Loading...
HomeMy WebLinkAboutNCC231555_Site Plan or Location Map_20230523 ^ CONSTRUCTION SCHEDULE \I III I I I` �J / / / i / -- \\ vn0 I. Obtain all necessary penults and plan approvals.Erosion and Sediment Contrcl \ \ 0 m n (E&SC)permit and a C ficate of Coverage(COC)must be obtained before any land disturbing activities I / / / / \ �g o 4" occur.A copy of the E&SC permit,the COC and a hard copy of the plan must be kept on site,preferably in a fll II/I / / \ q P o o� permits boo,and costructii�l�dng insp«lion. es e / / / \ ` 2. Install gravel e e first,then silt fences,reinforced silt Etta outlets and wattles. / 7 SODDING T. 3. Finish clearing and grubbing any necessary areas on the lots as they are started. / / / m o 4. Begin lot grading and excavation activities ' \ _ / / ouse A ? ' 5. Begin or cough gads and construction. owaua.nsxuuaxco I / / 6. Finish all rough g.adivg and house conawction I I I / / 301 ]. Began driveways,walks and patios �� I II I V • / — —� • 3, 8. Begin fine grading of lot areas ^" \ I / / / illi 9. Final grassing,mulching and stabbreng of la.In most cases this will involve the installation of sod on the lot. 11 ^^\ ,� S[Ly �� P Po 5 1'F silt fence will remain in place umil the lot is sodded or gmseing is stabilized end takes hold. M�� cxosrrorwruraixa vlcres. I II I\ \\ I C / �' 10. The contractor shall conduct self-inspections of the erosion and sedimentation control measures and complete I \ / -- ♦ the following mbner self-inspection farm found o the DEMLA website �!= eAmesocoeaec MU I 1 � /� Lm rvG exctaosnos http I/fl /cdeq/Etter¢v%20Mmeral%20aud%20Land%20Resources/S MPDES%.20 wssD armsnuto ��• Gen I/20P s/DEMLRCSWM logF R Agut82019pdfT I th (complete MA*csoocurrrnwstea Inspectionf shall b keptle d evadable f p all f recommended copy be M / '�,_ ep p b (09113A54T()ISA NCAC04&0131 NCGOIP Bib A dB) �/((/ RUS35<S >,�1�f��L �, Il Self P f d dt 100,0 b P rf d I very seven I `\ I 1" ,� calendar days d ti 24h f ery t of greater h 1inch.Ay ridropershall be /-----) V. / ON lit W ` SR 183A mad Immediately to m in measures as designed.All ESC measures shall be a[wined as specified to / ne rn ,:: sr,CINTO ROA• the construction details on this plan A rain gauge shall be installed at the project site for monitoring. „„'�• I �" ,N ROD DOVA3'N6 12. Inspection and final acceptance letters.When the project is complete,the penninees shall conmct DEMLA to / .� close out the E&SC Plan.After DEMLR informs the permiaee of the t close out,via ins ection I' j / I \`` tie permiaee shall visit`deq.nc.govMCG01'to submit an electronic Notice oPtermivatiov(a-NOT).A SHOOII 1Ild , / `D �� �' rust Several pemit feewdl becharged wtil Na cNOT has been Hued out / / \�� 1 al '.16flI1, II1so �� GROUND STABILIZATION wlmmaaPlaT. �n maaeclaMOWN/HEN THE SOD IS nX2e a � Ir7H � ' , SITE AREA STABILIZATION EXCEPTIONS APPEARANCE OF GOOD SOD �� 1 / VI INITY AP DESCRIPTION TIME FRAME i / / \ / -p NTS. PERIMETER DIKES, 7 DAYS NONE I// CONDOMINIUM 1 PW° 1 SWALES, DITCHES °' TRACT (EASEMENT —\0p ST \ &SLOPES °n'"°""°"` zf'�_ HIGH QUALITY 7 DAYS NONE n°Faa ' I I I 11 / 32 O Dom/vA fpgSE - WATER ZONES °"`'°'r°'°'"`"' M- (How) re"_aemat q 31 SLOPES STEEPER 7 DAYS IF SLOPES ARE oaa,vexa III I I / 1 0 •9 :8 A SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY THAN 3:1 10'OR LESS IN _ Fir NCGS 113A-54.1`IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR LENGTH AND ARE Genera Erosion Control Notes / 1 COMPLETED AS AN EXCEL SPREADSHEET. NOT STEEPER AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED THAN 2:1, 14 EROSION AND DAYS ARE 1.Only the areas shown shall be disturbed. \ SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A ALLOWED 2.All disturbed areas shall be grassed and e ,i - / NCAC 04B.0131 STATES THAT-...DOCUMENTATION SHALL BE ACCOMPLISHED BY mulched as soon as possible and maintained N� POND LOT 06= -- --- INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE SLOPES 3:1 OR 14 DAYS 7 DAYS FOR until pemanent cover is established. \\ _ ` /1 BL U; APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, FLATTER SLOPES GREATER O IT1I CON'R CTON 2 TT DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, THAN 50'IN roj �¢2�B� Its S Lot lan 3 SiLL'Dj�� 20 Irjririvir PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION LENGTH O Z I 30' \ \ "A" Lot Plan 4 +�[TJ CONTROL PLAN." KKS J"� L/n,. - "A" ALL OTHER AREAS 14 DAYS NONE(EXCEPT 2 i CONSTRUCTIO WITH SLOPES FOR PERIMETERS pp i- H4 LIMITSFLATTER THAN 4:1 AND HOW ZONES) // - -�=86 e8DATE: / � 4�• :. PAGE: r" DATE. PAGE: I�� /�/ \\ \\ , B-4S 4111! /tM Aro Silt s«k/Wattle SltSock/WPme N b E" r' —n " 111� //�/ \ / \ "�f- D-• itry� 10 Ir011111r4rilpill.P" P FLOW---,..._ M0 �I Area be ubs'ua°iee°nor " a u / EMI-" °ZFs-Ttdgt may �� 7" (� /� il��stakea ,2 'I =11.Jf, 1 Fill Pall Sock/wattle Stage S uniformly n°sere°el ro� ¶ R i i R // � � /////// V 1 0=�� `� x 2 gth netting nd the toe of a SECTION BEa aNWadedSlope tie:ock/Smum of 10feet ock/Wattle(s) It 1 1 1 w. �// plpQ aw f // !ilirkU 4c ' 30 13 UO� �� land .The eneaame 1t I .art 1ilirilliRo A.a°•. Ra flat m%i laingamaaallhe end otme ^^ U�LJ IJ �� J ■G A LJ ' L J FrU�e �llg '� sock/wattle(s) IOP•ronr .ta°•. Prevent run gang er°uMt en u 0 sat sock/watae(s). I 4. Oak or other durable hardwood stakes with a 2 tl' HU VA :HU NAY 1t0 WAY �HU AY HU AY �HU WAY SRO AY / I��Jj� O� Inch x z Inch cross aecti°n should be driven rL l: w�IlyPamb. Pe i'dhe crretire chore � �tnrougn the cenmrof me sin Notes: et or CURB INLET 1.If needed,Tree Protection fencing should be installetl along the buffer zone,wellantl I I 7rnawrnurn interval of .° boundary and/or around protected trees,providing a radius of al least 1.25 feet for eachIII W l'Wood Mulch or Com s g nda Mm sett tee in ealncn LEGEND inch of trunk diameter. / a, �. \hen UNTRENCHEDTo INS height of ALLATIION°9 awls.=.tic.uo.m,vnr.awa.n,crea"sr:re.sswsan.w,:. 5. bleMa h m N 2.Ins[all Sil[Fence on the low elevation sitles of eaeh lot.Install Sill Fence outlets shown On I .*Oft ,..9 1 Jf`[I/� NEO INSTALLATION con ereµte Mock shall b used behind n schemat c/diagram and field adjusted,if necessary,for placement M low points.If lots are tr, �/s°ck/wame d hold n In Place during ninon events. ontiguous and have different land owners or builders,each lot should have Individual Silt / Bats GIG W Fences. �-/ 1D E t.Nlnepect aEi socMwanM at least weekly and otter ® 3.Install required Bilt Fence within l0 feet of properly line to ensure there i6 no conflict with III filiii each 1 inch or greater rainfall Remo. septic system.It is the responsibility of the builtler to ensure the Installation of sediment Mulch or cold aMPos Stec wmu now RATES asneed to allow CURB INLET ENTRANCE control measures does not impact the septic system and repair areals). for umreechee se Area m a.Pnit•�P°'olenae.cam. az Ana z. aloe Mrat equate flow ogg r 4.it i'd:rn::::i constructionentranterexusto bemstauedper lot ! CONSTRUCTION t soh nml° ( nm)(won m)(6�nm) nm) e,I°w S. :t'''aetr:tterhles:dn::f ntl other areas tletlicated formanaging builtling material waste shall be etysneer Flmv away from storm drain Inlets or tlrainage ditches unless Il can be shown thatI7III Wom ;siltt6«k/xLensthre(axl flea":) (uaam] a b°°tf°p18�n,°1ia native exists.if this separation cannot be achievetl,theseareas mustbe_ coot le x re°,,sums T. ,0 pos m1 I oo I'1:7 shind Sut Fence. Iu c e jx s,n%n ni%x ni%x %x B. reamof disturbances shouts beprotected;streetsshouldbe sweptwhena (w (r41 (1ae (2sr (St♦ n hives ° tlimenlfm theconslmclion activityis present 'll if ed I/re/nil /^'/^') /m/"') /^'/^') /ni/ni) measure assbrenpem,a army aie°Iah°ven _,\NC-EnvironmentOl.jpeg ]. o ltFence,Slll Fence Outlets,ConsWclion Enlmncea and other measures are (..,..,..,_ 1 .\NC-Envirosxue,rlul.jyey sus cxsrtvenle"�s sn nbesmsoeaee until laid r r provided on additional sheets.Erosion and sediment control details are not drawn to scale. ----- SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION ,-,,=OATS„-I,:, TYPICAL LOT LAYOUT WITH CURB AND GUTTER J DATE: PAGE: DATE: PAGE: lain / , - -, Filter Fabric �t; 111: ----111111:------;117:1------:-111111'----7 Steel Post eMax.Extreawen9n°9a'k "itI nhwlre fr Wre Fence Plastic'oee ' ' Badkfill c°mtrenchact /�I ��new NPNx,re kn A Steel Post thoroughly S'r I r _ 1 �IPPS ktdu I /i Wire ties 1 1 9�In xO°^/N..24' '"tie E6'e a4 leoparda gw•a�nn / A i I tr, niter Fohno ' eve --- CROSSSEC SECTION / � :fr = a m,� urn"„�,ren�nwm6 Mn � / 2 Ensure entelw �,.""ea fences.rem re / , , / P"mrerem.dx rum„nwnnrn.re necessary securely t rem. M.nm".ru,c°nrevs rtre"mere,an°tie"a, "eP•avakme"�ewa can°uceaw.ksaan.eacnt.an°rgeele •=44 6 P d'Cone mmdmey- �v ti / I /truer rN enrceuarNaewurm,e -•• •• 3i s�• I / � / commam,eheurpexMre.6ewre ",,, umuxeammentaeP,msamuremeC^ - Man °lit: 1���,alreld,'wm recta anePµ.Pbl�anahM ream and grads 10�nawa�.. ---4 . d,me,mre re wmnin� �enrem.ream amh�mxrr.re. ecru re da. stab.r to a M�Tog sdaabele oat n in gin: ove°eblech°n°nemmat a' was as°°ked° c , / ,J.Pag.�hMhw� cos ��\NC-EnvlrTmealul.(ccy \Ne-Envb menegl.lpeg .SILT FENCE CONSTRUCTION ENTRANCE/EXIT � PAGE1of2 )1111:111 DATE PAGE: MIN. _ son TOTAL DISTURBED ACREAGE: 0.30 ACRES + LOT EROSION CONTROL PLAN 1 - ,.IIIIIIIIviiiIIIIIvIIIIIIII I - - MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION LOTS 2 & 3 -- COMMONS AT • General-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be TREwaEAtL j TOP OF SILT FENCE ! i - �v relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained es suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. - I • - Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove NI RIVER BLUFF STEEL FENCE ST 17,7 objectionable materials spilled,washed,or tracked onto public roadways. WIRE FEN HARDWARE CL TH FRONT VIEW Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure FOR �ctT FILTER R FABRIC IN that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. AND HARDWARE FILTER OF wasoeo sro SET MAX APAR� Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth PA M I REMODELING C O, INC. MIN IV INTO ON GROUND FA GROUND solo and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. CROSS CREEK TWP. CUMBERLAND COUNTY re w low el2G areas and Grassing and Mulching-The area to receive grassing and mulching should be properly feRilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be it fence at least 12 inches VS P SCALE: 1" 100' MAY 2023 one eon xni. repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. 1.Per NCO.01.Inspect outlet at lest VICO a week Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed BURY WIRE FENCE MO twnow CLOTH GRAPHIC SCALE n:e> moss,,ewlely h 1 � 1U0 0 50 100 200 400 HLTER FAealc IN taeuE oa`'"gKeep memdeensadequam sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water.now - 11 provide 4 Ream.mormo man MX*tome outlet.covered 6.Replace stone as needed to facilitate tie yarenng. Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout Remove and replace stone as necessary as it becomes clogged with sediment.Remove all SECTION VIEW fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. ( IN FEET ) ..\NC-Envirermen LetJpey 1 fnch = 100 Pt J ,..r.. SILT FENCE OUTLET MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 PHONE(910)484-5191 FAX(910)484-0388 LICENSE#F-0106 LAST SAVED:4/22/2023 B:42 AM LAST PLOTTED:4/27/2023 11:14 AM PLOTTED BY.Dennis Gibed FILENAME:G\CURRENT JOBS\PAMI REMODELING CO\23-2695-01 RIVER BLUFF-EC\PLANS\RIVER BLUFF EC-LOTS 2&3.DWG