HomeMy WebLinkAboutSW8091113_CURRENT PERMIT_20220914STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 09 111?�
DOC TYPE
❑k CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
2ozz og i-t
YYYYMMDD
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
September 14, 2022
Marine Corps Base Camp Lejeune
Attn: Neal Paul, Deputy Public Works Officer
1005 Michael Road
Camp Lejeune, NC 28547
Subject: Permit Renewal
NORTH CAROLINA
Environmental Quality
Post -Construction Stormwater Management Permit No. SW8 091113
P688 Apron Expansion Phase H, P683/P687 MV-22 Hangar Development and POV Parking
Garage
Onslow County
Dear Mr. Paul:
Effective August 1, 2013 the Post -Construction Stormwater Management Program has been transferred from the
Division of Water Quality ("DWQ") to the Division of Energy, Mineral and Land Resources ("DEMLR" ). All
previous references to DWQ will remain in older permits issued prior to August 1, 2013 until they are modified.
Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit.
The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for
the subject permit on August 10, 2022. The Division is hereby notifying you that permit SW8091 113 has been
renewed, updated, and re -issued on September 14, 2022, as attached. Please be aware that the renewal and re -
issuance of this stormwater permit does not imply that the site is currently in compliance.
This permit shall be effective until January 1, 2030 and does not supersede any other agency permit that may be
required. The project shall be subject to the conditions and limitations as specified therein. This permit does not
impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program
to provide you with a better understanding of your obligations under this permit. Failure to comply with these
requirements will result in future compliance problems. Please note that this permit is not transferable except
after notice to and approval by the Division.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request
an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The
written petition must conform to Chapter 150E of the North Carolina General Statutes and must be filed with the
OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding
the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center,
Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOA14.com. Unless
such demands are made this permit shall be final and binding.
If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional
Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov.
Sincerely,
1�L�
37;, Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
Enclosures: Attachment C — Permitting History
copy of the Renewal Application Documents
DES/ams: \\\Stormwater\Permits & Projects\2009\0901113 HD\2022 09 permit 091113
cc: Wilmington Regional Office Stormwater File
1 North Carolina Department of Environmental Quality I Division of Energy, Mineral and land Resources
EQ Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
910.796.7215
Post -Construction Stormwater Management
Permit No. SW8 091113
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT
HIGH DENSITY COMMERCIAL DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Commanding Officer US Marine Corps Base Camp Lejeune
P688 Apron Expansion Phase Il, P683IP687 MV-22 Hangar and PO Parking Garage
Curtis Road, Camp Lejeune, Jacksonville, Onslow County
FOR THE
construction, operation and maintenance of one (1) infiltration basin, four (4) sand filters and a
Rainwater Harvesting System, in compliance with the provisions of Session Law 2008-211 and 15A
NCAC 2H .1000 (hereafter collectively and separately referred to as the "stormwater rules') and as
outlined in the application, approved stormwater management plans, supplement, calculations,
operation and maintenance agreement, recorded documents, specifications, and other supporting
data (the "approved plans and specifications") as attached and/or on file with and approved by the
Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be
constructed, operated and maintained in accordance with these approved plans and specifications.
The approved plans and specifications are incorporated by reference and are enforceable part of this
permit.
This permit shall be effective from the date of issuance until January 1, 2030 and shall be subject to
the following specified conditions and limitations. The permit issued shall continue in force and effect
until the permittee files a request with the Division for a permit modification, transfer, renewal, or
rescission; however, these actions do not stay any condition. The issuance of this permit does not
prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or
terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A
NCAC 2H.1000 and NCGS 143-215.1 et.al.
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater described in
the application and other supporting data.
This stormwater system has been approved for the management of stormwater runoff as
described in Sections 1.9, 1.10 and 1.11 of this permit. The stormwater controls labeled IB-1,
SF-1, SF-2, SF-3, SF-4 and RHS have been designed to handle the runoff from 2,439,933 sf;
56,613 sf; 81,644 sf; 115,666 sf; 76,898 sf; and 67,150 sf of built -upon area, respectively.
Infiltration Basin I13-1 has 38,712 square feet of future allocation available.
3. The infiltration basin I13-1 must be operated with a 50 foot vegetated filter, designed to pass
the peak flow from the 10 year storm in a diffuse and non -erosive manner. The four sand
filters are not required to be operated with a vegetated filter.
Page 1 of 6
Post -Construction Stormwater Management
Permit No. SW8 091113
4. The RHS cistern is designed to collect the runoff from 67,150 sf of the MV-22 roof area
(horizontal component), reuse it as airplane washdown water and bypass any excess design
overflows to SF-2. The RHS cistern is designed to hold 80,000 gallons of runoff, or 10,695
cubic feet. The dedicated use is 57,600 gallons a week for airplane washdown water. The
hose bibs provided for airplane washing operations will automatically pull from the RHS tank.
When the RHS tank goes dry, a sensor will close the valve and water will be supplied from the
public line. The washdown area will have a valve to the sewer system which must be opened
during washing operations to allow that wastewater to drain to the sewer system, and then
closed so that new stormwater runoff can be directed to the RHS system. Adequate signage
and instructions must be provided in the washdown area.
5. The drainage area and built -upon area for each BMP will be limited to those amounts indicated
in Sections 1.9, 1.10 and 1.11 of this permit, as provided in the calculations, and as depicted on
the approved plans.
6. All stormwater collection and treatment systems must be located in either dedicated common
areas or recorded easements. The final plats for the project will be recorded showing all such
required easements, in accordance with the approved plans.
7. The runoff from all built -upon area within the permitted drainage areas of this project must be
directed into the permitted stormwater control system.
8. The project shall provide a 50 foot wide vegetated buffer adjacent all surface waters,
measured horizontally from and perpendicular to the normal water line of impounded
structures, the top of bank of both sides of streams and rivers, and the mean high water line of
tidal waters. Except as allowed for water -dependent uses, no built -upon area can be
constructed in the buffer.
9. The following design criteria have been permitted for the proposed sand filters and must be
provided and maintained at design condition:
Design Criteria
Units
SF-1
SF-2
SF-3
SF- 4
1. Drainage Area
Onsite
Offsite
acres
Ft2
Ft2
2.0
87,102
0
4.5
195,996
0
3.49
152,094
0
3.69
160,562
0
2. Total Impervious Surfaces
(1) Buildings
(2) Roads
(3) Parking
(4) Sidewalks
(5) Other
6 Future
Ft2
56,613
0
32,392
24,221
0
0
0
81,644
0
76,291
648
4,440
265
0
115,666
105,460
10,206
0
0
0
0
76,898
0
70,773
0
5,860
265
0
3. 2008 Design Storm
Inches
1.5
1.5
1.5
1.5
4. Sediment Chamber Depth
Feet
3.0
3.0
3.0
3.0
5. Sand Chamber Depth
Feet
4.5
7.0
5.5
4.5
6. Sed. Chamber Bottom Elev.
fmsl
13.5
10.0
12.0
10.0
7. Sand Chamber Bottom Elev.
fmsl
12.0
6.0
9.5
8.5
8. As Area Provided
Ft2
1,100
1,100
2,100
1,800
9. AfArea Provided
Ft2
1,600
1,120
2,112
2,040
10. Sed. Chamber Weir Elev.
fmsl
16.5
13.0
15
13
11. Top of Sand Elevation
fmsl
13.5
7.5
11.0
10.0
12. Maximum Head on Filter
Feet
3.0
5.5
4.0
3.0
13. Offline Bypass Weir Elev.
fmsl
16.53
13.03
15.14
13.16
14. Permitted Storage Volume
Ft3
12,766
19,836
23,051
16,995
15. Underdrain Diameter
Inches
6
6
6
6
16. Number of underdrains
ea
5
3
4
6
17. Time to Draw Down
hours
<40
<40
<40
<40
18. SHWT Elevation
fmsl
10.5
5.0
8.0
7.0
19. Receiving Stream
New River
20. Stream Index Number
WOK02 19- 11
21. Stream Classification
SC HOW NSW
Page 2 of 6
Post -Construction Stormwater Management
Permit No. SW8 091113
10
11
The following design criteria have been permitted for the Rainwater Harvesting System, RHS,
and must be provided and maintained at design condition:
a. Captured Roof Area, ftZ:
67,150
b. 2008 Design Storm, inches:
1.5
C. Required 1.5" volume, ft3:
7,966 (59,586 gallons)
d. Required Volume at 1.2 fos, ft3:
9,559 (71,501 gallons)
e. Permitted Storage Volume, ft3:
10,695 (80,000 gallons)
f. Dedicated Use:
57,600 gpw washdown water for planes
The following design criteria have been permitted for the existing infiltration basin IB-1 and
must be provided and maintained at design condition:
a.
Drainage Area, acres:
59.41
Onsite, ftZ:
2,587,759
Offsite, ftZ:
0
b.
Total Impervious Surfaces, ftZ:
2,439,933
Apron, ftZ:
2,082,465
Taxiway, ftZ:
172,718
MV-22 Hangar, ftZ:
146,038
Future, ftZ:
38,712
C.
Design Storm, inches:
1.5
d.
Basin Depth, feet:
6.o
e.
Bottom Elevation, FMSL:
11.0
f.
Bottom Surface Area, ftZ:
160,218
g.
Bypass Weir Elevation, FMSL:
12.8
h.
Permitted Storage Volume, ft3:
291.198
i.
Type of Soil:
sand
j.
Expected Infiltration Rate, in/hr:
5.0
k.
Seasonal High Water Table, FMSL:
9.0
I.
Time to Draw Down, hours:
5.0
M.
Receiving Stream/River Basin:
New River / WOK02
n.
Stream Index Number:
19-(11)
o.
Classification of Water Body:
"SC:HQW:NSW'
IL SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the system
will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance necessary to assure
the permitted stormwater system functions at the design condition. The approved Operation
and Maintenance Plan must be followed in its entirety and maintenance must occur at the
scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and re -vegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader,
catch basins, piping and vegetated filter.
g. A clear access path to the bypass structure must be available at all times.
4. The facilities shall be constructed, operated and maintained in accordance with the provisions
of this permit, the approved plans and specifications, and the supporting documents attached
to this permit and on file with the Division.
Page 3 of 6
Post -Construction Stormwater Management
Permit No. SW8 091113
5. If the stormwater system was used as an Erosion Control device, it must be restored to design
condition prior to operation as a stormwater treatment device, and prior to occupancy of the
facility.
6. Records of maintenance activities must be kept for each permitted BMP. The reports will
indicate the date, activity, name of person performing the work and what actions were taken.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to
operation of this permitted facility, a certification must be received from an appropriate
designer for the system installed certifying that the permitted facility has been installed in
accordance with this permit, the approved plans and specifications, and other supporting
documentation. Any deviations from the approved plans and specifications must be noted on
the Certification. A modification may be required for those deviations.
8. The Director may notify the permittee when the permitted site does not meet one or more of
the minimum requirements of the permit. Within the time frame specified in the notice, the
permittee shall submit a written time schedule to the Director for modifying the site to meet
minimum requirements. The permittee shall provide copies of revised plans and certification in
writing to the Director that the changes have been made.
9. No person or entity, including the permittee, shall alter any component shown in the approved
plans and specifications. Prior to the construction of any modification to the approved plans,
the permittee shall submit to the Director, and shall have received approval for modified plans,
specifications, and calculations including, but not limited to, those listed below. For changes to
the project or SCM that impact the certifications, a new or updated certification(s), as
applicable, will be required and a copy must be submitted to the appropriate DEQ regional
office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of size including
the SCM(s), BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage area.
C. Further development, subdivision, acquisition, lease or sale of any, all or part of the
project and/or property area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), the stormwater collection system and/or
vegetative conveyance shown on the approved plan.
e. The construction of any allocated future BUA.
f. The construction of any permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a permeable surface that were not included in
the approved plans and specifications.
g. Other modifications as determined by the Director.
III. GENERAL CONDITIONS
CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the
permittee shall take immediate corrective actions. This includes actions required by this
Division and the stormwater rules such as the construction of additional or replacement on -site
stormwater systems. These additional or replacement measures shall receive a permit from
the Division prior to construction.
2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to
the expiration date of this permit. The renewal request must include the appropriate
application, documentation and the processing fee as outlined in Title 15A NCAC
02H.1045(3).
3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION.
The permittee shall submit a completed Permit Information Update Application Form to the
Division within 30 days to making any one of these changes.
Page 4 of 6
Post -Construction Stormwater Management
Permit No. SW8 091113
4. TRANSFER. This permit is not transferable to any person or entity except after notice to and
approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor
the conveyance of common area to a third party constitutes an approved transfer of the permit.
a. TRANSFER REQUEST. The transfer request must include the appropriate application,
documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This
request must be submitted within 90 days of the permit holder meeting one or more of
the following:
i. A natural person who is deceased;
ii. A partnership, limited liability corporation, corporation, or any other business
association that has been dissolved,
iii. A person or entity who has been lawfully and finally divested of title to the
property on which the permitted activity is occurring or will occur through
foreclosure, bankruptcy, or other legal proceeding.
iv. A person or entity who has sold the property, in whole or in part, on which the
permitted activity is occurring or will occur,
V. The assignment of declarant rights to another individual or entity;
vi. The sale or conveyance of the common areas to a Homeowner's or Property
Owner's Association, subject to the requirements of NCGS 143-214.7(c2);
b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site
inspection will be conducted by Division personnel to ensure the permit conditions
have been met and that the project and the on -site stormwater system complies with
the permit conditions. Records of maintenance activities performed to date may be
requested. Projects not in compliance with the permit will not be transferred until all
permit and/or general statute conditions are met.
COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of
this permit until the Division approves the transfer request.
a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans,
application, supplement, operation and maintenance agreement, all applicable
recorded documents, and specifications shall be maintained on file by the permittee at
all times.
b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the
property during normal business hours to inspect all components of the permitted
project.
C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the
provisions of a stormwater management permit or the requirements of the stormwater
rules is subject to enforcement procedures as set forth in NCGS 143 Article 21.
d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an
annual certification completed by either the permittee or their designee confirming the
projects conformance with permit conditions
e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted
site does not meet one or more of the minimum requirements of the permit. Within the
time frame specified in the notice, the permittee shall submit a written time schedule to
the Director for modifying the site to meet minimum requirements. The permittee shall
provide copies of modified plans and certification in writing to the Director that the
changes have been made.
Page 5 of 6
Post -Construction Stormwater Management
Permit No. SW8 091113
OTHER PERMITS. The issuance of this permit does not preclude the permittee from
complying with and obtaining any other permits or approvals that are required for this
development to take place, as required by any statutes, rules, regulations, or
ordinances, which may be imposed by any other Local, State or Federal government
agency having jurisdiction. Any activities undertaken at this site that cause a water
quality violation or undertaken prior to receipt of the necessary permits or approvals to
do so are considered violations of NCGS 143-215.1, and subject to enforcement
procedures pursuant to NCGS 143-215.6.
Permit renewed, updated and reissued this the 14th day of September 2022.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
9 nan Wrenn, Uirector
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 6 of 6
Attachment C - Permitting History
P688 Apron Expansion Phase II, P683/13687 MV-22 Hangar Development and POV Parking Garage
Permit No. SW8 091113
Approval
Permit
BUMS
Description of the Changes
Date
Action
Version
construction, operation and maintenance of one (1) infiltration basin in
Original
compliance with the provisions of Session Law 2008-21 1 and 15A
4/13/2010
Approval
1.0
NCAC 2H .1000; stormwater control has been designed to handle the
runoff from 2,439,933 square feet of impervious area.
Combines the two previously permitted separate hangar buildings
P683 and P687 into one larger hangar, MV-22. An additional BMP
(Rainwater Harvesting System) was added within the existing I13-1
drainage area to collect the runoff from 110,000 sf of the MV-22
roof area, reuse it as airplane washdown water and bypass any
overflow to IB-1. Because the RHS tank only holds 80,000
gallons, the net roof impervious area gain for IB-1 is 34,960
square feet; 2.Adds a POV (privately owned vehicle) parking
6/15/2012
Modification
1.1
garage to accommodate 1254 vehicles, with runoff treated in 4
new sand filters; The P688 Apron Expansion and existing
Infiltration Basin #1 (I13-1) are unchanged from the April 2010
permit, although the allocated total BUA has been broken down
into its component parts. The combined hangar has resulted in
228,260 square feet of BUA directed into the existing infiltration
basin. The future allocation for I8-1 under the April 2010 permit
was 268,050 square feet, thus leaving 39,790 square feet
available for future development in IB-1
All the BMP's were redesigned to accommodate the Base -required 95tn
percentile design storm of approximately 2.3" for LID projects. The
design storm listed in the permit, however. is the DWQ design
storm, The roadway section detail for Longstaff Street was
12/14/2012
Modification
1.2
widened by an additional 2' for each lane and a six -foot -wide
running trail has been added, Minor changes to the drainage
areas for each BMP; Redesigned Sand Filter #1 as a basin, and
relocated the basin and the overflow discharge; Relocated the
bypass structure and overflow for Sand Filter #4; Relocated and
resized the Rainwater Harvesting System
9/14/2022
Renewal
2.0
Expires January 1, 2030
Permit Number: S
(to be provided by DWQ)
Drainage Area Number: &#-5-L
Rainwater Harvesting System
Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
— The roof area will be maintained to reduce the debris and sediment load to the
system. Excess debris can clog the system and lead to bypass of the design
storm, and reduced reuse volume.
— To ensure proper operation as designed, a licensed Professional Engineer,
Landscape Architect, or other qualified professional will inspect the system
annually.
— The system components will be repaired or replaced whenever they fail to
function properly.
— If the outlet is metered, use must be recorded at a minimum of monthly. These
records shall be kept on site for inspection by DWQ.
The system will be inspected by the owner/operator at least monthly and within 24
hours after each rain event. Records of operation and maintenance will be kept in a
known set location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblems:
How to remediate theproblem:
The entire system
A component of the system is
Make any necessary repairs or replace if
damaged or leaking.
damage is too large for repair.
Water is flowing out of the
Check system for clogging and damage. Repair
overflow pipe during a
as needed so the design volume is stored
design rainfall or smaller
properly without discharging during a design
(usually a 1" or 1.5" rainfall).
storm.
Check that the pump is operating properly and
that the water is actually being used at the
volume designed.
If it is still not operating properly, then consult
an expert.
The captured roof area
Excess debris or sediment is
Remove the debris or sediment as soon as
resent on the rooftop.
possible.
The gutter system
Gutters are clogged, or water
Unclog and remove debris. May need to install
is backing up out of the
gutter screens to prevent future clogging.
utters stem.
Rooftop runoff not snaking it
Correct the positioning or installation of gutters.
into gutter system.
Replace if necessary to capture the roof runoff.
Form SW401-Rainwater Harvesting 0&M-Rev.1
NOV 0 8 1011
ev_
Page l of 3
Permit Number:
(to be provided by DWQ)
Drainage Area Number:
BMP element:
Potentialproblems:
How to remediate theproblem:
The pump
Pump is not operating
Check to see if the system is clogged and flush if
properly.
necessary. If it is still not operating, then
consult an expert.
The overflow pipe
Erosion is evident at the
Stabilize immediately.
overflow discharge point.
The overflow pipe is clogged.
Unclog or replace if it cannot be unclogged.
The outflow i e is damn ed.
Repair or replace the pipe.
The secondary water
Not operating properly.
Consult an expert.
-supply
The cistern
Sediment accumulation of 5%
Remove sediment.
or more of the design volume.
Algae growth is present
Do not allow sunlight to penetrate the cistern.
inside the cistern.
Treat the water to remove/prevent algae.
Mosquitoes in the cistern.
Check screens for damage and repair/replace.
Treat with 'mosquito dunks' if necessary.
The screens and filters
Debris and/or sediment has
Search for the source of the debris/sediment
accumulated. Screens and
and remedy the problem if possible.
filters are clogged.
Clean/clear debris/sediment from screen or
filter. Replace if it cannot be cleaned.
EVE6VE
NOV 0 8 2012
BY'
Form SW401-Rainwater Harvesting O&M-Rev.I Page 2 o1 3
r �•
Permit Number: _5Vy r7 o (lll 3
(to be provided h9 DWQ)
Drainage Area Number: W5
1 acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name: MV-22 Aviation Complex MCAS New River P-683 & 11-687
BMP drainage area number:F— � 5
Print name:Carl H. Baker, P.E.
Title:Depuly Public Works Officer
Address: Building 1005 Michael Road, MCB Camp 1 e6eune, NC 28547
Phone
Signat
Date: /6 -11- 12
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
a Notary Public for the State of
, County of 4 ; do hereby certify that
personally appeared before me this
day of 0i� , , and acknowledge the due execution of the
forgoing rooftop management maintenance requirements. Witness my hand and official
seal,
irG
!i
L;m
NETTElicntyarciinaes,Z.7i}L_�
SEAL
My commission expires c�i3
ECEIVEn
NOV 0 g 1012 9
Form SW401-Rainwater Harvesting O&M-Rev.t
Page 3 of 3
�r
.� Permit Number:
(to be provided by OWQ)
Drainage Area Number. SF
Sand Filter Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a
known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or
replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and
the removal efficiency of the BMP.
Important maintenance procedures:
— The drainage area will be carefully managed to reduce the sediment load to the sand filter.
— The sedimentation chamber or forebay will be cleaned out whenever sediment depth exceeds
six inches.
— Once a year, sand media will be skimmed.
— The sand filter media will be replaced whenever it fails to function properly after maintenance.
The sand filter will be inspected quarterly and within 24 hours after every storm event greater than
1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in
a known set location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired
immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
Entire BMP
Trash/debris is present.
Remove the trash/debris.
Adjacent pavement (if
Sediment is present on the
Sweep or vacuum the sediment as soon as
applicable)
avement surface.
possible.
Perimeter of sand filter
Areas of bare soil and/or erosive
Regrade the soil if necessary to remove the
gullies have formed.
gully, and then plant a ground cover and
water until it is established. Provide time
and a one-time fertilizer application.
Vegetation is too short or too long.
Maintain vegetation at an appropriate
height.
Flow diversion structure
The structure is clogged.
Unclog the conveyance and dispose of any
sediment offsite.
The structure is damaged.
Make any necessary repairs or replace if
damage is too large for repair,
Forebay or pretreatment area
Sediment has accumulated to a
Search for the source of the sediment and
depth of greater than six inches.
remedy the problem if possible. Remove
the sediment and stabilize or dispose of it
in a location where it will not cause
impacts to streams or the BMP.
Erosion has occurred.
Provide additional erosion protection such
as reinforced turf matting or riprap if
needed to prevent future erosion
problems.
Weeds are present.
Remove the weeds, preferably by hand. If
a pesticide is used, wipe it on the plants
rather than spraying.
Form S W401-Sand Filter O&M-Rev.4 2009Sept 17
ECEFIVE
NOV 0 8 2012 Page I of 3
BY:
BMP element:
Potentialproblem:
How I will remediate theproblem:
Filter bed and underdrain
Water is ponding on the surface for
Check to see if the collector system is
collection system
more than 24 hours after a storm.
clogged and flush if necessary. If water
still ponds, remove the top few inches of
filter bed media and replace. If water still
ponds, then consult an expert.
Outlet device
Clogging has occurred.
Clean out the outlet device. Dispose of the
sediment offsite.
The outlet device is dama ed
Repair or replace the outlet device.
Receiving water
Erosion or other signs of damage
Contact the NC Division of Water Quality
have occurred at the outlet.
401 Oversight Unit at 919-733-1786.
Nov 08 2012
Form SW401-Sand Filter O&M-Rev.4 2009Septl7 Page 2 of 3
Permit Number: 5kj OW/0
(to be provided by D4V0)
I acknowledge and agree by my signature below that I am responsible for the performance of the
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior
to any changes to the system or responsible party.
Project name:MV-22 Aviation Complex MCAS New River P-683 & P-687
BMP drainage area number: :SF— I
Print name:Carl H. Baker, P.E.
Title:Deputy Public Works Officer
Address: Buildinlz 1005 Michael Road, MCB Camp Leleune, NC 28547
Date: /D -i'7 --1 2,
Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been
sold and a resident of the subdivision has been named the president.
a Notary Public for the State of
l ti c/�/ � , County of 4!:2 j do hereby certify that
lyy��ia/% /� ; 7d7 � personally appeared before me this,L day of
6Q,11 , ;;6/�2_ , and acknowledge the due execution of the forgoing sand filter
maintenance requirements. Witness my hand and official seal,
ALICE A, 130NNETTE
Notary Public
Onslow County
State of North Carolina
Commission Expire �/f
SEAL
My commission expires
—CE#VE .
NOV 0 8 2012
Form SW40I-Sand Filter O&M-Rev.4 2009Septl7 Page 3 of 3
Permit Number: .,�5AJfU/ ��/
(to he provided by DGi
Drainage Area Number: SF-2
Sand Filter Operation and Maintenance Agreement
1 will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a
known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or
replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and
the removal efficiency of the BMP.
Important maintenance procedures:
— The drainage area will be carefully managed to reduce the sediment load to the sand filter.
— The sedimentation chamber or forebay will be cleaned out whenever sediment depth exceeds
six inches.
— Once a year, sand media will be skimmed.
— The sand filter media will be replaced whenever it fails to function properly after maintenance.
The sand filter will be inspected quarterly and within 24 hours after every storm event greater than
1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in
a known set location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired
immediately.
BMP element:
Potential roblem:
How I will remediate theproblem:
Entire BMP
Trash/debris is present.
Remove the trash/debris.
Adjacent pavement (if
Sediment is present on the
Sweep or vacuum the sediment as soon as
applicable)
pavement surface.
possible.
Perimeter of sand filter
Areas of bare soil and/or erosive
Regrade the soil if necessary to remove the
gullies have formed.
gully, and then plant a ground cover and
water until it is established. Provide time
and a one-time fertilizer application.
Vegetation is too short or too long.
Maintain vegetation at an appropriate
hen ht.
Flow diversion structure
The structure is clogged.
Unclog the conveyance and dispose of any
sediment offsite.
The structure is damaged.
Make any necessary repairs or replace if
damage is too large for repair.
Forebay or pretreatment area
Sediment has accumulated to a
Search for the source of the sediment and
depth of greater than six inches.
remedy the problem if possible. Remove
the sediment and stabilize or dispose of it
in a location where it will not cause
impacts to streams or the BMP.
Erosion has occurred.
Provide additional erosion protection such
as reinforced turf matting or riprap if
needed to prevent future erosion
problems.
Weeds are present.
Remove the weeds, preferably by hand. If
a pesticide is used, wipe it on the plants
rather than spraying.
Form S W401-Sand Filter O&M-Rev.4 2009Sept 17
ECEIVEFJ
NOV 0 8 2012
BY.-----------
Page 1 of 3
BMP element:
Potentialproblem:
How I will remediate theproblem:
Filter bed and underdrain
Water is pending on the surface for
Check to see if the collector system is
collection system
more than 24 hours after a storm.
clogged and flush if necessary. If water
still ponds, remove the top few inches of
filter bed media and replace. If water still
ends, then consult an expert.
Outlet device
Clogging has occurred.
Clean out the outlet device. Dispose of the
sediment offsitc.
The outlet device is damaged
Repair or replace the outlet device.
Receiving water
Erosion or other signs of damage
Contact the NC Division of Water Quality
have occurred at the outlet.
401 Oversight Unit at 919-733-1786.
ECEIVERL
NOV 0 8 2012
Dorm S W401-Sand Filter O&M-Rev.4 2009Sept 17 Page 2 of 3
BY:
Pennit Number. SAd 0 0 1 /1l3 /7LCY.
(Io be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the performance of the
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior
to any changes to the system or responsible party.
Project name:MV-22 Aviation Complex MCAS New River 11-683 & P-687
6MP drainage area number: S F — OIL
Printname:Carl H. Baker, P.E.
7'itle:Deputy Public Works Officer
Address:Building 1005 Michael Road, MCB Camp Lejeune, NC 28547
Date: /D —/ 7— / ;—,
Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been
sold and a resident of the subdivision has been named the president.
1, r �� �ir�t� a Notary Public for the State of
County of do hereby certify that
personally appeared before me this day of
and acknowledge the due execution of the forgoing sand filter
maintenance requirements.
Witness my hand
dand
official sea],
Q:Q
SEAL
My commission expires
Form SW401-Sand Filter O&M-Rev.4 2009Sep117
j
'r
NOVI ; 2012
a°
Page 3 of 3
Permit Number:
(to be providedby DWQ)
Drainage Area Number. ST"!
Sand Filter Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a
known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or
replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and
the removal efficiency of the BMP.
Important maintenance procedures:
— The drainage area will be carefully managed to reduce the sediment load to the sand filter.
— The sedimentation chamber or forebay will be cleaned out whenever sediment depth exceeds
six inches.
— Once a year, sand media will be skimmed.
— The sand filter media will be replaced whenever it fails to function properly after maintenance.
The sand filter will be inspected quarterly and within 24 hours after every storm event greater than
1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in
a known set location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired
immediately.
BMP element:
Potential roblem:
How I will remediate theproblem:
Entire BMP
Trash/debris is present.
Remove the trash/debris.
Adjacent pavement (if
Sediment is present on the
Sweep or vacuum the sediment as soon as
applicable)
pavementsurface.
possible.
Perimeter of sand filter
Areas of bare soil and/or erosive
Regrade the soil if necessary to remove the
gullies have formed.
gully, and then plant a ground cover and
water until it is established. Provide lime
and a one-time fertilizer application.
Vegetation is too short or too long.
Maintain vegetation at an appropriate
height.
Flow diversion structure
The structure is clogged.
Unclog the conveyance and dispose of any
sediment offsite.
The structure is damaged.
Make any necessary repairs or replace if
damage is too large for repair.
Forebay or pretreatment area
Sediment has accumulated to a
Search for the source of the sediment and
depth of greater than six inches.
remedy the problem if possible. Remove
the sediment and stabilize or dispose of it
in a location where it will not cause
impacts to streams or the 13MP.
Erosion has occurred.
Provide additional erosion protection such
as reinforced turf matting or riprap if
needed to prevent future erosion
problems.
Weeds are present.
Remove the weeds, preferably by hand. If
a pesticide is used, wipe it on the plants
rather than spraying.
ECEIVE
Form S W401-Sand Filter O&M-Rev.4 2009Sept 17 NOV Q 8 2012 age I of 3
BY:_-----
BMP element:
Potentialproblem:
How I will remediate theproblem:
Filter bed and underdrain
Water is pending on the surface for
Check to see if the collector system is
collection system
more than 24 hours after a storm.
clogged and flush if necessary. If water
still ponds, remove the top few inches of
filter bed media and replace. If water still
ends, then consult an expert.
Outlet device
Clogging has occurred.
Clean out the outlet device. Dispose of the
sediment offsite.
The outlet device is damaged
Repair or replace the outlet device.
Receiving water
Erosion or other signs of damage
Contact the NC Division of Water Quality
have occurred at the outlet.
401 Oversight Unit at 919-733-1786.
Form SW40I-Sand Filter O&M-Rev.4 2009Sept17
NOV 0 8 1011
EP
BY:_
Page 2 of 3
Permit Number: 5W f 0� U (3
(to be provided by DIVO)
I acknowledge and agree by my signature below that I am responsible for the performance of the
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior
to any changes to the system or responsible party.
Project name:MV-22 Aviation Complex MCAS New River P-683 & 11-687
BMP drainage area number: I"
Print name:Carl H. Baker, P.G.
Title:Deputy Public Works Officer
Address:Building 1005 Michael Road, MCB Camp Lejeune, NC 28547
Date: ho /i —/ �'
Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been
sold and a resident of the subdivision has been named the president.
I, ML' & /Joi rare , a Notary Public for the State of
County of �& /,) , do hereby certify that
personally appeared before me this /,day of
�12— , and acknowledge the due execution of the forgoing sand filter
maintenance requirements.
Witness my hand and official seal,
NEITElicntyarolina .
[am
e -
SEAL
My commission expires 0/1'4% /
Form SW401-Sand Filter O&M-Rev.4 2009Sept 17
Nil
NOV 0 8 2012
Page 3 of 3
Perinit Number:
(Io be provided by 1 X VQ)
Drainage Area Number: 5 F- 4-
Sand Filter Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a
known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or
replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and
the removal efficiency of the BMP.
Important maintenance procedures:
— The drainage area will be carefully managed to reduce the sediment load to the sand filter.
— The sedimentation chamber or forebay will be cleaned out whenever sediment depth exceeds
six inches.
— Once a year, sand media will be skimmed.
— The sand filter media will be replaced whenever it fails to function properly after maintenance.
The sand filter will be inspected quarterly and within 24 hours after every storm event greater than
1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in
a known set location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired
immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
Entire BMP
Trash/debris is present.
Remove the trash/debris.
Adjacent pavement (if
Sediment is present on the
Sweep or vacuum the sediment as soon as
applicable)
pavement surface.
possible.
Perimeter of sand filter
Areas of bare soil and/or erosive
Regrade the soil if necessary to remove the
gullies have formed.
gully, and then plant a ground cover and
water until it is established. Provide lime
and a one-time fertilizer application.
Vegetation is too short or too long.
Maintain vegetation at an.appropriate
height.
Flow diversion structure
The structure is clogged.
Unclog the conveyance and dispose of any
sediment offsite.
'the structure is damaged.
Make any necessary repairs or replace if
damage is too large for repair,
Forebay or pretreatment area
Sediment has accumulated to a
Search for the source of the sediment and
depth of greater than six inches.
remedy the problem if possible. Remove
the sediment and stabilize or dispose of it
in a location where it will not cause
impacts to streams or the BMP.
Erosion has occurred.
Provide additional erosion protection such
as reinforced turf matting or riprap if
needed to prevent future erosion
problems.
Weeds are present.
Remove the weeds, preferably by hand. If
a pesticide is used, wipe it on the plants
rather than spraying.
Form SW401-Sand Filter O&M-Rev.4 2009Sept17
ECEPVE
NOV 0 8 2012
BY:
Page 1 of 3
BMP element:
Potentialproblem:
How I will remediate theproblem:
Filter bed and underdrain
Water is ponding on the surface for
Check to see if the collector system is
collection system
more than 24 hours after a storm.
clogged and flush if necessary. If water
still ponds, remove the top few inches of
filter bed media and replace. If water still
Foods, then consult an expert.
Outlet device
Clogging has occurred.
Clean out the outlet device. Dispose of the
sediment offsite.
The outlet device is d in a ged
Repair or replace the outlet device.
Receiving water
Erosion or other signs of damage
Contact the NC Division of Water Quality
have occurred at the outlet.
401 Oversight Unit at 919-733-1786.
ECEIVEB
Nov o e 2011
Form SW401-Sand Filter O M-Rev.4 2009Sept17 Yge 2 of_ 3
BY.
Permit Number: SW O C)(71 f 13
(to be provided by DIFQ)
I acknowledge and agree by my signature below that 1 am responsible for the performance of the
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior
to any changes to the system or responsible party.
Projecl name:MV-22 Aviation Complex MCAS New River P-683 & 11-687
BMP drainage area number: i —
Print name:Carl 1-I. Baker, P.G.
Title:Deputy Public Works Officer
Address:Buildima 1005 Michael Road, MCB Camp Lejeune, NC 28547
Date: 16 —.1�7—/2,
Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been
sold and a resident of the subdivision has been named the president.
a Notary Public for the State of
lG—e/ County of ��� J do hereby certify that
personally appeared before me this %day of
and acknowledge the due execution of the forgoing sand filter
maintenance requirements. Witness my hand and official seal,
am
SEAL
My commission expires ": �7 Cl/ ' -,'
Form SW401-Sand Filter O&M-Rev.4 2009Septl7
GENE
Nov p 8 2012 9
Page 3 of 3
-i
Permit Name:
(to be provided by DWQ
Drainage Area Number:
Grassed Swale Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
— The drainage area of the grassed swale will be carefully managed to reduce the
sediment load to the grassed swale.
— After the first-time fertilization to establish the grass in the Swale, fertilizer will
not be applied to the grassed swale.
The grassed swale will be inspected once a quarter. Records of operation and
maintenance will be kept in a known set location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire length of the
Trash/debris is present.
Remove the trash/debris.
Swale
Areas of bare soil and/or
Regrade the soil if necessary to
erosive gullies have formed.
remove the gully, and then re -sod
(or plant with other appropriate
species) and water until established.
Provide lime and a one-time
fertilizer application.
Sediment covers the grass at
Remove sediment and dispose in an
the bottom of the swale.
area that will not impact streams or
BMPs. Re -sod if necessary.
Vegetation is too short or too
Maintain vegetation at a height of
long.
approximately six inches.
The receiving water
Erosion or other signs of
Contact the NC Division of Water
damage have occurred at the
Quality 401 Oversight Unit at 919-
outlet.
733-1786.
ECEIVE
NOV 0 8 2012
Form SW401-Grassed Swale O&M-Rev.3 Page 1 of 2
Permit Number:
(to be provided by DNIQ)
acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. 1 agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:MV-22 Aviation Complex MCAS New River 11-683 & P-687
BMP drainage area number: Ga456t:0 Sv+4t,E5 IM 91JP14 DENSi rY 64SiaS
Print name:Carl 11. Baker, P.E.
Title:Deputy Public Works Officer
Address:Buildine 1005 Michael Road, MCB Camp Lejeune, NC 28547
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
a Notary Public for the State of
County of �UfJo� do hereby certify that
lrr� y ei personally appeared before me this
day of 1!!�� , , and acknowledge the due execution of the
forgoing grassed
swale maintenance requirements. Witness my hand and official seal,
ALICE A. SONNETTE
Notary Public
Onslow County
State of North Carolina
M Commission Ex ire
SEAL
My commission expires��c/%
EVEY 9/
NOV 0 8 2011
Form SW401-Grassed Swale O&M-Rev.3 R U
BY--_-----
Page 2 of 2
ULMLH UbL UNLY
Date Re ive
Fee Paid
Permit Number
NC DEO Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60.(c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number...SW8 091113
2. Project name: P-688 Apron Expansion Phase II
3. Project street address: XXX
City: MCB Camu Leieune - County: Onslow
ZIP: 28542
4. What, 4 any, changes have been made to the project as permitted? N/A
If the project has changed from the
Modification or Minor Modification f
B. PERMITTEE INFORMATION
approved plans, please complete SWU-101
m form available at: https://dea.nc.00v/abou
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at: https:/Ideg.nc.gov/about/divisions/energy-mineral-land•
resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not
automatically transfer with the sale of the property.
1. Current Permit Holder's Company Name/Organization: MCB Camp Leieune
2. Signing Official's Name: Neal Paul
3. Signing Official's Title: Deputy Public Works Division
4. Mailing Address: MCB Camp Lcjeune 1005 Michael Rd.
City: MCB Camp Lejeune State: NC
ZIP: 28547-2521
5. Street Address:
City: State: -ZIP:
6. Phone: (910 451-2213 Email: neal.paul@usmc.mil
Stormwater Permit Renewal Form
Page 1 of 3
May 11, 2018
r.Y
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HOW/ORW). Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
MCT 1. A permit application processing fee of $505.00 payable to NCDEO.
MCT 2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation - a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) - a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;'
c. Public Entity - a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership - the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a - e above authorizing the
signature of another entity.
MCT 3. One hard copy and one electronic copy of recorded documents required by the original permit that have
not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
MCT 4. O&M Agreements, Please select one:
® 1 have a copy of the current recorded 0&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
MCT 5. Designer Certifications, Please select one:
® A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
MCT 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
httns://www.sosnc.aov/online services/search/bv,title/ Business Reafetration
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
r'c e : r—` m �i �• ti`" r?o`' .'Y'x-=..---c—.r
'.710 "a.1-c.. .���• <
D. PERM ITTEE'S LLER FIICATION
I, A A - L4roa n f the person legally responsible for the permit, certify that I have
a Oycopy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs r ownership. formation provided on this permit renewal application is, to the best of my
knowledge, orre t of comp te.
Signature: Date: Z0 ZL
NOTARIZATION:
I, Lr In U 4 �rJ�� a Notary Public for the State of
MDY ODYD" County of n(L5(�tN do hereby certify
that �Roh2.r k R L-Ow CLL✓ personally appeared before me
this the ZO day of
forgoing instrument, Witness my hand and official seal,
r...r.yKy•:—
Mj(1�
4 ,ekpires� /�ZS
rrrnm�
Stormwater Permit Renewal Application Form Page 3 of 3
20 It—, and acknowledge the due
May 11, 2018
e ffi c1 5q"P °t! kFkN 'n U'w u< ro " y�° vt✓yi• T" 1 *t le' ve •..I
Permit No.
(to be provided by DWQ)
pF WA7F9
� r
NCDENR Y
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
RAINWATER HARVESTING SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part /it) must be printed, filled out and submitted along with all of the required information.
Project name
Contact person
Phone number
Date
Drainage area number
RHS
W. Jones, P.E.
Site Characteristics
Captured Horizontal Surface Area of Roof
67,150 fit'
Are you in Coastal County SA waters or ORW Areas?
No
Fill out Non -SA Waters/Other Section
Storage Volume: Non -SA Waters I Other
Design rainfall
1.5
in
OK
Rain Harvesting Volume Provided (Must include a factor of safety at
10693.757
ft'
OK
least 1.2x design rainfall)
Rain Harvesting Volume Provided
800K00
gal
Storage Volume: SA Waters & Saltwater ORW Areas
Runoff Volume generated from 1.5"
10687.50
ft'
OK
1-yr, 24-hr rainfall depth at your site
in
Do not fill out this section
Pre -Development 1-yr, 24-hr Runoff
ft3
Do not fill out this section
Post -Development 1-yr, 24-hr Runoff
ft3
Do not fill out this section
1-yr, 24-hr Runoff Volume Post -Pre
0.00
ft3
Do not fill out this section
Use 1.5" or Pre/Post?
Do not fill out this section
Volume of Rainwater Harvesting System Provided
Rain Harvesting Volume Provided at Site
10,693.76
1?
OK
Factor of Safety
1.20
OK
Rain Harvesting Volume Provided
80000.00
gal
ECEI V E
NOV 0 8 2012
BY. --
Form SW401-Rainwater Harvesting-Rev.3 Parts I. 8 II. Design Summary, Page 1 of 3
Permit No.
(to be provided by DWQ)
% Runoff'
% Runoff Used Op -Site
Primary,Method Used On -Site
% Runoff Treated On -Site
Primary Method of Treatment
% Runoff Infiltrated On -Site
Total Runoff Accounted For
Water Balance Calculations Attached?
Cistern Overflow, Gutter, & Gutter Downspout Sizing
Closest City
Captured Roof Area
Overflow Pipe Diameter Needed (in Dec. Inches)
Maximum Captured Area for above Overflow Pipe
Guttering
Number of Gutters Total
Do you have a plan details showing numbered gutters?
Do you have a detailed table showing slopes of all gutters?
Do you have a detailed table showing diameters of all gutters?
Do you have a detailed table showing downspout diameterof all
gutters?
Do you have a detailed table showing maximum captured area for
all gutters?
Additional Design Elements
Have you modeled this system using a water harvesting model?
Days to Draw Down Rainwater Harvester
Overflow discharged to:
Does the overflow discharge directly to impervious surfaces?
What is the overflow velocity for the 10-year storm?
Is the overflow velocity non -erosive
Is a First Flush Diverler Used?
If First Flush Diverter used, where is bypassed water discharged to?
Actual City
Closest City
Average Annual Historic Rainfall at your Site
Percent of Rainfall that will Overflow Cistern
Additional Design Elements
Which Model?
Does (his cistern have a dedicated year-round use?
Screen Sizing at Entrance to Rainwater Harvester
Do you have a secondary water supply to the rainwater harvester?
Plans for the footing included in submittal?
Is the cistern buried?
Pump provided? What is the pressure?
What are the designated uses of the pump?
Are Pump Sizing Calculations Attached?
Is Cistern Metal?
Form SW401-Rainwater Harvesting-Rev.3
100 %
vehicle washing
0 %
0 %
100 %
No
Wilmington
67150 ft'
18 in
67150 rye
17
Yes
No
No
No
No
Yes
5
days
Vegetated Area
No
2.5
fus
Yes
No
Jacksonville, NC
Wilmington
in
Yes
mm
No
No
Yes
OK
Please attach a table showing Gutter numbers, slopes,
diameters, downspout sizing and areas going to each
gutter
Please include plan details showing numbered gutters
gutters
gutters
Please include a detailed table showing downspout
diameter of all gutters
Please include a detailed table showing maximum
captured area for all gutters
OK
OK
OK
Please provide calculations to show non -erosive
velocity
OK
Design for footing must be provided if the load of the
cistern at full capacity is greater than the soils will
support
If cistern is buried, calculations must be provided to
show cistern will not float when empty ECE9 `�q,
OK V NOV 0 8 2012
Parts I. & II. DEpS
Permit
(to be provided by DWQ)
If•the only use is irrigation - are plans provided?
Labeled as non -potable water?
Are Locpl & State pumbing codes followed?
Does this roof area deduct BUA from calculations of another BMP?
If so, what BMP?
Notes:
Yes OK
Yes
Yes
SF-1
-CEIVE
NOV 0 81011
Form SW401-Rainwater Harvesting-Rev.3 Parts I. & II. Design Summary, Page 3 of 3
Permit No.5a) F 00f I X
(to be provided by DINO)
III! REQUIRED'ITEMS£HECKLIST _•';'-
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Initials
Pagel Plan
Sheet No.
G6
'-1� —10%
M
—...
0
P 7a(
1 Plans (1"- 50' or larger) of the entire site showing:
- Design at ultimate build -out,
- Off -site drainage (if applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
- Rain Harvester dimensions,
Pretreatment system,
Any first flush bypass system,
Maintenance access,
- Proposed drainage easement and public right of way (ROW),
- Overflow device, and
- Boundaries of drainage easement.
2. Partial plan (1" = 30' or larger) and details of rain harvester showing:
- Maintenance access
- Volume
- Area overflow is directed to and appropriate details of overflow area including vegetation, seeding plan
and side slopes
- Screen sizing
- Waterproof bladder if applicable
Footings
Pump design and sizing
Guttering with sizing and slopes, overflows, and
Filter strip.
3. Section view of the roof and rain harvester (i" = 20' or larger) showing:
- Pretreatment and treatment areas, and
- Inlet and outlet structures.
4. Rain harvesters shall not be used for sediment and erosion control during construction.
5. A table of elevations, areas, gutter slopes, gutter and overflow dimensions, incremental volumes &
accumulated volumes for overall site to verify volume provided.
6.
A construction sequence that shows how the rain harvester will be implemented on site.
7' The supporting calculations.
8' A copy of the signed and notarized operation and maintenance (0&M) agreement.
g' A copy of the deed restrictions (if required).
10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County
soil maps are not an acceptable source of soils information.
11 A copy of the printout from the water harvesting model used.
12 A copy of average annual rainfall at your site.
Form SW401-Rainwater Harvesting-Rev.3
ECEIVE '
NOV 0 8 2012
BY:
Part III. Required Items Checklist, Page 1 of 1
Permit Number: J/�%�'09/�j�
fro be provided by DWQ)
�p WATF9
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
SAND FILTER SUPPLEMENT
This form must be filled out on line, printed and submitted with all of the required information.
Make sure to also fill out and submit the Required Items Checklist (Section 1/1) and the I&M Agreement (Section IV)
Project name
Contact name
Phone number
Date
Drainage area number
Site Characteristics
Drainage area (AD)
Impervious area
% Impervious (IA)
Design rainfall depth (Ro)
Peak Flow Calculations
1-yr, 24-hr runoff depth
1-yr, 24-hr intensity
Pre -development 1-yr, 24-hr runoff
Post -development 1-yr, 24-hr runoff
Pre/Post 1-yr, 24-hr peak control
Storage Volume
Design volume (WQV)
Adjusted water quality volume (WQVAdj)
Volume contained in the sedimentation basin and on lop of the sand filter
Top of sand filler/grate elevation
Weir elevation (between chambers)
Maximum head on the sedimentation basin and sand filter (hM.Fift l)
Average head on the sedimentation basin and sand filter (hA)
Runoff Coefficient (Rv)
Type of Sand Filter
Open sand filler?
SHWT elevation
Bottom of the sand filter elevation
Clearance (dsHm)
Closed/pre-cast sand filter?
SHWT elevation
Bottom of the sand filler elevation
Clearance (dSHwr)
If this is a closed, underground closed sand filler: The clearance between
the surface of the sand filter and the bottom of the roof of the underground
structure (ds,)
Myra W. Jones, P.E.
(904) 791-4666
October 22, 2012
SF-1
87,102.00 ft' OK
56,613.00 It'
65.0% %
2.30 in
s.ba
In
0.15
in/hr
0.06
43/sec
0.21
ft'/sec
0.15
ft3/sec
10,685.00 ft'
r
8,013.75 it'
OK
12,766.00 ft
18.5 It amsl
52
16.5 ft amsl
3.00 If OK
1.50 It OK
0.63 (unilless)
CN /✓ Y or N
''—It amsl
It amsl
YorN
10.50 it amsl
12.00 ft amsl
1.50
�J(A it
ias3
t&. l4"
ECEIVE
NOV 0 g 2012
BY,
Form SW401-Sand Filter-Rev.5 2009Sept17 Parts I and II. Project Design Summary, Page 1 of 2
Permit Number:
(to be provided by DWQ)
Sedimentation Basin
Surface area of sedimentation basin (As)
Sedimentation basin/chamber depth
Sand Filter
Surface area of sand filler (AF)
Top of sand media filter bed elevation
Bottom of sand media filter bed/drain elevation
Depth of the sand media filler bed (dF)
Coefficient of permeability for the sand filter (k)
Outlet diameter
Outlet discharge/flowrate
Time to drain the sand filter (t)
Time to drain the sand filter (t)
Additional Information
Does volume in excess of the design volume bypass the sand filter?
Is an off-line flow -splitting device used?
If draining to SA waters: Does volume in excess of the design volume flow
evenly distributed through a vegetated filter?
What is the length of the vegetated filter?
Does the design use a level spreader to evenly distribute flow?
Is the BMP located at least 30ft from surface waters (50ft if SA waters)?
If not a closed bottom, is BMP located at least 100ft from water supply wells?
Are the vegetated side slopes equal to or less than 3:1
Is the BMP located in a recorded drainage easement with a recorded access
easement to a public Right of Way (ROW)?
What is the width of the sedimentation chamber/forebay (Wsed)?
What is the depth of sand over the outlet pipe (dpipe)?
1,100.00 it,
3.00 it
1,600.00 fit'
13.50 ft amsl
12.00 it amsl
1.50 ft
3.50 (fUday)
6.00 in
0.07 fit"/sec
40.00 hours
1.67 days
VA. IVleetb I I III I I I I lul I I, uuu l lay neeU [U Ue unAeabeu LU
......r_:., rti- ...........a... cr_.__.,
VA. MUM IIIIIIIIIIUIII, uur may ntleu LU ue IILLBeabeu lU
OK. Submit drainage calculations.
Y - YorN OK
Y YorN OK
YorN
YorN
Y YorN OK
YorN
Y YorN OK
YorN
22.00 ft OK
1.00 it OK
ECEI V E
NOV 0 8 2012
Form SW401-Sand Filter-Rev.5 2009Sept17 Parts I and II. Project Design Summary, Page 2 of 2
Permit No.
(to be provided by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal
package will result in a request for additional information. This will delay final review and approval of the project. Initial
in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the
agent may initial below. If a requirement has not been met, attach justification.
Initials
Pagel Plan
Sheet No.
CZ�
1. Plans (1" - 50' or larger) of the entire site with labeled drainage area boundaries
- System dimensions (length, width, and depth) for both the sedimentation chamber and the filter
chamber,
- Maintenance access,
- Flow splitting device,
- Proposed drainage easement and public right of way (ROW),
- Design at ultimate build -out,
- Off -site drainage (if applicable), and
- Boundaries of drainage easement.
2. Plan details (1" = 30' or larger) for the sand filter showing:
- System dimensions (length, width, and depth) for both the sedimentation chamber and the filter
chamber,
- Maintenance access,
- Flow splitting device,
- Vegetative filler strip dimensions and slope (if SA waters),
- Proposed drainage easement and public right of way (ROW),
- Design at ultimate build -out,
- Off -site drainage (if applicable), and
- Boundaries of drainage easement.
3. Section view of the sand filter (1" = 20' or larger) showing:
- Depth(s) of the sedimentation chamber and sand filter chamber,
- Depth of sand filter media,
- Connection between the sedimentation chamber and the sand filter chamber and weir elevation,
- SHWT elevation,
- Outlet pipe, and
- Clearance from the surface of the sand filter to the bottom of the roof of the underground structure (if
applicable).
4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by DWQ, by completing & submitting the soils
investigation request form. County sail maps are not an acceptable source of soils information.
5. Supporting calculations (including drainage calculations)
6. Signed and notarized operation and maintenance (0&M) agreement
7. A copy of the deed restrictions (if required). ECEIVE
NOV 0 g 2012
BY -
Form SW401-Sand Filter-Rev.5 2009Sept17 Part III, Page 1 of 1
Permit Number:
(to be provided by DWQ)
o20F W A rF9
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
SAND FILTER SUPPLEMENT
This form must be filled out on line, printed and submitted with all of the required information.
Make sure to also fill out and submit the Required Items Checklist (Section III) and the I&M Agreement (Section IV)
I. PROJECT INFORMATION
Project name MV-22 Aviation Complex, MCAS New River, P-683I P-687
Contact name Myra W. Jones, P.E.
Phone number
Date
Drainage area number
Ili DESIGN INFORMATION
Site Characteristics
(904) 791 A666
December 5, 2012
SF-2
Drainage area (AD) 195,996.00 It OK
Impervious area 81,644.00 ft2
% Impervious (IA) 41.7% %
Design rainfall depth (Ro) 2.30 in
Peak Flow Calculations
1-yr, 24-hrrunoff depth
3.59
in
1-yr,24-hrintensity
0.15
in/hr
Pre -development 1-yr, 24-hr runoff
0.26
ft'/sec
Post -development 1-yr, 24-hr runoff
0.37
ft3/sec
Pre/Post 1-yr, 24-hr peak control
0.11
ft3/sec
Storage Volume
Design volume (WOV)
15,778.00 ft'
Adjusted water quality volume (WOVAdi)
11,833.50 ft3
Volume contained in the sedimentation basin and on top of the sand filter
OK
19,836.00 ft3
Top of sand filter/grate elevation
15 ft amsl
Weir elevation (between chambers)
13 ft amsl
Maximum head on the sedimentation basin and sand filler (hMa FE er)
5.50 ft OK
Average head on the sedimentation basin and sand filler (hA)
2.75 ft OK
Runoff Coefficient (Rv)
0.42 (unilless)
Type of Sand Filter
Open sand filter?
N Y or N
SHWT elevation
It amsl
Bottom of the sand filter elevation
ft amsl
Clearance (dsnwr)
Closed/pre-cast sand filter?
Y Y or N
SHWT elevation
5.00 R amsl
Bottom of the sand filter elevation
6.00 R amsl
Clearance (dSHWr)
1.00
If this is a closed, underground closed sand filter: The clearance between
the surface of the sand filter and the bottom of the roof of the underground
ft
Q1A
structure (ds,)
OBI
6 Ss Warr = 13.03
ECEIVE
DEC 0 6 2012
By:_---
Form SW401-Sand Filter-Rev.5 2009Sept17 Parts I and II. Project Design Summary, Page 1 of 2
Permit Number:
(to be pmvided by DWQ)
Sedimentation Basin
Surface ar?a of sedimentation basin (As)
Sedimentation basin/chamber depth
Sand Filter
Surface area of sand filter (AF)
Top of sand media filter bed elevation
Bottom of sand media filter bed/drain elevation
Depth of the sand media filter bed (dF)
Coefficient of permeability for the sand filter (k)
Outlet diameter
Outlet discharge/flowrale
Time to drain the sand filter (t)
Time to drain the sand filter (t)
Additional Information
Does volume in excess of the design volume bypass the sand filter?
Is an off-line flow -splitting device used?
If draining to SA waters: Does volume in excess of the design volume flow
evenly distributed through a vegetated filter?
What is the length of the vegetated filter?
Does the design use a level spreader to evenly distribute now?
Is the BMP located at least 30ft from surface waters (50ft if SA waters)?
If not a closed bottom, is BMP located at least 100ft from water supply wells?
Are the vegetated side slopes equal to or less than 3:1
Is the BMP located in a recorded drainage easement with a recorded access
easement to a public Right of Way (ROW)?
What is the width of the sedimentation chamber/forebay (Wsd)?
What is the depth of sand over the outlet pipe (dpipe)?
1,100.00 ft,
VI\. VIUMb I III I III I I U I I I, JUL II ld[ I=L! Ul VC C�V�C;Q�CU rU
3.00 ft
1,120.00 f'
JM. rvlemJ Iul un IUI11, uul Ildy IMUU wJue ulu UMM w
7.50 ft amsl
6.00 ft amsl
1.50 ft
3.50 (fUday)
6.00 in
0.05 ft3/sec
40.00hours
OK. Submit drainage calculations.
1.67 days
Y
Y or N
OK
Y
Y or N
OK
YorN
ft
YorN
Y
Y or N
OK
YorN
Y
Y or N
OK
YorN
20.00 ft
OK
1.00 ft
OK
CCEIVE
DEC 112111
BY:
Form SW401-Sand Filter-Rev.5 2009Sep117
Parts I and II. Project Design Summary, Page 2 of 2
Permit No.
(to be provided by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal
package will result in a request for additional information. This will delay final review and approval of the project. Initial
in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent,
the agent may initial below. If a requirement has not been met, attach justification.
Initials Pagel Plan
Sheet No.
_T'
i�•
PIMA
irs
. Plans (1" - 50' or larger) of the entire site with labeled drainage area boundaries
System dimensions (length, width, and depth) for both the sedimentation chamber and the filter
chamber,
- Maintenance access,
- Flow splitting device,
- Proposed drainage easement and public right of way (ROW),
- Design at ultimate build -out,
- Off -site drainage (if applicable), and
- Boundaries of drainage easement.
2. Plan details (1" = 30' or larger) for the sand filter showing:
- System dimensions (length, width, and depth) for both the sedimentation chamber and the
chamber,
Maintenance access,
- Flow splitting device,
- Vegetative filter strip dimensions and slope (if SA waters),
- Proposed drainage easement and public right of way (ROW),
- Design at ultimate build -out,
- Off -site drainage (if applicable), and
- Boundaries of drainage easement.
eZ 3. Section view of the sand filter (1" = 20' or larger) showing:
- Depth(s) of the sedimentation chamber and sand filter chamber,
- Depth of sand filter media,
filter
- Connection between the sedimentation chamber and the sand filter chamber and weir elevation,
- SHWT elevation,
- Outlet pipe, and
- Clearance from the surface of the sand filter to the bottom of the roof of the underground structure (if
applicable).
4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by DWQ, by completing & submitting the soils
investigation request form. County soil maps are not an acceptable source of soils information.
5. Supporting calculations (including drainage calculations)
6. Signed and notarized operation and maintenance (0&M) agreement
7. A copy of the deed restrictions (if required).
-ECEIV G
NOV 0 8 2012
Form SW401-Sand Filter-Rev.5 2009Sept17 Part III, Page 1 of 1
Permit Number:
n„ ho h,, nMini
WATF,9
www
��
0p
n2 OG
g
NCDENR
s
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
SAND FILTER SUPPLEMENT
This form must be filled out on line, printed and submitted with all of the required information.
Make sure to also fill out and submit the Required Items Checklist (Section IIQ and the 18M Agreement (Section IV)
I. PROJECT INFORMATION
Project name
MV-22 Aviation Complex, MCAS New River, P-683 / P-687
Contact name
Myra W. Jones, P.E.
Phone number
(904) 7914666
Date
December 5, 2012
Drainage area number
SF-3
II. DESIGN INFORMATION
Site Characteristics
Drainage area (AD)
152,094.00 ft2 OK
Impervious area
115,666.00 ft2
% Impervious (IA)
76.0% %
Design rainfall depth (Ro)
2.30 in
Peak Flow Calculations
1-yr, 24-hr runoff depth
3.59 in
1-yr, 24-hr intensity
0.15 Whir
Pre -development 1-yr, 24-hr runoff
0.20 ft3lsec
Post -development 1-yr, 24-hr runoff
0.41 ft'/sec
Pre/Post 1-yr, 24-hr peak control
0.21 ft'/sec
Storage Volume
Design volume (WOV)
21,280.00 ft3
Adjusted water quality volume (WOVAdi)
15,960.00 ft,
Volume contained in the sedimentation basin and on top of the sand filter
OK
23,051.00 fit"
Top of sand filter/grate elevation
19 ft amsl
Weir elevation (between chambers)
15 ft amsl
Maximum head on the sedimentation basin and sand filter (hM.Fift,r)
4.00 ft OK
Average head on the sedimentation basin and sand filter (hA)
2.00 ft OK
Runoff Coefficient (Rv)
0.73 (unitless)
Type of Sand Filter
Open sand filter? N Y or N
SHWT elevation ft amsl
Bottom of the sand filter elevation ft amsl
Clearance (dSHWO
Closed/pre-cast sand filler? Y Y or N
SHWT elevation 8.00 ft amsl
Bottom of the sand filter elevation 9.50 ft amsl
Clearance (dsnwr) 1.50
If this is a closed, underground closed sand filter: The clearance between
the surface of the sand filter and the bottom of the roof of the underground ft
structure (dspce)
Ci Weir = 15.14
ECEIVE
DEC 0 6 2012 0
BY:
Form SW401-Sand Filter-Rev.5 2009Sep117
Paris I and II. Project Design Summary, Page 1 of 2
Sedimentation Basin
Surface area of se4imentation basin (As)
Sedimentation basin/chamber depth
Sand Filter
Surface area of sand filter (Ar)
Top of sand media filter bed elevation
Bottom of sand media filter bed/drain elevation
Depth of the sand media filter bed (dr)
Coefficient of permeability for the sand filter (k)
Outlet diameter
Outlet dischargelflowrate
Time to drain the sand filter (t)
Time to drain the sand filter (t)
Additional Information
Does volume in excess of the design volume bypass the sand filter?
Is an off-line flow -splitting device used?
If draining to SA waters: Does volume in excess of the design volume flow
evenly distributed through a vegetated filter?
What is the length of the vegetated filter?
Does the design use a level spreader to evenly distribute flow?
Is the BMP located at least 30ft from surface waters (50ft if SA waters)?
If not a closed bottom, is BMP located at least 100ft from water supply wells?
Are the vegetated side slopes equal to or less than 3:1
Is the BMP located in a recorded drainage easement with a recorded access
easement to a public Right of Way (ROW)?
What is the width of the sedimentation chamber/forebay (Ws d)?
What is the depth of sand over the outlet pipe (dpipe)?
Permit Number:
(to be provided by DWQ)
2,100.00 ftz JR. IVICCIJ IIIIIIIInum, UUI Illdy IICCU lU UC InultdJCU lU
3.00 ft
2,112.00 ft' Ur,. M Vib I I II I III I IU I II, UUI IIIdy IICCU lV VC II v Cdbvu lU
........:...I..........:...J ....I.......:! ............I... C..........
11.00 ft amsl
9.50 ft amsl
1.50 ft
3.50 (ft/day)
6.00 in
0.09 ft3lsec
40.00 hours OK. Submit drainage calculations.
1.67 days
Y
Y of N
OK
Y
YorN
OK
YorN
ft
YorN
Y
YorN
OK
YorN
Y
Y or N
OK
YorN
70.00 ft
OK
1.00 ft
OK
IE`i.. E IVE
DEC 0 6 2012
BY:
Form SW401-Sand Filter-Rev.5 2009Septl7 Parts I and 11. Project Design Summary, Page 2 of 2
Permit No.
(to be provided by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal
package will result in a request for additional information. This will delay final review and approval of the project. Initial
in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent,
the agent may initial below. If a requirement has not been met, attach justification.
Initials Pagel Plan
Sheet No.
1. Plans (1" - 50' or larger) of the entire site with labeled drainage area boundaries
- System dimensions (length, width, and depth) for both the sedimentation chamber and the filter
chamber,
- Maintenance access,
- Flow splitting device,
- Proposed drainage easement and public right of way (ROW),
- Design at ultimate build -out,
- Off -site drainage (if applicable), and
- Boundaries of drainage easement.
6 2. Plan details (V = 30' or larger) for the sand filter showing:
- System dimensions (length, width, and depth) for both the sedimentation chamber and the filter
chamber,
- Maintenance access,
- Flow splitting device,
- Vegetative filter strip dimensions and slope (if SA waters),
- Proposed drainage easement and public right of way (ROW),
- Design at ultimate build -out,
- Off -site drainage (if applicable), and
- Boundaries of drainage easement.
C6 3. Section view of the sand filter (V = 20' or larger) showing:
- Depth(s) of the sedimentation chamber and sand filter chamber,
- Depth of sand filter media,
- Connection between the sedimentation chamber and the sand filter chamber and weir elevation,
- SHWT elevation,
- Outlet pipe, and
- Clearance from the surface of the sand filter to the bottom of the roof of the underground structure (if
applicable).
4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by DWQ, by completing & submitting the soils
investigation request form. County soil maps are not an acceptable source of soils information.
5. Supporting calculations (including drainage calculations)
6. Signed and notarized operation and maintenance (0&M) agreement
7. A copy of the deed restrictions (if required).
o—H, E
NOV 0 8 2012
BY•
Form SW401-Sand Filler-Rev.5 2009Septl7 Part III, Page 1 of 1
Permit Number:
Ito be provided by DWQ)
OF WATFq
h �
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
SAND FILTER SUPPLEMENT
This form must be filled out on line, printed and submitted with all of the required information.
Make sure to also fill out and submit the Required Items Checklist (Section III) and the I&M Agreement (Section IV)
Project name
Contact name
Phone number
Date
Drainage area number
Myra W. Jones, P.E.
(904)791-4666
December 5, 2012
SF-4
New River, P-683 / P-687
II. DESIGN INFORMATION
Site Characteristics
Drainage area (AD)
160,562.00 ft2 OK
Impervious area
76,898.00 ft2
% Impervious (la)
47.9% %
Design rainfall depth (Re)
2.30 in
Peak Flow Calculations
1-yr, 24-hr runoff depth
3.59
in
1 -yr, 24-hr intensity
0.15
in/hr
Pre -development 1-yr, 24-hr runoff
0.19
ft3/sec
Post -development 1-yr, 24-hr runoff
0.32
ft3/sec
Pre/Post 1-yr, 24-hr peak control
0.13
ft3/sec
Storage Volume
Design volume (WQV)
14,772.00 ft'
Adjusted walerqualityvolume (WQVadi)
11,079.00 113
Volume contained in the sedimentation basin and on top of the sand filter
OK
16,995.00 ft,
Top of sand filter/grate elevation
17 It amsl
Weir elevation (between chambers)
13 ft amsl
Maximum head on the sedimentation basin and sand filter (hM„Finer)
3.00 It OK
Average head on the sedimentation basin and sand filter (ha)
1.50 ft OK
Runoff Coefficient (Rv)
0.48 (unitless)
Type of Sand Filter
Open sand filter? N Y or N
SHWT elevation it amsl
Bottom of the sand filter elevation ft amsl
Clearance (dSHWr)
Closed/pre-cast sand filter? Y Y or N
SHWT elevation 7.00 ft amsl
Bottom of the sand filter elevation 8.50 ft amsl
Clearance (dSHwr) 1.50
If this is a closed, underground closed sand filler: The clearance between
the surface of the sand filter and the bottom of the roof of the underground It
structure (ds,) Lo
63 pass vor = 13.1(1
CCEU N9 E'
DEC 0 6 2012
BY:
Form SW401-Sand Filter-Rev.5 2009Sept17 Parts I and II. Project Design Summary, Page 1 of 2
Permit
(to be provided by DWQ)
Sedimentation Basin
Surface area of sedimentation basin (As)
Sediment6on basin/chamber depth
Sand Filter
Surface area of sand filter (AF)
Top of sand media filler bed elevation
Bottom of sand media filter bed/drain elevation
Depth of the sand media filter bed (dF)
Coefficient of permeability for the sand filter (k)
Outlet diameter
Outlet discharge/flowrate
Time to drain the sand filter (t)
Time to drain the sand filter (t)
Additional Information
Does volume in excess of the design volume bypass the sand filter?
Is an off-line Flow -splitting device used?
If draining to SA waters: Does volume in excess of the design volume Flow
evenly distributed through a vegetated filter?
What is the length of the vegetated filter?
Does the design use a level spreader to evenly distribute Flow?
Is the BMP located at least 30ft from surface waters (50ft if SA waters)?
If not a closed bottom, is BMP located at least 100ft from water supply wells?
Are the vegetated side slopes equal to or less than 3:1
Is the BMP located in a recorded drainage easement with a recorded access
easement to a public Right of Way (ROW)?
What is the width of the sedimentation chamber/forebay (WSIX
What is the depth of sand over the outlet pipe (dpipe)?
1,800.00 ft2
vn. mccw mnuumui, our niay uceu to oe uudeancu w
3.00 ft
2,040.00 ft'
UR. rviceu ninnnmuy our nidy nccu to uc uwrcaxu to
10.00 ft amsl
8.50 ft amsl
1.50 ft
3.50 (fUday)
6.00 in
0.08 ft'/sec
40.00 hours
OK. Submit drainage calculations.
1.67 days
Y
Y or N
OK
Y
Y or N
OK
YorN
It
YorN
Y
YorN
OK
YorN
Y
Y or N
OK
YorN
30.00 ft
OK
1.00 ft
OK
ECEIVE
DEC 0 6 2012
Form SW401-Sand Filter-Rev.5 2009Sept17
Parts I and II. Project Design Summary, Page 2 of 2
Permit No.
(to be provided by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal
package will result in a request for additional information. This will delay final review and approval of the project. Initial
in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent,
the agent may initial below. If a requirement has not been met, attach justification.
Initials Pagel Plan
Sheet No.
1. Plans (V - 50' or larger) of the entire site with labeled drainage area boundaries
- System dimensions (length, width, and depth) for both the sedimentation chamber and the filter
chamber,
- Maintenance access,
- Flow splitting device,
- Proposed drainage easement and public right of way (ROW),
- Design at ultimate build -out,
- Off -site drainage (if applicable), and
- Boundaries of drainage easement.
Ci 2. Plan details (1" = 30' or larger) for the sand filter showing:
- System dimensions (length, width, and depth) for both the sedimentation chamber and the filter
chamber,
- Maintenance access,
- Flow splitting device,
- Vegetative filter strip dimensions and slope (if SA waters),
- Proposed drainage easement and public right of way (ROW),
- Design at ultimate build -out,
- Off -site drainage (if applicable), and
- Boundaries of drainage easement.
3. Section view of the sand filter (1" = 20' or larger) showing:
- Depth(s) of the sedimentation chamber and sand filter chamber,
- Depth of sand filter media,
- Connection between the sedimentation chamber and the sand filler chamber and weir elevation,
- SHWT elevation,
- Outlet pipe, and
- Clearance from the surface of the sand filter to the bottom of the roof of the underground structure (if
applicable).
4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by DWQ, by completing & submitting the soils
investigation request form. County soil maps are not an acceptable source of soils information.
5. Supporting calculations (including drainage calculations)
6. Signed and notarized operation and maintenance (O&M) agreement
7. A copy of the deed restrictions (if required).
ECEIVE
NOV 0 B 2012
BY,•
Form SW401-Sand Filler-Rev.5 2009Sept17 Part III, Page 1 of 1
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
GRASSED SWALE SUPPLEMENT
Permit Number:
(to be provided by DWD)
O�OF WATFgOc
o
This form must be filled out, printed and submitted.
The Required Items Checklist (Part III) must also be filled out, printed and submitted along with all of the required information.
IF PROJECTINORMTION^FA
Project name MV-22 Aviation Complex MCAS New River, P-683I P-687
Contact name Myra W. Jones, P.E.
Phone number
Date
Drainage area number
(904) 791A666
10/22/2012
Swale
Site Characteristics
Drainage area
113,133.00 ffZ
Impervious area
61,382.00 ft1
Percent impervious
54.3% %
Design rainfall depth
inch
Peak Flow Calculations
10-yr storm runoff depth
in
10-yr storm intensity
7.21
in/hr
Post -development 10-yr storm peak flow
10.94
fit/sec
Velocity
Maximum non -erosive velocity (peak 10-year storm)
6.00 f lsec
Soil characteristics (enter Y below)
Sand/silt (easily erodible)
Clay mix (erosion resistant)
X
Grass Type (enter Y' below)
Bermuda
X
Tall fescue
Bahiagrass
Kentucky bluegrass
Grass -legume mixture
Swale type: Fill out one of the options below:
Option 1: Curb Outlet Swale:
Y
(Y or N)
Maximum velocity
1.98
Side slopes
3.00
:1
Swale length
435.00
It
Option 2: Conveyance Swale, Seeking Pollutant Credit:
N
(Y or N)
Maximum velocity for 10-yr storm
fUsec
Side slopes
:1
Swale length
ft
M
Insufficient side slopes. Max is 5:1.
OK
DECEIVE
NOV 0 8 2012
BY
Form SW401-Grassed Swale-Rev.3 Parts I and II. Project Design Summary, Page 1 of 2
Permit Number:
(to be provided by DWQ)
Swale Characteristics
Swale Shape: Enter an "x" in the appropriate cell below:
Trapezoidal
X
Parabolic
V-shaped
Width of the bottom of the swale
2.00 it
Width of the top of the Swale
14.50 It
Additional Information
Is the swale sized for all runoff from ultimate build -out?
Y (Y or N)
OK
Is the BMP located in a proposed drainage easement with a
(Y or N)
recorded access easement to a public Right of Way (ROW)?
What is the distance from the bottom of the Swale to the SHWT?
8.75 it
OK
What is the ground level elevation?
16.36 fmsl
What is the elevation of the bottom of the swale?
14.25 fmsl
What is the SHWT elevation?
5.50 fmsl
What is the longitudinal slope of the swale?
0.50 %
OK
What is the depth of freeboard?
1.10 it
OK
NOV 0 8 2012
BY•
Form SW401-Grassed Swale-Rev.3
Parts I and 11. Project Design Summary, Page 2 of 2
Permit No:
(to be assigned by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package
will result in a request for additional information. This will delay final review and approval of the project. Initial in the space
provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial
below. If a requirement has not been met, attach justification.
Initials Pagel Plan
Sheet No.
1. Plans (1" = 50' or larger) of the entire site showing:
- Design at ultimate build -out,
- Off -site drainage (if applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
- Swale dimensions (width, length, depth),
- Maintenance access,
- Proposed drainage easement and public right of way (ROW),
- Grass species, and
- Boundaries of drainage easement.
2. Plan details (1" = 50' or larger) for the grassed swale showing:
- Swale dimensions (width, length, depth),
- Maintenance access,
- Proposed drainage easement and public right of way (ROW),
- Design at ultimate build -out,
- Grass species,
- Off -site drainage (if applicable),and
- Boundaries of drainage easement.
C6 3. Section view of the grassed swale (1" = 20' or larger) showing:
- Side slopes,
- Longitudinal slope,
- Freeboard
- Swale dimensions, and
- SHWT level(s)
,oiry? 4. Supporting calculations (including maximum velocity calculations for applicable storms)
_PCD_ 5. A copy of the signed and notarized operation and maintenance (0&M) agreement.
At 6. A copy of the deed restrictions (if required).
ECEIE
NOV 0 8 2012
BY: �
SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1
Permit Number:
(to be provided by DWQ)
o�Op W ATEgOG
A_CD iA
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
GRASSED SWALE SUPPLEMENT
r_-
This form must be filled out, printed and submitted.
The Required Items Checklist (Part III) must also be filled out, printed and submitted along with all of the required information.
Project name
Contact name
Phone number
Dale
Drainage area number
Site Characteristics
Drainage area
Impervious area
Percent impervious
Design rainfall depth
Peak Flow Calculations
10-yr storm runoff depth
10-yr storm intensity
Post -development 10-yr storm peak flow
Velocity
Maximum non -erosive velocity (peak 10-year storm)
Soil characteristics (enter Y below)
Sand/sill (easily erodible)
Clay mix (erosion resistant)
Grass Type (enter 'Y' below)
Bermuda
Tall fescue
Bahiagrass
Kentucky bluegrass
Grass -legume mixture
Swale type: Fill out one of the options below:
Option 1: Curb Outlet Swale:
Maximum velocity
MV-22 Aviation Complex MCAS New River, P-683 / P-687
Myra W. Jones, P.E.
(904) 791A666
10/22/2012
Swale SF-4
108,535.00 ft2
65,950.00 ftZ
60.8% %
inch
in
7.21 in/hr
11.43 ft3/sec
6.00 fUsec
X
X
Y (Y or N)
2.18 OK
Side slopes 3.00 :1 Insufficient side slopes. Max is 5:1.
Swale length 375.00 ft OK
Option 2: Conveyance Swale, Seeking Pollutant Credit: N (Y or N)
Maximum velocity for 10-yr storm ftlsec
Side slopes :1
Swale length It
ECEIVE
NOV 0 8 2012
BY:_.
Form SW401-Grassed Swale-Rev.3 Parts I and II. Project Design Summary, Page 1 of 2
Permit
(to be provided by DWQ)
Swale Characteristics
Swale Shape: Enter an Y' in the appropriate cell below:
Trapezoidal X
Parabolic
V-shaped
Width of the bottom of the swale 2.00 ft
Width of the lop of the Swale 13.00 it
Additional Information
Is the swale sized for all runoff from ultimate build -out?
Y (Y or N)
OK
Is the BMP located in a proposed drainage easement with a
recorded access easement to a public Right of Way (ROW)?
(Y or N)
What is the distance from the bottom of the swale to the SHWT?
9.75 it
OK
What is the ground level elevation?
16.50 fmsl
What is the elevation of the bottom of the swale?
14.25 fmsl
What is the SHWT elevation?
4.50 fmsl
What is the longitudinal slope of the swale?
0.50 %
OK
What is the depth of freeboard?
0.85 It
OK
NOV 0 8 202
By:__-------
Form SW401-Grassed Swale-Rev.3
Parts I and II. Project Design Summary, Page 2 of 2
Permit No:
(to be assigned by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package
will result in a request for additional information. This will delay final review and approval of the project. Initial in the space
provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial
below. If a requirement has not been met, attach justification.
Initials
Pagel Plan
Sheet No.
t�
S`
1. Plans 0" = 50' or larger) of the entire site showing:
- Design at ultimate build -out,
- Off -site drainage (if applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
- Swale dimensions (width, length, depth),
- Maintenance access,
- Proposed drainage easement and public right of way (ROW),
- Grass species, and
- Boundaries of drainage easement.
W
2. Plan details (V = 50' or larger) for the grassed swale showing:
- Swale dimensions (width, length, depth),
- Maintenance access,
- Proposed drainage easement and public right of way (ROW),
- Design at ultimate build -out,
- Grass species,
- Off -site drainage (if applicable),and
- Boundaries of drainage easement.
3. Section view of the grassed swale (1" = 20' or larger) showing:
- Side slopes,
- Longitudinal slope,
- Freeboard
- Swale dimensions, and
- SHWT level(s)
4. Supporting calculations (including maximum velocity calculations for applicable storms)
5. A copy of the signed and notarized operation and maintenance (0&M) agreement.
,,//
M
6. A copy of the deed restrictions (if required).
ECEIVEFJ
NOV 0 8 2012
BY:
SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1
®�
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
GRASSED SWALE SUPPLEMENT
Permit Number:
(to be provided by DWO)
o20p w A
TF9OG
Gh y
� r
O T
This form must be filled out, printed and submitted.
The Required Items Checklist (Part 111) must also be filled out, printed and submitted along with all of the required information.
I,IJPROnJECTjiI_NFORMAT ION
Project name MV-22 Aviation Complex MCAS New River, P-683 / P-687
Contact name Myra W. Jones, P.E.
Phone number (904) 791A666
Date 10/22/2012
Drainage area number Swale-Redev
II. DESIGN INFORMATION r, "xaiwnau`ea,`£ r
Site Characteristics
Drainage area 172,500.00 ft'
Impervious area 15.712.00 fe
Percent impervious 9.1 % %
Design rainfall depth inch
Peak Flow Calculations
10-yr storm runoff depth
in
10-yr storm intensity
7.21
in/hr
Post -development 10-yr storm peak flow
6.36
ft'/sec
Velocity
Maximum non -erosive velocity (peak 10-year storm)
6.00 fl/sec
Soil characteristics (enter "x" below)
Sand/sill (easily erodible)
Clay mix (erosion resistant)
X
Grass Type (enter 'Y below)
Bermuda
X
Tall fescue
Bahiagrass
Kentucky bluegrass
Grass -legume mixture
Swale type: Fill out one of the options below:
Option 1: Curb Outlet Swale:
Y
(Y or N)
Maximum velocity
1.87
Side slopes
3.00
:1
Swale length
960.00
ft
Option 2: Conveyance Swale Seeking Pollutant Credit:
N
(Y or N)
Maximum velocity for 10-yr storm
ft/sec
Side slopes .
:1
Swale length
It
OK
Insufficient side slopes. Max is 5:1.
OK
ECEIOP
NOV 0 6 2012
BY•
Form SW401-Grassed Swale-Rev.3 Parts I and It. Project Design Summary, Page 1 of 2
Permit Number.
(to be provided by DWQ)
Swale Charac,�eristics
Swat% Shape: Enter an 'Y' in the appropriate cell below:
Trapezoidal X
Parabolic
V-shaped
Width of the bottom of the swale 2.00 . It
Width of the top of the Swale 14.50 ft
Additional Information
Is the swale sized for all runoff from ultimate build -out?
Y (Y or N)
OK
Is the 8MP located in a proposed drainage easement with a
recorded access easement to a public Right of Way (ROW)?
(Y or N)
What is the distance from the bottom of the Swale to the SHWT?
3.00 It
OK
What is the ground level elevation?
10.10 fmSI
What is the elevation of the bottom of the swale?
8.00 fmsl
What is the SHWT elevation?
5.00 fmsl
What is the longitudinal slope of the swale?
0.50 %
OK
What is the depth of freeboard?
1.30 it
OK
ECEIVE
NOV 0 8 2012
BY
Form SW401-Grassed Swale-Rev.3
Pans I and II. Project Design Summary, Page 2 of 2
Permit No:
(to be assigned by DWQ)
III.a�REQUnZED ITEMS CHECKL�I$T• 4"iz„,i�'5,��'#.�.i's�.�YS;,r��.,.���.,��,4�'���r�r'sx"�^.�,;��Y. .`` .-,.kb.
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package
will result in a request for additional information. This will delay final review and approval of the project. Initial in the space
provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial
below. If a requirement has not been met, attach justification.
Initials Pagel Plan
Sheet No.
6 1. Plans (1" = 50' or larger) of the entire site showing:
- Design at ultimate build -out,
- Off -site drainage (if applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
- Swale dimensions (width, length, depth),
- Maintenance access,
- Proposed drainage easement and public right of way (ROW),
- Grass species, and
- Boundaries of drainage easement.
2. Plan details (1" = 50' or larger) for the grassed swale showing
- Swale dimensions (width, length, depth),
- Maintenance access,
- Proposed drainage easement and public right of way (ROW),
- Design at ultimate build -out,
- Grass species,
- Off -site drainage (if applicable),and
- Boundaries of drainage easement.
Ci
3. Section view of the grassed swale (V = 20' or larger) showing:
- Side slopes,
- Longitudinal slope,
- Freeboard
- Swale dimensions, and
- SHWT level(s)
4. Supporting calculations (including maximum velocity calculations for applicable storms)
5. A copy of the signed and notarized operation and maintenance (0&M) agreement.
6. A copy of the deed restrictions (if required).
F
IVE 2012�^
SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1
State Stornwater Management Systems
Permit No. SW8 091113
P 688 Apron Expansion, P 683 / 11687 MV-22 Hangar Development
and POV Parking Garage
Stormwater Permit No. SW8 091113
MCAS Camp Leieune, Onslow Countv
Designer's Certification
L Myra W. Jones as a duly registered Civil Engineer in the State of North
Carolina, having been authorized to observe periodically the construction of the project,
P 688 Apron Expansion Phase 11, P 683 / P 687 MV-22 Hangar and POV Parking Garage
(Project)
for Commanding Officer U.S. Marine Corps Base Camp Leieune (Project Owner)
hereby state that, to the best of my abilities, due care and diligence was used in the observation
of the project construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
1. None.
Signature
Registration N
Date
SEAL
SEAL
031309
W.
ECEIVE
11
SEP 2 4 2015
Page 1 of 2 BY: ------
State Slormwater Management Systems
Permit No. SW8 091 113
Certification Requirements:
✓ 1. The drainage area to the system contains approximately the permitted acreage.
v'*" 2. The drainage area to the system contains no more than the permitted amount of built -
upon area.
✓ 3. All the built -upon area associated with the project is graded such that the runoff
drains to the system.
✓ 4. All roof drains are located such that the runoff is directed into the system.
✓ 5. The bypass structure weir elevation is per the approved plan.
6. The bypass structure is located per the approved plans.
P 7. A Trash Rack is provided on the bypass structure.
✓ 8. All slopes are grassed with permanent vegetation.
✓ 9. Vegetated slopes are no steeper than 3:1.
✓ 10. The pipe culverts are located per the approved plans and do not cause short-
circuiting of the system.
✓ 11. The permitted amounts of surface area and/or volume have been provided.
✓ 12. All required design depths are provided.
✓ 13. All required parts of the system are provided.
✓ 14. The required system dimensions are provided per the approved plans.
cc: NCDLNR-DWQ Regional Office
Page 2 of 2