inflow hyd. No. = 2 - Post Development Max. Elevation = 9.48 ft Reservoir name = Temp Pool Max. Storage = 26,182 cuft Storage Indication method used Q (Cfs) 50.00 40.00 30.00 20.00 01111" Rational Post to Pond Hyd. No. 4 -- 100 Year Q (Cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0 5 10 15 20 25 30 35 40 45 50 Time (hrs) — Hyd No. 4 —Hyd No. 2 ®Total storage used = 26,182 cult PROJECT: PROJECT NO.: DESCRIPTION: DRAINAGE AREA DESIGN SHEET DRAINAGE AREA C: POND Post Development C A jft2 A ac 1 Building 0.95 0.00 2 Sidewalk 0,95 1,709 0.04 3 Parking 0,95 0.00 4 Street 0.95 75,302 1,73 6 Grass 0.35 63,338 1.45 7 Woods 0.20 33,977 0.78 8 Weighted C 0,59 Total Area 174,326 4.00 Impervious Area 1 77,011 1 77 Percent Impervious 44.2% DESIGN BY: CHECKED BY: Project Information WET DETENTION POND Pond C Project Name: Camp Lejeune Hospital Addition and Renovation Project #: 3053 and 3156 Designed by: JTR Date: 6/15/2010 Checked by: Date: Site Information Sub Area Location: Proposed Pond C Drainage Area (DA) = 4.003 Acres Impervious Area (IA) = 1.770 Acres Percent Impervious (1) = 44.2 % Elevations Top of Bank Elevation = 25.00 ft Emergency Elevation = 24.00 ft Permanent Pool Elevation = 22.50 ft Bottom of Pond Elevation = 18.00 It Bottom of Sediment Elevation = 17.00 ft Basin AreasNolumes Area of Permanent Pool = 16,232 sf Ap rm (includes main pond & forebays) (Elev = 22.50 ) Area of Bottom of Shelf = 12,853 sf Awt sn�n (includes main pond & forebays) Area of Bottom of Pond = 3,498 sf A�p� a (excluding sediment storage & forebays) Average Depth Depth of Pond = 4 ft Depth (dist. btwn. bot. of shelf & bur. of pond, excludes sediment) Average Depth = 3.00 ft Use Average Depth of = 3.00 ft Required Surface Area - Wetland SA/DA = 7 (90%TSS Removal via Pond) Min Req'd Surface Area = 12,206 sf (at Permanent Pool) Required Storage Volume - Using Simple Method Design Storm = 1.5 inch (Project Does Not Drain to SA waters) Determine Rv Value = 0.05 + 0,009 (1) = 0.45 in/in , Storage Volume Required = 9,764 cf (above Permanent Pool) Side Slopes of Pond = 3 : 1 Is Permenant Pool Surface Area Sufficient (yes/no)? Yes ( 16232 > 12206) sf WET DETENTION POND Pond C Project Information Project Name: Camp Lejeune Hospital Addition and Renovation Project #: 3053 and 3156 Designed by: JTR Date: 6/15/2010 Checked by: Date: 1.5" Volume Elevation Target Volume = 9,764 cu ft Lower Elevation = 23.00 Upper Elevation = 24.00 Lower Volume = 9,000 cu ft Upper Volume = 29,868 cu It Target Elevation = 23.04 Orifice Sizing - Dry Detention Oz D.,= 0.0565 cfs OS D.r.- 0.0226 cfs Orifice Size = 2.00 in O omm.= 0.041 cfs Drawdown Time = 2.8 days less than 5 days (yes/no) ? Yes greater than 2 days (yes/no) ? Yes Anti -Flotation Device 6-ft x 6-111 Riser Box Area: 36.0 sf Volume: 252.0 of Weight: 15,725 Ibs Factor of Safety 1.10 WT Req'd of Anti -Flotation Device: 17,297 Ibs Volume of Concrete Req'd: 115.3 cf Volume Provided: 135.0 cf Contour Incremental Accumulated Contour Area Volume Volume, S Stage, Z sq ft cu it cu It ft 22.50 16,232 0 0 0.00 23.00 19,769 9,000 9,000 0.50 24.00 21,967 20,868 29,868 1.50 25.00 24,221 23,094 52,962 2.50 (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) (Outside Dim. = 6-ft x 6-ft, Inside Dim. = 5-ft x 5-ft) (Water Displaced - Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) (6-ft x 6-ft Box filled 3.75-ft deep with concrete) Hydraflow Table of Contents Wet Pond C.gpw Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hydrograph Return Period Recap............................................................................ 1 1 - Year SummaryReport ....................................................................................................................... 2 HydrographReports................................................................................................................. 3 Hydrograph No. 1, Rational, Pre Development...................................................................... 3 Hydrograph No. 2, Rational, Post Development..................................................................... 4 Hydrograph No. 4, Reservoir, Rational Routing..................................................................... 5 PondReport - Temp Pool.................................................................................................. 6 2 - Year SummaryReport ....................................................................................................................... 7 HydrographReports................................................................................................................. 8 Hydrograph No. 1, Rational, Pre Development...................................................................... 8 Hydrograph No. 2, Rational, Post Development..................................................................... 9 Hydrograph No. 4, Reservoir, Rational Routing................................................................... 10 10 -Year SummaryReport ..................................................................................................................... 11 HydrographReports............................................................................................................... 12 Hydrograph No. 1, Rational, Pre Development.................................................................... 12 Hydrograph No. 2, Rational, Post Development................................................................... 13 Hydrograph No. 4, Reservoir, Rational Routing................................................................... 14 M111 M. SummaryReport ..................................................................................................................... 15 HydrographReports............................................................................................................... 16 Hydrograph No. 1, Rational, Pre Development.................................................................... 16 Hydrograph No. 2, Rational, Post Development................................................................... 17 Hydrograph No. 4, Reservoir, Rational Routing................................................................... 18 Hydrograph Return Period Re,ga ydra w Hydrographs Extension for AutoCAD®Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 Rational ------ 2.877 3.403 ------- ------- 4.597 ------- ------- 6,279 Pre Development 2 Rational ------ 11.18 13.16 ------- ------- 17.37 ------- ------- 23.24 Post Development 4 Reservoir 2 0.055 0.061 ------- ------- 0.071 ------- ------- 0.580 Rational Routing Proj. file: Wet Pond C.gpw Tuesday, Jun 15, 2010 2 Hydrograph Summary Repogydraflow Hydrographs Extension for AuloCAD® Civil 3D®2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 2.877 1 20 3,452 ------ ------ ------ Pre Development 2 Rational 11.18 1 10 6,710 ------ ------ ------ Post Development 4 Reservoir 0.055 1 20 5,296 2 22.87 6,676 Rational Routing Wet Pond C.gpw Return Period: 1 Year Tuesday, Jun 15, 2010 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 Pre Development Hydrograph type = Rational Storm frequency = 1 yrs Time interval = 1 min Drainage area = 4.000 ac Intensity = 3.424 in/hr OF Curve = Jacksonville. OF Composite (Area/C) = [(0.030 x 0.95) + (3.190 x 0.20) . (0.780 x 0.20)] / 4.000 Q (cfs) 3.00 1.00 Pre Development Hyd. No. 1 -- 1 Year Tuesday, Jun 15, 2010 Peak discharge = 2.877 cfs Time to peak = 0.33 hrs Hyd. volume = 3,452 cult Runoff coeff. = 0.21` Tc by User = 20.00 min Asc/Rec limb fact = 1/1 0.00 V I I I I I I I I I I I I I I I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Hyd No. 1 Q (cfs) 3.00 2.00 1.00 0.00 1 Time (hrs) 4 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3139 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 2 Post Development Hydrograph type = Rational Peak discharge = 11.18 cfs Storm frequency = 1 yrs Time to peak = 0.17 hrs Time interval = 1 min Hyd. volume = 6,710 cuft Drainage area = 4.000 ac Runoff coeff. = 0.59' Intensity = 4.739 in/hr Tc by User = 10.00 min OF Curve = Jacksonville. OF Asc/Rec limb fact = 1/1 ' Composite (Area/C) = [(1.770 x 0.95) + (1.450 x 0.35) + (0.780 x 0.20)] / 4.000 Q (Cfs) 12.00 10.00 W111l Gt[1Zrl 4.00 2.00 0.00 " I 0.0 0.0 0.1 Hyd No. 2 Post Development Hyd. No. 2 -- 1 Year 0.1 0.1 Q (cfs) 12.00 10.00 M 4.00 2.00 I I I I I N 0.00 0.2 0.2 0.2 0.3 0.3 0.3 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil MD® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 4 Rational Routing Hydrograph type = Reservoir Peak discharge = 0.055 cfs Storm frequency = 1 yrs Time to peak = 0.33 hrs Time interval = 1 min Hyd. volume = 5,296 cuft Inflow hyd. No. = 2 -Post Development Max. Elevation = 22.87 ft Reservoir name = Temp Pool Max. Storage = 6,676 cuft Storage Indication method used Q (Cfs) 12.00 10.00 : M W 4.00 f044Nl 0.00 _V ------- ml- 0 5 Hyd No. 4 Rational Routing Hyd. No. 4 -- 1 Year 10 15 20 Hyd No. 2 25 30 35 40 45 I® Total storage used = 6,676 cult Q (cfs) 12.00 10.00 4.00 f041rIr1 1 0.00 50 Time (hrs) Pond Report s Hydraflow Hydrographs Extension for AUtcl Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Pond No. 1 - Temp Pool Pond Data Contours - User -defined contour areas. Conic method used for volume calculation. Begining Elevation = 22.50 ft Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cult) 0.00 22.50 16,232 0 0 0.50 23.00 19,769 8,985 8,985 0.70 23.20 20,204 3,997 12,982 1.50 24.00 21,967 16,862 29,843 2.50 25.00 24,221 23,083 52,926 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 18.00 2.00 10.00 0.00 Crest Len (ft) = 25.00 25.00 0.00 0.00 Span (in) = 18.00 2.00 60.00 0.00 Crest EI. (ft) = 24.75 24.00 0.00 0.00 No. Barrels = 1 1 3 0 Weir CoeH. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 22.50 22.50 23.20 0.00 Weir Type = Riser Rect --- --- Length (ft) = 33.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope I%) = 0.50 0.00 0.00 n/a N-Value = .W3 .013 .013 n/a Orifice Coeff. = 0.60 0,60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes Yes No TW Elev. (tt) = 0.00 Note. Culvert/Odf ce outnoas are analyzed under inlet (ic) and outlet (ac) control. Weir risers checked for wince conditions tic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Chi CIvB CIvC PrfRsr WrA WrB WrC WrD Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 22.50 0.00 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 0.50 8,985 23.00 0.07 is 0.07 is 0.00 --- 0.00 0.00 --- --- --- ---. 0.066 0.70 12,982 23.20 0.08 is 0.08 is 0,00 --- 0.00 0.00 --- --- --- --- 0,080 1.50 29,843 24.00 4.00 oc 0.01 is 3.96 is --- 0.00 0.00 --- --- --- --- 3.966 2.50 52,926 25.00 10.51 oc 0.01 is 6.67 is --- 3.80 s 83.25 --- --- --- --- 93.73 7 Hydrograph Summary Re poqydraflow Hydrographs Extension for AutoCAD®Civil 3D®2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 3.403 1 20 4,084 ------ ------ ------ Pre Development 2 Rational 13.16 1 10 7,897 ------ ------ ------ Post Development 4 Reservoir 0.061 1 20 6,247 2 22.94 7,858 Rational Routing Wet Pond C.gpw Return Period: 2 Year Tuesday, Jun 15, 2010 H Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 1 Pre Development Hydrograph type = Rational Peak discharge = 3.403 cfs Storm frequency = 2 yrs Time to peak = 0.33 hrs Time interval = 1 min Hyd. volume = 4,084 cuft Drainage area = 4.000 ac Runoff coeff. = 0.21* Intensity = 4.052 in/hr Tc by User = 20.00 min OF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(0.030 x 0.95) + (3.190 x 0.20) + (0.780 x 0.20)] / 4.000 Q (Cfs) 4.00 3.00 2.00 Pre Development Hyd. No. 1 -- 2 Year 0.00 V I 1 I II I I I I I I II I I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Hyd No. 1 Q (Cfs) 4.00 3.00 2.00 1.00 r 0.00 1 Time (hrs) s• Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3Dm 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 2 Post Development Hydrograph type = Rational Peak discharge = 13.16 cfs Storm frequency = 2 yrs Time to peak = 0..17 hrs Time interval = 1 min Hyd. volume = 7,897 cuft Drainage area = 4.000 ac Runoff coeff. = 0.59" Intensity = 5.577 in/hr Tc by User = 10.00 min OF Curve = Jacksonville. I DF Asc/Rec limb fact = 1/1 ` Composite (Area/C) = [(1.770 x 0.95) + It.450 x 0.35) + (0.780 x 0.20)1 / 4.000 Q (Cfs) 14.00 12.00 1111I1I1I F'ul 1M AM 4.00 r wa Post Development Hyd. No. 2 -- 2 Year Q (Cfs) 14.00 12.00 10.00 F111IN 4.00 2.00 0.00 W I I I I I I I I 10.00 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 0.3 Hyd No. 2 Time (hrs) Hydrograph Report 10 Hydraflow Hydrographs Extension for AutoCADS Civil 3DS 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 4 Rational Routing Hydrograph type = Reservoir Peak discharge = 0.061 cfs Storm frequency = 2 yrs Time to peak = 0.33 hrs Time interval = 1 min Hyd. volume = 6,247 cuft Inflow hyd. No. = 2 -Post Development Max. Elevation = 22.94 ft Reservoir name = Temp Pool Max. Storage = 7,858 cuft Storage Indication method used. Q (cfs) 14.00 12.00 [tixlItil M 6.00 4.00 Rational Routing Hyd. No. 4 -- 2 Year Q (cfs 14.00 12.00 luoltill> 8.00 6.00 4.00 Wallill 0.00 ' I I I' ' ' 1 0.00 0 5 - 10 15 20 25 30 35 40 45 50 Time (hrs) — Hyd No. 4 —Hyd No. 2 ®Total storage used = 7,858 tuft 11 Hydrograph Summary Re pogydraflow Hydrographs Extension for AutoCADO Civil 3D®2009 by Aulodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min). Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 4.597 1 20 5,517 ---... ------ ------ Pre Development 2 Rational 17.37 1 10 10,423 ------ ....... ------ Post Development 4 Reservoir 0.071 1 20 8,127 2 23.07 10,375 Rational Routing Wet Pond C.gpw Return Period: 10 Year Tuesday, Jun 15, 2010 12 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 1 Pre Development Hydrograph type = Rational Peak discharge = 4.597 cfs Storm frequency = 10 yrs Time to peak = 0.33 hrs Time interval = 1 min Hyd. volume = 5,517 cuft Drainage area = 4.000 ac Runoff coeff. = 0.21' Intensity = 5.473 in/hr Tc by User = 20.00 min OF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 Composite (Area/C) = ((0.030 x 0.95) + (3.190 x 0.20) + (0.780 x 0.20)1 / 4.000 Q (Cfs) 5.00 1191111 3.00 W0111 1.00 Pre Development Hyd. No. 1 -- 10 Year 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Hyd No. 1 Q (cfs) 5.00 4.00 99116I11 2.00 1.00 0.00 1 Time (hrs) 13 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31)CN 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 2 Post Development Hydrograph type = Rational Peak discharge = 17.37 cfs Storm frequency = 10 yrs Time to peak = 0.17 hrs Time interval = 1 min Hyd. volume = 10,423 cuft Drainage area = 4.000 ac Runoff coeff. = 0.59' Intensity = 7.361 in/hr Tc by User = 10.00 min OF Curve = Jacksonville. OF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(1.770 x 0.95) + (1.450 x 0.35) + (0.780 x 0.20)] / 4.000 Q (Cfs) 18.00 15.00 [FAIIII7 • 11 . �� 3.00 0.00 r 0.0 0.0 0.1 Hyd No. 2 Post Development Hyd. No. 2 -- 10 Year 0.1 0.1 0.2 0.2 Q (Cfs) 18.00 15.00 12.00 we . 11 3.00 J v 0.00 0.2 0.3 0.3 0.3 Time (hrs) 14 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 4 Rational Routing Hydrograph type = Reservoir Peak discharge = 0.071 cfs Storm frequency = 10 yrs Time to peak = 0.33 hrs Time interval = 1 min Hyd. volume = 8,127 cuft Inflow hyd. No. = 2 -Post Development Max. Elevation = 23.07 ft Reservoir name = Temp Pool Max. Storage = 10,375 cuft Storage Indication method used. Q (cfs) 18.00 l M11111I 12.00 • m AM k1[417 0.00 0 5 Hyd No. 4 Rational Routing Hyd. No. 4 -- 10 Year 10 15 20 Hyd No. 2 25 30 35 40 45 ® Total storage used = 10,375 cult Q (Cfs 18.00 15.00 12.00 E'11011" Mire, 1 0.00 50 Time (hrs) 15 Hydrograph Summary Repogydraflow Hydrographs Extension for AutoCAD©Civil 3D©2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (fit) Total strge used (cuft) Hydrograph description 1 Rational 6.279 1 20 7,535 ------ ------ ------ Pre Development 2 Rational 23.24 1 10 13,944 ------ ------ ------ Post Development 4 Reservoir 0.580 1 20 10,540 2 23.23 13,818 Rational Routing Wet Pond C.gpw Return Period: 100 Year Tuesday, Jun 15, 2010 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31)® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 1 Pre Development Hydrograph type = Rational Peak discharge = 6.279 cfs Storm frequency = 100 yrs Time to peak = 0.33 hrs Time interval = 1 min Hyd. volume = 7,535 cuft Drainage area = 4.000 ac Runoff coeff. = 0.21' Intensity = 7.476 in/hr Tc by User = 20.00 min OF Curve = Jacksonville. OF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(0.030 x 0,95) + (3.190 x 0.20) + (0.780 x 0.20)] / 4.000 Q (CIS) 7.00 . M .M 4.00 M r M 1.00 Pre Development Hyd. No. 1 -- 100 Year Q (Cfs) 7.00 . O: 5.00 4.00 3.00 2.00 1.00 0.00 V 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 '40.00 .0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 .1 1 Hyd No. 1 Time (hrs) 17 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31)(D 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 2 Post Development Hydrograph type = Rational Peak discharge = 23.24 cfs Storm frequency = 100 yrs Time to peak = 0.17 hrs Time interval = 1 min Hyd. volume = 13,944 cuft Drainage area = 4.000 ac Runoff coeff. = 0.59" Intensity = 9.847 in/hr Tc by User = 10.00 min OF Curve = Jacksonville. OF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(1.770 x 0.95) + (1.450 x 0.35) + (0.780 x 0.20)] 14.000 Q (Cfs) 24.00 20.00 16.00 12.00 MO [KiA] 0.00 1' 0.0 0.0 0.1 Hyd No. 2 Post Development Hyd. No. 2 -- 100 Year 0.1 0.1 0.2 0.2 0.2 Q (Cfs) 24.00 20.00 f ORI 12.00 4.00 ' ' " 0.00 0.3 0.3 0.3 Time (hrs) W Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 4 Rational Routing Hydrograph type = Reservoir Peak discharge = 0.580 cfs Storm frequency = 100 yrs Time to peak = 0.33 hrs Time interval = 1 min Hyd. volume = 10,540 cuft Inflow hyd. No. = 2 -Post Development Max. Elevation = 23.23 ft Reservoir name = Temp Pool Max. Storage = 13,818 cuft Storage Indication method used. Q (cfs) 24.00 20.00 16.00 12.00 W41411 4.00 0.00 - 0 5 Hyd No. 4 Rational Routing Hyd. No. 4 -- 100 Year 10 15 20 Hyd No. 2 25 30 35 40 45 M= Total storage used = 13,818 cuft Q (cfs' 24.00 1K1X11i, 16.00 12.00 4.00 1 0.00 50 Time (hrs, PROJECT: PROJECT NO.: DESCRIPTION: DRAINAGE AREA DESIGN SHEET DRAINAGE AREA D: POND D Post Development C Aft°) A ac 1 Building 0.95 15,699 0,36 2 Sidewalk 095 6.969 0,16 3 Parking 0,95 1,803 0.04 4 Street 0.95 13,939 0.32 6 Grass 0.35 23,999 0.55 7 8 Weighted C 0.72 Total Area 62,409 1.43 Im ervious Area 38,410 0,88 Pe rcenl lm ervious 61.5% DESIGN BV: JTR CHECKED BY: VJC WET DETENTION POND Pond D Project Information Project Name: Camp Lejeune Hospital Addition and Renovation Project #: 3053 and 3156 Designed by: JTR Date: 6/15/2010 Checked by: Date: Site Information Sub Area Location: Proposed Pond D Drainage Area (DA) = 1.43 Acres Impervious Area (IA) = 0.880 Acres Percent Impervious (I) = 61.5 p/ Elevations Top of Bank Elevation = 25.00 ft Emergency Elevation = 23.70 ft Permanent Pool Elevation = 22.50 ft Bottom of Pond Elevation = 17.50 ft Bottom of Sediment Elevation = 16.50 It Basin Areas[Volumes Area of Permanent Pool = 5,888 sf A permy l (includes main pond & forebays) (Elev = 22.50 ) Area of Bottom of Shelf = 4,349 sf App, ,,e,l (includes main pond & forebays) Area of Bottom of Pond = 612 sf A 11nn (excluding sediment storage & forebays)' Average Depth ' Depth of Pond = 4.5 ft Depth (dist. btwn. btm. of shelf & btm. of pond, excludes sediment) Average Depth = 3.00 it Use Average Depth of = 3.00 ft Required Surface Area - Wetland SA/DA = 8.1 (90% TSS Removal via Pond) Min Req d Surface Area = 5,046 sf (at Permanent Pool) . Required Storage Volume - Using Simple Method Design Storm = 1.5 inch (Project Does Not Drain to SA waters) Determine Rv Value = 0.05 + 0.009 (I) = 0.60 inln Storage Volume Required = 4,702 cf (above Permanent Pool) Side Slopes of Pond = 3 : 1 Is Permenant Pool Surface Area Sufficient (yes/no)? Yes ( 5888 > 5046) sf WET DETENTION POND Pond D Project Information Project Name: Camp Lejeune Hospital Addition and Renovation Project M 3053 and 3156 Designed by: JTR Date: 6/15/2010 Checked by: Date: 1.5' Volume Elevation - Target Volume = 4.702 cu It Lower Elevation = 23.00 Upper Elevation = 24.00 Lower Volume = 3.368 cu It Upper Volume = 11,500 cu ft Target Elevation = 23.16 Orifice Sizing - Dry Detention Op D.y.= 0.0272 cfs 0zD,,= 0.0109 cfs Orifice Size = 1.25 in 0"".= 0.019 cfs Drawdown Time = 2.9 days less than 5 days (yes/no) ? Yes greater than 2 days (yes/no) ? Yes Anti -Flotation Device 6-ft x 6-ft Riser Box Area: 36.0 sf Volume: 270.0 cf Weight: 16,848 Ibs Factor of Safety 1.10 WT Req'd of Anti -Flotation Device: 18.533 Ibs Volume of Concrete Req'd: 123.6 cf Volume Provided: 153.0 cf Contour Contour Area Incremental Accumulated Volume Volume, S Stage, Z sq It cu ff cu It It 22.50 5.888 0 0 0.00 23.00 7,585 3,368 3,368 0.50 24.00 8,679 8,132 11,500 1.50 25.00 9,829 9,254 20,754 2.50 (Flowmte required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) (Outside Dim. = 6-it x 6-ft, Inside Dim. = 5-fl x 5-ft) (Water Displaced - Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) (6-ft x 6-ft Box filled 4.25-ft deep with concrete) Hydraflow Table of Contents Wet Pond D.gpw HydraFlow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hydrograph Return Period Recap............................................................................ 1 1 -Year SummaryReport ....................................................................................................................... 2 HydrographReports................................................................................................................. 3 Hydrograph No. 1, Rational, Rational Pre.............................................................................. 3 Hydrograph No. 2, Rational, Rational Post............................................................................. 4 Hydrograph No. 4, Reservoir, Ration Post Routed................................................................. 5 PondReport - Temp Pool.................................................................................................. 6 2 - Year SummaryReport ....................................................................................................................... 7 HydrographReports................................................................................................................. 8 Hydrograph No. 1, Rational, Rational Pre.............................................................................. 8 Hydrograph No. 2, Rational, Rational Post............................................................................. 9 Hydrograph No. 4, Reservoir, Ration Post Routed............................................................... 10 10 - Year SummaryReport ..................................................................................................................... 11 HydrographReports............................................................................................................... 12 Hydrograph No. 1, Rational, Rational Pre............................................................................ 12 Hydrograph No. 2, Rational, Rational Post........................................................................... 13 Hydrograph No. 4, Reservoir, Ration Post Routed............................................................... 14 100 - Year SummaryReport ..................................................................................................................... 15 HydrographReports............................................................................................................... 16 Hydrograph No. 1, Rational, Rational Pre............................................................................ 16 Hydrograph No. 2, Rational, Rational Post........................................................................... 17 Hydrograph No. 4, Reservoir, Ration Post Routed............................................................... 18 Hydrograph Return Period ReF, ytlra w Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 Rational ------ 2.351 2.781 ------- ------- 3,757 ------- ------- 5.131 Rational Pre 2 Rational ------ 5.296 6,226 ------- ------- 8.170 ------- ------- 10.90 Rational Post 4 Reservoir 2 0.023 0.025 ------- ------- 0.029 ------- ------- 0,404 Ration Post Routed Proj. file: Wet Pond D.gpw Tuesday, Jun 15, 2010 2 Hydrograph Summary Re pogydraflow Hydrographs Extension for AutoCAD®Civil 3D®2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) ,Inflow hyd(s) Maximum elevation (ft) Total surge used (cuft) Hydrograph description 1 Rational 2.351 1 20 2.821 ------ ------ ------ Rational Pre 2 Rational 5.296 1 8 2,542 ------ --.... ------ Rational Post 4 Reservoir 0.023 1 16 2,192 2 22.88 2,530 Ration Post Routed Wet Pond D.gpw Return Period: 1 Year Tuesday, Jun 15, 2010 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D8 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 1 Rational Pre Hydrograph type = Rational Peak discharge = 2.351 cfs Storm frequency = 1 yrs Time to peak = 0.33 hrs Time interval = 1 min Hyd. volume = 2,821 cult Drainage area = 1.430 ac Runoff coeff. = 0.48' Intensity = 3.424 in/hr Tc by User = 20.00 min IDF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 Composite (Area/C) _ [(1.110 x 0.35) + (0.320 x 0.95)] 11.430 0 (Cfs) 3.00 2.00 1.00 Rational Pre Hyd. No. 1 -- 1 Year 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Hyd No. 1 0 (Cfs) 3.00 2.00 1.00 0.00 1 Time (hrs) 4 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 2 Rational Post Hydrograph type = Rational Peak discharge = 5.296 cfs Storm frequency = 1 yrs Time to peak = 0.13 hrs Time interval = 1 min Hyd. volume = 2,542 cuft Drainage area = 1.430 ac Runoff coeff. = 0.72* Intensity = 5.144 in/hr Tc by User = 8.00 min OF Curve = Jacksonville. OF Asc/Rec limb fact = 1/1 ' Composite (Area/C) = ((0.880 x 0.95) + (0.550 x 0.35)1 / 1.430 Q (Cfs) 6.00 5.00 4.00 3.00 2.00 �aiI�l 0.00 " 1 1 0.0 0.0 0.1 Hyd No. 2 Rational Post Hyd. No. 2 -- 1 Year 0.1 0.1 Q (Cfs) 6.00 5.00 MR1111 3.00 2.00 1.00 0.00 0.2 0.2 0.2 0.3 Time (hrs) 5 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 4 Ration Post Routed Hydrograph type = Reservoir Peak discharge = 0.023 cfs Storm frequency = 1 yrs Time to peak = 0.27 hrs Time interval = 1 min Hyd. volume = 2,192 cuft Inflow hyd. No. = 2 -Rational Post Max. Elevation = 22.88 ft Reservoir name = Temp Pool Max. Storage = 2,530 cuft Storage Indication method used. Q (cfs) 6.00 5.00 C9iI1I 3.00 2.00 ROOM 0.00 " 0 5 Hyd No. 4 Ration Post Routed Hyd. No. 4 -- 1 Year Q (Cff 6.00 5.00 3.00 1.00 0.00 10 15 20 25 30 35 40 45 50 Hyd No. 2 ® Total storage used = 2,530 Cult Time (hrs) Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2009 by Autodesk, Inc. v6.066 Pond No. 1 - Temp Pool Pond Data Contours - User -defined contour areas. Conic method used for volume calculation. Begining Elevation = 22.50 It Stage I Storage Table Stage (ft) Elevation (ft) 0.00 22.50 0.50 23.00 0.70 23.20 1.50 24.00 2.50 25.00 Contour area (sqft) 5,888 7,585 7,799 8,679 9,829 Incr. Storage (cult) 0 3,359 1,538 6,587 9,247 Total storage (cuft) 0 3,359 4,897 11,485 20,732 Tuesday, Jun 15, 2010 Culvert I Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 18.00 1.25 10.00 0.00 Crest Len (ft) = 25.00 30.00 0.00 0.00 Span (in) = 18.00 1.25 60.00 0.00 Crest El. (ft) = 24.75 23.70 0.00 0.00 No. Barrels = 1 1 3 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 22.50 22.50 23.20 0.00 Weir Type = Riser Rect --- --- Length (ft) = 25.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope I%) = 0.50 0.00 0.00 nla N-Value = .013 .013 .013 nla Orifice Coeft. = 0.60 0.60 0.60 0.60 Exfil.(inlhr) = 0.000 (by Contour) Multi -Stage = nla Yes Yes No TW Elev. (ft) = 0.00 Note'. CulveNOrlfiee ourldea are analyzes under Inlet (ic) and outlet fici control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage I Storage I Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrfRsr WrA WrB WrC WrD Exfil User Tota ft tuft If cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0,00 0 22.50 0.00 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.00( 0.50 3,359 23.00 0.03 is 0.03 is 0.00 --- 0.00 0.00 --- --- --- --- 0.021 0.70 4,897 23.20 0.04 is 0.03 is 0.00 --- 0.00 0.00 --- --- --- --- 0,03: 1.50 11,485 24.00 3.60 oc 0.00 is 3.56 is --- 0.00 16.42 --- --- --- --- 19.9E 2.50 20,732 25.00 10.70 oc 0.00 is 6.81 is --- 3.85 s 148.07 --- --- --- --- 158.7z L> Hydrograph Summary Re pogydraflow Hydrographs Extension for AutoCAD®Civil 3D®2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (R) Total strge used (cuft) Hydrograph description 1 Rational 2.781 1 20 3,337 ------ ------ ------ Rational Pre 2 Rational 6.226 1 8 2,989 ------ ------ ------ Rational Post 4 Reservoir 0,025 1 16 2,565 2 22.94 2,975 Ration Post Routed Wet Pond D.gpw Return Period: 2 Year Tuesday, Jun 15, 2010 0 Hydrograph Report Hydrallow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 Rational Pre Hydrograph type = Rational Storm frequency = 2 yrs Time interval = 1 min Drainage area = 1.430 ac Intensity = 4.052 in/hr OF Curve = Jacksonville. OF Composite (Area/C) = [(1.110 x 0.35) + (0.320 x 0.95)] / 1.430 Q (Cfs) 3.00 elm 1.00 Rational Pre Hyd. No. 1 -- 2 Year Tuesday, Jun 15, 2010 Peak discharge = 2.781 cfs Time to peak = 0.33 hrs Hyd. volume = 3,337 cuft Runoff coeff. = 0.48" Tc by User = 20.00 min Asc/Rec limb fact = 1/1 0.00 VI I I II I I I I I I I I I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Hyd No. 1 Q (cfs) 3.00 2.00 1.00 0.00 1 Time (hrs) I Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 2 Rational Post Hydrograph type = Rational Peak discharge = 6.226 cfs Storm frequency = 2 yrs Time to peak = 0.13 hrs Time interval = 1 min Hyd. volume = 2,989 cuft Drainage area = 1.430 ac Runoff coeff. = 0.72` Intensity = 6.047 in/hr Tc by User = 8.00 min OF Curve = Jacksonville. OF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(0.880 x 0.95) + (0.550 x 0.35)] / 1.430 Q (Cfs) 7.00 6.00 5.00 4.00 KI61I611 Will]I 194I411 0.00 V ' 0.0 0.0 Hyd No. 2 Rational Post Hyd. No. 2 -- 2 Year 0.1 0.1 0.1 0.2 0.2 0.2 Q (Cfs) 7.00 !r D1111 4.00 3.00 2.00 1.00 Y 0.00 0.3 Time (hrs) 10 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 4 Ration Post Routed Hydrograph type = Reservoir Peak discharge = 0.025 cfs Storm frequency = 2 yrs Time to peak = 0.27 hrs Time interval = 1 min Hyd. volume = 2,565 cuft Inflow hyd. No. = 2 -Rational Post Max. Elevation = 22.94 ft Reservoir name = Temp Pool Max. Storage = 2,975 cuft Storage Indication method used. Q (cfs) 7.00 6.00 5.00 4.00 01110 2.00 1.00 000 Ration Post Routed Hyd. No. 4 -- 2 Year 0 5 10 15 20 25 30 35 40 45 50 V Vy Time (hrs) — Hyd No. 4 —Hyd No. 2 ®Total storage used = 2,975 cuff 11 Hydrograph Summary Repogydraflow Hydrographs Extension for AutoCADO Civil 3D®2009 by Aulodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 3.757 1 20 4,508 ------ ------ ------ Rational Pre 2 Rational 8.170 1 8 3,921 ------ ------ ------ Rational Post 4 Reservoir 0.029 1 16 3,277 2 23.07 3,905 Ration Post Routed Wet Pond D.gpw Return Period: 10 Year Tuesday, Jun 15, 2010 12 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 Rational Pre Hydrograph type = Rational Storm frequency = 10 yrs Time interval = 1 min Drainage area = 1.430 ac Intensity = 5.473 in/hr OF Curve = Jacksonville. IDF Composite (Area/C) = [(1.110 x 0.35) + (0.320 x 0.95)) / 1.430 Q (Cfs) 4.00 3.00 2.00 1.00 Rational Pre Hyd. No. 1 -- 10 Year Tuesday, Jun 15, 2010 Peak discharge = 3.757 cfs Time to peak = 0.33 hrs Hyd. volume = 4,508 cuft Runoff coeff. = 0.48" Tc by User = 20.00 min Asc/Rec limb fact = 1/1 0.00 V 1 1 1 1 1 1 1 I 1 I I I I I I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Hyd No. 1 Q (cfs) 4.00 3.00 2.00 "III] 0.00 1 Time (hrs) 13 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 2 Rational Post Hydrograph type = Rational Peak discharge = 8.170 cfs Storm frequency = 10 yrs Time to peak = 0.13 hrs Time interval = 1 min Hyd. volume = 3,921 cuft Drainage area = 1.430 ac Runoff coeff. = 0.72` Intensity = 7.935 in/hr Tc by User = 8.00 min OF Curve = Jacksonville. IDF Aso/Rec limb fact = 1/1 Composite (Area/C) = [(0.880 x 0.95) + (0.550 x 0.35)] / 1.430 Q (Cfs) 10.00 M 4.00 PAdH 0.00 0.0 0.0 Hyd No. 2 Rational Post Hyd. No. 2 -- 10 Year 0.1 0.1 0.1 0.2 0.2 0.2 Q Ids) 10.00 1111:111I01, [:loIt 4.00 I M1111 -X- 0.00 0.3 Time (hrs) 14 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 4 Ration Post Routed Hydrograph type = Reservoir Peak discharge = 0.029 cfs Storm frequency = 10 yrs Time to peak = 0.27 hrs Time interval = 1 min Hyd. volume = 3,277 cuft Inflow hyd. No. = 2 - Rational Post Max. Elevation = 23.07 ft Reservoir name = Temp Pool Max. Storage = 3,905 cult Storage Indication method used Q (cfs) 10.00 �f . M M 2.00 0.00 0 5 Hyd No. 4 Ration Post Routed Hyd. No. 4 -- 10 Year 10 15 20 Hyd No. 2 25 30 35 40 45 [® Total storage used = 3,905 cuft Q (cfs) 10.00 M . e] 4.00 WAGO] 1 0.00 50 Time (hrs) 15 Hydrograph Summary Re poqydraflow Hydrographs Extension for AutoCAD®Civil 3139)2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (h) Total strge used (cuft) Hydrograph description 1 Rational 5.131 1 20 6,157 ------ ------ ------ Rational Pre 2 Rational 10.90 1 8 5,231 ------ ------ ------ Rational Post 4 Reservoir 0.404 1 16 4,193 2 23.22 5,173 Ration Post Routed Wet Pond D.gpw Return Period: 100 Year Tuesday, Jun 15, 2010 16 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31AD 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 1 Rational Pre Hydrograph type = Rational Peak discharge = 5.131 cfs Storm frequency = 100 yrs Time to peak = 0.33 hrs Time interval = 1 min Hyd. volume = 6,157 cuft Drainage area = 1.430 ac Runoff coeff. = 0.48* Intensity = 7.476 in/hr Tc by User = 20.00 min OF Curve = Jacksonville. OF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(1.110 x 0.35) + (0.320 x 0.95)] 11.430 0 (Cfs) 6.00 5.00 3.00 2.00 1.00 Rational Pre Hyd. No. 1 -- 100 Year 0 (Cfs) 6.00 5.00 4.00 3.00 1PA11111 1.00 0.00 V 1 1 1 1 1 1 1 1 I I I I 1 I I I I I I `� 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 — Hyd No. 1 Time (hrs) 17 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil MO 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 2 Rational Post Hydrograph type = Rational Peak discharge = 10.90 cfs Storm frequency = 100 yrs Time to peak = 0.13 hrs Time interval = 1 min Hyd. volume = 5,231 cuft Drainage area = 1.430 ac Runoff coeff. = 0.72* Intensity = 10.585 in/hr Tc by User = 8.00 min OF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(0.880 x 0.95) + (0.550 x 0.35)] / 1.430 Q (Cfs) 12.00 10.00 :M .M 4.00 PArAI 0.00 1 ' 0.0 0.0 0.1 Hyd No. 2 Rational Post Hyd. No. 2 -- 100 Year Q (Cfs) 12.00 i 10.00 MOM 2.00 I I I 1 1 V 0.00 0.1 0.1 0.2 0.2 0.2 0.3 Time (hrs) W1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 4 Ration Post Routed Hydrograph type = Reservoir Peak discharge = 0.404 cfs Storm frequency = 100 yrs Time to peak = 0.27 hrs Time interval = 1 min Hyd. volume = 4,193 cuft Inflow hyd. No. = 2 -Rational Post Max. Elevation = 23.22 ft Reservoir name = Temp Pool Max. Storage = 5,173 cuft Storage Indication method used Q (cfs) 12.00 10.00 M 14110 4.00 2.00 0.00 " 0 5 Hyd No. 4 Ration Post Routed Hyd. No. 4 -- 100 Year 10 15 20 Hyd No. 2 25 30 35 40 45 ® Total storage used = 5,173 cuft Q (cfs) 12.00 10.00 E$ . & 4.00 2.00 1 0.00 50 Time (hrs) PROJECT: PROJECT NO.: DESCRIPTION'. DRAINAGE AREA DESIGN SHEET DRAINAGE AREA E: POND E Post Development C Aft° A ac 1 Building 0.95 15,120 0,35 2 Sidewalk 0.95 8,548 0.20 3 Parkin 0.95 0.00 4 Street 0.95 0.00 6 Grass 0,35 84,554 1.94 7 8 Weighted C 0A8 Total Area 108,222 1 2,48 Impervious Area 23.6681 0.54 Percent Impervious 21.9 DESIGN BY: CHECKED BY: WET DETENTION POND Pond E Project Information Project Name: Camp Lejeune Hospital Addition and Renovation Project #: 3053 and 3156 Designed by: JTR Date: 6/15/2010 Checked by: Date: Site Information Sub Area Location: Proposed Pond E Drainage Area (DA) = 2.48 Acres Impervious Area (IA) = 0.540 Acres Percent Impervious (1) = 21.8 % Elevations Top of Bank Elevation = 19.00 ft Emergency Elevation = 17.75 ft Permanent Pool Elevation = 16.50 ft Bottom of Pond Elevation = 11.50 ft Bottom of Sediment Elevation = 10.50 ft Basin Areas[Volumes Area of Permanent Pool = 3,941 sf Area of Bottom of Shelf = 2,780 sf Area of Bottom of Pond = 415 sf Average Depth Depth of Pond = 4.5 ft Average Depth = 3.01 ft Use Average Depth of = 3.00 It A Perm Pre, (includes main pond & forebays) (Elev = 16.50 ) A mi .heir (includes main pond & forebays) Awl Well (excluding sediment storage & forebays) Depth (dist. btwn. btm. of shelf & btm. of pond, excludes sediment) Required Surface Area - Wetland SA/DA = 3.5 (90% TSS Removal via Pond) Min Req'd Surface Area = 3,781 sf (at Permanent Pool) Required Storage Volume - Using Simple Method Design Storm = 1.5 inch (Project Does Not Drain to SA waters) Determine Rv Value = 0.05 + 0.009 (1) = 0.25 infn Storage Volume Required = 3,321 cf (above Permanent Pool) Side Slopes of Pond = 3 : 1 Is Permenant Pool Surface Area Sufficient (yes/no)? Yes ( 3941 > 3781 ) sf v WET DETENTION POND Pond E Project information Project Name: Camp Lejeune Hospital Addition and Renovation Project #: 3053 and 3156 Designed by: JTR Date: 6/15/2010 Checked by: Date: 1.5" Volume Elevation Target Volume = 3,321 cu It Lower Elevation = 17.00 Upper Elevation = 18.00 Lower Volume = 2,300 cu It Upper Volume = 7,991 cu It Target Elevation = 17.18 Orifice Sizing - Dry Detention Oz Dar,= 0.0192 cfs Os o,r,= 0.0077 cis Orifice Size = 1.00 in O o,,_ 0.012 cfs Drawdown Time = 3.2 days less than 5 days (yes/no) ? Yes greater than 2 days (yes/no) ? Yes Anti -Flotation Device 6-ft x 6-ft Riser Box Area: 36.0 sf Volume: 270.0 cf Weight: 16,848 Ibs Factor of Safely 1.10 Wi Req'd of Anti -Flotation Device: 18.533 Ibs Volume of Concrete Req'd: 123.6 of Volume Provided: 153.0 cf Contour Contour Area Incremental Accumulated Volume Volume, S Sta e, Z sq It cu ft cu It it 16.50 3,940 0 0 0.00 17.00 5,258 2.300 2,300 0.50 18.00 6,124 5,691 7,991 1.50 19.00 7,046 6,585 14,576 2.50 (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) (Outside Dim. = 6-ft x 6-fl, Inside Dim. = 5-ft x 5-ft) (Water Displaced - Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) (6-ft x 6-ft Box filled 3.5-ft deep with concrete) Hydraflow Table of Contents Wet Pond E.gpw HydraFlow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hydrograph Return Period Recap............................................................................ 1 1 -Year SummaryReport ....................................................................................................................... 2 HydrographReports................................................................................................................. 3 Hydrograph No. 1, Rational, Rational Pre.............................................................................. 3 Hydrograph No. 2, Rational, Rational Post............................................................................. 4 Hydrograph No. 4, Reservoir, Rational Post Routed.............................................................. 5 PondReport - Temp Pool.................................................................................................. 6 2 - Year SummaryReport ....................................................................................................................... 7 HydrographReports................................................................................................................. 8 Hydrograph No. 1, Rational, Rational Pre.............................................................................. 8 Hydrograph No. 2, Rational, Rational Post............................................................................. 9 Hydrograph No. 4, Reservoir, Rational Post Routed............................................................ 10 10 - Year SummaryReport ..................................................................................................................... 11 HydrographReports............................................................................................................... 12 Hydrograph No. 1, Rational, Rational Pre............................................................................ 12 Hydrograph No. 2, Rational, Rational Post........................................................................... 13 Hydrograph No. 4, Reservoir, Rational Post Routed............................................................ 14 100 - Year SummaryReport ..................................................................................................................... 15 HydrographReports............................................................................................................... 16 Hydrograph No. 1, Rational, Rational Pre............................................................................ 16 Hydrograph No. 2, Rational, Rational Post........................................................................... 17 Hydrograph No. 4, Reservoir, Rational Post Routed............................................................ 18 Hydrograph Return Period Regg ytlra w Hydrographs Extension for AutoCAD@ Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 Rational ------ 3.992 4.723 ------- ------- 6.379 ------- ------- 8.713 Rational Pre 2 Rational ------ 5.872 6.906 ------- ------- 9.089 ------- ------- 12.14 Rational Post 4 Reservoir 2 0.020 0.169 ------- ------- 1.450 ------- ------- 2.234 Rational Post Routed Proj. file: Wet Pond E.gpw Tuesday, Jun 15, 2010 Hydrograph Summary Re pogydraflow Hydrographs Extension for AutoCAD® Civil 30®2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 1992 1 20 4,790 ------ ------ ------ Rational Pre 2 Rational 5.872 1 9 3,171 ------ ------ ------ Rational Post 4 Reservoir 0.020 1 18 2,488 2 17.14 3,158 Rational Post Routed Wet Pond E.gpw Return Period: 1 Year Tuesday, Jun 15, 2010 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 Rational Pre Hydrograph type = Rational Storm frequency = 1 yrs Time interval = 1 min Drainage area = 2.480 ac Intensity = 3.424 in/hr OF Curve = Jacksonville. IDF Composite (Area/C) = [(1.990 x 0.35) + (0.490 x 0.95)] / 2.460 0 (Cfs) 4.00 3.00 2.00 1.00 Rational Pre Hyd. No. 1 -- 1 Year Tuesday, Jun 15, 2010 Peak discharge = 3.992 cfs Time to peak = 0.33 hrs Hyd. volume = 4,790 cuft Runoff coeff. = 0.47` Tc by User = 20.00 min Asc/Rec limb fact = 1/1 0.00 = 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Hyd No. 1 0 (cfs) 4.00 9414I11 2.00 1.00 IL 0.00 1 Time (hrs) 4 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 2 Rational Post Hydrograph type = Rational Peak discharge = 5.872 cfs Storm frequency = 1 yrs Time to peak = 0.15 hrs Time interval = 1 min Hyd. volume = 3,171 cuft Drainage area = 2.480 ac Runoff coeff. = 0.48" Intensity = 4.932 in/hr Tc by User = 9.00 min OF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 Composite (Area/C) _ [(0.540 x 0.95) + (1.940 x 0.35)] / 2.480 Q (Cfs) 6.00 5.00 4.00 3.00 2.00 1.00 Rational Post Hyd. No. 2 -- 1 Year Q (Cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 r ' ' ' ' " 0.00 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 Hyd No. 2 Time (hrs) 5 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 4 Rational Post Routed Hydrograph type = Reservoir Peak discharge = 0.020 cfs Storm frequency = 1 yrs Time to peak = 0.30 hrs Time interval = 1 min Hyd. volume = 2,488 cuft Inflow hyd. No. = 2 - Rational Post Max. Elevation = 17.14 ft Reservoir name = Temp Pool Max. Storage = 3,158 cuft Storage Indication method used. Q (cfs) 6.00 4.00 tcx1I1111 2.00 `fffil t 0.00� 0 5 Hyd No. 4 Rational Post Routed Hyd. No. 4 -- 1 Year 10 15 20 Hyd No. 2 25 30 35 40 45 Imm Total storage used = 3,158 cuft Q (cfs) 6.00 16114111 4.00 11111cx11Ic 2.00 "111C 1 0.00 50 Time (hrs) Pond Report 6 Hydraflow Hydrographs Extension for Al Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Pond No. 1 - Temp Pool Pond Data Contours - User -defined contour areas. Conic method used for volume calculation. Begining Elevation = 16.50 ft Stage I Storage Table Stage (ft) 0.00 0,50 0.75 1.50 2.50 Elevation (ft) W50 17.00 17.25 18.00 19.00 Contour area (sqft) 3,941 5,447 5,737 6,620 8,428 Incr. Storage (cuft) 0 2,337 1,398 4,629 7,505 Total storage (cult) 0 2,337 3,734 8,364 15,869 Culvert I Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 15.00 1.00 6.00 0.00 Crest Len (ft) = 25.00 20.00 0.00 0.00 Span (in) = 15.00 1.00 60.00 0.00 Crest EI. (ft) = 18.50 17.75 0.00 0.00 No. Barrels = 1 1 3 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 16.50 16.50 17.25 0.00 Weir Type = Riser Rect --- --- Length (ft) = 25.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope I%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Note: CulkeNOtlfice outflows are analyzed under inlet (ic) and outlet (oc) control. weir risers checked for orifice conditions (ic) and submergence (e). Stage / Storage I Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrfRsr WrA WrB Wl Wl Exffl User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 16.50 0.00 0.00 0.00 --- 0.00 0.00 --- --- --- 0.000 0.50 2,337 17.00 0.02 is 0.02 is 0.00 --- 0.00 0.00 --- --- --- --- 0.017 0.75 3.734 17.25 0.02 is 0.02 is 0.00 --- 0.00 0.00 --- --- --- --- 0.022 1.50 8,364 18.00 4.11 oc 0.00 is 4.10 is --- 0.00 8.33 --- --- --- --- 12.43 2.50 15,869 19.00 8.00 oc 0.00 is 2.39 is --- 5.56 s 93.08 --- --- --- --- 101.03 Hydrograph Summary Repogydraflow Hydrographs Extension for AutoCAD® Civil 3Dm 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (curt) Hydrograph description 1 Rational 4.723 1 20 5,667 ------ ------ ------ Rational Pre 2 Rational 6.906 1 9 3,729 ------ ------ ------ Rational Post 4 Reservoir 0.169 1 18 2,854 2 17.23 3,698 Rational Post Routed Wet Pond E.gpw Return Period: 2 Year Tuesday, Jun 15, 2010 H Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 1 Rational Pre Hydrograph type = Rational Peak discharge = 4.723 cfs Storm frequency = 2 yrs Time to peak = 0.33 hrs Time interval = 1 min Hyd. volume = 5,667 cuft Drainage area = 2.480 ac Runoff coeff. = 0.47' Intensity = 4.052 in/hr Tc by User = 20.00 min OF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 Composite (Area/C) = ](1.990 x 0.35) + (0.490 x 0.95)] 12.480 Q (cfs) 5.00 Mid M go Wid Rational Pre Hyd. No. 1 -- 2 Year 0.00 V 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Hyd No. 1 Q (cfs) 5.00 4.00 99114F. 2.00 1.00 x 0.00 1 Time (hrs) M Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 2 Rational Post Hydrograph type = Rational Peak discharge = 6.906 cfs Storm frequency = 2 yrs Time to peak = 0.15 hrs Time interval = 1 min Hyd. volume = 3,729 cult Drainage area = 2.480 ac Runoff coeff. = 0.48" Intensity = 5.802 in/hr Tc by User = 9.00 min OF Curve = Jacksonville. OF Asc/Rec limb fact = 1/1 Composite (Area/C) = f(0.540 x 0.95) + (1.940 x 0.35)] / 2.480 Q (Cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 000 0.0 0.0 0.1 Hyd No. 2 Rational Post Hyd. No. 2 -- 2 Year Q (cfs) 7.00 6.00 5.00 4.00 Milli 2.00 1.00 0.00 0.1 0.1 0.2 0.2 0.2 0.3 0.3 Time (hrs) 10 Hydrograph Report HydraFlow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 4 Rational Post Routed Hydrograph type = Reservoir Peak discharge = 0.169 cfs Storm frequency = 2 yrs Time to peak = 0.30 hrs Time interval = 1 min Hyd. volume = 2,854 cuft Inflow hyd. No. = 2 - Rational Post Max. Elevation = 17.23 ft Reservoir name = Temp Pool Max. Storage = 3,698 cuft Storage Indication method used. Q (cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 000 Rational Post Routed Hyd. No. 4 -- 2 Year 0 5 10 15 20 25 30 35 40 45 50 V V Hyd No. 4 — Hyd No. 2 ® Total storage used = 3,698 cuft Time (hrs) 11 Hydrograph Summary Re pogydraflow Hydrographs Extension for AutoCAD®Civil 3DO2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuff) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuff) Hydrograph description 1 Rational 6.379 1 20 7,655 ------ ------ ------ Rational Pre 2 Rational 9,089 1 9 4,908 ------ ------ ------ Rational Post 4 Reservoir 1,450 1 17 4,015 2 17.37 4,554 Rational Post Routed Wet Pond E.gpw Return Period: 10 Year Tuesday, Jun 15, 2010 12 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6,066 Tuesday, Jun 15, 2010 Hyd. No. 1 Rational Pre Hydrograph type = Rational Peak discharge = 6.379 cfs Storm frequency = 10 yrs Time to peak = 0.33 hrs Time interval = 1 min Hyd. volume = 7,655 cuft Drainage area = 2.480 ac Runoff coeff. = 0.47' Intensity = 5.473 in/hr Tc by User = 20.00 min OF Curve = Jacksonville. OF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(1.990 x 0.35) + (0.490 x 0.95)] / 2.480 Q (Cfs) 7.00 . 11 • 11 U1I11 9111111 P01111 1.00 Rational Pre Hyd. No. 1 -- 10 Year Q (cfs) 7.00 [Lt $H 5.00 4.00 3.00 2.00 fK1I11 0.00 V 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 V. 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 Hyd No. 1 Time (hrs) 13 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 2 Rational Post Hydrograph type = Rational Peak discharge = 9.089 cfs Storm frequency = 10 yrs Time to peak = 0.15 hrs Time interval = 1 min Hyd. volume = 4,908 cuft Drainage area = 2.480 ac Runoff coeff. = 0.48` Intensity = 7.636 in/hr Tc by User = 9.00 min OF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(0.540 x 0,95) + (1.940 x 0.35)) / 2,480 Q (Cfs) 10.00 : M . M 4.00 2.00 0.00 Y 0.0 0.0 Hyd No. 2 Rational Post Hyd. No. 2 -- 10 Year 0.1 0.1 0.1 0.2 0.2 0.2 0.3 Q (cfs) 10.00 4.00 2.00 Y 0.00 0.3 Time (hrs) 14 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 4 Rational Post Routed Hydrograph type = Reservoir Peak discharge = 1.450 cfs Storm frequency = 10 yrs Time to peak = 0.28 hrs Time interval = 1 min Hyd. volume = 4,015 cuft Inflow hyd. No. = 2 - Rational Post Max. Elevation = 17.37 ft Reservoir name = Temp Pool Max. Storage = 4,554 cuft Storage Indication method used. Q (cfs) 10.00 [xiI7 . M 4.00 2.00 0.00 0 3 Hyd No. 4 Rational Post Routed Hyd. No. 4 -- 10 Year 6 9 12 15 18 21 24 27 30 — Hyd No. 2 ® Total storage used = 4,554 cuft Q (cfs) 10.00 4.00 2.00 -a- 0.00 33 Time (hrs) 15 Hydrograph Summary Re po Flydraflow Hydrographs Extension for AutoCAD® Civil 3D®2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (tuft) Hydrograph description 1 Rational 8.713 1 20 10,456 ------ ------ ------ Rational Pre 2 Rational 12.14 1 9 6,556 ------ ------ ------ Rational Post 4 Reservoir 2.234 1 16 5,657 2 17.56 5,713 Rational Post Routed Wet Pond E.gpw Return Period: 100 Year Tuesday, Jun 15, 2010 Hydrograph Report 16 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 1 Rational Pre Hydrograph type = Rational Peak discharge = 8.713 cfs Storm frequency = 100 yrs Time to peak = 0.33 hrs Time interval = 1 min Hyd. volume = 10,456 cuft Drainage area = 2.480 ac Runoff coeff. = 0.47' Intensity = 7.476 in/hr Tc by User = 20.00 min OF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(1.990 x 0.35) + (0.490 x 0.95)1 12.480 Q (Cfs) 10.00 : M . MI 4.00 2.00 Rational Pre Hyd. No. 1 -- 100 Year Q (cfs) 10.00 [:1111111 4.00 2.00 0.00 V 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 V 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 Hyd No. 1 Time (hrs) 17 Hydrograph Report Hydrallow Hydrographs Extension for AutoCAD® Civil 3D9 2009 by Autodesk, Inc. v6.066 Tuesday. Jun 15, 2010 Hyd. No. 2 Rational Post Hydrograph type = Rational Peak discharge = 12.14 cfs Storm frequency = 100 yrs Time to peak = 0.15 hrs Time interval = 1 min Hyd. volume = 6,556 cuft Drainage area = 2.480 ac Runoff coeff. = 0.48' Intensity = 10.199 in/hr Tc by User = 9.00 min IDF Curve = Jacksonville. OF Asc/Rec limb fact = 1/1 Composite (Area/C) = i(0.540 x 0.95) + (1,940 x 0.35)] / 2.480 Q (Cfs) 14.00 12.00 10.00 8.00 6.00 4.00 milli Rational Post Hyd. No. 2 -- 100 Year Q (Cfs) 14.00 12.00 10.00 8.00 6.00 CtoN] fwili] 0.00 1 1 1 1 1 1 1 1 11V 0.00 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 Hyd No. 2 Time (hrs) 18 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Jun 15, 2010 Hyd. No. 4 Rational Post Routed Hydrograph type = Reservoir Peak discharge = 2.234 cfs Storm frequency = 100 yrs Time to peak = 0.27 hrs Time interval = 1 min Hyd. volume = 5,657 cuft Inflow hyd. No. = 2 - Rational Post Max. Elevation = 17.56 ft Reservoir name = Temp Pool Max. Storage = 5,713 cuft Storage Indication method used. Q (cfs 14.00 12.00 10.00 M9 M 4.00 2.00 Rational Post Routed Hyd. No. 4 -- 100 Year �4 --- Q (cfs) 14.00 12.00 fI1IQ8] M M 4.00 2.00 0.00 0.00 0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 Time (hrs) — Hyd No. 4 —Hyd No. 2 ®Total storage used = 5,713 tuft PROJECT: PROJECT NO.: DESCRIPTION: DRAINAGE AREA DESIGN SHEET DESIGN BY: CHECKED BY: DRAINAGE AREA 1: Infiltration Basin Post Development C Aft' A ac 1 Building 0,95 3.834 0.09 2 Sidewalk 0.95 0.00 3 Parkin 0.95 000 4 Street 0.95 6,462 0.15 6 Grass 0.35 19,983 0.46 7 8 Weighted C 0.55 Total Area 30,279 0.70 Impervious Area 10,296 024 Percentlm ervious 34.0% Volume Runoff to be Controlled From 3.0" Storm (Exempt from OH -Line Bypass) Rv=0.05-0.009(I) (Simple Method, Scheuler) 1= 34.0 Percent Impervious Rv= 0.36 Runoff Coefficient V=P'Rv'Ad P= 3,00 in Design Rainfall (OfOine Bypass Waived) V= 0.062 ac-ft Volume To Be Treated V= 2,695 its Volume To Be Treated A= 1 746 it, Area of Treatment Device D= 1 3" it Pool Depth V= 2,798 it Volume of Treatment 13,00 it Seasonal High Water Table Elevation 15,00 It Bottom of Treatment Device 16,35 ft Water Suface Elevation Drawdown Calculation V= 2.798 its Volume To Be Drawn Down A= 1,746 11' Area of Treatment Device k= 22 in/hr Drawdown Through Orifice 1= 7 ms Drawdown Time t= 0.31 days Hydraflow Table of Contents Infiltration Basin F.gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Friday, May 14, 2010 Hydrograph Return Period Recap............................................................................ 1 1 -Year SummaryReport ....................................................................................................................... 2 HydrographReports................................................................................................................. 3 Hydrograph No. 1, Rational, Pre Development...................................................................... 3 Hydrograph No. 2, Rational, Post Development..................................................................... 4 Hydrograph No. 4, Reservoir, Post to Infiltration................................................................... 5 Pond Report - Infiltration Basin F....................................................................................... 6 2 - Year SummaryReport ....................................................................................................................... 7 HydrographReports................................................................................................................. 8 Hydrograph No. 1, Rational, Pre Development...................................................................... 8 Hydrograph No. 2, Rational, Post Development..................................................................... 9 Hydrograph No. 4, Reservoir, Post to Infiltration................................................................. 10 10 - Year SummaryReport..................................................................................................................... 11 HydrographReports............................................................................................................... 12 Hydrograph No. 1, Rational, Pre Development.................................................................... 12 Hydrograph No. 2, Rational, Post Development................................................................... 13 Hydrograph No. 4, Reservoir, Post to Infiltration................................................................. 14 100 - Year SummaryReport ..................................................................................................................... 15 HydrographReports............................................................................................................... 16 Hydrograph No. 1, Rational, Pre Development.................................................................... 16 Hydrograph No. 2, Rational, Post Development................................................................... 17 Hydrograph No. 4, Reservoir, Post to Infiltration................................................................. 18 Hydrograph Return Period Recg� ydra w Hydrographs Extension for AutoCAD® Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr i Rational ------ 1.056 1.246 ------- ------- 1.666 ------- ------- 2.250 Pre Development 2 Rational ------ 1.980 2.328 ------- ------- 3.055 ------- ------- 4.075 Post Development 4 Reservoir 2 0.000 0.000 ------- ------- 0.000 ------- ------- 0.000 Post to Infiltration Proj. file: Infiltration Basin F.gpw Friday, May 14, 2010 Hydrograph Summary Re poqydrafiow Hydrographs Extension for AutoCAD® Civil 3Dm 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 1.056 1 15 950 ------ ------ ------ Pre Development 2 Rational 1,980 1 8 951 ------ ------ ------ Post Development 4 Reservoir 0,000 1 17 0 2 15.47 925 Post to Infiltration Infiltration Basin F.gpw Return Period: 1 Year Friday, May 14, 2010 Hydrograph Report Hydra9ow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Friday, May 14, 2010 Hyd. No. 1 Pre Development Hydrograph type = Rational Peak discharge = 1.056 cfs Storm frequency = 1 yrs Time to peak = 0.25 hrs Time interval = 1 min Hyd. volume = 950 cuft Drainage area = 0.700 ac Runoff coeff. = 0.38` Intensity = 3.970 in/hr Tc by User = 15.00 min OF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 ' Composite (Area/C) = [(0.040 x 0.95) . (0.660 x 0.35)] / 0.700 Q (Cfs) 2.00 1.00 0.00 ' ' 0.0 0.0 0.1 — Hyd No. 1 0.1 0.1 Pre Development Hyd. No. 1 -- 1 Year Q (Cfs) 2.00 1.00 I I I I I I I I I 1 V 0.00 0.2 0.2 0.2 0.3 0.3 0.3 0.4 0.4 0.4 0.5 0.5 Time (hrs) Hydrograph Report 4 Hydraflow Hydrographs Extension for AutoCAD® Civil 3130 2009 by Autodesk, Inc. v6.066 Friday, May 14, 2010 Hyd. No. 2 Post Development Hydrograph type = Rational Peak discharge = 1.980 cfs Storm frequency = 1 yrs Time to peak = 0.13 hrs Time interval = 1 min Hyd. volume = 951 cult Drainage area = 0.700 ac Runoff coeff. = 0.55 Intensity = 5.144 in/hr Tc by User = 8.00 min OF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 Q (cfs) 2.00 1.00 Post Development Hyd. No. 2 -- 1 Year 0.0 0.1 0.1 0.1 0.2 0.2 0.2 — Hyd No. 2 Q (cfs) 2.00 1.00 ' 0.00 0.3 Time (hrs) Hydrograph Report 5 HydraFlow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Friday, May 14, 2010 Hyd. No. 4 Post to Infiltration Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 0.28 hrs Time interval = 1 min Hyd. volume = 0 cult Inflow hyd. No. = 2 -Post Development Max. Elevation = 15.47 ft Reservoir name = Infiltration Basin F Max. Storage = 925 cuft Storage Indication method used. Exfiltration extracted from Outflow Q (cfs) 2.00 1.00 0.00 0.0 2.0 — Hyd No. 4 Post to Infiltration Hyd. No. 4 -- 1 Year 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Hyd No. 2 ® Total storage used = 925 cult 0 (cfs) 2.00 1.00 —J_ 0.00 18.0 Time (hrs) Pond Report i Hydraflow Hydrographs Extension for AutoCADS Civil 3D® 2009 by Autodesk, Inc. v6.066 Friday, May 14, 2010 Pond No. 1 - Infiltration Basin F Pond Data Contours - User -defined contour areas. Conic method used for volume calculation. Begining Elevation = 15.00 ft Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 15.00 1,746 0 0 1.00 16.00 2,233 1,984 1,984 1.35 16.35 2,417 813 2,798 2.00 17.00 2,777 1,687 4,484 Culvert I Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft) = 0,00 0.00 0.00 0.00 Length (ft) = 0.00 0.00 0.00 0.00 Slope 1%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a No No No Stage (ft) 2.00 1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 00 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 15.00 0.00 0.00 0.00 Crest El. (ft) = 16.50 0.00 0.00 0.00 Weir Coeff. = 3.33 3.33 3.33 3.33 Weir Type = Rect --- --- --- Multi-Stage = No No No No Exfil.(inlhr) = 2.200 (by Contour) TW Elev. (ft) = 0.00 Note: Culven/Onfice outflows are analped under Inlet (ic) and outlet (m) contra. Weir risers checked for orifice conditions (i6) and submergence (a). Stage I Discharge Elev (ft) 17.00 16.80 16.60 16.40 16.20 16.00 15.80 15.60 15.40 15.20 1500 0.00 Z00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 - Total O Discharge (cfs) Hydrograph Summary Report ydraFlow Hydrographs Extension for AutoCAD®Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 1.246 1 15 1.121 ------ ------ ------ Pre Development 2 Rational 2.328 1 8 1,118 ------ ------ ------ Post Development 4 Reservoir 0.000 1 13 0 2 15.55 1,087 Post to Infiltration Infiltration Basin F.gpw Return Period: 2 Year Friday, May 14, 2010 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3Dm 2009 by Autodesk, Inc. v6.066 Friday, May 14, 2010 Hyd. No. 1 Pre Development Hydrograph type = Rational Peak discharge = 1.246 cfs Storm frequency = 2 yrs Time to peak = 0.25 hrs Time interval = 1 min Hyd. volume = 1,121 cuft Drainage area = 0.700 ac Runoff coeff. = 0.38' Intensity = 4.684 in/hr Tc by User = 15.00 min OF Curve = Jacksonville.IDF Asc/Rec limb fact = 1/1 ' Composite (Area/C) = [(0.040 x 0.95) + (0.660 x 0.35))10.700 0 (Cfs) 2.00 WIT111 Pre Development Hyd. No. 1 -- 2 Year 0 (Cfs) 2.00 0.00 10, 1 1 1 1 1 1 1 1 1 1 1 1 1 1y 0.00 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 0.3 0.4 0.4 0.4 0.5 0.5 Time (hrs) — Hyd No. 1 Hydrograph Report 9 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Friday, May 14, 2010 Hyd. No. 2 Post Development Hydrograph type = Rational Peak discharge = 2.328 cfs Storm frequency = 2 yrs Time to peak = 0.13 hrs Time interval = 1 min Hyd. volume = 1,118 cuft Drainage area = 0.700 ac Runoff coeff. = 0.55 Intensity = 6.047 in/hr Tc by User = 8.00 min OF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 0 (Cfs) 3.00 2.00 1.00 Post Development Hyd. No. 2 -- 2 Year 0.0 0.1 0.1 0.1 0.2 0.2 0.2 — Hyd No. 2 0 Ids) 3.00 walIr, SKIllllI Y 0.00 0.3 Time (hrs) Hydrograph Report 10 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Friday, May 14, 2010 Hyd. No. 4 Post to Infiltration Hydrograph type = Reservoir Peak discharge = 0,000 cfs Storm frequency = 2 yrs Time to peak = 0.22 hrs Time interval = 1 min Hyd. volume = 0 cult Inflow hyd. No. = 2 -Post Development Max. Elevation = 15.55 ft Reservoir name = Infiltration Basin F Max. Storage = 1,087 cuft Storage Indication method used. Exfiltration extracted from Outflow Q (cfs) 3.00 2.00 1.00 0.00T- 0.0 2.0 — Hyd No. 4 Post to Infiltration Hyd. No. 4 -- 2 Year 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Hyd No. 2 [® Total storage used = 1,087 cult Q (cfs) 3.00 2.00 IwoIf, -- 0.00 18.0 Time (hrs) 11 Hydrograph Summary Re pogydraflow Hydrographs Extension for AutoCAD®Civil 3DO2009 by Aulodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 1.666 1 15 1,499 ------ ------ ------ Pre Development 2 Rational 3.055 1 8 1,466 ------ ------ ------ Post Development 4 Reservoir 0.000 1 36 0 2 15.72 1,427 Post to Infiltration Infiltration Basin F.gpw Return Period: 10 Year Friday, May 14, 2010 12 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD© Civil 3D® 2009 by Autodesk, Inc. v6.066 Friday, May 14, 2010 Hyd. No. 1 Pre Development Hydrograph type = Rational Peak discharge = 1.666 cfs Storm frequency = 10 yrs Time to peak = 0.25 hrs Time interval = 1 min Hyd. volume = 1,499 cuft Drainage area = 0.700 ac Runoff coeff. = 0.38' Intensity = 6.261 in/hr Tc by User = 15.00 min OF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(0.040 x 0.95) - (0.660 x 0.35)] / 0.700 Q (Cfs) 2.00 1.00 Pre Development Hyd. No. 1 -- 10 Year Q (cfs) 2.00 1.00 0.00 V 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0.00 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 0.3 0.4 0.4 0.4 0.5 0.5 Time (hrs) — Hyd No. 1 13 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 2 Post Development Hydrograph type = Rational Storm frequency = 10 yrs Time interval = 1 min Drainage area = 0.700 ac Intensity = 7.935 in/hr IDF Curve = Jacksonville. IDF Q (cfs) 4.00 3.00 2.00 [Kill] Post Development Hyd. No. 2 -- 10 Year Friday, May 14, 2010 Peak discharge = 3.055 cfs Time to peak = 0.13 hrs Hyd. volume = 1,466 cuft Runoff coeff. = 0.55 Tc by User = 8.00 min Asc/Rec limb fact = 1/1 0.0 011 0.1 0.1 0.2 02 0.2 — Hyd No. 2 Q (cfs) 4.00 3.00 2.00 SKIM] Y 0.00 0.3 Time (hrs) Hydrograph Report 14 Hydrafiow Hydrographs Extension for AutoCADO Civil 313® 2009 by Autodesk, Inc. v6.066 Friday, May 14, 2010 Hyd. No. 4 Post to Infiltration Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = 0.60 hrs Time interval = 1 min Hyd. volume = 0 CA Inflow hyd. No. = 2 -Post Development Max. Elevation = 15.72 ft Reservoir name = Infiltration Basin F Max. Storage = 1,427 cuft Storage Indication method used. Exfiltration extracted from Outflow Q (cfs) 4.00 3.00 1 1.00 0.00 0.0 2.0 — Hyd No. 4 Post to Infiltration Hyd. No. 4 -- 10 Year 4.0 6.0 8.0 — Hyd No. 2 10.0 12.0 14.0 16.0 18.0 ® Total storage used = 1,427 cult Q (cfs) 4.00 3.00 2.00 1.00 —1 0.00 20.0 Time (hrs) 15 Hydrograph Summary Repo qydraflow Hydrographs Extension for AutoCADO Civil 3D®2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 2.250 1 15 2,025 ------ ------ ------ Pre Development 2 Rational 4.075 1 8 1,956 ------ ------ ------ Post Development 4 Reservoir 0.000 1 20 0 2 15.96 1,903 Post to Infiltration Infiltration Basin F.gpw Return Period: 100 Year Friday, May 14, 2010 W. Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 31D® 2009 by Autodesk, Inc. v6.066 Friday, May 14, 2010 Hyd. No. 1 Pre Development Hydrograph type = Rational Peak discharge = 2.250 cfs Storm frequency = 100 yrs Time to peak = 0.25 hrs Time interval = 1 min Hyd. volume = 2,025 cuft Drainage area = 0.700 ac Runoff coeff. = 0.38" Intensity = 8.458 in/hr Tc by User = 15.00 min OF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 Composite (Area/C) = f(0.040 x 0.95) + (0.660 x 0.35)] / 0.700 Q (cfs) 3.00 0ilil 1.00 0.00 V 0.0 0.0 0.1 0.1 — Hyd No. 1 0.1 Pre Development Hyd. No. 1 -- 100 Year Q (cfs) 3.00 2.00 1.00 I 1 I I I I I 1 11i V 0.00 0.2 0.2 0.2 0.3 0.3 0.3 0.4 0.4 0.4 0.5 0.5 Time (hrs) 17 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Friday, May 14, 2010 Hyd. No. 2 Post Development Hydrograph type = Rational Peak discharge = 4.075 cfs Storm frequency = 100 yrs Time to peak = 0.13 hrs Time interval = 1 min Hyd. volume = 1,956 cuft Drainage area = 0.700 ac Runoff coeff. = 0.55 Intensity = 10.585 in/hr Tc by User = 8.00 min OF Curve = Jacksonville. IDF Asc/Rec limb fact = 1/1 Q (cfs) 5.00 4.00 [c1KO 2.00 0.00 0.0 0.0 — Hyd No. 2 Post Development Hyd. No. 2 -- 100 Year 0.1 0.1 0.1 0.2 0.2 0.2 Q (cfs) 5.00 4.00 11111:11011 2.00 IWiff � 0.00 0.3 Time (hrs) fd] Hydrograph Report Hydranow Hydrographs Extension for AutoCAD® Civil 31)(D 2009 by Autodesk, Inc. v6.066 Friday, May 14, 2010 Hyd. No. 4 Post to Infiltration Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 100 yrs Time to peak = 0.33 hrs Time interval = 1 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 -Post Development Max. Elevation = 15.96 ft Reservoir name = Infiltration Basin F Max. Storage = 1,903 cuft Storage Indication method used. Exflltration extracted from Outflow. Q (Cfs) 5.00 4.00 3.00 milli 1.00 0.0 2.0 4.0 — Hyd No. 4 a Post to Infiltration Hyd. No. 4 -- 100 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 ' 0.00 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) — Hyd No. 2 I® Total storage used = 1,903 tuft PROJECT: PROJECT NO.: DESCRIPTION: 111MI[ INW.1441 UNTREATED DRAINAGE AREA: PRE DEVELOPMENT Pre Development C A (ft') A (ac 1 Building 0.95 0.00 2 Sidewalk 0.95 13,964 0.32 3 Parking 0.95 28.698 0.66 4 Street 0.95 - 0.00 6 Grass 0.35 20,576 0.47 7 8 Wei hted C 0.75 Total Area 63,238 1.45 Impervious Area 42,662 6.98 Percent Impervious 67.5 % UNTREATED DRAINAGE AREA: POST DEVELOPMENT Post Development C A (ft') A ac 1 Building 0.95 0.00 2 Sidewalk 0.95 23,396 0.54 3 Parking 0.95 1,417 0.03 4 Street 0.95 - 0.00 6 Grass 0.35 38,425 0.88 7 8 Weighted C 0.59 Total Area 63,238 1.45 Impervious Area 24,813 1 0.57 Percent Impervious 39.2% IF 1 OF 4 DESIGN BY: JTR CHECKED BY VJC 0 LLP CAROLINAS ECS CAROLINAS, LLP "Setting the Standard for Service" Geotechnical • Construction Materials • Environmental • Facilities August 4, 2009 Ms. Tracy Bond, AIA Smith Group/Clark Nexsen Joint Venture 1850 K Street NW, Suite 250 Washington, DC 20006 Reference: Report of Infiltration Evaluation Naval Hospital Renovation Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.14997B Dear Ms. Bond: ECS Carolinas, LLP (ECS) recently conducted an Infiltration evaluation for the proposed stormwater best management practice (BMP) areas at the Naval Hospital Renovation on Camp Lejeune, Onslow County, North Carolina. This letter, with attachments, is the report of our evaluations. Field Testing On July 29 through 31, 2009, ECS conducted an exploration of the subsurface soil and groundwater conditions at eleven requested locations shown on the attached Test Location Plan (Figure, 1). The test areas were located in the field utilizing GPS equipment and a test location plan provided by Clark Nexsen. The purpose of this exploration was to obtain subsurface information of the in -place soils for the proposed stonnwater BMP areas. ECS explored the subsurface soil conditions by advancing one hand auger boring into the existing ground surface at the requested boring locations. ECS visually classified the subsurface soils and obtained representative samples of each soil type encountered. ECS also recorded the seasonal high water table (SHWT) observed at the time of each hand auger boring. The attached Infiltration Evaluation Form provides a summary of the subsurface conditions encountered at the hand auger boring location. The SHWT was estimated at the boring locations below the existing grade elevation. A summary of the findings are as follows: -Location SHWT 1 Winches 2 28 Inches 3 36 inches 4 24 Inches 5 18 inches 6 32 inches 7 24 Inches 8 24 Inches 9 48 inches 10 55 Inches 11 36 Inches 7211 Ogden Business Park, Suite 201, Wilmington, NC 28411 • T. 910-686-9114 • F: 910-686-9666 www.ecs[imited.com ECS Carolinas, LLP • ECS Florida, LLC • ECS Illinois, LLC • ECS Mld•Atlantic, LLC • ECS Southeast, LLC • ECS Texas, LLP Report of Infiltration Evaluation Naval Hospital Renovation Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.149978 August 4, 2009 ECS has conducted eleven infiltration tests utili2ing a compact constant head permeameter near the hand auger borings to estimate the infiltration rate for the subsurface soils. Infiltration tests are typically conducted at two feet above the SHWT. If the SHWT is less than three feet, the tests are conducted at ten inches below the surface elevation. Field Test Results Below is a summary of the infiltration test results: Location Description Depth Inches/ hour 1 Tan fine SAND w/silt 12 inches 1.4 2 Gray fine SAND w/silt 10 inches 1.2 3 Gray fine SAND fill 12 inches 4.0 4 Grey/tan fine SAND w/silt 10 inches 2.2 5 Gray/tan silty SAND 10 inches 0.40 6 Gray fine silty SAND 10 inches 1 0.76 7 Gray fine SAND 10 inches 3.7 8 Tan fine SAND 10 inches 4.4 9 Gray/tan fine SAND w/day lens fill 24 inches 1.1 10 Tan fine SAND 31 inches 10.9 11 Gray sindly SILT fill 12 inches 0.09 Infiltration rates and SHWT may vary within the proposed site due to changes in elevation and subsurface conditions. Closure The activities and evaluative approaches used in this assessment are consistent with those normally employed in assessments of this type. ECS's evaluation of site conditions has been based on our understanding of the project information and the data obtained during our field activities. ECS appreciates the opportunity to provide our services have any questions concerning this report or this project, 9114. Respectfully, ECS CAROLLINAS, LLP K. Brooks Wall Project Manager to you on this project. If you please contact us at (910) 686- Attachments: Figure 1 - Test Location Plan, Infiltration tvaluatlon CC: Mr. Steve Thomas, P.E.-Clark Nexsen g-"' l air, P. G. geologist Naval Hospital Renovations Camp Lejeune, Onslow Co., NC ECS Project No. 22-14997B August 3, 2009 KBW 10 TEST LOCATIONS L,L R 11 Figure 1- Test Location Plan Provided by: Clark Nexsen Infiltration Evaluation Naval Hospital Renovations Camp Lejeune,.Onslow County, North Carolina ECS Project No. 22.14997B Location Depth 1 0-16" 16"-36" August 4, 2009 Soil Description Gray/tan fine SAND w/silt Tan/brown sandy CLAY Seasonal High Water Table was estimated to be at 36 inches below the existing grade elevation. Infiltration Rate: 1.4 inches per hour Test was conducted at 12 inches below existing grade elevation Location Depth 2 0-24" 24"-50" Soil Description Gray fine SAND w/silt Tan fine SAND w/silt Seasonal High Water Table was estimated to be at 28 inches below the existing grade elevation. Infiltration Rate: 1.2 inches per hour Test was conducted at 10 inches below existing grade elevation Location Depth 3 0-36" 36"-30" Soil Description Grey fine SAND (fill) Tan/orange clayey SAND Seasonal High Water Table was estimated to be at 36 inches below the existing grade elevation. Infiltration Rate: 4.0 inches per hour Test was conducted at 12 inches below existing grade elevation Infiltration Evaluation Naval Hospital Renovations Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.14997E August 4, 2009 Location Depth Soil Description 4 0-18" Gray/tan fine SAND w/silt 18"-50" Tan/orange sandy CLAY Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Infiltration Rate: 2.2 inches per hour Test was conducted at 10 inches below existing grade elevation Location Depth Soil Description 5 0-18" Gray/tan silty SAND 18"-30" Gray/orange sandy CLAY w/silt Seasonal High Water Table was estimated to be at 18 inches below the existing grade elevation. , Infiltration Rate: 0.40 inches per hour Test was conducted at 10 inches below existing grade elevation Location Depth Soil Description 6 0-18" Gray fine silty SAND (fill) 18"-28" Orangish/yellow clayey SAND (fill) 28"-60" Tan/orange sandy CLAY Seasonal High Water Table was estimated to be at 32 inches below the existing grade elevation. Infiltration Rate: 0.76 inches per hour Test was conducted at 10 inches below existing grade elevation Infiltration Evaluation Naval Hospital Renovations Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.14997E August 4, 2009 Location Depth Soil Description 7 0-14" Gray fine SAND 14"-24" Tan fine SAND w/silt 24"-36" Tan/orange clayey SAND Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Infiltration Rate: 3.7 inches per hour Test was conducted at 10 inches below existing grade elevation Location Depth 8 0-12" 12"-24" 24"-36" Soil Description Tan fine SAND Gray/tan fine silty SAND Tan/orange clayey SAND Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Infiltration Rate: 4.4 inches per hour Test was conducted at 10 inches below existing grade elevation Location Depth Soil Description 9 0-24" Gray/tan fine SAND w/clay lens (fill) 24"-48" Tan fine SAND Seasonal High Water Table was estimated to be at 48 inches below the existing grade elevation. Infiltration Rate: 1.1 inches per hour Test was conducted at 24 inches below existing grade elevation Infiltration Evaluation Naval Hospital Renovations Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.149976 Location Depth 10 0-6" 6"-40" 40"-60" August 4, 2009 Soil Description Gray silty SAND Tan fine SAND Orange clayey SAND Seasonal High Water Table was estimated to be at 55 inches below the existing grade elevation. Infiltration Rate: 10.9 inches per hour Test was conducted at 31 inches below existing grade elevation Location Depth Soil Description 11 0-24" Gray sandy SILT (fill) 24"-40" Gray fine SAND w/clay lens (fill) 40"-60" Tan/orange sandy CLAY Seasonal High Water Table was estimated to be at 36 inches below the existing grade elevation. Infiltration Rate: 0.09 inches per hour Test was conducted at 12 inches below existing grade elevation ECS CAROLINAS, LLP "Setting the Standard for Service" Geotechnical • Construction Materials • Environmental • Facilities April 20, 2010 Ms. Tracy Bond SmithGroup 1850 K Street NW Washington, DC 20006 Reference: Report of Additional Infiltration Testing Naval Hospital Addition Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.15760 Dear Ms. Bond: ECS Carolinas, LLP (ECS) recently conducted additional infiltration testing for the proposed stormwater best management practice (BMP) areas at the Naval Hospital Addition site on Camp Lejeune, Onslow County, North Carolina. This letter, with attachments, is the report of our testing. Field Testing On April 15, 2010, ECS conducted an exploration of the subsurface soil and groundwater conditions at three requested locations shown on the attached Test Location Plan (Figure 1). The test areas were located with GPS equipment. The purpose of this exploration was to obtain subsurface information of the in -place soils for the proposed stormwater BMP areas. ECS explored the subsurface soil and groundwater conditions by advancing one hand auger boring into the existing ground surface at the requested boring locations. ECS visually classified the subsurface soils and obtained representative samples of each soil type encountered. ECS also recorded the groundwater level and the seasonal high water table (SHWT) observed at the time of the hand auger borings. The attached Infiltration Testing Form provides a summary of the subsurface conditions encountered at the hand auger boring locations. The groundwater level and the SHWT were estimated at the boring locations below the existing grade elevation. A summary of the findings are as follows: -.- °Location* a er. 'evels , .�• .:° , : '.' .. . � ' HWT: B-12 Winches 30 Inches B-13 701nches 241nches B-14 30 Inches 14 Inches ECS has conducted three infiltration tests utilizing a compact constant head penneameter near the hand auger borings to estimate the infiltration rate for the subsurface soils. Infiltration tests are typically conducted at two feet above the SHWT. If the SHWT is less than three feet, the tests are conducted at ten inches below the surface elevation. 7211 Ogden Business Park, Suite 201, Wilmington, NC 28411 • T 910-686-9114 • F: 910-686-9666 • www.ecslimited.com ECS Carolinas, LLP • ECS Flodda, LLC • ECS Illinois, LLC • ECS Mid -Atlantic, LLC • ECS Southeast, LLC • ECS Texas, LLP Report of Additional Infiltration Testing Naval Hospital Addition Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.15760 April 209, 2010 Field Test Results Below is a summary of the infiltration test results: Location "Description Depth Inches/ hour B-12 Tan fine SAND w silt 10 inches 2.2 B-13 Tan/orange CLAY w/sand 10 inches 0.06 B-14 Gray silty SAND 10 inches 0.75 Infiltration rates and SHWT may vary within the proposed site due to changes in elevation and subsurface conditions. Closure The activities and evaluative approaches used in this assessment are consistent with those normally employed in assessments of this type. ECS's evaluation of site conditions has been based on our understanding of the project information and the data obtained during our field activities. ECS appreciates the opportunity to provide our services to you on this project. If you have any questions concerning this report or this project, please contact us at (910) 686- 9114. Respectfully, ECS CAROLINAS, LLP K Brooks Wail Project Manager Attachments: Figure 1 - Test Location Plan Infiltration Testing Form � OJ----- Kris J. Stamm Principal 2 1 2 d 4 5 -- B-14: --., B-12 C Alf t5 / ,�Id"��I n�' '`��'l�'/R/ '.f'�—�,'i'y ✓ "fir mw _� \ it r.,'� ••' ! fi � Sri mi va B-131-- �! '2 3 4- ® APPROXIMATE TEST LOCATIONS Naval Hospital Addition Figure 1-Test Location Plan 0 Camp Lejeune, Onslow Co., NC ECS Protect No. 22-15760 �-==== (� d�� Provided by: SmithGroup April 15, 2010 CA%ROLIMAS KBW Infiltration Testing Form Naval Hospital Addition Site Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.15760 April 19, 2010 Location Depth B-12 0-6" 6"-30" 30"-80" Soil Description Gray silty SAND Tan fine SAND Brown sandy CLAY Seasonal High Water Table was estimated to be at 30 inches below the existing grade elevation. Infiltration Rate: 2.2 inches per hour Test was conducted at 10 inches below existing grade elevation Groundwater was encountered at 80 inches below the existing grade elevation. Location Depth Soil Description B-13 0-6" Gray silty SAND 6"-24" Tan/orange CLAY w/ sand 24"-70" Gray/orange/red CLAY Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Infiltration Rate: 0.06 inches per hour Test was conducted at 10 inches below existing grade elevation Groundwater was encountered at 70 inches below the existing grade elevation. Location Depth Soil Description B-14 0-12" Gray silty SAND 12"-36" Tan fine SAND w/ silt Seasonal High Water Table was estimated to be at 14 inches below the existing grade elevation. Infiltration Rate: 0.75 inches per hour Test was conducted at 10 inches below existing grade elevation Groundwater was encountered at 30 inches below the existing grade elevation. DIVISION OF WATER QUALITY INFILTRATION SYSTEM INVESTIGATION Complete and email this form to Vincent.Lewis@ncmail.net. If there are more than 7 areas to be tested, attach a second sheet. State Soil Scientist Confirmation Visit dateltime: y.,Oo Ary S/S/0 Project Name: Camp Leieune Naval Hospital Addition & Renovation County: Onslow Street Address: 100 Brewster Blvd Camp Lejeune, NC 28547-0100 Directions from the nearest intersection of two major roads: From Camp Leieune main gate, turn right onto Brewster Blvd., right on Hospital Corps Blvd Continue on Hospital Corps Blvd. until you reach parking lot on the left The location of the Infiltration Basin is located behind the existing hospital >1 acre being disturbed? ®YES ❑NO CAMA Major required? EIYES ®NO Consultant Name: Jason T. Rupert, E.I. Phone: (919) 576-2089 Consultant Firm Name: Clark Nexsen Architecture & Engineering Bore Number B-12 2 3 4 5 6 7 a Existing Ground Elevation 15.5 b Proposed Bottom Elevation 15.0 c Difference a minus b 0.5 d Add 2 ft_(Min. Bore Depth) 2.5 e Hardpan Depth? i Approx. Elev. Of SHWT 13.0 Max. lowest bottom elev. 15.0 h Infiltration Rate OK? * i Confirmation of SHWT * D State Soil Scientist Use ONLY Comments Required Attachments: 1. Legible vicinity map. 2. Complete Soils Report. 3. PDF formatted site plan with the boring locations to be tested. Site plans should be emailed or hand -delivered only. Illegible faxed maps will not be accepted. All proposed infiltration areas and existing, active utility lines located within the proposed basin/trench must be marked and flagged. If these areas are not flagged, the Soils Scientist reserves the right to decline to do the investigation. If the proposed infiltration system will be located in an area of existing pavement and there is no open area nearby, equipment capable of Web Soil Survey Page 2 of 2 that have a clay pan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, e/O, or C/D), the first letter Is for drained areas and the second is for undalned areas. Only the soils that in their natural condition are In group 0 are Method: Dominant Condition Percent Cutoff: None Specified FOIA I AccesSil illty Statement I Privacy Policy I Non -Discrimination Statement I Information Quality I USA.gov I white Mouse http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx 6/1 1 /2009 LETTER OF TRANSMITTAL %111 STEWART TO FROM Brad Shaver Jim Phillips USACE CE-SAW-RG-L Landscape Architect 69 Darlington Avenue (919) 866-4809 Wilmington, NC 28403 DATE SENT VIA 10.02.09 UPS Ground PROJECT NUMBER PROJECT NAME G9005 Camp LeJeune Hospital Expansion COPIES DATE DESCRIPTION 1 10.02.09 JD Application For approval ❑ For review & comment Returned for corrections For your use Approved as submitted Returned after review As requested Approved as noted Ej Resubmit copies for approval COMMENTS Brad, Please see the attached documentation of the site for the wetlands onsite. I have not been through the updated process, so let me know if there is any information lacking and feel free to contact me as needed. Thank you, Jim SIGNED Jim Phillips, RLA COPIED TO file ENGINEERING. INNOVATION. SOLUTIONS.'^ 421 FAYETTEVILLE STREET RALEIGH, NC T 919.3B0.8750 SUITE 400 27601 F 919,380.8752 ATTACHMENT PRELIMINARY JURISDICTIONAL DETERMINATION FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL DETERMINATION (JD): B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD: Jim Phillips, Stewart Engineering for US Military Hospital Expansion, Camp LeJeune. Jacksonville. NC C. DISTRICT OFFICE, FILE NAME, AND NUMBER: D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: (USE THE ATTACHED TABLE TO DOCUMENT MULTIPLE WATERBODIES AT DIFFERENT SITES) State:NC County/parish/borough: Onslow City: Jacksonville Center coordinates of site (lat/long in degree decimal format): Lat. 34°43'23.43" N, Long. 77°21' 41.74" W Universal Transverse Mercator: Name of nearest waterbody: Northeast Creek HUC 03030001 03-05-02 Identify (estimate) amount of waters in the review area: Non -wetland waters: linear feet: width (ft) and/or acres Cowardin Class: Stream Flow: Wetlands: 3.02 acres. Cowardin Class: Palustrine Name of any water bodies on the site that have been identified as Section 10 waters: Tidal: Non -Tidal: E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ❑ Office (Desk) Determination. Date: ® Field Determination. Date(s): 10.01.09 1. The Corps of Engineers believes that there may be jurisdictional waters of the United States on the subject site, and the permit applicant or other affected party who requested this preliminary JD is hereby advised of his or her option to request and obtain an approved jurisdictional determination (JD) for that site. Nevertheless, the permit applicant or other person who requested this preliminary JD has declined to exercise the option to obtain an approved JD in this instance and at this time. 2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre -construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an approved JD for the activity, the permit applicant is hereby made aware of the following: (1) the permit applicant has elected to seek a permit authorization based on a preliminary JD, which does not make an official determination of jurisdictional waters; (2) that the applicant has the option to request an approved JD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an approved JD could possibly result in less compensatory mitigation being required or different special conditions; (3) that the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) that the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) that undertaking any activity in reliance upon the subject permit authorization without requesting an approved JD constitutes the applicant's acceptance of the use of the preliminary JD, but that either form of JD will be processed as soon as is practicable; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a preliminary JD constitutes agreement that all wetlands and other water bodies on the site affected in any way by that activity are jurisdictional waters of the United States, and precludes any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an approved JD or a preliminary JD, that JD will be processed as soon as is practicable. Further, an approved JD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331, and that in any administrative appeal, jurisdictional issues can be raised (see 33 C.F.R. 331.5(a)(2)). If, during that administrative appeal, it becomes necessary to make an official determination whether CWA jurisdiction exists over a site, or to provide an official delineation of jurisdictional waters on the site, the Corps will provide an approved JD to accomplish that result, as soon as is practicable. This preliminary JD finds that there "may be" waters of the United States on the subject project site, and identifies all aquatic features on the site that could be affected by the proposed activity, based on the following information: 2 SUPPORTING DATA. Data reviewed for preliminary JD (check all that apply - checked items should be included in case file and, where checked and requested, appropriately reference sources below): ® Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant: ® Data sheets prepared/submitted by or on behalf of the applicant/consultant. ❑ Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ❑ USGS NHD data. ® USGS 8 and 12 digit HUC maps. ® U.S. Geological Survey map(s). Cite scale & quad name:Jacksonville, 1:24,0000. ® USDA Natural Resources Conservation Service Soil Survey. Citation: www.websoilsurvey.nrcs.usda.gov ❑ National wetlands inventory map(s). Cite name: ® State/Local wetland inventory map(s): ❑ FEMA/FIRM maps: ❑ 100-year Floodplain Elevation is: (National Geodectic Vertical Datum of 1929) ® Photographs: ® Aerial (Name & Date): or ❑ Other (Name & Date): ❑ Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): later jurisdictional determinations. Signature and date of Regulatory Project Manager (REQUIRED) 10.02.09 Signature and date of person requesting preliminary JD (REQUIRED, unless obtaining the signature is impracticable) CALI :F- VICINITY MAP GENERAL NOTES ACT mnu o.n. n x.w m. °' °16 zoorl w anrc.. ,. \\' ' O ` Fe = aavuc sear wuuurs m AA, wo �wt. .. CX �.. l �1 4�1. I- -AL _ �l e. 5� A. / �O _ nia.wou onno raa.m v awv uwv VV• 1 b' � 11 1 i iUf NAVAL HOSPITAL CAMP LE]EUNE '� ! cwtvxlC sC. a ��....,.00, x� ®TE♦W-ART A. V—I _ �` / �o—�. _ 1 Naugle, Mary From: Naugle, Mary Sent: Friday, June 11, 2010 10:02 AM To: 'Vincent J. Chirichella' Cc: Hall, Rhonda Subject: RE: Camp Lejeune Hospital Vince; Thank you so much for the reminder. Things are busy these days. SOD Provide the same sod note for stormwater that you do for SEC / LQ for the most part. I will let Rhonda address and she is out today. You can give stormwater the same plan. Specific Stormwater vegetation is taken from the BMP in CH 6, 9, 10, 14, 16,,etc... depending on where the vegetation is used [pond, vegetated strip, infil. basin, swale, etc...]. Vegetation Provide wet pond plan details to include on the vegetation plan: Specify The grass type for the slope above the permanent pool. A minimum of 3 species of wetlands plants is listed in the vegetation plan for the shelf. There is a list of suitable plants in table 9-1 of bmp CH 9. Please not that the "shallow water" plants are more suited for the part of the shelf that is under the permanent pool and that the "shallow land" plants are more suited for use on the part of the shelf above the permanent pool. Demonstrate that the minimum number of plants has been calculated and is specified on the vegetation plan. The minimum is 50 plants for every 200 square feet of shelf area. Provide the shelf area in calcs or plans. Please let me know if you need more information. Please verify with Rhonda [910-796-7312] and Janet when you plan to submit - they will communicate with me. Thank you, Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mar .naugleOncdenrgov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Vincent J. Chirichella[mailto:vchirichella@ClarkNexsen.com] Sent: Friday, June 11, 2010 7:51 AM To: Naugle, Mary Cc: Jason T. Rupert Subject: Camp Lejaune Hospital Mary Jean, I was sending a reminder for you to send the vegetation note discussed in the meeting yesterday. Would you also be able to point me in the direction where I could find the sodding detail discussed? Thanks. Vincent J. Chirichella PE, LEEDAP Senior Civil Engineer CLARK NEXSEN Architecture & Engineering 4000 Westchase Boulevard Suite 280 Raleigh, NC 27607 919.828.1876 Tel. 919.828.1877 Fax vchi richellaRcla rknexseo.com www.clarknexsen.com CONFIDE. NTIAIJTY NOTE : This e mail and any files transmitted with it contain primleged and confident, aI intormation and are intended solely for the use of the individual or entity to which they are addressed If you are not the intended mcipient or the person responsible for delivering the a mail to the intended roupient, you are hereby notified that any dissemination or copying of this e maii or any of its attachnienls is strictly prohibited. If you have received this e mail in error, Please nnnradialely notify the sending individual or entity by e-mod and permanently delete the original a mail and attachments from your computer system q wit // __ For DEf7RUse 0NLY� ` to O 3 Z9 Reviewer: t_ North Carolina Department of Environment and — ) o -�,o-s e Natural Resources s broc NCDENR Request for Express Permit Review me NCDENR Confirm: FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296.4698;alison.davidson(a)ncmaiLnet • Fayetteville or Raleigh Region -David Lee 919-791.4203; daviddee(a)ncmail.net • Mooresville & -Patrick Grogan 704-663-3772 or patrick.oroilan(a)ncmail.net • Washington Region -Lyn Hardison 252-946-9215 or Ivn.hardison(ci ncmail.net • Wilmington Region -Janet Russell 910.350-2004orianet.russeO-ncmail.net NOTE: Project application received after 12 noon will be stamped in the following work day. Enter Related SW Permits of request SW SW SW SW SW Project Name: NAVAL HOSPITAL PARKING ADDITION County: ONSLOW Applicant: CARL BAKER, PE. DIRECTOR -DESIGN BRANCH Company: U.S. GOVERNMENT Address: 1005 MICHEAL ROAD City: CAMP LEJEUNE, State: NC Zip: 28542-2521 Phone: 910-451-2213, Fax:910-451-2927, Email: cad.h.baker@usmc.mil Physical Location:100 BREWSTER BLVD, CAMP LEJEUNE, NC 28547-0100 Project Drains into NEW RIVER waters — Water classification SC: HQW.NSW (for classification see-htti):/lh2o.enr.state.nc.us/bims/reports/rei)ortsWB.htm1) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within % mile and draining to class SA waters N• or within 1 mile and draining to class HOW waters? Y Engineer/Consultant: VINCENT CHIRICHELIA, PE Company: CLARK NEXSEN Address: 4000 WEST CHASE BLVD, SUITE 200. City: RALEIGH, State: NC Zip: 27607-6864 iZ CF'3VV Phone: 919-828-1876. Fax:919-828-1877. Email: vchirichella@clarknexsen.com MAY 'L 8 2010 SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: _ BY: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ IntermittentlPerennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ® High Density -Detention Pond 5 # Treatment Systems ® High Density -Infiltration 1 #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems /® MOD:® Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW 8960329 (Provide permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront Quality ® Erosion and Sedimentation. Control Plan with 23 acres to be disturbed.(CK # (for DENR use)) THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting reouest) Wetlands on Site ® Yes ❑ No Buffer Impacts: ® No ❑ YES: _acre(s) Wetlands Delineation has been completed: ® Yes ❑ No Isolated wetland on Properly ® Yes ❑ No US ACOE Approval of Delineation completed: ® Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ® No Permit Received from US ACOE ❑ Yes ® No For DENR use only*****###i##******##ii4###4#iii###444it####Miiiii##iiiik##i Fee Split for multiple permits: (Check# 1 Total Fee Amount $ SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; ❑ Min) $ SW (❑ HD, ❑ LID, ❑ Gen) $ 401: $ LQS $ I Stream Deter— $ NCDENR EXPRESS March 2009 ivtq p ' F- � NF tL f� c_e, .�92AML& ��- t CN Comm. No.: 305313156 North Carolina Camp Lejeune Naval Hospital Addition & Renovation STORMWATER NARRATIVE & CALCULATIONS Stormwater Management Permit Submittal 17 May 2010 ICET'V]ET� MAY 2 8 2010 BY: Engineer (s): Vincent Chirichella, P.E. Jason Rupert, E.I. TABLE OF CONTENTS 1.0 PROJECT NARRATIVE..................................................................................................I 1.1 GEOTECHNICAI. INVES'rIGATION........................................................................................ 11 2.0 DESIGN APPROACH.....................................................................................................11 2.1 S'rORbl DRAINAGE PIPING.................................................................................................. 11 3.0 WATER QUALITY ANALYSIS...................................................................................11 4.0 WATER QUANTITY ANALYSIS.................................................................................12 4.1 PREDEVI'iLOP,NIEN'I'CONDITIONS........................................................................................ 12 4.2 POST DEVELOPMENT CONDITIONS..................................................................................... 13 APPENDIX A: STORM DRAINAGE CALCULATIONS AND MAPS APPENDIX B: GEOTECHNICAL REPORT APPENDIX C: INFILTRATION SYSTEM INVESTIGATION APPENDIX D: LOCATION AND VICINITY MAPS APPENDIX E: WETLAND DETERMINATION MAY262010 l Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 3053/3156 Sionnwater Narrative Clark*Nexsen 1.0 PROJECT NARRATIVE 1. General Information A. Name of Project- Camp Lejeune Naval Hospital Addition & Renovation B. Street Address, City, County- 100 Brewster Blvd., Camp Lejeune, Onslow C. Acres in Tract- 81 acres D. Acres Being Disturbed- 23 acres E. Acres in Wetlands- 3.0E acres 1. Wetlands Must Be Delineated- Wetlands are delineated and the jurisdictional Determination OD) has been approved by the Army Corps of Engineers. See Appendix F. for JD submittal. 2. Proposed Wetland Impacts Require Permits from Corps & DWQ- There will be no disturbance of wetlands. F. Ownership Information from NC Secretary of State Web Site- Camp Lejeune, NC G. Description of Development Proposal The Camp Lejeune Naval Hospital Addition & Renovation is comprised of 6 major areas of development. Stormwater on the site will be treated by five (5) wet detention basins and one (1) infiltration basin. Stormwater will be conveyed to the various Best Management Practice's (BMP's) by means of grassed swales and stormwater pipe networks. Area 1: Clinic Addition & Parking Lot The Clinic Addition & Parking Lot will include the addition of a 59,000 square foot . footprint, 2-story budding to the western end of the existing btrilding, approximately 194,000 square feet of additional parking, roads and sidewalks. This area is proposed to be treated with two (2) wet detention basins. Low impact development (LID) measures will be implemented in parking lot islands and other locations through the use of grassed s_ wales. MAY 2 6 2010 Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 305313156 Stormwater Narrative Clark*Ncxsen The medians were not used as BMP's due to the elevation of the Seasonal High Water Table (SHWT). Area 2: Mechanical Room Addition The Mechanical Room Addition will include the addition of 10,296 square feet of proposed BUA (mechanical room, cooling tower yard, and driveway) at the northwest corner of the existing west wing of the Naval Hospital. This new BUA will be treated by an infiltration basin. Stormwater will be conveyed to the infiltration basin through a pipe network and also a Swale that directs some of the runoff to an area drain. Area 3: New Etnployec Parking Lot The New Employee Parking Lot will include the addition of 77,011 square feet of proposed 13UA consisting of sidewalk and parking. This area is proposed to be treated with one (1) wet detention basin. The parking lot will provide an additional 150 parking spaces. LID measures will be implemented in this area through the use of grassed swales in the parking lot islands. Area 4: Emergency Department The Emergency Department will include the addition of a 16,000 square foot, 2-story building in the approximate location of the current Emergency Department (southern part of the existing Naval Hospital). The area also includes 22,711 square feet of existing and proposed parking, driveway, and sidewalks. This area of development is proposed to be treated with one (1) wet detention basin. LID measures will not be implemented in this area due to its location within the developed area and confined space clue to topography. Area 5: Employee Entrance The Employee Entrance will involve the re -development of the employee parking lot and associated walkways for entering the building due to the Emergency Department addition. The proposed development in this area will result in the reduction of existing 13UA resulting in improved Stormwater quality. The details of the area can be viewed in Section 2 Part E, `Stormwater Information; Will All Built Upon Area Be Collected' of this report. 2 Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 305313156 Stormwater Narrative Clark*Nexsen Area 6: Mobile Buildings The Mobile Buildings Area will include the addition of four (7) 2,160 square foot temporary trailers. The area also includes 8,548 square feet of walkways for access to the trailers. This area is proposed to be treated with one (1) wet detention basin. LID measures will be implemented in this area through the use of a grassed swale, north and west of the mobile buildings, which will convey stortmvatcr to the basin. 1. Previous or f.xisting Permits. SW8 960329- Camp Lejamc Naval Hospital Parking Lot Addition SW8 081115- Wounded Warrior Greenway Facilities As part of this stormwater permit submittal, Stormwater Permit SW8 081115- Wounded Warrior Greenway Facilities will be modified to reflect the rc-routing of the greenway to accommodate for the proposed Clinic Addition Parking Lots. All areas of the greenway that have been removed and replace will be directed into the wet detention basins; therefore, reducing the amount of impervious area covered by the original permit. Further, SW8 960329- Camp Lejcune Naval Hospital Parking Lot Addition, will be modified to include all proposed development including the replaced greenway. It is important to note that the areas including the stormwater networks, impervious area and BMPs associated with stormwater permit SW8 960329 will not be disturbed or modified in any way. 2. Tax parcel 1D Number- N/A H. Pre-1988 Built Upon Area - Camp Lejeune Naval Hospital has an extensive amount of Pre-1988 built upon area (BUA). The BUA includes sidewalks, buildings, roads and parking and is approximately 20 acres. The current site has only two wet detention basins as BMPs that treat specific areas of the parking lot that were added after the original development, and are permitted through DWQ under SW8 960329- Camp Lejcune Naval Hospital Parking Lot Addition. The proposed development has no effect on these BMPs or their drainage areas. The remaining BUA is 3 Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 3053/3156 Stormwater Narrative Clark*Nexsen captured by means of drop inlets, curb itilets and grassed swales which convey the stormwater offsjte. The existing stormwater pipe network is proposed to be rerouted in certain areas to allow for the proposed development. Delineated drainage area maps are provided within Appendix A. I. Discuss Phasing of the Project & Stormwater Facilities When Applicable. N/A J. Discuss Proposed Waste Water Treatment & Water Supply Water and Waste Water Treatment services will be extended from the existing building or new service connecting to existing utility infrastructure onsite. Additional lire hydrants will be provided as necessary. Sanitary sewer for the addition will be connected to an existing 8" sewer main on the north side of the building. The existing waterhnc loop will be relocated around the new addition. K. Identify Historic Sites & Projects Being Funded With Public Monies- N/A L. Disclose Any/All Non -Compliance Issues with DENlt Agencies - Not all BUA will be collected and treated by a proposed BMP. These areas are discussed in detail in Section 2 Part E. 2. Stormwater Informatron A. L Provide River Basin- White Oak IL Stream Classification- SC; HQW, NSW 111. Index Number- 19-16-(4.5) B. Identify Whether the Stormwater Design is High Density or Low Density, Commercial or Residential, State Stormwater or Coastal Stormwater, Address Vested Rights When Applicable; Identify Pockets of High Density. High Density, Commercial, Coastal Stormwater. 4 Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 3053/3156 Stormwater Narrative Clark*Nexscn C. Proposed Total % Impervious Surface. 43% Total Impervious D. Number of Proposed Treatment Measures, `I'ype(s) of Collection System 6 BMPs: Five (5) Wet Detention Basins & One (1) Infiltration Basin. All Wet Detention Basins are designed to treat a design rainfall depth of 1.5 inches (Quahty), pre/post control of the 1-yr and 2-yr 24-hr storm peak flow (Quantity), and a design Total Suspended Solids (CSS) removal of 90%. The pre -development and post -development drainage area maps and storm system calculations are included in Appendix A. Wet Detention Basin A Wet Detention Basin A has a drainage area of 129,312 sq.ft. (2.97 acres). The drainage area of wet detention basin A is 53.1% impervious, with a total impervious area of 68,668 sq.ft. (1.58 acres). The BUA consists primarily of parking lot, with sidewalk and greenway also present. Stormwater is conveyed within the parking lot using LID methods of two grassed Swale islands within the parking lot. The stormwater is picked up on the northern end of the swales by drop inlets and conveyed to the forebay of the wet detention basin. The Wounded Warrior Greenway Facilities are modified in the area to the southwest of the basin to accommodate for the parking lot addition. Stormwater from the relocated Wounded Warrior Grcenway sheet flows into the wet detention basin. Areas of the Wounded Warrior Greenway not modified by this project will remain ,under the existing Low Density Stormwater permit and will not be treated with the new BMPs. A grassed swale is proposed along the western side of the parking lot addition to capture and divert offsite stormwater before it enters the parking lot. The swale will convey the stormwater to its existing outlet, 40 LF of 18" RCP passing under the greenway, located to the northwest of the wet detention basin. We are proposing to extend the outlet pipe with the addition of 114 LF of 18"RCP and two manholes. The additional stormwater piping and two manholes are being proposed to allow for the stormwater to be diverted around the proposed wet detention basin. The stormwater will exit the pipe and overland flow into the wetlands. The basin is drawndown through a 1.5 inch orifice in the riser in approximately 3.3 days, outletting at a rate of 0.03 cfs (ft'/s). An emergency spillway is proposed as a drain 5 Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 305313156 Stormwater Narrative Clark*Nexscn mechanism during emergency storm events. The wet detention basin provides 2.76 feet of freeboard over the staging elevation of the 100-yr storm and has been designed per NCDI3NR Requirements to have a treatment efficiency of 90% TSS Removal. Wet Detention Basin B Wet Detention Basin B has a drainage area of 325,700 sq.ft. (7.48 acres). The drainage area of the basin is 56.4% impervious, with an impervious area of 183,793 sq.ft. (4.22 acres). The BUA consists of the hospital clinic addition, sidewalk, parking lot addition, and streets. The proposed system of pipes and inlets will collect storm water runoff from roof leader downspouts for roof runoff, overland flow from the parking area, and some lawn areas. A section of existing stormwater pipe, including a discharge point, will be removed to accommodate for the proposed development to meet the requirement to treat all new impervious area. LID measures will be implemented in parking islands, where possible, throughout the proposed parking area in the form of grassed swales. The basin is drawndown through a three (3) inch orifice in the riser in approximately 2.3 days and outletting at a rate of 0.116 cfs (fees). An emergency spillway is proposed as a drain mechanism during emergency storm events. The wet detention basin provides 2.53 feet of freeboard over the staging elevation of the 100-yr storm event and has been designed per NCDENR Requirements to have a treatment efficiency of 90% TSS Removal. Wet Detention Basin C Wet Detention Basin C has a drainage area of 174,326 sq.ft. (4.00 acres). The drainage area of the basin is 44.2% impervious, with an impervious area of 77,011 sq.ft. (1.77 acres). The BUA consists of the new employee parking lot and sidewalk. Stormwater will overland flow from the parking lot and sidewalks to one of two LID measures in the form of grassed swales making up the parking lot islands. The two grassed swales will convey the stormwater to the western end of the swales where it will enter the stormwater pipe network via drop inlets connected to the stormwater network. The pipe network will outlet the stormwater to the forebay of the wet detention basin. The wet detention basin is drawndown through a two (2) inch orifice in the riser in approximately 2.8 days, outletting at a rate of 0.041 cfs (fO/s). An emergency spillway is proposed as a drain mechanism during emergency storm events. The wet detention basin 6 Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 305313156 Slormwater Narrative Clark*Nexsen provides 1.82 feet of freeboard over the staging elevation of the 100-yr storm event and has been designed per NCDENR Requirements to have a treatment efficiency of 90% TSS Removal. Wet Detention Basin D Wet Detention Basin D has a drainage area of 62,409 sq.ft. (1.43 acres). The drainage area of the basin is 61.5% impervious, with an impervious area of 38,410 sq.ft. (0.88 acres). The BUA consists of the Emergency Department addition, existing and proposed sidewalk, driveway and parking. The proposed system of pipes and inlets will collect stormwater runoff from roof leader downspouts for roof runoff, overland flow from the parking area, sidewalks, driveway, and some lawn/planter areas. The stormwater will be conveyed to the forebay of the basin located to the south of the Emergency Departient. Because of the location of the development area (surrounded entirely by existing development and located on a hill), there will be no opportunities to incorporate LID measures for this stormwater system. The wet detention basin is drawndown through a 1.25 inch orifice in the riser in approximately 2.9 days, outletting at a rate of 0.019 cfs (fees). An emergency spillway is proposed as a drain mechanism during emergency storm events. The wet detention basin provides 1.77 feet of freeboard over the staging elevation of the 100-yr storm event and has been designed per NCDGNR Requirements to have a treatment efficiency of 90% TSS Removal. Wet Detention Basin E Wet Detention Basin E, has a drainage area of 108,222sq.ft. (2.48 acres). The drainage area of the basin is 21.9% impervious, with an impervious area of 23,668 sq.ft. (0.54 acres). The BUA consists of seven (7) mobile buildings and sidewalks. Stormwater will overland flow from the area in a northwest direction to be diverted to the forebay of the BMP by grassed swalcs. The wet detention basin is drawndown through a one (1) inch orifice in the riser in approximately 3.2 days, outletting at a rate of 0.012 cfs (fP/s). An emergency spillway is proposed as a drain mechanism during emergency storm events. The wet detention basin provides 1.52 feet of freeboard over the staging elevation of the 100-yr storm event and has 7 Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 3053/3156 Storinwaler Narrative Clark*Nexsen been designed per NCDENR Requirements to have a treatment efficiency of 90% TSS Removal. Infiltration Basin F Infiltration Basin F has a drainage area of 30,279sq.ft. (0.70 acres). The drainage area of the basin is 34.0% impervious, with an impervious area of 10,296 sq.ft. (0.24 acres). The BUA consists of the new mechanical room, cooling tower yard, and access driveway. Stormwater will be conveyed to the infiltration basin through a pipe network and also a swale that directs some of the runoff to an area drain. The infiltration basin is designed to treat a design rainfall depth of 3.0 inches. A rainfall depth of 3 inches was used to allow this sytem to be exempt from providing an off-line bypass structure. The basin is designed to drawdown the design storm in approximately 0.14 days. An emergency spillways is proposed as a drain mechaninsm during emergency storm events. The infiltration basin provides 1.02 feet of freeboard over the staged elevation of the 100-yr storm event and to treat 85% TSS Removal. E. Will All Built Upon Area Be Collected- No. The following areas will not be treated as discussed in the Stormwater Scoping Meeting on November 24, 2009. Area 4: Emergency Department- Cut Through and New Stairs The Emergency Department drive isle cut through into the visitor parking lot, and the new stairway near the Emergency Department entrance down to the visitor parking lot will be treated by existing grassed swales. The cut through and new stairs accounts for 1,813 sq.ft. Area 5: Employee Entrance In its existing condition, this portion of the site is approximately 63,238 sq.ft. (1.45 acres) with 42,662 sq.ft. (0.98 acres) of BUA. The proposed development calls for 18,637 sq.ft. (0.43 acres) of BUA to be demolished and replaced with pervious cover, resulting in a proposed 24,025sq.ft. (0.55 acres) of BUA. Treatment of stormwater for this area is not possible unless utilizing a stormwater vault and pumping to a remote BMP. The employee E Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 305313156 Stormwalcr Narrative Clark*Nexsen parking lot is sloped towards the existing hospital employee entrance where the low point is located approximately 30-feet from the face of the existing building. The stormwater is captured by the existing stormwater pipe network and is outletted to existing grassed swales. The runoff from this area of the site will be treated by existing grassed swales. The reduction in BUA for this area results in better stormwater quality by providing more area for infiltration and less pollutant runoff. Area 6: Visitor Entrance There are two proposed cut through areas in the median of the main entrance of the hospital. These cut throughs allow access for incoming visitors to the proposed parking lots. These two areas account for 1,323 sq.ft. of BUA and will be treated by existing grassed swales. Area 7: New Employee Parking Lot Sidewalk There is a proposed section of sidewalk across the street from the New Employee Parking Lot. This sidewalk will allow for pedestrian access from the proposed parking lot to the hospital. The area of sidewalk accounts for 206 sq.ft. (.01 acres) of 13UA and will be treated by existing grassed swales. F. Identify Whether or Not the Project Has Buffer Requirements & Whether or Not Development Is Proposed Within A Buffer. N/A G. Discuss Coastal Management rheas of Environmental Concern When Applicable. N/A H. Disclose Whether or Not Off -Site Runoff Is Conring Onto The Site or Into The Proposed BMP. N/A I. Discuss Whether Road Construction Across Other Property Is Necessary To Access This Project. None Necessary. N/A 9 Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 3053/3156 Stormwater Narrative Clark*Nexsen J. If An On -Site ) 'valuation Of'The Soils Has Been Done, Discuss Infiltration Rates, Seasonal High Water 'fable, etc., and Include Date Of Site 13valuatio❑ ('this Is Required For Infiltration Projects). Two Geotechnical Reports have been completed for this project (See Appendix B). In the area of the Infiltration Basin, the SHWT has been determined to be located 30 inches below existing grade elevation with an infiltration rate of 2.2 inches per hour. An on -site meeting with Vincent Lewis occurred on May 5'h at 9:30 un where the above information was verified. K. Is The Department of'rratisportation Requirhig The Construction Of A 'Turn Lane Or Road Widening Associated With The Project. N/A 1.1 GEOTECHNICAL INVESTIGATION Geotechnical investigation was performed by 13CS Carolinas, LLP. A copy of the Geotechnical report is included in Appendix B. 2.0 DESIGN APPROACH 2.1 STORM DRAINAGE PIPING Permanent storm drainage piping systems are designed for a 10-year storm event using the Rational Method for rainfall analysis. Rainfall intensity values were taken from the NOAA website. Runoff coefficients are based on the following values: Description Runoff Coefficient, C Pavcd and Roof Areas 0.95 Unimproved Areas 0.35 Using Bentley StormCAD V8i, the post -development storm water collection system was modeled. An analysis of the hydraulic grade line for the 1O-year design rainfall event found the existing and proposed structures' rim elevations to be above the water level. See Appendix A for detailed information of the post -developed analysis. 10 Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 3053/3156 Stormwatcr Narrative Clark*Nexsen 3.0 WATER QUALITY ANALYSIS According to the NCDENR Design Guide, the infiltration basin stormwater treatment system is designed to remove 85 percent of the average annual post development total suspended solids (TSS), 30 percent of the average annual post development total nitrogen (f N), and 35 percent of the average annual post development total phosphorus (IT), by implementing Best Management Practices (BMP's). According to the NCDENR Design Guide, the wet detention basin stormwater treatment system is designed to remove 85 or 90 percent of the average annual post development total suspended solids (rSS), 25 percent of the average annual post development total nitrogen (TN), and 40 percent of the average annual post development total phosphorus (0), by implementing Best Management Practices (BNIP's). 4.0 WATER QUANTITY ANALYSIS The BNIP routings were performed using the triangular hydrograph storage estimation method in the Hydraflow Hydrographs 2009 computer program. The analysis indicates that the total site post development condition peak runoff for the 1-year, 2-year, 10-year, and 100-year design storms is less than the predevelopment condition. 4.1 PREDEVELOPMENT CONDITIONS The total development area is approximately 23 acres. There arc two (2) existing wet detention basins on site that collect areas of the existing parking lot. Where there is existing development, stormwater is conveyed offsite via stormwater pipe networks and grassed swales. The site ultimately drains to the north into the New River of the White Oak River basin. The table below summarizes the predevelopment conditions peak runoff for the drainage areas. Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 3063/3156 ' Slormwatcr Narrative Clark*Ncxscn Drainage Areas Predevelopment Condition Peak Runoff Summary 1-year Peak Runoff (cfs) 2-year Peak Runoff (cfs) 10-year Peak Runoff (cfs) 100-year Peak Runoff (cfs) A 2.591 3.066 4.141 5.657 B 13.58 16.06 21.70 29.64 C 2.877 3.403 4.597 6.279 D 2.351 2.781 3.757 5.131 E 3.992 4.723 6.379 8.713 F 1.056 1.246 1.666 2.250 Total Existing Drainage Area Runoff 26.447 31.279 42.24 57.67 4.2 POST DEVELOPMENT CONDITIONS The proposed post development BUA drains to one of five I3MPs; five (5) wet detention basins, one (1) infiltration basin. The majority of built upon area (BUA) is captured and treated at the 6 BMPs, except for those areas previously discussed. The method of conveyance is a piped system that includes chop and curb inlets, as well as implementing LID measures in the form of grassed swales. Details are provided on the plans and storm system sizing and basin routing calculations are provided in Appendix A. The table below summarizes the post development conditions peak runoff after being routed to through the associated 13MP. 12 Camp Lejeune Naval Hospital Addition & Renovation CN Comm. No. 305313156 Stormwater Narrative Clark*Nexsen Drainage Areas Post development Condition Peak Runoff Summary 1-year Peak Runoff (cfs) 2-year Peak Runoff (cfs) 10-year Peak Runoff (cfs) 100-year Peak Runoff (cfs) A 0.040 0.043 0.050 2.794 B 0.141 0.155 0.181 2.535 C 0.055 0.061 0.071 0.593 D 0.023 0.025 0.029 0.876 E 0.019 0.020 0.771 2.056 F 0 0 0 0 Total Existing Drainage Area Runoff 0.278 0.304 1.102 8.854 The analysis shows a decrease in post development runoff. The table below summarizes the total predevelopment and post development runoff for the project. 1-year Peak 2-year Peak 10-year Peak 100-year Peak Runoff Runoff (cfs) Runoff (cfs) Runoff (cfs) (cfs) Total Predevelopment Runoff 26.447 31.279 42.24 57.67 Total Postdevelopment 0.278 0.304 1.102 8.854 Runoff Net Difference in Runoff -26.169 -30.975 -41.138 -48.816 13 DIVISION OF WATER QUALITY S TiS��Pt INFILTRATION SYSTEM INVESTIGATION Complete and email this form to Vincent.Lewis@ncmail.net. If there are �re`(((han 7 areas to be tested, attach a second sheet. / IT State Soil Scientist Confirmation Visit date/time: u/ /!J Qv Project Name: Camp Leleune Naval Hospital Addition & Renovation��y�y2gmO9 County: Onslow Street Address: 100 Brewster Blvd Camp Lejeune, NC 28547-0100 Directions from the nearest intersection of two major roads: From Camp Leleune main pate, turn right onto Brewster Blvd., right on Hospital Corps Blvd. Continue on Hospital Corps Blvd. until you reach parking lot on the left. The location of the Infiltration Basin is located behind the existing hospital. >1 acre being disturbed? ®YES []NO CAMA Major required? []YES ®NO Consultant Name: Jason T. Rupert, E.I. — Phone: (919) 576-2089 Consultant Firm Name: Clark Nexsen Architecture & Engineering Bore Number B-12 2 3 4 5 6 7 a ExistingGround Elevation 15.5 b Proposed Bottom Elevation 15.0 c Difference a minus b 0.5 d Add 2 ft. Min. Bore Depth) 2.5 e Hardpan Depth? f Approx. Elev. Of SHWT 13.0 Max. lowest bottom elev. 15.0 h Infiltration Rate OK? * i Confirmation of SHWT *State Soil Scientist Use ONLY Comments S,r 1 fu) 4,,c b - 3y Syli,p 3fl - 3{ Required Attachments: 1. Legible vicinity map. 2. Complete Soils Report. 3. PDF formatted site plan with the boring locations to be tested. Site plans should be emailed or hand -delivered only. Illegible faxed maps will not be accepted. All proposed infiltration areas and existing, active utility lines located vithin the proposed basin/trench must be marked and flagged. If these areas are not flagged, the Soils Scientist reserves the right to decline to do the investigation. If the proposed infiltration system will be located in an area of existing pavement and there is no open area nearby, equipment capable of ECS CAROLINAS, LLP "Setting the Standard for Service" Geotechnical • Construction Materials • Environmental • Facilities April 20, 2010 Ms. Tracy Bond SmithGroup 1850 K Street NW Washington, DC 20006 Reference: Report of Additional Infiltration Testing Naval Hospital Addition Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.15760 Dear Ms. Bond: ECS Carolinas, LLP (ECS) recently conducted additional infiltration testing for the proposed stormwater best management practice (BMP) areas at the Naval Hospital Addition site on Camp Lejeune, Onslow County, North Carolina. This letter, with attachments, is the report of our testing. Field Testing On April 15, 2010, ECS conducted an exploration of the subsurface soil and groundwater conditions at three requested locations shown on the attached Test Location Plan (Figure 1). The test areas were located with GPS equipment. The purpose of this exploration was to obtain subsurface information of the in -place soils for the proposed stormwater BMP areas. ECS explored the subsurface soil and groundwater conditions by advancing one hand auger boring into the existing ground surface at the requested boring locations. ECS visually classified the subsurface soils and obtained representative samples of each soil type encountered. ECS also recorded the groundwater level and the seasonal high water table (SHWT) observed at the time of the hand auger borings. The attached Infiltration Testing Form provides a summary of the subsurface conditions encountered at the hand auger boring locations. The groundwater level and the SHWT were estimated at the boring locations below the existing grade elevation. A summary of the findings are as follows: Location Water Level_ SHWT B-12 80 inches 30 inches B-13 70 inches 24 inches B-14 30 inches 14 inches ECS has conducted three infiltration tests utilizing a compact constant head permeameter near the hand auger borings to estimate the infiltration rate for the subsurface soils. Infiltration tests are typically conducted at two feet above the SHWT. If the SHWT is less than three feet, the tests are conducted at ten inches below the surface elevation. 7211 Ogden Business Park, Suite 201, Wilmington, NC 28411 • T: 910-686-9114 F: 910-686-9666 • www.eGSlimited.com ECS Carolinas, LLP • ECS Florida, LLC • ECS Illinois, LLC • ECS Mld-Atlantic, LLC • ECS Southeast, LLC • ECS Texas, LLP Report of Additional Infiltration Testing Naval Hospital Addition Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.15760 , April 209, 2010 Field Test Results Below is a summary of the infiltration test results: Location "Description Depth Inches/ hour B-12 Tan fine SAND w silt 10 inches 2.2 B-13 Tan/orange CLAY w/sand 10 inches 0,06 B-14 Gray silty SAND 10 inches 0.75 Infiltration rates and SHWT may vary within the proposed site due to changes in elevation and subsurface conditions. Closure The activities and evaluative approaches used in this assessment are consistent with those normally employed in assessments of this type. ECS's evaluation of site conditions has been based on our understanding of the project information and the data obtained during our field activities. ECS appreciates the opportunity to provide our services to you on this project. If you have any questions concerning this report or this project, please contact us at (910) 686- 9114. Respectfully, ECS CAROLINAS, LLP K. Brooks Wall Project Manager Attachments: Figure 1 - Test Location Plan Infiltration Testing Form Kris . S� r' Principal 2 d 4 _-- B-14.. r� I B-12 .. I u Ti— r �f 5 O.i MIX N, flo. 9�1 00� l � 1 r 71 n .1 I r (•,' m n'°MM¢ i �a C Cmm�..: nomul CA M M YY B 13 iro APPROXIMATE TEST LOCATIONS Naval Hospital Addition Imo - Figure 1—Test Location Plan Camp Lejeune, Onslow Co., NC „..1 , ECS Project No. 22-15760 r Provided by: SmithGroup d�p April 15, 2010 0 KBW Cld ROLIf�31'GAS Infiltration Testing Form Naval Hospital Addition Site Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.15760 April 19, 2010 Location Depth Soil Description B-12 0-6" Gray silty SAND 6"-30" Tan fine SAND 30"-80" Brown sandy CLAY Seasonal High Water Table was estimated to be at 30 inches below the existing grade elevation. Infiltration Rate: 2.2 inches per hour Test was conducted at 10 inches below existing grade elevation Groundwater was encountered at 80 inches below the existing grade elevation. Location Depth Soil Description B-13 0-6" Gray silty SAND 6"-24" Tan/orange CLAY w/ sand 24"-70" Gray/orange/red CLAY Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Infiltration Rate: 0.06 inches per hour Test was conducted at 10 inches below existing grade elevation Groundwater was encountered at 70 inches below the existing grade elevation. Location Depth Soil Description B-14 0-12" Gray silty SAND 12"-36" Tan fine SAND w/ silt Seasonal High Water Table was estimated to be at 14 inches below the existing grade elevation. Infiltration Rate: 0.75 inches per hour Test was conducted at 10 inches below existing grade elevation Groundwater was encountered at 30 inches below the existing grade elevation. I L Y* - \, xi' d� it � 1 \� - �� " ' -• 3I w F-- Site Location Map 0 340 680 1,360 2,040 2,720 Feet Moo coFor DENR Use ONLY QQ Re sewer. T BJ. �1�W ©, North Carolina Department of Environment and Natural Resources e �` .j—�i T NCDENR Request for Express Permit Review Time 10 e% Confirm: V FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan fi file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296.4698;alison.davidson(a)ncmail.net • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.leeld,ncmail.net • Mooresville & -Patrick Grogan 704-663.3772 or patrick.arogan(o0cmail.net • Washington Region -Lyn Hardison 252-946-9215 or lyn.hardison(a2ncmail.net • Wilmington Region -Janet Russell 910-350-2004 or janet.russell(7g ncmail.net NOTE: Project application received after 12 noon will be stamped in the following work day. SW SW SW SW SW 4 k10-1�ft �- Project Name: NAVAL HOSPITAL PARKING ADDITION County: ONSLOW Applicant: CARL BAKER, PE, DIRECTOR -DESIGN BRANCH Company: U.S. GOVERNMENT Address: 1005 MICHEAL ROAD City: CAMP LEJEUNE, State: NC Zip: 28542-2521 Phone: 910-451-2213, Fax: 910-451-2927, Email: carl.h.baker@usmc.mil Physical Location:100 BREWSTER BLVD. CAMP LEJEUNE. NC 28547-0100 Project Drains into NEW RIVER waters - Water classification SC HOW NSW (for classification see-htto://h2o.enr.state.nc.us/bims/reports/reportsWB.html) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within''/2 mile and draining,to,cla $-SA wa e� or within 1 mile and draining to class HOW waters? Y = N, V V, Engineer/Consultant: VINCENT CHIRICHELLA, PE Company: CLARK NEXSEN FFR 5 2010 Address: 4000 WEST CHASE BLVD, SUITE 200. City: RALEIGH, State: NC Zip: 27607-6864 Phone: 919-828-1876, Fax: 919-828-1877, Email: vchirichella@clarknexsen.com SECTION ONE: REQUESTING A SCOPING MEETING ONLY �Y ® Scoping Meeting ONLY ® DWQ, ❑ DCM, ® DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ InlermittentlPerennial Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)] ® High Density -Detention Pond 5 # Treatment Systems ® High Density -Infiltration 1 #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density -SW Wetlands # Treatment Systems ❑ High Density -Other _ # Treatment Systems /® MOD:® Major El Minor ❑ Plan Revision—[] Redev. Exclusion SW 8960329 (Provide permit#) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 21 acres to be disturbed.(CK # (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scooino and express meetina request Wetlands on Site ® Yes ❑ No Buffer Impacts: ® No ❑ YES: _acre(s) Wetlands Delineation has been completed: ® Yes ❑ No Isolated wetland on Property ® Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ® No 404 Application in Process w/ US ACOE: ❑ Yes ® No Permit Received from US ACOE ❑ Yes ® No +++++++++++++++++++******++++++******++*+++**++++***+++*FOr DENR use Only*+****++*+++******+*************+*************************** Fees lit for multiplepermits: Check# Total Fee Amount$ SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Mal; [I Min) $ SW (❑ HD, ❑ LD, ❑ Gen) $ 401: $ Los $ Stream Deter— $ NCDENR EXPRESS March 2009 �r ! " MUZI 3�� -N L L p ECS CAROLINAS, LLP "Setting the Standard for Service:' =e Geotechnical • Construction Materials • Environmental • Facilities August 4, 2009 Ms. Tracy Bond, AIA Smith Group/Clark Nexsen Joint Venture 1850 K Street NW, Suite 250 Washington, DC 20006 Reference: Report of Infiltration Evaluation Naval Hospital Renovation Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.14997E Dear Ms. Bond: ECS Carolinas, LLP (ECS) recently conducted an infiltration evaluation for the proposed stormwater best management practice (BMP) areas at the Naval Hospital Renovation on Camp Lejeune, Onslow County, North Carolina. This letter, with attachments, Is the report of our evaluations. Field Testing On July 29 through 31, 2009, ECS conducted an exploration of the subsurface soil and groundwater conditions at eleven requested locations shown on the attached Test Location Plan (Figure 1). The test areas were located in the field utilizing GPS equipment and a test location plan provided by Clark Nexsen. The purpose of this exploration was to obtain subsurface information of the in -place soils for the proposed stormwater BMP areas. ECS explored the subsurface soil conditions by advancing one hand auger boring into the existing ground surface at the requested boring locations. ECS visually classified the subsurface soils and obtained representative samples of each soil type encountered. ECS also recorded the seasonal high water table (SHWT) observed at the time of each hand auger boring. The attached Infiltration Evaluation Form provides a summary of the subsurface conditions encountered at the hand auger boring location. The SHWT was estimated at the boring locations below the existing grade elevation. A summary of the findings are as follows: Location SHWT 1 Winches 2 .28 inches 3 Winches 4 24 inches 5 18 inches 6 32 inches 7 24 inches 8 24 inches 9 48 inches 10 55 inches 11 36 inches 7FE8 F'xvEv 2 A 2010 �---__ 7211 Ogden Business Park, Suite 201, Wilmington, NC 28411 • T 910-686-9114 • F: 910-686-9666 www.erslimited.com ECS Carolinas, LLP • ECS Florida, LLC • ECS Illinois, LLC • ECS Mid -Atlantic, LLC • ECS Southeast, LLC • ECS Texas, LLP TABLE OF CONTENTS INTRODUCTION.......................................................................................... 4 DENR Compliance Assistance Activities ........................................................L.' 6 DENR Environmental Stewardship Initiative ................................................:.... 10 2008 PROGRAM AT-A-G LANCE DATAAND ENFORCEMTTRENDS 14 AirQuality ............................................................................................... 15 Coastal Mana ementI ................................................................................. 16 Environmental alth = Food, DairyLodging and stitutional Sanitation .................. 17 Environmental He Ith — Mammogra hy I ........................................................... 18 Environmental Hea h — On -Site Wa er Protec ' n ................................................ 19 Environmental Healt — Public Wat4r Suppl ................................................ 20 Environmental Health Radioactiv Materals ......................................... 21 Environmental Health — kellfish S nita on ......................................................... 22 Environmental Health - Ta ing ...................................................................... 23 Environmental Health —X-Ra ..................................................................... 24 ForestResources ...................................................................................... 25 LandReso ................................................................. 26 Land Resources — Erosion an S di entation Control ....................................... 27 Land Resources - Mining .... ......... ......... ......... ......................... 28 MarineFisheries ........................................................................................ 29 Waste Management — azardou Waste ...................................................... 30 Waste Management Solid Wasle I ................................................................. 31 Waste Managem t — UST Prog am ................................................................. 32 Water Quality Aquifer Protectio ....................................... 33 Water Quali - NPDES ................................................................................ 34 Water Quality — Pretreatment, Er iergency Response and Collection Systems ..........1. 35 Water Quality — Stormwater/Non oint Source ................................................... 36 APPENDICES..................................................................................................... 37 A 2008 Program Compliance and Enforcement Data ............................................ 38 B DENR Enforcement Primer.............................................................................. 81 C Program Descriptions .............................................................................. 85 DCompliance Contacts ........................................................................... 90 E Principles of Enforcement ......................................................................... 92 F Process Flowcharts ................. ............................................ I ..... ... ..... 94 DENR YEAR 2008 COMPLIANCE ACTIVITY REPORT page - 3 - Report of Infiltration Evaluation Naval Hospital Renovation Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.14997B August 4, 2009 ECS has conducted eleven infiltration tests utilizing a compact constant head permeameter near the hand auger borings to estimate the infiltration rate for the subsurface soils. Infiltration tests are typically conducted at two feet above the SHWT. If the SHWT is less than three feet, the tests are conducted at ten inches below the surface elevation. Field Test Results Below is a summary of the infiltration test results: Location Description Depth Inches/ hour 1 Tan fine SAND w/silt ' 12 inches 1.4 2 Gray fine SAND w/silt 10 inches 1.2 3 Gray fine SAND fill 12 inches 4.0 4 Grey/tan fine SAND w/silt 10 inches 2.2 5 Gray/tan silty SAND 10 inches 0.40 6 Gray fine silty SAND 10 inches 0.76 7 Gray fine SAND 10 inches 3.7 8 Tan fine SAND 10 inches 4.4 9 Gray/tan fine SAND w/clay lens fill 24 inches 1.1 10 Tan fine SAND - 31 inches 10.9 11 Gray sandy SILT fill 12 inches 0.09 ld�°Infiltration rates and SHWT may vary within the proposed site due to changes in elevation and subsurface conditions. Closure The activities and evaluative approaches used in this assessment are consistent with those normally employed in assessments of this type. ECS's evaluation of site conditions has been based on our understanding of the project information and the data obtained during our field activities. ECS appreciates the opportunity to provide our services have any questions concerning this report or this project, 9114. Respectfully, ECS CAROLINAS, LLP le�4A --- K. Brooks Wall Project Manager to you on this project. If you please contact us at (910) 686- Attachments: Figure 1 - Test Location Plan, Infiltration Evaluation CC: Mr. Steve Thomas, P.E.-Clark Nexsen e9' Lair, P. G. I Geologist North Carolina Department (Environment and Natural lao ounces [En aronmen$al �e ulatory Co gi90ance �c$av'y in Cale dar Year 2008 Contributor: Jill Pafford, Sec/Aiiry's Office Program Advisors: Roy Brownl ,Coastal anagement Jackie Gle , Environme I Health - Food, Lodging and Institutional Sanitation Ted Lyon, nvironmenlal H Ith — On -Bile Water Protection Tony Gall gher, Environment Health — Public Water Supply Bennifer ate, Environmental H Ith —Radiation Protection Patti Fo er, Environmental Healt Shellfish Sanitation Gail BI dsoe, Forest Resources Melt viIs, Land Resources Rex anier, Marine Fisheries Leb etl Kady, Waste Management—Haza ous Waste D ald Herndon, Waste Management —Sol Waste J n Manthey, Waste Management—Undergr and Storage Tanks d Hartlee, Water Quality — Aquifer Protection aryl Merritt, Water Quality — Collection Systems Tom Belnick, Water Quality— NPDES Shelton Sullivan, Water Quality — Stonnwater Julie Woosley, Pollution Prevention and Environmental Assistance Amanda Foster, Attorney General's Office DENR YEAR 2008 COMPLIANCE ACTIVITY REPORT page - 2 - e;. Naval Hospital Renovations Camp Lejeune, Onslow Co., NC ECS Project No. 22-149S August 3, 2009 KBW 10 TEST LOCATIONS 11 FED 2 4 2010 Figure 1- Test Location Plan Provided by: Clark Nexsen January2010 January2010 February S M T W T F S S M T W T F S 1 2 1 2 3 4 5 6 3 4 5 6 7 8 9 7 8 9 10 11 12 13 10 11 12 13 14 IS 16 14 15 16 1] 18 19 20 -'- 1] 18 19 20 21 22 23 21 22 23 24 25 26 27 24 25 26 22 28 29 30 28 31 Sunday Monday, Tuesday Wednesday Thursday Friday Saturday Dec 27 28 - - 29 30 31 Jan 1, 10 2 N HOLIDAY N W 3 4 5 6 7 8 9 8:30am Record Time/ rn m c m 10 11 12 13 14 15 16 8:30am Record Time/ ti 0 ti - c m 17 18 19 20 21 22 23 8:30am Record Time/ N f` ti C N 24 25 26 27 28 29 30 8:30am Record Time/ 0 P N C N Lewis,Linda 2 11/23/2009 3:06 PM Infiltration Evaluation Naval Hospital Renovations Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.1499713 August 4, 2009 Location Depth 1 0-16" 16"-36" Soil Description Gray/tan fine SAND w/silt Tan/brown sandy CLAY Seasonal High Water Table was estimated to be at 36 inches below the existing grade elevation. Infiltration Rate: 1.4 inches per hour Test was conducted at 12 inches below existing grade elevation Location Depth 2 0-24" 24"-50" Soil Description Gray fine SAND w/silt Tan fine SAND w/silt Seasonal High Water Table was estimated to be at 28 inches below the existing grade elevation. Infiltration Rate: 1.2 inches per hour Test was conducted at 10 inches below existing grade elevation Location Depth Soil Description 3 0-36" Grey fine SAND (fill) 36"-30" Tan/orange clayey SAND Seasonal High Water Table was estimated to be at 36 inches below the existing grade elevation. Infiltration Rate: 4.0 inches per hour Test was conducted at 12 inches below existing grade elevation Fi E T!L FEB 2 4 2010 BY: January 2010 January 2010 February W 2010 5 M T W T F S S M T T F S 1 2 1 2 3 4 5 6 3 4 5 6 7 8 9 7 8 9 10 11 12 13 10 11 12 13 14 15 16 14 15 16 17 18 19 20 17 18 19 20 21 22 23 21 22 23 24 25 26 27 24 25 26 27 28 29 30 28 31 Sunday. Monday Tuesday Wednesday Thursday Friday Saturday Dec 27 28 29 30 31 Jan 1, 30 2 N R f` N V N 3 4 5 6 7 8 9 m ry, c m 10 11 12 13 14 15 16 o ti ' c 17 18 19 20 21 22 23 N n ri C N 24 25 26 27 28 29 30 m v N C N Baker, Chris 2 11/23/2009 3:07 PM to Infiltration Evaluation Naval Hospital Renovations Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.14997E August 4, 2009 Location Depth 4 0-18" 18"-50" Soil Description Gray/tan fine SAND w/silt Tan/orange sandy CLAY Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Infiltration Rate: 2.2 inches per hour Test was conducted at 10 inches below existing grade elevation Location Depth Soil Description 5 0-18" Gray/tan silty SAND 18"-30" Gray/orange sandy CLAY w/silt Seasonal High Water Table was estimated to be at 18 inches below the existing grade elevation. Infiltration Rate: 0.40 inches per hour Test was conducted at 10 inches below existing grade elevation Location Depth Soil Description 6 0-18" Gray fine silty SAND (fill) 18"-28" Orangish/yellow clayey SAND (fill) 28"-60" Tan/orange sandy CLAY Seasonal High Water Table was estimated to be at 32 inches below the existing grade elevation. Infiltration Rate: 0.76 inches per hour Test was conducted at 10 inches below existing grade elevation edythe. mckinnev(a)ncden r.gov E-mail correspondence to and from thi dress may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Infiltration Evaluation Naval Hospital Renovations Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.14997B August 4, 2009 Location Depth 7 0-14" 14"-24" 24"-36" Soil Description Gray fine SAND Tan fine SAND w/silt Tan/orange clayey SAND Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Infiltration Rate: 3.7 inches per hour Test was conducted at 10 inches below existing grade elevation Location Depth 8 0-12" 12"-24" 24"-36" Soil Description Tan fine SAND Gray/tan fine silty SAND Tan/orange clayey SAND Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Infiltration Rate: 4.4 inches per hour Test was conducted at 10 inches below existing grade elevation Location Depth Soil Description 9 0-24" Gray/tan fine SAND w/clay lens (fill) 24"-48" Tan fine SAND Seasonal High Water Table was estimated to be at 48 inches below the existing grade elevation. Infiltration Rate: 1.1 inches per hour Test was conducted at 24 inches below existing grade elevation 910 796-7421 NOTE: change in email address: Email correspondence to and from this address y be subject to the North Carolina Public Records Law and may be disclose third parties. Infiltration Evaluation Naval Hospital Renovations Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.14997B August 4, 2009 Location Depth 10 0-6" 6"-40" 40"-60" Soil Description Gray silty SAND Tan fine SAND Orange clayey SAND Seasonal High Water Table was estimated to be at 55 inches below the existing grade elevation. Infiltration Rate: 10.9 inches per hour Test was conducted at 31 inches below existing grade elevation Location Depth Soil Description 11 0-24" Gray sandy SILT (fill) 24"-40" Gray fine SAND w/clay lens (fill) 40"-60" Tan/orange sandy CLAY Seasonal High Water Table was estimated to be at 36 inches below the existing grade elevation. Infiltration Rate: 0.09 inches per hour Test was conducted at 12 inches below existing grade elevation Project: P031 MPMG & ETC - (ETC Portion)�January 2010 EWWETLAND MAP Page 3 of 3 .6 ON P. WA 1 1 1 1 1 1 1 SHEET CI101 CI ° O O O -SEE PROJECT P7331-RENO` MRI PDOIPON FOR WORN IN 1, � I j 21 .. ' I I �SET C1104II- SH — 1103 ._.A - 1� \ ly' r (� SHE ..�LnE I I 1� �s:" l 1 �� �� � 0 1 1 l� 1 1 1 f. 1 1£i1 1 O1 0 1 1 1 1 1 1 1 1 J v _ Site Location Map . I r- I VUI o[ r- 1001 E) nU,FJILQI AUUILIUII/I UIIUV21LIUH Legend Ojurisdictional —wetland —area I\1 c• � m 780 ° °U °°° o ° ° ° 0 340 680 1,360 2,040 2,720 Feet III Russell, Janet From: Jason T. Rupert Urupert@ClarkNexsen.com] Sent: Wednesday, February 24, 2010 10:41 AM To: Russell, Janet Cc: Vincent J. Chirichella; Towler CIV David W Subject: Camp Lejeune Hospital Scoping Meeting #2 Request Attachments: Vicinity Map.pdf; Geotech Infiltration Report.pdf; Site Plan.pdf; 091223 NCDENR Stream Classification.pdf; 100224 Camp Lejeune Clinic - Express Request - Stormwater Permit Submittal.doc Hi Janet, Vincent Chirichella and I would like to request our second Scoping meeting for the Camp Lejeune Hospital Addition and Renovation. Per our first scoping meeting, we think it would be beneficial for Joanne Steenhuis to join Mary Jean, Rhonda, and you at the our next meeting if possible. We would like to propose meeting on March 9-111h. David, could you please confirm which day works best for you. Thanks, Jason T. Rupert El, LEED AP Civil E.I. CLARK NEXSEN Architecture 6 Engineering 4000 Westchase Boulevard Suite 280 Raleigh, NC 27607 919.828.1876 Tel. 919.828.1877 Fax imoe rtAclarknexsen.com vrv+w.cla rknexsen.com FES 2 4 2010 CONFIDENTIALITY NOTE. This e-mail arid any files transmitted with it contain privileged and confidential information and are intended solely fm the use of the individual or entity to which they are addressed If you arc not the intended recipient or the person responsible for delivering the e-mail to the intended recipient, you are hereby notified that any dissemination or copying of this a -mail or any of Its attachments is strictly prohibited If you have received this a mail in error. please immediately notify the sending individual or entity by e-mail and permanently delete the original o mail and attachments from your computer system. Agency Activity Number of Activities in 2008 Land ReMan Erosion Sedimentrol Sedimentation and Erosion Control Plan Design Workshops 4 Desi n Worksho Partici ants 480 Local Government Inspector Workshop 1 Local Program Workshop Participants 100 Land Resources/ Mining Technical Assistance by Telephone 1,215 Meetings with Applicants and Consultants 118 Onsite Meetin s with Operator/Applicant/Consultants/ 348 tribution of Surface Mining Manual 22 Acc s to Mining Program Web Site 460 Marine Fisheries Fish inroclamation Distribution Ongoing Waste Management/ Hazardous Waste Com lia a Assistance Workshops 21 Regulated tities Attending Worksho s 478 Compliance A !stance Visits 91 Technical Assist ce Calls 1,540 DWM Web Site Hit 202,489 Technical Assistance letters 18 Waste Management/ Solid Waste Compliance Assistance orksho s 27 Regulated Entities Attendin W rksho s 897 Compliance Assistance Visit`s 585 Compliance Assistance Calls \ 45,240 Web Site Hits \ 100,970 Technical Assistance Letters \ 620 Local Government An ual Reports \ 657 Waste Managment/ UST Com liance Assistatrice Workshops \ 5 Regulated Entities'Attending Workshops \ 50 Compliance As stance Visits \ 11 Compliance sistance Calls \ 12,480 Water Quality/Aq Prot Compliance^ssistance Workshops \ 14 Com lian a Assistance Visits \ 73 Water Quality/NPDES Complia6ce Assistance Visits \ 11 Tech al Assistance Visits \ 55 Water Quality/PERCS Ce ied Collection S stem O erator Trainin \ 3 workshops H A and PAR Training \ 4-6 workshops e ional Emergency Response Training \ 7 regions Water Quality/ Stormwater/Non-Paint Discharge Local Delegated Erosion Control Program Workshop \ 115 attendees E&SC Planning & Design Workshop \ 500 attendees Surface Water Identification & Training Certification Course \ 4 wrksh s 90 attendees NC Assoc of Elec Coops Annual En ineers/O s Conference 150 attendees North Carolina Society of Surveyors Institute \ 15 attendees SW BMP Training - Local Governments 4 wrksh s 140 attendees State Stormwater Consistency Meetings 7 nit s —15 per meeting) Timber Products Permit Workshops for NC Forestry Association \ 2 workshops Technical Assistance / Compliance Visits \ 3 visits DPPEA Technical Assistance Calls 659 Technical Assistance Visits 134 Training Sessions \ 166 Web Site Visits 3,S19,g71 Web Site Hits 13,3 4,921 Number of Regulated Entities Enrolled in the Environmental Stewardship Initiative 115 DENR YEAR 2008 COMPLIANCE ACTIVITY REPORT page - 7 - Architecture & Engineering 4000 Westchase Boulevard, Suite 280 Raleigh, NC 27607 P. 919.828.1876 F. 919.828.1877 www.clarknexsen.com meeting minutes DATE: SEE LAST PAGE OF DOCUMENT FOR ATTENDEES LIST November 24, 2009 Opened meeting by giving an overview of the existing conditions, adjacent project (Wounded Warrior Greenway), and current PROJECT: Camp Lejeune Hospital Addition proposed design. and Renovation PURPOSE OF MEETING: General Discussion for Stormwater. stormwater scoping Prior to - Delineate existing stormwater network and provide drainage Subnittal map to show that proposed design does not affect existing PREPARED BY: stormwater netW R-qvG! ]anon Rupert, El - No more than ZIfs can be discharged from a single point into Vincent Chirichella, PE existing wetlands. Ensure no channelizing of outflow. COMMISSION NUMBER: Recommend using rip rap, level spreader, vegetated filter 3053 / 3156 strip or wide trapezoidal ditch. ROUTE TO: - For wet ponds or constructed wetlands, if designing treatment to meet 90%TSS, vegetated filter strip is not required. - Stormwater treatment requirements are: ga*'-d4l o Quantity: Pre vs Post for 1-yr 24-hr storm. o Quality: Treat 1 1/2-inch using Simple Method. - Permanent pool discussion: o When placing a pond in a sloped area, use the Seasonal High Water Elevation on the lower elevation of the hill to set the permanent pool elevation. Ensure the permanent pool elevation is higher than the existing wetland elevation. - Required to combine two previous permits with proposed work into one new High Density 2010 permit. m o SW8 960329-Camp Lejeune Naval Hospital Parking Lot Addition • Provide East and West ponds as first two yQ �Q7 columns of permit application K?�� o SW8 081115-Wounded Warrior Greenway Facilities - Provide two (2) borings per BMP showing seasonal high water elevation. - Watch laydown areas to ensure they are treated for stormwater and erosion control. - Due to the complexity of this permit, provide a very detailed narrative describing all areas and treatment measures. An additional scoping meeting was suggested prior to final submittal meeting. FILE: Page 1 of 4 Architecture c`a Engineering meeting minutes General Discussion for Erosion Control: - Provide velocity calculations for diversion ditches. Suggests sodding high velocity areas and large slopes. - Provide description of inspection/maintenance measures. - Provide a very detailed construction sequence. - Include a construction setback from existing wetlands. Discussed providing a 10-ft setback. - Discussed showing double row of silt fence along existing wetlands with rock outlets at low areas. - Email Rhonda Hall prior to submitting to remind her of presence at scoping meeting. Below is a description of each area discussed. Area 1: Clinic Addition Described proposed layout and the relation to the existing stormwater .system and existing wetlands. One of the existing storm system discharge points drains to a finger of existing wetlands. This project will remove all discharge from this discharge point due to the requirement to treat all new impervious and necessary location for a BMP. Ms. Naugle indicated her desire to fill this finger of existing wetlands due to the lack of stormwater discharging in this area (removing the stormwater discharge may cause the wetlands to dry up). Mr. Chirichella explained the direction given to the project team to NOT disturb any existing wetlands. Ms. Naugle indicated she will discuss this further with Joanne Steenhuis, a 401 Specialist, and further discussion between NCDENR, NAVFAC, and Clark Nexsen may be required. This area of parking and building is proposed to be treated with two (2) wet ponds only. LID measures will be implemented where possible through the use of grassed swales. Stormwater quality will be improving in this area due to the amount of impervious surface being treated through BMP's. Area 2: Mechanical Room Addition This area of proposed service area and building is proposed to be treated only with an infiltration basin. LID measures will be implemented where possible through the use of grassed swales. Area 3: New Employee Parking Lot - This area of new parking is proposed to have treatment only with a wet pond. LID measures will be implemented where possible through the use of grassed swales. Area 4: Emergency Department Cut Through and New Sidewalk These areas are proposed to have treatment through existing grassed (}Qkgt swales only. c� Page 2 of 4 Architecture & Engiiaeering meeting minutes Area 5: Emergency Department - This area of new walks, drive and building are proposed to be treated with only a wet pond. Area 6: Employee Entrance - This area of walks and drives are proposed to NOT provide additional stormwater treatment and flow through the existing storm system. " Treatment of stormwater for this area is not possible unless utilizing a stormwater vault and pumping to a remote BMP. The employee parking lot is sloped towards the existing hospital building employee entrance where the low point is located approximately 30-feet from the face of the existing building. Stormwater quality will improve in this area due to a reduction in impervious surface. f2 a.o vt akADL.p, File location: H:\JOBS\3053 - Hospital Clinic Addition at Camp Lejeune\4 Correspondence\CN Internal\091125 NCDENR stormwater Meeting Minutes.doc Page 3 of 4 Architecture & Engineering meeting minutes Attendees: Name jorgan ization Telephone Number Email Address Vincent Chirichella, PE Clark Nexsen 919-828-1876 vchirichella(@clarknexsen.com Jason Rupert, EI Clark Nexsen 919-828-1876 "ru ert clarknexsen.com Mary Jean Naugle NCDENR 910-796-7303 Mary.nauqle@ncmail.net Rhonda Hall INCDENR 910-796-7335 Rhonda. Hall@ ncmail. net Cameron Weaver INCDENR 910-796-7427 cannergin.weaverft ncmail. net David Towler, EI Camp leieune-Public Works Div. 910-451-3238 davi .tow r usmc.mil Page 4 of 4 Naugle, Mary From: Naugle, Mary Sent: Wednesday, December 02, 2009 11:50 AM To: 'Vincent J. Chirichella' Subject: state stormwater ponds and wetlands Vincent. Please note the design conditions of the state stormwater BMP. It is on the web at address below. Section 10. 15 BMP shall not be located to produce adverse impacts on water levels in adjacent wetlands Section 10. 19 The permanent pool elevation shall be within 6 inches (plus or minus) of the SHWT elevation. Page 10 -9 DWQ requires a soils report that includes a determination of the SHWT elevation for all wet pond designs. The permanent pool elevation shall meet the following requirements: 1. The PPE must be no more than six inches above or below the SHWT. 2. If the design proposed does not meet the requirement of item 1 above, then the following must be provided: a. A calculation -based hydrogeological analysis of the proposed wet pond and surrounding subsurface conditions must demonstrate it will not adversely affect wetlands, surface waters, and buffers. b. The analysis must demonstrate that the permanent pool will.... http://h2o.enr.state.nc.us/su/documents/Ch10-WetPonds16June2009.pdf. I told Joanne to expect your call when the layout is further defined. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardi7al Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax marynaugle@ncdenr9ov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. DC 00 l I l5 — cmc ` ) Naugle, Mary From: Naugle, Mary Sent: Wednesday, December 02, 2009 11:36 AM To: Naugle, Mary; 'Vincent J. Chirichella'; 'Rhonda. Hall@ncmail. net', 'cameron.weaver@ncmail.net'; 'david.towler@usmc.mil' Cc: 'Jason T. Rupert'; Steenhuis, Joanne Subject: RE: Camp Lejeune Hospital Addition and Renovation Project Scoping - MJN Meeting Reply amendment 2 Vincent; In response to your phone call regarding this project: 1. You clarified there will be no disturbance to wetlands. The plan that I received on 11/24/09 has been revised to show no wetlands disturbance. 2. You will discuss the location of the pond and its impact to the adjacent finger wetlands with Joanne as layout is finalized. (910-796-7306] 5. You indicated that you are relocating part of the greenway in Permit no. sw8 081115. a. It would be best to remove that portion from the SW8 081115 by a minor modification to the permit. Add the relocated part of the greenway to your project area since it is treated in the proposed bmp. b. Please include this hospital expansion on the existing permit SW8 960329 as a major modification. We understand that there will be 3 different sets of stormwater rules for this permit, but rescinding the 1996 permit and opening a new 2010 permit does not eliminate this need. [pre-'88, 1995 rules, 2008 rules]. Delineate the east project limits for SW8 081115 Mod on the plans for SW8 960329 Modification. 7, 8, & 9: if you cannot route small areas of walkways to the bmp, you will demonstrate why. Your memo: The discharge to wetlands must be < 2 feet per second [velocity— not volume]. Thank you for calling to clarify the information. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 284O5 910-796-7215 910-796-7303 910-350-2004 fax mary.noug1e@ncdenr.gov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Naugle, Mary Sent: Wednesday, December 02, 2009 10:50 AM To: Naugle, Mary; 'Vincent]. Chirichella'; 'Rhonda. Hall@ncmail. net'; 'cameron.weaver@ncmail.net'; 'david.towler@usmc. mi I' Cc: 'Jason T. Rupert'; Steenhuis, Joanne Subject: RE: Camp Lejeune Hospital Addition and Renovation Project Scoping - M]N Meeting Reply amendment Naugle, Mary From: Naugle, Mary Sent: Wednesday, December 02, 2009 10:43 AM. To: 'Vincent J. Chirichella'; Rhonda.Hall@ncmail.net; cameron.weaver@ncmail.net; david.towler@usmc.mil Cc: Jason T. Rupert; Steenhuis, Joanne Subject: RE: Camp Lejeune Hospital Addition and Renovation Project Scoping Meeting Vincent; The following is recommended: 1. Obtain USACE 404 and DWQ 401 approval for any impacts to wetlands. I spoke with Joanne [401] and she spoke with Brad [404] and wetlands disturbance or impacts should be avoided for stormwater purposes. Consider starting the pond outside the wetlands and running it further north. Even if you do not disturb the wetlands, get concurrence for 404 and 401 regarding impacts to the wetlands as a result of new adjacent pond — i.e. no recharge of the finger wetlands on the north east side of parking area, and provide a copy of the memo with submittal of stormwater application. 15A NCAC 026.0231. 2. Obtain concurrence from 404 and 401 for the wetlands under the proposed west parking of this project. These wetlands were not delineated on the plans for permit no. SW8 081115. 3. Clarify the amount of wetlands on the existing and proposed plans for stormwater. Submit the approval from the USACE and DWQ 401 group of any impacts. The narrative submitted with the express request for stormwater meeting, listed 3 acres in wetlands on item 1.(e), yet you mentioned in the meeting that there were no impacts. 4. Route all new bua to treatment. Further review of the walkway by existing pond and road crossing by proposed pond indicates the runoff may be able to be routed to the ponds. If there are small areas of walkways that cannot be collected, then demonstrate why it cannot be treated on the plans with narrative the finished elevations and contours, along with bua totals. 5. Permit No. SW8 081115 will be maintained as Low Density for the existing greenway with no revisions. Please include this hospital expansion on the existing permit SW8 960329 as a major modification. If the runoff from the greenway is routed to the pond for the hospital expansion, then delineate the drainage area on the plans for the hospital expansion and delineate the bua and drainage area amounts on the bua tables in the application and calcs as "off -site drainage from SW8081115". We understand that there will be 3 different sets of stormwater rules for this permit, but rescinding the 1996 permit and opening a new 2010 permit does not eliminate this. [pre-'88, 1995 rules, 2008 rules]. Delineate the project limits for SW8 081115 on the plans for SW8 960329 Modification. 6. Clearly delineate all drainage areas and bua on the common plan. Identify the pre '88 bua, differently from the 1996 permitted parking and treatment, different from the proposed with this modification. 7. Re: area 4 — emergency dept cut through new sidewalk. Label on the plans and demonstrate why runoff cannot be treated in bmp. It appears this could be routed to the 1996 pond. 8. Re: area 6 - employee entrance, see item 7. Provide totals of bua in this area for pre and post and details on the plans to demonstrate the proposed bua is less than existing and the stormwater controls will improve with redevelopment by providing diffuse flow to vegetated areas with no site discharge. 9. Driveway into the existing area - Ditto 7 or treat in the proposed middle pond. Please let me know if you need more information. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality Naugle, Mary From: Vincent J. Chirichella [vchirichella@ClarkNexsen.coml Sent: Wednesday, November 25, 2009 3:27 PM To: Naugle, Mary; Rhonda.Haii@ncmail.net; cameron.weaver@ncmail.net; david.towler@usmc.mil Cc: Jason T. Rupert Subject: Camp Lejeune Hospital Addition and Renovation Project Scoping Meeting Attachments: 091125 NCDENR Stormwater Meeting Minutes.pdf Attached are the meeting minutes from yesterday's Scoping meeting for the Camp Lejeune Hospital Addition and Renovation Project. Please review and notify me if there are any discrepancies prior to next Wednesday December 2, 2009. Thank you. Vincent J. Chirichella PE, LEEDAP Senior Civil Engineer CLARK NEXSEN Architecture & Engineering 4000 Westchase Boulevard Suite 280 Raleigh, NC 27607 919.828.1876 Tel. 919.828.1877 Fax vchi richella(cDclarknexse n. corn www.clarknexsen.com CtrN.'1Df : rP.f.t I I NO fL hw o irail and any files transrMt. it %rith it writ In priv}Ierled aad c+rrfidential intonnabon and ant mtendcd solely Ica If w use of thi, individual or eulny to wh,ch shay are addmssod If you are nol the intendrxl mciPIcnf or 11m psrson responsible for dtlrv. r.nq rht a mad to Gir :t.fer,dr-d rxal c .. ,oa fic hr. rev; IOVIE I III ,fly drs,emmahos or LIP ymg of 6rs e mad or any of Is ira M.cnts I Cnetiy proh,loleJ If you !,IV_ we rty,d this c in. If in err mrred.!e y noldy the sa,din9 individual or ennty bye n.vl and Itormanently delete Iho ongnial 0-re all nno ottarhmonts frnm your computer system Russell, Janet From: Jason T. Rupert Drupert@ClarkNexsen.coml Sent: Wednesday, November 11, 2009 4:52 PM To: Russell, Janet Subject: RE: Hospital Clinic Addition Camp Lejeune Janet, Sorry to write you again. But we have had another change in schedule. We will not be able to meet on Monday, November 16. We are still available on Tuesday, November 17 and November 23-25, all at 10 AM if you prefer. Once again, I am sorry. I promise not to change the dates again! Thanks, Jason T. Rupert El, LEED AP Civil El CLARK NEXSEN Architecture & Engineering 4000 Westchase Boulevard Suite 280 Raleigh, NC 27607 919.828.1876 Tel. 919.828.1877 Fax i ru oertrdclarknexsen.com www.clarknexsen.com .l I pan, l is Ir 'e llpn 1. -nd t mvlrgh tl ,itutI, nimr....to Pr .d dPa „0" pr •�' .. :t rl t 1.1 i:.t, el. t .. 0, ',_. . v:o, �, 'c' .-I'd o..12 .0n,Cwhit l:na It ua. utly dt:i' ,. rra'. auJ._d., .... .. . From: Jason T. Rupert Sent: Tuesday, November 10, 2009 2:40 PM To: 'Russell, Janet' Cc: Towler CIV David W; Vincent J. Chirichella Subject: RE: Hospital Clinic Addition Camp Lejeune Janet, Unfortunately, an issue came up this morning that will not allow us to meet on Wednesday, November 18. Would it be possible to reschedule? From previous emails, the only dates that we would be able to meet next week would be Monday, November 16 or Tuesday, November 17. The following week, we could meet Monday thru Wednesday. We are able to meet in the morning for any of those dates at 10:00 AM. I apologize for the inconvenience. Regards, Jason T. Rupert El, LEED AP Civil El CLARK NEXSEN Architecture & Engineering 4000 Westchase Boulevard Suite 280 Raleigh, NC 27607 919,828.1876 Tel. 919.828.1877 Fax iruoertAclarknexsen.com w .clarknexsenxom r70141- IDLNTIAI I i Y Nr) I c I Ih; l� nisi( and any N'L- fir . tutted v di it contain pn oged and ron[ denh iI inform 6lon and ale Intended solely to, he Lmr of t;:e .,divldual or entity to call ch th, ; i ^ ,Aho.•,od If you an, not thn v-eoded recipient or On person w,,ponsiblo for delrveriny the e-mail to the .ntendi-d toopienl you are hereby notified teal an; di..,cuunst-on ui r:opyr iy nl this , riain, any of its Gd acnme:nl, 5 +L:;Ly profobdrd d you havP received Ifs :n urro,. p:oase Immedmtely notdy th- .,ndrq irdividial or onbfy by e rnail red oenuanently doacu the onginal n daft and attachn'rnts ham your cn nprter sys^um From: Russell, Janet[mailto:janet.russell@ncdenr.gov] Sent: Tuesday, November 10, 2009 10:47 AM To: Jason T. Rupert Cc: Towler CIV David W; Vincent J. Chirichella Subject: Hospital Clinic Addition Camp Lejeune Gentlemen: The Express Stormwater & Erosion Control Scope Meeting has been scheduled with Mary Jean Naugle and Rhonda Hall on Wednesday, November 18 at 10:00 AM here in the Wilmington Regional Office. Please review the attachment, "Stormwater @ Camp Lejeune'. Also, please review the checklist for a complete application on the stormwater bmp website prior to the meeting. Please respond to this email to confirm and reserve the scope meeting date / time. Thanks, Janet Janet M. Russell Express Coordinator 910 796-7421 NOTE: change in email address: janet.russell@ncdenr.gov Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. �(po32R or 0 kk'!>' For DENRSco�0 � Use LY • pp Reviewer: �� i..�"' North Carolina Department of Environment and submit, 1 t — °24 Natural Resources 10: !!!�' NCDENR Request for Express Permit Review Time Confirm: I l_ 12-_0 9 FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (POF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. 1—1 or tg Enter Related SW Permits of request • Asheville Region -Alison Davidson 828.296-4698;alison.davidson() ancmail.net • Fayetteville or Raleigh Region -David Lee 919.791.4103; david.lee(rDncmail.net • Mooresville & -Patrick Grogan 704-663.3772 or patrick.grogan(a)ncmail.net • Washington Region -Lyn Hardison 252-946-9215 or lvn.hardison(ancmail.net Sw SW ` -Q L � • Wilmington Region -Janet Russell 910-350-2004 or janet.russell(ii ncmail.net SW NOTE: Project application received after 12 noon will be stamped in the following work day. Sw 10 iz: Project Name: CAMP LEJEUNE HOSPITAL CLINIC ADDITION County: ONSLOW nn Applicant: CARL BAKER, PE. DIRECTOR -DESIGN BRANCH Company: U.S. GOVERNMENT -�-� og ^ r >� 1 �,� rn, C f'"r3Id• `� Address: 1005 MICHEAL ROAD City: CAMP LEJEUNE, State: NC Zip: 28542-2521 Phone: 910-451-2213, Fax: 910-451-2927, Email: carl.h.baker@usmc.mil Physical Location:100 BREWSTER BLVD. CAMP LEJEUNE, NC 28547-0100 Project Drains into NEW RIVER waters —Water classification SC: HQWASW (for classification see-http://h2o.enr.state.nc.ustbims/reports/reportsWB.html) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within Y2 mile and draining to class SA waters N or within 1 mile and draining to class HOW waters? N Engineer/Consultant: VINCENT CHIRICHELLA. PE Company: CLARK NEXSEN Address: 4000 WEST CHASE BLVD, SUITE 200. City: RALEIGH, Stale: NC Zip: 27607-6864 R E C E I V EPhone: 919-828-1876, Fax: 919-828-1877, Email: vchirichella@clarknexsen.com SECTION ONE: REQUESTING A SCOPING MEETING ONLY NOV 0 9 2009 ® Scoping Meeting ONLY ® DWO, ❑ DCM, ® DLR. ❑ OTHER: DWQ SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERM47TING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear it or _acres) ❑ Riparian Buffer Authorization El Minor Variance ❑ Major General Variance ❑ State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & St Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Sio-Retention _ # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems /❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit#) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with _ acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scopina and express meeting reauest Wetlands on Site ® Yes ❑ No Buffer Impacts: ® No ❑ YES: _acre(s) Wetlands Delineation has been completed: ® Yes ❑ No Isolated wetland on Property ® Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ® No 404 Application in Process w/ US ACOE: ❑ Yes ® No Permit Received from US ACOE ❑ Yes ® No xxxxxxx++s++ssx+ssss+xxax++Casa+xa+ax++xxaa+++++aa++i+a+EOf DENR use Oulyssaaxaaxa+aax+♦sasaaaaaaa++a+aaaaaai++++++++++++++++++++++xx Fee Split for multiple permits:(Check# 1 Total Fee Amount SUBMITTAL DATES I Fee SUBMITTAL DATES Fee LAMA $ Variance ([IMaj; [I Min) $ SW (❑ HD, ElLD, [I Gen) $ 401: I $ LQS I I $ Stream Deter,_ $ <�!b?I cd tv P_CW111Jf',r- of . II- I1-0� NCDENR EXPRESS March 2009 Stormwater 1. General Information a. Name of Project- Camp Lejeune Hospital Clinic Addition b. Street Address, City, County- 100 Brewster Blvd., Camp Lejeune, Onslow c. Acres in Tract- 81 acres d. Acres Being Disturbed- 27 acres e. Acres in Wetlands- 3.06 acres 1. Wetlands Must Be Delineated- Wetlands are delineated 2. Proposed Wetland Impacts Require Permits From Corps & DWQ- N/A f. Ownership Information From NC Secretary of State Web Site- Camp Lejeune, NC g. Description of Development Proposal The Camp Lejeune Hospital Clinic Addition will include an addition of 59,000 square foot to the western end of the existing building, 314,000 square feet of additional parking, roads and sidewalks. Stromwater on the site will be treated by two (2) wet detention basins, two (2) constructed wetlands, and one (1) infiltration basin. Stormwater will be conveyed to the various bmps by means of 9rlssed swales and stormwater pipe networks 1. Previous or Existing Permits. SW8 960329- Camp Lejeune Naval Hospital Parking Lot Addition SW8 081115- Wounded Warrior Greenway Facilities 2. Tax parcel ID Number- N/A h. Pre-1988 Built Upon Area- The site has approx. 20 acres of pre-1988 BUA. Discuss Phasing of the Project & Stormwater Facilities When Applicable. N/A Discuss Proposed Waste Water Treatment & Water Supply- Water and Waste Water Treatment service will be extended from the existing building to the building addition. Additional Fire hydrants will be provided as necessary. Sanitary sewer for the addition will be connected to an existing 8" sewer main on the north side of the building. The water line will be looped around the addition tying into an existing waterline. Site Location Map 0 340 680 1,360 2,040 2,720 Feet � � �'�\i t � ��l �" n ♦ 1\ �� ,�. u 4�� � A �� .. � �, � � � Ili � � oii� � �� f'�. � - � .. � � I �I 0�.. � � y� ,pry - .. -� \ S. �," ���. � AI� � � �l �e��� ''ter I � u�u„ �� � � �'q: II' r /� :� �$Q}�W('' :., s(ll "� �lY. 1y. 1 I � �"'� w �. �T4 � ♦ �4 �� _ :'�-� _— k d _:n.. �f � I � - � __ ! l - S h�iY e-�:t��' � � s'I /�� _�,��,: .. @�� � r -- ��'V � 'I. a i k. Identify Historic Sites & Projects Being Funded With Public Monies- N/A I. Disclose Any/All Non -Compliance Issues with DEN Agencies- N/A 2. Stormwater Information a. I. Provide River Basin- White Oak II. Stream Classification- SC; HQW, NSW III. Index Number- 19-16-(4.5) b. Identify Whether the Stormwater Design is High Density or Low Density, Commercial or Residential, State Stormwater or Coastal Stormwater, Address Vested Rights When Applicable; Identify Pockets of High Density. High Density, Commercial, Coastal Stormwater. c. Proposed Total % Impervious Surface. 65% Total Impervious d. Number of Proposed Treatment Measures, Type(s) of Collection System 5 BMPs: Two (2) Wet Detention Basins, Two (2) Constructed Wetlands, One (1) Infiltration Basin. e. Will All Built Upon Area Be Collected- No. A portion of the site that has existing BUA will be demolished and replaced with a less amount of proposed BUA. f. Identify Whether or Not the Project Has Buffer Requirements & Whether C or Not Development Is Proposed Within A Buffer. N/A 5o I Ceetiw f e4 g. Discuss Coastal Management Areas of Environmental Concern When Applicable. N/A h. Disclose Whether or Not Off -Site Runoff Is Coming Onto The Site or Into The Proposed BMP. N/A i. Discuss Whether Road Construction Across Other Property Is Necessary To Access This Project. None Necessary. N/A j. If An On -Site Evaluation Of The Soils Has Been Done, Discuss Infiltration Rates, Seasonal High Water Table, etc., and Include Date Of Site Evaluation (This Is Required For Infiltration Projects). See attached Geotechnical Report. \ • r F. kA-T K lk-�o r to „S; C\ k. Is The Department of Transportation Requiring The Construction Of A Turn Lane Or Road Widening Associated With'fhe Pr-'o.ect. NME I V E D 1 ° NOV 0 9 2009 DWO PROJ # azUgygyryxqx"w - I,": -oncr OA Mew n1 poi - en a �vr':�-s-^ernrm—lTM 1CAit®LIP9A� ECS CAROLINAS, LLP "Setting the Standard for Service" Geotechnical • Construction Materials • Environmental * Facilities August 4, 2009 Ms. Tracy Bond, AIA Smith Group/Clark Nexsen Joint Venture 1850 K Street NW, Suite 250 Washington, DC 20006 Reference: Report of Infiltration Evaluation Naval Hospital Renovation Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.14997B Dear Ms. Bond: ECS Carolinas, LLP (ECS) recently conducted an infiltration evaluation for the proposed stormwater best management practice (BMP) areas at the Naval Hospital Renovation on Camp Lejeune, Onslow, County, North Carolina. This letter, with attachments, is the report of our evaluations. Field Testing On July 29 through 31, 2009, ECS conducted an exploration of the subsurface soil and groundwater conditions at eleven requested locations shown on the attached Test Location Plan (Figure 1). The test areas were located in the field utilizing GPS equipment and a test location plan provided by Clark Nexsen. The purpose of this exploration was to obtain subsurface information of the in -place soils for the proposed stormwater BMP areas. ECS explored the subsurface soil conditions by advancing one hand auger boring into the existing ground surface at the requested boring locations. ECS visually classified the subsurface soils and obtained representative samples of each soil type encountered. ECS also recorded the seasonal high water table (SHWT) observed at the time of each hand auger boring. The attached Infiltration Evaluation Form provides a summary of the subsurface conditions encountered at the hand auger boring location. The SHWT was estimated at the boring locations below the existing grade elevation. A summary of the findings are as follows: Location SHVVT 1 36 inches 2 28 inches 3 Winches 4 24 inches 5 18 inches 6 32 inches 7 24 inches 8 24 inches 9 48 inches 10 55 inches 11 Winches 7211 Ogden Business Park, Suite 201, Wilmington, NC 28411 • 1 910-686-9114 • F: 910-686-9666 www.ecslimited.com ECS Carolinas, LLP • ECS Florida, LLC • ECS Illinois, LLC • ECS Mid -Atlantic, LLC - ECS Southeast, LLC ' ECS Texas, LLP Report of Infiltration Evaluation Naval Hospital Renovation Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.149978 August 4, 2009 ECS has conducted eleven infiltration tests utilizing a compact constant head permeameter near the hand auger borings to estimate the infiltration rate for the subsurface soils. Infiltration tests are typically conducted at two feet above the SHWT. If the SHWT is less than three feet, the tests are conducted at ten inches below the surface elevation. Field Test Results Below is a summary of the infiltration test results: Location Description Depth Inches/ hour 1 Tan fine SAND w/silt 12 inches 1.4 2 Gray fine SAND w/silt 10 inches 1.2 3 Gray fine SAND fill 12 inches 4.0 4 Grey/tan fine SAND w/silt 10 inches 2.2 5 Gray/tan silty SAND 10 inches 0.40 6 Gray fine silty SAND 10 inches 0.76 7 Gray fine SAND 10 inches 3.7 8 Tan fine SAND 10 inches 4.4 9 Gray/tan fine SAND w/clay lens fill 24 inches 1.1 10 Tan fine SAND 31 inches 10.9 11 Gray sandy SILT fill 12 inches 0.09 Infiltration rates and SHWT may vary within the proposed site due to changes in elevation and subsurface conditions. Closure The activities and evaluative approaches used in this assessment are consistent with those normally employed in assessments of this type. ECS's evaluation of site conditions has been based on our understanding of the project information and the data obtained during our field activities. ECS appreciates the opportunity to provide our services to you on this project. If you have any questions concerning this report or this project, please contact us at (910) 686- 9114. Respectfully, ECS CAROLINAS, LLP / K. Brooks Wall Project Manager Attachments: Figure 1 -Test Location Plan, Infiltration Evaluation CC: Mr. Steve Thomas, P.E.-Clark Nexsen -air, P. G. Geologist 10 0 TEST LOCATIONS Naval Hospital Renovations Camp Lejeune, Onslow Co., NC ECS Project No. 22-14997B August 3, 2009 KBW 11 a Figure 1— Test Location Plan Provided by: Clark Nexsen C AMOLAMlAS A Infiltration Evaluation Naval Hospital Renovations Camp Lejeune,.Onslow County, North Carolina ECS Project No. 22.14997B August 4, 2009 Location Depth 1 0-16" 16"-36" Soil Description Gray/tan fine SAND w/silt Tan/brown sandy CLAY Seasonal High Water Table was estimated to be at 36 inches below the existing grade elevation. Infiltration Rate: 1.4 inches per hour Test was conducted at 12 inches below existing grade elevation Location Depth 2 0-24" 24"-50" Soil Description Gray fine SAND w/silt Tan fine SAND w/silt Seasonal High Water Table was estimated to be at 28 inches below the existing grade elevation. Infiltration Rate: 1.2 inches per hour Test was conducted at 10 inches below existing grade elevation Location Depth 3 0-36" 36"-30" Soil Description Grey fine SAND (fill) Tan/orange clayey SAND Seasonal High Water Table was estimated to be at 36 inches below the existing grade elevation. Infiltration Rate: 4.0 inches per hour Test was conducted at 12 inches below existing grade elevation Infiltration Evaluation Naval Hospital Renovations Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.14997B August 4, 2009 Location Depth 4 0-18" 18"-50" Soil Description Gray/tan fine SAND w/silt Tan/orange sandy CLAY Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Infiltration Rate: 2.2 inches per hour Test was conducted at 10 inches below existing grade elevation Location Depth Soil Description 5 0-18" Gray/tan silty SAND 18"-30" Gray/orange sandy CLAY w/silt Seasonal High Water Table was estimated to be at 18 inches below the existing grade elevation. Infiltration Rate: 0.40 inches per hour Test was conducted at 10 inches below existing grade elevation Location Depth Soil Description 6 0-18" Gray fine silty SAND (fill) 18"-28" Orangish/yellow clayey SAND (fill) 28"-60" Tan/orange sandy CLAY Seasonal High Water Table was estimated to be at 32 inches below the existing grade elevation. Infiltration Rate: 0.76 inches per hour Test was conducted at 10 inches below existing grade elevation Infiltration Evaluation Naval Hospital Renovations Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.14997B August 4, 2009 Location Depth 7 0-14" 14"-24" 24"-36" Soil Description Gray fine SAND Tan fine SAND w/silt Tan/orange clayey SAND Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Infiltration Rate: 3.7 inches per hour Test was conducted at 10 inches below existing grade elevation Location Depth 8 0-12" 12"-24" 24"-36" Soil Description Tan fine SAND Gray/tan fine silty SAND . Tan/orange clayey SAND Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Infiltration Rate: 4.4 inches per hour Test was conducted at 10 inches below existing grade elevation Location Depth Soil Description 9 0-24" Gray/tan fine SAND w/clay lens (fill) 24"-48" Tan fine SAND Seasonal High Water Table was estimated to be at 48 inches below the existing grade elevation. Infiltration Rate: 1.1 inches per hour Test was conducted at 24 inches below existing grade elevation Infiltration Evaluation Naval Hospital Renovations Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.14997E August 4, 2009 Location Depth 10 0-6" 6"-40" 40"-60" Soil Description Gray silty SAND Tan fine SAND Orange clayey SAND Seasonal High Water Table was estimated to be at 55 inches below the existing grade elevation. Infiltration Rate: 10.9 inches per hour Test was conducted at 31 inches below existing grade elevation Location Depth Soil Description 11 0-24" Gray sandy SILT (fill) 24"-40" Gray fine SAND w/clay lens (fill) 40"-60" Tan/orange sandy CLAY Seasonal High Water Table was estimated to be at 36 inches below the existing grade elevation. Infiltration Rate: 0.09 inches per hour Test was conducted at 12 inches below existing grade elevation ♦• UNR mATP9 ♦ UNITLO mATn GNP LLIEUNL WAONANOLL Mrt�4N.YN.�M1O. W I O[PAmYLNT M T121N1[PION bm Pamuno] /�.t 1 OLOINMJL sums wn:o 1S l j I t `•� ACLAONLjti .; �. :' 1. ham♦ >r t J( `. I 7 � •I� I� I v.fit f -/ / � � �` � I 1,� yn-• �.-: : 1 1iy✓ A _/ , fn I� f I o r f.. AiTA RY N 1pN _ I V ✓a / J Y'll.l'CY• _b__ —.. b 1 "Y ... �. .- � tl • rr.�1�'i• Irtt•.lO J N�„.MNYf On11GM. Mm _ YYL W® e•w y/ YIBIYC. 19n1YA iI Ibw�' WYWL 4..n 11lmi.n~�WiYV IW WIbII wl�iJbN� "'�`l iw� ' , r•'M`,b, YWIit M��Y_.._ RN�•I�IYI6brw.ti lW )bFY wMb.. OMMeYn OF41 �1P4bILL. "e�m" wry... �e•...+ 'sE"CttIL'C's'• -- ..,. �.�.•.. .�.:. '--•-�'a• ubv urnacnc Site Location Map P-1 857 & P-1 857B Hospital Addition/Renovation Legend Ojurisdictional —wetland —area 10 NHfUSAi BASKETRrHII30 CO 41 N, M17 14 X is BAS COU L COURT 631L 50DO 600V -) I 1/0 sm 5A C;7 Z 9 0 r--835-1 0 340 680 1,360 2,040 2,720 Feet PI, Web Soil Survey Pagel of 2 Contact lls ouwmne05onn nalo A•<' 1,—r Soil eurveYs SOI1 S.—,"o... GlOuelY PreRrnn[[,s lnnoul Nr.p A A Area of Drtared (AO31 Soil Mao Soil Data Cacho,., Slmdro Cart fFhwl View Soil Information By III Dean" rdow iel m i to a Class soli View Options Map r Table r Desa ipbon of r Rating Rating Options r .r. 11, IV M if r e may' Tables — Hydrologic Soil Group — Summary By Map Unit Summary by Map Unit — Onalow County, North Carolina r Detailed Description Map unit symbol Map unit name Rating Ivancad Options © we Boymeade not Sand, 0 to 6 A Aggregation DCIHnwe CaMiBm percent slopes Method "a Baymeade-Urban land A Component Mopes m 0 to 6 pelnt stapes percent Cutoff MSC Marvin loamy not no, 6 a Tla-brak Rule p lower to 15 percent slopes f Higher MI Muckalee barn D View Deweiytla Vlw Rmft Touts for Ara of Samoan Name O Acres In ADZ Pereant of Act 22.6 224% 42.1 46.9% 25 A 15.3% 5.4 5.4% 100.5 100.0% uacnpuon — nyoromglc eon croup Hydrologic soil groups am based on estimates of runoff potential. Soils are assigned to one of four groups scoarding to the rate of water Infiltraton when the soils are not protected by vegetation, are thoroughly Wet, and receive precipitation from long-0uration storms. The ails in the United States are assigned to four groups (A, B, C, and O) and three duel classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high o filhation rate (taw runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessNely drained ands or gravelly sands. These soils have a high rate of wMM transmission. Group B. Soils having a moderate Infiltration rate when thoroughly we. These consist chiefly of moderately deep or deep, moderately well drained or well canned soils that have moderately Me texture to moderatehr cozrue texture. Thew soils have a moderate ate of water transmission. Group C, Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of wits having a layer that impedes the downward movement of water or soils of modaratelly one texture or fine texture. These .if, have a slow rate of "star transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These Consist chiefly of clays that have a high shrink -swell potential, its that have a high water bible, soils http://websoilsurvey.nres.usda.gov/app/WebSoilSurvey.aspx 6/11/2009 Aerial Image , u 4 r' , r'---- ( `; 11 �i--^.� ` /`♦ --� � I , ,J , � p l till Nl N IN IN ,III I �, I`_ , \ �- ,� / / /��� __ , , ♦ � I I , 111 ` I � ;..' \_; I ;;;.. I r ;_:;;, ;u;= -,--� �` I I • (r/;; -%'rl it `` t�` % " //� ��/ / f `____� `_'8_- •___lam I 1 1001 , Legend t`ti ,` Project Boundary ; ��` N ` I i 101, - — WETLAND LINE \ ��a ter I_':;I CAMP LEJEUNE HOSPITAL WETLAND DELINEATION JACKSONVILLE, NC CAMP LEJEUNE HOSPITAL 0 100200 400 600 800 — WETLAND DELINEATION Feet JACKSONVILLE, NC I INCH = 400 FEET CAMP LEJEUNE HOSPITAL 0 100200 400 600 800 — WETLAND DELINEATION Feet JACKSONVILLE, NC I INCH = 400 FEET Streams and Water Bodies I R "'f' f •..'J A C K S O L � 4 Troai ti 'o d / �.,froltT'aB��� f tit 1 4 �V. i l r � r _ 4 9 NX j��•ti. ,,I. � JyF III 1.17 CAMP LEJEUNE HOSPITAL - WETLAND DELINEATION JACKSONVILLE, NC NOTES � i _. SEE PROJECT P1331 RENOVATAND MRI ADDITION FOR WORK IN T'IS AREA0. ...r cuNlc ADDITION 6- I //PROPOSED a\ II 1—ATER —WETLAND I � WETLAND � / 4 ij 1 / lli i ^J \ m � IJ 0 1 O .1 .1 _j uTo �9W_rn / n I 7TFITf�TIT��T � � I NOT FOR CONSTPUC^ON- SU BM IT 1 ,4'_ . TvO:_ [ a c SMITHGROUP / .., CLARK•NEXSEN, AJOINUENTURE a. wva�am�r SN 1 aF P PARKING INFORMATION NssF:N / EMPLOYEE / EXISTING 616 CAR I( 12 MOTORCYCLE ADDITIONAL 150 CAR. TOTAL 767 CAR 12 MOTORCYCLE ,r 10 os/snos VISITOR_vI�T"— EXISTING 476 CAR og'� I� ADDITIONAL 139 CAR mwa« - TOTAL 615 CAR E z o= uLLI Z a w o 0 Z w z 00 ^ J ~ - z aQ l� N ° w w C iJ 2Q wU w� LL w Q �Q dZ F GRAPHIC SCALE s Z ns Eo v-1857952 N<0095-09-C-3212 C 1100 MATCHLINE SHEET 2 ------------------- ----- -- — - - — - - — - - — - - — / �6 � >4 1 Ct � / WETLANDS AREA 1 7 125,422 SO FT i 0 C2 2.879 ACRES C3 WETLANDS '� .e UPLANDS •/^0 '� \9 � 0 WETLANDS CONTINUE PAST THE LIMITS OF l23 --A� ,yq� THIS PROJECT �. C4A WF7 ` �WF10 j16 WF8 GO / 2 Al\G A Al u t `43 __A,- L42 �b A2 � � (p A7 A6 yT ��qs �. �q7 A !A, A3 Cl4 \ WF2 Y/ WF9 A9. Aa \Y/ Cl 3 y �S A4 A UPLANDS LEGEND SURVEY CONTROL POINT WETLAND FLAG WETLAND LINE (� JURISDICTIONAL STREAM PROJECT LIMITS GRAPHIC SCALE 60 0 30 so 120 ( IN FEET ) I inch = 60 ft. BEGINNING OF CSd' JURISDICTIONAL C6 $ STREAM C 77 Ue \, CA G Ct�p C9 !� C11 �w a C10 L32 D2 D1 �E2 � A va . El lW4 E7�CAR E5 E3 . 2�O�ESS joy �y . WETLANDS AREA 2 SEAL y: 2,205 SO FT :a L-4163 r: 0.051 ACRE �sFA.9',ip.st{ L50 E5 E4 3 `19 �)O N a Z Q LU z O Z tL Q �' z 7 = J Z o -j0. z > < Q g z0 w w Project No. G9005 d� owe opvaYaL MQa=ea �a�sFE- o$Xox�9 �9w -Mlfi WETLAND FLAG TABLE ' FLAG NORTHING EASTING Al 358027.1291 2492306.3506 A2 358023.1362 2492265.8300 A3 358000.0215 2492245.7883 A4 357952.7019 2492235.3536 A5 358007.1970 2492200.0532 A6 358011.2792 2492167.5887 A7 358000.7096 2492122.1294 A8 357976.0485 2492085.0731 A9 357989.3256 2492053.5493 B3 358154.9967 2492463.8523 B4 358157.5465 2492477.2591 B5 358166.7816 2492486.4376 86 358207.8627 2492508.7772 B8 358193.4949 2492550.0099 89 358204.8549 2492553.7259 B10 358230.1428 2492514.2200 B11 358264.9437 2492475.5654 B12 358340.2844 2492494.7346 B13 358373.6734 2492515.0633 814 358404.8376 2492526.5951 B15 358455.9853 2492497.2178 B16 358496.0310 2492454.9652 B17 358525.9828 2492466.8596 B18 358565.2539 2492489.5228 B19 358611.9286 2492497.6616 Cl 358136.9250 2492441.1652 C2 358113.1491 2492362.3677 C3 358094.0936 2492352.2786 C4 358056.1979 2492344.4262 C5 357934.5654 2492435.0444 C6 357931.9859 2492437.1194 C7 357911.0343 2492462.3933 C8 357891.13461 2492485.5743 C9 357859.0190 2492499.9679 C10 357839.8325 2492511.3224 C71 357859.1709 2492439.6931 C12 357861.9521 2492439.5671 C13 357965.8423 2492340.2154 C14 358001.3898 2492326.2448 Dl 357807.0271 2492480.1786 D2 357806.4947 2492460.5302 WF2 357981.6531 2492386.7661 WF7 358061.4434 2492385.0633 WF8 358034.9809 2492414.8786 WF9 357998.3930 2492452.1861 WF10 358051.3535 2492408.6623 E1 357755.3418 2492497.1049 E2 357782.0121 2492532.7387 E3 357727.6874 2492504.6593 E4 357664.5548 2492512.1905 E5 357662.1131 2492492.8131 E6 357731.5619 2492491.4599 E7 357750.20741 2492465.0493 GENERAL NOTES 1. THIS SURVEY MAP IS INTENDED TO REPRESENT THE WETLANDS ON A PORTION OF THE NAVAL HOSPITAL AT CAMP LEJEUNE PROPERTY, AND IS NOT A BOUNDARY SURVEY. 2. WETLANDS SHOWN BASED ON DELINEATION BY STEWART ENGINEERING, INC. DATAED FEBRUARY 1, 2010. 3. HORIZONTAL DATUM IS NAD 83-2007. BASED ON GPS METHODS USING REAL-TIME KINEMATIC SOLUTIONS FOR THE NORTH CAROLINA GEODETIC SURVEY CONTROL POINTS SHOWN HEREON. COMBINED SCALE FACTOR IS 0.99991656 4. THIS DRAWING DOES NOT CONFORM TO N.C. GS47-30 AND THEREFORE IS NOT FOR RECORDATION. ARp 20 .LESS /O. ~y O . :Q SEAL 7. a L-,411663�r 10 NAVAL HOSPITAL SHOWN FOR INFORMATIONAL PURPOSES ONLY OVERALL VIEW 1" = 500, CERTIFICATION THIS CERTIFIES THAT THIS COPY OF THIS PLAT ACCURATELY DEPICTS THE BOUNDARY OF THE JURISDICTION OF SECTION 404 OF THE CLEAN WATER ACT WITHIN THE DESIGNATED INSET AREA, AS DETERMINED BY THE UNDERSIGNED ON THIS DATE. OTHER AREAS OF JURISDICTION MAY BE PRESENT ON THE SITE BUT HAVE NOT BEEN DELINEATED. UNLESS THERE IS CHANGE p .. z o o � > g 0 o o z IN THE LAW OR OUR PUBLISHED REGULATIONS, THIS '7 `° DETERMINATION OF SECTION 404 JURISDICTION MAY BE RELIED CD UPON FOR A PERIOD NOT TO EXCEED FIVE YEARS FROM THIS DATE. THIS DETERMINATION WAS MADE UTILIZING THE 1987 0 m CORPS OF ENGINEERS WETLAND DELINEATION MANUAL. m o d REGULATORY OFFICIAL a <n o` cLi TITLE DATE USACE ACTION ID .c n z Q W U ° ~ z L SURVEYOR'S CERTIFICATION � o_ � LL I, JOSEPH N. GRADY, JR., CERTIFY THAT THIS MAP WAS K 0 LU DRAWN UNDER MY SUPERVISION FROM AN ACTUAL SURVEY o d O MADE UNDER MY SUPERVISION; THAT THIS MAP WAS NOT p Q g Y PREPARED IN ACCORDANCE WITH'.°G. S. 47-30 AS AMENDED. z > Q U WITNESS MY ORIGINAL SIGNATURE; LICENSE NUMBER, AND g. Z U SEAL THIS IeDAY OF MARCH, AID., 2010. W LINE TABLE LINE LENGTH BEARING LINE- LENGTH BEARING Ll 47.38' S09'53'29"W L27 32.83' S50'20'31"E L2 45.34' S29'59'21"W L28-3 30.55' S49'21'20'E L3 32.23' S21'39'32"W L29 35.19' S24'08'28"E L4 58.21' S46'32'10"E L30 .; 22.29' S30'37'01"E L5 58.98' S29'52'17"E L31 . 45.23' S43'30'42'W L6 33.23' S20'18'22"W L32'i 19.66, S88'26'53"W L7 39.09' S31'20'06"W L33 : 56.65' N21'34'56"W L8 77.74' S74'16'30"W L34:.. 2.78' N0235'38"W L9 52.01' S48'00'11"E L35 : - 143.75' N43'43'15'W L10 46.91' S57'22'35"E L36 38.19' N21'27'19"W Lll 11.95' S18'O6'49"W L37 32.53' N37'42'03"W L12 43.66' N70'47'19"W L38 40.72' S84'22'20"W L13 46.76' S28'32'13'W L39 = 30.59' S40'55'37"W L14 13.02' S44'49'26"W L40 38.75' S15'37'16"W L15 13.65' S79'13'54'W L41. 56.80' N38'25'37"W L16 29.01' S51'27'38'W L42 32.72' N82'49'59"W L17 82.31' S73*12'35'W L43 46.67' S76'54'39"W L18 21.56' S27'53'58"W L44 44.51' S56'21'22'W L19 70.75' S52'50'13"E L45 34.21' N67'09'37"W L20 68.55' S39'24'50"E L46 - 54.39' S18'07'S9"E L21 52.25' N45'33'2B'W L47 44.51' N53'11'13"E L22 39.87' N48'24'34"W L48 .' 61.15' S27'20'01"W L23 40.97' S82'38'41"W L49 ". 63.58' SO6'48'10"E L24 85.73' S29'35'44"E L50 19.53' S82'49'05"W L25 67.44' S45'42'55'E L51 - 69.46' N01'06'59"W L26 3.3V S38'48'44'E L52 .. 32.33' N54'46'42"W L53 32.46' N80'54'00"E ProlecL No. G9005 Ev,o _g EP w,.. Bw oY 3 o d �o�YEaw Eo " obo S10'04'00'E 5724.71' GRID 5725.19' GROUND SEAL 7% �ayy. N. GRP r 617 / UPLANDS / B16 - - �/ 0.3 0 15 6� n WETLANDS / B14 / WETLANDS AREA 1 B13 125,422 SO FT ^ 2.879 ACRES v. �IB 12 ro WETLANDS CONTINUE ; UPLANDS i LEGEND SURVEY CONTROL POINT WETLAND FLAG WETLAND LINE q JURISDICTIONAL STREAM PROJECT LIMITS PAST THE LIMITS OF THIS PROJECT / B10 GRAPHIC SCALE Yo 60 0 90 60 120 JURISDICTIONAL STREAM 86 �I? E39 �� BB / " ( IN FEET ) L15� B5 1 ------- ----- B3 84 --------------1 inch =-0 IL ------ MATCHLINE SHEET 3 a Z 4 W U Z Z °-° a w Q U) Z O_ w > w J O zZ i < U Q g Z U L w 3 Project No. G9005 o�� r i z �oNm^Y%n LLv_a^!K �Iaoa�� Ea9-�-F a w d o Y a 3 ug3 Hi v�� p �-` 'o gggox-,e sa�YExs �zd AE u E3u'�