Loading...
HomeMy WebLinkAboutNCC231688_ESC Approval Submitted_20230606 Iredell County Planning & Development Erosion Control Section I RED E L L 349 North Center Street c o u N P.O. Box 788 Statesville, NC 28687 Date: May 251h 2023 LETTER OF APPROVAL WITH MODIFICATIONS Andy Gibbon EC New Vision Carolinas, LLC 500 Stonehenge Parkway Dublin, OH 43017 RE: Project Name: Courtyards at Lake Davidson Acres Approved with Modifications: 53.0 Project ID: [REDE-2023-092 Project Location: PIN 4654184695.000 Submitted By: Odom Engineering, PLLC Date Received: May I9'h 2023 Plan Type: New Dear Mr. Gibbon: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and herby issue this Letter of Approval with Modifications. Modifications must be received in this office no later than two weeks prior to the project start date. Failure to submit modified plans can result in a violation and fine under the Iredell County Land Development Code. The Modifications required for Approval are listed on the attached page. The Certificate of Approval issued by Iredell County must be posted at the job site. This plan approval shall expire three (3) years following the date of this approval as is required by Title 15A NCAC 4B.0129 and Appendix H of the Iredell County Land Development Code. Title 15A NCAC 4B 0118(a) and Appendix H of the Iredell County Land Development Code requires that a copy of the approved erosion control plan be on file at the job site. Any amendments and/or revisions to the approved plan must be reviewed and approved prior to implementation in order for the site to remain in compliance. Failure to submit plans for approval may result in administrative actions and/or penalties as indicated in the Iredell County Land Development Code. Also, this letter gives notice as required by G.S. 113A-61.1(a)and Appendix H of the Iredell County Land Development Code, of our right of periodic inspection to insure compliance with the approved plan. Iredell County's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the Letter of Approval with Modifications Courtyards at Lake Davidson May 25th 2023 Page 2 of 3 commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Iredell County Land Development Code and the Sedimentation Pollution Control Act of 1973, (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act and Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. It is the responsibility of the applicant to obtain all other required permits or approvals. As of May 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov ncdenr.gov or Paul Clark at Paul.clark`ii ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. As of May 1, 2019, a$100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it is required that this office to be notified of the proposed starting date for this project. Failure to notify this office of the starting date may result in a Notice of Violation and civil penalty. As required in the approved plan construction sequencing, please schedule a preconstruction conference with our staff prior to land disturbing activity. Your cooperation is appreciated. Sincerely, ::;7Peryle:VIt at Jonathan Williams, CESSWI Erosion Control Coordinator Enclosures: Modifications Fact Sheet on the New NCGO1 Permit Permit Letter of Approval with Modifications Courtyards at Lake Davidson May 25`h 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Courtyards at Lake Davidson Project ID: IREDE-2023-092 County: Iredell Reviewed by: Jonathan Williams Required changes are designated as "RC" under legal authority from NC General Statutes Chapter 113A Article 4 and the Iredell County Land Development Code. Suggested changes are designated as "SC" for improvement of the plan. I. Provide erosion control protection on the down slope sides of proposed well access area on the northwest corner of the site.—RC 2. Install diversions to carry runoff to Sediment Basins 3 & 4 in Phase 1 to ensure as much of the drainage area as possible enters the basins behind the 3rd baffle furthest from the skimmer.—RC 3. Ensure silt fencing protects the entire downslope side of Sediment Basin 5. —RC 4. Space all basin baffles as evenly as possible between the diversion entry point and the skimmer.—RC 5. Ensure any potentially exposed junction boxes and yard inlets are protected upon installation in Phase 1. -RC 6. Increase Sediment Basins 1, 2 & 6 emergency spillway depth of flow to a minimum of 0.9 feet.—RC 7. Increase Sediment Basins 3 & 4 emergency spillway depth of flow to a minimum of 0.8 feet. —RC 8. Increase Sediment Basin 5 emergency spillway depth of flow to a minimum of 0.7 feet.— RC 9. Adjust Sediment Basin 1 skimmer orifice size to 1.75 inches to dewater the required basin volume in as close to 3 days' time possible (2.59 days). —RC 10. Adjust Sediment Basin 2 skimmer orifice size to 1.75 inches to dewater the required basin volume in as close to 3 days' time possible (3.15 days). —RC 1 l. Adjust Sediment Basin 3 skimmer orifice size to 1.5 inches to dewater the required basin volume in as close to 3 days' time possible (3.06 days).—RC 12. Adjust Sediment Basin 4 skimmer orifice size to 1.25 inches to dewater the required basin volume in as close to 3 days' time possible (3.36 days).—RC 13. Adjust Sediment Basin 5 skimmer orifice size to 1.25 inches to dewater the required basin volume in as close to 3 days' time possible(2.7 days).—RC 14. Adjust Sediment Basin 6 skimmer orifice size to 2 inches to dewater the required basin volume in as close to 3 days' time possible (2.82 days).—RC 15. Develop the site in 20 to 25 acre max disturbance phases. -SC