Loading...
HomeMy WebLinkAboutSW8100907_CURRENT PERMIT_20230112STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 10 og 0-1 DOC TYPE © CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2 o 2'3 o l 12 YYYYMMDD ROY COOPER Governor ELIZABETH,S. BISER Secretary DOUGLAS R. ANSEL Interim Director January 12`s, 2023 Funston Land and Timber LLC Attn: Allen Jefferson Earp, Manager 1007 Evangeline Drive Leland, NC 28405 NORTH CAROLINA EnvLro=ental,Quality Subject: Permit Renewal Post -Construction Stormwater Management Permit No. SW8100907 Brunswick Forest Phase 5A Hammock Park Brunswick County Dear Mr. Earp: Effective August 1, 2013 the Post -Construction Stormwater Management Program has been transferred from the Division of Water Quality ("DWQ") to the Division of Energy, Mineral and Land Resources ("DEMLR" ). All previous references to DWQ will remain in older permits issued prior to August I, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit. On August 5, 2009, the Governor signed Session Law 2009-406. This law impacted any development approval issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which was current and valid at any point between January 1, 2008, and December 31, 2010. The law extended the effective period of any permit that was set to expire during this time frame to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for a total of four (4) years extension. The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on January I Ith, 2023. The Division is hereby notifying you that permit SW8100907 has been renewed, updated, and re -issued on January 12d; 2023, as attached. Please be aware that the renewal and re - issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until December 31", 2029, which includes all available extensions, and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to, provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after _notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written, petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty_(30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOA 1.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Aisia Freeman in the Wilmington Regional Office, at.phone # (910) 796-7318 or Aisia.freeman@ncdenr.gov. Sincerely, D -y WC9 Douglas R. Ansel, Interim Director Division of Energy, Mineral and Land Resources 10 North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources EQ2P Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 28405 ate\ 000,zo 910.796.7215 r State Stormwater Permit No. SW8 080401 Page 2 of 2 Enclosures: Attachment A — Designer's Certification Form Attachment C — Permitting History Copy of the Renewal Application Documents DES/af: WStormwater\Permits & Projects\2010\100907 HD\2023 01 permit 100907 cc: Austin Scheib, PE; Hanover Design Services, P.A. Wilmington Regional Office Stormwater File �E� iauw®i.aim.N North Carolina Department of Environmental Quality I Division of Energy. Mineral and land Resources Wilmington Reglonal Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 28405 910.79 .7215 Post Construction Stormwater Management Permit No. SW8100907 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Funston Land and Timber. LLC Brunswick Forest — Phase 5A Hammock Park Shelmore Way, Leland, Brunswick County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules') as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications') as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until December 311, 2029 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission, however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 48,258 square feet of impervious area. 3. A 50' wide vegetative buffer must be provided adjacent impounded structures, streams, rivers and tidal waters. 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. The built -upon area for the future development is limited to 27,108 square feet. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 1 of 5 91 Post Construction Stormwater Management Permit No. SW8100907 The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: Onsite, ftz: Offsite, ftz: b. Total Impervious Surfaces, ftz: Onsite, ftz: Offsite, ftz: C. Design Storm, inches: d. Average Pond Design Depth, feet: e. TSS removal efficiency: f. Permanent Pool Elevation, FMSL: g. Permanent Pool Surface Area, ftz: h. Permitted Storage Volume, ft3: i. Temporary Storage Elevation, FMSL: j. Pre-dev. 1 yr-24 hr. discharge rate, cfs k. Controlling Orifice: I. Orifice flowrate, cfs: M. Permitted Forebay Volume, ft3: n. Fountain Horsepower o. Receiving Stream/River Basin: p. Stream Index Number: q. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 11.08 482.577 None 48,258 48,258 None 1.5 3 90% 18 10,000 11,500 19 4.31 1.5" 0 pipe 0.03 6,100 N/A Mallory Creek / Cape Fear 18-78 "C.Sw" The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. Records of maintenance activities must be kept and made available upon request to authorized personnel of the division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will not be allowed in the stormwater treatment system, as the permanent pool volume is less than 30,000 cubic feet. Page 2 of 5 Post Construction Stormwater Management Permit No. SW8100907 6. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 10. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. Page 3 of 5 Post Construction Stormwater Management Permit No. SW8100907 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved, iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur, V. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. c. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Page 4 of 5 Post Construction Stormwater Management Permit No. SW8100907 Permit renewed, updated, and reissued this the 121h day of January 2023. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION C /` k Douglas R. Ansel, Interim Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 5 Post Construction Stormwater Management Permit No. SW8100907 Attachment A Brunswick Forest — Phase 5A Hammock Park Stormwater Permit No. SW8 100907 Brunswick County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date Page 1 of 2 SEAL Post Construction Stormwater Management Permit No. SW8100907 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 11. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. _16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDENR-DEQ Regional Office Town of Leland Building Inspections Page 2 of 2 Attachment C- Permitting History Brunswick Forest Phase SA Hammock Park Permit No. SW8 100907 Approval Date Permit Action RIMS Version Description of the Changes Modified Plan Sheets High Density Commercial Wet Detention Pond Project - construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211. The stormwater control has been designed to handle the 9/21/2010 Original 1.0 runoff from 48,258 square feet of impervious area. A 50' 1-4 (of 4) Approval wide vegetative buffer must be provided adjacent impounded structures, streams, rivers and tidal waters. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. The built -upon area for the future development is limited to 27,108 square feet. 1/12/2023 Renewal 2.0 New expiration date 12/31/2029 Page 1 of 1 Permit Number:- 0(/ / 7 (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provit This system (check one): ❑ does ® does not This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a fore] Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed; until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate the roblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to, best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. ' If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. SEP 14 2010 Form SW401-Wet Detention Basin O&M-Rev.4 IRY• I Page 2 of 4 Permit (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair, if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 8.0 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 4.0 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom 14----------------- FOREBAY BASIN DIAGRAM 66/1 in the blanks) I ft Min. Sediment Storage Permanent Pool Elevation 18.0 Sediment Removal Elevation 10 Volum, Bottom Elevation MAIN POND SFP 14 ?010 1-ft Storage Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Brunswick Forest -Phase 5A Hammock Park BMP drainage area number:Pond 32 Print name: Allen Jefferson Earp Title: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, IZDS:GrnpMn L R:ySSBLL - a Notary Public for the State of Norm CAZOL R1A County of C1flt_om rS uS do hereby certify that iA.LLEN -EA.tZ P personally appeared before me this la!" day of 20I O , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, ,�%klllt1jj01 oy�PY l,gvs�t<: QJ 'op7Aq� f Off•• �. e(jS *COV SEAL My commission expires T/I 1/22) 1 S Forni SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit Number:_(/�O /Oy�� 7 (to be provided by DWQ) Drainage Area Number: Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation — Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. — Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC, 1993). Forested filter strips do not require this type of maintenance. — Once a year, the soil will be aerated if necessary. — Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire filter strip Trash/debris is present. Remove the trash/debris. system The flow splitter device The flow splitter device is Unclog the conveyance and dispose (if applicable) clogged. of anv sediment off -site. The flow splitter device is Make any necessary repairs or damaged. replace if damage is too large for repair. SEP 14 2010 Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page I of 3 BMP element: Potentialproblem: How I will remediate theproblem: The swale and the level The swale is clogged with Remove the sediment and dispose lip sediment. of it off -site. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm end of the level spreader that that is higher than the level lip, and shows stormwater has then plant a ground cover and bypassed it. water until it is established. Provide lime and a one-time fertilizer application. Trees or shrubs have begun Remove them. to grow on the Swale or just downslo e of the level lip. The bypass channel Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then reestablish proper erosion control. Turf reinforcement is Study the site to see if a larger damaged or ripap is rolling bypass channel is needed (enlarge if downhill. necessary). After this, reestablish the erosion control material. The filter strip Grass is too short or too long Maintain grass at a height of if applicable). approximately three to six inches. Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Sediment is building up on Remove the sediment and the filter strip. restabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer application. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application. Nuisance vegetation is Remove vegetation by hand if choking out desirable species. possible. If pesticide is used, do not allow it to get into the receiving water. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality local Regional Office, or the outlet. 401 Oversight Unit at 919-733-1786. SEP 14 2010 Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 __—'�Pag®2 o{ 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Brunswick Forest -Phase 5A Hammock Park BMP drainage area n Print name: Allen Jefferson ELM Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president* h IZos>✓MAgy L1<�tXS EI i a Notary Public for the State of Woi rH CAKOLI NA County of CtLu rri B uS , do hereby certify that A u_:t3 Tet✓FEPSON t�_ A' L ? personally appeared before me this _ day of 2,010 , and acknowledge the due execution of the forgoing filter strip, riparian buffer, and/or level spreader maintenance requirements. Witness my hand and official seal, s�;; 0:' �""';'4r, s,CO J��.•' SEAL My commission expires VI1�2OIL ¢ 20/0 Form S W U401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 3 of 3 DEMLR USE ONLY NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 100907 2. Project name: Brunswick Forest Phase 5A Hammock Park 3. Project street address: Shelmore Way City: L 28405 County: Brunswick —ZIP: 4. What, if any, changes have been made to the project as permitted? If the project has changed from the original approved plans, please complete SWU-101 fora Major Modification or Minor Modification Application form available at., hftps://deg.nc.gov/about/divisions/energy- mi ne ral-la n d-reso u rces/e ne rgy-m i n era I-land-rules/sto rmwater-p rog ram/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https://deg.nc.gov/about/divisions/energy-mineral-land- resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: Funston Land and Timber LLC 2. Signing Official's Name: Allen Jefferson Earp 3. Signing Official's Title: Manager 4. Mailing Address: 1007 Evangeline Drive City: Leland State: NC ZIP: 28405 5. Street Address: 1007 Evangeline Dr City: Lealand State: NC ZIP: 28405 6. Phone: (910) 383-1425 Email: rrussel a( )brunswickforest.com ECEI V JAN 1 1 2023 BY: Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 100907 2. Project name: Brunswick Forest Phase 5A Hammock Park 3. Project street address: Shelmore Way City: L 28405 County: Brunswick —ZIP: 4. What, if any, changes have been made to the project as permitted? If the project has changed from the original approved plans, please complete SWU-101 fora Major Modification or Minor Modification Application form available at., hftps://deg.nc.gov/about/divisions/energy- mi ne ral-la n d-reso u rces/e ne rgy-m i n era I-land-rules/sto rmwater-p rog ram/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https://deg.nc.gov/about/divisions/energy-mineral-land- resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: Funston Land and Timber LLC 2. Signing Official's Name: Allen Jefferson Earp 3. Signing Official's Title: Manager 4. Mailing Address: 1007 Evangeline Drive City: Leland State: NC ZIP: 28405 5. Street Address: 1007 Evangeline Dr City: Lealand State: NC ZIP: 28405 6. Phone: (910) 383-1425 Email: rrussel a( )brunswickforest.com ECEI V JAN 1 1 2023 BY: Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORIM. Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: 1. A permit application processing fee of $505.00 payable to NCDEQ. 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. Ak3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. 4. O&M Agreements, Please select one: ® 1 have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. A5. Designer Certifications, Please select one: {�] A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division, or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. t 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). httos://www.sosnc.gov/online services/search/by title/ Business Registration ECEI V C JAM 1 1 2023 BY: Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION I, JNJ LEI-3 SFFtFMSQ� EAee , the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved pla I gree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper fore mFoh or transfer the permit prior to any changes to the project, SCMs, or ownership. All information pr, v is pit renewal application is, to the best of my knowledge, correct and complete. Signature: NOTARIZATION: Date: 10, -7,0 , Z2 a Notary Public for the State of County of IHYuA-t 6ua ) , do hereby certify that AuTl Ni GA1Zpersonally appeared before me this the 'no4tc day of )1 r p _ 20 _, and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) Notary Signature reYttCVU,A� My commission expires_ID RYtL C".• ' sF ; 0*.• AUBL\G•_: ECEIVE jAH 1 1 2023 BY:,_-- Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 Permit No. _� /i le DW , (to be provided by DINO) ®�� OO� W ATF9OG h 9 NCDENR � r T STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Brunswick Forest -Phase 5A Hammock Park Contact person Jeff Earn Phone number 910-383-1425 Date 8/27/2010 Drainage area number Pond 32 II. DESIGN INFORMATION Site Characteristics Drainage area 482,577 ff' Impervious area, post -development 48,258 112 Impervious 10.00 Design rainfall depth 1.5 in Storage Volume: Non -SA Waters Minimum volume required 8,500 its OK Volume provided 11,500 fls OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5' runoff volume rys Pre -development 1-yr, 24-hr runoff rys Post -development 1-yr, 24-hr runoff rys Minimum volume required I Volume provided If Peak Flow Calculations ..... Is the pre/post control of the 1yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr stone Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/POet 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1Oft vegetated shelf elevation Bottom of loft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume Y (Y or N) 3.8 in NA-SCS Method (unitless) NA-SCS Method (unitless) 3.55 in/hr OK 4.31 ft/sec 2.74 ry'/sec -1.57 ry'/sec 19.00 fmsl 18.00 fmsl 17.60 fmsl 18.50 fmsl 17.50 fmsl 10.00 fmsl 9.00 frost 1.00 fl (Y or N) fmsl N CARO�1'y 1:iSSiri:.q SE AL 20007 -Z? , 10 Data not needed for calculation option #1, but OK if provided. Data not needed for calculation option #1, but OK if provided. SEP 14 2010 Form SW401-Wet Detention Basin-Rev,8.9/17/09 '� —-i_P.ans,t 81,�. Design Summary, Page 1 of 2 Permit (to be provided by DWO) II. DESIGN INFORMATION Surface Areas Area, temporary pool 13,000 ft' Area REQUIRED, permanent pool 6,274 ft' SNDA ratio 1.30 (unitless) Area PROVIDED, permanent pool, Ape,y 10,000 ft, OK Area, bottom of IOfl vegetated shelf, Aw ,su 8,611 ft, Area, sediment cleanout, top elevation (bottom of pond), Asp,. 600 fl� Volumes Volume, temporary pool 11,500 it, OK Volume, permanent pool, Vpi 29,800 it' Volume, forebay (sum of forebays if more than one forebay) 6,100 rya Forebay % of permanent pool volume 20.5 % % OK SAIDA Table Data Design TSS removal 90 % Coastal SNDA Table Used? Y (Y or N) MountairVPiedmont SA/DA Table Used? N (Y or N) SNDA ratio 1.30 (unitless) Average depth (used in SNDA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, V, p, 29,800 ft' Area provided, permanent pool, Apeu_ppd 10,000 ft' Average depth calculated 3.00 It OK Average depth used in SNDA, da„ (Round to nearest 0.511) 3.0 It OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, A,,. 10,000 It' Area, bottom of 10ft vegetated shelf, Aw y,en 8,611 ft' Area, sediment cleanout, top elevation (bottom of pond), Amv�aa 600 it, 'Depth' (distance b/w bottom of 1Oft shelf and top of sediment) 7.50 ft Average depth calculated 3.00 it OK Average depth used in SNDA, dav, (Round to nearest 0.5ft) 3.0 it OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 1.50 in Area of orifice (if -non -circular) in' Coefficient of discharge (Co) 0.60 (unitless) Driving head (Hp) 0.33 ft Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (C„.) (unitless) Length of weir (L) it Driving head (H) ft Pro -development 1-yr, 24-hr peak flow 4.31 ft'/sec Post -development 1-yr, 24-hr peak flow 2.74 ft'/sec Storage volume discharge rate (through discharge orifice or weir) 0.03 ft'/sec Storage volume drawdown time 3.00 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK / Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 It OK Length of flowpath to width ratio 3 :1 OK d Length to width ratio 3.0 :1 OK e I Trash rack for overflow & orifice? Y (Y or N) OK 4A 4 2p10 Freeboard provided 1.0 ft OK '\ Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build�out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: Y (Pump) Form SW401-Wet Detention Basin-Rev.e 9/17/09 Pans I. & II. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. DBB Sheet 2 DBB Sheet 3 DBB Shee13 U7:1:>id/_1 DBB Sheet 3 DBB Sheet 4 DBB Attached DBB Attached NA 1. Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations 8. A copy of the signed and notarized operation and maintenance (0&M) agreement 9. A copy of the deed restrictions (if required). DBB In Calcs 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8.9/17/09 Part III. Required Items Checklist, Page 1 of 1 Hanover Design Services, P.A. Land Surveyors, Engineers, Land Planners January 10, 2023 Department of Environment and Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: SW8100907 To whom it may concern: The wet pond for the above -mentioned project has been inspected for compliance with the original design drawings and operation and maintenance agreement. All repairs, if required, have been made and the SCM is in substantial compliance with the approved plan. Sincerely, Adam Grady, PE Hanover Design Services P.A. agrady@hdsilm.com (910) 343-8002 Office (910)343-9941 Fax p� FfcSS/D.�iy'� •9 a • SEAL = G N, II ECEIVE JAN t 1 2021 BY:�_ 1123 Floral Parkway Wilmington, N.C. 28403 Phone (910) 343-8002 Fax 910) 343-9941 Business Firm License No. C-0597