HomeMy WebLinkAboutSW8110907_HISTORICAL FILE_20220907STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 W)cK)l
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
❑X HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
2y220g0-1
YYYYMMDD
Burd, Tina J
From:
Burd, Tina J
Sent:
Thursday, August 18, 2022 2:57 PM
To:
Barraco CIV Talia M
Subject:
SW8 110907 - Temporary Lodging Facility Addition
The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted
the Stormwater Permit Renewal Application and $505.00 fee for the subject project on August 10, 2022. The project has
been assigned to Ashley Smith and you will be notified if additional information is needed.
Best Regards,
Tina Burd
Administrative Associate II
Wilmington Regional Office
Division of Environmental Assistance & Customer Service
Phone 910-796-7215
NCDEQ
Wilmington Regional Office
127 Cardinal Drive Ext.
Wilmington, NC 28405
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
Website: http://deg.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
Based on the nument guidance to minimize the spread of CO VID-to, the Department of Environmental Quality has adjusted operations to
protect the health and safety of the staff and public. Many employees are working remotely or arc on staggered shifts. To accommodate these
staffing changes, all DF.Qoffice locations are lirniting public access to appointments only. Please check with the appropriate staff before
visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the
public dining this challenging time.
Non -Transfer Application Completeness Review Checklist
Project Name: TEt-�tPOeA" LO)Gr rJ6 PrIICJ0 Ts'
Project County/Location: O PzA 3 L0k z. / t`nC'8
Permit Action: New New Permit # 2 :
Not located in the ETJ of the following delegated
Date Delivered to WIRO: 7/7- 17p
BIMS Received/Accepted Date: (D O%Z.
Date Given to Admin: , (r9y oZa
a
BIMS Acknowledged Date': o ( d 0'��
and functioning programs:
NHC: Carolina Beach / Kure Beach / Wilmington / Wrightsville Beach
Bruns: Leland / Navassa (?) / Oak Island
Cart: Emerald Isle Onsl: Jacksonville Pend: Surf City
Major Mod / Minor1 enewal ®Existing Permit #:
Applicant & Permittee are the same?' Expiration Date°:
Permit Type: HD LD / LD Overall / HD &LD Combo
General Permit / Offsite / Exempt + Redevelopment
Development Type: Commercial/Residents ther
Subdivided?: Subdivision or ge o
Offsite to S W 8:
MIs Offsite Lot approved in Master Permit?
Rule(s): u2017 Coastal L2g2008 Coastal u1995 Coastal
Phase 11 Universal �1988 Coastal
Permittee Type & Documents Needed:
Property Owner(s) Purchaser =Lessee =HOA Developer
=Viable? =Viable? =Viable? =Viable? =Vlable?
=Deed =Purchase Agmt =Lease =Election Minutes
Paperwork
®Application
rIZZ&ee: ❑$505 (within 6mo) Check#(s): �12G� =No Fee
❑Su pplement' (1 new form or for older forms: 1 original per SCM)
FJO&M2
Soils Report (Infil or PP)
Calculations (signed/sealed)
=Deed Restrictions, if subdivided
Project Narrative
MUSGS Map (or on file?) Subject to SA?: Y / N Subject o ORW?: Y / N
Plans (2 Sets)
NOTES:
'Enter ELMS Acknowledged Date on this Sheet
3For New Projects -Enter New Permit # on Supplements & Deed Restriction Templates.
3 If permittee is different, STOP. Needs to be transferred first.
°If w/in 6 months and they are requesting a mod, STOP. Needs a renewal first.
slf Lot not approved in master permit, STOP. Master permit needs mod.
EMAILED ENGINEER DATE:
REVIEWER NAME: L�
Comments:
G:WQ\\\Reference Library\Procedures\Checklists\Completeness Review Checklist_2021 09 08