Loading...
HomeMy WebLinkAboutSW8060309_CURRENT PERMIT_20220907STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 O�oo3oc1 DOC TYPE ® CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2022 0c) 0-) YYYYMMDD ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director September 7, 2022 Marine Corps Base Camp Lejeune Attn: Neal Paul, Deputy Public Works Officer 1005 Michael Road Camp Lejetme, NC 28547 NORTH CAROLINA Environmental Quality Subject: Permit Renewal Post -Construction Stormwater Management Permit No. SW8 060309 Reserve Training & Vehicle Maintenance Facility Onslow County Dear Mr. Paul: The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on August 10, 2022. The Division is hereby notifying you that permit SW8060309 has been renewed, updated, and re -issued on September 7, 2022, as attached. Please be aware that the renewal and re - issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until August 27, 2030 and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov. Sincerely, rBrian Wrenn, Director Division of Energy, Mineral and Land Resources Enclosures: Attachment A - Designer's Certification Form Attachment C — Permitting History copy of the Renewal Application Documents DES/ams: \\\Stormwater\Permits & Projects\2006\060309 HD\2022 09 permit 060309 cc: Wilmington Regional Office Stormwater File �North Carolina Department of Environmental Quality I Division of Energy, Mineral and land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington, North Carollna 28405 rxx�rH UAourae 910.796.7215 Post -Construction Stormwater Management Permit No. SW8 060309 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO USMCB Camp Lejeune Reserve Training Facility & Vehicle Maintenance Facility/ P- 128 Intersection of Rifle Range Road and Rifle Range Road, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of two (2) infiltration basins (hereafter referred to as infiltration system or stormwater control measure) discharging to Class SA waters in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter referred to as the "stormwater rules') and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit This permit shall be effective from the date of issuance until August 27, 2030 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the permitted stormwater control measures. The stormwater controls labeled Drainage Area 1 and Drainage Area 2 have been designed to handle the runoff from 103,699 and 105,067 square feet of built -upon area, respectively. 3. The maximum built -upon area allowed for the entire project is 208,766 square feet. Page 1 of 7 Post -Construction Stormwater Management Permit No. SW8 060309 4. The drainage areas will be limited to the amounts of built -upon area indicated in Sections 1.2 and 1.7 of this permit, and per approved plans. The built -upon area for the future development within Drainage Area 1 and Drainage Area 2 is limited to 2,378 and 6,830 square feet, respectively. 5. The infiltration system treating Drainage Area 2 is permitted per the Alternative Design Criteria under Section .1008 (h). The proposed system provides equal or better control, equal or better protection of surface waters and results in no increased potential for nuisance conditions. The infiltration system can store at least 2.5 times the minimum design storm, therefore neither an LS/VFS nor an offline bypass are required. Since this is a modification to an existing permit, the multipliers identified in Section 1.7.d of the permit varies depending on the policy in place at the time the proposed improvements were approved. 6. A 50' wide vegetative buffer must be provided and maintained adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. 7. The following design criteria have been permitted for the infiltration basins and it must be provided and maintained at the design condition: Basin 1 Basin 2 a. Drainage Area, acres: 4.38 3.65 Onsite, subject to 1995 rules, ft2: 191,008 96,279 Onsite, subject to SL 2008-211, ft2: 0 62,671 offsite, ft2: None None b. Total Impervious Surfaces, ft2: 103,699 105,067 Onsite, subject to 1995 rules, ft2: 103,699 58,414 Onsite, subject to SL 2008-211, ft2: 0 46,653 Offsite, ft2: None None c. Design Storm, inches: 1995 rule, inches: 1.5 1.5 SL 2008-211, inches: n/a 3.68 d. Design Storm Multiplier to Waive Bypass and Vegetated Filter Strip: 1995 rule: n/a 3 SL 2008-211: n/a 2.5 e. Forebay: Bottom Elevation, FMSL: Na 51.55 Temporary Storage Elevation, FMSL: 53.75 Permitted Storage Volume, ft3: 7,484 f. Infiltration Basin Depth, feet: 1.89 2.75 g. Infiltration Bottom Elevation, FMSL: 52.50 51.00 In. Infiltration Bottom Surface Area, ft2: 4,775 13,554 i. Infiltration Bypass Weir Elevation, FMSL: 54.39 53.75 j. Total Permitted Storage Volume, ft3: 12,956 51,538 k. Type of Soil: Ba meade Ba meade I. Expected Infiltration Rate, in/hr: 1.5 1.5 m. Seasonal High Water Table, FMSL: 47.00 45.50 n. Time to Draw Dawn, days: 0.95 2.54 o. Receiving Stream/River Basin: Stones Creek / White Oak p. Stream Index Number: 19-30-3 q. Classification of Water Body 'SA.HQW' II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. Page 2 of 7 Post -Construction Stormwater Management Permit No. SW8 060309 During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. If the stormwater system is used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 3. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s). BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 4. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at design condition. The approved Operation and Maintenance Agreement is incorporated by reference into this permit and must be followed in its entirety and maintenance must occur at the scheduled intervals. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. All stormwater collection and treatment systems must be located in either public rights -of -way, dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such rights -of -way, common areas and easements, in accordance with the approved plans. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 9. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 3 of 7 Post -Construction Stormwater Management Permit No. SW8 060309 III. GENERAL CONDITIONS 1. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur, V. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2), b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions Page 4 of 7 Post -Construction Stormwater Management Permit No. SW8 060309 e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit renewed, updated and reissued this the 7th day of September 2022. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION CAkta 2�A 7,, nan vvrenn, Director Division of Energy. Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 060309 Page 5 of 7 Post -Construction Stormwater Management Permit No. SW8 060309 Reserve Training Facility & Vehicle Maintenance Facility / P-1286 Parking Lot Stormwater Permit No. SW8 060309 Onslow County Attachment A Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 Post -Construction Stormwater Management Permit No. SW8 060309 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built - upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDEQ-DEMLR Wilmington Regional Office Page 7 of 7 Attachment C - Permitting History Reserve Training & Vehicle Maintenance Facility Permit No. SW8 060309 Approval Permit BIMS Description of the Changes Date Action Version construction, operation and maintenance of 3 infiltration basins in compliance with the provisions of 15A NCAC 2H .1000 ; Infiltration # I has been designed to handle the 5/1/2006 Original 1.0 runoff from 103,699 square feet of impervious area. This basin must be operated with Approval a 50' vegetated filter. Infiltration 92 has been designed to handle the runoff from 58,415 square feet of impervious area. Infiltration #3 has been designed to handle the runoff from 7,9 11 square feet of impervious area. The improvements previously approved for Drainage Area 3 were not constructed. Instead, with this modification the proposed gravel parking lot is to be located within the previously approved Drainage Area 3. The grading associated with proposed improvements will impact Drainage Area I and the calculations have been revised 8/27/2014 Modification 1.1 accordingly; The infiltration basin associated with Drainage Area 2 is being increased to handle the proposed improvements. A forebay will be installed to promote sediment accumulation and act as additional storage volume; construction, operation and maintenance of two (2) infiltration basins discharging to Class SA waters in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000, Plan modifying the previously approved gravel parking lot to a light duty asphalt pavement 9/25/2015 Revision 1.2 parking lot. The total area of the site remains the same and the proposed impervious area is not changing from the previously approved amount. 10/6/2016 Modification 13 The relocation of Infiltration Basin 2 resulting in the reducing in drainage area. The infiltration basin design remains the same. 9/7/2022 Renewal 2.0 Expires August 27, 2030 Penn it Number: (to be provided by., DWQ) Drainage Area Number: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate the roblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. EcGivie JUL as 6Y: Form SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3 BMP element: Potentialproblem: How I will remediate theproblem: The forebay Sediment has accumulated and reduced the depth to 75% Search for the source of the sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment has accumulated. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than Replace the top few inches of filter 5 days after a storm event. media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area. spray). The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediately. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. ECEIVEJ JUL 11 2014 Form SW401-Infiltration Basin O&M-Rev.3 RV Page 2 of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Reserve Training Facility & Vehicle Maintenance Facilitv/P-1286 Gravel Lot BMP drainage area number: Print name:Neal Paul Title:Deputy Public Works Officer Address:Building 1005 Michael Road Camp Leieune N.C. 28542 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. day of J 1� forgoing infi V V , a Notary Public for the State of County of MOW, do hereby certify that personally appeared before me this and acknowledge the due execution of the basin maintenance requi ments. Witness y d and official seal, KELLEY VANDECOEVERIN01 NOTARY PUBLIC ONSLOW COUNTY STATE OF NORTH CAROLINA SEAL My commission expires vmcw ` ECEIVE11 JUL 11 2M BY: Form SW401-Infiltration Basin O&M -Rev., Page 3 of 3 `SGiJ�D�D.3o % Permit Number: (lobe provided by DWQ) Drainage Area Number _ Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. - Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. - The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter ofthe Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide time and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the Swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Form SW401-Infiltration Basin O&M-Rev.3 ECEI V E JUL 11 2014 SY.--Page-I-of 3 BMP element: Potentialproblem: How I will remediate theproblem: The forebay Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment Search for the source of the has accumulated. sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than Replace the top few inches of filter 5 days after a storm event. media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area. spray). The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediately. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. EGEIVEjj JUL 11 2014 Form SW401-Infiltration Basin O&M-Rev.3 Y. Page 2 of 3 Permit (to be provided by DWQ) I acknowledge and agree by my signature below that 1 am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Reserve Training Facility & Vehicle Maintenance Facility/P-1286 Gravel Lot BMP drainage area Print name:Neal Paul Title:Deputy Public Works Officer Address: Building 1005 Michael Road Camp Leieune N.C. 28542 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of )Vy , do hereby certify that personally appeared before me this 11 towledge the due execution of the forgoing infiltration basin maintenance require ents. Witness my hand and official seal, ------------ KELLEY VANDECOEVERIN NOTARY PUBLIC ONSLOW COUNTY STATE OF NORTH CAROLINA SEAL My commission expire 040 1 i N1 I EL. E I V C t W JUL 9 1 2m Form SW40I-infiltration Basin O&M-Rev.3 tsr: Page-3 of 3 114ml"I NP IINI V Date ec Fee Paid Number o uPermit a f, # FliJO F% uJ o 0 0 NC DEG Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 060309 2. Project name: Reserve Training & Vehicle Maintenance Facility 3. Project street address: XXX City: MCB Camp Leieune County: Onslow ZIP: 28542 4. What, if any, changes have been made to the project as permitted? N/A If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at: httos.*//deg.nc.gov/about/divisionS/E B. PERMITTEE INFORMATION If changes to the permidee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: httos://de(Lne.00v/aboutidivisions/enerdv-mineral-land- resources/enerdv-mineral-land-ruleslstoimwateelxoGram/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: MCB Camp Leieune 2. Signing Official's Name: Neal Paul 3. Signing Official's Title: Deputy Public Works Division 4. Mailing Address: MCB Camp Leieune 1005 Michael Rd. City: MCB Camp Leieune State: NC ZIP: 28547-2521 5. Street Address: City: State: ZIP: _ 6. Phone: 910) 451-2213 Email: neal.paul®usmc.mil AUG 10 2022 BY. Stormwaler Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HOW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: MCT 1. A permit application processing fee of $505.00 payable to NCDEO. MCT 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation - a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) - a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;' c. Public Entity - a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership - the general partner; e. Sole proprietor; or I. Letter of authorization signed by one of the signatories noted in a - e above authorizing the signature of another entity. MCT 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. It the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. MCT 4. O&M Agreements, Please select one: ® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. MCT 5. Designer Certifications, Please select one: ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. MCT 6. [IF APPLICABLE) If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). httos://www.sosnc.gov/online services/search/by title/ Business Redistration v� .. f�l'frrrr�a ft?p AUG 10 2022 Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTE CERTIFICATION I, ,1• • . the person legally responsible for the permit, certify that 1 have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the pr r forms to modify or transfer the permit prior to any changes to the project, SCMUo nership. All in rmati provided on this permit renewal application is, to the best of my knowledge orrect b complete. Signature: WX Date: 7 LD ZL NOTARIZATION: 1 I 1, V �Y �� Ysoc a Notary Public for the State of V"AA County of iE4 D do hereby certify that abLrk K . Low 6LV- personally appeared before me this the Q day of , W!!%F 20 2,11 and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, .(Nei ERS0010 I n3IA: ._ QQ MYC1y�r�p 1E 4-s z Ow ff'fill fig �r% �¢.^ P 0�1•' !� AUG 10 2022 l n.1 Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 Permit No. Sv"% V1pynt 19 (to be provided by OWO) Of WATp', F o STORMWATER MANAGEMENT PERMIT APPLICATION FORM NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 11/J must be printed, tilled out and submitted along with all of the required information. G PROJECT, INFORMATION Project Name Reserve Training Facility 8 Vehicle Maintenance Facility/ P-1286 Gravel Lot Contact Person Steve Medvick Phone Number 757-322-4214 Date 28-Jul-14 Drainage Area Number Basin If 1 in Drainage Area #1 II: DESIGN INFORMATION Site Characteristics Drainage area 191,008.00 fl' Impervious area 103,699.00 tt' Percent impervious 54.29 % Design rainfall depth 1.50 in Peak Flow Calculations 1-yr, 24-hr rainfall depth NA in 1-yr, 24-hr intensity NA irdhr Pre -development 1-yr, 24-hr discharge NA tt'/sec Post -development 1-yr, 24-hr discharge NA ft'/sec Pre/Post 1-yr, 24-hr peak flow control #VALUE! ft'/sec Storage Volume: Non -SA Waters Minimum design volume required it Design volume provided It' Storage Volume: SA Waters 1.5'runoff volume 12860.00 fl' Pre -development 1-yr, 24-hr runoff volume NA It, Post -development 1-yr, 24-hr runoff volume NA to Minimum required volume #VALUE! ft' Volume provided 12,956.00 ft' #VALUE! Soils Report Summary Soil type Baymeade Infiltration rate 1.50 iNhr SHWi elevation 47.00 fmsl Basin Design Parameters Drawdown time 0.95 days OK Basin side slopes 3.00 :1 OK;i"w Basin bottom elevation 52.50 fmsl OK \\ v Storage elevation 54.39 fmsl AUo q �O Storage Sudao Area 8,313.00 tt' L Top elevation 55.00 frost By-----_�� Basin Bottom Dimensions Basin length 150.00 ft Basin width 50.00 ft Bottom Surface Area 4,775.00 ft, Form SW401-Infiltration Basin-Rev.5 11Apr2011 Pals I. 811. Design Summary, Page 1 of 2 Permit (to be provided by DWQ) Additional Information Maximum runoff to each inlet to the basin? 2.90 ac-in Maximum of 2 acre -inches allowed Length of vegetative filter for overflow 1Wk ft OK Distance to structure nla ft OK Distance from surface waters 2,479.00 ft OK Distance from water supply well(s) nla ft OK Separation from impervious soil layer 3.00 If OK Naturally occuring soil above shwt 3.00 ft OK Bottom covered with 4-in of clean sand? N (Y or N) Must cover bottom with 4-in of clean sand Proposed drainage easement provided? nla (Y or N) OK Capures all runoff at ultimate build -out? y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Pretreatment device provided NO r'r 1. �.1 • �1 U.. � Form SW401-Infiltration Basin-Rev.5 11ApQ011 Parts I. & II. Design Summary, Page 2 of 2 Permit No. Ito be poWlded by DWO) O° WwtE9 .mRA STORMWATER MANAGEMENT PERMIT APPLICATION FORM NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, rdled out and submitted along with all of the required 'information. Contact Person Phone Number Date Drainage Area Number 757-322-4214 7d/3�/le 6,;,216 REV Basin It 1 in Drainage Area #2 ILC'DESIGKINFORMATIONF- .' Site Characteristics Drainage area 158.950.00 ff 6177 ]ln 2 1lj E tw fif2F �9 Impervious area 1O 067.00 it' q(e (, S3 Iv 2 AJ E , , _ FT PIE A Percent impervious 66.10 % ' Design rainfall depth 1;50 in Peak Flow Calcutatlons 1-yr, 24-hr rainfall depth i-yr, 24-hr intensity Pre -development 1-yr, 24-hr discharge Post -development 1 •yr, 24-hr discharge Pre/P0s11-yr 20r peak flow control Storage Volume: Non -SA Waters Minimum design volume required Design volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1-yr, 24-hr runoff volume Posldevelopment 1•yr, 24-hr runoff volume Minimum required volume volume provided AT ELEV S-'!.) S Solis Report Summary Soil type Infiltration rate SRWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage Surface Area Top elevation Basin Bottom Dimensions Basin length Basin width Bottom Surface Area :lee in 0.15 in1hr 015 ff'Isec 000, ft'lsec - 7o l5- ry'Isec to ft' �rGUL/ 5643o0 ff' 1'1.1i5, -7113 = 17— 8/(0_,,,, 1,90200 n' V/FA hoe 1=Xr$T."/N(7 13,84500 ry' 11943.00 it' %Z,S?298S(c QLuS 2./6/2=Sfl S'GL 51,53800 ry' Baymeade E W STi/JF� 'P4 e!d /T 1.50 'mlhr 45.50 fmsl 2.54 days OK 3.00 :1 OK 51.00 final OK 53.75 Imsl 18,53800 it' 54.50 fmsl 24000 it 54.00 It 13,554 00 ry2 Form Sw401-InOtraen Elam -Rev 5 11Ap2011 Pene'I. S H. Design Summary: Page 1 of 2 Permit No. (to be provided by D WO) Additional Information Maximum runoff to each inlet to the basin?. 2.00 ac-in OK Length of vegetative filter for overflow '. nla it OK Distance to structure , .nla - ft OK Distance from surface waters - 3',168.00", It OK Distance from water supplywell(s); nla. `. ft OK Separation from impervious soil layer s 3.0V ft OK' Naturally occuring soil above shwt 3.00 , .. it OK Bottom covered with 4-in of clean sand? y i '(Y or N) OK Proposed drainage easement provided? nla'. (Y or N) OK Capures all runoff at ultimate build -out? y `(Y or N) OK Bypass provided for larger storms? - Y :. (Y or N) OK Pretreatment device provided Forebay Form SW401-Infiltration Basin-Rev.5 11Apr2011 Parts I. 8 II. Design Summary, Page 2 of 2