Loading...
HomeMy WebLinkAboutNCC231486_Site Plan or Location Map_20230517 CONSTRUCTION SCHEDULE / P I. Obtain all relit pe rmits and Ito vale.Erosion and Sediment Control m occur. permit and a ESC p permit, t,Coverage d a ha most be the obtained before aany kept land disturbing activitiesblin ASELF—INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY .A copy of the E&SC permit,the COC and a hard copy of the plan must be kept on site,preferably N a NCGS 113A-54.1"IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR GROUND STABILIZATION permits box,and accessible during inspection. COMPLETED AS AN EXCEL SPREADSHEET JTAULZATON 2. Install gravel construction enrcancesf Sthen silt fences,reinforced silt fence outlets and wattles. AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED A 3 Finish clearing and grubbing a,necessaryareas on the lots as they are started. EROSION AND SITE AREA STABILIZATION 4 Begin lot grading and excavation SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A EXCEPTIONS �', / \ s Begin or rnnbnae with houseactivities. on e DESCRIPTION TIME FRAME 4111111V6 Finish all roll adtn and NCAC 04B.0131 STATES THAT"...DOCUMENTATION SHALL BE ACCOMPLISHED BY CITY OFOM 8h, 8m s INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE ^ ��` 7. Install driveways,walks and patios. ctiv be VASS �. 8 Begin five grading of lot areasAPPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, PERIMETER DIKES, 7 DAYS NONE SWALES, DITCHES 9 Final g gee mulching andstabilising of lot.In most cases this will involve the installation of sod on the lot. DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, &SLOPES ', P grassing is stabilizedPRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION C°A' 1 The silt fence it remain I self-inspection decorandmkeshold. HIGH QUALITY 7 DAYS NONE 1CONTROL PLAN." 10 The contractor shall conduct If' s of the erosion and sedimentation control measures and win late WATER ES , 9 ,$p� '/ nnps/�files.ne.goe eodseEnergy%zOMineml%zoand 2ALana%zoeesources/smrmwaterMPDEs%zo General Erosion Control Notes HIGH-QUALITY WATER ZONE Gmmal%2OPwotils/DETPLB-stun-5eonamung-Fosse-Rev-wagnst-8-zolg.pdt.Twdvemmms otmmplem SLOPES STEEPER 7 DAYS IF SLOPES ARE <F e +°� inspectimtonns sbau be kept oe site ana avaaable ror inspection et au times.uis recommeededa copy be Pursuant to G.S.113A(3),provisions for permanent ground c sufficient to 1. Only the areas shown Shall be disturbed, AND ALL REQUIREMENTS THAN 3:1 10'OR LESS IN ' kept inapermas box.(OS 134-sa.l(e),Isw NCAC 04B.OITI,NCG01 FartmsectionaAand E) entrain Bros must be accomplished for all disturbed areas within14 REGARDING SENSITIVE AREA LENGTH AND ARE „:°w^ II. self-ins eetionsr erosionavasedimmtpttvs enrcolmeaaaresarembeerr edatleaatoeoeerworkingde erosion BO calendar days(whichever is shorter following 2.Temporary ground stabilization is required within 7 days on all ll p p cry seem days ys(w ) WATERSHEDS SHOULD NOT STEEPER calendar days and within 24 hours of every min event of greater than inch.Any needed repairs shall be r construction. areas. BE FOLLOWED THAN 2:1, 14 5N made immediately to maintain measures as designed.All ESC measures shall be maintained tt specified in DAYS ARE the sottvo ction details on this plan.A rain gauge shall be installed at the project site for monitoring. 12. Inspection ana final acceptance letters.When the project is complete,the permineea shall cotsp000 EM[Jt m ALLOWED t ctose out the asses Plm.wtlml)E1vlllx informs the perminee otee prof oe rfto out,via iaspeaim repod, SLOPES 3:1 OR 14 DAYS 7 DAYS FOR the permintt sM1ell visit"deq.ne.govMC001"tosubmit m eleetronio Notioe oftermination(e-NOT).A$100 ok FLATTER SLOPES GREATER annual I fee will be charged until the¢NOT has been filled we \ \ THLENGTH IN VICINITY MAPgeneral permit it , ) OPEN SPACE \ (NOT TO SCALE) / �� / \\ AREA#$ I 1\ 1 \ \ ,y+, ALL OTHER AREAS 14 DAYS NONE(EXCEPT ,� /' \\ I I \\ N\\ ` FLATTER TH STHAN S4:1 FR PERIMETERS ANOD HQW ZONES) I % I m\ \ \ 1// / / J ) IITHIS PROJECT IS INA / 1 HIGH-QUALITY WATE[E ZONE 00 illillp,-- I DATE: PAGE: `"'' \ (DRAINAGE ACCESS 1 \ 1AND ALL REQUIREMEECS • v lT ( \) MAINT NANCE ` \ -EGARALL REQ SENSITIVE AREA \ \ ( — —\ \ /` EASEMENT\ ,,,\ \ WATBE FOLLO SHOULD \ .a. .c. .r °: . .a. .r .c e ...;\ \ I \\ `�a� �,yg\ \ c\ I \P✓. BE FOLLOWED ss F p9 L �� i i I r: % 1 1 70 SODDING _ 1 \ RE NF 3 4 I ✓t 1 � I i gym/ ! áii 1 ',..,.?,,,,,OUTLET �V 8 s DI:MOUE/WE SPACES PM 00 NOT OVERLAP.A 611/..E.0 ,n 1.—it, �t. � tt� LNUAOVvnY 1J LJ — J�J `: I� zG8I�4CCESS \ \ .\\ \ � I •V M eussaus mumns>eces. �HU1aY 11U NAV �HU AY `HU NAY �HU WAV —HU AV44% / TENANCE \ \ CONS \ r'— CE 64� 1 aswm / EASEMENT \ \ \ ` utnirsTeN \ (TYE)•'; 'kn 7/ BUTTING- CURB INLET Nato e \ 63 ,y�, a 1 If needed,Tree Protection Gnc ng should be Installed along the buffer zone wetland \ \ \ \ \ 's a ) / CORRECT., boundary and/or around protected trees providing a radius of.least 1 25 feet for each o q \ \ \ \ ,Ou / LEGEND inch of trunk diameter. Min \ 1 62 ClQ\ / 2 Install Silt Fence on the low elevation sides IN each lot Install Slit Fence outlets shown on ro q 400 \ \ 1 \ �s1 ��—�Y\ / DIRECTIONFLOW schematic/diagram agram and field adjusted f necessary,for placement at low points.If lots are QZj�SILT FENCE �_� cont guous and have d fferent land owners or builders each lot should have ind vidual S It ''' 1 \ 1Fences. Z0 ENTRANSILT FENCE OUTLET ® 3lnstall requred Silt Fence within l0 feet of propeaylna to ensure there's na mntl ct with I I \ !CONSTRUCTION ErvrRAN rapt c sYslem.It s the resp b'I ty f th b'Itl t th 'nstallat on of sea mint �I \ "1CURB NLET = inns%measures tlaes not' p tM1 pti y f tl p reels). a Au a t one conMraIN on E t tE r b ' nap l t- I I1 yOp ( l i �tlfl„ ��� s waem b-ns ana Diner areas a d tar n g g b-1d g te,a1 waste span beat ( A I �,\ / Sp F/v Ileast 50 feat away hour eta tl 'Its tl g d'h less t can be shown that / 47 r'r• \ '9rQ,C'�gC�c ——— tno other alternative exsts If this separation cannot be acheved these areas must be r 1' ul w.„n,e sot r^`r ^s soon`�sr„e coo s" EMOWER • contained behind Sllt Fence. \ 1 \ ��, / x '�`4 / 1• e alu. m B.Inlets downstream of disturbances should be protected;streets should be swept when , APPEARANCE OF GOOD SOD eedlmem Whin me annstmation anuYi�is present. \ 59 \ ..\NC—Environmental.peg 7.Detoilsfor Silt Fence,Silt Fence Outlets,Construction Entrances and other measures are ` 146ES \ ` I // \ • I II Iprovided on additional sheets.Erosion and sediment control details are not drawn to scale. 1TYPICAL LOT LAYOUT W ITH CURB AND GUTTER t `\ 160I \ na,m. ra• 1 1 11�4��II���OI�I�I��� i\ THIS PROJECT IS IN A HIGH-Qt�4LITY / ro°�,° WATER ZONE AND ALL REQUIREMENTS I \ �e,nr.o,a.xm„.\ I REGARDING SENSITIVE ARE n I 10J �� \ osa.ssnan. a�,a, 1 AA'''' � s°orwas-, mos°°n,„o.aas\ , WATERSHEDS SHOULD BE FOLLO IED \ I„ \ / \ \ — 11 p � N DATE: PAGE: ` OPENggPACE 42 ' GO / \ Facer Fabric \ \ AREA#1 4/ \ I ,�o'C / �ti Steel P. /RENFORCED��`n ATI — \ 8.Max Standard Strength _ aLTFENaE qD\ {�a \ 1 B^ckfll Trench CM g E�without Wire Fence wre , ' a Compost 1 �) \ Ca r T{�\ \ I O dg� / m steal cost thoroughly / / / �p`a/ 6\ / MAINTBNANCEo RLOT CONSTRUCTION a k `� / / ' �� c� rRroh«a Af ,..,-Wre tiek1624• rpdwa / 1 `' 1/ _,.e ' / DRAINAGE ACCESS ' \•. 1711104C' \\ ,�jl I / / /' ic�-- ( 9ti' . / / 8 / 1eNTRnNc \ HIS PRO ECT IS IN I HIGH-0U{{yyII``LITV // / pose q depositsuld be made immediately.. ND a — k aownaa torwamaangn I e�in / I // // MAINTENANCE II \ \II � W�4TER ZO�E ANDALSITIVEREQ RE ME E the / ` REGAFIING SENSITIVE AN I / /. Sodding-The sod should be properly maintained to Insure that Me grass take holds in.areas being secured.T.sod should.watered as necessary // I / \\ 1 �s� 'TERSHEFS SHOULD BE Fe -*WED SLF ter Fabric ( // '/ /' 1 \ `L° I I / ( apossible. .,cm na.>h. n.mca.oe p m e=,cc,. ra a «co,n,dcaaa°°,penes CROSS SECTION VIEW \ / 41111\ip \ 2 \ a' 1I I // a„ma ur cxwe=«renoc. m,.=.n,a1.,n.,.a:..: „ ,,,,--arlmpo.n.tsm=,area, IPo Iand e. me as soon as year permit the s nealed to insure P grass,affig a pen�� \ \ ) \ 1.,(4, \ / growing season permits the use of a permanent grass. n,a,.n,o., ,. aaaNae.pe ,., «.a. .a.,. a General onContr°INote Me ar.shown shall he d. /l/ \ I I Fyn• I I I \ rainfall.insure Mat Mey are operating as designed and Mat Mem w"agn,.thr,rnpenoffro placed in locations.will not interfere with home constructon activities. dpet,� Once Me house construction is completed and the lot is ready to receive sod,them Me berm shall be removed and the material incorporated into Me graded lot area ,,.e,.. ,...•mac,.,=n,as.p ,tio raou, .' piontl.ax.,rma.a n, / \ emporary-one saa¢anon Is required iuidr says sal I ems \ I \ • pedw® '''re r,a aawaa ''''.''..a.aaawn«ape / 1�nil.asopona mnamaeaarm. a.a .o..a.m,«n.n,a,p,m.mnxWna7.Eale .naamsnme:edtp amahe prom a elms pests a•e undo,tram u,... a c .°m,ms - wsMr,mw.a. \ .apedmmn=a,ocn. \ / / `o ` I ..n,nn,.mmcaaa com.a.m«seen wmp.waam,s,am11-,inn.m®nrea„wdtsa.a ' / THIS PROJEC7'IS IN A N'I 1 \ - `otror at rnoa«ptt w«,oDoes win cm.,, n J 2HIGH-QUALITY ATER ZONE Illifii, a., I I I \ I 1 particularon the lot to insure Mat Me . no / AND ALL BE UIREMENTSNo, / / \ ue uwoa wao-o N. / REGARDING SENSITIVE AREA I / 1 \ I nsw ats tares / W�1'TBE FOLLOWED SHOULD / / / ' \ I Iheight.Removed 1 �\ / / EEFOLLO SHOULD 0/ / / I \ I I 'caa"a,a.wnb'aap \NC—En�ronmenlal Jpeg \ / 1 A / ' \ \ / 'Sry/ / ' I R.am,cm six can - a SILT FENCE / pressure ro the f= p«=„a= necessary / �/ I rn,tudana. a I I / l 30 /27011pplaW .'// DATE: PAGE: \\ / / 29 ) /// / / eels _I ` FENCE J/ I //30, PAGE 1 of 2 + • III II II (III II II "l /� f // // �� LOT EROSION CONTROL PLAN • / S�tee TOTAL DISTURBED ACREAGE: 0.56 ACRES AiTXEW MUST E03kSHED I OPEN SPACE �E��/ / , '� / SoU / O E „apW FRONT VIEW �%) AREA#2 Aoop,�/o // // / sow LOTS 39, 40 & 63 ,°�' FILTER FABRIC, WINDER STATION / / / THIS PROJECT IS IN A FILTER esro o al CAND HARDWARELOTH IN TRENCH / HIGH-QUALITY WATER ZONE WASHED Gelllfe / / /// / / AND ALL REQUIREMENTS 1. / / REGARDING SENSITIVE AREA 2'FILTER FABRIC ON n/ `a/ / WATERSHEDS SHOULD FOR �mazs� 1.Hardware cloth and gravel should GROUND based on field conditions GannmDnlnvaadna,naaard�nrnn=aamrlay Me silt fence at least 12 inc., I / / /' BE FOLLOWED arRYWIREFENaEANnNARnW atnr„ '� E p.out ofq 2.Smne outlets should be letatlN°nceaweekandaeaeac inc // 1.General Erosion Control Notes DREAM FINDERS HOMES, LLC FILTER FABRIC IN TRENCH9.Keep mesh!me F Complete exquired ceeds .immediately. // / areas. IN THE CIT' OF VASS 4.Remove s.lment when half of covered. / 5. Replace stone as needed tofacliat°de-W8'er'ng / // McNEILL TOWNSHIP MOORE COUNTY, N.C. / ..\NC—Environmenfal.jpe9 BEararvalEW ( SCALE: 1"= 100' MARCH 2O23 rrrr— ^rr„, SILT FENCE OUTLET GRAPHIC SCALE IN FEET ENGINEERS 0 D —too o too 200 300 coo N PLANNERS SURVEYORS MOORMAN, KIZER & REITZEL, INC. 115 BROADFOOT AVE. FAYETTEVILLE, N.C. MOORM AN,KIZER & REITZEL,IN C. PHONE (910) 484-5191 FAX(910) 484-0388 License #: F-0106