Loading...
HomeMy WebLinkAboutNCC231396_Site Plan or Location Map_20230511 I SHEET INDEX: 1 COVER SEALED ALTA SURVEY(SHEET 1) SEALED ALTA SURVEY(SHEET 2) C 1.0-OVERALL SITE& UTILITY PLAN C 1.1 -SITE& UTILITY PLAN C 1.2-SITE& UTILITY PLAN C 1.3-SITE& UTILITY PLAN C 1.4- DEMOLITION PLAN C 1.5-OVERALL PHASE PLAN F I VEC 1.6-SITE NOTES& STORM DRAINAGE CHART R R O CK_ SUB � IVISI C2.0 GOLD OI�WIND DRIVE 10+00 TO 21+00 PLAN & PROFILE C 2.1 -GOLD WIND DRIVE 21+00 TO 30+50 PLAN& PROFILE WINSTON-SALEM, NC C 2.2-GOLD WIND DRIVE 30+50 TO 32+50 PLAN & PROFILE C 2.3-WOOD VALLEY ROAD (SOUTH) 10+00 TO 21+20 PLAN& PROFILE C 2.4-WOOD VALLEY ROAD (NORTH) 10+00 TO 21+20 PLAN & PROFILE C 2.5-WOOD VALLEY ROAD(NORTH) 18+00 TO 25+00 PLAN& PROFILE DRIARCLIFFE RD C 2.6-WOOD VALLEY ROAD (NORTH)25+00 TO 32+20 PLAN & PROFILE C 2.7- PANOLA ROAD(EAST) 10+00 TO 18+00 PLAN & PROFILE C 2.8- PANOLA ROAD (WEST)10+00 TO 18+00 PLAN& PROFILE o Lt_ TANGLE LN C 2.9-GOLD WIND DRIVE SAN. SEWER OUTFALL PLAN & PROFILE o C 2.10 WOOD VALLEY SAN. SEWER OUTFALL PLAN & PROFILE `r WITHEROW RD C 2.11 -NORTH SAN.SEWER OUTFALL PLAN & PROFILE 4y� S"'"nOyOA so C 2.12 NORTH SAN. SEWER OUTFALL PLAN& PROFILE 29a C 3.0- OVERALL INITIAL CLEARING & GRUBBING PLAN s�e9 C 3.OA OVERALL INITIAL CLEARING & GRUBBING PLAN o9l2 7 �p•4'8' C 3.1 - INITIAL CLEARING& GRUBBING PLAN e C 3.2- INITIAL CLEARING & GRUBBING PLAN SITE C 3.3-INITIAL CLEARING& GRUBBING PLAN C 3.4-INITIAL CLEARING & GRUBBING PLAN C 3.5-INITIAL CLEARING & GRUBBING PLAN 'Or" % aT ,0O C 3.6- INITIAL CLEARING & GRUBBING PLAN a3 C 3.6A- INITIAL CLEARING& GRUBBING PLAN 9 C 3.7-OVERALL INTERMEDIATE GRADING & EC PLAN 0<790 POWERS POINT CT C 3.7A-OVERALL INTERMEDIATE GRADING & EC PLAN C 3.8-INTERMEDIATE GRADING& EC PLAN C 3.9- INTERMEDIATE GRADING& EC PLAN o y� ePaaRD C 3.10-INTERMEDIATE GRADING& EC PLAN o. 9Fa �° W000 ob C 3.11 -INTERMEDIATE GRADING& EC PLAN o nAF A LrNNDEEDR C 3.12-INTERMEDIATE GRADING& EC PLAN d �.yn C 3.13-INTERMEDIATE GRADING& EC PLAN POWERS RD C 3.14- FINAL GRADING& EC PLAN C 3.15-FINAL GRADING& EC PLAN C 3.16- FINAL GRADING & EC PLAN C 3.17-FINAL GRADING& EC PLAN LOCATION MAP C 3.18 FINAL GRADING & EC PLAN SCALE: 1" = 500' E C 3.19-FINAL GRADING& EC PLAN Fr C 3.20-STOCKPILE GRADING PLAN C 3.21 -STOCKPILE GRADING PLAN SITE DEVELOPER/OWNER SURVEYOR C 3.22-WETPOND#1 ENLARGEMENT PLAN WILLIAMS LAND DEVELOPMENT, INC. REGIONAL LAND SURVEYORS, INC. m C 3.23-WETPOND#2 ENLARGEMENT PLAN C 4.0 OVERALL DRAINAGE AREA MAP MR. DIXON PITT 8624 WEST MARKET STREET, SUITE 100 C 4.1 DRAINAGE AREA MAP 331 HIGH STREET GREENSBORO, NORTH CAROLINA 27409 C 4.2- DRAINAGE AREA MAP WINSTON SALEM , NC 27101 0,T, C 4.3-DRAINAGE AREA MAP C 4.4-SKIMMER BASIN DRAINAGE AREA MAP C 4.5- PRE-DEVELOPMENT DRAINAGE AREA BASIN MAP LaBella 0C 4.6-POST-DEVELOPMENT DRAINAGE AREA MAP-WET POND 1 v,,o"°"1c Powered by partnership. ``�o�4H...A o0'L q a C 4.7- POST-DEVELOPMENT DRAINAGE AREA MAP TO WET POND 2 �&� ' 939 Burke Street, Suite H C 4.8-DRAINAGE, MAINTENANCE &ACCESS EASEMENT MAP psr a� 22052 ; Winston-Salem, NC 27101 Q E C 5.0 EROSION CONTROL DETAILS A•F22052? C 5.1 EROSION CONTROL DETAILS r0o/yl,,,, ;S7IM?,,o's C#0430 Fi g C 5.2-NCG01 GROUP STABILIZATION/SELF INSPECTION e 9 q Email: pstimpson@labellapc.com =o% REVISION NO: DATE: DESCRIPTION: oa• PROJECT NO: 2220142