Loading...
HomeMy WebLinkAboutNCC231487_Site Plan or Location Map_20230517 CONSTRUCTION SCHEDULE P I. Obtvnanemlit pe rmits and Ito vale.Erosion and Sediment Control / m occur. permit and a&SC p permit, t,Coverage d a ha most be the obtained before aany kept land disturbing activities ASELF—INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY .A copy of the E&SC permit,the COC and a hard copy of the plan must be kept on site,preferably N a NCGS 113A-54.1"IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR GROUND STABILIZATION permits box,and accessible during inspection. COMPLETED AS AN EXCEL SPREADSHEET JTAULZATON 2. Install gravel construction enrcancesf Sthen silt fences,reinforced silt fence outlets and wattles. AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED i 3 Finish clearing and grubbing a,necessaryareas on the lots as they are started. EROSION AND SITE AREA STABILIZATION 4 Begin lot grading and excavation SEDIMENTATION CONTROL PLAN THAT IS REPT ON THE PROJECT SITE.RULE 15A EXCEPTIONS ,P',•'1. , \ s Begin oraom,nue with houseactivities. on e DESCRIPTION TIME FRAME 4111111V6 Finish all roll adtn and house NCAC 04B.0131 STATES THAT"...DOCUMENTATION SHALL BE ACCOMPLISHED BY CITY OF8h gr g0° s INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE ^ ��` 7. Install driveways,walks and patios. ctiv be VASS7. �. 8 Begin fine gmaingof lot are APPROVED EROSION AND SEDIMENTATION CONTROL PLANI OR COMPLETING, PERIMETER DIKES, 7 DAYS NONE ito SWALES, DITCHES 9 Final grassing,mulching andstabilizing" floc In most cases this will involve the installation of sod on the lot DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, &SLOPES ', P grassing stabilizedPRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION °A' '1 The silt fence will remain I I the lot is sodded or and takes hold. HIGH QUALITY 7 DAYS NONE 1CONTROL PLAN." 1p 'the contractor shall conductIf' s of the erosion and sedimentation control measures and win late WATER the following combined seer-inspection torn roans on the Deoec webaite THIS PROJECT IS IN A TEHO ZONES 4' �/ nnpa:Ofilea.ne.govmuaeg En gyizomm mlizoana azoLana uzoReaomee sto mwaterMpDEs ozo General Erosion Control Notes HIGHQUALITY WATER ZONE Generalon'1E film'Mca-esW-Mnnee'ring-eom,s-wove'agnst-s-zol9.pol'.Tweroemonmsofcomplere SLOPES STEEPER 7 DAYS IF SLOPES ARE <�e a°� �w� iept inontomts box.(GS I I A-54.1eedoeSAable foeinspec131,NCu 0mes.0 is Secommenaede copy be Pursuant to G.S.113A(3),provisions for permonent ground c sufficient to 1, Only the areas shown Shall be disturbed, AND ALL REQUIREMENTS THAN 3:1 10'OR LESS IN ' kept oecpermas box.(OS usA-saJ(e),few NCAC 04B.OfTt,NCGOf partmsectionaAand e) ,strain Bros must be accomplished for all disturbed areas within14 REGARDING SENSITIVE AREA LENGTH AND ARE „:°wN II. Self-ina ecfionsforerosionandsedimentationcontrolmeasuresaretobe performedworkingdays erosion 60 calendar days(whichever is shorter followingcompletion 2.Temporary ground stabilization is required within 7 days on all p p dry sevenoys ys(w ) co p WATERSHEDS SHOULD NOT STEEPER calendar days and within 24 hours of every rain event of greater than I inch.Any needed repairs shall he f construction. areas. BE FOLLOWED THAN 2:1, 14 5N made immediately to maintain measures as designed.All ESC measures shall be maintained as specified in DAYS ARE the construction details on this plan.A rain gauge shall be installed at the project site for monitoring. 12. Inspection and final acceptavee letters.When the projerxeocomplete,the permineea shall contacthor cept m ALLOWED t ctose out the erase plan.wfter l)EMLR informs the peret ets otee projeerftoe out,via inspecion repod, SLOPES 3:1 OR 14 DAYS 7 DAYS FOR the permintt sM1ell visit"deq.ne.govMC001"tosubmit an eleetronio Notioe ofterminafion(e-NOT).A$100 FLATTER SLOPES GREATER annual I fee will be charged writ the nNOT has been filled out. \ \ THAN 50'IN VICINITY MAP °a g`" ° l' g , ) OPEN SPACE vv A(NOT TO SCALE) / �� / \\ GTH �- AREA#3 I 11 1 \ V ,y+, ALL OTHER AREAS 14 DAYS NONE(EXCEPT i / \ N ` WITH SLOPES FOR PERIMETERS / I / .) I \ \\ FLATTER THAN 4:1 AND HQW ZONES) I / / A \ 4111p/ / :------- ,;t,,) ' —\ \ ( \ 1 1 THIS PROIEGG IS INA 1 \ ` THIS WATE ZONE , —------—— 4114\1" ,(e I \ )DRAINAGE ACCESS \ AND ALL REQUIREM bLTS • \� & \ \\\ -EGARDING SENSITIVE AREA DATE: PAGE: lT `\ i�� \ \ / \ \ I, EASEMENI\MAINTENANCE \ �,� WATERSHEDSSHOULD \ e "'\ \ \ I \ \ �./\ \ BE FOLLOWED rF n9 L �� �% i i I I , ,I \ \ �� eve\\/\ \ \ 7SODDING 1t S III I� I v � � � I e e a �� 4°/ , \ // A 'ads V A V 6 ' 0 LAY SOO INA STAGGERED 4if..... 4 II 4 I ' I ,� .� I ,_. I / // 1 \ \ \ ` \ \ 67 1 fir• ':: R` ll I ,P JH 1l I I z s. DRAINAGE CCESS / / 53 \ —— \ 65 NOT OVERLAP.ASH/VIM.° eI �I:;J ��ul A. —. L �� J aI� \ 64 \ \\ naAan n,MM, >eaea —HU1aY 11U NAV H �HU AY HU NAY —HU WAV —HU AV / MAINTENANCE I \O�OFwm Notes: u / FASEI�ENT \ \ \ ` • \\ \ \ // aim E"°s CURB INLET 1 If needed Tree Protection fencing should be Installed along the buffer zone wetland \ \ \ \ 1 \ \ '� I / up Rsc-nC SOD CUTFER MIST a boundary and/or around protected trees providing a radius of.least 1.25 feet for each \''''' q /I \ \ \ 1 62� �OU / LEGEND nchof trunk diameter Min / 400 \ \ c'WI /2 Install Sllt Fence on the low elevaf on s des IN each lot Install Sllf Fence outlets shown on ro q / a) \ \ s AYN \ I /FLOW N schematitld agram and field adjustetl f necessary,for placement at low po nts If lots are / \ \ <,�P cT/ CO \_ coot guous and have tl fferent land owners or bu Itlem each lot should have'ntl Vdual S It 'q eel 1 \ 1 \ \ / SILT FENCEFences. 2 SILT FENCE OUTLET ® 3 Install requredSilt Fence wifn' 10f t tip peaylnetaenaaremere'anoaonnaaMth 11 \ Lot Plan \ \/ 3 ENTRANCECONSTRUCTION septic system.It s the responsibility f thebuilder t theinstallation of sediment40 �\ \ °„A„a 4 \ \ CURB INLET m control measures does not' p thesepticsystem tl p ree(s). 4 Atl at and Construction Et IEt' b installed per It. s Waste bens and oaar areas dedicated rmanaging building fetal woofs anon beat ( �� 1 \ ,� > 61p 'il, 5 ��\\ I t i flfl, IIB • MOW WHEIV THE SOD is least 50 feat away hour eta a 'Ito drainage ditches leas t can be spawn that 47 �� T / , ARFgCF / ——— / c% gs/ no other alternative ex sts If this separation cannot be ach eved these areas must be rvc i .G w.n, rAR Asoou`.°sr"soo s" EMOWER contained behind Silt Fence \\ 41k1( s N �',.\ / ,/ X %ra'W / Es°` LAID. RaH,=a, 8 Inlets downstream of disturbances should be protected;streets should be swept when g CONSTRUCT/ • sediment from the construction activity Is present , l \ Q Nir ' :'4 E /'� 5jg / \ APPEARANCE OF GOOD SOD \NC—Env'ron mental peg T Details for Silt Fence Silt Fence Outlets Construction Entrances and other measures are \ • ` ce• ACI PI 1 ` I / \ provided on additional sheets.Erosion and sediment control details are not drawn to scale. '+V 1 / III^ I I I I ------ TYPICAL LOT LAYOUT WITH CURB AND GUTTER \ `�RE NF q 60 I \ I 41I�IIIV�OV�^I II�OJ matoLonEanuivAnio II u.r,wx .r eS NQur EC l /.... 5m 1 /' A. ., 1 HIS PROJECT IS IN A HIGH DUALITY 1 ,„/-...:'44t// 'I ",rwe'NCE`"1ON 1 I 10 /'\\ \\ -- - gal4ga"'. °°"'"°°`WT WATER ZONE AND ALL REQUIREMENTSoI Iv / \ 11 _ \ \ \REGARDING SENSITIVE AREA }, \ ---- \ WATERSHEDS SHOULD BE FOLLOWED 1 /!�43^''I/ \' I I / \ DATE: PAGE: ` / \ OPEN PACE I ,ATrL// GO 1 12 ,' / \\ \\ Filter Fabric gg 42 \ AREk#1 / _/ tiOS Steel Poet str Nefekte labia.. ' Wi.e `\ \\ / I / 40 I A' �a \ 14 / / dry' �' \ i B'MaxStandaN , ' Backfill trench ,- / C Max.Extra strength fa ho without wire fence Wire Fence and Compact / 1 GO 15 // / // \ \thoroughly / p6/ ,c/ ,' Steel Post ` �� / A V-<5' / / • MAINTBNANCEO R LOT CONSTRUCTION I — t\ V / / / \\ // I 4 I \ / I,inspect Any sinaelure used to trap seckne.and clean it otit as lonnaately remove all ob,ectionable materials PWre ties I 1 te-za• } /�-— ( y� 07 //oRAINAGB ACCESS N\ / I \ 17 \\/ / IT I 'I // / / i Ns or tracked onto t once a week and eller each immediately. e,y / / MAINTENANCE > ) 1 �p /.S .V.1W'-HIS PROf)1ECT IS IN A HIGH-0U LITV poses q ...Ups. 1 — I I e�un / I / / EASEMENT / el / TER ZO EAND ALL REQUIRE E neon ' I 7 /' / ( 1 / • REGAFIDING SENSITIVE AR ( / ao== e aownaa forward along �\\ , 1C, - %`o: / TERSHEFS SHOULD BE F• .)WED I (I / Sodding-The sod should be properly mainIsined to Insure that Me grass take holds in Me areas being secured.The sod shook.watered as necessary _ I /I. i // /' // N� 1 \ Lot Clan 'i/=po/ I t fe a p a 4 ter Fabric CROSS SECTIONVEW \ / ,. °I 1 ( / Grossing sod Mulching•The+rut to receive grassing and mulching should.properly renilized and limed as necessary as an inMal step in soil preparation. m..=.,a. �a n,aarea_ -\ i — �\ ,` 20 0„..„,..in,has been placed..arnid be maintaim.as nealed to insure thz ell areas are germaffig properly.Any hare areas mla.repm.a. j y\ ) I ���2 I i \ growing permitscon mum°.r.e�..., e w aao;teb m.. e°..em°mwarew. °O...°...... / \ \ General on Control Notes l \ 21/ 'Ig I I ��• I 1 \ \ / lvve been no breaches in Me hem Berms shall not exceed weekly markerin height.and shall be placed in locations.will not interfere with home constructon activities. rated into Me graded lot area °m.,m.mae,tt,•e.aa.v .� Oer.,",n..mm=s�.m. tow° # / _mT.�maw tfeMmg Is Nit on 1 s� mt.,fe,na��waM N w ere. Po.atrmron .wh wa area,. / 22/ / I \ 1 \ 1 / „ere..M.a .w. a, �..., ammo maree°aam. ovine R .a°°wma,a,,,,,, nrete �a =M 7. ae0l.a,° a.w�..e_of,a.pinandymeanomumb,M,. e tr ..M,mtrGeneral-All measures will be inspected and conections made after runoff producing rainffls.or at least once per week minimum.The builder will insure that Me �.t n=a=ren �.penrate... , construction activities on.m.w w�.m.bmnnrmm.a.a=.mee Thorough wins...w°aa.e°ar-.me®m®nre°aerecicre. / / THIS PROJECJTS INA / I'+I II 1 \ \ ,o.w..wmnnr r.N.m=n,r a.�. J 2 HIGH-QUALITY ZONE ••.� , /23/ I / \ \ I 1 particularon , control measures.If / AND ALL RE UIREMENTS �J / / / / ` are uw,oa wao-o N\ / REGARDING SENSITIVE AREA I / 1 \ IWattles- re maintainedal far sedimcntedien runoff is eliminated as much es.possible.Silt fences and gmel construction entrances will lx. ales shall.inspected after sipificant rainfall events.Rills or gullies upslope of the wattle and any undercutting is.he repaired.Sediment ssuggested / W�'TERSHEDS SHOULD / / / ) \ ) I 00 I �\ / / BE FOLLOWED 0/ / / / \ I I rearreera.wneataap \NC—Environmental Ipeg \ \ / 1 A / / \ \ / 'Sty/ / a I SILT FENCE pressure ro the f= Mreplace,wn= nw // / I I nn,tutane= as 4kt /fti pp_41101 ItPillr, / I I I l ,�\ 30 / DATE: PAGE: ., / i 29 1 /,/ / aMIN _1 ` FENCE J �/ PAGE 1 of 2 • I` 11111111 11111111 II I I I II I_I /� 1 /� �/ .� LOT EROSION CONTROL PLAN r / S�t�e TOTAL DISTURBED ACREAGE: 0.95 ACRES if THEW I OPEN SPACE ���4 // / / / SO' / OF „rnToTeEcT` FRONT VIEW ���e\ AREA#2 AoROh /, // //Sow LOTS 99, 43-46 & 61 WIREBURT WIRE FENCE,FILTER /' �� / / / THIS PROJECT IS IN WINDER STATION FILTER OF �' / / HIGH-QUALITY WATER ZONE WASHED STo o al CLOTH IN TRENCH Geilfe /...../ // l / AND ALL REQUIREMENTS s / / REGARDING SENSITIVE AREA 2'FILTER FABRIC ON n/ `b/ / WATERSHEDS SHOULD FOR cos zs� ,.Hardware cloth end gravel should GROUND aaeeonhemroaartroRa. aaonmDalavaaoRa,aaaorlay tile silt fence O least n=eam / /' BE FOLLOWED aaRYwIREFENaEANoHARow aLoTH '� E sp.oan 0S,e 2.Slone outlets.should be IetatlxtanceaweekandatereacIinc General Erosion Control Notes DREAM FINDERS HOMES, LLC FILTER FABRIC IN TRENCHa Keep mesh free of F Complete mil exquired ceeds immediately. / /' / reds. IN THE CIT' OF VASS 5. Replace OOeasne edtora`r'"e°dPW8'er' / // McNEILL TOWNSHIP MOORE COUNTY, N.C. ..\C—Environmental.jpeg BEa aNa1EW ( /' N / SCALE: 1"= 100' APRIL 2023 ,-, - -11.-,., SILT FENCE OUTLET GRAPHIC SCALE IN FEET ENGINEERS 0 D -too o too 200 300 coo N PLANNERS SURVEYORS MOORMAN, KIZER & REITZEL, INC. 115 BROADFOOT AVE. FAYETTEVILLE, N.C. MOORM AN,KIZER & REITZEL,IN C. PHONE (910) 484-5191 FAX(910) 484-0388 License #: F-0106