Loading...
HomeMy WebLinkAboutSW8130301_HISTORICAL FILE_20130327STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 13 03w DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS 0 HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 20 k3032-1 YYYYMMDD RES NR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P. E. Governor Director March 27. 2013 Commanding Officer MCB Camp Lejeune c/o Neal Paul, Deputy Public Works Officer Bldg. 1005 Michael Road Camp Lejeune, NC 28547 Subject: State Stormwater Management Permit No. SW8 130301 Wallace Creek Marine Mart High Density Commercial Wet Detention Pond Project Onslow County Dear Mr. Paul John E. Skvarla, III Secretary The Wilmington Regional Office received a complete, Express Stormwater Management Permit Application for Wallace Creek Marine Mart on March 25, 2013. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 130301 dated March 27, 2013, for the construction, operation and maintenance of the BMP's and built -upon areas associated with the subject project. This permit shall be effective from the date of issuance until March 27, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150E of the North Carolina General Statutes. Per NCGS 143-215(e), the petition must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis at (910) 796-7215. Sincerely, C arles Wakild, P.E., Director Division of Water Quality GDS/ arl: S:\WQS\Stormwater\Permits & Projects\2013\130301 LD\2013 03 permit 130301 cc: Timothy Focht, P.E., Stellar Architectural and Engineering Group David Towler, MCB Camp Lejeune Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-7215 \ FAX: 910-350-2004 \ DENR Assistance: 1-877-623-6748 NorthCarolina Internet: vevrv.nmaterquality.org a'atum iff An Equal Opportunity\ Affirmative Action Employer (/ V `( State Stormwater Management Systems Permit No. SW8 130301 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Commanding Officer, MCB Camp Lejeune Wallace Creek Marine Mart Comer of Birch Street and McHugh Boulevard, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of two (2) wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until March 27, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 of this permit. The stormwater controls labeled SWMF-1 and SWMF-2 have been designed to handle the runoff from 80,954 and 11,761 square feet of built -upon area, respectively. 3. A 50' wide vegetative buffer must be provided and maintained adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. 4. Each drainage area will be limited to the amount of built -upon area indicated in this permit, and per approved plans. There is no allocation of built -upon area for future development. 5. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 130301 6. The following design criteria have been provided in the wet detention ponds and must be maintained at design condition: SWMF-1 SWMF-2 tA a C. d. e. f. 9. i. l- k. I. m n. o. p- q. Drainage Area, ycres: Onsite, ft : Offsite, ft2: Total Imperviou? Surfaces, ft2: Onsite, ft : Offsite, ft2: Design Storm, inches: Average Pond Design Depth, feet: TSS removal efficiency: Permanent Pool Elevation, FMSI�: Permanent Pool Surface Area, ft Permitted Storage Volume, ft : Temporary Storage Elevation, FMSL: Pre-dev. 1 yr-24 hr. discharge rate, cfs: Controlling Orifice, 0 pipe, inches: Orifice flowrate, cfs: Permitted Forebay Volume, ft3: Max. Fountain Horsepower: Receiving Stream/River Basin: Stream Index Number: Classification of Water Body: II. SCHEDULE OF COMPLIANCE 2.32 0.61 101,130 26,378 0 0 80,954 11,761 80,954 11,761 0 0 1.5 1.5 3.5 3.0 90% 90% 20.0 19.3 10,279 3,536 16,583 2,073 21.3 19.8 0.087 0.023 1.5 0.75 0.038 0.006 5,062 1,725 N/A N/A (PPV <30000 cf) Beaverdam Creek / WOK02 19-20-2 "SB NSW" 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall, at all times, provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The signed and approved Operation and Maintenance Agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will not be allowed in either stormwater treatment system, because the permanent pool volume is below 30,000 cubic feet. 6. The facilities must be constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 130301 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. The permittee shall provide and maintain clear and unencumbered access to the stormwater facilities for inspection and maintenance. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. d. Any permitted future areas shown on the approved plans. e. Filling, altering, relocating, or piping any vegetative conveyance shown on the approved plan. 11. The Director may notify the Permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the Permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The Permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12. The permit application, the approved plans and specifications, and the design calculations for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 30 days prior to a change of ownership, or a name change of the permittee or of the project, or a mailing address change, the permittee must submit a completed and signed Name/Ownership Change Form to the Division of Water Quality, accompanied by the supporting documentation as listed on the form. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 3. Any individual or entity found to be in noncompliance with the provisions of this storrmwater management permit or the requirements of the Stormwater rules is subject to enforcement procedures as set forth in G.S. 143 Article 21. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 130301 6. The permittee grants DENR Staff permission to enter the property during normal ` business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit remains in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 27th day of March 2013. NQJ2TH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION ivision of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems l_ Permit No. SW8 130301 Wallace Creek Marine Mart Stormwater Permit No. SW8 130301 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 130301 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDENR-DWQ Regional Office Page 7 of 7 Permit Number: � (to be p/ ovided by DWQ) Drainage Area Number: ,. Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection willbe corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): . ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shallbe performed as follows. Any problems that are found shall be repaired immediately. . BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash debris is present. Remove the trash/ debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. - approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 MAft 0 6 2013 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Frosion is occurring in the Regrade the swale"if necessary to Swale, smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. - Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather titanspraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. I and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them - invasive plants cover 50% of with pesticide (do not spray). the basin surface. G .0V;Ta Form SW401-Wet Detention Basin O&M-Rev.4 MAR 0 6 2013 �� Page 2 of 4 BY: ] Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: 'The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow,on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 5 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM ill in the blanks) Permanent Pool Elevation 20.0 Sediment Removal%L5.0 Pe anen Pool ---------------- Volume Sediment Removal Elevation 15.0 Volume Dottom Eleva4.0 -(t Min. -----`- --------- ------- ------------------ ------ Sediment Bottom Elevation I4.0 I-ft in. Storage Sediment Storage " FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 j ' Page 3 of 4 h9A�t 0 6 2013 BY: Permit Number: (to be provided by DWQ) I acknowledge'and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Wallace Creek Marine Mart BMP drainage area Print Title: Deputy Public Works Officer Address:1005 Michael Road Camp Lejeune NC 28547 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. ow (D�6 ow1 , a Notary Public for the State of �Y,C7-K�(� 1kCounty l 1V 1 of 6t , do hereby certify that Wpersonally appeared before me this 2�z_ day of -1 C1 r/ , �41 � and acknowledge the due execution of the forgoing wet detention basin maintenance seal,' KELLEY VAN OECOEVERINQ NOTARY PUISL10 ONSLOW COUNTY STATE OF NOPTH CAROLINA SEAL My commission expires Witness my hand and official Form SW401-Wet Detention Basin O&M-Rev.4 Y �c?pR 0 6 29B Page 4 of 4 Permit Number: ! A) (to be provided by DWQ) Drainage Area Number: 2. Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed., remove the gully, and then plant a ground cover and water until it is established. Provide time and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 tr 7EC 0 @6+ EL_ MAR 0 6 2013 I Page 1 of 4 BY: Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclogthe pipe. Dispose of the Swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the Swale if necessary to Swale. smooth it over and provide erosion control devices such as reinforced turf malting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or . the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. _Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. _ Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area.. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive punts cover 50% of with pesticide (do not spray). the basin surface. V E Form SW401-Wet Detention Basin O&M -Rev. 4 "� h�A� Q 6 2013 Page 2 of 4 N Permit Number: Drainage Area h (to be provided by DWQ) BMP element: Potentialproblem: How I will renrediate theproblem: The embankment , , Shrubs have started to grow Remove shrubs immediately. -on the embankment. " Evidence of muskrat or Use traps to remove muskrats and beaver activity is present, consult a professional to remove beavers: A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. . appropriate professional shows that the embankment needs re air. if a licable The outlet device Clogging has occurred.. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 5 'feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blankv)' V Permanent Pool Elevation 19.3 Sediment Removal . 14.3 Pe manen Pool . -- --- Volume Sediment Removal Elevation 14.3 Volume Bottom Elevatim 13.3 -ft Min. ----------------------------- ------------ ------ Sediment Bottom Elevation 13.3 141 n. Storage Sediment Storage FOREBAY MAIN POND E G E 9 MAR 0 6.20B Form SW401-Wet Detention Basin O&M-Rev.4 I rj Page 3 of 4 Permit Number: (to be provided by DWQ). I acknowledge and agree by my signature below that I am responsible for.the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project narne:Wallace Creek Marine Mart BMP drainage area Print name 'ritle:Deputy Public Works Officer Address:1005 Michael Road Camp Leieune, NC, 28547 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. , I, n County of day of a forgoing wet detention Lin seal, NOTARY PUBLIC ONSLOW COUNTY STATE OF NORTH CAROLINA SEAL My commission expires N� a Notary Public for the State of W , do hereby certify that personally appeared before me this, 22 and acknowledge the due execution of the ve reauirdments. WitnessxAv-hand and of Form SW401-Wet Detention Basin O&M-Rev.4 i, MAR 0 6 205 BY: Page 4 of 4 r DWQ USE ONLY D to Received Pee Paid Permit Number DD � D 03D Applicable Rules: ❑ Coastal SW - 1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Wallace Creek Marine Mart 2. Location of Project (street address): McHugh Boulevard City:Camp Lejeune County:Onslow Zip:28547 3. Directions to project (from nearest major intersection): The site is located in the southeast quadrant of the McHugh Blvd./Birch St. intersection 4. Latitude:34* 40' 33.80" N Longitude:77° 21' 9.45" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New []Modification ❑ Renewal w/ Modificationt tRencu,als eaitk modifications also requires SWU-102 - Renezual Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: 4.84 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.lf any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? ®No ❑Yes Ifyes, see S.L. 2012-200, PartVl: littp:Lpoi-tal.ncdeiir.org/web/wq/ws/su/statesw/rL]Ies laws LEIVE t MAR 0 6 2013 Form SWU-101 Version 06Aug2012 Page I of 6 . .. III. , CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, ` designated government official, individual, etc. who owns the project): Applicant/ Organization:Neal Paul Signing Official & Title:Deputy Public Works Officer b.Contact information for person listed in item 1a above: Street Address:1005 Michael Road City:Camp Lejeune State:NC Zip:28547 Mailing Address (if applicable): City: Phone: (910 ) 450 - 5803 EmaiLneal.paulOO usmc.mil State: Fax: (910 ) 451 - 2927 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/1 Signing Official & b.Contact information for person listed in item 2a above: Street Address: City: Mailing Address City: Phone: ( ) State: Zip: Fax: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b.Contact information for person listed in item 3a above: Mailing Address: Phone: Email: 4. Local jurisdiction for building permits: Point of State: Zip: Fax: ( ) Phone #: FormSWU-101 Version06Aug2012 Page 2of6 eV' MAR 0 6 2013 IV. , PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff will drain to an onsite wet detention facility where it will be treated and attenuated prior 11 to being discharged offsite. There are two (2) wet detention facilities proposed onsite designed to meet the NCDENR Stormwater BMP Manual 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Storm water runoff from this project drains to the White Oak River basin. 4. Total Property Area: 4.46 acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:4.46 acres Total project area shall be calculated to exclude the follotoillR the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Nornml High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landeoard from the NHW (or MHM line. The resultant project area is used to calculate overall percent built upon area (BUA). Non-constal7oetlands landward of the NHW (orMHW) line nnay be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 72.7 % 9. How many drainage areas:does the project have?2 (For high density, count 1 for each proposed engineered stonnwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Draina e Area 1 Drainage Area 2 Drainage Area _ Area _ Receiving Stream Name Beaver46aua Beaverean -Drainage Stream Class * SB; NSW SB; NSW Stream Index Number * 19-20-2 19-20-2 Total Drainage Area (so 101,130 26,378 On -site Drainage Area (so 101,130 26,378 Off -site Drainage Area (so 0 0 Pro osed Impervious Area** (so 80,954 11,761 Impervious Area** total 80.1 44.6 Impervious** Surface Area Drainage Area 1 Drainage Area 2 Drainage Area Drainage Area On -site Buildings/Lots (so 13,803 On -site Streets (so 11,761 On -site Parking (so 60,421 On -site Sidewalks (so 6,730 Other on -site (so Future (so Off -site (so Existing BUA*** (so Total (so: 80,954 11,761 * Streau Class and Index Number can be determined at: http://nortal.ncdenr.or eoeb/zoq(d)s/csu/classi 'cations Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. q_ a „� Report only that amount of existing BUA that will remain after developnnent. Do not report ai'7 i- e �ti7i j 1 Alqqthnt Imo. " 1 is to be removed and which will be replaced by need BUA. 88� Form S WU-101 Version 06Aug2012 Page 3 of 6 MAR 0 6 2013 ev. 11. Flow was the off -site impervious area listed above determined? Provide documentation. Projects in Union County: Contact Dli'Q Central Office staffto check ifthe project is located u4illin a Threatened & Endangered Species watershed that mcr), be subject to snore stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from littp://portal.iicdeiir.org/web/wq/­ws/su/bnip-inaiiva . VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wg/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://portalmcdennorg/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.nccienr.org/web/wq/ws/su/statesw/forms does. I Is 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants -- Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envlielp.org/pages/onestopexpress.litnnl for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/nnanagennentfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NFIW line of tidal waters, and any coastal wetlands landward of the MHW or NI-PN lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NI-IW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. in. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. (� E E W "- r' g o. Drainage areas delineated (included in the main set of plans, not as a separate document). �4 p. Vegetated buffers (where required). 0 6 2013 f MAR j Form SWU-101 Version 06Aug2012 Page 4 of a 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verifij the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: Page No: 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretary.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate (teed restrictions and protective covenants forms can be downloaded from httu://portal.ncdennorv/web/wq/ws/so/statesw/forms_docs. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer.Timothy Focht, P.E. Consulting Firm: Stellar Mailing Address:2900 Hartley Road City:lacksonville Phone (904 1 899-9866 Emailftfocht@stellar.net State:FL Zip:32257 Fax: (904 ) 438-3241 IX. PROPERTY OWNER AUTHORIZATION (if Con tact lnformmtion, item 2 has been filled out, complete this section) I, (print or hype name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item la) . with (print or type name of organization listed in Contact Information, item In) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. �1EGEDVE MAR 0 6 2013 EY: Form SWU-101 Version 06Aug2012 Page 5 of As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or:def5ults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that.the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of County of do hereby certify that personally appeared before me this _ day of and acknowledge the due execution of the application for a stormwater permit Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item la) Neal Prod certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwa or r les under 15A IJCAC 2I-I .1000 and any other applicable state stormwater requirements. Date: 3 UPI00 the State of County of V" do hereby certify that ,{\/y`-� lt'LAV� personally before me this % ay of )� and a kn 1 e the on o t a stormwater permit. Witness my hand and official seal 61EY VANDECOEVERI NOTARY PUBLIC ONSLOW COUNTY STATE OF NORTH CAROLINA Form SW-U-101 . Version 06Aug2012 commission expires J Y V l f GER ly/ E MAR 0 6 2013 Page 6 of 6 Permit No. -�LT��Lt-�� (to be provided by DWQ) a ` 1 wnrFho O/ Y NCDEPIR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. L,PROJECT INFORMATION Project name Wallace Creek Manne Mad Contact person Tim Focht Phone number (904) 899-9866 Date 3/21/2013 Drainage area number 1 II. DESIGN INFORMATION Site Characteristics Drainage area Impervious area, post -development impervious Design rainfall depth Storage Volume: Non-SAWaters Minimum volume required Volume provided Storaga Volume: SAWaters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the prelpost control of the 1yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr stone Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 10ft vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the lop of the additional volume Form S W401-Wet Detention Basin-Rev.9-4118112 101,130 ft' 80,954 ft' 80.05 1.5 in 10,123 its 16,583 ft' OK, volume provided is equal to or in excess of volume required. fit' 0 k' fill ft, Y (Y or N) 3.6 in 0.15 (unilless) 0.80 (unilless) 3.93 inlhr OK 0.00 ft'Isec 0.06 ft'lsec 0.06 ft'Isec 21.30 fmsl 20,00 fmsl 20.00 fmsl 20.50 fmsl 19.50 fmsl 15,00 fmsl 14.00 first 1.00 ft (Y or N) fmsl EGEoVE A!. ? 5 4u73 � MA!. li BY: Parts 1.811. Design Summary, Page 1 of 2 Permit No. (to be provkhad by DWO) "fi^ II: DESIGN INFORMATION Surface Areas Area, temporary pool 14,227 ft' Area REQUIRED, permanent pool 8,090 ft' SAIDA ratio 8.00 (unilless) Area PROVIDED, permanent pool, As,,,,,_,, 10,279 fit` Area, bottom of 1 Oft vegetated shelf, A.., 6,451 ft` Area, sediment cleanout, top elevation (bottom of pond), Abot_pond 1,859 ft' Volumes Volume, temporary pool 16,583 ft' Volume, permanent pool, Vp,,,,, p.i 26,158 fte Volume, forebay (sum of forebays if more than one forebay) 5,062 ft' Forebay %of permanent pool volume 19.4% % SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or N) Mountain/Piedmont SAIDA Table Used? N (Y or N) SAIDA ratio 8.00 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, Vp„„. 26,158 ft' Area provided, permanent pool, Apgn, via 10,279 ft` Average depth calculated ft Average depth used in SAIDA, d., (Round to nearest 0.511) ft Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool, A,_,, 10,279 ft` Area, bottom of ioft vegetated shelf, A,,,La,et 6,451 ft` U71 OK OK Need 3 ft min. Area, sediment cleanout, top elevation (bottom of pond), Ab,,.p 1,859 ft' 'Depth' (distance bM bottom of 10ft shelf and top of sediment) 4.50 ft Average depth calculated 3.31 ft OK Average depth used in SAIDA, J., (Round to down to nearest 0.5ft) 3.5 ft OK Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (Co) Driving head (He) Drawdown through weir? Weir type Coefficient of discharge (C„.) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of towpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: Form SW401-Wet Detention Basin-Rev.9-4/18112 Y (Y or N) 1.50 in in 0.60 (unitless) 0.43ft N (Y or N) (unitless) (unilless) ft ft 0.00 ft'/sec 0.06 ft'/sec 0.06 ft`/sec; 2.99 days 3 :1 10 :1 10.0 It 6 :1 2.2 :1 Y (Y or N) 1.7 ft Y (Y or N) N (Y or N) Y (Y or N) Storage volume discharge rate greater than pre-dev. lyr24hr. OK, draws down in 2-5 days. OK OK OK OK OK OK OK OK Insufficient. Recorded drainage easement required. OK EBIVF MIAR 2 5 2013 BY: Parts I. & II. Design Summary, Page 2 of 2 Permit No. ' (to be pmvlded by DWQ) W�ATF9�`O O�y NCDEIdR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. Project name Contact person Phone number Date Drainage area number vvenace l IUUK mdnue man Tim Focht (904)899-9866 312112013 2 II.:DESIGN INFORMATION; Site Characteristics Drainage area 26,378 ft2 Impervious area, post -development 11,761 ft' %impervious 44.59 % Design rainfall depth 1.5 in Storage Volume: Non-SAWaters Minimum volume required 1,769 it' Volume provided 2,073 ft3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.51' runoff volume its Pre -development 1-yr, 24-hr runoff f13 Post -development 1-yr, 24-hr runoff it3 Minimum volume required it3 Volume provided ft3 Peak Flow Calculations Is the pre/post control of the 1 yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hrslonn Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 10ft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume Y (Y or N) 3.6 in 0.15 (unitless) 0.53 (unitless) 3.93 in/hr OK 0.00 ft3/sec 0.01 ft3/sec 0.01 ft3/sec 19.80 fmsl 19.30 fmsl 19.30 fmsl 19.80 fmsl 18.80 fmsl 14.30 fmsl 13.30 fmsl U0 It (Y or N) =0EO E,�'y1 fmsl V�,� 24' !j MAR 2 5 2013 BY: Form SW401-Wet Detention Basin-Rev.9-4/18112 Pons I. & II. Design Summary, Page 1 of 2 . .1. I., a Permit No. (to be provided by DWQ) I1.•DESIGN INFORMATION -. - "` ` "• ' Surface Areas Area, temporary pool Area REQUIRED, permanent pool SAIDA ratio Area PROVIDED, permanent pool, Ap„R Area, bottom of 1 Oft vegetated shelf, Abi shut Area, sediment cleanout, top elevation (bottom of pond), AwLp , Volumes Volume, temporary pool Volume, permanent pool, Vpn,,,. Volume, forebay (sum of forebays if more than one forebay) Forebay p/ of permanent pool volume SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? MountaimPiedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vpe,,,,_pe Area provided, permanent pool, Ap _pm Average depth calculated Average depth used in SAIDA, d., (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Ape,m-pW Area, bottom of 1Oft vegetated shelf, A� ram Area, sediment cleanout, lop elevation (bottom of pond), A,,j pe,a 4,765 ft' 1,187 ft? 4.50 (unitless) 3,536 fl` OK 2,470 ft' 521 ft' 2,073 ft3 OK 7,963 rya 1,725 ft3 21.7% % OK 90 % Y (Y or N) N (Y or N) 4.50 (unitless) N (Y or N) 7,963 W 3,536 fit` ft ft Y (Y or N) 3,536 ft` 2,470 fC 521 ft' 'Depth" (distance b/w bottom of 10ft shelf and top of sediment) 4.50 ft Average depth calculated 3.15 It Average depth used in SAIDA, d., (Round to down to nearest 0.5fi) 3.0 ft Drawdown Calculations Drawdown through orifice? Diameter of office (if circular) Area of office (if -non -circular) Coefficient of discharge (CD) Driving head (He) Drawdown through weir? Weir type Coefficient of discharge (C„.) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow 8 office? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: Form SW401-Wet Detention Basin-Rev.9-4118112 Y (Y or N) 0.75 in in' 0.60 (unitless) 0.17 If N (Y or N) (unitless) (unitless) ft ft 0.00 ft3lsec 0.01 ft'/sec 0.01 ft'/sec 3.35 days 3 :1 10 :1 10.0 ft 3 :1 2.6 :1 Y (Y or N) 2.5 ft Y (Y or N) N (Y or N) Y (Y or N) Need 3 ft min. OK OK Storage volume discharge rate greater than pre-dev.1 yr24hr. OK, draws down in 2-5 days. OK OK OK Insufficient flow path to width ratio. Must not shod -circuit pond. OK OK OK OK Insufficient. Recorded drainage easement required. OK EGE'` MAR 2 5 2013 BY! Parts I. a II. Design Summary, Page 2 of 2 M Permit No. _!57ewd/_5�9_ ?�) (to be provided by DWQ) III. REQUIRED]TEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initi Sheet No. C104, C105 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. C401, C402 2. Partial plan (1" = 30' or larger) and details for the wet detention basin shoving: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and /J -Filter strip. C401, C402 3. Section view of the wet detention basin (1" = 20' or larger) shovnng: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. C104, C702 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. Design Calc. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. C701, C702 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. Design Calc. 7. The supporting calculations. Attached 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. NA 9. A copy of the deed restrictions (if required). Attached 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. `� . C E yy fir " l MAR 0 6 2013 Form SW401-Wet Detention Basin-Rev.94/18/12 Part III. Required Items Checklist, Page 1 of 1 BY: MEMORY TRANSMISSION REPORT TIME :03-27-'13 14:40 FAX NO.1 :910-350-2004 NAME :DENR Wilmington FILE NO. 139 DATE 03.27 14:34 TO S 919044383241 DOCUMENT PAGES 8 START TIME - 03.27 14:36 END TIME 03.27 14:40 PAGES SENT 8 STATUS OK *** SUCCESSFUL TX NOTICE Porgy Cbory. Governor sm[e or rror[e carmen. Dcpar[men[ ofH mnn[ and Natural Rnwonrca Wllm.....np[on Realanal OrRca FAX COVER 911EE'l' Jnnn ESRvarla lL�•—)Socrebry To: pax: '��/J70��/fe/ i�OG' T /��-- Y��f—mil �� Prom: Jo Cnsm Fax: (9l Ol J50-2004 IJ7 rnr6msl O•ive £n[rnnlonWilmington N<28905 - (9t0) 116-1.11 - 1, 8,. A—,— Rmployar Pat McCrory, Governor Date: State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office FAX COVER SHEET John E Sknarla III, Secretary No. Pages (excl. cover): From: Jo Casmer Phone: (910) 796-7336 Fax: ��__ ��/�107 �� Fax: (910) 350-2004 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 • An Equal Opportunity Affirmative Action Employer MEMORY TRANSMISSION REPORT as TIME :03-27-'13 14:36 FAX NO.1 :910-350-2004 NAME :DENR Wilmington FILE NO. 138 DATE 03.27 14:34 TO 8 919104512927 DOCUMENT PAGES 8 START TIME 03.27 14:34 END TIME 03.27 14:36 PAGES SENT 8 STATUS OR *** SUCCESSFUL TX NOTICE S antes of North Carolina Unpnramnna of Hnvaron ment and Nnaural Revonrcna Wllman¢ton Ra¢lenna O(flea Par.NcLrorv. Governor FAX COVER SHEET JOAn sSavarlo //L�>9ncretory )3nlr_ Co: �� - J-4/l1O C�lF�%�U.0 G� //%�L] No. Ppgef (excl. cover): / Phono: (y1Ql_"196-"�336 8 127 Cvdlnal p,jv Sx[ Sjnn, W ilm,t, NC 29405 � (910) 796-7215 � An f:9nel JPPortunitY AMrmetiv� Acton Cmplol'er - 14V State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Pa( McCrory, Governor FAX COVER SHEET John E Skvarla III, Secretary Date: =- Z' ��3 No. Pages (excl. cover): A119 From: Jo Casmer Co: ��/ ������� �GJ Phone: (910) 796-7336 Fax: — 2 y '/ Fax: (910) 350-2004 Re: 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 • An Equal Opportunity Affirmative Action Employer �stellar TRANSMITTAL DATE: March 22, 2013 TO: Janet Russell RE: Marine Corps Base Camp Lejeune NCDENRMarine'Mah Wilmington Regional Office Stormwater Management Submittal 127 Cardinal Drive Extension Express Permitting Wilmington, NC 28405 II we are sendina: I M UPS-Overniqht I ❑ U. S. Mail I ❑ Courier 1 ❑ Hand Carry 11 ✓ Enclosed Under Separate Cover ✓ Project Drawings ✓ For Your Use Project Specifications Reviewed Shop Drawings Reviewed & Noted Product Literature Revise & Resubmit Other Not Accepted # Copies Dwg. # Date Description Prepared By 2 3/22/13 Comment -Responses TAF 2 3/21/13 Revised Design Analysis TAF 2 3/21/13 Revised Permit Drawings (C501, TAF C506) 2 3/21/13 Revised Wet Detention Basin TAF Supplement (SWMF-1) 2 3/21/13 Revised Wet Detention Basin TAF Supplement (SWMF-2) REMARKS: Please find the attachments listed above for your review and approval. If you have any questions or require additional information, please call me at (904) 899-9866. Tim Focht :CEIVE'S MAR 2 5 2013 04040 Trans Janet Russell 22Mart 3.doc 2900 Hartley Road, Jacksonville, Florida 32257 • Telephone (904) 260-2900 www.stellar.net *stellar 2900 Hartley Road Jacksonville, Florida 32257 (904) 260-2900 MEMORANDUM Date: 22Mar13 To: To Whom it May Concern From: Tim Focht Subject: Wallace Creek Marine Mart Stormwater Project No. SW8 130301 god Request for Additional Information Following are responses to comments made by Linda Lewis dated 19Mar13 (attached). 1. An error was found in the equation determining the flow rate required to drain the treatment volume (reminant of a different jurisdication's requirement) and has been corrected. The CF (conversion factor) converts acre feet to cubic feet and hours to seconds. This is necessary to obtain the answer in cubicfeet per second. The Simple Methods yields a lower minimum storage volume required. The difference in how the minimum storage volume is calculated is so minor, it doesn't affect the suggested standard orifice sizes. 2. The bleed down orifice in both Pond #1 and Pond #2b have been revised as requested. 3. The bleed down in Pond #2b has been revised to a circular orifice. There are two layers of anti - clogging decises used in both Pond #1 and Pond #2b, a turn down pipe and a trash skimmer. 4. The iCPR model is no longer used to determine the bleed down time for Pond #2b. ECESVE MAR 2 5 2013 BY.— DESIGN ANALYSIS CAMP LEJEUNE MARINE MART ONSLOW COUNTY, NORTH CAROLINA PREPARED ON: MARCH 21, 2013 PREPARED BY: *Stellar 2900 HARTLEY ROAD JACKSONVILLE FLORIDA32257 (904) 260-2900���4Q SEAL Emmo p g q�035300 . 6 Cdl W:�' 2 5 2013A. V A� f!3O �C32L//j NARRATIVE ECEIVE' MAR 2 5 2013 T:UobsW4000-040MC4040 Wallace Creek Marine Mart_NC\Design\Celc\Civil\Ccver.Coc ov STORM WATER NARRATIVE I. GENERAL INFORMATION Project Name & Address: Marine Corps Base Camp LeJeunC Wallace Creek Marine Mart Camp LeJeune, NC 28540 Property Ownership: U.S. Government Acres Disturbed: 4.82 acres Wetlands Disturbed: There are no wetlands within the limits of construction. Existing Permits: None. H. EXISTING CONDITIONS The site is located in an urbanized area on Marine Corps Base Camp Lejeune at the intersection of Birch Street and McHugh Boulevard. The project site is primarily undeveloped with dense woods and heavy ground cover; however, there are areas within the limits of construction that have been developed. These areas are associated with the adjacent Worship Center. There is utility infrastructure (overhead electric, fiber optic, sanitary sewer, water) along McHugh Boulevard and Birch Street adjacent to the site. Marine Corps Base Camp Lejeune owns and maintains these utilities on base. The site is relatively flat with elevations ranging from 18 to 25 and slopes averaging 1.5 percent. Due to the extensive ground cover and shallow slopes, there are no existing erosion and sedimentation problems on the project site. There is a 0.07-acre wetland system adjacent to the project site. This wetland system received an approved jurisdictional determination from the ACOE in August, 2011 with an expiration of August, 2016. Stormwater runoff sheet drains across the site from south to north. The runoff enters a roadside Swale along Birch Street and conveyed to a cross culvet flowing north under Birch Street. The Stormwater runoff continues draining in a northerly direction into Beaver Dam Creek, Beaver Dam Creek is classified as a "SB, NSW" water body with index 19-20-2. Beaver Dam Creek flows into Morgan Bay then through the New River Inlet to the Atlantic Ocean. The site is located within the White Oak River Basin. III. PROPOSED DEVELPMENT The proposed project consists of a 13,803 square foot building with a fuel pumping station, asphalt parking areas and utility infrastructure necessary to support the development. Land disturbance activities required for this development total approximately 4.82 acres and include activities such as demolition of pavement areas, clear & grub existing vegetati �sii� uc� ati� I r MAR 2 5 2013 building foundations, excavation for stormwater management facilities, trenching for underground infrastructure, and general site grading. A separate potable water service line and fire service line will be brought into the site by means of a single 6" tap off the existing water distribution main alongMcHugh Boulevard. The development will include construction of a sanitary pump station located behind the proposed building near the delivery area. The pump station will discharge to the south through a 2" forcemain connecting to an existing manhole located near the Worship Center. This project will be designed, permitted, and constricted in one phase. There are no additional roadway or utility improvements required to support this project. The proposed site plan does accommodate for a future roadway extension. This future roadway extension, if completed, will be a separate project that will be constructed, funded, designed and permitted by others. The project boundary totals 4.46 acres (194,248 sf) with a disturbed area of 4.82 acres. The increased disturbed area is due to miscellaneous grading around the perimeter and installation of the forcemain across the adjacent development. Attached is a site plan delineating the project boundary and the proposed built -upon areas. Below is a table detailing the proposed built -upon area within the project boundary. Description Built -Upon Area Building 13,803 Pavement 72,182 Sidewalk 6,730 TOTAL 92,715 The total built -upon area is 72.7% so the project will be classified as High Density. The development will be divided into two drainage basins. Both basins will utilize a wet detention basin to treat and attenuate stormwater runoff from the site prior to discharging downstream. Both systems will be designed per NCDENR's Stormwater BMP Manual provding 90% TSS removal, a forebay, vegetated slopes, and a 10' wide vegetated shelf These BMPs will manage peak discharge rates and erosive conditions so downstream conveyance systems will not be adversely affected. There is no off -site drainage area entering the proposed stormwater management system. ECS Carolinas, LLC completed a geotechnical investigation of the site on March 9, 2012. The report described the top 6" — 8" as organic topsoil. Beneath the surface to depths of 7' contain intermittent layers of very loose to medium dense silty, slightly silty, clayey and clean sand (SM, SP-SM, SC, SP) having N-values ranging from 3 to 21 blows per foot. Soils from 7 feet to depths of 25 feet are intermittent layers of very loose to medium dense silty, slightly silty, clayey and clean sand (SM, SP-SM, SC, SP) and very soft to firm sandy clays and clays (CL, CH) having N-values ranging from the weight of hammer to 15 blows per foot. USDA Natural Resource Conservation Service classifies the existing soils as follows: Baymeade Find Sand, 0-6 percent slopes (BaB) Hydrologic Soil Group: A Soil Erosion Factor (K, rock free): 0.05 nICEIVE, MAR 2 5 I'll BY:_------ Soil Erosion Factor (K, whole soil): 0.05 Soil Erosion Factor (T): 5 Wind Erodibility Group: 1 Wind Erodibility Index : 220 A Report of Seasonal High Water Table Estimation was performed by ECS Carolinas, LLC on April 10, 2012 to provide subsurface data for design of the stormwater BMP. A single hand auger was dug so the ground water level and soils can be analyzed. At the boring location, the groundwater level measured 48- inches below existing grade and the Seasonal High Water Table was determined at 18-inches below existing grade. IZIE C' E I V E MPa, 2 5 Ili, BY: CALCULATIONS E-70VER MAR 2 5 2013 DJcbs10 000-04099\04040 Wallace Creek Marine Man _NC\Design\Calc%CiviKCover.Coc BY:__ Pre -Development Basin Calculations Drainage Areas: BASIN NAME PRE-1 Total Area: Impervious and Pervious Areas: Impervious: Basin: PRE-1 Description: Area (ac) Parking Pavement 0.00 Roof Top 0.00 Sidewalk 0.00 Percent Impervious 0% Pervious: Basin: PRE-1 Description: Area (ac) Open Space -Good Cond. 0.00 Woods -Good Cond. 2.92 Percent Pervious 100% Runoff Coefficient : BASIN AREA 2.92 acres 2.92 acres PRE-1 Basin Area Description Area (ac) (ac) 'C" Wtd "C" Impervious 0.00 2.92 0.95 0.00 Perv.-Open 0.00 2.92 0.20 0.00 Perv.-Woods 2.92 2.92 0.15 0.15 Runoff Coefficient = 0.15 'Er. EI @ E MAR 2 5 2013 Pre -Development Basin Calculations Curve Number : PRE-1 Soil Map Hydrologic Land Use Total WTD Symbol Soil Group Description Area (ac) Area CN CN BaB A Woods 2.92 2.92 30 30 BaB A Open Space 0.00 2.92 39 0 -- -- Impervious 0.00 2.92 98 0 Curve Number = 30 Time of Concentration Lao Time & Peak Rating Factor PRE-1 Time of Concentration: Ground Cover: Dense brush with a few trees Wave Travel Length: 243 ft. Slope: 1.44 % From Figure 7 - Average Velocities for Estimating Travel Time for Overland Flow Travel Vel.= 0.30 ft./sec. T, = (243 ft./0.30 ft./sec.) / 60 sec./min. = 14 min. Lag Time: Not Applicable for this basin Peak Rating Factor: K= 323 MAR 2 5 Z013 ev:._------- Post -Development Basin Calculations Drainage Areas: BASIN NAME BASIN AREA POST-1 2.32 acres POST-2 0.61 acres Total Area: 2.93 acres Impervious and Pervious Areas: Impervious: Basin: POST-1 POST-2 Description: Area (ac) Area (ac) Pavement 1.39 0.27 Roof Top 0.32 0.00 Sidewalk 0.15 0.00 Percent Impervious 80% 44% Pervious: Basin: POST-1 POST-2 Description: Area (ac) Area (ac) Landscape 0.46 0.34 Percent Pervious 20% 56% Runoff Coefficient : POST-1 Basin Area Description Area (ac) (ac) "C" Wtd 'C" Impervious 1.86 2.32 0.95 0.76 Landscape 0.46 2.32 0.20 0.04 Runoff Coefficient = 0.80 POST-2 Basin Area Description Area (ac) (ac) "C" Wtd "C" Impervious 0.27 0.61 0.95 0.42 Landscape 0.34 0.61 0.20 0.11 Runoff Coefficient = 0.53 MAR 2 5 2013 rv:_ Post -Development Basin Calculations Curve Number: POST-1 Soil Map Hydrologic Land Use Total WTD Symbol Soil Group Description Area (ac) Area CN CN BmB A Landscape 0.46 2.32 39 8 -- -- Impervious 1.86 2.32 98 79 Curve Number= 86 POST-2 Soil Map Hydrologic Land Use Total WTD Symbol Soil Group Description Area (ac) Area CN CN BmB A Landscape 0.34 0.61 39 22 Impervious 0.27 0.61 98 43 Curve Number= 65 RE EOVE MAR 2 5 2013 6Y:_ Wet Detention Basin Calculations: SWMF-1 Required Water Quality Volume: Criteria: 1.50 inches of runoff over the entire drainage area WQv = (Wt.'C" 1.50' Area)112 WQv= 0.2324 ac-ft = 10,122 cf Provided Storage: Stage vs. ArealStorage Relationship: Main Pond Forebay Pond Elevation Area Area Storage Area Area Storage 14.0 aeoimenc average 15.0 1,859 0.0427 0.0000 385 0.0088 0.0000 Design Bottom 16.0 2,748 0.0631 0,0529 597 0.0137 0.0113 17.0 3,712 0.0852 0.1270 842 0.0193 0.0278 18.0 4,752 0.1091 0.2242 1,119 0.0257 0.0503 19.0 5,868 0.1347 0.3461 1,428 0.0328 0.0795 19.5 6,451 0.1481 0.4168 Shelf Grade Change 20.0 8,510 0.1954 0.5027 1,769 0.0406 0.1162 SHGW Perm. Pool Treatment Elevation Area Area Storage Storage Description (ft) (ft) (acres) (ac-ft) (ac-ft) 14.0 Sediment Storage 15.0 2,244 0.0515 0.0000 Design Bottom 16.0 3,345 0.0768 0.0642 17.0 4,554 0.1045 0.1548 18.0 5,871 0.1348 0.2745 19.0 7,296 0.1675 0.4256 19.5 6,451 0.1481 0.5045 Shelf Grade Change 20.0 10,279 0.2360 0.6005 0.0000 SHGW 20.5 12,808 0,2940 0.1325 Shelf Grade Change 21.0 13,687 0.3142 0.2846 21.30 14,227 0.3266 0.3807 Weir Elevation 22.0 15,487 0.3555 0.6194 23.0 17,039 0.3912 0.9928 TOB Treatment Volume Summary: Required Treatment Volume = 0.2324 ac.-ft. Design Treatment Volume = 0.3807 ac.-ft. Permanent Pool Average Depth: "AD must be a minimum of 3-feel 4� MAR 2 5 2013 Wet Detention Basin Calculations: SWMF-1 Option 2 AD=[0.25"(1+(Abs IApp))]*I((Abs +Abo)/2)'(Depth /Abs) ] Area at Bottom of Shelf (Abs) = 6451 ft.' Area at Permanent Pool (App) = 10279 ft.' Area at Bottom of Pond (Abp) = 1859 ft z Depth = 4.5 ft. AD= 3.31 ft. Surface Area to Drainage Area Ratio (90 Percent TSS Removal Efficiency): Percent Impervious Cover = 80% Permanent Pool Average Depth: = 3.50 Required Surface Area to Drainage Area Ratio' = 0.0800 Provided Surface Area to Drainage Area Ratio = 0.1017 " Obtained from NCDENR Stormwater BMP Manual, Chapter 10, Table 10-4. Forebay Volume Sizing: ' Volume must be 20% of total PPV provided Required Permanent Pool Volume = 0.12 ac.-ft. Provided Permanent Pool Volume = 0.12 ac.-ft. Bleed Down Orifice Sizing Calculations: Determine Flow Rate to Drain Treatment Volume within 48-120 hours: Q=(TV)I(t'CF) Q = Rate of Discharge (cfs) TV = Treatment Volume (ac-ft) t = time to drain the treatment volume (48-120 hrs) CF = (43,560 sflac) / (3,600 sec/hr) = 12.1 TV" = 0.2324 Ac-ft TV' = 0.2324 Ac-ft t = 48 hrs t = 120 hrs Qdr.,n= 0,0586 cfs Odram= 0.0234 cfs Determine Orifice Size: Orifice Size Equation: A = ( Q )/ (C'(2'g'h)^.5) 48 Hours 120 Hours Where: Q = Required Capacity 0.0586 cfs 0.0234 C = Orifice Discharge Coefficient 0.6 0.6 g = acceleration of gravity 32.2 (ft/s') 32.2 h = Design hight 0.4333 ft 0.4333 A = Orifice Area 0.0185 ft2 0.0074 Calculate Orifice Diameter Area = (piD2)/ 4 Diameter = (4' Area / pi)2 Diameter = 1.84 in (48 hr) 1.16 in (120 hr) ry�g USE Orifice Diameter = 1.50 in. E .0 .E U @N E 111211113 F.Y: Wet Detention Basin Calculations: SWMF-2 Required Water Quality Volume: Criteria: 1.50 inches of runoff over the entire drainage area WQv = (Wt. 'C" 1.50 ` Area) 112 WQv = 0.0406 ac-ft 1,767 of Provided Storage: Stage vs. Area/Storage Relationship: Main Pond Forebay Pond Elevation I Area Area Storage Area Area Storage 13.3 Sediment Storage 14.3 521 0.0120 0.0000 64 0.0015 0.0000 Design Bottom 15.3 758 0.0174 0.0147 144 0.0033 0.0024 16.3 1,028 0.0236 0.0352 253 0.0058 0.0069 17.3 1,329 0.0305 0,0622 386 0.0089 0.0143 18.3 1,661 0.0381 0,0966 545 0.0125 0.0250 18.8 1,836 0.0421 0.1166 634 0.0146 0.0317 Shelf Grade Change (main pond only) 19.3 2,807 0.0644 0.1433 729 0.0167 0.0396 SHGW 19.8 3,935 0.0903 0.1820 830 0.0191 0.0485 Shelf Grade Change (main pond only) 20.3 4,304 0.0988 0.2293 938 0.0215 0.0586 21.3 5,084 0.1167 0.3370 1,172 0.0269 0.0829 TOB(forebay pond) 22.3 5,921 0.1359 0.4633 TOB (main pond) Perm. Pool Treatment Elevation Area Area Storage Storage Description (it) (ft') (acres) (ac-ft) (ac-ft) 13.3 Sediment Storage 14.3 585 0.0134 0.0000 Design Bottom 15.3 902 0.0207 0.0171 16.3 1,281 0.0294 0.0421 17.3 1,715 0.0394 0.0765 18.3 2,206 0.0506 0.1215 18.8 2,470 0.0567 0,1484 Shelf Grade Change (main pond only) 19.3 3,536 0.0812 0,1828 0,0000 SHGW 19.8 4,765 0.1094 0.0476 Shelf Grade Change (main pond only) 19.80 4,765 0.1094 0.0476 Weir Elevation 20.3 5,242 0.1203 0.1051 21.3 6,256 0.1436 0.2371 22.3 5,921 0.1359 0.3768 TOB Treatment Volume Summary: Required Treatment Volume = 0.0406 ac: ft. Design Treatment Volume = 0.0476 ac: ft. It MAR 2 5 2013 cv:_ Wet Detention Basin Calculations: SWMF-2 Permanent Pool Average Depth: AD must be a minimum of 3-feet Option 2 AD=[0.25'(1*(Abe I A,,)))*[((Am*Abv)/2)'(Depth /Abe)] Area at Bottom of Shelf (Ac,) = 2470 ft' Area at Permanent Pool (AeP) = 3536 H 2 Area at Bottom of Pond (AW) = 521 ft.2 Depth = 4.5 ft AD = 3.15 ft Surface Area to Drainage Area Ratio (90 Percent TSS Removal Efficiency): Percent Impervious Cover = 44% Permanent Pool Average Depth: = 3.00 Required Surface Area to Drainage Area Ratio' = 0.0450 Provided Surface Area to Drainage Area Ratio = 0,1331 ' Obtained from NCDENR Stormwater BMP Manual, Chapter 10, Table 10-4. Forebay Volume Sizing: Volume must be 20 % of total PPV provided Required Permanent Pool Volume = 0.0366 ac: ft. Provided Permanent Pool Volume = 0.0396 ac: ft. Bleed Down Onfice Sizing Calculations: Determine Flow Rate to Drain Treatment Volume within 48-120 hours Q = (TV) / (t - CF) Q = Rate of Discharge (cfs) TV = Treatment Volume (ac-ft) t = time to drain the treatment volume (hrs) CF = (43,560 sf/ac) / (3,600 sec/hr) = 12A TV' = 0.0406 Ac-ft TV' = 0.0406 Ac-ft t= 48 hrs t= 120 hrs Qd„ fin 0.0102 cfs Qmem= 0.0041 cis Determine Orifice Size: Orifice Size Equation: A = ( 0 )/ (C'(2'g'h)"S) 48 Hours 120 Hours Where: Q= Required Capacity 0.0102 cis 0.0041 C = Orifice Discharge Coefficient 0.6 0.6 g = acceleration of gravity 32.2 (fV3) 32.2 h=Design night 0.1667ft 0.1667 A=Orifice Area 0.0052 ft? 0.0021 Calculate Orifice Diameter: Area = Diameter = Diameter = USE Onfice Diameter= (pi' D2)/ 4 (4*Area / pi)' 0.98 in (48 hr) 0.62 in (120 hr) 0.75 in. y IVE-: MAR 2 5 2013 sv Wallace Creek Marine Mart Input Summary 3/21/13 =-_= Basins Name: POST-1 Node: SWMF-1 Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: UH484 Peaking Factor: 484.0 Rainfall File: Storm Duration(hrs): 0.00 Rainfall Amount(in): 0.000 Time of Conc(min): 10.00 Area(ac): 2.320 Time Shift(hrs): 0.00 Curve Number: 86.00 Max Allowable Q(cfs): 999999.000 DCIA(%): 0.00 _ Name: POST-2 ___________________________________ Node: SWMF-2A Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: UH484 Peaking Factor: 484.0 Rainfall File: Storm Duration(hrs): 0.00 Rainfall Amount(in): 0.000 Time of Conc(min): 10.00 Area(ac): 0.610 Time Shift(hrs): 0.00 Curve Number: 65.00 Max Allowable Q(cfs): 999999.000 DCIA(%): 0.00 _________________ Name: PRE-1 _____________ ____________________________________ Node: BNDRY-PRE Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: UH323 Peaking Factor: 323.0 Rainfall File: Storm Duration(hrs): 0.00 Rainfall Amount(in): 0.000 Time of Conc(min): 14.00 Area(ac): 2.930 Time Shift(hrs): 0.00 Curve Number: 30.00 Max Allowable Q(cfs): 999999.000 DCIA(%): 0.00 --== Nodes Name: BNDRY-POST Base Flow(cfs): 0.000 Init Stage(ft): 0.000 Group: BASE Warn Stage(ft): 999.000 Type: Time/Stage Time(hrs) Stage(ft) __________ --------------- 0.00 0.000 120.00 0.000 Name: BNDRY-PRE Base Flow(cfs): 0.000 ___-_____9______________. Init Stage(ft): 0.000 Group: BASE Warn Stage(ft): 999.000 Type: Time/Stage Time(hrs) Stage(ft) 0.00 0.000 120.00 0.000 ___ ___-_9__ ____ _____ Name: SWMF-1 Base Plow(cfs): 0.000 Init Stage(ft): 20.000 Group: BASE Warn Stage(ft): 23.000 Type: Stage/Area Interconnected Channel and Pond Routing Model (ICPR) (02002 Streamline Technologies, Inc. Pagel o}f+5 1 MAR 2 5 2013 !'Y:-_ Wallace Creek Marine Mart Input Summary 3/21/13 Stage(ft) Area(ac) 20.000 0.2360 20.500 0.2940 21.000 0.3142 22.000 0.3555 23.000 0.3912 ---------------------- Name: SWMF-2A Group: BASE Type: Stage/Area Stage(ft) Area(ac) 19.300 0.0183 20.300 0.0233 21.300 0.0289 Name: SWMF-2B Group: BASE Type: Stage/Area Stage(ft) Area(ac) 19.300 0.0413 19.800 0.0617 20.300 0.0685 21.300 0.0832 22.300 0.0991 ___- Drop Structures Base F1ow(cfs): 0.000 Base F1ow(cfs): 0.000 Name: OUTSTR-1 From Node: SWMF-1 Group: BASE To Node: BNDRY-POST UPSTREAM DOWNSTREAM Geometry: Circular Circular Span(in): 15.00 15.00 Rise(in): 15.00 15.00 Invert(ft): 18.170 18.000 Manning's N: 0.013000 0.013000 Top Clip(in): 0.000 0.000 Bet Clip(in): 0.000 0.000 Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Init Stage(ft): 19.300 Warn Stage(ft): 21.300 Init Stage(ft): 19.300 Warn Stage(ft): 22.300 Length(ft): 75.00 Count: 1 Friction Equation: Automatic Solution Algorithm: Most Restrictive Flow: Both Entrance Loss Coef: 0.500 Exit Loss Coef: 1.000 Outlet Ctrl Spec: Use do or tw Inlet Ctrl Spec: Use do Solution Incs: 10 *"* Weir 1 of 2 for Drop Structure OUTSTR-1 **` count: 1 Bottom Clip(in): 0.000 Type: Vertical: Mavis Top Clip(in): 0.000 Flow: Both Weir Disc Coef: 3.200 Geometry: Rectangular Orifice Disc Coef: 0.600 Span(in): 6.00 Invert(ft): 21.300 Rise(in): 999.00 Control Elev(ft): 21.300 Weir 2 of 2 for Drop Structure OUTSTR-1 *** TABLE Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. Page 2 of 5 Wallace Creek Marine Mart Input Summary 3/21/13 Count: 1 Type: Vertical: Mavis Flow: Both Geometry: Circular Span(in): 1.50 Rise(in): 1.50 Name: OUTSTR-2 Group: BASE UPSTREAM Geometry: Circular Span(in): 15.00 Rise(in): 15.00 Invert ( ft1 : 17.800 Manning's N: 0.013000 Top Clip(in): 0.000 Bot Clip(in): 0.000 TABLE Bottom Clip(in): 0.000 Top Clip(in): 0.000 Weir Disc Coef: 3.200 Orifice Disc Coef: 0.600 Invert(ft): 20.000 Control Elev(ft): 20.000 From Node: SWMF-2A To Node: SWMF-2B DOWNSTREAM Circular 15.00 15.00 17.300 0.013000 0.000 0.000 Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall '" Weir 1 of 1 for Drop Structure OUTSTR-2 *" Count: 1 Type: Vertical: Mavis Flow: Both Geometry: Rectangular Span(in): 24.00 Rise(in): 999.00 Name: OUTSTR-3 Group: BASE UPSTREAM Geometry: Circular Span(in): 15.00 Rise(in): 15.00 Invert(ft): 19.000 Manning's N: 0.013000 Top Clip(in): 0.000 But Clip(in): 0.000 Length(ft): 91.00 Count: 1 Friction Equation: Automatic Solution Algorithm: Most Restrictive Flow: Both Entrance Loss Coef: 0.500 Exit Loss Coef: 1.000 Outlet Ctrl Spec: Use do or tw Inlet Ctrl Spec: Use do Solution Incs: 10 Bottom Clip(in): 0.000 Top Clip(in): 0.000 Weir Disc Coef: 3.200 Orifice Disc Coef: 0.600 Invert(ft): 1B.800 Control Elev(ft): 18.800 From Node: SWMF-2B To Node: BNDRY-POST DOWNSTREAM Circular 15.00 15.00 18.000 0.013000 0.000 0.000 Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall -* Weir 1 of 2 for Drop Structure OUTSTR-3 `•' Count: 1 Type: Vertical: Mavis Flow: Both Geometry: Rectangular Span(in): 6.00 Rise(in): 999999.00 "* Weir 2 of 2 for Drop Structure OUTSTR-3 ... TABLE Length(ft): 346.00 Count: 1 Friction Equation: Automatic Solution Algorithm: Most Restrictive Flow: Both Entrance Loss Coef: 0.500 Exit Loss Coef: 1.000 Outlet Ctrl Spec: Use do or tw Inlet Ctrl Spec: Use do Solution Incs: 10 Bottom Clip(in): 0.000 Top Clip(in): 0.000 Weir Disc Coef: 2.500 Orifice Disc Coef: 0.600 Invert(ft): 19.800 Control Elev(ft): 19.300 . YY 3AM Interconnected Channel and Pond Routing Model (ICPR) ©2002 Streamline Technologies, Inc. Page 3 of 5 vwo � i MAAR 2 5 2013 °;Y:- Wallace Creek Marine Mart Input Summary 3/21/13 Count: 1 Type: Vertical: Mavis Flow: Both Geometry: Circular Span(in): 0.75 Rise(in): 0.75 --_= Hydrology Simulations Bottom Clip(in): 0.000 Top Clip(in): 0.000 Weir Disc Cost: 3.200 Orifice Disc Coef: 0.600 Invert(ft): 19.300 Control Elev(ft): 19.300 TABLE Name: lyr-24hr Filename: T:\JOBS\04000-04099\04040 WALLACE CREEK MARINE MART NC\DESIGN\CALC\CIVIL\lyr-24hr.R32 Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall File: Scsii-24 Rainfall Amount(in): 3.63 Time(hrs) Print Inc(min) 24.000 15.00 Name: 5yr-24hr Filename: T:\JOBS\04000-04099\04040 WALLACE CREEK MARINE MART NC\DESIGN\CALC\CIVIL\5yr-24hr.R32 Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall File: Scsii-24 Rainfall Amount(in): 5.71 Time(hrs) Print Inc(min) ------------------------------ 24.000 15.00 ---= Routing Simulations Name: lyr-24hr Hydrology Sim: lyr-24hr Filename: T:\SOBS\04000-04099\04040 WALLACE CREEK MARINE MART_NC\DESIGN\CALC\CIVIL\lyr-24hr.I32 Execute: Yes Restart: No Patch: No Alternative: No Max Delta Z(ft): 0.01 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 Min Calc Time(sec): 0.5000 Boundary Stages: Time(hrs) Print Inc(min) --------------. ------------- 999.000 15.000 Group Run ------------- BASE - ----- Yes Delta Z Factor: 0.00500 End Timelhrs): 120.00 Max Calc Time(sec): 60.0000 Boundary Flows: Name: 5yr-24hr Hydrology Sim: 5yr-24hr Filename: T:\JOBS\04000-04099\04040 WALLACE CREEK MARINE MART_NC\DESIGN\CALC\CIVIL\5yr-24hr.I32 Execute: Yes Restart: No Patch: No Alternative: No Max Delta Z(ft): 0.01 Delta Z Factor: 0.00500 Interconnected Channel and Pond Routing Model (ICPR) C2002 Streamline Technologies, Inc. Page 4 of 5 Wallace Creek Marine Mart Input Summary 3/21/13 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 Min Calc Time(sec): 0.5000 Boundary Stages: Time(hrs) Print Inc(min) 999.000 15.000 Group Run BASE Yes End Time(hrs): 120.00 Max Colo Time(sec): 60.0000 Boundary Flows: Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline'I'echnologies, Inc. Page 5 of 5 MAR 2 5 2013 BY:_ U Wallace Creek Marine Mart Node Min/Max Report 3/21/13 Name BNDRY-POST BNDRY-POST BNDRY-PRE BNDRY-PRE SWMF-1 SWMF-1 SWMF-2A SWMF-2A SWMF-2B SWMF-2B Group Simulation Max Time Stage hrs BASE lyr-24hr 0.00 BASE 5yr-24hr 0.00 BASE lyr-24hr 0.00 BASE 5yr-24hr 0.00 BASE 1yr-24hr 24.00 BASE 5yr-24hr 13.69 BASE lyr-24hr 24.00 BASE 5yr-24hr 12.95 BASE lyr-24hr 24.00 BASE 5yr-24hr 12.98 Max Warning Max Delta Max Surf Max Time Stage Stage Stage Area Inflow £t ft ft ft2 hrs 0.00 999.00 0.0000 0 24.00 0.00 999.00 0.0000 0 13.45 0.00 999.00 0.0000 0 0.00 0.00 999.00 0.0000 0 23.50 21.26 23.00 0.0003 14160 12.00 21.76 23.00 0.0004 15060 12.00 19.77 21.30 0.0001 901 12.00 20.04 21.30 0.0003 960 12.00 19.77 22.30 0.0001 2644 12.01 20.04 22.30 0.0002 2831 12.02 Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. N � Ili @p N rq Max Max Time Max Inflow Outflow Outflow cfs hrs cfs 0.07 0.00 0.00 0.73 0.00 0.00 0.00 0.00 0.00 0.02 0.00 0.00 6.90 24.00 0.06 12.36 13.69 0.58 0.59 12.01 0.41 1.72 12.02 1.21 0.41 24.00 0.01 1.21 12.98 0.16 Page 1 of I `gyp' a� �'i d m N O J 6 r V < Si N a U O U O P LL 6 r U r 16 > n u o d w a a U Notes (min) (min) Inlet Pipe 1-3 1 DI HDPE 334 0.33 0.33 0.79 10.00 1.38 0.26 6.43 1.66 22.55 22.41 22.17 0.24 15 0.012 0.06 1.37 1.68 HGL I = 5-yr, 10-min 1.68 20.55 18.89 Crown 19.30 17.64 1.66 0.50 4.02 4.93 Invert 2-3 2 DI HDPE 32 0.20 0.20 0.79 10.00 0.15 0.16 6.43 1.02 23.18 22.24 22.17 0.07 12 0.012 0.07 1.29 1.02 HGL 1.02 21.18 21.02 Crown 20.18 20.02 0.16 0.50 3.46 2.72 Invert 3-5 3 MH 0.00 0.53 0.79 11.38 0.50 22.17 22.018.89 18.21 Crown 17.39 16.71 0.68 0.50 4.54 8.02 Invert 4HDPE137 *6.430.00 4-5 4 DI 246 0.85 0.85 0.79 10.00 0.90 22.52 22.02 0.50 18 0.012 0.14 2.44 4.32 HGL 20.93 19.71 Crown 1943. 18.21 1.22 0.50 4.54 8.02 Invert 5-6 5 DI HDPE 16 0.49 1.87 0.79 11.89 0.05 1.48 6.43 2.49 22.30 22.02 21.76 0.26 24 0.012 0.15 3.02 9.50 HGL 5YR HWL=21.76 9.50 18.21 18.13 Crown SHGW=20.00 6 FES 16.21 16.13 0.08 0.50 5.49 17.25 Invert BOT=15.00 7-8 7 DI RCP 28 0.06 0.06 0.53 10.00 0.13 0.03 6.43 0.20 22.54 20.40 20.40 0.00 15 0.013 0.00 0.17 0.20 HGL I = 5-yr, 10-min 0.20 20.54 20.40 Crown 19.29 19.15 0.14 0.50 3.71 4.55 Invert 8-10 8 DI RCP 72 0.13 0.19 0.53 10.13 0.17 0.10 6.43 0.44 22.54 20.08 20.07 0.01 15 0.013 0.01 0.53 0.65 HGL 0.65 20.21 18.94 Crown 18.96 17.69 1.27 1.77 7.00 8.59 Invert 9-10 8 DI RCP 28 0.05 0.05 0.53 10.00 0.13 0.03 6.43 0.17 20.94 20.07 20.07 0.00 15 0.013 0.00 0.14 0.17 HGL 0.17 18.94 18.80 Crown 17.69 17.55 0.14 0.50 3.71 4.55 Invert 10-11 9 DI RCP 13 0.12 0.36 0.53 10.30 0.06 0.19 6.43 0.41 20.94 20.07 20.04 0.03 15 0.013 0.04 1.00 1.23 HGL SYR HWL=20.04 1.23 17.30 17.24 Crown SHGW = 19.30 11 FES 16.05 15.99 0.06 1 0.50 1 3.71 1 4.55 Invert BOT=14.30 Project: Wallace Creek Marine Mart Compiled by: TAF Friction Losses Entrance Loss Velocity Head Hf =((29*nA2)*(LIRA1.33))*((VA2)l2g) He = (kl*VA2)12g Hv = VA2l2g *note KI value is .7 for all segments Pipe Manning's Friction Entrance Velocity Total Length Diameter I Velocity "n" Losses Losses Head Head Segment (feet) (in.) (fps) (feet) (feet) 1-3 334 15 1.37 0.012 0. 0.02 0.03 0. 2-3 32 12 1.29 0.012 02 0.02 0.02 0.03 07 0.07 3-5 137 18 1.52 0.012 0.08 0.03 0.04 0.15 4-5 246 18 2.44 0.012 6.35 0.06 0.09 0.5 5-6 16 24 3.02 0.012 0.02 0.1 0.14 0.26 7-8 28 15 0.17 0.013 0 0 0 0 8-10 721 151 0.531 0.013 0.01 0 0 0.01 9-10 281 151 0.141 0.013 0 0 0 0 10-11 131 151 1.001 0.0131 01 0.01 0.021 0.03 MAR 2 5 2013 Q = (1.49/n) * A * Rh2rd * oirz n = Mannings Roughness Coefficient A = Area (square feet) Rh= Hydraulic Radius (ft) So= Slope (ft/ft) Dia Dia A Rip Rap Design Calculations: SWMF-1 Circular Pipe Rh Rh2/3 So So So1n Q Q Velocity (in) (ft) (ft2) (ft) (%) (ft/ft) (cfs) (gpm) (N/s) 0.013 15 1.25 1.23 3.93 0.313 0.461 0.230 0.0023 0.0480 3.11 1394.22 2.53 Act. Pipe Equiv. Pipe Equiv. Vel. Flow (cfs) Dia. (in) Dia. (in) (fps) Length (ft) Width (ft) 3.11 15.00 15.00 2.53 7.50 11.25 Width (ft) _ 3.75 Length (ft) = 7.50 Width (ft) _ 11.25 Q = (1.49/n) * A * Rhzr * So112 n = Mannings Roughness Coefficient A = Area (square feet) Rh= Hydraulic Radius (ft) So= Slope (ft/ft) Din Dia A Rip Rap Design Calculations: SWMF-2 Circular Pipe Rh Rhzr So So So'rz Q Q Velocity (in) (ft) (ft) (ft) M) (ft/ft) (cfs) (gpm) (ft/s) O.OL3 15 1.25 1.23 3.93 0.313 0.461 0.290 0.0029 0.0539 3.49 1565.55 2.84 Act. Pipe Equiv. Pipe Equiv. Vel. Flow (cfs) Dia. (in) Dia. (in) (fps) Length (ft) Width (ft) 3.49 15.00 15.00 2.84 7.50 11.25 Width (ft) _ 3.75 Length (ft) = 7.50 Width (ft) _ 11.25 Precipitation Frequency Data Server Page 1 of 4 NOAA Atlas 14, Volume 2, Version 3 el-, � Location name: Jacksonville, North Carolina, US* Coordinates: 34.6736,-77.3524 l q Elevation: 25ft* ° source: Google Maps .` POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Baran, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF Oraohical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)' Average recurrence interval (years) Duration 10 25 50 100 200 500 1000 5.90 6.96 8.06 9.06' 10.2 11.2 12.1 13.0 14.2 15.2 5-mm (5.47-6.41) (6.46-7.52) (7,45-8.70) (8.35-9.78) (9.38-11.0) 11 (10.2-12.0) (11.0-13.0) (11.7-14.0) (12.7-15.4) (13.5-16.5) 4.72 5.56 6.45 7.24 8.15 8.89 9.59 10.3 11.2 12.0 10-min (4.37-5.11) (5.16-6.02) (5.96-6.97) (6.68-7.82) (7.48-8.78) 1 (8.12-9.58) (8.73-10.4) (9.31-11.1) (10.0-12.1) (10.6-13.0) 3.93 4.66 5.44 6.10 } 6.69 7.50 8.09 8.66 9.40 10.0 15-min (3.64-4.26) (4,32-5.04) (5.03-5.68) .(5S3d6S9)1 1 (6.32-7.42) (6.86-8.06) (7.36-8.73) (7.83-9.36) (8.42-10.2) (8.87-10.9) 3.22 3.87 4.42 5.10 5.65 6.19 6.74 7.48 8.10 30-min (2.50-2.-2.92) (2.99-3.48) (3.57-4.17) (4.08-4.78) (4.68-5.49) (5.16-6.09) (5.63-6.68) (6.10-7.29) (6.70-8.11) (7.18-8.80) 2.02 2.48 2.86 3.40 3.83 4.27 4.73 5.37 5.91 60-min (1.56-1.-1.82) (1.87-2.19) (2.29-2.68) (2.86-3.11) (3.71 -3.66) (3.50-4.13) (3.88-4.60) (4.28-5.11) (4.80-5.82) (5.24-6.43) 1.02 1.24 1.56 1.85 2.24 2.58 2.94 3.34 3.89 4.38 F2-hr (0.944-1.11) (1.15-1.35) (1.44-1.69) (1.70-2,01) (2.05-2.43) (2.35-2.80) 1 (2.66-3.19) 11 (2.99-3.62) (3.46-4.23) 1 (3,86-4.78) 0.735 0.891 1.13 1.35 l 6-5--jF 1.92 2.22 2.54 3.02 3.44 3-hr (0.677-0.805) (0.822-0.975) (1.04-1.23) 1 (1.23-1.47) 11 (1.50-1.80) 1 (1.74-2.10) 1 (1.99-2.41) 11 (2.26-2.77) (2.65-3.29) (2.99-3.77) 0.449 0.644 0.689 0.824 1.02 1.19 1.37 1.58 17 2.16 6-hr (0.411-0.495) (0.498-0.600) (0.629-0,760) (0.750-0,908) (0.918-1.12) (1.05-1.30) 1 (1.22-1.50) 1 (1,39-1.73) 1 (1.64-2.07) 1 (1.85-2.37) 0.263 0.319 0.406 0.488 0.605 0.712 0.829 0.960 1.16 1.33 12-hr (0.239-0.293) (0.289-0.355) (0.367-0.451) (0.440-0.543) (0.541-0.671) (0.632-0.787) (0.729-0.915) (0.835-1.06) (0.990-1.28) (1.13-1.48) 0.152 0.184 0.236 0.285 0.354 0.415 0.483 0.559 0.674 0.774 24-hr (0.139-0.167) (0.169-0,203) (0.218-0.262) (0.259-0.313) (0,320-0.389) (0.371-0.455) (0.427-0.529) (0.488-0.613) (0,577-0.742) (0.652-0.857) 0.088 0.107 0.137 0.163 0.203 0.237 0.276 0.320 0.386 0.443 2-day (0.080-0.097) (0.097-0.118) (0.125-0.151) (0.148-0.180) (0.182-0.224) (0,211-0.262) (0.243-0.305) (0.278-0.354) (0.329-0.430) (0.371-0.497) 0.062 0.075 0.096 0.114 0.140 0.163 0.188 0.216 0.259 0.296 3-day (0.057-0.069) (0.069-0.083) (0.087-0.106) (0.103-0.125) (0.126-0.154) (0.146-0.179) (0.166-0.207) (0.189-0.239) (0.222-0.288) (0.250-0.332) 0.049 0.059 0.076 0.089 0.109 0.126 0.144 0.164 0.196 0.223 4-da (0.045-0.054) (0.054-0.065) (0.069-0.083) (0.081-0.098) (0.098-0.119) (0.113-0.138) (0.128-0.158) (0.144-0.181) (0.169-0.217) (0.190-0.249) 0. 333 0.039 0.049 0.058 0.070 0.080 0.091 0.103 0.120 0.134 7-day (0.030-0.036) (0,036-0.043) (0.045-0.054) (0.053-0,063) (0.064-0.076) (0.072-0.087) (0.081-0.099) (0.091-0.112) (0.105-0.132) (0.116-0.149) 0.025 o.031 0.038 0.044 0.053 0.060 0.068 0.076 0.088 0.098 10-day (0.023-0.028) (0.028-0.033) (0.035-0,041) (0.040-0.048) (0.048-0.057) (0.054-0.065) (0.061-0.074) (0.068-0.083) (0.077-0.097) (0.085-0.109) 0.017 0.020 0.025 0.028 0.033 0.037 0.042 0.046 0.053 0.058 20-day (0.010-0.018) (0.019-0.022) (0.023-0,026) (0.026-0.030) (0.031-0.036) (0.034-0,040) (0.038-0.045) (0,042-0.050) (0.047-0.058) (0.051-0.064) 0.014 0.016 0. 220 0.022 0.026 0.029 0.032 0.035 0.040 0.043 30-da (0.013-0,015) (0.015-0.018) (0.019-0,021) (0.021-0.024) (0.024-0.028) (0.027-0.031) (0.030-0.035) (0.032-0.038) (0.036-0.043) (0.038-0.047) 0.012 0.014 0.016 0.019 0.022 0.024 0.026 0.029 0.033 0.036 45-day (0.011-0.012) (0.013-0.015) (0.015-0.018) (0.017-0.020) (0.020-0.023) (0.022-0.026) (0.024-0.029) (0.026-0.031) (0.029-0.035) (0.032-0.039) 0.011 0.012 0.015 0.016 0.019 0.021 0.023 0.624 0.027 11 0.029 60-day (0.010 0.011) (0.012-0.013) (0.014-0.016) (0.015-0.017) (0.018-0.020) (0.019-0.022) (0.021-0.024) (0.022-0.026) (0.025-0.029) (0.026-0.031) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90 % confidence interval. The probability that precipitation frequency estimates (fare given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more Information. Back to Top PF graphical "' "E r �� �, _. W R. 2 5 2913 BY: http://`hdse.nws.noaa. govlhdsc/pfds/pfds_printpage.html?lat=34.6736&lon=-77.3524&data=intens... 2/21 /2013 qNOAA Atlas 14, Volume 2, Version 3 y Location name: Jacksonville, North Carolina, US" 6 , Coordinates: 34.6825, •77.3629 � r n p Elevation: 5ft" �= d -source: Google Maps °t�.�` POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather service, Silver Spring, Maryland PF tabular I PF oraghical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)l Average recurrence interval (years) Duration 5-min 10-min 50 0.929 (0.849-1.00) 1.48 (1.35-1.60) 100 1.01 (0.914-1.09) 1.60 (1.45-1.73) 200 1.08 (0.978-1.17) 1.72 (1.55-1.85) 500 1.18 (1.06-1.28) 1.87 (1.67-2.02) 1000 1.26 (1.12-1.37) 1.99 (1.76-2.16) 1 0.492 (0.456-0,534) 0.786 (0728-0.852) 2 0.579 (0.537-0,627) 0.927 (0.859-1.00) 5 0.671 (0.620-0.725) 1.08 (0.993-1.16) 10 ������� 0.754 (0.695-0.814) 1.21 1 (1.11-1.30) 25 0.851 (0.781-0.918) 1.36 1 (124-1.46) 15-min 30-mtn 60-min 2-hr 3-hr 6-hr 12-hr 24-hr 2-day 3-day 4-day 7-day 10-day 20-day 30-day 45-day 60-day 0.982 (0.910-1.07) 1.35 (1.25-1.46) 1.68 (1.56-1.82) 2.04 (1.89-2.22) 2.21 (2.03-2.42) 2.69 (2.46-2.96) 3.17 (2.88-3.53) 3.63 (3.33-4.01) 4.23 (3,65-4.67) 4.47 (4.09-4.93) 4.72 (4.32-5.19) 5.47 (5.04-5.98) 6.11 (5.64-6.67) 8.14 (7.56-879) 9.99 (9.34-10.7) 12.5 (11.7-13.5) 15.2 (143 16.2) 1.1'7 (1.08-1.26) 1.61 (1.49-1.74) 2.02 (1.87-2.19) 2.48 (2.29-2.69) 2.67 1 (2.47-2.93) 3.25 (2.98-3.59) 3.84 (3.48-4.27) 4.42 (4.05-4.87) 5.12 (4.66-5.66) 5.41 (4.94-5.96) 5.71 (5.22-6.27) 6.59 (607-7.20) 7.32 (6.75-8.00) 9.68 1 (9.00-10.5) 11 -9-1 1 (11.1-12.7) 1 -148--1 1 (139-16.0) 1 17.9 (16.8-19.1) 1.361.72 (1.26-1.47) 1.93 (l 79-2.09) 2.48 (2.29-2.68) 3.11 (2.87-3.39) 3.37 (3.10-3.69) 4.12 (3.78-4.54) 4.88 (4.42-5.43) 5.71 (5.23-629) 6.57 (5.97-7.26) 6.91 (6.29-7.61) 7.25 ) (6.61-7.97 8.29 (7.61-9.05) 9.08 (8.35-9.90) 11.8 (10.9-12.7) 14.3 (13.3-15.3) 17.7 (16.5-19.0) 21.0 (79.8-22.5) this table are based (1.41-1.65) 2.21 (2.04-239) 2.88 (2.65-3.11) 3.69 (3.39-4.01) 4.03 4.93 (4.49-5.43) 5.88 (5.29-6.53) 6.82 (6.21 -7.50) 7.83 (7.08-8.63) 8.18 (7.42-9.01) 8.54 (7.77-9.38) 9.70 (8.87-10.6) 10.5 ) (9.66-11.5 13.5 16.2 (15A-174) 1 20.0 IF (18.6-21.5) 23.6 (22.1-25.2) on frequency (1,58-1.85) 2.55 (2.34-2.75) 3.39 (3.11-3.66) 4.48 (4.09-4.86) 4.95 1 (4.51-5.39) 6.07 (5.49-6.67) 7.28 (6.51 -8.07) 8.49 (7.67-9.32) 9.72 (8.73-10.7) 10.1 (9.06-11.1) 10.4 (9.43-11.4) 11.7 (10.7-128) 12.6 (11.5-13.7) 16.0 1 114.7-17.2) 18.9 1 (17.5-2D.2) 23.2 (21.5-25.0) 27.0 (25.2-28.8) analysis of 1.87 (1.71-2.02) 2.82 (2.58-3.04) 3.82 (3.49-4.12) 5.16 (4.69-5.60) 5.77 (&21-6.28) 7.09 (6.36-7.79) 8.57 (7.60-9.47) 9.95 (B.90-10.9) 11.4 (10.1-12.6) 71.7 (10.5-12.9) 12.1 (10.6-13.2) 13.4 (12.1-14.6) 14.4 (13.0-15.7) 18.0 (16.4-19.4) 21.0 (19.4-225) 25.9 (23.9-27.9) 29.7 (27.6-31.7) partial duration 2.02 (1.84-2.18) 3.09 (2,81-3.34) 4.26 (3.87-4.60) 5.88 (5.31-6.38) 6.65 (5.96-7.24) 8.20 (7.30-899) 9.97 (8.77-11.0) 11.6 (10.2-12.7) 13.2 ) (11.7-14.6 13.5 (12.0-14.9) 13.8 (123-152) 15.3 (13.7-16.7) 16.2 (14.6-17.7) 00.1 (18.3-21.8) 23.2 (21.3-24.9) 28.6 (262-30a) 32.4 (30.0-34.7) series (PDS). 2.16 (1.96-2.34) 3.37 (3.04-3.64) 4.72 (4.27-5.11) 6.66 (5.97-7.22) 7.62 (6.77-8.30) 9.44 (8.31-10.3j 11.5 (10.0-12.7) 13.4 (11.7-14.7) 15.3 (133-17.0) 55.5 (13.6-1Z2) 15.8 (13.8-17.4) 17.3 (15.3-18.9) 1 -2 (16.3-20.0) 22.4 11 (20.1-24.3) 25.4 1 (232-27.4) 31.4 (285-33.9) 35.2 (32.4-37.7) 2.35 (2.10-2.55) 3.74 (3.34-4.05) 5.36 (4.80-5.811 7.78 (6.90-8.45) 9.05 (7.94-9.87) 11.3 (9.77-12.4) 13.9 (11.9-15.3) 16.2 (13.8-17.8) 18.5 (15.8-20.6) 88.6 (16.0-20.7) 18.8 (16.2-20.8) 20.2 (17.6-22.2) 21.1 (18.6-23.3) 25.5 11 (22.6-27.9) 28.5 (25.7-30.9) 35.2 (31.7-38.3) 38.8 (35.4-41.9) 2.50 (2.21-2.72) 4.05 (3.59-4.40) 5.91 (5.24-6.42) 8.75 (7.70-9.54) 10.3 (8.96-11.3) 22.9 (11.1-14.2) 16.0 (13.5-17.7) 16.5 (15.6-20.6) 21.3 (17.8-23.8) 21.3 ) (18.0-23.8 2 4- (18.2-23.9) 22.6 (19.4-25.0) 23.5 (20.4-26.1) 28.1 (24.6-30.8) 31.0 (27.7-33.7) F 38.3 (34.1-41.9) 41.7 (37.8-45.2) Precipitation frequency (PF) estimates in Numbers in (for a given are not checked parenthesis are duration and average against probable PF estimates recurrence maximum at lower and upper interval) will precipitation bounds of the be greater than (PMP) estimates 90 %confidence the upper bound and may be higher interval. The (or less than than currently probability the lower bound) valid PMP that precipitation is 5%. Estimates values. frequency at upper estimates bounds Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical MAR 2 5 2013 BY: lL®CATION & VICINITY MAPS T.WobsW4000-04095t04040 Wallace Creek Marine Mart_ NC10esignkCaldCiviRCover.doc E UVF MAR 2 5 2013 6Y:_ Lewis,Linda From: Lewis, Linda Sent: Tuesday, March 19, 2013 6:09 PM To: Tim Focht Cc: 'Bradshaw CIV Thomas C , Scott, Georgette Subject: Express Review Addinfo #2 SW8 130301 Attachments: 2013 03 addinfo_2 130301.pdf Tim Attached please find my second round of review comments. If the application is not substantially complete by March 26, 2013, it will have to be returned. Linda March 19, 2013 Neal Paul, Deputy Public Works Officer MCB Camp Lejeune Building 1005 Michael Road Camp Lejeune, NC 28547 Subject: 2nd Request for Additional Information — Express Review Stormwater Project No. SW8 130301 Wallace Creek Marine Mart Onslow County Dear Mr. Paul: The Wilmington Regional Office received previously requested additional information regarding the Express State Stormwater Management Permit application for Wallace Creek Marine Mart on March 12, 2013. A preliminary review of that information has determined that the application is still not complete. The following information is needed to continue the stormwater review: The one -inch orifice specified by the consultant is too small under the average head of 0.43 feet. I am unclear as to how the 2-day and 5-day target flowrates for Pond 1 were calculated. The formula used by the consultant is unfamiliar and contains a "CF" number (conversion factor?), but the CF is equal to 43,560 divided by 3600. The Division calculates estimated target flowrates by dividing the minimum storage volume (9739 cubic feet via the Simple Method) by the number of seconds in 2 days (172800) and in 5 days (432000), resulting in .056 cfs and .023 cfs respectively. The standard orifice equation can then be solved for the range of suitable orifice areas using these flowrates and the "average" head, H/3. The orifice areas are then plugged into the equation for the area of a circle, nr2, and solved for the radius, r, and then the diameter. In this case, the range of orifice diameters is 1.15" up to 1.8". Suggested standard sizes would be 1.25". 1.5" or 1.75". 2. It's going to be easier to check, clear and maintain the orifice in Pond 1 if the 4" PVC T-assembly is located outside the outlet structure, between the skimmer plate and the structure wall, in the pond. 3. If there is no weir available at the specified temporary storage elevation (19.8) in OCS #3 in Pond 2, then the driving head for the 90' V -notch weir must be measured from the top of the structure, at 21.3. The 2 foot head results in a 14.14 cfs flow rate that draws down the required 1.5" storage volume (1488 cf by the Simple Method) in approximately 1.75 minutes, which does not meet the rule requirement for 2-5 days. As stated in the previous additional information letter, the 2-5 day draw down requirement is associated with the 1.5" design storage volume, i.e., .0406 acre-feet, and not with the routing of the 1 year 24 hour storm. It is apparent that the use of a V-notch weir as an orifice is not working in this case. Please go back to the small diameter orifice, although I suggest designing several layers of trash rack devices to avoid constant clogging. Mr. Paul March 19, 2013 Stormwater Application No. SW8 130301 4. Routing the storm is not the same as calculating the required orifice size or flowrate which will draw down Pond 2 within 2-5 days. The provided calculations appear to be based on a 1 year 24 hour "simulation" and indicate that the pond returns to its normal water level in approximately 29 hours, which is too fast. It is a static calculation assuming a "full pond" whose water level must return to its starting point under average head (1-1/3) no faster than 2 days, but no slower than 5 days. This conservative static design also assumes that no outflow occurs during the storm event. Please note that a revision to one number may have a domino effect on other numbers, which may require revision of the applications, calculations, supplements, plans, details, and associated documentation. Please verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to March 26, 2013, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. In the Express program, no more than 2 time extensions may be granted, for a total of 10 days. If this is a new project, the construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. The proposed modification may not be constructed until the permit modification is approved and issued. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been returned to the engineer or agent. All original documents must be revised and returned, or new originals must be provided. Photocopies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7301 or email me at linda.lewis(cDncdenr.gov Sincerely, Linda Lewis Environmental Engineer III GDS/arl: S:\WQS\Stormwater\\Permits 8 Projects12013\130301 HD\2013 03 addinfo_2130301 CC: Timothy A. Focht, P.E., The Stellar Group, Inc. Wilmington Regional Office Stormwater File Page 2 of 2 TRANSMITTAL DATE: March 11, 2013 TO: Janet Russell RE: Marine Corps Base Camp Lejeune NCDENR Marine Mart Wilmington Regional Office Stormwater Management Submittal 127 Cardinal Drive Extension Express Permitting Wilmington, NC 28405 We are sending: ® UPS -Overnight ❑ -US Mail ❑ Courier ❑ Hand Carry ✓ I Enclosed Under Separate Cover ✓ Project Drawings ✓ For Your Use Project Specifications Reviewed Shop Drawings Reviewed & Noted Product Literature Revise & Resubmit Other Not Accepted # Copies Dw . # Date Description Prepared B 2 3/11/13 Comment -Responses TAF 2 3/11/13 Revised Design Analysis TAF 2 3/11/13 Revised Permit Drawings (C401, TAF C402, C501, C506) 2 3/11/13 Revised Wet Detention Basin TAF Supplement (SWMF-1) 2 3/11/13 Revised Wet Detention Basin TAF Supplement (SWMF-2) REMARKS: Please find the attachments listed above for your review and approval. If you have any questions or require additional information, please call me at (904) 899-9866. Tim Focht F7CEIVIE MAR 12 2013 Russell l l Marl3.doc 2900 Hartley Road, Jacksonville, Florida 32257 • Telephone (904) 260-2900 www.stellar.net *stellar 2900 Hartley Road Jacksonville, Florida 32257 (904) 260-2900 MEMORANDUM Date: 11 Ma r13 To: To Whom it May Concern From: Tim Focht Subject: Wallace Creek Marine Mart Stormwater Project No. SW8 130301 Following are responses to comments made by Linda Lewis dated 8Mar13 (attached). The drawdown orifice calculation for SWMF-1 has been revised using the corrected head. The outfall control structure detail on sheet C501 has been revised to detail outfall control structure #1 for SWMF-1 only. Individual details for outfall control structures #2 and #3 have been added on sheet C506. 3. See response to comment 2 above. (� The design intent is to use a singe) V-notch weir (90°) for both the drawdown and overflow �J features. The V-notch weir, extending the full width of the structure, is more than adequate to serve as the overflow weir. 5. The weir in outfall control structure #2 has been revised. The weir crest elevation is now 18.80. 6. BMPs have been provided at all outfall control structures to prevent clogging. 0 The coefficient for the V-notch weir has been corrected. The driving head for the V-notvch weir as been corrected. 8. The requested labels have been added to the cross sections on sheets C401 and C402. 9. Dimensions and radii have been added to the plan view on sheets C401 and C402. 10. All dates have been updated and documents signed & sealed. 11. The geometric input for modelling the V-notch wier into iCPR has been confirmed. The weir cofficient has been corrected. 12. A Time -Series report from iCPR for SWMF-2B has been printed to show proper drawdown with 2- 5 days. The storm event modelled is inconsequential for the purpose of drawdown time confirmation. A storm event sufficient enough to reach the temporary pool elevation must be used then confirm the required treatment has been drawn down within the required time. MAR 12 2013 By: MC®EN W O North Carolina Department of Environment and Natural Resources Pat McCrory Governor March 8, 2013 Division of Water Quality Charles Wakild, P. E. Director Neal Paul, Deputy Public Works Officer MCB Camp Lejeune Building 1005 Michael Road Camp Lejeune, NC 28547 Subject: Request for Additional Information — Express Review Stormwater Project No. SW8 130301 Wallace Creek Marine Mart Onslow County Dear Mr. Paul: John E. Skvarla, III Secretary The Wilmington Regional Office received an Express State Stormwater Management Permit application for Wallace Creek Marine Mart on March 6, 2013. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Please resize the circular orifice for Pond 1 using a head that is 1/3 of the total elevation head. Please refer to Section 3.5.2 of the BMP manual. Assuming that a rectangular outlet weir exists at the temporary pool elevation (TPE) of 21.3, the elevation difference between TPE and permanent pool (PPE) is 1.3 feet. One third of this is approximately 0.42 feet. I am not sure how the consultant derived the currently specified driving head of 0.69 feet. 2. The current outfall structure detail does not specify or show the circular orifice location. There is reference to a weir elevation, however, there are 3 different weirs possible: one for the V-notch weir (as the orifice); and, the other two for the temporary pool overflow weir. It needs to be made clear on the outfall structure detail that the circular orifice is located below the overflow weir elevation. 3. Please add a plan view detail of the V-notch weir which specifies the notch angle and the trash rack, to the pond details. 4. Outfall Control Structure #3 will also require an overflow weir set at 19.8. The only weir listed in the table for OCS #3 is the 90 V-notch weir at elevation 19.3. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: 910-796-72151 FAX: 910-350-20041 DENR Assistance. 1-877-623-6748 Internet: x .ncwaterquality.org one NhCarolina Naturally Mr. Paul March 8, 2013 Stormwater Application No. SW8 130301 A rectangular weir at the permanent pool elevation of 19.3 is not encouraged in OCS #2. Because Pond 2A acts as the forebay, water qualify would be better served if the weir elevation in OCS #2 was a few inches lower, maybe at 18.8 or 19.0. This encourages the water level in Pond 2A and 2B to rise and fall more evenly. By setting the weir elevation in Pond 2A at 19.3, there's a possibility that the water level in Pond 2A will always be higher than in Pond 2B. Please specify a suitable trash rack over the face of all weirs (V-notch and overflow) and add that detail to the plans. See Section 5.8.8 of the BMP Manual for trash rack requirements. A suitable trash rack for the circular orifice would be a 900 or 450 turned -down elbow, such that the opening is 6" below the permanent pool elevation. This will prevent floating debris from clogging the orifice. 7. Please recalculate the V-notch weir flowrate for Pond 2 and provide corrected information on the supplement form. Per Section 3.5.1 and Figure 3-2 in the BMP Manual, the coefficient of discharge for a 90' notch angle at the full head of 0.5 feet is 2.5, not 3.2. The coefficients in the BMP manual table include the Tan(O/2). The driving head is the difference between the TPE and the PPE, which is 0.5 feet. There is no need to use H/3 for a V-notch weir because the flowrate is not reduced as the head drops. The full elevation head of 0.5 can be used in the equation, even for low flows. I am not sure where or how the consultant determined that 0.125 was the driving head in this case. The length of a V-notch weir is not relevant to the calculation of the flowrate. Based on the correct coefficient and driving head, the calculated flowrate for this V-notch weir is 0.442 cfs, which is well above the target range of .003 to .009 cfs for this small pond. 8. Please label the temporary pool and permanent pool elevations on the pond section details. 9. Please provide the dimension and radius for each line and arc of the permanent pool contour. 10. Please stamp, sign and date the revised design calculations. The outside cover is dated February 25, 2013, but the ICPR reports inside are dated February 28, 2013. 11. Page 3 of 5 of the ICPR report indicates that the geometry of the weir for OCS #3 is "Trapezoidal". Please confirm that the entry of "0" as the bottom width makes this a V-notch weir. Please note that the discharge coefficient of 3.2 is not correct for a 900 V-notch weir. 12. The calculations for Pond 2 indicate that the "Bleed Down Orifice Sizing Calculations" can be found in the ICPR Model input and results. I can locate the model entry parameters on page 3 of 5, but I cannot locate the resulting flowrate or drawdown time calculations. Please note that the 2-5 day draw down requirement is associated with the 1.5" design storage volume, and. not with the routing of the 1 year 24 hour storm. Page 2 of 3 i Mr. Paul March 8, 2013 Stormwater Application No. SW8 130301 Please note that a revision to one number may have a domino effect on other numbers, which may require revision of the applications, calculations, supplements, plans, details, and associated documentation. Please verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to March 15, 2013, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. In the Express program, no more than 2 time extensions may be granted, for a total of 10 days. If this is a new project, the construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. The proposed modification may not be constructed until the permit modification is approved and issued. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been returned to the engineer or agent. All original documents must be revised and returned, or new originals must be provided. Photocopies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7301 or email me at Ilnda.lewis(Lbncdenr.gov Sincerely, ez."- Linda Lewis Environmental Engineer III GDS/arl: S:1WQMtormwater\\Permits 8 Projects120131130301 HD12013 03 addinfo 130301 CC: Timothy A. Focht, P.E., The Stellar Group, Inc. Wilmington Regional Office Stormwater File Page 3 of 3 TRANSMITTAL DATE: March 5, 2013 TO: Janet Russell RE: Marine Corps Base Camp Lejeune NCDENR Marine Mart Wilmington Regional Office Stormwater Management & Erosion Sediment 127 Cardinal Drive Extension ControlSubmittal ;j Wilmington, NC 28405 Express Permitting We are sending: ® IJPS-Overnight ❑ U. S. Mail ❑ Courier ❑ Hand Carry ✓ Enclosed Under Separate Cover ✓ Project Drawings ✓ For Your Use Project Specifications Reviewed' Shop Drawings Reviewed & Noted Product Literature Revise & Resubmit Other Not Accepted # Copies Dw . # Date Description Pre ared B. 2 Stormwater Management Permit TAF Application Submittal (includes: Application Fee, Stormwater Management Permit Application w/ Supplements, Operation & Maintenance Agreements, Design Analysis w/ Narrative, Permit Drawings) 3 Erosion & Sediment Control Permit TAF Application (includes: Application Fee, SWPPP, Design Drawings, Calculations) REMARKS: Please find the attachments listed above for your review and approval. Please note, you should already have a copy of the Financial Responsibility /Ownership Form, Stormwater Design Checklist, Geotechnical Report, ACOE Jurisdictional Determination Approval, and the Erosion & Sediment Control Design Checklist from our submittal meeting on February 26, 2013. If you have any questions or require additional information, please call me at (904) 899-9866. ECEIVE MAR 0 6 2013 Tim Focht 04040 Trans Janet Russel; Wert Idoc y: 2900 Hartley Road, Jacksonville, Florida 32257 • Telephone (904) 260-2900 www.stellar.net ECS CAROLI AS, LLP "Setting the Standard for Service" Geotechnical • Construction Materials • Environmental -.Facilities ❑C Re9 srmeJ En9 ax, r, -o 0 April 10, 2012 Mr. Timonthy A. Focht,'P.E. Stellar Group 2900 Hartley Road Jacksonville, Florida 32257 Reference: Report, of Seasonal High Water Table Estimation Wallace Creek Marine Mart MOB Campleje,une,,North Carolina ECS Project No. 22.174i9 Dear Mr. Focht: ECS Carolinas, LLP (ECS) recently performed a hand auger boring for seasonal high water table estimation for the proposed stormwater best management practice (BMP) areas for the Wallace Creek Marine Mart in MCB Camp Lejeune, Onslow County, North Carolina. This letter, with attachments, is the report of our testing. Field Testing On April 4, 201,2, ECS conducted an exploration of the subsurface soil and groundwater conditions, at. the location shown on the attached Boring Location Plan (Figure 1). The purpose of this exploration was to obtain subsurface information of the in -place soils for the proposed stormwater BMP area. ECS explored the subsurface soil and groundwater conditions by advancing one hand auger boringinto the existing ground surface at the boring location. ECS visually classified the subsurface soils of each soil type 'encountered. ECS also recorded the groundwater level and the seasonal high water table (SHWT) observed at the time of the hand auger boring. The attached Seasonal High Water Level Estimation Form provides a summary of the subsurface conditions encountered at the hand auger boring location. The groundwater level and the SHWT were estimated at the boring location below the existing grade elevation. A summary of the findings are as follows: .:Location'. i, ._ ' _'I: L Water.Level'. SHWT S-1 I 48 inches 18 inches MAR 0 6 2013 BY:� �/30 I 7211 Ogden Business Park, Suite 201, Wilmington, NC284,11 • T. 910-686-9114 • F: 910-686-9666 • www.epslimited.com ECS Capitol Services. PLLC s ECS Carolinas, LLP • ECS Florida, LLC - ECS Midwest, LLC - ECS Mid -Atlantic, LLC e ECS Southeast, LLC v ECS Texas, LLP Report of Seasonal High Water Table Estimation Wallace Creek Marine Mart MCB,Camp Lejeune, North Carolina, ECS Project No.: 22.17419 Closure The activities and evaluative approaches used in this assessment are consistent with those normally employed in assessments of this type. ECS's testing of site conditions has been based on our understanding of the project information and the data obtained during our field activities. ECS appreciates the opportunity to provide our services to you on this project. If you have any questions concerning'this report or this project, please contact us at (910) 686- 9114. Respectfully, ECS CAROLINAS, LLP Winslow E. Goins' P.E. Project Engineer Attachments: Figure 1 - Boring Location Plan Seasonal High Water Table Estimation Form ?r7 Kris J. Stamm Principal o Y o WLLI F ct W fi Q Z W lL c H T F 5.%ate/' _.,r'z. ^•� '�'ti,� U Z, ' {./lea" j'J/ _ u,:i;:°�a;y"R""" 1�Yy\`'•, �'L��n.\\ S ,' J. Q Q- 9i ��, b�;� ♦ R�+g�'/ aTP, { ca�� 25'SP w%�2�\•``�...r �, ee'' � � 4F� r as �♦��. $ `r � i' ..,�.Az. ^�+,�+�r� � °il - a ��, {+t [LW� � 25 :SP�T,�` �@ ��s�; � ,dFP'.� _ � � '}ICE � •r. 5 o h! � C • ��i. t � ,� � �t�= a r.�. � `!,� �� -r{ � it Z M��• •,k' �`c2lc�����. 25'-SP-A���.� �.� ti♦l\*�' •♦— cn�' /f O' I y f wm� Q* sY e Nb� .�. a !� ham♦ \ ` \ ♦ Key �'FA5 41, f yF r... a�- K! >�w �• � •ilti >r L4�� �a,�„i*. 'ui. �i� .'.,a".i' k�. ^ Q spa V�� e�,�y��q r. ny �ey., jz� .!�f �� k ,�y�#�3 ♦ '•� k .� y. r+�"...F'�'3`'z�"=`t s.�7; `�a�^ �^r.'.�, i°t:�'i� � _�.erf.. •:r=� .CJ -m.. '�� � F �Py ��� rq �n� ��� � � ">M'•,. �,�'^t�,. � .,� � "-.' ENGINEER1 DRAFONG WEG MFH w T. -, GALE ' " r - s • ^>� ♦1 is t n r ram- C ♦ _-7° ..5 i.';_,\? ? }L�r. -'0 .;�•, "'• •fix' +��a.� .3 .. .i PROJECT 22-17419 r '- f- ; DENOTES APPROXIMATE `mow DENOTESAPPROXIMATE LOCATION OF s t r �*, LOCATION OF'SOIL TEST BORING'�V HAND AUGER BORING SHEET,1. 'of ,1 C r - Lrv.o ..,s9 « �- v" vY- •''6 1Cn.`i2a?;ri ATE 3/9/2012 Season High Water Level Estimation Wallace Creek Mini Mart MCB Camp Lejeune, North Carolina ECS project No. 22.17419 April 4, 2012 Location Depth Soil Description S-1 0-12" Brown silty SAND 12"-36" Gray/tan clayey SAND 36"-60" Gray silty SAND Elevation of ground'surface at boring: 23 feet Seasonal High Water Table was estimated, to be at 18 inches below the existing grade elevation. Ground water was encountered at 48 inches below the existing grade elevation. MAR 0 6 2013 BY:____ REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS WALLACE CREEK MARINE MART MCB CAMP LEJEUNE, NORTH CAROLINA TM PREPARED FOR: MR. TIMONTHY A. FOCHT, P.E. STELLAR GROUP 2900 HARTLEY ROAD JACKSONVILLE, FLORIDA 32257 ECS CAROLINAS, LLP. PROJECT NO.: 22.17419 MARCH 9, 2012 MAR 0 6 2013 BY: ECS C A Ra OU N A S s LLP "Setting the Standard for Service" 1. Geotechnical • Construction Mc"Itel'IEIIS • Envitont-nental • Facilities . NC Registered Engineering Firm F-1070 March 9, 2012 Mr. Timonthy A. Focht, P.E. Stellar Group 2900 Hartley Road Jacksonville, Florida 32257 Re: Report of Subsurface Exploration and Geotechnical Engineering Evaluation Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 Dear Mr. Focht: As authorized by your acceptance of our proposal number 15534R, dated January 30, 2012, ECS Carolinas, LLP has completed a subsurface exploration for the subject project. This report presents the results of the field exploration; laboratory testing and engineering analysis, along with our recommendations for design of geotechnical related items. We appreciate the opportunity to be of service to you during the design phase of this project and look forward to our continued involvement during the construction phase. If you have any questions concerning the information and recommendations presented in this report, please contact us at (910) 686-9114 for further assistance. Respectfully submitted, ECS CAROLINAS, LLP _._ 16 1 71J Micah F. Hatch, E.I. Project Manager Winslow E. Goins, P.E. Project Engineer North Carolina License No. 033751 V i Q w< < Walid M. Sobh, P. Principal Engineer North Carolina License No. 022983 7211 Ogden Business Park, Suite 201, Wilmington, NC 28411 T. 910-686-9,114 • F: 910-686-9666 • www.ecslimited.com ECS Capitol Services, PLLC • ECS Carolinas, LLP • ECS Florida, LLC • ECS Midwest, l_I-C • ECS Mid-Alian(ic, LLC • ECS Southeast, LLC • ECS Texas, LLP REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ANALYSIS WALLACE CREEK MARINE MART MCB CAMP LEJEUNE, NORTH CAROLINA PREPARED FOR: MR. TIMONTHY A. FOCHT, P.E. STELLAR GROUP 2900 HARTLEY ROAD JACKSONVILLE, FLORIDA 32257 PREPARED BY: ECS CAROLINAS, LLP 7211 OGDEN BUSINESS PARK SUITE 201 WILMINGTON, NORTH CAROLINA 28411 ECS CAROLINAS, LLP PROJECT NO.: 22.17419 FIRM NO. F-1087 WINSLOW E. GOINS P.E. \\G CARar,,// 3 io � o NC/LkiNSE%10\033751 MARCH 9, 2012 ECESVE MAR 0 6 2013 EY: TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY ..................................... ................................................................. 1 2.0 PROJECT OVERVIEW.........................................................................................................2 2.1 Project Information..........................................................................................................2 2.2 Scope of Work.................................................................................................................2 2.3 Purpose of Exploration....................................................................................................2 3.0 EXPLORATION PROCEDURES..........................................................................................3 3.1 Subsurface Exploration Procedures.................................................................................3 3.1.1 Soil Test Borings.....................................................................................................3 3.2 Laboratory Testing Program............................................................................................3 4.0 EXPLORATION RESULTS...................................................................................................4 4.1 Site Conditions................................................................................................................4 4.2 Regional Geology............................................................................................................4 4.3 Soil Conditions..............................................................................:..................................4 4.4 Groundwater Conditions..................................................................................................5 4.5 Laboratory Test Results...................................................................................................5 5.0 ANALYSIS AND RECOMMENDATIONS..............................................................................6 5.1 Subgrade Preparation......................................................................................................6 5.2 Engineered Fill Placement...............................................................................................6 5.3 Foundations Design.........................................................................................................8 5.4 Floor Slab Design............................................................................................................8 5.5 Seismic Site Class Determination and Liquefaction Potential..........................................9 5.6 Lateral Earth Pressures..: .............................................................................................. 10 5.7 Pavement Recommendations........................................................................................11 5.8 Site Drainage.................................................................................................................12 5.9 Construction Considerations..........................................................................................12 6.0 CLOSING...........................................................................................................................13 APPENDICES APPENDIX A -FIGURES APPENDIX B-SPT BORING LOGS AND SOIL CLASSIFICATION SYSTEM, DESCRIPTION, AND TERMINOLOGY APPENDIX C-LABROTORY TEST RESULTS APPENDIX D-GENERAL CONDITIONS APPENDIX E-PROCEDURES REGARDING FIELD LOGS, LABORATORY DATA SHEETS AND SAMPLES Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 1.0 EXECUTIVE SUMMARY This report contains the results of our subsurface exploration and geotechnical engineering analysis for the proposed site located at the intersection of Birch Street and McHugh Boulevard on MCB Camp Lejeune, North Carolina. At the time of our exploration, the proposed site was heavily wooded and relatively level. ECS understands that a one-story commercial/retail building and fuel island canopy will be constructed at the site. The building structure will include masonry walls, structural steel roof, structural steel columns and cast -in -place slab. The anticipated maximum column loads for the structure will be 60 kips. The anticipated maximum wall load is 4 kips per foot. The estimated slab load is 125 pounds per square foot (psf). Site grades are anticipated to be raised one foot. The exterior pavements may consist of flexible and rigid pavement sections for both standard and heavy duty traffic. Approximately 6 to 8 inches of organic topsoil was reported by the drillers at the borings locations. Beneath the surface to depths of 7 feet, the test borings typically encountered intermittent layers of very loose to medium dense silty, slightly silty, clayey and clean sands (SM, SP-SM, SC, SP). From 7 feet to depths of 25 feet, the test borings typically encountered intermittent layers of very loose to medium dense silty, slightly silty, clayey and clean sands (SM, SP-SM, SC, SP) and very soft to firm sandy clays and clays (CL, CH). A layer containing organics was encountered at depths of approximately 17 feet in borings B-2 and B-4, and at depths of approximately 22 feet in borings B-5 and B-6. In boring B-6, from a depth of 25 feet to a depth of approximately 50 feet, the test boring typically encountered intermittent layers of very loose to medium dense silty, slightly silty, and clean sands (SM, SP-SM, SP) and weathered limestone. In summary, the proposed building can be supported on conventional shallow foundations. For foundations designed and constructed in accordance with the recommendations provided in this report, a net allowable soil bearing pressures of 2,000 pounds per square foot (psf) is recommended for use in proportioning shallow foundations. We request the opportunity to review our foundation recommendations and make any necessary changes once the final building location and site design grades are determined. Specific information regarding the subsurface exploration procedures used, the site and subsurface conditions at the time of our exploration, and our conclusions and recommendations concerning the geotechnical design and construction aspects of the project are discussed in detail in the subsequent sections of this report. Please note this Executive Summary is an important part of this report and should be considered a "summary" only. The subsequent sections of this report constitute our findings, conclusions, and recommendations in their entirety. Prepared By: Reviewed By: Micah F. Hatch, E.I. Winslow E. Goins, P.E. Project Manager Project Engineer Walid M. Sobh, P.E. Principal Engineer MAR 0 6 2013 1 BY: Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 2.0 PROJECT OVERVIEW 2.1 Project Information Our understanding of the proposed development is based upon our discussions with representatives of Stellar Group, Inc. and a review of the site plan provided to ECS by Stellar Group, Inc. The proposed site is located at the intersection of Birch Street and McHugh Boulevard on MCB Camp Lejeune, North Carolina. At the time of our exploration, the proposed site was heavily wooded and relatively level. ECS understands that a one-story commercial/retail building and fuel island canopy will be constructed at the site. The building structure will include masonry walls, structural steel roof, structural steel columns and cast -in -place slab. The anticipated maximum column loads for the structure will be 60 kips. The anticipated maximum wall load is 4 kips per foot. The estimated slab load is 125 pounds per square foot (psf). Site grades are anticipated to be raised one foot. The exterior pavements may consist of flexible and rigid pavement sections for both standard and heavy duty traffic. 2.2 Scope of Work The conclusions and recommendations contained in this report are based on the results of: • eight soil test borings, • visual examination of the samples obtained during our field exploration, • the results of select laboratory index and engineering properties testing, • engineering analyses of the field and laboratory findings with respect to the provided project information. 2.3 Purposes of Exploration The purpose of this exploration program was to determine the soil and groundwater conditions at the site and to develop engineering recommendations to assist in the design and construction of the proposed project. We accomplished these objectives by: • performing a site reconnaissance to evaluate the existing site conditions, • drilling test borings to explore the subsurface soil and groundwater conditions, • performing laboratory tests on selected representative soil samples from the borings to evaluate pertinent engineering properties; and • analyzing the field and laboratory data to develop appropriate geotechnical engineering design and construction recommendations. Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 3.0 EXPLORATION PROCEDURES 3.1 Subsurface Exploration Procedures 3.1.1 Soil Test Borings The eight soil test borings drilled on the site were performed using a track -mounted CME 45B drill rig utilizing various cutting bits to advance the boreholes. Mud rotary drilling was utilized to advance the borings. Representative soil samples were obtained by means of the split -barrel sampling procedure in general conformance with ASTM D-1586. In this procedure, a 2-inch O.D., split -barrel sampler is driven into the soil a distance of 18 inches by a 140-pound hammer falling 30 inches. The number of blows required to drive the sampler through a 12-inch interval is termed the Standard Penetration Test (SPT) value and is indicated for each sample on the boring logs in Appendix B. The SPT value can be used as a qualitative indication of the in -place relative density of cohesionless soils. In a less reliable way, it also indicates the consistency of cohesive soils. This indication is qualitative, since many factors can affect the standard penetration resistance value (i.e., differences between drill crews, drill rigs, drilling procedures, and hammer -rod - sampler assemblies) and prevent a direct correlation between SPT resistance value, or N- Value, and the consistency or relative density of the tested soil. Split -spoon samples were obtained at approximately 2.5-foot intervals within the upper 10 feet and at approximately 5-foot intervals thereafter. The approximate locations of the soil test borings are indicated on the Boring Location Plan in Appendix A of this report. The drilling crew maintained a field log of the soils encountered in the borings. After recovery, each sample was removed from the sampler and visually classified. Representative portions of each soil sample were then sealed in air -tight containers and brought to our laboratory in Wilmington, North Carolina for visual examination and formal classification by a geotechnical engineer in general accordance with the Unified Soil Classification System guidelines. 3.2 Laboratory Testing Program Representative soil samples obtained during our field exploration were selected and tested in our laboratory to check field classifications and to determine pertinent engineering properties. The laboratory testing program included: • visual classifications of soil according to ASTM D 2487; • index property testing included natural moisture content determinations (ASTM D 2216), Atterberg limits analyses (ASTM D 4318), grain size analyses (ASTM D 1140), organic content determinations (ASTM D 2974), and modified Proctor test (ASTM D 1557). Data obtained from the laboratory tests are included on the Laboratory Testing Summary and in Appendix C of this report. The soil samples collected for this exploration will be retained at our laboratory for a period of sixty (60) days, after which they will be discarded unless other instructions are received as to their disposition. Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 4.0 EXPLORATION RESULTS 4.1 Site Conditions The proposed site is located at the intersection of Birch Street and McHugh Boulevard on MCB Camp Lejeune, North Carolina. At the time of our exploration, the proposed site was heavily wooded and relatively level. 4.2 Regional Geology The site is located in the Coastal Plain Physiographic Province of North Carolina. The Coastal Plain is composed of seven terraces, each representing a former level of the Atlantic Ocean. Soils in this area generally consist of sedimentary materials transported from other areas by the ocean or rivers. These deposits vary in thickness from a thin veneer along the western edge of the region to more than 10,000 feet near the coast. The sedimentary deposits of the Coastal Plain rest upon consolidated rocks similar to those underlying the Piedmont and Mountain Physiographic Provinces. In general, shallow unconfined groundwater movement within the overlying soils is largely controlled by topographic gradients. Recharge occurs primarily by infiltration along higher elevations and typically discharges into streams or other surface water bodies. The elevation of the shallow water table is transient and can vary greatly with seasonal fluctuations in precipitation. 4.3 Soil Conditions Soil Test Borings: Approximately 6 to 8 inches of organic topsoil was reported by the drillers at the borings locations. Beneath the surface to depths of 7 feet, the test borings typically encountered intermittent layers of very loose to medium dense silty, slightly silty, clayey and clean sands (SM, SP-SM, SC, SP). Standard penetration test resistances (N-values) in these soils generally ranged from 3 to 21 blows per foot (bpf). From 7 feet to depths of 25 feet, the test borings typically encountered intermittent layers of very loose to medium dense silty, slightly silty, clayey and clean sands (SM, SP-SM, SC, SP) and very soft to firm sandy clays and clays (CL, CH). A layer containing organics was encountered at depths of approximately 17 feet in borings B-2 and B-4, and at depths of approximately 22 feet in borings B-5 and B-6. Standard penetration test resistances (N-values) in these soils generally ranged from W.O.H. (Weight of Hammer) to 15 bpf. In boring B-6, from a depth of 25 feet to a depth of approximately 50 feet, the test boring typically encountered intermittent layers of very loose to medium dense silty, slightly silty, and clean sands (SM, SP-SM, SP) and weathered limestone. Standard penetration test resistances (N-values) in these soils generally ranged from 4 to 41 blows per foot (bpf). The descriptions provided in this section are a general summary of the subsurface conditions encountered within the test borings. The SPT Boring Logs in Appendix B contain detailed information recorded at each of the boring locations and represent the geotechnical engineer's interpretation of the data based on visual examination of the soil samples obtained during the field exploration. The stratification lines on the SPT Boring Logs represent approximate boundaries between material types and the actual transition between strata is expected to be gradual. 4 I. Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 I 4.4 Groundwater Conditions Groundwater observations were made at approximately 24 hours after the completion of the drilling operations in the boring locations. Furthermore, visual observations of the samples retrieved during drilling exploration were used in evaluating the groundwater conditions. The j groundwater depths were observed to range from 6.4 to 12.9 feet below the existing grade approximately 24 hours after the completion of the borings. IThe highest groundwater observations are normally encountered in the late winter and early spring. Variations in the location of the long-term water table may occur as a result of changes in precipitation, evaporation, surface water runoff, and other factors not immediately apparent at the time of this exploration. If long term water levels are crucial to the development of this site, it would be prudent to verify water levels with the use of perforated pipes or piezometers. I 4.5 Laboratory Test Results Index and engineering properties tests were performed on select samples of the sample soils encountered within the test borings. In summary, the tested samples had in -situ moisture 1 contents ranging from 8.1 to 55.2 percent. The grain size analyses of the tested samples indicated that the tested materials had 6.9 and 21.8 percent fines passing the number 200 sieve. The Atterberg limits analysis of the tested samples indicated liquid limits of 21 (both samples), plastic limits of 44 and 52 and plasticity indices of 23 and 31. The organic content determinations of the tested samples indicated organic content of 7.5 and 26.2 percent. The modified Proctor test of the bulk sample resulted in a maximum dry density of approximately 119.4 and an optimum moisture content of 12.2 percent. Specific laboratory test results are provided in the Laboratory Testing Summary and in Appendix C of this report. 5 Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 5.0 ANALYSIS AND RECOMMENDATIONS The recommendations provided in this report are based upon our understanding of the proposed construction, the information provided to us during this study and our past experience with similar conditions. Should any of the information provided to us be changed prior to final design, ECS should be notified to review these recommendations and make appropriate revisions, if necessary. 5.1 Suburade Preparation The first step in preparing the . site for the proposed construction should be to remove vegetation, rootmat, topsoil, deleterious materials, existing pavement, foundations, utilities, and any other soft or unsuitable materials from the existing ground surface. These operations should extend at least 10 feet, where possible, beyond the planned limits of the proposed building and pavements. After proper clearing, stripping, grubbing, and prior to fill placement, foundation, slab, or pavement construction, the exposed subgrade soils should be carefully evaluated by an experienced geotechnical engineer to identify any localized unstable or otherwise unsuitable materials. After evaluating the exposed soils, loose and yielding areas should be identified by proofrolling the exposed subgrades, if site and subsurface conditions allow, with an approved piece of equipment, such as a loaded dump truck, having a single -axle weight of at least 10 tons. Any soft or unsuitable materials identified during proofrolling operations should be either repaired in -place or removed and replaced with an approved backfill placed and compacted in accordance with recommendations of this report. Site subgrade conditions will be significantly influenced by weather conditions. Subgrades that are evaluated after periods of rainfall will not respond as well to proofrolling as subgrades that are evaluated after periods of more favorable weather. We strongly recommend that rubber tire equipment not be used if subgrade conditions exhibit elevated moisture conditions. The contractor should use tracked equipment to minimize the degradation of marginally stable subgrade. The preparation of fill subgrades, as well as proposed building subgrades, should be observed on a full-time basis by a representative of ECS. These observations should be performed by an experienced geotechnical engineer, or his representative, to ensure that unsuitable materials have been removed and that the prepared subgrade is suitable for support of the proposed construction and/or fills. 5.2 Engineered Fill Placement Following the removal of deleterious surface and subsurface materials, and after achieving a stable subgrade, engineered fills can be placed and compacted to achieve the desired site grades. Fill for support of the proposed construction and for backfill of utility lines within expanded building and pavement limits should consist of an approved material, free of organic matter and debris and cobbles greater than 3 inches, and have a Liquid Limit (LL) and Plasticity Index (PI) less than 35 and 9, respectively. We also recommend that fills within structural areas have a modified Proctor (ASTM D 1557) maximum dry density of at least 100 pounds per cubic foot (pcf). M Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 Unsuitable fill materials include topsoil, organic materials (OH, OL), and high plasticity clays and silts (CH, MH). Such materials removed during grading operations should be either stockpiled for later use in landscape fills, or placed in approved on or off -site disposal areas. Existing soils containing significant amounts of organic matter will not be suitable for re -use as engineered fill. As such, the organic content of the near surface soils should be evaluated to determine if some of these soils will be suitable for re -use as engineered fill. Natural fine- grained soils classified as clays or silts (CL, ML) with ILL and PI greater than 40 and 20, respectively, should be evaluated by the geotechnical engineer at the time of construction to determine their suitability for use as engineered fill. Prior to the commencement of fill operations and/or utilization of any off -site borrow materials, the contractor should provide representative samples of the proposed fill soils to the geotechnical engineer. The geotechnical engineer can determine the material's suitability for use as an engineered fill and develop moisture -density relationships in accordance with the recommendations provided herein. Samples should be provided to the geotechnical engineer at least 3 to 5 days prior to their use in the field to allow for the appropriate laboratory testing to be performed. Fill materials placed within the building and pavement areas should be placed in lifts not exceeding 8 inches in loose lift thickness and moisture conditioned to within their working range of optimum moisture content. The fills should then be compacted to a minimum of 95 percent of the soil's modified Proctor (ASTM D 1557) maximum dry density to within 12 inches below finished subgrade. The upper 12 inches of fills placed beneath structural development should be compacted to 98 percent of the soil's modified Proctor maximum dry density. The typical working range of optimum moisture for the natural Coastal Plain soils at the site is expected to be within approximately 3 percent of the optimum moisture content. Care should also be taken to provide a smooth, gently sloping ground surface at the end of each day's earthwork activities to help reduce the potential for ponding and absorption of surface water. Grade controls should also be maintained throughout the filling operations. Filling operations should be observed on a full-time basis by a qualified representative of ECS to determine that the required degrees of compaction are being achieved. We recommend that a minimum of one compaction test per 2,000-square-foot area be performed for each lift of controlled fill. The elevation and location of the tests should be clearly identified at the time of fill placement. Areas which fail to achieve the required degree of compaction should be re -worked until the specified degree of compaction is achieved. Failing test areas may require moisture adjustments or other suitable remedial activities in order to achieve the required compaction. Fill materials should not be placed on frozen, frost -heaved, and/or soils which have been recently subjected to precipitation. Wet or frozen soils should be removed prior to the continuation of site grading and fill placement. Borrow fill materials, if required, should not contain excessively wet or frozen materials at the time of placement. Additionally, if grading operations occur during the winter months, frost -heaved soils should be removed prior to placement of engineered fill, granular sub -base materials, foundation or slab concrete, and asphalt pavement materials. If problems are encountered during the site grading operations, or if the actual site conditions differ from those encountered during our subsurface exploration, the geotechnical engineer should be notified immediately. Report of Subsurface Exploration and Geotechnlcal Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 5.3 Foundation Desian Provided the subgrade preparation and earthwork operations are completed in strict accordance with the recommendations of this report, the proposed construction can be supported on conventional shallow foundations bearing on approved natural materials and/or properly compacted fill. We recommend a net allowable design soil bearing pressure of 2,000 psf for proportioning continuous and isolated column footings. To reduce the possibility of foundation bearing failure and excessive settlement due to local shear or "punching" failures, we recommend that continuous footings have a minimum width of 18 inches and that isolated column footings have a minimum lateral dimension of 30 inches. Furthermore, all footings should bear at a depth to provide adequate frost cover protection. For this region, we recommend the bearing elevation be a minimum depth of 12 inches below the finished exterior grade or in accordance with the local building code requirements. We request the opportunity to review our foundation recommendations and make any necessary changes once final site design grades are determined. The net allowable soil bearing pressure refers to that pressure which may be transmitted to the foundation bearing soils in excess of the final minimum surrounding overburden pressure. The final footing elevation must be evaluated by ECS personnel to verify that the bearing soils are capable of supporting the recommended net allowable bearing pressure and suitable for foundation construction. These evaluations should include visual observations, hand rod probing, and dynamic cone penetrometer (ASTM STP 399) testing, or other methods deemed appropriate by the geotechnical engineer at the time of construction, in each column footing excavation and at intervals not greater than 20 feet in continuous footing excavations. The settlement of a structure is a function of the compressibility of the bearing materials, bearing pressure, actual structural loads, fill depths, and the bearing elevation of footings with respect to the final ground surface elevation. Estimates of settlement for foundations bearing on engineered or non -engineered fills are strongly dependent on the quality of fill placed. Factors which may affect the quality of fill include maximum loose lift thickness of the fills placed and the amount of compactive effort placed on each lift. Provided the recommendations outlined in this report are strictly adhered to, we expect that total settlements for the proposed construction are expected to be in the range of 1 inch or less, while the differential settlement will be approximately 1/2 of the anticipated total settlement. This evaluation is based on our engineering experience and the provided structural loadings, and is intended to aid the structural engineer with his design. 5.4 Floor Slab Design Provided a suitable subgrade will be prepared as recommended herein, ground level slabs for the maintenance buildings can be designed as slabs -on -grade. Our findings indicate that a modulus of subgrade reaction (ks) of 125 pci is appropriate for design provided that upper 12 inches of the slab subgrade soils have been uniformly compacted to at least 98 percent of their modified Proctor maximum dry density. Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 We recommend that all slabs -on -grade be isolated from the foundations so that potential differential settlement of the structure will not induce shear stresses in the floor slab. Also, to minimize the crack width of any shrinkage cracks that may develop near the surface of the slab, wire mesh reinforcement may be included in the slab design. The mesh should be located in the top third of the slab to be effective. We also recommend that all slabs -on -grade be underlain by a minimum of 6 inches of clean granular fill with less than 5 percent fines by weight to help prevent the capillary rise of subsurface moisture from adversely affecting the slab. If floor covering such as tile or carpet will be utilized for interior finishes, a polyethylene vapor barrier may be used beneath the floor slab for moisture control considerations. 5.5 Seismic Site Class Determination and Liquefaction Potential North Carolina has adopted (with State amendments) the 2009 Edition of the International Building Code (IBC 2009), and the IBC 2009 requires that a seismic Site Class be assigned for new structures. The method for determining the Site Class is presented in Section 1613.5.5 of the IBC 2009. The seismic Site Class is typically determined by a calculating a weighted average of N-values from standard penetration testing in conventional soil test borings, undrained shear strengths, or the shear wave velocities of the materials in the upper 100 feet of the site. According to the IBC 2009, a seismic Site Class "E" may be used for this site based upon a weighted average N-value of 7.6. Based on the USGS Seismic Hazard Curves and the IBC 2009, for a seismic site class "E" at latitude 34.676' and longitude-77.353°, the Sos value is 0.331 and the Spy value is 0.174. The seismic design category depends on the occupancy group of the building and should be determined by the structural engineer. The soils encountered in the borings were evaluated for liquefaction potential using simplified procedures developed by Seed and Idriss. For the analysis, the peak ground acceleration was assumed in accordance with IBC 2000 Section 1803.5.12 to be Sos/2.5 in the absence of a site specific seismic study. The liquefaction potential for this site is low. Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 5.6 Lateral Earth Pressures Any below -grade or retaining walls utilized for this project should be designed to withstand the lateral earth pressures exerted upon them. In the design of below -grade retaining walls to restrain compacted engineered fill or in -situ natural soils, the following soil parameters can be utilized: Coefficient Coefficient Coefficient of Active of Passive of At Rest Effective Unit Depth Earth Earth Earth Friction Cohesion Weight (pcf) (ft) Pressure, Pressure, Pressure, Angle (psf) (below water Ka Kp Ko table) 0-7 0.29 3.39 0.45 33 0 110 (47.6) 7-22 200 42.6 22-25 0.32 3.12 0.48 31 0 42.6 These recommendations have assumed no surcharge loads. The recommended coefficient of friction is 0.25 for concrete over soil. The increased lateral pressures generated by surcharge loads (i.e. slopes, parking and building areas, etc.) should be considered in the design. Based on our subsurface findings, shallow groundwater levels were measured at the site. We anticipate that the below grade walls will be properly and adequately waterproofed. The wall should be designed to resist hydrostatic pressures. For wall conditions where wall movement cannot be tolerated or where the wall is restrained at the top, the "At Rest' earth pressure should be used. For wall conditions where outward wall movement in the range of 0.5 to 1 percent of the wall height can be tolerated, the "Active' earth pressure should be used. In evaluating the resistance of soil to lateral loads imposed by structures, the "Passive" earth pressure should be used. Please note that the full development of passive pressure requires deflections toward the soil mass on the order of 1 to 4 percent of the wall height. 10 i ( l Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 5.7 Pavement Design Considerations I For the design and construction of exterior pavements, the subgrades should be prepared in strict accordance with the recommendations in the "Subgrade Preparation" and "Engineered Fill Placement' sections of this report. An important consideration with the design and construction of pavements is surface and subsurface drainage. Where standing water develops, either on the pavement surface or within the base course layer, softening of the subgrade and other I problems related to the deterioration of the pavement can be expected. Furthermore, good I drainage should minimize the possibility of the subgrade materials becoming saturated during the normal service period of the pavement. ECS recommends a light duty, flexible pavement section of 2 inches of surface SF9.5 mix overlying 6 inches of compacted ABC stone in the parking and road areas. For a heavy duty, flexible pavement section, ECS recommends 3 inches of surface SF9.5 mix overlying 6 inches of compacted ABC stone in the parking and road areas. For a light duty or heavy duty, rigid pavement section, we recommend 6 inches of 650 psi flexible strength concrete overlying 4 inches of compacted ABC stone in the road areas. Regardless of the section and type of construction utilized, saturation of the subgrade materials and asphalt pavement areas results in a softening of the subgrade material and shortened life span for the pavement. Therefore, we recommend that both the surface and subsurface materials for the pavement be properly graded to enhance surface and subgrade drainage. By quickly removing surface and subsurface water, softening of the subgrade can be reduced and y the performance of the parking, area can be improved. Site preparation for the parking areas should be similar to that for the building area including stripping, proofrolling, and the placement of compacted structural fill. i Please note that large, front -loading trash dumpsters frequently impose concentrated front - wheel loads on pavements during loading. This type of loading typically results in rutting of 1 bituminous pavements and ultimately pavement failures and costly repairs. Consequently, we l recommend the use of an 8 inch thick, mesh reinforced concrete slab that extends the entire length of the truck. Concrete pavements should be properly jointed and reinforced as needed to help reduce the potential for cracking and to permit proper load transfer. 5.8 Site Drainage i j Positive drainage should be provided around the perimeter of the structure to minimize the potential for moisture infiltration into the foundation and slab subgrade soils. We recommend that landscaped areas adjacent to these structures be sloped away from the construction and maintain a fall of at least 6 inches for the first 10 feet outward from the structures. The parking lots, sidewalks, and any other paved areas should also be sloped to divert surface water away from the proposed building. The proper diversion of surface water during site grading and construction will help reduce the potential for delays associated with periods of inclement weather. The proper diversion of surface water is especially critical since portions of the site soils are expected to be moisture sensitive. Based upon our past experience, the use of `browning" large areas of exposed soils should be useful to help divert surface water from the prepared subgrades. 11 Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 5.9 Construction Considerations Exposure to the environment may weaken the soils at the foundation bearing elevation if the foundation excavations remain exposed during periods of inclement weather. Therefore, foundation concrete should be placed the same day that proper excavation is achieved and the design bearing pressure verified. If the bearing soils are softened by surface water absorption or exposure to the environment, the softened soils must be removed from the foundation excavation bottom immediately prior to placement of concrete. If the excavation must remain open overnight, or if inclement weather becomes imminent while the bearing soils are exposed, we recommend that a 1 to 3 inch thick "mud -mat" of "lean" concrete be placed over the exposed bearing soils before the placement of reinforcing steel. It is imperative to maintain good site drainage during earthwork operations to help maintain the integrity of the surface soils. The surface of the site should be kept properly graded to enhance drainage of surface water away from the proposed construction areas during the earthwork phase of this project. We recommend that surface drainage be diverted away from the proposed building and pavements areas without significantly interrupting its flow. Other practices would involve sealing the exposed soils daily with a smooth -drum roller at the end of the day's work to reduce the potential for infiltration of surface water into the exposed soils. The key to minimizing disturbance problems with the soils is to have proper control of the earthwork operations. Specifically, it should be the earthwork contractor's responsibility to maintain the site soils within a workable moisture content range to obtain the required in -place density and maintain a stable subgrade. Scarifying and drying operations should be included in the contractor's price and not be considered an extra to the contract. In addition, construction equipment cannot be permitted to randomly run across the site, especially once the desired final grades have been established. Construction equipment should be limited to designated lanes and areas, especially during wet periods to minimize disturbance of the site subgrades. It will likely be necessary to utilize tracked equipment during grading operations particularly if the subgrade soils exhibit elevated moisture conditions. 12 Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Leisure, North Carolina ECS Project No.: 22.17419 6.0 CLOSING Our geotechnical evaluation of the site has been based on our understanding of the site, the project information provided to us, and the data obtained during our exploration. The general subsurface conditions utilized in our evaluations have been based on interpolation of subsurface data between the borings. If the project information provided to us is changed, please contact us so that our recommendations can be reviewed and appropriate revisions provided, if necessary. The discovery of any site or subsurface conditions during construction which deviate from the data outlined in this exploration should be reported to us for our review, evaluation and revision of our recommendations, if necessary. The assessment of site environmental conditions for the presence of pollutants in the soil and groundwater of the site is beyond the scope of this geotechnical exploration. 13 A O x „•h W F U LU Ix 0 CL E 1FM"i- q K � ri' P•, ,. ea-' rum-'�1ST'. o � d L � �-m � .� 4 : BBB yyn4§�'�� 4 a � n � ,� Af � .. 5' SPT � , P di, ✓ 1:✓`sn`bu� .\�y eAwMYI � � � >a€,Vti�. , r � •'4 '��. ✓ � u4. 10' SPT � � ,n _ d H — .L9 O Ix t ENGINEER1 DRAFTING WEG IL MFH �� a✓ '& 4 a `]4 ���� ht Y iSCALE NTS � n u a PROJECT DENOTES APPROXIMATE �" 22-1.7419 s LOCATION OF SOIL TEST BORING SHEET APPENDIX B SPT BORING LOGS AND SOIL CLASSIFICATION SYSTEM, DESCRIPTION AND TERMINOLOGY Unified Soil Classification System (ASTM Designation D-2487) Major Division Group Symbol Typical Names Classification Criteria bi k �z .o �gg0 U � 0 Highly organic soils GW Well -graded gravels and gravel- C„ = D6O/Dts Greater than 4 sand mixtures, little or no fines ❑ a C, _ (D30)2/(DIOxD60) Between 1 and 3 GP Poorly graded gravels and gravel- S3 tq 8 1 m y � Not meeting both criteria for GW sand mixtures, little or no fines o c GM Silty gravels, gravel -sand -silt � y ti m U � Atterberg limits plot below "A" line or mixtures plasticity index less that 4 A GC Clayey gravels, gravel -sand -clay Atterberg limits plot above "A" line mixtures a and plasticity index greater than 7 ❑ SW Well -graded sands and gravelly 0 18 G t Cn = De011) 0 Greater than 6 sands, little or no fines o° Ng$ N C.=(D3o)a/(DIoxD60) Between l and SP Poorly graded sands and gravelly q O z z °i Not meeting both criteria for SW sands, little or no fines EJ a o p' SM Silty `^ N Atterberg limits plot below "A" line or sands, sand -silt mixtures � 8 plasticity index less than 4 SC Clayey sands, sand -clay mixtures v, Atterberg limits plot above "A" line and plasticity index greater than 7 ML Inorganic silts, very fine sands, NOW n-lira mprotmu approximate uppm limit ofLL and PI mmbinaliooa rock flour, silty or clayey fine for rxmral wits(cmpi c ly d❑❑mincd). ASTM-D1487. sands B0 CL Inorganic clays of low to medium ro plasticity, gravelly clays, sandy as m clays, silty clays, lean clays �t m OL Organic silts and organic silty clays of low plasticity co 6ro MH Inorganic silts, micaceous or diatomaceous fine sands or silts, m elastic silts Io CH Inorganic clays of high plasticiti ■■■■■.ERM■■ NOMMENISEffiNK ■.■■■■E■KON. ■■■..MMI,.. ■..■N.,.NMA ■■MP rM...■. ..®:...■■.. ■■NSON y fat clays o to m or m m or V m w too to 44UIa LIMIT, U. OH Organic clays of medium to high Plasticity chart for the classification of fine-grained soils. plasticity Tests made on faction finer than No. 40 sieve Pt Peat, muck and other highly Fibrous organic matter; will organic soils char, bum, or glow Z7 CARt7 (_INA� UNIFIED SOIL. CLASSIFICATION SYSTEM y fat clays o to m or m m or V m w too to 44UIa LIMIT, U. OH Organic clays of medium to high Plasticity chart for the classification of fine-grained soils. plasticity Tests made on faction finer than No. 40 sieve Pt Peat, muck and other highly Fibrous organic matter; will organic soils char, bum, or glow Z7 CARt7 (_INA� UNIFIED SOIL. CLASSIFICATION SYSTEM NOTES FOR BORING LOGS I. Drilling and Sampling Symbols: SS: Split Spoon Sampler RB: Rock Bit Drilling ST: Shelby Tube Sampler BS: Bulk Sample of Cuttings RC: Rock Core; NX, BX, AX PA: Power Auger (no sample) PM: Pressuremeter HSA: Hollow Stem Auger DC: Dutch Cone Penetrometer WS: Wash Sample Standard Penetration (Blows/Ft) refers to the blows per foot of a 140 lb. hammer falling 30 inches on a 2 inch O.D. split spoon sample, as specified in ASTM D-1586. The blow count is commonly referred to as the N value. H. Correlation of Penetration Resistances to Soil Properties: Relative Density of Cohesionless Soils Consistency of Cohesive Soils SPT-N Relative Density SPT-N Consistency 0-4 Very Loose 0-2 Very Soft 5 - 10 Loose 3-4 Soft 11 - 30 Medium Dense 5 - 8 Firm 31 - 50 Dense 9 - 15 Stiff 51 or more Very Dense 16 - 30 Very Stiff 31 - 50 Hard 50 or more Very Hard M. Unified Soil Classification Symbols: GP: Poorly Graded Gravel ML: Low Plasticity Silts GW: Well Graded Gravel MH: High Plasticity Silts GM: Silty Gravel CL: Low Plasticity Clays GC: Clayey Gravel CH: High Plasticity Clays SP: Poorly Graded Sands OL: Low Plasticity Organics SW: Well Graded Sands OH: High Plasticity Organics SM: Silty Sands CL - ML: Dual Classification (Typical) SC: Clayey Sands IV. Water Level Measurement Symbols: WL: Water Level BCR: Before Casing Removal WS: While Sampling ACR: After Casing Removal WD: While Drilling WCI: Wet Cave In DCI: Dry Cave In The water levels are those water levels actually measured in the borehole at the times indicated by the symbol. The measurements are relatively reliable when auguring, without adding fluids, in a granular soil. In clays and plastic silts, the accurate determination of water levels may require several days for the water level to stabilize. In such cases, additional methods of measurement are generally applied. The elevations indicated on the boring logs should be considered approximate and were not determined using accepted surveying techniques. w aeweuwee CLIENT JOB BORING# SHEET Stellar Group17419 B-1 1 OF 1 PROJECT NAME ARCHITECT -ENGINEER Wallace Creek Marine Mart . SITE LOCATION -0- CALIBRATED PENETROMETER TONS/FT2 Birch Ave Camp Le'eune Onslow Count 4 5i PLASTIC WATER LIQUID LIMIT CONTENT % LIMIT % 1 DESCRIPTION OF MATERIAL ENGLISH UNITS ROCK QUALITY DESIGNATION -d REV w F ? ROD% - REC.% — o BOTTOM OF CASING LOSS OF CIRCULATION ZO 20% 40% 8 % 80% 10 % ® STANDARD Uj u w o Z SURFACE ELEVATION BLOo WS/ORATION w ❑ 0 a 0 m a� 3 w m 10 20 30 40 60h Topsoil Depth 6" - ? i Loose, Tan -Brown, Silty, Fine SAND, (SM) 3 S-1 SS 18 18 3 8 i 5 i Medium Dense to Loose, Tan, Silty, Fine S-2 SS 18 18 SAND, (SM) ff 5 7 ® 14 5 7 i ) i I S-3 SS 18 18 5 7 Very Soft, Gray, Sandy CLAY, (CL) 2 i WOH i i I S-4 SS 18 18 — WOH 1 10 i Very Loose to Loose, Gray, Fine SAND, Wlth 'r:. ,t i:r:11 Silt, (Sp-SM) (Y.t111'. Ij:ttl {. 2 i S-5 SS 18 18 2 4 i 2 I4:If.11: rea u ry:frgi i i 4 i S-6 SS 18 18 +srtu U' 5 i li;il:ll: 4 i 20 IA;tf 7i5''I1 j; i mrcu 1 Ix i 1 i Soft, Gray, CLAY, With Sand, (CL) • S-7 SS 18 18 1 3 i 25 2 END OF BORING @ 25.00' i 30 i i i i i E I i I THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. INSITU THE TRANSITION MAY BE GRADUAL, 4 WL wsD WD❑ BORING STARTED 02/20/12 WL(BCR) $ WL(ACR) BORING COMPLETED 02/20/12 CAVE IN DEPTH S' WL 8.90' RIG 45B ATV FOREMAN BF DRILLING METHOD Mud Rotary CLIENT JOB# - BORING# SHEET Stellar Group17419 B-2 1 OF 1 PROJECT NAME ARCHITECT -ENGINEER SSW Wallace Creek Marine Mart SITE LOCATION -0- CALIBRATED PENETROMETER TONS/FT2 Birch Ave Cam Le'eune Onslow County 1 2 4 5. PLASTIC WATER LIQUID LIMIT CONTENT% LIMIT% _ W w o i w a < w w a i o a m U W DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING LOSS OF CIRCULATION 2 9 z0 ¢ 3 w u 3 O m ROCK QUALITY DESIGNATION 8 RECOVERY ROD% REC.% - 20% 40% 60% so% 10 % SURFACE ELEVATION (� STANDARD PENETRATION BLOWS/FT 10 20 30 40 50+ ,Topsoil Depth 6" Loose, Tan -Brown, Silly, Fine SAND, (SM) 3 S-1 SS 18 18 ! 3 6 6 6 10 16 Medium Dense to Loose, Tan, Fine SAND, With Silt,(SP-SM) +r�•� +: u. +. yaa; f !i Igtl'il S-2 SS 18 18 141'[I) 4'''`)1 3 4 S-3 SS 18 18 Very Soft, Gray, Sandy CLAY, (CL) 1 1 f S-4 SS 18 18 WO 10 WOH i Very Loose, Gray, Fine SAND, (SP) 2 15 S-5 SS 18 18 2 2 4 i Very Loose, Dark Gray and Brown, Clayey, Fine SAND, With Organics, (SC) 2 S-6 SS 18 18 2 3 i 20 i S-7 SS 18 18 i 2 25 i END OF BORING @ 25.00' 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL. '=t wL WS❑ WD❑ BORING STARTED 02/20/12 N_ WL(BCR) Y WL(ACR) BORING COMPLETED 02/20/12 CAVE IN DEPTH S" WL 10.60' RIG 456 ATV FOREMAN BF DRILLING METHOD Mud Rotary CLIENT JOB BORING# SHEET Stellar Group 17419 I B-3 1 OF 1 PROJECT NAME ARCHITECT -ENGINEER Wallace Creek Marine Mart SITE LOCATION -0- CALIBRATED PENETROMETER TONS/FT2 Birch Ave Carnp Le'eune Onslow County 2 6. PLASTIC WATER LIQUID LIMIT CONTENT % LIMIT % 1� zr yI Z a �u L a Z O a 3a >w> O DESCRIPTION OF MATERIAL EN GLISH UNITS BOTTOM OF CASING 3D LOSS OF CIRCULATIOND Z O Q fi 3 w to 3 O m -� ROCK QUALITY DESIGNATION & RECOVERY EC 00% 10 % 20%D% 40% 80%5 SURFACE ELEVATION ® STANDARD PENETRATION BLOWS/FT mn 30 40 so+ Topsoil Depth 8" 1 j 2 + S-1 SS 18 18 Loose, Tan -Brown, Silly, Fine SAND, (SM) 3 2 3 6 S-2 SS 18 18 8 + a 12: + 6 Medium Dense, Tan, Fine SAND, (SP) S-3 SS 18 18 i WOH i WOH i i + Very Loose, Gray, Clayey, Fine SAND, (SC) S-4 SS 18 18 10 1 i i + i Very Soft, Gray to Dark Gray, CLAY, With Sand,(CL) i S-5 SS 18 18 WOH WO 15 WOH i i WOH S-6 SS 18 18 20 WOH i i 25 + i i 7 il5 i 8 i I i I Medium Dense, Gray -Brown, Fine to Medium SAND, With Silt, (SP-SM) 16irr t n wPfII. h: bis o•.u:u• i"ii•( 1: S-7 SS 18 18 END OF BORING @ 25.00' 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL. LZ WL WS❑ WOO BORING STARTED 02/20/12 WL(BCR) $ WL(ACR) BORING COMPLETED 02/20/12 CAVE IN DEPTH ' WL 7.30' RIG 45B ATV FOREMAN BF DRILLING METHOD Mud Rotary CLIENT JOB# BORING SHEET - Stellar Group17419 B-4 1 OF 1 PROJECT NAME ARCHITECT -ENGINEER Wallace Creek Marine Mart SITE LOCATION -0- CALIBRATED PENETROMETER TONS/FT2 Birch Ave Camp Le'eune Onslow Countv I S. PLASTIC WATER LIQUID LIMIT CONTENT% LIMIT% i 0 1 i DESCRIPTION OF MATERIAL ENGLISH UNITS ROCK QUALITY DESIGNATION 8 RECOVERY w RQD% — • REC.% — C o p T� BOTTOMOF CASING LOSS OF CIRCULATION �1 zp 20% 40% 6 % 8 % 10 % a d a O SURFACE ELEVATION a 3 ® STANDARD PENETRATION BLOWS/FT a p p 3 w m 0 20 30 40 60. To soll Depth 6" Very Loose, Tan -Brown, Silty, Fine SAND, (SM) 1 i S-1 SS 18 18 '.I.', 1 3 '• 2 i Medium Dense, Tan to Gray, Fine SAND, (SP) 3 i S-2 SS 18 18 5 11 6 5 5 S-3 SS 18 18 _ 8 2 12 Very Loose, Gray, Clayey, Fine SAND, (SC) WOH S-4 SS 18 18 WOH 10 7 1 i i i i Very Soft, Gray, CLAY, With Sand, (CH) WOH WO�®35.2 I S-5 SS 18 18 5 WOH i i i Very Soft to Soft, Black, Sandy CLAY, With Organics, (CL) WOH S-6 SS 18 18 WOH 2 20 2 1 S-7 SS 1 18 1 18 2 4 25 2 '• END OF BORING @ 25.00' i i so— THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL. =L WL wS❑ WD❑ BORING STARTED 02/20/12 =F WL(SCR) Y WL(ACR) BORING COMPLETED 02/20/12 CAVE IN DEPTH '12 WL 6.40' RIG 45B ATV FOREMAN BF DRILLING METHOD Mud Rotary CLIENT JOB# BORING# SHEET Stellar Group17419 B-5 1 OF 1 PROJECT NAME ARCHITECT -ENGINEER ut Wallace Creek Marine Mart SITE LOCATION CALIBRATED PENETROMETER TONS/FT2 Birch Ave Carrip Leieune Onslow Countv 1 z 1 s. PLASTIC WATER LIQUID LIMIT CONTENT % LIMIT % o Z a w a Z v o a DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOMOFCASING LOSS OF CIRCULATION Icy Zp KW ¢ I- 3 w p m ROCK QUALITY DE SIGNREC.% RECOVERY 20%O% 40% 60%EC. 80% 100% SURFACE ELEVATION ® STANDARDPENETRATION BLOWS/FOWSIFT 0 20 30 To Boll Depth 161 Loose, Tan -Brown, Silty, Fine SAND, (SM) 2 S-1 SS 18 18 2 i 3 i 5 4 4 I i 5 � Loose to Medium Dense, Tan, Fine SAND, (SP)I S-2 SS 18 18 � fi � S-3 SS 18 18 = 11 21 10 WOH Very Loose, Gray, Clayey, Fine SAND, (SC) S-4 SS 18 18 WO 10 0 WOHVON i i ! '• i Very Soft, Gray, CLAY, With Sand, (CL) WON S-5[SS 18 18 w0 15 WOH i i i i WOH ' WO S-6 SS 18 18 20 WOH Firm, Black, Sandy CLAY, With Organics, (CL) 4 S-7 SS 18 18 2 25 3 i i i I I I END OF BORING @ 25.00' 30 i I i i i i i i I i i i i i i 7HE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. INSITU THE TRANSITION MAY BE GRADUAL, Q WL WS❑ WOO BORING STARTED 02/20/12 SE WL(BCR) $ WL(ACR) BORING COMPLETED 02/20/12 CAVE IN DEPTH Q WL 6.70' RIG 45B ATV FOREMAN BF DRILLING METHOD Mud Rotary CLIENT JOB# BORING# SHEET - Stellar Group 17419 B-6 1 OF 2 PROJECT NAME ARCHITECT -ENGINEER Wallace Creek Marine Mart SITE LOCATION -Q- CALIBRATED PENETROMETER TONS/FT2 Birch Ave Cam Le'eune Onslow Countv 1 2 4 5t PLASTIC WATER LIQUID LIMIT CONTENT% LIMIT% ®� C li 0 z J a W h Q o WJ . W DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING LOSS OF CIRCULATION D N �j ZO ¢ ¢ 3 w m ROCK LITY OE SIGN REC.% RECOVERY ROD% — - REC.% 20% 40% fi0% e0% 10 ® STANDARD PENETRATION BLOWS/Fr 10 20 30 40 5. SURFACE ELEVATION Topsoil Depth 8" Loose, Brown, Silty, Fine SAND, (SM) I 2 S-1 SS 18 18 3 5 8 5 Medium Dense, Tan to Gray, Fine SAND, (SP) 5 S-2 SS 18 18 6 6 12: ' lj; 5 7 T 14 S-3 SS 18 18 10 woH WON 1 ' 1 Very Soft, Gray to Dark Gray, CLAY, With Sand, (CL) s-a ss 18 16 WOH 15 S-5 SS 18 18 WO WOH WOH i 20 S-6 SS 18 18 WO WOH i i i i j Very Loose, Dark Brown, Clayey, Fine Sand, With Organics, (SC) 1 Y5 S-7 SS 18 18 1 9 1 Loose, Gray -Brown, Silty, Fine SAND, (SM) Medium Dense to Very Loose, Gray, Fine to Medium SAND, (SP) 30 74 2 S-8 SS 18 18 CONTINUED ON NEXT PAGE. THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAYBE GRADUAL. = WL 12.90' WS❑ WD❑ BORING STARTED 02/21/12 =E WL(SCR) Y WL(ACR) BORING COMPLETED 02/21/12 CAVE IN DEPTH WL RIG 456 ATV FOREMAN BF DRILLING METHOD Mud Rotary CLIENT JOB$ BORING SHEET Stellar Group 17419 I B-6 2 OF 2$1 PROJECT NAME ARCHITECT -ENGINEER I� Wallace Creek Marine Mart SITE LOCATION .-0, CALIBRATED PENETROMETER TONsn,T2 Birch Ave Cam Le'eune Onslow County 1 2 5. PLASTIC WATER LIQUID LIMIT CONTENT% LIMIT% 2^ DESCRIPTION OF MATERIAL ENGLISH UNITS i A _1 ROCK QUALITY DESIGNATION 8 RECOVERY c I� ROD% REG.% �- Z o K BOTTOM OF CASING LOSS OF CIRCULATION � Z 20% 40% 60% BO% 100% O < jp 00 SURFACE ELEVATION ® STANDARD PENETRATION BLOWS/FT wo < 3 w m 1p 20 3 4 50. I i I i i S-9 SS 18 18 2 35 2 i i : i Medium Dense, Gray, Fine to Coarse SAND,ii.',! With Silt, With Cemented Layers, (SP-SM) ij4sI1; 1ilsu' 5 i ; 5-10 SS 18 18 rc ,. 10 21.8-6 21 + i 40 caul 1 i iea'tu ;nlgll; I;�IIr i 5-11 SS 18 18 If..l•ell: IGLf„ nsu• 4 s .15 i 45 li?tF.Ui 7:•*l, S I Ikiv T.IAII' i i ! 1 I Dense, Gray, Weathered Limestone, (WR) S ' 5-12 SS 18 18 0 41 50 35 1 END OF BORING @ 50.00' i 55 i i i I i 60 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAYBE GRADUAL. SZ WL 12.90' WS❑ WD❑ BORING STARTED 02/21/12 WL(BCR) $ WL(ACR) BORING COMPLETED 02/21/12 CAVEINDEPTH 4' WL RIG 45B AN FOREMAN BF DRILLING METHOD Mud Rotary CLIENT JOB# BORING# SHEET Stellar Group 17419 B-7 1 OF 1 PROJECT NAME ARCHITECT -ENGINEER Wallace Creek Marine Mart SITE LOCATION .-a- CALIBRATED PENETROMETER TONS/FT2 Birch Ave Cam Le'eune Onslow County 1 2 45. PLASTIC WATER LIQUID LIMIT CONTENT% LIMIT% C Z p z a y w a o El Y� O DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING LOSS OF CIRCULATION o W¢ < 3 w 3 O m10 1 ROCK QUALITY DESIGNATION 8 RECOVERY ROD% REC.8 20% 40% fi0% 80% 10 % ® STANDARD PENETRATION BLOWS/FT 20 30 40 50+ SURFACE ELEVATION ,Topsoil Depth 6" Loose, Tan -Brown to Tan -Orange, Silty, Fine SAND, (SM) 1 a S-1 SS 18 18 3 3 8-2 SS 18 18 3 7 j 5 4 g Loose to Very Loose, Gray, Clayey, Fine SAND, (SC) 5-3 SS 18 18 2 WOH S-4 SS 18 18 WOH 1 10 i ' i i END OF BORING @ 10.00' 15 20 i i 25 i i 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAYBE GRADUAL. 4 WL Wso WD❑ BORING STARTED 02/20/12 ]z WL(BCR) Y WL(ACR) BORING COMPLETED 02/20/12 CAVE IN DEPTH @5.40' = WL RIG 45B ATV FOREMAN BF DRILLINGMETHOD Mud Rotary CLIENT JOB# BORINGp SHEET Stellar 17419 B-8 1 OF 1 PROJECT NAME NAME ARCHITECT -ENGINEER Wallace Creek Marine Mart �— SITE LOCATION -Q- CALIBRATED PENETROMETER TONS/FT2 Birch Ave Camp Le'eune Onslow County 2 s, PLASTIC WATER LIQUID LIMIT CONTENT% LIMIT% I DESCRIPTION OF MATERIAL ENGLISH UNITS ' 6 i ROCK QUALITY DESIGNATION 8 RECOVERY w o i BOTTOM OF CASING ID LOSS OF CIRCULATION RQD% % REC.% 20% 4080% 80% 10 % Z rc Z SURFACE ELEVATION ® STANDARD PENETRATION Z aIn d wJ a Q g a r0 p Q 110� Q BLOWS/FT in 20 30 sn. To soil Depth 6" `• ' I Loose, Gray, Clayey, Fine SAND, (SC) SS 18 18 2 !+ 3 i Loose, Tan, Silty, Fine SAND, (SM) - SS 1B 18 2 5 3Medium Is Dense, Gray, Fine SAND, (SP) SS 18 18 s B i 17 9 ! j Very Loose, Gray, Silty, Fine SAND, (SM) S-4 SS 18 18 3 2 10 24 END OF BORING @ 10.00' ' ! i 15 � ! i 20 ! i 25 i I I i ! 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SFrU THE TRANSITION MAYBE GRADUAL. R WL WS❑ WD❑ BORING STARTED 02/20/12 Q WL(BCR) $ WL(ACR) BORING COMPLETED 02/20/12 CAVE IN DEPTH @ 5.20' s' WL RIG 45B ATV FOREMAN BF DRILLING METHOD Mud Rotary hem ttr6ia� LoAK®LONAZZ9 LLV "Setting the Standard for Service" Geote Chnical • COn Struction Materials • Envll'L7nmental - Racil hies NC Registered Enpineedng Firm F-1070 March 9, 2012 Mr. TimonthyA. Focht, P.E. Stellar Group 2900 Hartley Road Jacksonville, Florida 32257 Re: Report of Subsurface Exploration and Geotechnical Engineering Evaluation Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 Dear Mr. Focht: As authorized by your acceptance of our proposal number 15534R, dated January 30, 2012, ECS Carolinas, LLP has completed a subsurface exploration for the subject project. This report presents the results of the field exploration; laboratory testing and engineering analysis, along with our recommendations for design of geotechnical related items. We appreciate the opportunity to be of service to you during the design phase of this project and look forward to our continued involvement during the construction phase. If you have any questions concerning the information and recommendations presented in this report, please contact us at (910) 686-9114 for further assistance. Respectfully submitted, ECS CAROLINAS, LLP A/ + Micah F. Hatch, E.I. Project Manager Winslow E. Goins, P.E. Project Engineer North Carolina License No. 033751 V 4" W< < "O�� .. Walid M. Sobh, P.E. Principal Engineer North Carolina License No. 022983 72,11 Ogden Business Park, Suite 201, Wilmington, NC 284,11 • I: 910-686-9114 • P: 910-686-9666 • www.ecslilnited.com ECS Capitol Services, PLLC • ECS Carolinas, LLP • ECS Florida, LLC • ECS Midwest, t-LC • ECS Mid-Allanlic, LI-C • ECS Southeast, LLC • ECS Texas, LLP REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS WALLACE CREEK MARINE MART MCB CAMP LEJEUNE, NORTH CAROLINA PREPARED FOR: MR. TIMONTHY A. FOCHT, P.E. STELLAR GROUP 2900 HARTLEY ROAD JACKSONVILLE, FLORIDA 32257 PREPARED BY: ECS CAROLINAS, LLP 7211 OGDEN BUSINESS PARK SUITE 201 WILMINGTON, NORTH CAROLINA 28411 ECS CAROLINAS, LLP PROJECT NO.: 22.17419 FIRM NO. F-1087 WINSLOW E. GOINS P.E. �\� ICIAI?0'111i E A L SC �W v- NC L16iNSE41O. 033751 MARCH 9, 2012 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY......................................................................................................1 2.0 PROJECT OVERVIEW.........................................................................................................2 2.1 Project Information..........................................................................................................2 2.2 Scope of Work.................................................................................................................2 2.3 Purpose of Exploration....................................................................................................2 3.0 EXPLORATION PROCEDURES..........................................................................................3 3.1 Subsurface Exploration Procedures.................................................................................3 3.1.1 Soil Test Borings.....................................................................................................3 3.2 Laboratory Testing Program............................................................................................3 4.0 EXPLORATION RESULTS...................................................................................................4 4.1 Site Conditions................................................................................................................4 4.2 Regional Geology............................................................................................................4 4.3 Soil Conditions.................................................................................................................4 4.4 Groundwater Conditions.................................................................................0................5 4.5 Laboratory Test Results.................................................................................4.................5 5.0 ANALYSIS AND RECOMMENDATIONS..............................................................................6 5.1 Subgrade Preparation......................................................................................................6 5.2 Engineered Fill Placement...............................................................................................6 5.3 Foundations Design.........................................................................................................8 5.4 Floor Slab Design............................................................................................................8 5.5 Seismic Site Class Determination and Liquefaction Potential..........................................9 5.6 Lateral Earth Pressures... .............................................................................................. 10 5.7 Pavement Recommendations........................................................................................11 5.8 Site Drainage.................................................................................................................12 5.9 Construction Considerations..........................................................................................12 6.0 CLOSING...........................................................................................................................13 APPENDICES APPENDIX A -FIGURES APPENDIX B-SPT BORING LOGS AND SOIL CLASSIFICATION SYSTEM, DESCRIPTION, AND TERMINOLOGY APPENDIX C-LABROTORY TEST RESULTS APPENDIX D-GENERAL CONDITIONS APPENDIX E-PROCEDURES REGARDING FIELD LOGS, LABORATORY DATA SHEETS AND SAMPLES Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 1.0 EXECUTIVE SUMMARY This report contains the results of our subsurface exploration and geotechnical engineering analysis for the proposed site located at the intersection of Birch Street and McHugh Boulevard on MCB Camp Lejeune, North Carolina. At the time of our exploration, the proposed site was' heavily wooded and relatively level. ECS understands that a one-story commercial/retail building and fuel island canopy will be constructed at the site. The building structure will include masonry walls, structural steel roof, structural steel columns and cast -in -place slab. The anticipated maximum column loads for the structure will be 60 kips. The anticipated maximum wall load is 4 kips per foot. The estimated slab load is 125 pounds per square foot (psf). Site grades are anticipated to be raised one foot. The exterior pavements may consist of flexible and rigid pavement sections for both standard and heavy duty traffic. Approximately 6 to 8 inches of organic topsoil was reported by the drillers at the borings locations. Beneath the surface to depths of 7 feet, the test borings typically encountered intermittent layers of very loose to medium dense silty, slightly silty, clayey and clean sands (SM, SP-SM, SC, SP). From 7 feet to depths of 25 feet, the test borings typically encountered intermittent layers of very loose to medium dense silty, slightly silty, clayey and clean sands (SM, SP-SM, SC, SP) and very soft to firm sandy clays and clays (CL, CH). A layer containing organics was encountered at depths of approximately 17 feet in borings B-2 and B-4, and at depths of approximately 22 feet in borings B-5 and B-6. In boring B-6, from a depth of 25 feet to a depth of approximately 50 feet, the test boring typically encountered intermittent layers of very loose to medium dense silty, slightly silty, and clean sands (SM, SP-SM, SP) and weathered limestone. In summary, the proposed building can be supported on conventional shallow foundations. For foundations designed and constructed in accordance with the recommendations provided in this report, a net allowable soil bearing pressures of 2,000 pounds per square foot (psf) is recommended for use in proportioning shallow foundations. We request the opportunity to review our foundation recommendations and make any necessary changes once the final building location and site design grades are determined. Specific information regarding the subsurface exploration procedures used, the site and subsurface conditions at the time of our exploration, and our conclusions and recommendations concerning the geotechnical design and construction aspects of the project are discussed in detail in the subsequent sections of this report. Please note this Executive Summary is an important part of this report and should be considered a "summary" only. The subsequent sections of this report constitute our findings, conclusions, and recommendations in their entirety. Prepared By: Reviewed By: Micah F. Hatch, E.I. Winslow E. Goins, P.E. Project Manager Project Engineer Walid M. Sobh, P.E. Principal Engineer Report of Subsurface Exploration and Geotechnlcal Engineering Analysis Wallace Creek Marine Mart MCB Camp Leisure, North Carolina ECS Project No.: 22.17419 2.0 PROJECT OVERVIEW 2.1 Project Information Our understanding of the proposed development is based upon our discussions with representatives of Stellar Group, Inc. and a review of the site plan provided to ECS by Stellar Group, Inc. The proposed site is located at the intersection of Birch Street and McHugh Boulevard on MCB Camp Lejeune, North Carolina. At the time of our exploration, the proposed site was heavily wooded and relatively level. ECS understands that a one-story commercial/retail building and fuel island canopy will be constructed at the site. The building structure will include masonry walls, structural steel roof, structural steel columns and cast -in -place slab. The anticipated maximum column loads for the structure will be 60 kips. The anticipated maximum wall load is 4 kips per foot. The estimated slab load is 125 pounds per square foot (psf). Site grades are anticipated to be raised one foot. The exterior pavements may consist of flexible and rigid pavement sections for both standard and heavy duty traffic. 2.2 Scope of Work The conclusions and recommendations contained in this report are based on the results of • eight soil test borings, • visual examination of the samples obtained during our field exploration, • the results of select laboratory index and engineering properties testing, • engineering analyses of the field and laboratory findings with respect to the provided project information. 2.3 Purposes of Exploration The purpose of this exploration program was to determine the soil and groundwater conditions at the site and to develop engineering recommendations to assist in the design and construction of the proposed project. We accomplished these objectives by: • performing a site reconnaissance to evaluate the existing site conditions, • drilling test borings to explore the subsurface soil and groundwater conditions, • performing laboratory tests on selected representative soil samples from the borings to evaluate pertinent engineering properties; and • analyzing the field and laboratory data to develop appropriate geotechnical engineering design and construction recommendations. Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 3.0 EXPLORATION PROCEDURES 3.1 Subsurface Exploration Procedures 3.1.1 Soil Test Borings The eight soil test borings drilled on the site were performed using a track -mounted CME 45B drill rig utilizing various cutting bits to advance the boreholes. Mud rotary drilling was utilized to advance the borings. Representative soil samples were obtained by means of the split -barrel sampling procedure in general conformance with ASTM D-1586. In this procedure, a 2-inch O.D., split -barrel sampler is driven into the soil a distance of 18 inches by a 140-pound hammer falling 30 inches. The number of blows required to drive the sampler through a 12-inch interval is termed the Standard Penetration Test (SPT) value and is indicated for each sample on the boring logs in Appendix B. The SPT value can be used as a qualitative indication of the in -place relative density of cohesionless soils. In a less reliable way, it also indicates the consistency of cohesive soils. This indication is qualitative, since many factors can affect the standard penetration resistance value (i.e., differences between drill crews, drill rigs, drilling procedures, and hammer -rod - sampler assemblies) and prevent a direct correlation between SPT resistance value, or N- Value, and the consistency or relative density of the tested soil. Split -spoon samples were obtained at approximately 2.5-foot intervals within the upper 10 feet and at approximately 5-foot intervals thereafter. The approximate locations of the soil test borings are indicated on the Boring Location Plan in Appendix A of this report. The drilling crew maintained a field log of the soils encountered in the borings. After recovery, each sample was removed from the sampler and visually classified. Representative portions of each soil sample were then sealed in air -tight containers and brought to our laboratory in Wilmington, North Carolina for visual examination and formal classification by a geotechnical engineer in general accordance with the Unified Soil Classification System guidelines. 3.2 Laboratory Testing Program Representative soil samples obtained during our field exploration were selected and tested in our laboratory to check field classifications and to determine pertinent engineering properties. The laboratory testing program included: • visual classifications of soil according to ASTM D 2487; • index property testing included natural moisture content determinations (ASTM D 2216), Atterberg limits analyses (ASTM D 4318), grain size analyses (ASTM D 1140), organic content determinations (ASTM D 2974), and modified Proctor test (ASTM D 1557). Data obtained from the laboratory tests are included on the Laboratory Testing Summary and in Appendix C of this report. The soil samples collected for this exploration will be retained at our laboratory for a period of sixty (60) days, after which they will be discarded unless other instructions are received as to their disposition. Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 4.0 EXPLORATION RESULTS 4.1 Site Conditions The proposed site is located at the intersection of Birch Street and McHugh Boulevard on MCB Camp Lejeune, North Carolina. At the time of our exploration, the proposed site was heavily wooded and relatively level. 4.2 Regional Geology The site is located in the Coastal Plain Physiographic Province of North Carolina. The Coastal Plain is composed of seven terraces, each representing a former level of the Atlantic Ocean. Soils in this area generally consist of sedimentary materials transported from other areas by the ocean or rivers. These deposits vary in thickness from a thin veneer along the western edge of the region to more than 10,000 feet near the coast. The sedimentary deposits of the Coastal Plain rest upon consolidated rocks similar to those underlying the Piedmont and Mountain Physiographic Provinces. In general, shallow unconfined groundwater movement within the overlying soils is largely controlled by topographic gradients. Recharge occurs primarily by infiltration along higher elevations and typically discharges into streams or other surface water bodies. The elevation of the shallow water table is transient and can vary greatly with seasonal fluctuations in precipitation. 4.3 Soil Conditions Soil Test Borings: Approximately 6 to 8 inches of organic topsoil was reported by the drillers at the borings locations. Beneath the surface to depths of 7 feet, the test borings typically encountered intermittent layers of very loose to medium dense silty, slightly silty, clayey and clean sands (SM, SP-SM, SC, SP). Standard penetration test resistances (N-values) in these soils" generally ranged from 3 to 21 blows per foot (bpf). From 7 feet to depths of 25 feet, the test borings typically encountered intermittent layers of very loose to medium dense silty, slightly silty, clayey and clean sands (SM, SP-SM, SC, SP) and very soft to firm sandy clays and clays (CL, CH). A layer containing organics was encountered at depths of approximately 17 feet in borings B-2 and B-4, and at depths of approximately 22 feet in borings B-5 and B-6. Standard penetration test resistances (N-values) in these soils generally ranged from W.O.H. (Weight of Hammer) to 15 bpf. In boring B-6, from a depth of 25 feet to a depth of approximately 50 feet, the test boring typically encountered intermittent layers of very loose to medium dense silty, slightly silty, and clean sands (SM, SP-SM, SP) and weathered limestone. Standard penetration test resistances (N-values) in these soils generally ranged from 4 to 41 blows per foot (bpf). The descriptions provided in this section are a general summary of the subsurface conditions encountered within the test borings. The SPT Boring Logs in Appendix B contain detailed information recorded at each of the boring locations and represent the geotechnical engineer's interpretation of the data based on visual examination of the soil samples obtained during the field exploration. The stratification lines on the SPT Boring Logs represent approximate boundaries between material types and the actual transition between strata is expected to be gradual. Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 4.4 Groundwater Conditions Groundwater observations were made at approximately 24 hours after the completion of the drilling operations in the boring locations. Furthermore, visual observations of the samples retrieved during drilling exploration were used in evaluating the groundwater conditions. The groundwater depths were observed to range from 6.4 to 12.9 feet below the existing grade approximately 24 hours after the completion of the borings. The highest groundwater observations are normally encountered in the late winter and early spring. Variations in the location of the long-term water table may occur as a result of changes in precipitation, evaporation, surface water runoff, and other factors not immediately apparent at the time of this exploration. If long term water levels are crucial to the development of this site, it would be prudent to verify water levels with the use of perforated pipes or piezometers. 4.5 Laboratory Test Results Index and engineering properties tests were performed on select samples of the sample soils encountered within the test borings. In summary, the tested samples had in -situ moisture contents ranging from 8.1 to 55.2 percent. The grain size analyses of the tested samples indicated that the tested materials had 6.9 and 21.8 percent fines passing the number 200 sieve. The Atterberg limits analysis of the tested samples indicated liquid limits of 21 (both samples), plastic limits of 44 and 52 and plasticity indices of 23 and 31. The organic content determinations of the tested samples indicated organic content of 7.5 and 26.2 percent. The modified Proctor test of the bulk sample resulted in a maximum dry density of approximately 119.4 and an optimum moisture content of 12.2 percent. Specific laboratory test results are provided in the Laboratory Testing Summary and in Appendix C of this report. Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Leisure, North Carolina ECS Project No.: 22.17419 5.0 ANALYSIS AND RECOMMENDATIONS The recommendations provided in this report are based upon our understanding of the proposed construction, the information provided to us during this study and our past experience with similar conditions. Should any of the information provided to us be changed prior to final design, ECS should be notified to review these recommendations and make appropriate revisions, if necessary. 5.1 Subgrade Preparation The first step in preparing the. site for the proposed construction should be to remove vegetation, rootmat, topsoil, deleterious materials, existing pavement, foundations, utilities, and any other soft or unsuitable materials from the existing ground surface. These operations should extend at least 10 feet, where possible, beyond the planned limits of the proposed building and pavements. After proper clearing, stripping, grubbing, and prior to fill placement, foundation, slab, or pavement construction, the exposed subgrade soils should be carefully evaluated by an experienced geotechnical engineer to identify any localized unstable or otherwise unsuitable materials. After evaluating the exposed soils, loose and yielding areas should be identified by proofrolling the exposed subgrades, if site and subsurface conditions allow, with an approved piece of equipment, such as a loaded dump truck, having a single -axle weight of at least 10 tons. Any soft or unsuitable materials identified during proofrolling operations should be either repaired in -place or removed and replaced with an approved backfill placed and compacted in accordance with recommendations of this report. Site subgrade conditions will be significantly influenced by weather conditions. Subgrades that are evaluated after periods of rainfall will not respond as well to proofrolling as subgrades that are evaluated after periods of more favorable weather. We strongly recommend that rubber tire equipment not be used if subgrade conditions exhibit elevated moisture conditions. The contractor should use tracked equipment to minimize the degradation of marginally stable subgrade. The preparation of fill subgrades, as well as proposed building subgrades, should be observed on a full-time basis by a representative of ECS. These observations should be performed by an experienced geotechnical engineer, or his representative, to ensure that unsuitable materials have been removed and that the prepared subgrade is suitable for support of the proposed construction and/or fills. 5.2 Engineered Fill Placement Following the removal of deleterious surface and subsurface materials, and after achieving a stable subgrade, engineered fills can be placed and compacted to achieve the desired site grades. Fill for support of the proposed construction and for backfill of utility lines within expanded building and pavement limits should consist of an approved material, free of organic matter and debris and cobbles greater than 3 inches, and have a Liquid Limit (LL) and Plasticity Index (PI) less than 35 and 9, respectively. We also recommend that fills within structural areas have a modified Proctor (ASTM D 1557) maximum dry density of at least 100 pounds per cubic foot (pcf). Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 Unsuitable fill materials include topsoil, organic materials (OH, OL), and high plasticity clays and silts (CH, MH). Such materials removed during grading operations should be either stockpiled for later use in landscape fills, or placed in approved on or off -site disposal areas. Existing soils containing significant amounts of organic matter will not be suitable for re -use as engineered fill. As such, the organic content of the near surface soils should be evaluated to determine if some of these soils will be suitable for re -use as engineered fill. Natural fine- grained soils classified as clays or silts (CL, MIL) with LL and PI greater than 40 and 20, respectively, should be evaluated by the geotechnical engineer at the time of construction to determine their suitability for use as engineered fill. Prior to the commencement of fill operations and/or utilization of any off -site borrow materials, the contractor should provide representative samples of the proposed fill soils to the geotechnical engineer. The geotechnical engineer can determine the material's suitability for use as an engineered fill and develop moisture -density relationships in accordance with the recommendations provided herein. Samples should be provided to the geotechnical engineer at least 3 to 5 days prior to their use in the field to allow for the appropriate laboratory testing to be performed. Fill materials placed within the building and pavement areas should be placed in lifts not exceeding 8 inches in loose lift thickness and moisture conditioned to within their working range of optimum moisture content. The fills should then be compacted to a minimum of 95 percent of the soil's modified Proctor (ASTM D 1557) maximum dry density to within 12 inches below finished subgrade. The upper 12 inches of fills placed beneath structural development should be compacted to 98 percent of the soil's modified Proctor maximum dry density. The typical working range of optimum moisture for the natural Coastal Plain soils at the site is expected to be within approximately 3 percent of the optimum moisture content. Care should also be taken to provide a smooth, gently sloping ground surface at the end of each day's earthwork activities to help reduce the potential for ponding and absorption of surface water. Grade controls should also be maintained throughout the filling operations. Filling operations should be observed on a full-time basis by a qualified representative of ECS to determine that the required degrees of compaction are being achieved. We recommend that a minimum of one compaction test per 2,000-square-foot area be performed for each lift of controlled fill. The elevation and location of the tests should be clearly identified at the time of fill placement. Areas which fail to achieve the required degree of compaction should be re -worked until the specified degree of compaction is achieved. Failing test areas may require moisture adjustments or other suitable remedial activities in order to achieve the required compaction. Fill materials should not be placed on frozen, frost -heaved,. and/or soils which have been recently subjected to precipitation. Wet or frozen soils should be removed prior to the continuation of site grading and fill placement. Borrow fill materials, if required, should not contain excessively wet or frozen materials at the time of placement. Additionally, if grading operations occur during the winter months, frost -heaved soils should be removed prior to placement of engineered fill, granular sub -base materials, foundation or slab concrete, and asphalt pavement materials. If problems are encountered during the site grading operations, or if the actual site conditions differ from those encountered during our subsurface exploration, the geotechnical engineer should be notified immediately. Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 5.3 Foundation Desian Provided the subgrade preparation and earthwork operations are completed in strict accordance with the recommendations of this report, the proposed construction can be supported on conventional shallow foundations bearing on approved natural materials and/or properly compacted fill. We recommend a net allowable design soil bearing pressure of 2,000 psf for proportioning continuous and isolated column footings. To reduce the possibility of foundation bearing failure and excessive settlement due to local shear or "punching" failures, we recommend that continuous footings have a minimum width of 18 inches and that isolated column footings have a minimum lateral dimension of 30 inches. Furthermore, all footings should bear at a depth to provide adequate frost cover protection. For this region, we recommend the bearing elevation be a minimum depth of 12 inches below the finished exterior grade or in accordance with the local building code requirements. We request the opportunity to review our foundation recommendations and make any necessary changes once final site design grades are determined. The net allowable soil bearing pressure refers to that pressure which may be transmitted to the foundation bearing soils in excess of the final minimum surrounding overburden pressure. The final footing elevation must be evaluated by ECS personnel to verify that the bearing soils are capable of supporting the recommended net allowable bearing pressure and suitable for foundation construction. These evaluations should include visual observations, hand rod probing, and dynamic cone penetrometer (ASTM STP 399) testing, or other methods deemed appropriate by the geotechnical engineer at the time of construction, in each column footing excavation and at intervals not greater than 20 feet in continuous footing excavations. The settlement of a structure is a function of the compressibility of the bearing materials, bearing pressure, actual structural loads, fill depths, and the bearing elevation of footings with respect to the final ground surface elevation. Estimates of settlement for foundations bearing on engineered or non -engineered fills are strongly dependent on the quality of fill placed. Factors which may affect the quality of fill include maximum loose lift thickness of the fills placed and the amount of compactive effort placed on each lift. Provided the recommendations outlined in this report are strictly adhered to, we expect that total settlements for the proposed construction are expected to be in the range of 1 inch or less, while the differential settlement will be approximately 1/2 of the anticipated total settlement. This evaluation is based on our engineering experience and the provided structural loadings, and is intended to aid the structural engineer with his design. 5.4 Floor Slab Desicln Provided a suitable subgrade will be prepared as recommended herein, ground level slabs for the maintenance buildings can be designed as slabs -on -grade. Our findings indicate that a modulus of subgrade reaction (ks) of 125 pci is appropriate for design provided that upper 12 inches of the slab subgrade soils have been uniformly compacted to at least 98 percent of their modified Proctor maximum dry density. Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 We recommend that all slabs -on -grade be isolated from the foundations so that potential differential settlement of the structure will not induce shear stresses in the floor slab. Also, to minimize the crack width of any shrinkage cracks that may develop near the surface of the slab, wire mesh reinforcement may be included in the slab design. The mesh should be located in the top third of the slab to be effective. We also recommend that all slabs -on -grade be underlain by a minimum of 6 inches of clean granular fill with less than 5 percent fines by weight to help prevent the capillary rise of subsurface moisture from adversely affecting the slab. If floor covering such as tile or carpet will be utilized for interior finishes, a polyethylene vapor barrier may be used beneath the floor slab for moisture control considerations. 5.5 Seismic Site Class Determination and Liquefaction Potential North Carolina has adopted (with State amendments) the 2009 Edition of the International Building Code (IBC 2009), and the IBC 2009 requires that a seismic Site Class be assigned for new structures. The method for determining the Site Class is presented in Section 1613.5.5 of the IBC 2009. The seismic Site Class is typically determined by a calculating a weighted average of N-values from standard penetration testing in conventional soil test borings, undrained shear strengths, or the shear wave velocities of the materials in the upper 100 feet of the site. According to the IBC 2009, a seismic Site Class "E" may be used for this site based upon a weighted average N-value of 7.6. Based on the USGS Seismic Hazard Curves and the IBC 2009, for a seismic site class "E" at latitude 34.676' and longitude-77.353°, the Scs value is 0.331 and the Sol value is 0.174. The seismic design category depends on the occupancy group of the building and should be determined by the structural engineer. The soils encountered in the borings were evaluated for liquefaction potential using simplified procedures developed by Seed and Idriss. For the analysis, the peak ground acceleration was assumed in accordance with IBC 2000 Section 1803.5.12 to be Sos/2.5 in the absence of a site specific seismic study. The liquefaction potential for this site is low. 0 Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 5.6 Lateral Earth Pressures Any below -grade or retaining walls utilized for this project should be designed to withstand the lateral earth pressures exerted upon them. In the design of below -grade retaining walls to restrain compacted engineered fill or in -situ natural soils, the following soil parameters can be utilized: Coefficient Coefficient Coefficient of Active of Passive of At Rest Effective Unit Depth Earth Earth Earth Friction Cohesion Weight (pcf) (ft) Pressure, Pressure, Pressure, Angle (psf) (below water Ka KP Ko table) 0-7 0.29 3.39 0.45 33 0 110 (47.6) 7-22 200 42.6 22-25 0.32 3.12 0.48 31 0 42.6 These recommendations have assumed no surcharge loads. The recommended coefficient of friction is 0.25 for concrete over soil. The increased lateral pressures generated by surcharge loads (i.e. slopes, parking and building areas, etc.) should be considered in the design. Based on our subsurface findings, shallow groundwater levels were measured at the site. We anticipate that the below grade walls will be properly and adequately waterproofed. The wall should be designed to resist hydrostatic pressures. For wall conditions where wall movement cannot be tolerated or where the wall is restrained at the top, the "At Rest' earth pressure should be used. For wall conditions where outward wall movement in the range of 0.5 to 1 percent of the wall height can be tolerated, the "Active" earth pressure should be used. In evaluating the resistance of soil to lateral loads imposed by structures, the "Passive" earth pressure should be used. Please note that the full development of passive pressure requires deflections toward the soil mass on the order of 1 to 4 percent of the wall height. M] Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 5.7 Pavement Desian Considerations For the design and construction of exterior pavements, the subgrades should be prepared in strict accordance with the recommendations in the "Subgrade Preparation" and "Engineered Fill Placement' sections of this report. An important consideration with the design and construction of pavements is surface and subsurface drainage. Where standing water develops, either on the pavement surface or within the base course layer, softening of the subgrade and other problems related to the deterioration of the pavement can be expected. Furthermore, good drainage should minimize the possibility of the subgrade materials becoming saturated during the normal service period of the pavement. ECS recommends a light duty, flexible pavement section of 2 inches of surface SF9.5 mix overlying 6 inches of compacted ABC stone in the parking and road areas. For a heavy duty, flexible pavement section, ECS recommends 3 inches of surface SF9.5 mix overlying 6 inches of compacted ABC stone in the parking and road areas. For a light duty or heavy duty, rigid pavement section, we recommend 6 inches of 650 psi flexible strength concrete overlying 4 inches of compacted ABC stone in the road areas. Regardless of the section and type of construction utilized, saturation of the subgrade materials and asphalt pavement areas results in a softening of the subgrade material and shortened life span for the pavement. Therefore, we recommend that both the surface and subsurface materials for the pavement be properly graded to enhance surface and subgrade drainage. By quickly removing surface and subsurface water, softening of the subgrade can be reduced and the performance of the parking, area can be improved. Site preparation for the parking areas should be similar to that for the building area including stripping, proofrolling, and the placement of compacted structural fill. Please note that large, front -loading trash dumpsters frequently impose concentrated front - wheel loads on pavements during loading. This type of loading typically results in rutting of bituminous pavements and ultimately pavement failures and costly repairs. Consequently, we recommend the use of an 8 inch thick, mesh reinforced concrete slab that extends the entire length of the truck. Concrete pavements should be properly jointed and reinforced as needed to help reduce the potential for cracking and to permit proper load transfer. 5.8 Site Drainage Positive drainage should be provided around the perimeter of the structure to minimize the potential for moisture infiltration into the foundation and slab subgrade soils. We recommend that landscaped areas adjacent to these structures be sloped away from the construction and maintain a fall of at least 6 inches for the first 10 feet outward from the structures. The parking lots, sidewalks, and any other paved areas should also be sloped to divert surface water away from the proposed building. The proper diversion of surface water during site grading and construction will help reduce the potential for delays associated with periods of inclement weather. The proper diversion of surface water is especially critical since portions of the site soils are expected to be moisture sensitive. Based upon our past experience, the use of "crowning" large areas of exposed soils should be useful to help divert surface water from the prepared subgrades. 11 Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 5.9 Construction Considerations Exposure to the environment may weaken the soils at the foundation bearing elevation if the foundation excavations remain exposed during periods of inclement weather. Therefore, foundation concrete should be placed the same day that proper excavation is achieved and the design bearing pressure verified. If the bearing soils are softened by surface water absorption or exposure to the environment, the softened soils must be removed from the foundation excavation bottom immediately prior to placement of concrete. If the excavation must remain open overnight, or if inclement weather becomes imminent while the bearing soils are exposed, we recommend that a 1 to 3 inch thick "mud -mat" of "lean" concrete be placed over the exposed bearing soils before the placement of reinforcing steel. It is imperative to maintain good site drainage during earthwork operations to help maintain the integrity of the surface soils. The surface of the site should be kept properly graded to enhance drainage of surface water away from the proposed construction areas during the earthwork phase of this project. We recommend that surface drainage be diverted away from the proposed building and pavements areas without significantly interrupting its flow. Other practices would involve sealing the exposed soils daily with a smooth -drum roller at the end of the day's work to reduce the potential for infiltration of surface water into the exposed soils. The key to minimizing disturbance problems with the soils is to have proper control of the earthwork operations. Specifically, it should be the earthwork contractor's responsibility to maintain the site soils within a workable moisture content range to obtain the required in -place density and maintain a stable subgrade. Scarifying and drying operations should be included in the contractor's price and not be considered an extra to the contract. In addition, construction equipment cannot be permitted to randomly run across the site, especially once the desired final grades have been established. Construction equipment should be limited to designated lanes and areas, especially during wet periods to minimize disturbance of the site subgrades. It will likely be.necessary to utilize tracked equipment during grading operations particularly if the subgrade soils exhibit elevated moisture conditions. 12 Report of Subsurface Exploration and Geotechnical Engineering Analysis Wallace Creek Marine Mart MCB Camp Lejeune, North Carolina ECS Project No.: 22.17419 6.0 CLOSING Our geotechnical evaluation of the site has been based on our understanding of the site, the project information provided to us, and the data obtained during our exploration. The general subsurface conditions utilized in our evaluations have been based on interpolation of subsurface data between the borings. If the project information provided to us is changed, please contact us so that our recommendations can be reviewed and appropriate revisions provided, if necessary. The discovery of any site or subsurface conditions during construction which deviate from the data outlined in this exploration should be reported to us for our review, evaluation and revision of our recommendations, if necessary. . The assessment of site environmental conditions for the presence of pollutants in the soil and groundwater of the site is beyond the scope of this geotechnical exploration. 13 ° LV F s b V C z L) Z _ t v Z_ m C ,�'�'� �`. �` � fix'✓ ,. , ""�.�`� 25' SP ?`II�"�,, �;` � 1'� 'c ,� "�5M1 � y,,c�,; tAt #,�y�, 5' SPT � � w'M'a, ,• x �" .� r ,�, '^""�,. �� d • 'a n. .i? i 4' � 'it"(e � 'a fi�w` �1 "8,�„ ++ w f�, �. s A J �: '� � 9�-'+� �d�"� �t,.'`� ��-� >.�i �•. � 25 SP � ` .�� m�' � ' � �__� ,.xis"� � �_ „y;' �, � '�� m. ' . � � �i„• �.� � °iy� � ,�"a'. 10' SPT 7 _ � " '` H 4 v S ENGINEER DRAFTING k h'rc °•ITjsA�W E Y�.r r r ^1'- r A9 �".�'' is �h ``35 WEG MFH SCALE t t.,''t''`" NTS PROJECT DENOTES APPROXIMATE No. 22-17419 h I _ LOCATION OF SOIL TEST BORING `y h �4 SHEET 1 of 1 s ¢, � f p —4_'_ b'a W'a ` "`'M� "W"k*� � i`F ry z a� a ... i5,rr ATE 3/9/2012 APPENDIX B SPT BORING LOGS AND SOIL CLASSIFICATION SYSTEM, DESCRIPTION AND TERMINOLOGY Unified Soil Classification System (ASTM Designation D-2487) Major Division Group Symbol Typical Names Classification Criteria A 8z 0 v e o o •o z GW Well -graded gravels and gravel- C" = D6D/Dl0 Greater than 4 sand mixtures, little or no fines 0 C, = (D3o)2/(DIoxD60) Between 1 and 3 GP Poorly graded grovels and gravel - to - w Not meeting both criteria for GW sand mixtures, little or no fines 0 h h o GM Silty gravels, gravel -sand -silt eoD 3 V " °' Atterberg limits plot below "A" line or mixtures chid 0 plasticity index less than 4 GC Clayey gavels, gravel -sand -clay y Atterberg limits plot above "A" line mixtures •� and plasticity index greater than 7 u U SW Well -graded sands and gravelly °o M c Ca= D6U/DIo Greater than 6 sands, little or no fines o Ca = (D30)2/(DIoxD60) Between I and 3 SP Poorly graded sands and gravelly �`A^, O N zz; � � z Not meeting both criteria for SW sands, little or no fines a, N Atterberg limits plot below "A" line or SM Silty sands, sand -silt mixtures 8 plasticity index less than 4 SC Clayey sands, sand -clay, mixtures o Atterberg limits plot above "A" line and plasticity index greater than 7 ML Inorganic silts, very fine sands, Notc:U-aae rcpramEa opprodmeta upW limn of ll. and PI mmblmlioD, rock flour, silty or clayey fine for lmWal mils(empircally dcicrmin4, ASTM-D2487. sands CL Inorganic clays of low to medium w plasticity, gravelly clays, sandy - w clays, silty clays, lean clays E( OL Organic silts and organic silty clays of ]ow plasticity Fw „ 5b n MH Inorganic silts, micaceous or diatomaceous fine sands or silts, 30 elastic silts to CH Inorganic clays of high plasticiti ■■■■■■ER-M.. ■■■■■..MOR, ■.■■■.M.NO. ■■■■.MMIMPI,.■ . .■..O.,.ZI NONE lMEMNON I..®:....■.■ y fat clays l o to x m w w w ro a w Im Ilo LIQUID LIMIT, LL OH Organic clays of medium to high Plasticity chart for the classification of fine-grained soils. plasticity Tests made on fraction finer than No. 40 sieve Highly organic soils Pt Peat, muck and other highly Fibrous organic matter; will organic soils char, bum, or glow UNIFIED SOIL CLASSIFICATION SYSTEM y fat clays l o to x m w w w ro a w Im Ilo LIQUID LIMIT, LL OH Organic clays of medium to high Plasticity chart for the classification of fine-grained soils. plasticity Tests made on fraction finer than No. 40 sieve Highly organic soils Pt Peat, muck and other highly Fibrous organic matter; will organic soils char, bum, or glow UNIFIED SOIL CLASSIFICATION SYSTEM REFERENCE NOTES FOR BORING LOGS I. Drilling and Sampling Symbols: SS: Split Spoon Sampler RB: Rock Bit Drilling ST: Shelby Tube Sampler BS: Bulk Sample of Cuttings RC: Rock Core; NX, BX, AX PA: Power Auger (no sample) PM: Pressuremeter HSA: Hollow Stem Auger DC: Dutch Cone Penetrometer WS: Wash Sample Standard Penetration (Blows/Ft) refers to the blows per foot of a 140 lb. hammer falling 30 inches on a 2 inch O.D. split spoon sample, as specified in ASTM D-1586. The blow count is commonly referred to as the N value. H. Correlation of Penetration Resistances to Soil Properties: Relative Density of Cohesionless Soils Consistency of Cohesive Soils SPT-N Relative Densi[v SPT-N Consistency 0-4 Very Loose 0-2 Very Soft 5 - 10 Loose 3-4 Soft 11 - 30 Medium Dense 5-8 Firm 31 - 50 Dense 9 - 15 Stiff 51 or more Very Dense 16 - 30 Very Stiff 31 - 50 Hard 50 or more Very Hard M. Unified Soil Classification Symbols: GP: Poorly Graded Gravel ML: Low Plasticity Silts GW: Well Graded Gravel ME: High Plasticity Silts GM: Silty Gravel CL: Low Plasticity Clays GC: Clayey Gravel CH: High Plasticity Clays SP: Poorly Graded Sands OL: Low Plasticity Organics SW: Well Graded Sands OR High Plasticity Organics SM: Silty Sands CL - ML: Dual Classification (Typical) SC: Clayey Sands W. Water Level Measurement Symbols: WL: Water Level BCR: Before Casing Removal WS: While Sampling ACR: After Casing Removal WD: While Drilling WCI: Wet Cave In DCI: Dry Cave In The water levels are those water levels actually measured in the borehole at the times indicated by the symbol. The measurements are relatively reliable when auguring, without adding fluids, in a granular soil. In clays and plastic silts, the accurate determination of water levels may require several days for the water level to stabilize. In such cases, additional methods of measurement are generally applied. The elevations indicated on the boring logs should be considered approximate and were not determined using accepted surveying techniques. SK awv¢avwae CLIENT JOB# BORING# SHEET Stellar Group17419 6-1 1 OF 1 ffr PROJECT NAME ARGHITECT-ENGINEER Wallace Creek Marine Mart SITE LOCATION -(D- CALIBRATED PENETROMETER TONSlFT2 Birch Ave Cam Le'eune Onslow County 4 5+ PLASTIC WATER LIQUID LIMIT CONTENT % LIMIT % ? DESCRIPTION OF MATERIAL ENGLISH UNITS ISM ROCK QUALITY DESIGNATION 8 RECOVERY W F F E RQD% I'll — Z o BOTTOM OF CASING LOSS OF CIRCULATION ZO 20% 40% 8 % 80% 10 % ���JJJ 70 W g O SURFACE ELEVATION O$ STANDARD PENETRATION BLOWSlFT OW N N ILL n 3 W m 0 20 30 40 50+ ,Topsoil Depth 6" ' 3 i Loose, Tan -Brown, Silty, Fine SAND, (SM) S-1 SS 18 18 3 8 ' i 6 Medlum Dense to Loose, Tan, Silty, Fine S-2 SS 18 18 SAND, (SM) � ® 14 i 5 T 5 � S-3 SS 18 18 5 7 i Very Soft, Gray, Sandy CLAY, (CL) 2 i WOH i S-4 SS 18 18 — woH i ' '• 10 i i I Very Loose to Loose, Gray, Fine SAND, With "P.. ,: Silt, (Sp-SM) lni�ili: jrisn•, 2 j I S-5 SS 18 18 'h`I` In::'%Il _' 2 i I 15 I'i4F�J'. man is i 19iff.U: rccn, IRAs I 4 S-6 SS 18 18 mmm 5 15:t1:1 J: 4 zo i�ic%H: i IN {. i Soft, Gray, CLAY, With Sand, (CL) S-7 SS 18 18 1 3 i 25 2 ? i END OF BORING @ 25.00' j 30 i I i THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. INSITU THE TRANSITION MAY BE GRADUAL. S2 WL wi WD❑ BORING STARTED 02/20/12 SZ WL(BCR) Y WL(ACR) BORING COMPLETED 02/20/12 CAVE IN DEPTH YL WL 8.90' RIG 45B ATV FOREMAN BF DRILLING METHOD Mud Rotary CLIENT JOB# BORING SHEET Stellar Group17419 B-2 1 OF 1 PROJECT NAME ARCHITECT -ENGINEER Wallace Creek Marine Mart ++. SITE LOCATION CALIBRATED PENETROMETER TONS/FT2 Birch Ave Cam Le'eune Onslow Countv 1 2 4 5. PLASTIC WATER LIQUID LIMIT CONTENT% LIMIT % ®� i DESCRIPTION OF MATERIAL ENGLISH UNITS ROCK QUALITY DESIGNATION 8 RECOVERY m Z E RQD% REC.% Z o BOTTOM OF CASING LOSS OF CIRCULATION ZO 20% 40% 60% 80% 10 % ® STANDARD PENETRATION W G 3 w Q Q S W SURFACE ELEVATION < O BLOWS/FT a m m h m 3 W m 10 20 30 40 50. —Topsoil Depth 6" Loose, Tan -Brown, Silty, Fine SAND, (SM) 3 S-1 SS 18 18 3 6 Medium Dense to Loose, Tan, Fine SAND, With s-2 Ss 18 18 slit, (Sp-SM) ur ,. {F;j: 61 8 18 5 Ixmu 3 i S-3 SS 18 18 4.vF)1; 4 Very Soft, Gray, Sandy CLAY, (CL) 1 I S-4 SS 18 18 WO 10 WOH Very Loose, Gray, Fine SAND, (SP) i 2 5-5 SS 18 18 2 4 1 1 15 2 Very Loose, Dark Gray and Brown, Clayey, Fine SAND, With Organics, (SC) ' 2 S-6 SS 18 18FBI 2 3 i 20 i 7 S-7 SS 18 18 1 2 i END OF BORING @ 25.00' i 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL. Q WL WS❑ WDO BORING STARTED 02/20/12 WL(BCR) Y WL(ACR) BORING COMPLETED 02/20/12 CAVE IN DEPTH 'S2 WL 10.60' RIG 45B ATV FOREMAN BF DRILLING METHOD Mud Rotary CLIENT JOB 7! BORING N SHEET Stellar Group 17419 j 13-3 1 OF 1 PROJECT NAME ARCHITECT -ENGINEER Wallace Creek Marine Mart SITE LOCATION �- CALIBRATED PENETROMETER TONS/FT2 Birch Ave Carrip Le'eune Onslow Count 2 4 6. PLASTIC WATER LIQUID LIMIT CONTENT LIMIT% DESCRIPTION OF MATERIAL ENGLISH UNITS �e—� ROCK QUALITY DESIGNATIONEc.% RECOVERY yyy pp z BOTTOMOFCASING LOSS OF CIRCULATION Z %D% 40% 8 %gEC 80% 10 % SURFACE ELEVATION ® STANDARD PENETRATION BLOWS/FT g >T� U Q to ; o 4 r�i O 10 20 30 40 50. Topsoil Depth 8" ' Loose, Tan -Brown, Silly, Fine SAND, (SM) S-1 SS 18 18 1 2 ' i 3 i S-2 SS 18 18 3 6 5 3 Medium Dense, Tan, Fine SAND, (SP) 8 S-3 SS 18 18 8 12. j I I Very Loose, Gray, Clayey, Fine SAND, (SC) N VON WOH S 44 SS 18 18 WOH 1 to — i Very Soft, Gray to Dark Gray, CLAY, With Sand,(CL) j I WOH S-5 SS 18 18 WO I 15 WOH i i i i i S-6 SS 18 18 WOH ' 20 WOH Medium Dense, Gray -Brown, Fine to Medium laiif 1: SAND, With Silt, (SP-SM) 19:et)7, MIX". ) {oitfil: to 17 S-7 SS 18 18 7 25 IMit. 1: 8 j END OF BORING @ 25.00' i : : i I I I 30 f i I I i THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL. 'Q WL wso WD❑ BORING STARTED 02/20/12 WL(BCR) Y WL(ACR) BORING COMPLETED 02/20/12 CAVE IN DEPTH 'II WL 7.30' RIG 45B ATV FOREMAN BF DRILLING METHOD Mud Rotary CLIENT JOB i! BORINGN SHEET Stellar Group 17419 I B-4 1 OF 1 PROJECT NAME ARCHITECT -ENGINEER Wallace Creek Marine Mart SITE LOCATION .-Q- CALIBRATED PENETROMETER TONS/FT2 Birch Ave Cam Le'eune Onslow Countv 2 5 PLASTIC WATER LIQUID LIMIT CONTENT% LIMIT% C t� Qd Z W. 5 d i 0 DESCRIPTION OF MATERIAL ENGLISH UNITS®� BOTTOMOFCASING LOSS OF CIRCULATION ZO ,�,�,,,� Q a m ROCK QUALITY DESIGNATION 8 RECOVERY RQD% REC.% — 20% 4 % 60% S % 10 % ® STANDARD PENETRATION 0 BLO oS/FT 40 + SURFACE ELEVATION Topsoil Depth 6" Very Loose, Tan -Brown, Silly, Fine SAND, (SM) 1 S-1 SS 18 18 ili': 1 3 2 i B Medium Dense, Tan to Gray, Fine SAND, (SP) 5 S-2 SS 18 18 5 11. 6 5 � S-3 SS 18 18 _ 8 2 12 WOH Very Loose, Gray, Clayey, Fine SAND, (SC) S-4 SS 18 18 WOH 0 1 Very Soft, Gray, CLAY, With Sand, (CH) WOH i we 10-35.2 S-5 SS 18 18 15 WOH i Very Soft to Soft, Black, Sandy CLAY, With Organics, (CL) WON S-6 SS 18 18 WON 2 20 2 i i i i i 1 S-7 �SS 18 18 2 4 25 2 i i i i i i END OF BORING @ 25.00' 30 ' THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAYBE GRADUAL. =L WL ws0 WD❑ BORING STARTED 02/20/12 =E WL(BCR) Y WL(ACR) BORING COMPLETED 02/20/12 CAVE IN DEPTH Q WL 6.40' RIG 45B ATV FOREMAN BF DRILLING METHOD Mud Rotary CLIENT JOB# BORING SHEET Stellar Group 17419 I B-5 1 OF 1 PROJECT NAME ARCHITECT -ENGINEER Wallace Creek Marine Mart SITE LOCATION -C> CALIBRATED PENETROMETER TONstFr2 Birch Ave Camp Le'eune Onslow County 1 2 s+ PLASTIC WATER LIQUID LIMIT CONTENT% LIMIT% g DESCRIPTION OF MATERIAL ENGLISH UNITS ROCK QUALITY DESIGNATION & RECOVERY w F z^ ROD% REC.% 10 C O N & BOTTOM OF CASING LOSS OF CIRCULATION o 20% 4080% 8(1% 100% % (2)STANDABLOWSIFT RD RATION a J udF7 ? O SURFACE ELEVATION W 10 20 30 40 50+ ,Topsoil Depth 6" i Loose, Tan -Brown, Silty, Fine SAND, (SM) 2 S-1 SS 18 18 2 i 3 i ! Loose to Medium Dense, Tan, Fine SAND, (SP) 4 S-2 SS 18 18 4 5 j 5 i 6 ! S-3 SS 18 18 —_ 11 21 i 10 Very Loose, Gray, Clayey, Fine SAND, (SC) WOH S-4 SS 18 18 WO 0 WOH 0 i i Very Soft, Gray, CLAY, With Sand, (CL) WOH S-5 SS 18 18 wo 15 woH I i : i I : INCH j S-6 SS 18 18 wo 0-�4.9 20 woH I i Firm, Black, Sandy CLAY, With Organics, (CL) 4 S-7 SS 18 18 2 25 3 END OF BORING @ 25.00' i i I i 30 i i i i j i i I I j i THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL. =Z WL ws0 WD❑ BORING STARTED 02/20/12 3z WL(SCR) $ WL(ACR) BORING COMPLETED 02/20/12 CAVE IN DEPTH '12 WL 6.70' RIG 45B ATV FOREMAN BF DRILLING METHOD Mud Rotary CLIENT JOB# BORING# SHEET Stellar Group 17419 I B-6 1 OF' PROJECT NAME ARCHITECT -ENGINEER 2P Wallace Creek Marine Mart W SITE LOCATION -Q- CALIBRATED PENETROMETER TONS/FT2 Birch Ave Canno Le'eune Onslow County 1 2 4 5. PLASTIC WATER LIQUID LIMIT CONTENT % LIMIT % ®� C w O i % m Z r o N O a� DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING LOSS OF CIRCULATION D m p ¢ a 5• O m ROCK QUALITY DE SIGN REC,% RECOVERY 20%D% 40% - 60%REC. 80%10 ® STANDARD PENETRATION BLOWS/FT 10 20 30 40 5. SURFACE ELEVATION Topsoil Depth 8" ' Loose, Brown, Silty, Fine SAND, (SM) 1 2 S-1 SS 18 18 {I' 3 8 5 ' 5 Medium Dense, Tan to Gray, Fine SAND, (SP) 5 S-2 SS 18 18 a 12: B 5 � S-3 SS 18 18 7 1i4 7 WDH woH 1 Very Soft, Gray to Dark Gray, CLAY, With Sand, (CL) S-4 SS 18 18 10 WOH S-5 SS 18 18 WO 15 WOH i WOH S-6 SS 18 18 WD ' 20 WON Very Loose, Dark Brown, Clayey, Fine Sand, With Organics, (SC) 1 S-7 SS 18 18 1 1 Loose, Gray -Brown, Silty, Fine SAND, (SM) P5 D Medium Dense to Very Loose, Gray, Fine to Medium SAND, (SP) i i 7 14 2 S-8 SS 18 18 30 CONTINUED ON NEXT PAGE. THE STRATIFICATION LINES REPRESENTTHE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAYBE GRADUAL. Q WL 12.90- Ws WD❑ BORING STARTED 02/21/12 WL(BCR) JE WL(ACR) BORING COMPLETED 02/21/12 CAVE IN DEPTH 4 WL RIG 45B ATV FOREMAN BF DRILLING METHOD Mud Rotary CLIENT JOB BORING# SHEET Stellar Group17419 B-6 2 OF 2 ".0 PROJECT NAME ARCHITECT -ENGINEER Wallace Creek Marine Mart ,. SITE LOCATION -(:I- CALIBRATED PENETROMETER TONSIFT2 Birch Ave Carrip Le'eune Onslow County 1 5. PLASTIC WATER LIQUID LIMIT CONTENT % LIMIT % F DESCRIPTION OF MATERIAL ENGLISH UNITB 0 1 ROCK QUALITY DESIGNATION 8 RECOVERY RQD% REC.% - �- Z o BOTTOM OF CASING 30 LOSS OF CIRCULATIONr] 20% 40% 60% 80% 100% OW SURFACE ELEVATION ® STANDABOOWS//RATION wo N 10 20 30 40 6+ i 3 i i S-9 SS 18 18 2 q i 35 2 i I i i i Medium Dense, Gray, Fine to Coarse SAND, i With Slit, With Cemented Layers, (SP-SM) .": O � ::fl;: •. i7i4fl{: rain• 5 . i I 5-10 SS 18 18 I .:a) 10 21.8-0 21 40 1;{IF is i (e:rtil w; 1pu: I i I :arw Itifh. li i i � I/,all 4 5-11 SS 18 18 Imr,.nr zra;u 6 115 45 lyiarlli lie411: 9 i :%i'dl: Off i Dense, Gray, Weathered Limestone, (WR) 8 S-12 SS 18 18 8 41 50 35 END OF BORING @ 50.00' I I 55 j i i i j i I i 60 i i i i i i i i i i i i i I THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAYBE GRADUAL. R WL 12.90' WS❑ WD❑ BORING STARTED 02/21/12 4 WL(BCR) Y WL(ACR) BORING COMPLETED 02/21/12 CAVE IN DEPTH f WL RIG 45B AN FOREMAN BF DRILLING METHOD Mud Rotary CLIENT JOBH BORING SHEET Stellar Group17419 I B-7 1 OF 1 rn PROJECT NAME ARCHITECT -ENGINEER Wallace Creek Marine Mart5—ujw SITE LOCATION CALIBRATED PENETROMETER TONS/FT2 Birch Ave Camp Le eune Onslow Count z 5 PLASTIC WATER LIQUID LIMIT CONTENT% LIMIT% Z a m w a i F o a Q O K DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING LOSS OF CIRCULATION � Ey z0 w ¢ < 3 w 3 0 m ROCK QUALITY DESIGNATION &RECOVERY RQD% REC.% 2 % 40 % 60% % 10 % SURFACE ELEVATION ® STANDARD PENETRATION BLOWS/Fr p 0 50+ _Topsoil Depth 6" Loose, Tan -Brown to Tan -Orange, Silty, Fine SAND, (SM) 1 a S-1 Ss 18 18 3 i i II 3 S-2 SS 18 18 3 7 5 4 4 3 Loose to Very Loose, Gray, Clayey, Fine SAND, (SC) S-3 SS 18 18 2 i WOH S-4 SS 18 18 WOH 1 0 1 i i i END OF BORING @ 10.00' 15 20 j i 25 i 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN -SITU THE TRANSITION MAY BE GRADUAL. =Z WL wso WOO BORING STARTED 02/20/12 WL(BCR) Y WL(ACR) BORING COMPLETED 02/20/12 CAVE IN DEPTH @ 5.40' 1`—Z WL RIG 45B ATV FOREMAN BF DRILLING METHOD Mud Rotary CLIENT JOB# BORING# SHEET Stellar Grou 17419 B-8 1 OF 1 PROJECT NAME ARCHITECT-ENGINEERUC Wallace Creek Marine Mart „ SITE LOCATION -Q- CALIBRATED PENETROMETER TONS/FT2 Birch Ave Cam Le'eune Onslow County 1 z 4 5t PLASTIC WATER LIQUID LIMIT CONTENT% LIMIT% ? DESCRIPTION OF MATERIAL ENGLISH UNITS L- ® i ROCK QUALITY DESIGNATION 8 ftECOVERV c RQD% — - REC.% -- E Ci o BOTTOM OF CASING 3D LOSS OF CIRCULATION 2 z 20% 40% 60% 80% 10 % SURFACE ELEVATION RD PENET ® STANDABLOWS/FT�TION w ¢ O O O iy 20 To soli Depth 6" ! Loose, Gray, Clayey, Fine SAND, (SC) S-1 SS 18 18 1 2 i I 3 IS-2 Loose, Tan, Silty, Fine SAND, (SM) SS 18 18 2 2 5 5 3 i Medium Dense, Gray, Fine SAND, (SP) S-3 SS 18 18 g j 17 8 Very Loose, Gray, Silty, Fine SAND, (SM) ,,:;Till 3 S-4 SS 18 18 2 10 2 4 i END OF BORING @ 10.00' i 1 I I i 1 15 i i i ! i ! 20 i i I i 25 i i i I 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. INSITU THE TRANSITION MAY BE GRADUAL. =Z WL WS❑ wD❑ BORING STARTED 02/20/12 =¢ WL(BCR) Y WL(ACR) BORING COMPLETED 62/20/12 CAVE IN DEPTH @ 5.20' Q WL RIG 45B ATV FOREMAN BF DRILLING METHOD Mud Rotary Project Number: 22 - 17419 Project Name: WALLACE CREEK MARINE MART ECS Carolinas, LLP Wilmington, North Carolina Laboratory Testing Summary Project Engineer: wEG Principal Engineer: wMs Date: March 8, 2012 Summary By: WEG PIPE, Me# Summary Key: SA = See Attached Hyd = Hydrometer UCS = Unconfined Compression Soil Su = Undrained Shear Strength S = Standard Proctor Con = Consolidation UCR = Unconfined Compression Rock ND = Not Detected M= Modified Proctor DS = Direct Shear LS = Lime Stabilization OC = Organic Content GS = Specific Gravity CS = Cement Staibilization Particle Size Distribution Report 100 9C 8C 7L 6C 5C 4C 3C 2C 1C C IN 11 �II E IN IN IN % +3" coarse Fine Coarse Medium Flne Silt Clay 0.0 0.0 0.0 0.1 0.3 77.8 21.8 SIEVE SIZE PERCENT FINER SPEC." PERCENT PASS? (X=NO) 3/8 100.0 #4 100.0 #10 99.9 #20 99.8 #40 99.6 #60 97.8 #100 48.5 #200 21.8 Material Description Tan, Silty, Fine SAND Atterberq Limits PL= LL= P1= Coefficients D90= 0.2248 D85= 0.2130 D60= 0.1685 D50= 0.1525 D30= 0.1103 D15= D10= Cu- Cc= Classification USCS= AASHTO= Remarks F.M =0.53 (no specification provided) Source of Sample: B-1 Depth: 3.5-5 Sample Number: S-2 Date: 2/29/12 ECS CAROLINAS, LLPMM Client: Stellar Group C 7211 Ooden Business Park suila 201 Project: Wallace Creek Marine Mart WIIminOton, NC 28411 LLP Ph: (910) 686-9114 CAR® Fa■: c910) 686-9666 Pro ect No: 17419 Figure Tested By: KEL LIQUID ARID PLASTIC LIMITS TEST REPORT. 6 5 0. 40 w z 30 F g a 20 10 0 10 20 30 40 50 60 70 80 90 100 110 LIQUID LIMIT ECS CAROLINAS, LLP m 7211 Ogden Business Park Cllent: Stellar Group Suite 201 Project: Wallace Creek Marine Mart WIImInglOn, N 28411 LLP Ph: (810) 686-9C114' R®Fax: (910)686-9666 ProectNo.: 17419 Figure 0 / Dashed line indicates flee approximate/ upper limn: boundary for natural sails / o / / / / (a O� / / / CL-mL IUIL UI' QL NII-! or UI-! I SOIL DATA SOIL DATA NATURAL SYMBOL SOURCE SAMPLE DEPTH WATER PLASTIC LIQUID PLASTICITY USCS NO. CONTENT LIMIT LIMIT INDEX % % ® B-4 S-5 13.5-IS 55.2 21 52 31 � Tested By: KEL LIQUID AND PLASTIC LIMITS TEST REPORT 60 Dashed line indicates the approximate SOIL DATA NATURAL SYMBOL SOURCE SAMPLE DEPTH WATER PLASTIC LIQUID PLASTICITY USCS NO. CONTENT LIMIT LIMIT INDEX B-5 S-6 18.5-20 54.9 21 44 23 o Tested By: Tested By: Particle Size Distribution Report Of W Z LL f— Z W U w W ll °/ +3 Coarse Fine Coarse 0.0 0.0 1.9 0.6 SIEVE SIZE PERCENT FINER SPEC.' PERCENT PASS? (X=NO) 3/4 100.0 3/8 98.9 #4 98.1 #10 97.5 #20 96.1 #40 85.4 #60 58.6 #100 10.8 #200 6.9 (no specification provided) Source of Sample: B-6 Depth: 38.5-40 Sample Number: S-10 ® ECS CAROLINAS, LLP C Suite 7211 Ogden Business Park Su201 Wilmington, 0iNC 28411 LLP Ph: (910) 686-9114 cna® Fax: (010) 686.9666 edlum Fine 12.1 78.5 Material Description Gray, Fine to Coarse SAND, With Silt Atterbero Limits PL= LL= Pl= Coefficients D90= 0.5170 D85= 0.4189 D60= 0.2543 D50= 0.2279 D30= 0.1874 D15= 0.1591 D10= 0.1306 Cu= 1.95 Cc= 1.06 Classification USCS= AASHTC= Remarks F.M =1.34 Client: Stellar Group Project: Wallace Creek Marine Mart Date: 2/29/12 Tested By: KEL COMPACTION TEST REPORT Curve No.: B-2, S-1 Project No.: 17419 Project: Wallace Creek Marine Mart Client: Stellar Group Source of Sample: B-2 Sample Number: S-1 Remarks: MATERIAL DESCRIPTION Description: Grayish Brown, Silty Fine SAND Classifications - USCS: AASHTO: Nat. Moist. = Sp.G. = 2,60 Liquid Limit = Plasticity Index = % < No.200 = 140 130 120 m NN 70 TEST RESULTS Maximum dry density = 119.4 pef Optimum moisture = 12.2 Date: 2/29/12 Water content, % Figure ECS Carolinas. LLP Tested By: CS Checked By: KEL General Conditions The analysis, conclusions, and recommendations submitted in this report are based on the exploration previously outlined and the data collected at the points shown on the attached location plan. This report does not reflect specific variations that may occur between test locations. The borings were located where site conditions permitted and where it is believed representative conditions occur, but the full nature and extent of variations between borings and of subsurface conditions not encountered by any boring may not become evident until the course of construction. If variations become evident at any time before or during the course of construction, it will be necessary to make a re-evaluation of the conclusions and recommendations of this report and further exploration, observation, and/or testing may be required. This report has been prepared in accordance with generally accepted soil and foundation engineering practices and makes no other warranties, either expressed or implied, as to the professional advice under the terms of our agreement and included in this report. The recommendations contained herein are made with the understanding that the contract documents between the owner and foundation or earthwork contractor or between the owner and the general contractor and the caisson, foundation, excavating and earthwork subcontractors, if any, shall require that the contractor certify that all work in connection with foundations, piles, caissons, compacted fills and other elements of the foundation or other support components are in place at the locations, with proper dimensions and plumb, as shown on the plans and specifications for the project. Further, it is understood the contract documents will specify that the contractor will, upon becoming aware of apparent or latent subsurface conditions differing from those disclosed by the original soil exploration work, promptly notify the owner, both verbally to permit immediate verification of the change, and in writing, as to the nature and extent of the differing conditions and that no claim by the contractor for any conditions differing from those anticipated in the plans and specifications and disclosed by the soil studies will be allowed under the contract unless the contractor has so notified the owner both verbally and in writing, as required above, of such changed conditions. The owner will, in turn, promptly notify this firm of the existence of such unanticipated conditions and will authorize such further exploration as may be required to properly evaluate these conditions. Further, it is understood that any specific recommendations made in this report as to on -site construction review by this firm will be authorized and funds and facilities for such review will be provided at the times recommended if we are to be held responsible for the design recommendations. APPENDIX E PROCEDURES REGARDING FIELD LOGS, LABORATORY DATA SHEETS AND SAMPLES Procedures Regarding Field Logs, Laboratory Data Sheets and Samples In the process of obtaining and testing samples and preparing this report, procedures are followed that represent reasonable and accepted practice in the field of soil and foundation engineering. Specifically, field logs are prepared during performance of the drilling and sampling operations which are intended to portray essentially field occurrences, sampling locations, and other information. Samples obtained in the field are frequently subjected to additional testing and reclassification in the laboratory by more experienced soil engineers, and differences between the field logs and the final logs exist. The engineer preparing the report reviews the field and laboratory logs, classifications and test data, and his judgment in interpreting this data, may make further changes. Samples are taken in the field, some of which are later subjected to laboratory tests, are retained in our laboratory for sixty (60) days and are then discarded unless special disposition is requested by our client. Samples retained over a long period of time, even if sealed in jars, are subject to moisture loss which changes the apparent strength of cohesive soil generally increasing the strength from what was originally encountered in the field. Since they are then no longer representative of the moisture conditions initially encountered, an inspection of these samples should recognize this factor. It is common practice in the soil and foundation engineering profession that field logs and laboratory data sheets not be included in engineering reports because they do not represent the engineer's final opinions as to appropriate descriptions for conditions encountered in the exploration and testing work. On the other hand, we are aware that perhaps certain contractors submitting bids or proposals on work may have an interest in studying these documents before submitting a bid or proposal. For this reason, the field logs will be retained in our office for inspection by all contractors submitting a bid or proposal. We would welcome the opportunity to explain any changes that have been and typically are made in the preparation of our final reports, to the contractor or subcontractors, before the firm submits the bid or proposal, and to describe how the information was obtained to the extent the contractor or subcontractor wishes. Results of the laboratory tests are generally shown on the boring logs or described in the extent of the report, as appropriate. The descriptive terms and symbols used on the logs are described on the attached sheet, entitled General Notes. ,n A U.S. ARMY CORPS OF ENGINEERS 4VILmlNGTON DISTRICT Action Id. SAW-2011-00779 County: Onslow U.S.G.S. Quad: Camp Leieune NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner: US Marine Corps; Camp Leieune Agent: Tetr'a',tech'; Inc Address: Attn: John R. Townson, Director Address: Attn: Brad Schaeffer Environmental Management Division 285 Ellicott Street Building 12, Room 245, McHugh Boulevard Buffalo, NY 14203 Camp Leieune; NC 28541 Telephone No.: (910) 451-5003 Telephone No.: 716-849-9419 Property description Size (acres) 156 Nearest Waterway New River USGS HUC 03020302 Location description MCB Camp Leicune Indicate Which of the Following Apply: A. Preliminary Determination Nearest Town Jacksonville River Basin While Oak Coordinates N 34.675 W-77.343 Based on preliminary information, there may be wetlands on the above described property. We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction. To be considered final, ajurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). B. Approved Determination _ There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. There are wetlands on the above described property subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ We strongly suggest you have the wetlands on your property delineated. Due to the size of.yoitr property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. The wetland on your property have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWAjurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. X The waters of the U.S. including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on 8/18/2011. Unless fE_ZEluV1iE MAR 0 6 2013 BY: there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ There are no waters of the U.S., to include wetlands, present on the above described property which arc subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the laty or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Washington, NC, at (252) 946-6481 to determine their requirements. Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Richard Spencer at 910-251-4172. C. Basis For Determination OHWM and 1987 Delineation Manual Wetlands are adlacent to New River, a traditional navigable waters. D. Remarks E. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR pan 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: District Engineer, Wilmington Regulatory Division Ann:Richard K. Spencer, Regulatory Specialist, Wilmington Regulatory Division Office 69 Darlington Avenue Wilmington, North Carolina28403-1343 In order for an RFA to be, accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the District Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by October 18 , 2011. **It is not necessary to submit an RFA form to the District Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: — =_---- Richard K. Spencer, Re rlatory- Specialist^ Date August 18, 2011 Expiration Date August 18, 2016 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http //i-egulatory,usacesui-vey.com/ to complete the survey online. FEAR 0 6 2013 Flo, k iY.M!"... 5 F>.,t s�� t;.�`M NOfi1FjICATIONt�OF'�A�M�I,VZS�'2-�s iV�` � ���i�'OPTaION�S'AND�PROC�SS '��xx �F''•(, Ai�D�nS ' Y pJi [t � ,�'�i x GYZf F J v^W� � � e'�.+y �Siu R'E' yrfi>1,,pl�1� c se�wy�}yrX-1,/�i�,M1�"]�., � of g �r� F �+'S r M x e,r t i Y 2� £yr y ���,. �a (. h. ,?"i'�'a. �t�'J..-'... -4. 3,tx''-2::"K�,..a�'�:.fr k��.,.."3`(✓_o�x y.f,.v'oY.,w�'S `r.::i+s�'. .. 's.d,.. .. C'°:,tom:.,.. ,.?b.1�.�L r.. '_x �l .,ry4�ii��'.i :2 A licanC US Marine Corps, Camp Le'eune Pile Number: SAW 2011-00779 Date: August 18, 2011 Attached is: MCAB Camp Le'eune Birch Strectt(156) See Section below ❑ INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A PROFFERED PERMIT (Standard Permit or Letter ofpermission) _ B ❑ PERMIT DENIAL C. ® APPROVED JURISDICTIONAL DETERMINATION D ❑ PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I jlie I' fit your nghts and options fegardrng an admmtstrattve appeal'of the above decision ;Addit m"I mfonnahoninay be found at http //www »sate army mtlhnet%functwns/ciVlcecwo%reg or :� , , 'Corpsre u]ations at33,CFR7 art33L_r( i A: INITIAL PROFFERED PERMIT: You may acceptor object to the permit. • ACCEPT: Ifyou received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature our the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFFRED PERMIT: You may accept m- appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. if you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: if you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section 11 of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice, D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section 11 of this form and sending the form to the district engineer. This form most be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved Jr) (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. EGEE9 r" h MAR 0 6 2013 BY: ... .. If. : , ESEPP$RPSECTXOV „QUTA`TALRDRMIT�., REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT MQ0NTACT rQMUESTIONS ORVFORMATION , , , ; i If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may also appeal process you may contact: contact: Mr. Richard K. Spencer, Regulatory Project Manager Mr. Mike Bell, Administrative Appeal Review Officer U.S. Army Corps of Engineers, Wilmington District CESAD-ET-CO-R Wilmington Regulatory Field Office U.S. Army Corps of Engineers, South Atlantic Division 69 Darlington Avenue 60 Forsyth Street, Room 9M 15 Wilmington, North Carolina 28403-1343 Atlanta, Georgia 30303-8801 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits and approved Jurisdictional Determinations send this form to: District Engineer, Wilmington Regulatory Division, AttwRichard K. Spencer, Regulatory Specialist, Wilmington Regulatory Division Office, 69 Darlington Avenue, Wilmington, North Carolina 28403- 1343 For Permit denials and Proffered Permits send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Mike Bell, Administrative Appeal Officer, CESAD-ET-CO-R, 60 Forsyth Street, Room 9M15, Atlanta, Georgia 30303-8801 rSVEi�� MAR 0 6 2013 t ` w BY: 1' I TRANSMITTAL DATE: February 26. 2013 TO: Janet Russell REi Marine'Corps Base Camp Lejeune NCDENR Marine Mart Wilmington Regional Office Stormwater Management & Erosion Sediment 127 Cardinal Drive Extension Control Submittal Wilmington, NC 28405 Express Permitting We are sending: ❑ UPS -Overnight ❑ U. S. Mail ❑ Courier ® Hand Carry ✓ Enclosed Under Separate Cover ✓ Project Drawings ✓ For Your Use Project Specifications Reviewed Shop Drawings Reviewed & Noted Product Literature Revise & Resubmit Other Not Accepted # copies Ow . # Date Descri tion Prepared B 2 Permit Drawings TAF 2 Design Analysis (Narrative, TAF Calculations, Checklists, Maps) 2 Geotechnical Report TAF 2 ACOE Wetland Determination Maps 2 SWPPP 1 Express Permitting Application Fee 1 Erosion Control Application Fee REMARKS: Please find the attachments listed above for your review and approval. If you have any questions or require additional information, please call me at (904) 899-9866. rE C �.� of s ?: 7 � MAR 0 6 2013 BY: Russell 26FebI3.doc Tim Focht 2900 Hartley Road, Jacksonville, Florida 32257 • Telephone (904) 260-2900 www.stellar.net STORM WATER NARRATIVE 1. GENERAL INFORMATION Project Name & Address: Marine Corps Base Camp LeJeune Wallace Creek Marine Mart Camp LeJeune, NC 28540 Property Ownership: U.S. Government Acres Disturbed: 4.65 acres Wetlands Disturbed: There are no wetlands within the limits of constniction. Existing Permits: None. 11. EXISTING CONDITIONS The site is located in an urbanized area on Marine Corps Base Camp Lejeune at the intersection of Birch Street and McHugh Boulevard. The project site is currently undeveloped with dense woods and heavy ground cover across the entire site. There is utility infrastructure (overhead electric, fiber optic, sanitary sewer, water) along McHugh Boulevard and Birch Street adjacent to the site. Marine Corps Base Camp Lejeune owns and maintains these utilities on base. The site is relatively flat with elevations ranging from 18 to 25 and slopes averaging 1.5 percent. Due to the extensive ground cover and shallow slopes, there are no existing erosion and sedimentation problems on the project site. There is a 0.07-acre wetland system adjacent to the project site. This wetland system received an approved jurisdictional determination from the ACOE in August, 2011 with an expiration in August, 2016. Stormwater runoff sheet drains across the site from south to north. The runoff enters a roadside Swale along Birch Street and conveyed to a cross culvert flowing north under Birch Street. The stormwater runoff continues draining in a northerly direction into Beaver Dam Creek. Beaver Dam Creek is classified as a "SB, NSW" water body with index 19-20-2. Beaver Dam Creek flows into Morgan Bay then through the New River Inlet to the Atlantic Ocean. The site is located within the White Oak River Basin. III. PROPOSED DEVELPMENT The proposed project consists of a 13,803 square foot building with a fuel pumping station, asphalt parking areas and utility infrastructure necessary to support the development. Land disturbance activities required for this development total approximately 4.65 acres and include activities such as demolition of pavement areas, clear & grub existing vegetation, excavation for building foundations, excavation for stormwater management facilities, trenching for ECEO V E FEB 13 2013 BY: underground infrastructure, and general site grading. Note, the Marine Mart site is undeveloped with dense woods yet the constriction of the Marine Mart requires demolition of an asphalt drive on the adjacent Worship Center site. The proposed project will remove the existing Worship Center drive and replace it with a shared drive serving both sites. A separate potable water service line and fire service line will be brought into the site by means of a single 6" tap off the existing water distribution main along McHugh Boulevard. The development will include construction of a sanitary pump station. The pump station will pump to a nearby sanitary manhole. This project will be designed, permitted, and constricted in one phase. There are no off -site roadway improvements required for this project. The proposed site plan allows for a future roadway extension. This roadway extension, if completed, will be a separate project that will be constructed, funded, designed and permitted by others. The project site totals 5.86 acres with a disturbed area of 4.65 acres. Attached is a site plan delineating the project limits and the proposed built -upon areas. Below is a table detailing the proposed built -upon area within the project limits. Description Built -Upon Area Building 13,803 Pavement 72,951 Sidewalk 6,371 TOTAL 93,125 The total built -upon area is 36.5% so the project will be classified as High Density. The development will be divided into two drainage basins. Both basins will utilize a wet detention basin to treat and attenuate stormwater runoff from the site prior to discharging downstream. Both systems will be designed per NCDENR's Stormwater BMP Manual provding 90% TSS removal, a forebay, vegetated slopes, and a 10' wide vegetated shelf These BMPs will manage peak discharge rates and erosive conditions so downstream conveyance systems will not be adversely affected. There is no off -site drainage area entering the proposed stormwater management system. ECS Carolinas, LLC completed a geotechnical investigation of the site on March 9, 2012. The report described the top 6" — 8" as organic topsoil. Beneath the surface to depths of 7' contain intermittent layers of very loose to medium dense silty, slightly silty, clayey and clean sand (SM, SP-SM, SC, SP) having N-values ranging from 3 to 21 blows per foot. Soils from 7 feet to depths of 25 feet are intermittent layers of very loose to medium dense silty, slightly silty, clayey and clean sand (SM, SP-SM, SC, SP) and very soft to firm sandy clays and clays (CL, CH) having N-values ranging from the weight of hammer to 15 blows per foot. USDA Natural Resource Conservation Service classifies the existing soils as follows: Baymeade Find Sand, 0-6 percent slopes (BaB) Hydrologic Soil Group: A Soil Erosion Factor (K, rock free): 0.05 Soil Erosion Factor (K, whole soil): 0.05 Soil Erosion Factor (T): 5 IECEIVE`" FEB 13 2013 Wind Erodibility Group: 1 Wind Erodibility Index : 220 A Report of Seasonal High Water Table Estimation was performed by ECS Carolinas, LLC on April 10, 2012 to provide subsurface data for design of the stormwater BMP. A single hand auger was dug so the ground water level and soils can be analyzed. At the boring location, the groundwater level measured 48- inches below existing grade and the Seasonal High Water Table was determined at 18-inches below existing grade. ECEBVUE FEB 13 2013 BY: PRLP Pw i305,91,9 {__ _c -1: 34• FlNCD El0 SE l / / 'if I I WM1IS.4T E 91tSJ BL —'T4F SYf)E) CWI / smuilona: I i .72 kPl(5.10 .-.- - - \ I. . . POST-1 DA-238 21 pye CPIN UIFIWS WlelE uVrt ge....1. / IIY 8 NCPE o9.2i usm�es a rlw0 la' III \M aei•IOS MY •3L.I1 LIS'.1 z'M1Z-WIE. MI If 0.0. CN•I)PO zw' M IS'ICPE )w _� li1.R fF BODR�-,]SB / fN95b3d9 / \ WIfILL SIRJRJBE 13 F`wswz.11 I �..r iM-31 FYI stn-i9 w I Mrtur- ]JII Q PR RIP-3..N vx-ro.w u' i1K.fD OW SECI4:H le' ✓ Is' 9rs x�lroob _ _E:zwv)v.zs W 1 \ R'MI]'RY e s-las IX9 DN-33.51 — / LL' FMl Qa N/ E-Im ioP-v.m :swvw.0 en-,nw ez.vvzz.]s —1 . zL• N 15 MP L _ / 9Y RiV�N.9. \ ]KB%31 Y ezwBwSm el�i Euv�-zzs. I9A I xNWl9.)] i ExRTNL l \ I PIIINLYL uzri Ponz , J —\J L�=^a===��'—_�=��vcl \ / WHUCH BLW. / — >' J - - — ` \ — — — — — — — — J WHUGH BLw. Russell, Janet From: Tim Focht [tfocht@stellar.net] Sent: Tuesday, February 12, 2013 10:38 AM To: Russell, Janet Cc: Thomas Bradshaw Subject: Express Request - Wallace Creek Marine Mart Attachments: Wallace Creek MM Express Request.pdf Janet: Please see the attached Express Request package. I can be ready to submit the drawings for review any time around Friday, February 22nd. Please pick a day around then that suites your schedule and let me know. Thank you. Tim Focht Ph:904.899.9866 Fax: 904.438.3241 Cell: 904.716.9508 APlease consider the environment before printing e-mails. P15WA North Carolina Department of Environment and Natural Resources NCDENR Request for Express Permit Review FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map Isan of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828.296.4698;alison.davidson(cbncmail.net • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.leeAmcmail.net • Mooresville & -Patrick Grogan 704-6633772 orpatrick.grogan(dncmail.net • Washington Region -Lyn Hardison 252-946.9215 or Ivn.hardisonAncmail.net • Wilmington Region -Janet Russell910-350-2004 or ianeLrussell(rDncmail.net NOTE: Project application received alter 12 noon will be stamped in the following work day. For DENR Use ONLY Reviewer. 1L . ��—)_ .^�``�C'J Submit: 2 - !moo Time: —LL- ; OS confirm: Z " iQ FAX or Email the completed form to Express SW SW SW SW SW Project Name: MARINE CORPS BASE CAMP LEJEUNE - MARINE MART County: ONSLOW W A 11 A [ e Applicant: NEAL PAUL Company: MARINE CORPS BASE CAMP LEJEUNE, PUBLIC WORKS Address: 1005 MICHAEL ROAD City: CAMP LEJEUNE, State: NC Zip: 28547 Phone: 910-450-5803, Fax: 910-451-2927, Email: NEAL.PAUL@USMC.MIL Physical Location:INTERSECTION OF BIRCH STREET AND MCHUGH BOULEVARD, CAMP LEJEUNE, NC 28547 Project Drains into BEAVER DAM CREEK waters — Water classification SB-NSW (for classification see- hftp://h2o.enr.state.nc.us/bims/reports/reponsWB.htmi P &T 27, 2c9 o ce'l ' ' 1 fnfl('-f-- Project Located in WHITE OAK River Basin. Is project draining to class ORIN waters? NO, within'/2 mile and draining to class SA waters NO or within 1 mile and draining to class HOW waters? NO _ _ ,I Engineer/Consultant: TIMOTHY FOCHT Company: STELLAR CI E B y E -li Address: 2900 HARTLEY ROAD City: JACKSONVILLE, State: FL Zip: 32257-_ Phone: 904-899-9866, Fax: 904-899-9866, Email: TFOCHT@STELLARAET FEB 12 2013 SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWQ, ❑ bCM, ❑ DLR, ❑ OTHER: BY: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ IntermittentlPerennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® Slate Stormwater ® General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)] ® High Density -Detention Pond 2 # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems / ❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development Cl Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 4.7 acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ® Yes ❑ No Buffer Impacts: ❑ No ® YES: _acre(s) Wetlands Delineation has been completed: ® Yes ❑ No Isolated wetland on Property ❑ Yes ® No US ACOE Approval of Delineation completed: ® Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ® No Permit Received from US ACOE ® Yes ❑ No rr+r+rr«r rrr rrrrrrrrrr arr ♦rar rrr aa♦rar+aaa ♦a as+aaa+a++a+For DENR use onlya+a*++++raa+a«r+a++++«raaa++«+r+araar+ar++ara+aarrr+++++«++ Fee Split for multiple permits: (Check# Total Fee Amount $ SUBMITTAL DATES Fee 41 SUBMITTAL DATES Fee CAMA $ Vanne (EJ Mai; 0 Min( $ SW (❑ HD, ❑ L0, ❑ Gen) 1 $ 401; $ LQS I $ 1 Stream Deter— $ E Cons4-_. SeCi J-b r\S S }'U r�oV L il�Fl i� -f-b �'9 S � /� du✓� � � C CIar\,S ' V e Plr�-•.•s �e5�d',�5 s�o',I �, burrow GR 1 cV� �Pr }\l�r�S 117� St Poa # 2 wRLr s-I-uPF O cc a kA--r-�ir_r e4 6 s� Ze- dyer rr� IL STORM WATER NARRATIVE GENERAL INFORMATION Proiect Name & Address: Marine Corps Base Camp LeJeune Wallace Creek Marine Mart Camp LeJeune, NC 28540 Property Ownership: U.S. Government Acres Disturbed: 4.65 acres Wetlands Disturbed: There are no wetlands within the limits of construction. Existing Permits: None. EXISTING CONDITIONS The site is located in an urbanized area on Marine Corps Base Camp Lejeune at the intersection of Birch Street and McHugh Boulevard. The project site is currently undeveloped with dense woods and heavy ground cover across the entire site. There is utility infrastructure (overhead electric, fiber optic, sanitary sewer, water) along McHugh Boulevard and Birch Street adjacent to the site. Marine Corps Base Camp Lejeune owns and maintains these utilities on base. The site is relatively flat with elevations ranging from 18 to 25 and slopes averaging 1.5 percent. Due to the extensive ground cover and shallow slopes, there are no existing erosion and sedimentation problems on the project site. There is a 0.07-acre wetland system adjacent to the project site. This wetland system received an approved jurisdictional determination from the ACOE in August, 2011 with an expiration in August, 2016. Stormwater runoff sheet drains across the site from south to north. The runoff enters a roadside swale along Birch Street and conveyed to a cross culvert flowing north under Birch Street. The stormwater runoff continues draining in a northerly direction into Beaver Dam Creek. Beaver Dam Creek is classified as a "SB, NSW" water body with index 19-20-2. Beaver Dam Creek flows into Morgan Bay then through the New River Inlet to the Atlantic Ocean. The site is located within the White Oak River Basin. III. PROPOSED DEVELPMENT The proposed project consists of a 13,803 square foot building with a fuel pumping station, asphalt parking areas and utility infrastructure necessary to support the development. Land disturbance activities required for this development total approximately 4.65 acres and include activities such as demolition of pavement areas, clear & grub existing vegetation excavation four s ECEI V E FEB 12 2013 r building foundations, excavation for stormwater management facilities, trenching for underground infrastructure, and general site grading. A separate potable water service line and fire service line will be brought into the site by means of a single 6" tap off the existing water distribution main along McHugh Boulevard. The development will include construction of a sanitary pump station. The pump station will pump to a nearby sanitary manhole. This project will be designed, permitted, and constructed in one phase. There are no off -site roadway improvements required for this project. The proposed site plan allows for a future roadway extension. This roadway extension, if completed, will be a separate project that will be constructed, funded, designed and permitted by others. The project site totals 5.86 acres with a disturbed area of 4.65 acres. Attached is a site plan delineating the project limits and the proposed built -upon areas. Below is a table detailing the proposed built -upon area within the project limits. Description Built -Upon Area Building 13,803 Pavement 72,951 Sidewalk 6,371 TOTAL 93,125 The total built -upon area is 36.5% so the project will be classified as High Density. The development will be divided into two drainage basins. Both basins will utilize a wet detention basin to treat and attenuate stormwater runoff from the site prior to discharging downstream. Both systems will be designed per NCDENR's Stormwater BMP Manual provding 90% TSS removal, a forebay, vegetated slopes, and a 10' wide vegetated shelf. These BMPs will manage peak discharge rates and erosive conditions so downstream conveyance systems will not be adversely affected. There is no off -site drainage area entering the proposed stormwater management system. ECS Carolinas, LLC completed a geotechnical investigation of the site on March 9, 2012. The report described the top 6" — 8" as organic topsoil. Beneath the surface to depths of 7' contain intermittent layers of very loose to medium dense silty, slightly silty, clayey and clean sand (SM, SP-SM, SC, SP) having N-values ranging from 3 to 21 blows per foot. Soils from 7 feet to depths of 25 feet are intermittent layers of very loose to medium dense silty, slightly silty, clayey and clean sand (SM, SP-SM, SC, SP) and very soft to firm sandy clays and clays (CL, CH) having N-values ranging from the weight of hammer to 15 blows per foot. USDA Natural Resource Conservation Service classifies the existing soils as follows: Baymeade Find Sand, 0-6 percent slopes (BaB) Hydrologic Soil Group: A Soil Erosion Factor (K, rock free): 0.05 Soil Erosion Factor (K, whole soil): 0.05 Soil Erosion Factor (T): 5 Wind Erodibility Group: 1 Wind Erodibility Index : 220 ECEI V E FEB 12 2013 BY: A Report of Seasonal High Water Table Estimation was performed by ECS Carolinas, LLC on April 10, 2012 to provide subsurface data for design of the stormwater BMP. A single hand auger was dug so the ground water level and soils can be analyzed. At the boring location, the groundwater level measured 48- inches below existing grade and the Seasonal Fligh Water Table was determined at 18-inches below existing grade. MECEovE FEB 12 2013 BY:_ I 11 'In :,R V AT 0 uses MqG Google Maps Goode O mcRs ..an 4 smrr.r e+r Vppun fl./ r O Page 1 of I To see all the dotails that are visible on the screen, use the RriW Ink nevt to No map. 0 8 t4ex O hr �Vicinity t O a.. 6a 0."+p le,nmrr omn. n.r rFEB 12 209 BY: --- http://maps.google.com/?11=34.63827,-77.32721&z=l l &t=h 12/4/2012 Google Maps GOOSIC a'9Y Page l of I To aea ell the tleNiR That are vaiEle on Ne scroen, use No'Print' link neat to No map. 1 Site Location f z ` �1<a' t t �. t}� 9 .,� "� Fm�n.a •.ate �^ i ry f$ http://maps.google.com/?11=34.63827,-77.32721&z=l 1 &t=h l2/4/2012 Ed -- I W w — — — — — — — — — — — - ------------ �P' bi, fill - -------------- — ---- - -- SITE PIAN 11 MEIIIIIII1111 1111 11��!! !!1!A; ;l, --- - ----- - ....... gill, - Ll----------- ---------------------- - ------------------- . ...... . . ... . .. . . .... -.- .. . ... ..... . .... . .... ------------ ------- / 7 ---------- ------------ PC21 0 2 WE�i FEB 12 2013 To sea 90 the details that ere vialele on the eaeen, use the "PdnP' link next to the map. Ii c I v E MAR 2 5 2013 BY: Goo8le Nn esE 0 eNT FrY f+mn E �1��LffJy.� r Nam' O Iben M.Ch3 .: Vicinity bl n O 3 9 aelsy carps eswee*p LFp me To we all me details Nat ere vlslele on the screen, use the 'PHnr link next to the map. yfrry cm >+h er4 l jiF C .nyaeox f . O M1 1 ynaYsit^p 9FtlM1 f,.a l.•: y q a �0q67IvRiR. MAR 2 5 Z-/T3 � BY: I to -Y 'Kumfordl c,\t I -3' ; • Par_ t Sreert. N . . . . . . . utche n RO < Ov r Point - - - Iwn 0 iAf-lurry Spring ..... ..... Point, eY . 7 COMO "InEs st 6 ne i-- J, buN reds sLqp h t-j P•Jhl USGS MAP V A T 1W aL ;1v % 1111W g am low ago In 730) U.S. MARINE CORPS BASE CAMP LEJEUNE 28540 1033 FINAL AQUATIC RESOURCES SURVEY BIRCH STREET (156) ONSLOW COUNTY MAP DATE: JUNE 28, 2011 �p pFESS/n, �y Q� SEAL v L-4925 _ S��g� E r'rrnnun` ` , it ,Z 1 3 ENVIRONMENTAL CONSULTANT: RECEIVED SURVEYING CONSULTANT:. TETRA TECH, INC. JUN 3 0 2011 KENNETH E. JOHNSON, P.L.S. L-4925 2200 WILSON BLVD., SUITE 400 CHARLES F. RIGGS & ASSOCIATES, INC. (C-730) ARLINGTON, VA 22201 REG. WLM. FLo, OFC. 502 NEW BRIDGE STREET JACKSONVILLE, NC 28540 MAR 0 6 2013 SHEET > OF 1 > BY:-- z N 0 i. MARINE CORPS BASE CAMP L FINAL AQUATIC RESOURCES SUP BIRCH STREET (156) ONSLOW COUNTY MAP DATE: JUNE 28, 2011 r TLANDS AND WATERS DEUNEATED/IDENTIFIED BY TETRA TECH, INC. 2200 WILSON BLVD., SUITE 400 ARLINGTON, VA 22201 TEL (703) 931-9301 CHARLES F. RIGGS & ASSOCIATES, INC. (C-730) 502 NEW BRIDGE STREET, JACKSONVILLE, NC 28540 TEL (910) 455-0877 FAX: (910) 455-9033 UNDER THE DIRECTION OF KENNETH E. JOHNSON PROFESSIONAL LAND SURVEYOR, L-4925 I, KENNETH E. JOHNSON, PROFESSIONAL LAND SURVEYOR, CERTIFY THAT THIS MAP WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL GPS SURVEY MADE UNDER MY SUPERVISION AND THE FOLLOWING INFORMATION WAS USED TO PERFORM THE SURVEY: _ WETLAND AND STREAM FLAGS LOCATED BASED ON TETRA TECH, INC. DELINEATION: 1) CLASS OF SURVEY: CLASS B US/GIS 2) POSITIONAL ACCURACY: SUB —METER 3) TYPE OF GPS FIELD PROCEDURE: POST —PROCESS DIFFERENTIAL GPS ADJUSTMENT 4) DATES OF SURVEY: DECEMBER 2010 5) DATUM/EPOCH: NAD 83 (2007)/CORS 2002.00 6) PUBLISHED/FIXED—CONTROL USE: JACKSONVILLE CORS ARP (CORS ID—NCJV) 7) GEOID MODEL: GEOID 09 8) COMBINED GRID FACTOR(S): 0.99991534 9) UNITS: DATA COLLECTED BASED ON UNITED STATES STATE PLANE 1983—NORTH CAROLINA 3200 U.S. SURVEY FEET AND CONVERTED TO URA ZONE 18N METERS `:k� G THIS CERTIFIES THAT THIS COPY OF THIS PLAT ACCURATELY DEPICTS THE BOUNDARY OF THE JURISDICTION, EXCEPT WERE NOTED, OF SECTION 404 OF THE CLEAN WATER ACT AS DETERMINED BY THE UNDERSIGNED ON THIS DATE. IN ADDITION. THIS PLAT ACCURATELY IDENTIFIES INTERMITTENT AND PERENNIAL STREAM ORIGIN LOCATIONS. UNLESS THERE IS A CHANGE IN THE LAW OR OUR PUBLISHED REGULATIONS, THIS DETERMINATION OF SECTION 404 JURISDICTION MAY BE RELIED UPON FOR A PERIOD NOT TO EXCEED FIVE YEARS FROM THIS DATE. THIS DETERMINATION WAS MADE UTILIZING THE 1987 CORPS OF ENGINEERS WETLANDS DELINEATION MANUAL AS WELL AS THE REGIONAL SUPPLEMENT TO THE CORPS OF ENGINEERS WETLAND DELINEATION MANUAL' ATLANTIC AND GULF COASTAL PLAIN REGION (Ver. 2.0). r-g-�2o//-0077� U ACE ACTT N ID GENERAL NOTES, 1) ALL DISTANCES SHOWN ARE GROUND HORIZONTAL FIELD MEASUREMENTS. 2) THIS SURVEY IS TIED TO GRID AND THE DATUM IS NAD 83 (2007). 3) THIS SURVEY IS PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT AND MAY NOT INDICATE ALL ENCUMBRANCES ON THE PROPERTY. 4) THIS SURVEY IS SUBJECT TO ALL EASEMENTS, AGREEMENTS AND RIGHTS —OF —WAY OF RECORD PRIOR TO THE DATE OF THIS SURVEY. 5) THIS SURVEY IS OF THE AQUATIC RESOURCES WITHIN THE SURVEY LIMITS OF THE BIRCH STREET TRACT AREA IN ONSLOW COUNTY, NC AS DEUNEATED/IDENTIFlED BY TETRA TECH. INC. AND SURVEYED BY CHARLES F. RIGGS & ASSOCIATES, INC. 6) THE SURVEY LIMIT BOUNDARY AS ILLUSTRATED WAS SUPPUEO BY TETRA TECH, INC. AND WAS NOT SURVEYED BY CHARLES F. RIGGS & ASSOCIATES, INC. 7) THE WATERBODIES, AS ILLUSTRATED, WERE EITHER SUPPLIED BY TETRA TECH, INC. OR DEUNEATED/IDENNFIED BY TETRA TECH, INC. AND SURVEYED BY CHARLES F. RIGGS & ASSOCIATES, INC. REFER TO THE WATERBODY TABLE FOR MAPPING SOURCE DETAILS. 8) THIS MAP CONTAINS LETTERS/ LABELS, DESCRIBING STREAM/ REACH CLASSIFICATIONS, WHICH ARE NOT RECOGNIZED BY THE U.S. ARMY CORPS OF ENGINEERS. Ll S87'03"09"E 120.74m N74'04'38"E EMN SW INT CC (TIE LINE) 182.88m UTM 18N TO FLAG W1-1 (TIE LINE) N: 3839713.8780m TO FLAG W3-102 E: 284336.0710m WETLAND W1 NAD 83 (2007) N4'46'44"E 326.84m (TIE LINE) TO FLAG W2-21 SMN CROSSWALK CC UTM 18N N: 3839202.3250m E: 284593.1860m NAD 83 (2007) WETLAND W2 I( WETLAND W3 S89'08'49"E 650.60m (TIE LINE) TO FLAG W4-11 LEGEND SURVEY LIMIT WETILAND CONTROL MOUMENT CONTROL CORNER EMN FITNESS CC UTM 18N N: 3839670.8290m E: 285281.7770m NAD 83 (2007) `I MAR 0 6 2013 1 BY: WETLAND W4 WETLAND AREA TABLE WETLAND # AREA (ACRES) JURISDICTIONAL DETERMINATION W1 0.07 JURISDICTIONAL W2 0.20 JURISDICTIONAL W3 6.27 JURISDICTIONAL W4 0.47 JURISDICTIONAL TOTAL 7.01 JURISDICTIONAL 1, KENNETH E. JOHNSON, PROFESSIONAL LAND SURVEYOR, CERTIFY THAT THIS MAP WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL GPS SURVEY MADE UNDER MY SUPERVISION AND THE FOLLOWING INFORMATION WAS USED TO PERFORM THE SURVEY: SURVEY CONTROL CORNER: 1) CLASS OF SURVEY: CLASS A 2) POSITIONAL ACCURACY: 1:+10,000 (95% CONFIDENCE) 3) TYPE OF GPS FIELD PROCEDURE: REAL TIME KINEMATIC NETWORKS USING TOPCON GRS-1 RECEIVER 4) DATES OF SURVEY: DECEMBER 2010 5) DATUM/EPOCH: NAD 83 (2007) 6) PUBLISHED/FIXED-CONTROL USE: JACKSONVILLE CORS ARP (CORS ID-NCJV) 7) GEOID MODEL: GEOID 09 8) COMBINED GRID FACTOR(S): 0.99991534 9) UNITS: DATA COLLECTED BASED ON U.S. SURVEY FEET AND CONVERTED TO UTM ZONE 18N METERS KLNNLIH E.J N - f5 0 100m 200m 300m 400m SCALE: 1:1oom SHEET 2 OF 11 INDEX GRIDS OF PROJECT AREAS 5 = SHEET NUMBER LEGEND SURVEY LIMIT WETLAND WATERBODY TABLE Jurisdictional Waterbody# Segment Classification Length (m) Length (ft) Mapping Source' Determination Non-RPW 166 545 GPS Surveyed -Norl-Jurisdictional' R01 RPW 39 128 GPS Surveyed Jurisdictional R02 Non-RPW 29 95 GPS Surveyed Non -Jurisdictional Navy GIS R03 RPW 167 548 Layer/GPS Jurisdictional Surve ed R04 RPW 115 377 GPS Surveyed Jurisdictional Navy GIS R05 RPW 925 3035 Layer/Digital Jurisdictional Ortho hoto R06 Non-RPW 206 676 GPS Surveyed Non -Jurisdictional' 'Where indicated centerline or stream reaches, or pomuns uieleui, wne veinicU 111 Ll IU jl�­ -Fly.,. v GIS layer, digitized using 2007 Navy digital orthophotos, or GPS surveyed. Portions of stream reach flows through jurisdictional waters. o : 100m 200m 300m 400m SCALE: 1:100m CARO4 �'.. SEAL r L-4921 SUR 3 p?0 SHEET 3 OF 1 > LEGEND SURVEY DATA POINT o Wl-1 WITH FLAG IDENTIFICATION NON —SURVEYED POINT ON SURVEY LIMIT MWETLAND STREAM/REACH TRANSITION POINT FOR STREAM/REACH CLASSIFICATION TYPE \A CAR04'' ., SS/p,, SEAL _ r L-4925 �N h� W2-1 START R01—IMS 11 W2-5 W39 / UPLANDS W36 -WETLAND R01—IMS10 W2 W3p W2-12 `r 3 W2-15 R01 (IMS) TO WETLAND W3, W2-17 ,N?A FLAG W3-7 ROt—IMS9 NW30'59'E_ 308.03m - o_o�_./"``X�\ (TIE LINE) MATCHLINE SHEET 5 OF 11 k V�$ R01—EMS8��� R012 EMS NON (JURISDICTIONAL 0 - 10m 20m 30m 40m SHEET 4 OF 11 SCALE: 1:10m - LEGEND SURVEY DATA POINT o W1-1 WITH FLAG IDENTIFICATION NON -SURVEYED POINT ON SURVEY LIMIT �`.:•.,:;,, WETLAND — — STREAM/REACH TRANSITION POINT FOR A, STREAM/REACH CLASSIFICATION TYPE 2VEY LIMITS ���annnni CAR04'''', i �� OF SS/p by SEAL v L-4925 oa = =�F SIJR`�� Eim",A 11 30. MATCHLINE SHEET 4 OF 11 R01-EMS7 R01-EMS5 k 4z- j R01-EMS3 UPLANDS m b R01-EMS1 m a z 0 10m 20m 30m 40m SHEET 5 OF I SCALE: 1:10m LEGEND SURVEY DATA POINT o W1-1 WITH FLAG IDENTIFICATION NON —SURVEYED POINT ON SURVEY LIMIT WETLAND STREAM/REACH TRANSITION POINT FOR ® STREAM/REACH CLASSIFICATION TYPE CAI�O� �FESS/n, �y SEAL = L-4925 a inb y1 �O S.'1\ ,IlMb 3� MATC H LI N E SHEET 7 OF 11 0 10m 20m 30m 40m SCALE: 1:10m SHEET 6 OF 11 8//8/11 MATCHLINE SHEET 6 OF 11 LEGEND SURVEY DATA POINT o W1-1 WITH FLAG IDENTIFICATION NON —SURVEYED POINT ON SURVEY LIMIT WETLAND — STREAM/REACH TRANSITION POINT FOR STREAM/REACH CLASSIFICATION TYPE ``pu�linr)rgr CAR04 oFESS/p 2 SEAL t c� L-4925 0 EJ�'�?o``�Ji� rrrrfiilih , MATCHLINE SHEET 8 OF 11 a z 0 10m 20m 30m . 40m SHEET 7 OF > 1 SCALE: 1:10m V R02-EMS3 R03-IMS2 P 6�x Pow d R02-EMS1VR03-IMS1 LEGEND SURVEY DATA POINT o-WI-1- WITH FLAG IDENTIFICATION NON -SURVEYED POINT ON SURVEY LIMIT MATCHLINE SHEET 7 OF 11 WETLAND W3 109 W3-37 J "o. "Oo o� J W4-1 R06 (EMS) NON -JURISDICTIONAL WETLA W3-38 o RO6-EMS10 \ WETLAND UPLANDS W4-11 , STREAM/REACH TRANSITION POINT FOR AL STREAM/REACH , CLASSIFICATION TYPE SURVEY LIMITS ``"a�inu4,q i RCN CARO4 i ,ss/ Ly SEAL r L-4925 9 O _ UPLANDS IUPLANDS I RO6-EMS4 20 "Po -& 6' �oy / 9l d R06— MS1 o lom 20m 30m 40m SCALE:1:10m 1 SHEET 8 OF 11 W LEGEND z o J SURVEY DATA POINT S 00 o Wi-1 WITH FLAG U IDENTIFICATION I- I �. NON -SURVEYED POINT :E Lij ON SURVEY LIMIT = V7 WETLAND — — STREAM/REACH TRANSITION POINT FOR s STREAM/REACH CLASSIFICATION TYPE `�unnmp�� �•��N CARoz S/p�2y ; SEAL = r L -� 9 :'�4 SI Ty \ SURVEY LIMIT R04-PMS4---'_l'�' I \ \ R05= S)� � 0tn ` � - I �tn I R04-PMS2 b R04-PMS1 UPLANDS UPLANDS 0 10m 20m 30m 40m SCALE: 1:10m SHEET 9 OF 1 25_/rg/li U.S. MARINE CORPS BASE CAMP LEJEUNE FINAL AQUATIC RESOURCES SURVEY BIRCH STREET (156) ONSLOW COUNTY APPENDIX LINE SEGMENTS IN NUMERICAL ORDER BY LEADING DATA POINT ALL DISTANCES ARE IN METERS CARp��., SS/�y°si 2 SEAL L-4925 SHEET 10 OF 11 //-4� WETLAND LINE TABLE LINE # LENGTH DIRECTION W7 1.53m S57'32'30"E W2 7.96m SO4'06'41"E W3 14.43m S29'04'29"E W4 11.76m S49'18'20"E W5 17.16m S21'37'17"E W6 12.72m S48'15'54"E W7 6.86m S71'30'53"E W8 3.91m N69'15'07"W W9 23.58m N38'56'21"W W10 10.37m N17'50'18"W W71 18.71m N44'53'48"W W12 11.58m N18'04'57"W W13 7.22m N2847'11"E W14 33.37m S06'26'25"W W15 7.63m N8732'20"W W16 17.08m S78'49'42"W W17 9.28m S64'18'27"W W18 17.90m S60'21'49"W W19 20.07m N56'43'32"W W20 2.94m N23'19'01"E W21 18.54m S65'29'21"E W22 12.62m N65'34'30"E W23 13.52m N64'33'55"E W24 16.87m N71'54'52"E W25 11.15m N38'44'44"E W26 18.01M N09'15'09"E W27 11.64m S59'32'29"W W28 13.86m S80'36'07"W WETLAND LINE TABLE LINE # LENGTH DIRECTION W29 6.32m N86'00'47"W W30 15.91m N74'51'31"W W31 21.65m N52'29'12"W W32 18.66m N80'15'27"W W33 7.21m N21'49'05"E W34 28.66m S68'14'49"E W35 13.55m S38'16'37"E W36 15.05m S85'54'05"E W37 12.36m N79'49'33"E W38 8.40m N76'59'30"E W39 9.11 m S84'02'56"E W40 24.44m N71'12'06"E W41 27.68m N87'55'39"E W42 14.08m S39'16'30"E W43 15.26m S66'55'28"E W44 5.76m S23'27'47"E W45 14.78m S52'57'27"E W46 6.55m S76'07'15"W W47 18.68m N83'52'48"W W48 14.63m S62'09'10"W W49 19.80m S76'72'22"W W50 18.95m S27'29'23"W W51 23.04m S11'11'41"E W52 9.93m S61'07'27"E W53 16.56m N88'53'22"E W54 4.76m S20'31'54"E W55 11.98m S55'04'53"W W56 13.96m S87'10'56"W WETLAND LINE TABLE LINE # LENGTH DIRECTION W57 11.78m S78'19'45"W W58 11.49m S66'07'02"W W59 20.56m S12'26'27"W W60 16.94m S14'43'52"E W61 15.17m S51'35'31"E W62 14.73m S16'45'28"E W63 12.57m S49'50'39"E W64 11.97m S35'40'33"E W65 11.10m S60'40'11"W W66 1.32m S15'29'58"W W67 17.12m S62'47'59"E W68 20.82m N7453'38"E W69 3.19m N30'43'41"W W70 3.64m N05'05'07"E W71 28.15m N69'54'44"E W72 10.93m N35'17'15"E W73 7.60m S62'34'21"E W74 6.82m S18'05'45"E W75 11.98m S56'51'19"E W76 13.62m N75'27'03"E W77 14.66m N48'58'41"E W78 14.85m N4546'09"E W79 13.71m N69'40'09"E W80 4.03m N78'20'08"E W81 10.46m S34'36'30"W W82 12.40m S59'41'13"W W83 16.96m S46'34'19"W W84 15.04m S20'32'54"W WETLAND LINE TABLE LENGTH DIRECTION 11.65m S08'34'50"E E 17.63m S63'47'21"W 28.90m S44-31-32"E W88 5.73m N49'16'28"E W89 12.99m N1511'12"E W90 13.82m N67'05'34"E W91 27.07m N54'43'02"E W92 15.61m N56'41'20"E W93 7.03m N69'56'14"E W94 3.01 m S36'56'05"W W95 17.17m S52'03'36"W W96 8.88m S19'44'49"W W97 9.36m S61'17'46"E W98 3.07m S15'11'23"E W99 r1469m N80'53'38"W W700 16.44m S57'I6'10"W W701 14.18m S39'23'27"W W102 17.34m S42'15'12"W W103 11.47m S18'57'37"E W104 27.73m S27'32'39"E W105 29.23m S23'07'09"E W106 29.41m S38'58'16"E W107 21.05m S55'29'12"E W108 9.90m S3356'45"W W109 30.04m S75'01'16"W W710 10.19m N34'56'01"W W711 20.80m N45'25'57"W W712 13.65m N12'22'23"W WETLAND LINE TABLE LINE # LENGTH DIRECTION W113 15.32m N26'35'04"W W114 10.69m N41'25'30"W W115 13.51m N04'49'16"W W116 8.88m N11'18'27"W W117 25.50m N17'55'38"W W118 11.16m S73'32'06"W W119 1.46m N71'01'46"W W120 12.09m N36'24'22"W W721 25.59m N41'14'23"W W122 20.70m S80'50'42"W W723 22.36m S89'05'34"W W724 16.25m S84'12'41"W W125 24.09m N60'27'14"W W126 20.03m N72'35'22"W W12 118.10m S75'58'54"W W128 15.21m S42'37'38"W W129 7.32m N04'40'22"E W130 12.77m N41'34'16"E W131 13.24m N25'03'59"E W132 17.43m N00'25-15"W W133 18.99m N49'24'49"W W134 15.00m N43'43'29"W W135 7.31m N40'15'17"E W136 9.46m N00'54'43"E W737- .22.02m N12'42'02"W W138 19.61m N05'15'22"E W139 18.45m N09'50'05"W W740 18. Mm N15'53'15"E WETLAND LINE TABLE LINE # LENGTH DIRECTION W741 15.71m N1327'02"E W142 16.08m N11'33'03"E W143 19.87m N37'10'26"E W144 16.32m N47'59'22"E W745 17.22m N00'57'39"E W146 11.22m S71'58'32"W W747 18.81m N57'51'19"W W748 13.18m N8335'09"W W149 11.37m S32'51'22"W W150 22.87m S31'04'46"W W751 26.89m S22'20'26"W W152 10.76m S08'29'09"E W153 5.36m S62'02'31"W W154 15.28m NO2'14'38"E Wi55 24.98m N15'40'21"E W156 13.81m NO3'40'24"E W157 18.18m N05'00'14"W W758 20.20m N31'23'44"W W159 14.63m N79'41'30"E W160 18.62m . S84'30'14"E W161 15.86m S82'18'28"E W162 38.39m S43'10'37"E o`%,\H1 CARO4 SS/p^'tiy': SEAL v L-4925 0 E. 3�� J\1 �'�gYniniu� SHEET 11 OF 11