Loading...
HomeMy WebLinkAboutNC0085936_NOV-2023-MV-0099_20230531IL P O Box 2430 524 Brogden Road Smithfield North Carolina 27577 919-934-4115 919 934-4956 Fax SPIB 4,000 I.ANU,,er V May 24, 2023 cy. !'l/AW,& & Jon&.; t7/Lt/. lVir011111cntal 0t],111iv MAY 2 6 2023 Raleigh R.egioll,il office NC Dept. of Environmental Quality Attention: Mitch Hayes !"ND Division of Water Resources Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 Subject: NOTICE OF VIOLATION &INTENT TO ASSESS CIVIL PENALTY Tracking Number: NOV-2023-MV-0099 Permit No: NCO085936 Wet Log Deck Storage site Johnston County Dear Mr. Hayes: After reviewing the letter received about the April 2023 Discharge Monitoring Report (DMR), we do not think there are any violations. Our wet deck operation did not start until Monday April 3, 2023. Our first sample was taken on Wednesday April 5, 2023. We sample once a week each Wednesday. Our sample frequency has always been the same in the past years if you review our records. If you look at 2022 for example when we started our wet deck and sampling. We sampled it in 2022 on the 6", 14th, 20th, and 271". There was no violation for the week of April 1", 2022. Our oil and grease from each sample was not detected and we stated zero, but that does not show up on the electrical report. April 5, 12, 19, and 26" were all not detected. In my past samples I always put <5.0 and will continue to do so like have in the all the past years since electronical submission started. Something else that has changed is our flow. In 2018 after our permit renewal, we were able to use a county water line with pressure to help on our wet deck operations. We sent notification of this when we sent in our permit renewal in 2018. Leaf Environmental helped me submit our permit renewal for NCO0859 earlier this year. With the usage history they determined our flow is now 0.450 mgd. I would also like information on how I can submit a request to reduce our sample frequency like we discussed on the phone. Please forward the information or who I need to contact to start the process. Thanks, Kevin Williams Vice President