Loading...
HomeMy WebLinkAboutThunder Swamp - UMB - Buffer Credit Ledger 053123Transaction Number Sale/ Release Date Purchaser or % Credit Release Project Name HUC of Project Square Feet Acres Square Feet Acres Square Feet Acres Local Gov't Requiring 1 5/19/22 52,435.473 1.204 0.000 52,435.473 1.204 DWR 2 6/3/22 DR Horton - Terramor LLC Winston Pointe (20041488 v9)03020201 10,856.000 0.249 41,579.473 0.955 DWR 3 6/7/22 Highfill Infastructure Engineering, P.C.Big Branch Sewer (20200597 v2)03020201 45.720 0.001 41,533.753 0.953 DWR 4 6/17/22 1258 North Main Development LLC Richland Creek Outfall Replacement and Short Extension (20220223)03020201 13,484.753 0.310 28,049.000 0.644 DWR 5 6/30/22 69,913.963 1.605 97,962.963 2.249 DWR 6 7/19/22 Lennar Carolinas, LLC Cayden Cove (20210782)03020201 23,025.000 0.529 74,937.963 1.720 DWR 7 8/3/22 Duke Energy PNG Line 142 Pipeline (20210364)03020201 69,913.368 1.605 5,024.595 0.115 DWR 8 8/17/22 Bonaventure Property Company, LLC Angier Avenue (20211730)03020201 5,024.000 0.115 0.595 0.000 DWR 9 11/30/22 34,956.982 0.803 34,957.577 0.803 DWR 10 1/25/23 Pulte Group Saunders Farm (20220011)03020201 606.000 0.014 34,351.577 0.789 DWR 11 5/15/23 34,956.982 0.803 69,308.559 1.591 DWR 12 5/31/23 Novo Nordisk Pharmaceutical Industries LP Novo Nordisk Site Capacity Expansion (20150465 v2)03020201 34,351.577 0.789 34,956.982 0.803 DWR 192,263.400 157,306.418 34,956.982 Task 4: Credits Released (10%) Task 3: Credits Released (10%) Task 2: Credits Released (20%) Task 1: Credits Released (15%) Total Credits Released to Date: 192,263.400 square feet ENVIRONMENTAL BANC & EXCHANGE, LLC - RES 2022 Phase II UMBRELLA MITIGATION BANK Thunder Swamp Phase II, HUC 03020201 Buffer Credit Ledger 5/31/2023 DWR Bank Parcel Project Number: 2021-0306v2 Credits Released/Available to Bank Credits Debited/Sold from Bank Buffer Credit Balance